6/20/2014
5th Street Station LLC
5 SW Broad St
Fairburn,GA 30213
RE: Construction.General Permit Coverage#VARIOE976,5th Street Station-Commercial- Charlottesville
Dear Charles Lee:
DEQ has received your registration statement for the proposed land-disturbing project under the General Permit for
Discharges of Stormwater from Construction Activities(VAR10). The project's date of coverage is either the date of this
letter or fifteen business days after the postmark date of the project's complete registration packet submittal to DEQ.
By submission of the registration statement,you acknowledge that the proposed project is eligible for coverage under the
General Permit and you have agreed to the conditions in the General Permit including any applicable conditions regarding
Total Maximum Daily Loads and impaired waters. Please be aware that§62.1-44.15:35 of the Code of Virginia and the
General Permit contain additional requirements if nonpoint nutrient offsets are chosen to meet the post-development nonpoint
nutrient runoff compliance requirements. Section§62.1-44.15:35 1 requires that the permit issuing authority require that
nonpoint nutrient offsets or other off-site options achieve the necessary nutrient reductions PRIOR TO THE
COMMENCEMENT OF THE PERMITTEE'S LAND DISTURBING ACTIVITY.
A copy of the General Permit is available on the DEQ web page at
http://www.deq.virginia.gov/Portals/0/DEQ/Water/Publications/CGPvarlo.pd£ Print the VARIO permit and read it carefully
as you are responsible for meeting all the permit conditions.The General Permit will expire on June 30,2014.
Your project specific permit registration number is VAR1OE976. A copy of this permit coverage letter,registration
statement,copy of the VARIO permit,and the project's Stormwater Pollution Prevention Plan(SWPPP)must be at the 1
construction site from the date of commencement of the construction activity to fmal stabilization. In addition,DEQ staff
conduct periodic site inspections for compliance with the permit.
Additional information is available on the DEQ webpage at:
http://www.deq.virginia.gov/programs/water/stormwatermanaQement/vsmppermits/constructiongeneralpermit.aspx. For
questions,contact the Permit Processor at(804),698-4039.