Loading...
HomeMy WebLinkAboutWPO201400035 Permit 2014-04-18 1,00, r, COMMONWEALTH of VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY Street address:629 East Main Street,Richmond,Virginia 23219 Molly Joseph Ward Mailing address:P.O.Box 1105,Richmond,Virginia 23218 David K.Paylor Secretary of Natural Resources Fax: 804-698-4019-TDD(804)698-4021 Director www.deq.virginia.gov (804)698-4020 1-800-592-5482 6/20/2014 5th Street Station LLC 5 SW Broad St Fairburn,GA 30213 RE: Construction.General Permit Coverage#VARIOE976,5th Street Station-Commercial- Charlottesville Dear Charles Lee: DEQ has received your registration statement for the proposed land-disturbing project under the General Permit for Discharges of Stormwater from Construction Activities(VAR10). The project's date of coverage is either the date of this letter or fifteen business days after the postmark date of the project's complete registration packet submittal to DEQ. By submission of the registration statement,you acknowledge that the proposed project is eligible for coverage under the General Permit and you have agreed to the conditions in the General Permit including any applicable conditions regarding Total Maximum Daily Loads and impaired waters. Please be aware that§62.1-44.15:35 of the Code of Virginia and the General Permit contain additional requirements if nonpoint nutrient offsets are chosen to meet the post-development nonpoint nutrient runoff compliance requirements. Section§62.1-44.15:35 1 requires that the permit issuing authority require that nonpoint nutrient offsets or other off-site options achieve the necessary nutrient reductions PRIOR TO THE COMMENCEMENT OF THE PERMITTEE'S LAND DISTURBING ACTIVITY. A copy of the General Permit is available on the DEQ web page at http://www.deq.virginia.gov/Portals/0/DEQ/Water/Publications/CGPvarlo.pd£ Print the VARIO permit and read it carefully as you are responsible for meeting all the permit conditions.The General Permit will expire on June 30,2014. Your project specific permit registration number is VAR1OE976. A copy of this permit coverage letter,registration statement,copy of the VARIO permit,and the project's Stormwater Pollution Prevention Plan(SWPPP)must be at the 1 construction site from the date of commencement of the construction activity to fmal stabilization. In addition,DEQ staff conduct periodic site inspections for compliance with the permit. Additional information is available on the DEQ webpage at: http://www.deq.virginia.gov/programs/water/stormwatermanaQement/vsmppermits/constructiongeneralpermit.aspx. For questions,contact the Permit Processor at(804),698-4039. Sincerely, di Frederick K.Cunningham,Director Office of Water Permits