HomeMy WebLinkAboutSDP202100022 Plan - Approved 2022-12-19County of Albemarle COMMUNITY DEVELOPMENT DEPARTMENT 401 McIntire Road, North Wing Charlottesville, VA 22902-4579 ��RGIPnA December 19, 2022 Rachel Moon Shimp Engineering, P.C. 912 E. High St. Charlottesville, VA 22902 rachell2shimo-enaineerine.com RE: LOR #1 for SDP202100022 Albemarle Business Campus Block 5 - Final Site Plan Dear Ms. Moon, phone:434-296-5832 www.albemarle.org This letter approves your submitted Letter of Revision for the above -referenced site plan. The letter of revision proposes the following changes as shown on the attached plan and described in the attached letter, dated 10-26-2022: 1. An amendment to the scope of phasing for the Albemarle Business Campus to allow a portion of the required pedestrian path adjacent to TMP 76-46F (as shown on the attached plan) to be constructed during the development of Block 2, instead of with Block 5, which is Phase 1 of Albemarle Business Campus. There are no other changes to the approved plan proposed. This letter is the first (151) Letter of Revision for this site. Three (3) Letters of Revision are allowed, after which all required changes must be submitted in the form of a site plan amendment. Sincerely, *4w;; - Andrew Reitelbach Senior Planner II County of Albemarle Community Development Department mreitelbach(@albemarle.org Attachments: Letter of Revision Request Site Plan Change SHIMP ENGINEERING, P.C. Design Focused Engineering October 26, 2022 County of Albemarle Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 RE: SDP2021-22 Albemarle Business Campus: Block 5 Letter of Revision #1 To Whom It May Concern, SDP2021-22 Albemarle Business Campus: Block 5 is a site development plan on tax map parcels 07600- 00-00-046AB and 07600-00-00-05400. This site plan is the first phase of the Albemarle Business Campus Neighborhood Model District, proposing the construction of a private road, Vision Lane, self -storage and smaller commercial/office uses, and a Class B Type 2 pedestrian path in the rear. This letter of revision seeks to revise the scope of phase 1 as the original phasing plan and the approved SDP2021-22 would require the construction of the pedestrian path nearly 55' beyond the end of the parking area currently proposed. At the time of adjacent block's construction (Block 2, phase 5), this parking area would be expanded; if the full extent of the pedestrian path were to be constructed in phase 1, the portion of the phase I path would essentially require reconstruction at phase 5, as the extension of the parking area would necessitate regrading and disturbance of the path area. To allow for a sensible sequencing of construction, the developer requests this revision to the scope of phase 1. Materials included in this submission are (1) full-size digital copy of the site plan sheet of the approved SDP2021-22, with phasing lines. (4) full-size hard copies may be provided, at the request of the County. If you have any questions, please do not hesitate to contact me at Rachelkshimp-en ing eering com or by phone at 434-227-5140. You can also contact Justin Shimp at Justin@shimp-engineering.com. Best regards, Rachel Moon Shimp Engineering, P.C. 912 E. High St. Charlottesville, VA 22902 1434.227.5140 1 shimp-engineering.com REVISED PHASE t UTURE DEVELOPMENT PHASE �. .;,4....._ -- I PHASE PRIVATE ROAD, , IL iY NOEo. PREV TION IS REQUIRED FOR SERVICE FUTURE LINE CC NNECTIONS!! PHASE _FRC R DEr, FOBUH+iiNG FUTURE TENANTS CAN ' ,.: d. gaILOING IF DESIRED 3 R .]>>rEJ f-!R"F W=4750z0.75=3. 565 GPM FOR. l YPF i,A GUILOING VITH 103.500 SF FLOOR AREA WITH AUTOMATIC SPRINKVPR SYSTEM. AVAILABLE AV N.+A 020 FIRE FI. OVM/.I GPM PER ACSA FLOW TESTS. 4 BUILDING FdIC IS 9T FROM THE ADJACENT FHA r 1 � FUTURE DEVELOPMENT PHASE 1 � FUTURE DEVELOPMENT PHASE ♦ 1 ♦ a .� . . r r . . . . . . . . . . . . Y r . r r ./•r - _ - ` PHASE 4 REFA IL, PORTION OF // 3� �,, _ .. r • • > +' aip !1.. _ ' - • MULTIUSE PATH �t((ll 3 - _ a w, r' s o . a t ' & OLD LYNCHBURG Submittal type rA. a:: > - ROADIMPROVEMENTS > _s Reviev:edand Approved bythe . > > Comm�ugniYl Development Department > > Date— Signature F PHASE 5 HOTEL, PORTION OF PEDESTRIAN PATH, DOG PARK, & CENTRALPARK � PHASE 3 OFFICE, ABC PARK, & PORTION OF MULTIUSE PATH P SH1M I #�c:t ALBEMARLE BUSINESS CAMPUS. BLOCK 5 SITE & UTILITY PLAN ILL 7T� C6