Loading...
HomeMy WebLinkAboutWPO202100069 Bond Estimates 2022-12-22Project Name: VSMP Plan Scottsville Tiger Fuel Market WP02021-00069 WPO file number: WP02021-00069 TMP(s): 130A1-47B, 130A1-49 Date Estimate Completed: 07/06/2022; c64 byjL 122223 Stormwater Management Plan Bond Estimate Item Item Number z 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 zo 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 permanent diversion or ditch standard manhole frame top (not Well drop inlet or grate manhole structure (per ft. rise) pipe, rop, cmp (15 to 48") aggregate base or drainage stone trees shrubs seedlings underdrain(LF) biofilter soil mix ICY) bash rack/ anti vortex devices maintenance access road (LF) rip -rap, placed (Outfall at At into bioretention) rip -rap, placed (Outfall, bimetention to detention) rip -rap, placed (Outfall, bioretention to detention) riµrap, placed (grouted rprap spittv") survey and layout (price par 0.1 mi.) mobilization as -built drawings (per facility) materials testing (per facility) compaction testing (per dam) Survey and platting of Open Space 15.0 in 0 ES-1,2 EC-1 18.0 in 1 ES-1,2 EC-1 44.0 in 0 ES-1,2 EC-1 in 0 ES-1,2 EC-1 in 80.5 ftL Pw ewcilrm2 .nua.2s'deeperonesmeagc lal'ea omrcmmlun shcecCs No. Unit Unit Cost Cost (installed) PW ft $13.00 $0.00 0 ea $500.00 $0.00 0 ea $3,500,00 $0.00 0.01 $00.00 $0.00 0.01 $35.00 $0.00 77.0 ft $40.00 $3,580.00 0.0 ft $50.00 $0.00 100.0 ft $35.00 $3,500.00 665.0 ton $35.00 $23,275.02 12 ea $275.00 $3,300.00 25 ea $50.00 $1,250.00 0 ea $5.00 $0.00 1701 $5.00 $850.00 281 cy $45.00 $12,645.00 1 ea $1,500.00 $1,500.00 _ +ft $50.00 $0.00 depth 1.5 ft length ft width 21.0 (tons) 85.05 $60.00 $5,103.00 depth 1 ft Ave. length �ft width 44.0 (tons) 49.5 $60.00 $2,970.00 depth 1 ft length _O ft Ave. width 25.0 (tons) 54.375 $60.00 $3,262.50 depth 1 ft length _ft wdith 10.0 (tons) 28.5 $60.00 $1,710.00 acres 3.49 basins $2,245.00 $2,500.00 .ea $2000.00 $4,000.00 as $2,000.00 $4,000.00 as $3,000.00 $6,000.00 ea $2,500.00 $0.00 W 0210UM9_Sco[hville Tige, Fuel SWM Bona 070522_CMe alljel3l33l.du cost sum $81,690.52 contingency $8,169.05 Total $89,860 12/22/2022