HomeMy WebLinkAboutWPO202100034 Review Comments WPO VSMP 2022-12-20�q oe atg 401 McIntire Road, North Wing
Charlottesville, VA 22902-4579
County of Albemarle Telephone:434-296-5832
m COMMUNITY DEVELOPMENT DEPARTMENT WWW.ALBEMARLE.ORG
VSMP Permit Plan Review
Project title: Victorian Heights
Project file number: WPO202100034 amendment 1
Plan preparer: Collins Engineering [scott@collins-engineering.com]
Owner or rep.: Riverbend Development [alan@riverbenddev.com]
Plan received date: 11/22/22
Date of comments: 12/20/22
Reviewer: Emily Cox
County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to
act on any VSMP permit by issuing a project approval or denial. This project is denied/approved.
The rationale is given in the comments below. The VSMP application content requirements can
be found in County Code section 17-401.
A. Stormwater Pollution Prevention Plan (SWPPP)
The SWPPP content requirements can be found in County Code section 17-405. A SWPPP
must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary.
1. Approved amendment plans will need to be inserted into the SWPPP on site.
B. Pollution Prevention Plan (PPP)
The PPP content requirements can be found in County Code section 17-404.
1. PPP for amendment was not provided.
C. Stormwater Management Plan (SWMP)
VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a
SWMP. This plan is denied, and the reasons are provided in the comments below. The
stormwater management plan content requirements can be found in County Code section 17-
403.
1. Please label the title as WPO202100034 amendment 1 on the title sheet.
2. Please provide more spot shots to show how drainage will flow into proposed inlets
behind building #2 and not flow over the retaining walls.
3. Please show the managed slopes on the grading plan so grading can be confirmed to
comply with County Code 18- 30.7.5 - Design standards.
4. Have engineered retaining wall plans been submitted? They will be required before final
site plan approval.
5. Do you have VDOT approval for structure 1 to be installed in ROW and in the sidewalk?
6. Do you have RWSA approval? Their approval is necessary for final site plan approval, but
it was understood that part of this amendment was because of their pipes. If so, please
provide their approval.
7. Revised calculations packet was not received. Please provide and ensure all applicable
calculations are provided.
Engineering Review Comments
Page 2 of 3
D. Erosion and Sediment Control Plan (ESCP)
Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP.
This plan is disapproved, and the reasons are provided in the comments below. The erosion
control plan content requirements can be found in County Code section 17-402.
1. Please update the narrative for the sequence of construction. Specify when all
traps/basins are to be installed and removed. Please note that storm pipes behind
building 3 will need to be installed with inlet protection before ST 3 is removed.
2. Ensure the outlets of all diversion dikes and pipes have outlet protection. Ensure the
outlet protection type and sizing is specified.
The VSMP permit application and all plans may be resubmitted for approval when all comments
have been satisfactorily addressed. For re -submittals please provide 2 copies of the complete
permit package with a completed application form.
Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a
meeting to discuss this review.
Process:
After approval, erosion and sediment control and stormwater management improvements must
be bonded. The bonding process begins when the plan is approved, and the applicant submits a
bond estimate request form and fee to the Department of Community Development. A plan
reviewer will prepare estimates and check parcel and easement information based on the
approved plans. The County's Management Analyst will prepare bond agreement forms, which
will need to be completed by the owner and submitted along with cash, certificates or sureties
for the amounts specified. The agreements will need to be approved and signed by the County
Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and
forms.
Stormwater Management Facilities Maintenance agreements will also need to be completed and
recorded. The County's Management Analyst or other staff will prepare the forms and check for
ownership and signature information. The completed forms will need to be submitted to the
County, who will record the agreement.
After bonding and agreements are complete, county staff enters project information in a DEQ
database for state application processing, if a DEQ permit is required. DEQ reviews the
application information based on local VSMP authority approval. At this time, the DEQ portion of
the application fees will need to be paid directly to the state. For fastest processing, this is done
electronically with the emails provided on the application. DEQ should notify applicants with
instructions on how to pay fees. When DEQ approves the application, they will issue a permit
coverage letter, which must be posted at the construction site.
Engineering Review Comments
Page 3 of 3
After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction
conference. Applicants must complete the request for a pre -construction conference form and
pay the remainder of the application fee. The form identifies the contractor and responsible land
disturber, and the fee remaining to be paid. This will be checked by county staff, and upon
approval, a pre -construction conference will be scheduled with the County inspector. At the pre -
construction conference, should everything proceed satisfactorily, a joint VSMP and grading
permit will be issued by the County so that work may begin.
County forms can be found on the county website forms center under engineering;
https://www.al bemarle.org/government/commu nity-development/apply-for/engineering-applications