2415 Ivy Rd Commercial Redevelopment — Pipe Inspection Summary
Date: October 25, 2022
Summary:
Roudabush Pipe Inspection Services conducted a video inspection on 10/25/22 of the storm
water pipes at 2415 Ivy Rd . This inspection was at the request of Charlotte Harper and Hunter E. Craig
Company. The purpose of this inspection was to verify proper installation and function of the installed
storm pipes to VDOT standards. The facility was inspected with a Pearpoint P350 wheeled crawler
camera with a pan/tilt/zoom Camera. Wincan pipe inspection software was used to document the
inspections and produce an inspection report of the SWM facility. The inspection standards used were
NASSCO PACP and VDOT VTM 123.
Findings:
Please find a summary of inspections on attachment A. Please contact kraineno.roudabush. com
for any questions or a link to the inspection videos.
Respectfully,
Kent C Raine
NASSCO Cart # U-0920- 703010383
Roudabush, Gale, and Associates, INC
Pipe Inspection Services
Attachment A: Pipe Inspection Report
6PROUDABUSH, GALE & ASSOC., Inc.
A PROFESSIONAL CORPORATION Serving Virginia Since 1956
2415 Ivy rd Commerical Re -Development Pipe Inspection Summary
ROUDABUSH,GALE AND ASSOCIATES
999 SECOND ST SE CHARLOTTESVILLE,VA 22902
434 977 0205
Inspector: Kent Raine NASSCO # U-0920-703010383
Date: 10-25-22
Testing methods : VTM 123, NASSCO
Test
Section #
Storm
Culvert
Structure
DIRECTION
STREET
Length
Inspected
Date
comments
Recommended Repair
Size (in)
Material
Total #
Inspections
Start
End
1
STORM
1A
Ex srRM
DOWN
PARKING LOT
132.6
25-Oct-22
OK
N/A
24
HDPE
1
2
STORM
1B
1A
DOWN
PARKING LOT
72.1
25-Oct-22
OK
N/A
24
HDPE
1
3
STORM
1B
2
UP
PARKING LOT
205.3
25-Oct-22
OK
N/A
24
HDPE
1
4
STORM
6
2
DOWN
PARKING LOT
93.2
25-Oct-22
OK
N/A
24
HDPE
1
5
STORM
8
6
DOWN
PARKING LOT
130.3
25-Oct-22
OK
N/A
24
HDPE
1
6
STORM
8
10
UP
PARKING LOT
153.7
25-Oct-22
OK
N/A
24
HDPE
1
7
STORM
8
12
UP
PARKING LOT
28
25-Oct-22
OK
N/A
24
HDPE
1
8
STORM
14
OUTFALL
DOWN
PARKING LOT
78
25-Oct-22
DEPOSITS SETTLED- OK
N/A
15
HDPE
1
9
STORM
OUTFALL
14
UP
PARKING LOT
15.7
25-Oct-22
REVERSE INSPECTION -OK
N/A
15
HDPE
1
10
STORM
16
14
DOWN
PARKING LOT
86.1
25-Oct-22
OK
N/A
15
HDPE
1
11
STORM
1B
22
UP
PARKING LOT
47.9
25-Oct-22
DEPOSITS SETTLED- OK
N/A
15
HDPE
1
12
STORM
OUTFALL
24
UP
PARKING LOT
120
25-Oct-22
OK
N/A
1 15
HDPE
1
13
STORM
26
24
DOWN
PARKING LOT
1 3.8
1 25-Oct-22
OK
N/A
1 15
1 HDPE
1 1
14
STORM
26
28
UP
PARKING LOT
1 56.1
1 25-Oct-221
DEPOSITS SETTLED- OK
N/A
1 15
1 HDPE
I 1
TOTAL: I 1222A
Deformations — Deformations are considered to be significant defects and according to ASTM are coded as failing when beyond 5% distortion.
However, several factors are considered when giving our opinion of approval or rejection. Degree of deformation, materials used (rigid or flexible)
and location of the pipe are all taken into account when determining functionality. These factors are subjectively considered when
recommending repairs.