Loading...
HomeMy WebLinkAboutSDP202200045 Correspondence 2022-12-20608 Preston Avenue P 434.295.5624 Suite 200 IF434.295.1800 T I M M O N S GROUP Charlottesville, VA 22903 wwwAimmons.com December 20, 2022 Kevin McCollum Senior Planner County of Albemarle Community Development 401 McIntire Rd, North Wing Charlottesville, VA 22903 RE: SDP202200045 - TownePlace at Pantops — Final Site Plan SRC Review — Comment Response Letter Dear Mr. McCollum: We have reviewed your comments from July 26, 2022 and made the necessary revisions. Please find our responses to the comments below in bold lettering. Albemarle County Planning Services (Planner) — Kevin McCollum, kmccollum@albemarle.org— Required Changes: Comments to be addressed prior to final site plan approval: 1. [32.5.2(a)] Please include a reference to the Initial Site Plan Number: SDP202100097 and include a place holder for the Final Site Plan Number. The Initial Site Plan number "SDP202100097" has been referenced on Sheet C0.0. A placeholder for the Final Site Plan number has been provided on Sheet C0.0 as well. Rev. 1 : Include the final site plan application number SDP202200045. The final site plan application number SDP202200045 has been provided on the cover sheet C0.0. 2. [32.6.2(a), 32.5.2(a)] According to Albemarle County GIS the owner of the property is Pantops Hotel LLC. Please clarify this information on the plans and include a deed for reference. Correct all labels that include the owner information. Th property owner of the proposed site is Pantops Hotel, LLC. This information has been corrected on Sheet C0.0. The deed references are on sheet C2.0. Rev. 1 : Comment addressed. 3. [32.6.2(a), 32.5.2(d)] Please show and label all Steep Slopes - Managed. ENGINEERING I DESIGN I TECHNOLOGY a. Clarify the Site Data. Include Steep Slopes— Managed as an applicable Overlay District under the Zoning information. Delete the information regarding Critical Slopes. There are no Critical Slopes on the property. Critical Slopes only apply to properties outside of the Development Areas (ex. in the Rural Areas). The site information regarding critical slopes has been removed from Sheet C0.0. The managed steep slopes on -site have been outlined, shaded, and called out on sheet C2.0. Rev. 1 : Comment addressed. 4. [General Comment] Add a date of revision. A date of revision has been added the border on all applicable plan sheets. Rev. 1 : Comment addressed. Continue to update the date as revisions are made. The date of revision has been added to the border on all applicable plan sheets. 5. [General Comment] Please clarify the title. In some places it reads "Townplace" and others "Towneplace". The title has been corrected to "Towneplace" on all applicable plan sheets. Rev. 1 : Comment addressed. 6. [32.5.2 (j)(k)(I), 32.6.2(g)] Show all existing and any proposed easements. Any new easements required for water, sewer, drainage facilities, or any proposed utilities will need to be reviewed, approved, and recorded prior to final site plan approval. Please submit an easement plat application the County for review. The final site plan will need to be updated so that all easements are shown and labeled identifying easement type, whether its public or private, a width dimension, and the recorded instrument with deed book and page number. All existing easements are shown on Sheet C2.0 and C4.2. All proposed easements are shown on Sheet C4.1. An easement plat will be provided with future submission. Rev. 1 : Comment stands. All existing easements are shown on Sheets C2.0 and C4.2. All proposed easements are shown on Sheet C4.1. There is ongoing coordination to submit an easement plat. 7. [Section 32] Final site plan must comply with all applicable requirements of Section 32.6, 32.7, and 32.8 of the Zoning Ordinance prior to final approval. Acknowledged. (Rev. 1): Comment stands. It is our opinion this comment has been satisfied regarding 32.6 and 32.7. Please specify clearly with a plan specific comment should this not be agreed. Regarding 32.8 it is understood a bond is required for the WPO plan. Given there is no road plan associated with this development please clarify if in the opinion of Albemarle County there are any bonding requirements the extend beyond the WPO plan E&S/SWM bond. 8. [General Comment] This site lies in the Monticello Viewshed. Please contact Liz Russell at Irussell@monticello.orR to discuss design strategies that comply with the Voluntary Guidelines for Development within Monticello's Viewshed. Noted, there is ongoing coordination with the architect regarding this. Rev. 1 : Comment stands. An exhibit has been provided to Liz Russel for coordination regarding this comment. Response is pending and will be shared via email once received during this review cycle. 9. [32.6.2(i), 4.12.16] Many of the proposed parking spaces do not meet minimum length requirements as outlined in Section 4.12.16(c). a. [4.12.16(c)(6)] It does not appear that the parking spaces meet the criteria for a minimum length reduction as outlined in 4.12.16(c)(6) below: Minimum length reduction. Perpendicular and curvilinear parking space minimum length requirements may be reduced by not more than two feet when any of the following conditions are satisfied: (i) one or more rows of parking are separated by planting islands, median, or other such features (other than sidewalks) and allow for an unobstructed overhang, from each row, equivalent to the reduction; or (ii) one or more rows of parking adjacent to a building are separated from the building by planting islands, or other such features (other than sidewalks) and allow for an unobstructed overhang, from each row, equivalent to the reduction. For all parking spaces that are proposed 16' deep, a 2' planting strip will be placed between the parking space and adjacent sidewalk to allow unobstructed overhang, referencing section 4.12.16(c). Rev. 1 : Comment addressed. 10. [32.7.9.7(a)(3)] Please provide a construction detail in plan and profile view of the proposed dumpster enclosure. The detail should identify materials to be used, color, dimensions, etc. Please be aware that walls used for screening must be a minimum of 6' in height. A construction detail has been provided in both plan and profile view of the proposed dumpster. The proposed walls for screening have a 6' height. See sheet C1.0. Rev. 1 : Comment addressed. 11. [32.7.8 and 4.17] Lighting Plan a. Use a light loss factor of 1.0 to determine footcandles on site. LLF has been changed to 1.0. Rev. 1 : Where on the plans does it show the LLF factor? Sheet L3.0 shows the LLF factor used to determine footcandles on site. b. Please state the pole height of all outdoor luminaires. The pole height for all outdoor fixtures are 20' (included on cut sheets, 17.5' pole with 2.5' concrete base). c. [4.17.4 (b)] Please add a note that states "Each outdoor luminaire equipped with a lamp that emits 3,000 or more initial lumens shall be a full cutoff luminaire and shall be arranged or shielded to reflect light away from adjoining residential districts and adjacent roads. The spillover of lighting from luminaires onto public roads and property in residential or rural areas zoning districts shall not exceed one-half footcandle." This note has been added on sheet L3.0. d. Correct the job name at the top of the cut sheets table. The correct project has been added to the cut sheets on sheet L4.0. 12. [32.7.4.1] Please see attached Engineering Division comments. A Water Protection Ordinance (WPO) application amendment must be submitted, reviewed, and approved prior to final site plan approval. Please contact Engineering Division staff with specific questions related to WPO requirements. A WPO plan has been submitted with the Final Site Plan, and we will continue to coordinate with the Engineering Division to address comments. Rev. 1 : Comment stands. A WPO plan has been resubmitted with the Final Site Plan. 13. [32.7.2.3] Pedestrian infrastructure, designed and constructed to the standards of the Virginia Department of Transportation, must be provided along Olympia Dr. and Town and Country Lane. a. The sidewalk shall beat least 5' in width. The proposed sidewalk along Town and Country Lane and Olympia Dr. has been updated to a S' width. The existing sidewalk along Town and Country Lane and Olympia Dr. will be reconstructed to allow the construction of a retaining wall. b. As proposed the sidewalk is within the private property lines. The owner will be responsible for maintenance of the sidewalk and will also have to grant a public access easement over the sidewalk. The owner will maintain and grant a public access easement over the perimeter sidewalk along Town and Country Lane and Olympia Drive. The public access easement is shown on C4.1. Rev. 1 : Submit a public access easement and maintenance agreement to be reviewed and approved prior to final site plan approval. There is ongoing coordination to submit a public access easement and maintenance agreement for review. c. Alternatively, the developer can dedicate land to the right-of-way so that the sidewalk is within the public right of way. If the sidewalk is in the right-of-way, VDOT will maintain it and an access easement won't be required. Acknowledged. See response to 13.b. above. Final Site Plan Review Comments: 1. [32.5.2(a)] For any adjacent parcels visible on the drawings, please show the property lines and include a label stating the owner's name, TMP number, zoning districts, and present uses. Labels stating the owner's name, TMP number, zoning district, and present use have been provided for all adjacent parcels that are visible on the plans. See sheet C2.0. Please contact Kevin McCollum at the Department of Community Development at kmccollum@albemarle.org or 434.296.5832 ext. 3141 for further information. Additional Reviewer Comments: Albemarle County Engineering Services (Engineer) — John Anderson, ianderson2@albemarle.org — Requested changes Date of Comments 07-08-2022: 1. C2.0 a. Please provide deed bk. —pg. ref. for existing public drainage easement for storm conveyance leaving the Guadalajara property to the south, then transiting hotel development parcel. The deed bk. — pg. ref. for the existing public drainage easement leaving the Guadalajara property and transiting the hotel development parcel has been provided on sheet C2.0. FSP : Addressed. b. Show and label managed steep slopes. Managed steep slopes have been outlined, shaded, and called out on sheet C2.0. ESP : Addressed. c. Revise label reading 'Use: vacant, TMP 78-11' since it is a commercial car sales parking lot with non -vacant use (blue -circle area, image, below). Satellite imagery (6/1/20) The use for parcel TMP 78-11 has been updated to "commercial car sales parking." FSP : Partially addressed. As follow-up: Please ensure parcel ownership data for 78-11B1 and 78-9C displays. Image removed with FSP comments. The parcel ownership data for parcels 78-11B1 and 78-9C, along with all other adjacent parcels visible in the viewport, now display on the existing condition sheet, C2.0. d. Please consider and provide collection/conveyance (as needed) of storm runoff that may transit existing drainage ditch that crosses the hotel site, a ditch beginning near the car sales parking lot (blue arrow, below): Given the updated survey, a drainage ditch does not exist through the proposed site. See Sheet C2.0. Any off -site storm runoff that may flow from the car sales parking lot towards the site will be captured by curb and routed to an existing storm inlet east of the proposed site (detailed stormwater management plans are included with the WPO plans). FSP : Addressed. Note: WPO202200027, submitted, 07/07/2022 review pending. e. Show/label existing sidewalk adjacent to Town and Country Lane. Determine and label ex. sidewalk width. The existing sidewalk along Town and Country Lane has been labeled with widths on Sheet C2.0. FSP : Addressed. f. Plan appears to propose elimination of this sidewalk; preserve walk as a required element of public streets per subdivision street design guide, VDOT Road Design Manual, Appx. B (1) Pictometry2 satellite imagery: The sidewalk along Town and Country Lane and Olympia Dr. will be demolished and reconstructed in order to install the retaining wall as part of this project. The proposed sidewalk is shown on sheet C4.0 with a public access easement shown on C4.1. FSP : Addressed. 2. C4.0: a. Please revise label reading 'retaining wall with fall protection barrier on top for vehicles and pedestrian's to 'retaining wall with guardrail' since guardrail is appropriate for vehicles. VDOT GR-2 standard is available to include on plans. The label has been revised as requested on Sheet C4.0. VDOT GR-2 details have been added to Sheet C1.1. LEE : Addressed. b. Provide wheel stops for parking spaces fronting retaining wall. Referencing the 16' deep parking spaces facing the retaining wall north of the project site, curb is being proposed as a wheel stop so that the 2' planting strip can be utilized for the required vehicle overhang. The 16' deep parking spaces are necessary to keep a 26' drive aisle along that section of the site for fire access. FSP : Withdrawn. c. Label narrowest width of curvilinear parking spaces in sections that do not label width at narrowest dimension. The narrowest widths of curvilinear parking have been labeled. See Sheet C4.0. Minimum 9' widths are provided for all on -site parking, excluding ADA parking spaces. FSP : Addressed. d. Revise parking space -sidewalk design; select from allowable parking -sidewalk configurations at p. 17, ACDSM, which requires, for example, wheel stops for 18' L spaces w/ 5' w sidewalks (https://www.albemarle.org/Home/ShowDocument?id=270). All 18' deep parking space -sidewalk designs have been revised. Referencing page 17 of the ACDSM, sidewalks adjacent to 18' deep parking spaces without a wheel stop or 2' planting strip now have a minimum 6' width. See Sheet C4.0. FSP : Addressed. e. Identify curb type/s. All curb types have been identified on Sheet C4.0. FSP : Addressed. f. Label all sidewalk widths. All sidewalk widths have been labeled on Sheet C4.0. FSP : Addressed. g. Provide HC-parking space signs. HC-parking signs have been provided in front of all ADA spaces. See Sheet C4.0. FSP : Addressed. h. East entrance to hotel may limit fire rescue (apparatus) access to site. Engineering defers to ACFR. (FSP): N/A If ACFR requests site access to include unrestricted access around the hotel, ensure retaining wall design accommodates ACFR vehicle weight (65,000— 80,000 Ibs.), or weight of vehicle class likely to respond from ACFR Station 16, Pantops. Noted, retaining wall will be designed to accommodate the ACFR vehicle weight. FSP : Addressed. iii. If ACFR apparatus requires access around hotel, ensure retaining wall guardrail accommodates overhang portion of ACFR vehicle, from front axle to front fender. An Autoturn analysis has been performed confirming the accommodation of the ACFR vehicle. An exhibit of this analysis can be provided upon request. ESP : Addressed. iv. (Please do not assume ACFR vehicles are permitted to stage vehicles or response or presence within public RW of Town and Country Lane, or Olympia Drive.) Noted, this is not being assumed. The drive aisle is 26' on the north and south sides of the hotel to allow for vehicle staging. FSP : Addressed. Provide GR-2 with labels for retaining wall located along linear and curvilinear parking along N edge of hotel parking lot. Guardrail has been called out on top of the proposed retaining wall along Town and Country Lane and as well Olympia Drive. The guardrail and retaining wall integration will be further designed and detailed by a structural engineer for the second submission of the final site plan. A note of this has been provided with the detail on Sheet C1.1. FSP : Addressed. Increase 3' sidewalk width along Olympia Drive to meet VDOT minimum sidewalk width, 5'. [See VDOT Road Design Manual, Appx. B(1), Sec. 4.J.1.A(2)- https://www.virgin iadot.org/business/resources/LocDes/RDM/Append B1.pdf} The proposed sidewalk along Olympia Dr. has been increased to a 5' width, meeting VDOT requirements. See Sheet C4.0. FSP : Addressed. k. Provide CG-12 at E end of proposed sidewalk adjacent to Olympia Drive, W side of N entrance to hotel site. CG-12 has been provided at the eastern end of the proposed sidewalk adjacent to Olympia Drive and on the western side of the most northern entrance to the hotel site. See Sheet C4.0. FSP : Addressed. Provide GR-2 detail. VDOT GR-2 details have been added to Sheet C1.1. FSP : Addressed. m. Submit geotechnical PE -sealed retaining wall design for all wall ht. >4-ft. for Engineering review prior to FSP approval. The retaining wall design will not be submitted with this first submission of the final site plan. The retaining wall will be designed by a structural engineer and detailed for the second submission of the final site plan. We are actively working with geotechnical and structural engineers to design a retaining wall that integrates a guardrail and provides relief for the proposed outfall pipe. FSP : Persists. A PE -sealed retaining wall design has been submitted with the FSP resubmission. n. Note: All walls > 3-ft. ht. not integral to building design will require building permit from building inspections, CDD. Acknowledged, see response to comment 2.m. above. FSP : May persist. Acknowledged, see response to comment 2.m. above. 3. C5.0: a. Convert parking space with SWIM facility manway access to a parking island so that manway access is not obstructed by a parked vehicle. The UG detention system has been removed as the downstream pond was designed this site. This has been coordinated with county staff and calculations will be provided with the WPO plans. FSP : NA b. Provide drainage profiles (storm pipes, UG SWIM detention facility). Drainage profiles have been provided on Sheets C7.0 and C7.1. (FSP): Partially addressed. As follow-up: i. Please provide profile label to require 1/2 " steel plate in the floor of MH Str. Ref. VDOT Drainage Manual. P. 9-37, Sec. 9.4.8.7., Maximum grades. A profile label has been provided for the step-down manhole structure 102 to require a 1/2" steel plate in the floor. See sheet C7.0. Comment 3.b.i. also applies to any other step-down MH Str. Where difference between INV IN and INV OUT > 4-ft. A step-down structure with a %z" steel plate has been provided for all structures in which the difference between the INV IN and INV OUT is greater than 4 ft, see sheet C7.0. iii. Please provide SL-1 profile label (safety slab) for MH Str. 102, and any other MH Str. Where the difference between top of structure and INV OUT > 12-ft. A SL-1 safety slab has been provided for MH Str. 102, no other proposed storm sewer structures have a difference greater than 12' between its top and INV out, see sheet C7.0. iv. Revise depth / slope of pipe 107 so that 20' easement width for this pipe (C4.1) may be minimized to extent possible 20' easement width jeopardizes hotel foundation (strip footer) and likely conflicts with retaining wall. Amending depth / slope of pipe 107 requires adjustment to pipe 300, as well, but it appears possible to raise both pipes. (Please see ACDSM easement with diagram, below, item 3.e.) Context has been provided on the storm profiles, (see sheet C7.0), of the building footer and its load plane. The building footer's load plane projects under the proposed storm pipe (107). The horizontal distance between storm pipe 107 and the building footer is 10'. The horizontal distance between storm pipe 107 and the retaining wall is 14.5'. c. Show/label a public drainage easement extending from UG detention system (SWM easement) that is centered on the facility outfall pipe, OF, to the property boundary. As mentioned above, the UG detention system has been removed with this submission. All proposed drainage easements for the other storm structures/sewer have been provided on sheet C4.1. FSP : NA d. Provide detail for relieving arch or pipe sleeve where UG SWM facility outfall pipe, OF, is proposed to pass beneath retaining wall near Olympia Drive. Consider and discuss alternatives, or if no alternative SWIM facility outfall location exists, establish this via notes, labels, etc. The retaining wall design will not be submitted for the first submission of the final site plan. The retaining wall will be designed by a structural engineer and detailed for the second submission of the final site plan. We are actively working with geotechnical and structural engineers to design a retaining wall that integrates a guardrail and provides relief for the proposed outfall pipe. As mentioned above, the UG detention system has been removed with this submission. FSP : Persists. Details for the storm sewer pipe passing beneath the retaining wall have been provided in the retaining wall design. e. It is not possible without SWM detention profile to evaluate proposed SWM facility easement with precision. As design advances, please consult ACDSM, p.15, Easement diagram to determine required SWM facility easement width. As mentioned above, the UG detention system has been removed, and has been replaced with storm pipe for the proposed storm system. All proposed easements have been provided on sheet C4.1. FSP : Withdrawn. f. Provide VDOT LD-204 inlet computations. Provide LD-229 storm drainage design computations. All VDOT LD-204 inlet computations and VDOT LD-229 storm drainage computations will be included with the WPO resubmission. FSP : Addressed. g. Proposed retaining walls are shown within existing public drainage easement; existing storm pipes are shown crossing beneath or intersecting proposed retaining wall. Provide final site plan that indicates existing storm drainpipes are relocated to avoid any construction or future maintenance conflict with retaining walls. No permanent improvements of type proposed are allowed within public drainage easement. The existing storm pipes have been relocated to avoid any future conflicts with maintenance or construction with the proposed retaining wall. The existing public drainage easement has been abandoned. A proposed public drainage easement is provided on sheet C4.1, with no permanent improvements proposed within. See note on sheet C4.1. FSP : Addressed. h. Establish new public drainage easement centered on relocated existing storm drain lines. A new public drainage easement has been provided for the relocated existing storm pipes, shown on sheet C4.1. FSP : Persists. (Ref item 3.i.) It is understood this comment repeats 3i below with the request/intent that the proposed public drainage easements illustrated on plan sheet C4.1 shall be platted, submitted for review/approval, and recorded prior to Final Site plan approval. L Record new platted public drainage and SWM facility/access easements prior to WPO plan approval. New platted public drainage easements will be provided with future submittal. FSP : Persists. Understood the easements shall be platted, submitted for review/approval, and recorded prior to WPO plan approval. j. Note: WPO plan approval is a prerequisite to FSP approval. Acknowledged. FSP : Acknowledged. Acknowledged. k. Furnish relevant design data with WPO, including weir plate, manway, weir orifice design, debris cage, typ. Details, plan/profile, etc., as needed. All relevant stormwater information has been provided with WPO submission. FSP : May persist with WPO Plan. Acknowledged. I. Avoid nuisance ponding at all locations across parking lots / across site access. Main entrance to hotel appears somewhat susceptible to nuisance ponding / ice in winter. With the grading and site constraints, the main entrance to the hotel is lower than the entrance grading. Trench drains have been placed in front of the main entrance of the hotel, and the pavement is crested near the entrance to ensure positive drainage away from the entrance Most of this area is covered with an overhang, reducing the actual runoff to this area. Inlet sizing calculations will be provided with the WPO plans. FSP : Addressed. (Note): Calc shown on WPO plan, Sheet C6.2. m. Ensure parking lot grade near S entrance to hotel is < 5%; -5.25% impermissible. [18-4.12.15.c.] With the grading constraints of the site and access requirements, we currently have a maximum grade of 6% in the parking aisles and spaces. This is the maximum one -point slope — the slopes parallel and perpendicular to the stalls are less than 5% in each direction. FSP : Addressed. n. Ensure slope, S entrance to hotel is < 10% in every direction. [18-4.12.17.a.] The south entrance to the hotel has a maximum of 9%. Profile and cross slope labels have been provided on sheet C5.0. FSP : Addressed. o. Revise grade, S entrance to hotel such that side -slope is traversable for tall (high - clearance) trucks; side -slope is severe at this location posing risk of tipping/loss of control in wet or icy conditions. The grading in the S entrance to the hotel has been revised to reduce the severity of the cross slope to approx.. 3%. FSP : Addressed. p. Provide / label CG-6 wherever runoff concentrates against curbing; for example: loop around west end of hotel. CG-6 has been added and labeled where runoff concentrates against curbing. See Sheet C4.0. FSP : Addressed. q. Recommend Y D-inlet above/ connecting with storm pipe 6-4 at east end of hotel. A yard drain has been provided to the suggested location to avoid runoff across the proposed sidewalk, shown on sheet C5.0. FSP : Addressed. Show/label CG-12 at HC-parking spaces at front of hotel. CG-12 has been added and labeled at ADA parking spaces in front of the hotel. See Sheet C4.0. FSP : Addressed. s. Label parking lot island bullnose radii (or typ. R). All parking lot island bullnose radii have been labeled on Sheet C4.0. ESP : Addressed. t. Please ensure each building egress is ADA-compliant with respect to landing, max. grade, etc. CG-12 curb ramps have been provided and graded to meet ADA compliance. See sheet C4.0 and C5.0. A detail sheet for the curb ramp grading (currently 5 on -site) will be provided in future submissions. ESP : Addressed. u. Collect / convey retaining wall weep discharge via system to prevents water crossing sidewalk/s. Perforated pipe has been added behind the retaining wall to collect wall weep discharge and is being proposed to tie into storm pipe 101. See sheet C5.0. This specific drainage system and tie-in will be furthered designed and detailed with the retaining wall and submitted for the second submission of the final site plan. A note of this has been added to sheets C4.0 and C5.0. FSP : Addressed. v. Acquire/record off -site temporary construction easement to perform grading on TMP 07800-00-00-009CO or provide copy of written agreement to perform grading across or at edge of this parcel. Proposed site contours are infeasible without easement / Agreement from this TMP owner. Approaches for this are being coordinated and will be further discussed with the next submission. FSP : persists. Grading has been revised to illustrate how grades can comfortably tie in without crossing the property line and as such off -site easements and/or agreements are not required. See sheet C5.1. Further strict language has been added to the plans to assure the contractor will not cross the property line with installation of improvements. 4. Submit a WPO Plan for hotel development at earliest convenience. A WPO Plan has been submitted for review. FSP : Addressed. WPO202200027 S. Submit separate easement plat for public drainage and SWM facilities associated with this development. Separate plat review process must be completed, plat approved and recorded, prior to WPO plan approval. A separate easement plat will be submitted with future submission. FSP : Persists. It is understood the public drainage easements illustrated on plan sheet C4.1 shall be platted, submitted for review/approval, and recorded prior to WPO & Final Site plan approval. 6. L1.0: a. Five canopy species (landscape plants) proposed along base of+/- 4' wall have strong potential to undermine wall; revise landscape plan. These trees have been respaced along Olympia Drive to not undermine the above -mentioned wall. FSP : Addressed. b. Restore, show, label, and dimension 5' sidewalk (Min. width) along both Town and Country Lane and Olympia Drive since removing / not replacing an existing pedestrian facility within public RW is not an option. Sheet 1.1.0 has been updated to show, label, and dimension the sidewalk. FSP : Addressed. Albemarle County Architectural Review Board (ARB) — Margaret Maliszewski, mmaliszewski@albemarle.org Requested Changes: 1. The plan will be reviewed by the ARB at the August 1, 2022 meeting. Comments will be available after that. Albemarle County Building Inspections— Betty Slough, bslough@albemarle.org— Requested Changes, see below: 1. Review pending. Comments will be forwarded upon receipt. Albemarle County Information Services (E911) — Elise Kiewra, ekiewra@albemarle.org— No objection. Albemarle County Department of Fire & Rescue — Howard Lagomarsino, hlagomarsino@albemarle.org—Requested Changes, below: 1. Add note to plan indicating the FDC must be C&O thread. A note has been added to the plans indicating that the FDC must be C&O thread. See sheet C4.0. 2. During demolition and/or construction, the following fire prevention steps are required, so please note them on the plan: a. Smoking shall be prohibited in areas where smoking makes conditions such as to make smoking a hazard and these areas shall be designated with no smoking signs per Virginia Statewide Fire Prevention Code. b. Areas where smoking can occur, shall have appropriate receptacles for discarded smoking materials per Virginia Statewide Prevention Code. c. Per the Virginia Statewide Fire Prevention Fire Code, vehicular access for firefighting shall be provided at all construction and demolition sites, including access to within 100 ft. of temporary or permanent fire department connections, and have no overhead wiring or there overhead obstruction lower than 13 ft. 6 inches; this access may be via permanent or temporary road, but shall be capable of supporting Fire apparatus in all weather conditions. d. Contractor shall ensure the street numbers are always plainly visible from the frontage street during construction per the Virginia Statewide Fire Code. e. An approved water supply for firefighting operations shall be in place and available as soon as combustible materials arrive on site. f. Waste and combustible debris shall be removed from the building at the end of each day and disposed of in accordance with the Virginia Statewide Fire Code. g. Fire extinguishers shall be provided, with not less than one approved fire extinguisher at each stairwell, on all floor levels where combustible materials have accumulated, in every storage and construction shed and in areas of special; hazards, such as where flammable and combustible liquids are stored or used, in accordance with the Virginia Statewide Fire Code. h. Operations involving the use of cutting and welding shall comply with the Virginia Statewide Fire Prevention Code and shall require a permit from the Albemarle County Fire Marshal's Office. The above notes have been added under the "Albemarle County Fire and Rescue General Construction Notes" section, see sheet C1.0. Albemarle County Service Authority (ACSA) — Richard Nelson, rnelson@serviceauthority.org — Requested Changes, see below:07-05-2022 General: 1. Provide fixture counts to confirm water meter size. The total water fixture count is 585. 2. Show ACSA utilities on the grading plan. ACSA utilities are now shown on the grading plans, see sheets C5.0-05.1. Sheet C1.3: 1. To clarify; the VDOT detail for precast manholes does not match ACSA's standard manhole detail. The VDOT precast manhole details have been removed from the plans and replaced with ACSA's standard manhole details. Sheet C1.4: 1. Remove standard Manhole Drop Connection detail and replace with typical branch tie in detail. The standard manhole drop connection detail has been removed from the plans. Revisions have been made to the proposed sanitary sewer system. Structure 2 has been swapped from a manhole to a 6" cleanout, eliminating the use of a manhole with a branch tie-in. The proposed sanitary system now ties into the existing sanitary main using an internal drop connection structure (Structure 1), with a "doghouse" base structure, instead of to the existing manhole as shown on the previous FSP submission, SDP202200045. See sheet C1.2. Sheet C4.0: 1. Clarify if the intent is to utilize the existing connection for the hydrant relocation. The intent is to utilize existing FHA connection for the new FHA connection. This has been clarified on the plans, see sheet C4.0. 2. Specify the relocated hydrant is to be replaced. The existing FHA is being relocated and replaced with a new FHA, as clarified on sheets C2.1 and C4.0. 3. Relocate portion of proposed water main outside of parking spaces. The portion of the proposed water main under the parking spaces have been relocated outside of the parking spaces, see sheet C4.0. 4. Reduce proposed water main to 6-inch water after FHA, behind hotel. The proposed water main has been reduced to 6" after the FHA, behind the hotel. See sheet C4.0. S. Add a hydrant to the end of the water main, next to the meter vault. A fire hydrant has been added at the end of the water main, next to the meter vault. See sheet C4.0. 6. Reference the Large Service Line detail for how the service line, from the main, should be run to the meter vault. The large meter service line detail has been provided on the plans, see sheet C1.2. Sheet L1.0 1. Remove proposed trees from ACSA easements. Trees have been removed ACSA easements. Virginia Department ofTransoortation (VDOT)—John Wilson iohn.wilson@vdot.vireinia.eov— Requested changes, see below 07-01-2022: 1. Just to reiterate the County's' comment, VDOT will not maintain sidewalk without dedicated to right of way to County. Acknowledged. The owner will maintain and grant public access over the perimeter sidewalk along Olympia Drive and Town and Country Lane. 2. Please provide the WPO plans, for pre and post construction drainage calculations, tying into existing structures for adequacy of discharge. WPO plans have been submitted that provide pre and post construction drainage calculations for the proposed and existing storm sewer infrastructure. Rivanna Water and Sewer Authority— Dvon Veea. dveea@rinavvan.ore— Reauested Chanties. see below General Comments Not yet complete. Virginia Department of Health — Alan Mazurowski, aIan.mazurowski@vdh.virginia.gov— No objections. We have included PDF copies of the plans and calculations for your review. If you have any questions or comments, please feel free to give me a call at 434.295.5624 or email at bryan.cichocki@timmons.com . Sincerely, Bryan Cichocki, PE Project Manager