Loading...
HomeMy WebLinkAboutWPO202200052 Plan - VSMP 2022-12-27POLLUTION PREVENTION PLAN KEY $YIAPM PLTMtt RgIELTgN RNN GE CONCRETE ® wFMENT No LEMENi WASTE $TRI4TME Q ULIIDX WING A. PavilNGnxo .ING Fill O4IEWANG ER TgXS MPTERIFL CFINERY OND $ldtPf£ ® SE DURING DURIXG RU P.m ®souownSTE DISPoSOL QSRNRMV YLPERATIDTgXS © WA41W,1 - VEUmGNT I4_ EWpIPMEM Ol WASHING O SNPPP MND3p% MITE vEo .NG NELSTCRAfE 100 0 100 200 300 BIRD STREET "02022 XX POLLUTION PRE VE1M0N PLAN NOTE: CONTRACTOR CAN RELOCATE POLLUTION PREVENTION ITEMS, BUT MUST MARK UP DRAWINGS WITH UPDATED LOCATION. LIMITS OF DISTURBANCE TO BE FIELD MARKED WITH WHITE FLAGS OR WHITE PAINT ` -J IMPORTS MUST BE NOTED IN THE SWPPP GRADING LOG. CONTRACTOR SHALL MARK LOCATION OF COVERED DUMPSTERS AND BUILDING MATERIALS (INCLUDING PAINT AND SOLVENTS) WITHIN THE LIMITS OF DISTURBANCE AS NEEDED. ALL POLLUTANTS SHALL BE PREVENTED FROM ENTERING STORM DRAINS. FUEL CONTAINMENT SIZING. ESTIMATED FUEL TANK: 200 GAL=27 CF LAY PVC IMPERMEABLE LINER ON TOP SUPPORTED BY HAY BALES TO CREATE CONTAINMENT. MAX CONTAINMENT DEPTH=1.5'. BASE FOOTPRINT: 4'x8'=32SF. AT 0.9' HEIGHT OF FUEL STORAGE, BASE STORAGE VOLUME= 29 CF. 1.1 x 10-YR RAIN DEPTH=1.1x5.6"=0.51' FINAL FUEL CONTAINMENT SIZE: 4'Wx8'Lx1.5'D