HomeMy WebLinkAboutWPO202100069 Bond Estimates 2022-12-22 (2)Project Name: VSMP Plan Scottsville Tiger Fuel Market WP02021-00069 WPO file number: WP02021-00069 TMP(s): 130A1-47B, 130A1-49 Date Estimate Completed: 07/05/2022; cbkbyIA 122222 Erosion & Sediment Control Plan Bond Estimate Item Item Number r z 3 4 5 6 7 8 9 10 rr 12 13 14 15 16 17 18 19 20 21 zz 23 24 25 26 27 28 29 30 31 32 33 stablization (PS, TS) silt fence (SF) safety fence (SAF) diversion (DD, FD, RWD) temporary slope drain (TSD) Sediment Trap #1 earthwork for trap/basin structures for basin Sediment Trap #2 earthwork for trap/basin No. Unit 3.5 1acres 560.0 ft 560. ft 1500. ft pipe length MWf pipe diameter Mrin height of dam at toeoft ft cut at high side ft height of fill at faceft cut at face length of damft top width width of cut (area above transition 6 sf (total width of dam) 6 ft (height below transitio 2 ft (area below transition; 2 sf (total fill volume) 11.9 cy length of spillway _ft width of spillway ft riser diamein barrel length ft barrel diameter in height of dam at toe height of fill at face length of dam top width (area above transition (total width of dam) 48 sf 10ft riser diamein barrel length ft barrel diameter in height of dam at toe height of fill at face length of dam top width (area above transition (total width of dam) 48 sf 10ft height of dam at toe height of fill at face length of dam top width (area above transition (total width of dam) 48 sf 10ft ft (riser unit price) $0.00 base plate orfdn -cy (barrel unit price) $0.00 barrel collars baffle length ft cut at high side It cut at faceoft ft length of cutft width of cut (area below transiti( 132 at (total width of cut) 58 ft Unit Cost Cost (installed) $5,000.00 $17,450.00 $5.00 $2,800.00 $5.00 $2,800.00 $13.00 $19,500.00 $0.00 $0.00 $13.00 $3,081.00 $50.00 $370.00 $0.00 $200.00 $0 $0.00 $200.00 $0 $50.00 $0 12/22/2022 Project Name: VSMP Plan Scottsville Tiger Fuel Market WP02021-00069 WPO file number: WP02021-00069 TMP(s): 130A1-47B, 130A1-49 Date Estimate Completed: 07/05/2022; cbkby IA 1222222 Erosion & Sediment Control Plan Bond Estimate Item Item Number 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 structures for basin silt fence inlet protection (IP) stone inlet protection (IP) outlet protection (OP) channel (SCC, malted) check dam construction entrance (CE) wash rack paved construction entrance rip -rap, placed (height below lransitio 1 ft (depth below transit 4 ft (area below transition; 4 sf (area above lransitik 100 at (total fill volume) 211.9 cy (total cut volume) 842.1 cy length of spillway (TOAL CY estimate, 913 cy width of spillway -ft ft (spillway stone tons 7.8 tons riser height ft riser diameter in (riser unit price) $150.00 barrel length ft 151 base plate or fdn -cy barrel diameter in (barrel unit price) $35.00 barrel collars baffle length Mft length width ft length ft ILft width ft Lft depth in channel ft channel width depth ft length Jim"' ft width (tons) survey and layout (price per 0.1 mi.) acres mobilization - traps and basins - WP02021(i0069_ScoHs u Tiger Fuel ESC Bond 070522_CMars6Ja122222.Aur No. Unit Unit Cost (installed) Cost $13.00 $11,869.00 $50.00 $390.00 $200.00 $200.00 $50.00 $00.00 $2200.00 $189.00 0 $0.00 $2,500.00 $2,000.00 $3,500.00 $60.00 $1,050.00 $330 $1,995.00 $0 $0 $0.00 $1,000.00 $378.00 $0.00 $0.00 $2,500.00 $2,000.00 $0.00 $0.00 $2,745.00 $2,500.00 cost sum $72,758.00 contingency $7,275.80 Total $80,040 12/22/2022