Loading...
HomeMy WebLinkAboutWPO202000030 Plan - As-built 2022-12-30GENERAL NOTES OWNER: ...._-LL ... T.:= } JPA TOWER INVESTORS LLC Vr yr rwnu new_ PO BOX 5509 e^unoF nTTCcvTI F o vw '»nfhq CHARLOTTESVILLE, VA 229052415 DEVELOPER: HUNTER E CRAIG COMPANY 1900 ARLINGTON BOULEVARD CHARLOTTESVILLE,VA 22903 (434)974-4500 ENGINEER: COLLINS ENGINEERING 200 GARRETT ST, SUITE K CHARLOTTESVILLE,VA 22902 (434)293-3719 TAX MAP NO.: 06000-00-00-025AO -e C® - DB.5268, PG.449 (INST.#:202000000739) TOTAL PROJECT AREA: 3.89 ACRES TOTAL NOTE: A BLA IS BEING PROPOSED WITH THIS SITE PLAN TO RELOCATE THE PROPERTY LINE THAT CURRENTLY PASSES THROUGH ONE OF THE EXISTING BUILDINGS. THE NEW PROPERTY LINE WILL BE LOCATED JUST TO THE WEST OF THE BELL -AIR MARKET BUILDING, AS SHOWN ON THIS PLAN. THE PROPOSED BLA WILL ADD AN ADDITIONAL 0.91 ACRES FROM TMP 60-25B TO THE PROPERTY (TMP 60-25A), WHEN COMPLETE. NO IMPROVEMENTS ARE PROPOSED WITHIN THIS 0.91 ACRES. THE PROPERTY LINE ADJUSTMENT (AS REQUESTED BY STAFF) IS THE ONLY MODIFICATION ASSOCIATED WITH THIS AREA. NEW TOTAL PROJECT AREA (AFTER BLA): 4.80 ACRES ZONING: C-1 COMMERCIAL ZONING. THE PROPERTY IS ALSO SUBJECT TO THE AIRPORT IMPACT AREA (AIA), ENTRANCE CORRIDOR (ARB), AND STEEP SLOPES OVERLAY DISTRICTS AS DESCRIBED IN SECTION 30 OF THE ZONING ORDINANCE. THIS PARCEL IS ALSO SUBJECT TO THE ACTION OF A SPECIAL USE PERMIT GRANTED IN 2004 WITH SP2004-00021 FOR A BALLET SCHOOL. TOPO & SURVEY: SURVEY PROVIDED BY ROGER W. RAY & ASSOCIATES IN AUGUST 2019. TOPOGRAPHY IS FIELD SURVEY PERFORMED BY ROGER W. RAY & ASSOCIATES. TOPO FIELD VERIFIED BY COLLINS ENGINEERING IN SEPTEMBER, 2019. DATUM: NAD83, NAVD 88 EXISTING CONDITIONS: RELATIVELY FLAT DEVELOPED SITE WITH (2) EXISTING COMMERCIAL BUILDING, PARKING, AND OUTSIDE GRAVEL STORAGE AREA. THE COMMERCIAL BUILDING PROPOSED TO BE RENOVATED FOR A CHANGE IN USE IS 28,960 SF AND THE EXISTING COMMERCIAL BUILDING THAT SHALL REMAIN (WITH NO IMPROVEMENTS OF CHANGES TO THE CURRENT USE) IS 17,425 SF. PROPOSED: THE EXISTING COMMERCIAL RETAIL BUILDING WILL BE RENOVATED FOR THE FOLLOWING USES: 2,500 SF RESTAURANT 5,000 SF COMMERCIAL RETAIL 18,180 SF COMMERCIAL OFFICE/COMMERCIAL RETAIL 3,280 SF MANUFACTURING/PROCESSING/ASSEMBLY/FABRICATION TOTAL SQUARE FOOTAGE: 28,960 SF EXISTING BUILDING TO REMAIN WITH CURRENT USES: 2,465 SF MEDICAL OFFICE 6,800 SF BALLET SCHOOL 8,160 SF COMMERCIAL OFFICE TOTAL SQUARE FOOTAGE: 17,425 SF WATER SUPPLY PROTECTION AREA: N/A WATERSHED / WATER RESOURCE AREA: RIVANNA RIVER DRAINAGE BASIN ALLOWABLE DENSITY: N/A PROPOSED DENSITY: N/A GREENWAY DEDICATION: N/A - EXISTING PAVED PATHWAY ON THE PROPERTY TO REMAIN BUILDING HEIGHTS: EXISTING (1) STORY BUILDING TO REMAIN. MAXIMUM BUILDING HEIGHTS SHALL NOT EXCEED 65 FEET. NOTE: HEIGHT OF BUILDING OVER 40 FEET OR 3 STORIES SHALL PROVIDE A STEPBACK PER SECTION 4.20. EXISTING BUILDING HEIGHT = 18' SETBACKS: FRONT SETBACK: 10' BLDG. MINIMUM FROM R/W OR EXTERIOR EDGE OF SIDEWALK IF SIDEWALK IS OUTSIDE R/W. 30' BLDG. MAXIMUM FROM R/W OR EXTERIOR EDGE OF SIDEWALK IF SIDEWALK IS OUTSIDE R/W. 10' MINIMUM FOR OFF-STREET PARKING OR LOADING SPACES FROM ANY PUBLIC STREET R/W. SIDE & REAR SETBACK: MINIMUM: IF THE ABUTTING LOT IS ZONED RESIDENTIAL, RURAL AREAS, OR THE MONTICELLO HISTORIC DISTRICT: I NO PORTION OF ANY STRUCTURE EXCLUDING SIGNS SHALL BE LOCATED CLOSER THAN 50 FEET FROM THE DISTRICT BOUNDARY; AND (II) NO OFF-STREET PARKING OR LOADING SPACE SHALL BE LOCATED CLOSER THAN 20 FEET TO THE DISTRICT BOUNDARY. IF THE ABUTTING LOT IS ZONED COMMERCIAL OR INDUSTRIAL ANY PRIMARY STRUCTURE SHALL BE CONSTRUCTED AND SEPARATED IN ACCORDANCE WITH THE CURRENT EDITION OF THE BUILDING CODE. MAXIMUM: NONE STEPBACKS: FRONT - FOR EACH STORY THAT BEGINS ABOVE 40 FEET IN HEIGHT OR FOR EACH STORY ABOVE THE THIRD STORY, WHICHEVER IS LESS, THE MINIMUM STEPBACK SHALL BE 15 FEET. SIDE & REAR: NONE PRIVATE TRAVELWAYS: CURB & GUTTER TRAVEL WAYS UTILITIES (WATER AND SEWER): COUNTY PUBLIC WATER AND SANITARY SEWER AGRICULTURAL/ FORESTAL DISTRICT: NONE EXISTING VEGETATION: TREES ALONG THE WESTERN PROPERTY LINE AND (3) LARGE TREES ALONG THE SOUTHERN BOUNDARY. ADDITIONAL LANDSCAPING AND VEGETATION ALONG THE NORTHERN PROPERTY LINE. LIGHTING: EXISTING LIGHT POLES AND BUILDING LIGHTING SHALL REMAIN AS IS. NO ADDITIONAL LIGHTING IS PROPOSED WITH THE SITE PLAN AMENDMENT. ANY PROPOSED LIGHTING MUST COMPLY WITH REQUIREMENTS OF SECTION 32.7.8 & SECTION 4.17 OF THE ZONING ORDINANCE. IVY ROAD COMMERCIAL REDEVELOPMENT PLAN wheeler Really VSMP ASBUILT PLAN sga Sda iYg SAMUEL MILLER MAGISTERIAL DISTRICT Is Clubo ALBEMARLE COUNTY, VIRGINIA SHEET LAYOUT - SCALE: 1" = 60' R-2962.75 L-206 \\ =206.83 4 z� \ P v \ \ \ s\ \\ /A F \ T.M.P 6C-25 ROSSER ASSOCIATES D.B. 1083-50 D.B. 535-3C8 PLAT ZONING: HC 'HIGHWAY COMM[ USE: COMMERCIAL OFF1G o + d Pf A \\ �\ \ y \ \ \ EXISTING O .FEN;1 zJ� IGAS 5TATIONI CONVENIENCE STORE -1 3 � I1 - k I - I - P I 1 I, a - F _-_______ \ �� - -- - °R/ \A -- rN POLE - 5' t _ - - - - F}3873 _ --- - - =s EE DER L�5 & - - _ .= D 35 ------ _ WATER sb _ __ S 435 ------------ ---- ------------ ` --- ____ -------- ---- - -----� _ -- _ ---- T. M"P 76C-A-01 BE RANG KATHI -378 __-----�'-- 1-CANTERBURY LLC a 8 \ R - D.B. 4648, PG380 i II J B. 1 -1 ES DEN i I .ZONING: R-1 RESIDENTIAL - ZONING R-1_RESIDENTIAL USE: SINGLE FAMILY DETACHED LOT USE SINCE FAMILY DETACHED- LOT .MP, 60-24A OF VIRGINIA FOUNDA 1. 5184, PG.139 ZONING: RA RURAL/RESIDENCE 240 'ice PROPOSED3.280sF OF MANUFACTURING) PROCES51NGl ASSEMeLYt& f FABRICATION - PROPOSED rI IF COW MERCIAL OFFICEIRETAIL RROPoseps.aoo s= PRoeoseD a,Soo sF COMMERCIAL RETAIL RESTAURANT ' LANDSCAPING: A LANDSCAPING PLAN IS PROVIDED WITH THE FINAL SITE PLAN IN ACCORDANCE WITH ALBEMARLE RETAINING WALLS: NO RETAINING WALLS ARE PROPOSED WITH THIS PLAN. A STONE WALL, FOR COUNTY ORDINANCE SECTION 32.7.9, SEE SHEET 5. STREET TREES SHALL ALSO BE INCLUDED WITH THE SCREENING PURPOSES ONLY, IS PROPOSED ALONG IVY ROAD ADJACENT TO THE LANDSCAPING DESIGN TO INCORPORATE STREET TREES EVERY 40' ALONG THE ROADWAYS. PROPOSED PARKING LOT. TRASH RECEPTACLES: A PROPOSED TRASH DUMPSTER IS PROPOSED ON -SITE FOR TRASH SERVICE FOR THE BUILDING. RECREATION: N/A PHASING: THIS SITE SHALL BE DEVELOPED IN ONE PHASE. CRITICAL SLOPES: MANAGED STEEP SLOPES ARE EXISTING ON SITE AS SHOWN ON THE PLAN. NO IMPACTS TO MANAGED SLOPES ARE CURRENTLY PROPOSED WITH THE DEVELOPMENT. PARKING REQUIRED: RESTAURANT: 2,500 SF x 13 SPACES/1000 SF = 33 SPACES RETAIL: 5,000 SF x 800/b x 1 SPACE/100 SF = 40 SPACES BURIAL SITES: NO CEMETERIES WERE FOUND DURING FIELD INVESTIGATION OF THE SITE. COMMERCIAL OFFICE/RETAIL: 28,805 SF x 80% x 1 SPACE/200 SF = 115 SPACES BALLET SCHOOL: 8 PARKING SPACES LAND AREA: (TMP-6025A WITH PROPOSED BLA ADJUSTMENT) - TOTAL ACREAGE (4.80 ACRES) MANUFACTURING/PROCESSING/ASSEMBLY/FABRICATION: EXISTING BUILDINGS: 46,385 SF - 1.06 AC. (22.2%) 1 SPACE/EMPLOYEE ON THE LARGEST SHIFT (7 EMPLOYEES) = 7 SPACES PROPOSED PAVED PARKING AND TRAVELWAYS: 48,753 SF - 1.12 AC. (23.3%) 1 SPACE/500 SF OPEN TO PUBLIC (500 SF) = 1 SPACE (2 SPACES MIN. FOR CUSTOMER PARKING) SIDEWALKS: 5,013 SF - 0.12 ACRES (2.5%) GAS STATION/RETAIL (TMP60-25B): 2,350 SF x 80% x 1 SPACE/100 SF = 19 SPACES EXISTING PARKING AREA/GRAVEL STORAGE: 46,450 SF - 1.06 ACRES (22.1%) TOTAL PARKING REQUIRED: 224 SPACES REQUIRED OPEN AREA / LANDSCAPING AREA 62,487 SF - 1.43 ACRES (29.9%) PARKING PROVIDED: TOTAL PARKING SPACES PROVIDED = 224 SPACES (96 EXISTING PARKING SPACES AND 128 PROPOSED PARKING SPACES - 22 PAVERS, 99 NEW ASPHALT, 7 NEW STRIPED ON EX ASPHALT) IMPERVIOUS AREAS: 146,601 SF (3.37 AC) TOTAL NOTE: THERE WILL BE A PARKING EASEMENT ON THE TMP60-25B PARCEL FOR THE EXISTING 15 PARKING SPACES BEHIND THE RETAIL STORE. PAVED PARKING AND CIRCULATION AREA: 100,216 SF 0 EX15TING MEDICAL OFFICE SPACE (z.465 ED I I -- TO IF IT 11111 1Irc NIT COJNTrWJARD VERAL PARFING pr �V\Iln ERISTING BALLyT SCHOOL (6, uSF) E OO EXISTING OFFICE SPACE a 16o SF STREAM BUFFERS/FLOODPLAIN: NO STREAM BUFFERS ARE LOCATED ON THE PROPERTY IN ACCORDANCE WITH THE ALBEMARLE COUNTY WATER PROTECTION ORDINANCE. THE PROPERTY ALSO DOES NOT LIE WITHIN THE LIMITS OF A 100-YEAR FLOODPLAIN, PER FEMA MAP NUMBER 51003CO267D ADOPTED FEBRUARY 4, 2005. NO IMPACTS ARE PROPOSED FOR ANY STREAM BUFFERS OR 100 YEAR FLOODPLAIN LIMITS WITH THE REDEVELOPMENT OF THE PROPERTY. THE PROPERTY IS NOT LOCATED WITHIN A STATE DAM INUNDATION ZONE OR FEDERAL DAM INUNDATION ZONE. T:--1 STORMWATER MANAGEMENT: 2.86 ACRES DISTURBED. THE SITE DECREASES IMPERVIOUS AREA WITHIN THE DISTURBED ACREAGE. THE POST -DEVELOPMENT TP LOAD REDUCTION FOR THE SITE IS 0.86 LB/YEAR. STORMWATER MANAGEMENT FOR THE PROPOSED IMPROVEMENTS ON THE SITE AND WATER QUANTITY REDUCTION SHALL BE ACCOMMODATED WITH ONSITE FACILITIES. THESE FACILITIES, SHALL INCLUDE PERVIOUS PAVERS AND A LANDSCAPED GRASS DRY DETENTION AREA WITH PRETREATMENT CELLS. ADDITIONAL WATER QUALITY NUTRIENT CREDITS SHALL BE UTILIZED TO ACHIEVE THE NECESSARY REMOVAL RATES FOR THE DEVELOPMENT. THE FINAL WPO AND VSMP PLAN SHALI APPROVED PRIOR TO LAND DISTURBING OPERATIONS AND PRIOR TO FINAL SITE PLAN APPROVAL. NOTE: ALL ROOF DRAINS SHALL DISCHARGE IN A MANNER NOT TO CAUSE A PUBLIC NUISANCE AND NOT OVER SIDEWALKS. 0 Np SL Anne's-BelfieldQ School Belfleltl Campus fM QNRAO Central n Development Laboretary f.4n wme.c, d 5 5 Fs 0 Atlantic Research Group 0 SUBJECT AREA PeAia Univer of Char QQ k Q The Market at Bellalr QDrug Leffler -Slot, Farm leulcnner Construction Co., loc ® O Q ool"' Priming & Copying Services s Dniveoty of Virginia Polite Department Q Teague Fun VICINITY MAP SCALE: 1" = 1000' LEGEND ROADS I EXISTING CULVERT 0 DROP INLET & STRUCTURE NO. CURB CURB & GUTTER PROPOSED ASPHALT PROPOSED CONCRETE PROPOSED PAVER (IMPERVIOUS) BENCH MARK T VDOT STANDARD STOP SIGN 200 EXISTING CONTOUR SHEET INDEX SHEET COVER SHEET nil\ r/ln i1L16I�'1 v\TC-prTOlY`i 1 ..� �i CT4�� Lr\VJIVIV &:=!l -IL Y C-31NTR3L r' L f\V JIVIV Ul JLVlI'I LIY I 23N7\3L STORMWATER MANAGEMENT PLAN 8 STORMWATER MANAGEMENT DETAILS 9A STORMWATER MANAGEMENT DETAILS 9 PROFILES 10 TOTAL SHEETS -44- 5 NOTES: CONTRACTOR SHALL VERIFY LOCATION AND ELEVATION OF ALL UNDERGROUND UTILITIES SHOWN ON PLANS IN AREAS OF CONSTRUCTION PRIOR TO STARTING WORK. CONTACT ENGINEER IMMEDIATELY IF LOCATION OR ELEVATION IS DIFFERENT FROM THAT SHOWN ON THE PLANS, IF THERE APPEARS TO BE A CONFLICT, AND UPON DISCOVERY OF ANY UTILITY NOT SHOWN ON THE PLANS. THE CONTRACTOR MUST LOCATE ALL SURFACE AND SUB -SURFACE UTILITIES PRIOR TO ANY WORK ONSITE. ANY SIDEWALK AND/OR CURB DAMAGE IDENTIFIED IN THE SITE VICINITY DUE TO PROJECT CONSTRUCTION ACTIVITIES AS DETERMINED BY THE VDOT INSPECTOR SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE. SIDEWALK WILL BE REPLACED AT THE DIRECTION OF THE VDOT INSPECTOR. ANY EXISTING SIDEWALK THAT IS CURRENTLY DAMAGED AND IN NEED OF REPAIR OR NOT IN COMPLIANCE WITH CURRENT STANDARDS SHOULD BE REPLACED AS PART OF THIS PROJECT AS WELL. IN ADDITION, ANY EXISTING CG-12S ALONG THE PERIMETER OF THE SITE SHOULD BE UPGRADED TO MEET CURRENT STANDARD IF NEEDED. ALL SIGNING AND PAVEMENT MARKINGS SHALL BE CONSISTENT WITH THE MUTCD. ADDITIONAL NOTES: 1. ALL GRASS AND LANDSCAPING AREAS SHALL BE PRIVATELY OWNED AND MAINTAINED. 2. THE STREETS IN THE DEVELOPMENT SHALL BE PRIVATE TRAVELWAY AND TRAVELWAYS AND WILL NOT MEET THE STANDARDS FOR ACCEPTANCE INTO THE SECONDARY SYSTEM OF STATE HIGHWAYS AND WILL NOT BE MAINTAINED BY THE VIRGINIA DEPARTMENT OF TRANSPORTATION OR THE COUNTY OF ALBEMARLE. 3. THE PROPOSED DEVELOPMENT SHALL BE SERVED BY PUBLIC WATER AND SEWER. ASBUILT STORMWATER MANAGEMENT NOTES: 1. THE VARIABLE WIDTH PUBLIC FACILITY, ACCESS, & DRAINAGE EASEMENTS HAVE BEEN RECORDED WITHIN DB.5504, PG. 281-297. THE EASEMENTS ARE SHOWN AND LABELED ON SHEET 9A. 2. THE COORDINATES FOR THE NORTHERN PRE-TREATMENT CELL ARE: IN: 5314.8088; E: 5017.1779 3. THE COORDINATES FOR THE SOUTHERN PRE-TREATMENT CELL ARE: IN: 5170.4056; E: 5018.9404 4. THE COORDINATES FOR THE DETENTION BASIN ARE: IN: 5397.0704; E: 5077.6391 S. THE COORDINATES FOR THE PERVIOUS PAVERS ARE: IN: 4991.8475; E: 5064.8556 SCOTTIR. CLTLLIN: Lie. No. 035791 P 12/12/22 �5'IOAreT. C�G� n I]1 rI N L � � i W W F z0Ln 0 o z J g Z GO L U) a W I u � w w O a I GO w Z W 0 fnoow>` U) J O Q � � J L u !n ~ ~ GO L Q LR) i U) U) W ce 0r 0 L N Go00 Q 0 ICY) ti Z M /�rj M I --I ZD �m V^ CNN} V � Q C) W N N W > z_ J z W _ U LU O / LU Uj LU zo U cn LU WW Y J w Q O III U Ul U) F_: LU w Zw O _ J~ LU O J O IN Lr) w U J _J E- 0 w w a V) JOB NO. 192171 SCALE 111=60' SHEET NO. 1 \ \ \ \ Pre -Development Impervious Areas- Water Quality \ A � � PRE,-ReDEVELOPMENT A POSIT-ReDEVELOPMENT SCALE 1"=100' " (Defined by the Limits of Disturbance) \ \ \ \ / / / \ < Post -Development Impervious Areas- Water Quality �,TH OF \ V / / < \ SCALE 1"=100' / i Existing Dirt Parking 1,636 sf \ \ ` \ \ / I \ 1 \ ` \ � � - _ (Defined by the Limits of Disturbance) � Existing Gravel Parking 43,277 sf v vv� \ V A v v - / - Proposed Asphalt Parking & Circulation 63,484 sf O �CI Existing Concrete Parking 2,920sf V \ \\ A A \ / Proposed Concrete Loading Area 2,900sf �' _ _SCOTT R. LLINSZ Existing Asphalt Parking 23,224 sf / / \ \ \ \ \ \ U Lic. No. 035791 a Existing Sidewalk 2,008sf / Av \ \ \ \\ ASBUIL-�RAINAQ� MAP Proposed Concrete Sidewalk 5,936sf 7i + \ Public Road 6,823 sf Public Road 7,549 sf / A A ' v A / v v 79,143 sf O� 12 12 22 80,614sf it l --/ A\ �v A \ i� `� / A \\ �`S'S �GZ , � _ V v / � / � v ,. A 'I A � - - - / � _ V v ZONAL E _Overall Net Change in Impervious Area -1,471 sf �4 (Within the Proposed Limits of Disturbance) ----_- o ry ry 1 ­1 r1i -PROPOSED ER1 V\ A A OFF THfCBYPA SES OFFSITE T-i v� V A /1- V i vv ♦ / A \ v v1 V 1- ♦ \ LU LU Uz ¢ ¢ { o J o o g z= v- \ v F a m m ONSITE SUBAREAS USED \ I \ \ \ \ \ \ I \ _ , _ ONSITE SUBAREAS USED \ (� a Z Z <L a / v - ^,� A V A _ A A V A r/ V � A 1 / v V _ _ � � FQILCHANNEL ANB - v - � V � v 1 ( � v � V d � , _ A "�F9.ILCHANI��L,AND � � - v U � w w O o_ FLOOD PROTECTION \ - A V A v _ _ v V A V A v \ \ \ \ \ \ I _ \t \ \ \ Z W > \ \ FLOOD PROTECTION � � g g uJ � \ \\ -ANALYSIS, TYP. i \ EJ( NG RT \ V A ( �"v J PJC NG V.€RT \ Z _1 L J ( �sTiNG / v v \ v I � v .nLYs1s_ 'V I v v \ v u u w r l IMPERVIOUS ) V v \� v \ o } � t L CON FF - V I \ V A A / CON l FF -v - \ Z Z CO \ C \ \� \ VI- \ / RUNOF �TH Y -S \ \ ) r - \ \` `\ �� RUNOF H Y ES \ \ \ U1 Z Z Q OF OUTT T BO ` "`'� ,- TRA LWAY F 17E I2 OF O1JT T O \ ` �. /�r \\ ONSITE UBARE & \ Z \ \ \ _ w O O (D Q \ C) \ \ \\ ,� \ ONSITE UBARE & \ \ \ - - \ I \ \ \ - V , U U \ TH R S � I � _ PROPOSED T B �\ \ - - \ ce ce U0 OP9,SED u TS OF DISTU NC 2.86ac. \ \ \ I VIA STOR / E SD 2 - - '� OP9,SED LIMITS OF DI STU NC 2.86ac. a n I ,:- \ USED\FOR WATT R UALITY ANA ),\ - --- _ \ / • \ FOR SUBAR A I TI O \ •"... N \ \ \ ) \ _ - / �✓ A SI=WER-60M T �� _ v Q v - - _ �✓ A SEWER-COM T T �� -� v v USED FVOR WATER QUALITY ANA v Av v v w w i t STING A\ A ....,� �.v A V A V A -__ J > > V A e^ \ v A � \ \ V I 101 OF OLF w/ A ELEV.=6' 100' OF OLF w/ A ELEV.=6 �,� f• - l ?.: �""°', . \ \ \\\ 2. \ _ \ ro� �„ v v A .t♦� 10' OF CONC. FLOW w/ A ELEV.=1' 10' OF CONC. FLOW w/ A ELEV.=1'. > 'OUTFAL, Afl v v v �x i v v i I - OUTFACE A' v i v v 265' OF CHNL FLOW ®5f ft/s � 1 / 340' OF CHNLr' \ I I \ • II/ J - - Y \i� \ `� ��`� R-. i• Y +Lp � � s'\\ ----/' I \ \ \ --- 9 EXISTING � A � � I � I - � -- : EXISTING i A v it DEVELOPMENT __ - - - � \ .� � / I ( � 1 i I � � \ -) ■ � \ \\ 8$ � � � III DEVELOPMENTTO REMAIN A\ it �� ���\T= Shr. A �' _ � - - L I TO REMAIN v A 4711 D CHANGES TO ROPOSED ACHANGESTO NTOEROIO HPBUPLDSIENG FOOTPRINT' v / / / l 1 TWO PRE-TREATMENT CELLS ARE t THE BUILDING FOOTPRINT o r I \ V ' �' �� �� r INTERCONNECTED HYDRAULICALLY WITH STING . _ _POINT OF WATER QUANTITY ANALYSIS. / / ,` �� THE PROPOSED DRY DETENTION BASIN • . POINT OF WATER QUANTITY ANALYSIS. _? THE PROPOSED DEVELOPMENT's - v i / / VIA THE DRAINAGE PIPES. FACILITY - - °" THE PROPOSED DEVELOPMENT's v 'E SUBAREAS ULTIMATELY DRAIN TO THIS / / / _ RELEASES RUNOFF TO OUTFALL'A'. ( �� _ I SUBAREAS ULTIMATELY DRAIN TO THIS z = PROPOSXISTENG PIPE VIA A D & EXISTING STEM OGE PIPES. - - �� �` ( �\ - EXISTING PIPE VIA A SYSTEM OF o - _ I PROPOSED & EXISTING DRAINAGE PIPES. / s A i "':� UTFALL B •• ONSITED � .i � ®�. � -. . - //�- / 93� r� ��� ��� _ '=ul �� �. � _ -- � � 0.58 avert -:'� I " r.- - - / ) i i - ��V� / / i /� _ 4 !_ _ ai - �i / � \ \ / j/ � / ✓yam �'�� E,y _� � ._ � � �� � / � --_�/�--1�..�-� c _ _ � - � H1 IVY RpAD.. - - --- _ _ - i �- RQAD. / - - - 7 - - - - 100' OF OLF w� A ELEV.-6' �- �- j - - - - - I N �° _ \ \ - - - - - 100' OF OLF w/ A ELEV. / - - \ _ _ _ - MM - _ - - - - - \ - Pre -Development Impervous Area Summary - - - - - - - - _ 18' OF CONC. FLOW w A ELEV.=6' - _ - - - - - W ° 210' OF CONC. FLOW w/ A ELEV.-12' - / _ ,_ - \ __ _ t ------------ --_ __���-��/I �\ -� \- \ ----- --_ _=_ _ \- 0 OF CHNL ----- - _ / / Onsite DA A Impervous Area Summary / 20 ' FLOW ®St ft/s ONSITE DAB / / \ i \ CY) i ) 3 Onsite Dirt Parking 1,500 sf \ _ - - - _- -- - cN=88 / Post -Development Im ervous Area Summary g I / Onsite DA A mpervous Area Summary Onsite Gravel Parkin 40,825 sf � \ Tc=O.15Kr. Onsite Concrete 500 sf v - - / a Onsite Asphalt 5,425 sf / v - / PropOnsite Building 13,0 sf o / / / \ \ - , \ Proposed Pavement 3565 0 sf \ \ \ - - - Onsite Building 13,900 sf / - / / \ - - - Proposed Concrete 2775 sf W N - , - WATERSHED SUMMARY , - , - Offsite Impervious Areas 11,750 sf / \ \ \ - - - - WATERSHED SUMMARY Offsite Impervious Areas 11,750 sf N 0 J / \ CN Area, 1-year Flow, 2-year Flow, 10-year Flow, 73,900 sf _ - \ \ _ _ Area, 1-year Flow, 2-year Flow, 10-year Flow, 64,075 sf z - \ - ac. cfs cfs cfs Onsite DA A Im ervous Area Summary - / CN ; 1 Q - P ry / ` - ac. cfs cfs cfs Onsite DA B Impervous Area Summary Onsite DAA (Pre-DeV.) 87 3.09 8.67 11.41 19.95 Onsite Concrete 1,100 sf - - \ - - Onsite DAA (Post-Dev.) 88 3.09 5.40 8.44 15.03 Proposed Concrete Sidewalk (incl. Pavers) 6,398 sf ° Onsite DA B (Pre-Dev.) 81 0.58 1.22 1.68 3.17 Onsite Dirt Parking 136 sf J / - Onsite DA B (Post-Dev.) 88 0.58 1.72 2.24 3.87 Proposed Asphalt 5,230 sf W z o 86 3.67 9.89 13.09 23.12 1,236 sf / / - _ - - 88 3.67 7.12 10.68 18.90 11,628 sf J W COUNTY OF ALBEMARLE Department of Community Development ,.f Construction Record Drawings (As -built) for VSMP W W The following is a list of information required on construction record drawings s for S 9 g stormwater facilities (reference Water Protection Ordinance 17-422). /t is preferable that the construction record drawing be prepared by someone other than the designer. Please do not provide design drawings as construction record drawings. A. A signed and dated professional seal of the preparing engineer or surveyor. B. The name and address of the firm and individual preparing e drawings the dns on the title sheet. C. The constructed location of all items associated with each facility, and the inspection records to verify proper dimensions, materials and installation. The items include, but are not limited to the following: I. Inspection Records and photographs for pipe trenches and bedding, including underdrains. Video Pie ion for s which no accessible o viewable. 2. p Inspect r any pipe Ich are t acce le r tewa le. 3. Updated Location with geo-coordinates of all facilities. 4. Verified Drainage Area ma s for the drains area treated and for drainage to the facilities. g P 8e g 5. Current physical and topographic survey for all earthen structures. Ponds should include a survey of the pond bottom. Surveys should verify pond volumes ate per design. Corrections may be required for alterations from the design. 6. Plants, location and type. 7. Plans and profiles for all culverts, Pipes, Risers, Weirs and Drainage Structures - Display the installed type of drainage structures, culvert/pipe size, weirs, materials, inlets or end treatment(s), inlet and outlet protection, alignment and invert elevations compared to design. 8. Computations: For significant deviations from design, provide sealed computations verifying that the as -built condition is equivalent or better than design. 9. Ditch Lines - Display the constructed location of all ditch lines and channels, including typical sections and linings. 10. Easements - Show all platted easements with dead book refei runes labeled. Facilities and drainage must be within platted easements. Provide copies of recorded documents. 11. Guardrail, fences or other safety provisions - Display the constructed location of all safety provisions; fences, guardrail, including the type, length and applied end treatments, compared to design. 12. Material layers - biefilter media, stone layers, sand layers, keyways and cores must be verified as to material types and depths. Include inspection reports, boring or test pit reports and materials certifications. Biofilter media must be an approved state mix. 13. Access roads - show location of access roads, surface treatment, drainage, etc, as applicable. 14. Compaction reports are required to verify fill compaction in dams. 15. Manufacturers certifications for proprietary BMP's certifying proper installation and functioning. STORM WATER MANAGEMENT NARRATIVE. ASBUILT OVERSUMMARY: HAVE BEEN ALL THE STORMWATER MANAGEMENT PLAN COMPLIESIWITH PART IIB MINIMUM REQUIREMENTS. THE STORMWATER RUNOFF RATES, VOLUMES, GENERAL SWM NOTES: u+..aF AND au VELOCITIES RESULTING FROM THIS RODEVELOPMENT --___ __ IMPROVED PRIOR TO EXITING THE PROJECT. PLEASE SEETHE ATTACHED >.. STATE APPROVED TRASH RACKS SHALL BE INSTALLED ON ALL ORIFICE OPENINGS. SEE SHEET 9, OR EQUIVALENT FOR DETAILS. STORMWATER MANAGEMENT CALCULATIONS PACKET FOR EVIDENCE OF THIS COMPLIANCE AND THIS SHEET FOR ADDTIONAL SUMMARIES. THE z. CONCRETE FOUNDATIONS SHALL BE INSTALLED ON ALL RISER STRUCTURES MEETING MINIMUM VESCH .i SPECIFICATIONS. 3 4 PROJECT UTILIZES A DRY DETENTION BASIN WITH PRE-TREATMENT CELLS, IN CONJUNCTION WITH AN OVERALL REDUCED IMPERVIOUS AREA IN THE 3 CONTRACTOR SHALL HIRE A THIRD PARTY GEOTECHNICAL L ENGINEER ENSURE THE EMBANKMENTS IMPOUNDING WATER ARE STRUCTURALLY POST -DEVELOPMENT STATE, FOR STORMWATER QUANTITY COMPLIANCE. THE PROJECT UTILIZES PERMEABLE PAVERS AND A NUTRIENT CREDIT PURCHASE CA N SOUND, THIS INCLUDES THE SU BGRADE LOCATED AROUND THE DETENTION BASIN LOCATED BENEATH THE PARKING LOT. ALL EXISTING AND FOR STORMWATER QUALITY COMPLIANCE. PROPOSED FILL MATERIAL AND PROPOSED CONSTRUCTION SHALL BE APPROVED BY AN ONSITE GEOTECHNICAL ENGINEER PRESENT DURING THE REQUIRED Q OF THE EMBANKMENTS AND FILL AREAS AND PRESENT DURING THE CORE SAMPLING. STOCONSTRUCTION QUALITY SUMMARY: . THE DOWNSTREAM EMBANKMENT SIDE SLOPES OF ALL PERMANENT FACILITIES SHALL HAVE :i SLOPE. 4 3 THE VRRM SPREADSHEET DEVELOPMENTS WAS USED FOR THIS PROJECT AND THE STORMWAT@-^6/ UA AREA BOUNDARY EQUALS THE EROSION ADSHE THE VRRM SPREADSHEET FOR 'YQ Q 5. CONTRACTOR SHALL EXCAVATE SEDIMENT LADEN MATERIAL IN THE ESC SEDIMENT TRAPPING DEVICE AT THE TIME OF THE FACILITY'S CONVERSION O TOTAL & SEDIMENT CONTROL LIMITS OF DISTURBANCE BOUNDARY. THIS RODEVELOPMENT PROJECT AFfiwliRCi A TOTAL PHOSPHOROUS REMOVAL OF RATE 0.86 TO A PERMANENT SWM FACILITY. AT SUCH TIME THE CONTRACTOR SHALL REGRADE THE SEDIMENT TRAPPING DEVICE TO THE PROPOSED GRADES Ib r. THE REMOVAL OF A PORTION OF THIS REQUIRED PHOSPHOROUS LOADING IS MET THROUGH THE BEST MANAGEMENT PRACTICE OF A LEVEL I 1L Q SHOWN ON THE SWM SHEETS. THE CONTRACTOR SHALL MINIMIZE SOIL COMPACTION DURING THE CONVERSIONS. PERMEABLE PAVEMENT PARKING LOT. SUBAREA 'DA B' IS TREATED VIA THE LEVEL I PERMEABLE PAVEMENT. THE PR9P85E9 PERMEABLE PAVERS GENERATE A PHOSPHOROUS REMOVAL RATE OF 0.34 Ib r. THE REMAINING 0.52 Ib r PHOSPHOROUS REMOVAL I W61- "� "'-' VIA A NUTRIENT CREDIT PURCHASE. ASBUILT HAS BEEN MET General Construction notes for Stormwater Management Plans 1. All dams and constructed fill to be within 95% of maximum dry CURRENTLY, THE EXISTING SITE AREA FLOWS OFFSITE UNTREATED. THE EXISTINGISITE WITHIN THEILiMITS OF DISTURBANCE CONSISTS OF A LARGE density and 2% of optimum moisture content. All fill material to be BUILDING, SPRAWLING GRAVEL PARKING AREA AND A PAVED TRAVELWAY. THEOROPOSEB PLAN ,4i;: THE EXISTING BUILDING, REMOVE THE approved by a geotechnical engineer. A geotechnical engineer is to GRAVEL AREA AND RECONFIGURE THE SITE TO PROVIDE ASPHALT TRAVELWAYS AND PARKING WHILE DECREASING THE SITE'S OVERALL IMPERVIOUS ' be during construction of dams. P 9 AREA. 2. Pie and riser joints are to be watertight P 1 within stormwater ASBUILT Management facilities. THE PROP9EE& ReDEVELOPM ENT CREATES TWO CONCENTRATED OUTFALLS, THESE ARE DENOTED ON THIS SHEET AS OUTFALL W AND OUTFALL'B'. 3. For temporary sediment traps or basins which are to be converted OUTFALL'A' RELEASES RUNOFF FROM ONSITE SUBAREA W AND OUTFALL'B' RELEASES RUNOFF FROM ONSITE SUBAREAS'. BOTH OUTALLS W AND 'B' to permanent stormwater management facilities; conversion is not DRAIN TO THE POINT OF ANALYSIS VIA A SERIES OF DOWNSTREAM MANHOLES AND DRAINAGE PIPES. to take place until the site is stabilized, and permission has been ASBUILT obtained from the erosion control inspector. THE VAST MAJORITY OF THE AROP9EE9 PARKING LOT IMPROVEMENTS ARE LOCATED WITHIN ONSITE DA W IN THE POST-ReDEVELOPMENT STATE. THIS RUNOFF IS ATTENUATED IN THE DRY DETENTION BASIN AND ITS TWO INTERCONNECTED PRE-TREATMENT CELLS. FOR THE PURPOSES OF THIS ANALYSIS ONSTE SUBAREAS' DOES NOT RECEIVE ATTENUATION. THE TWO SUBAREAS' PEAK FLOWS WERE SUMMED AND ANALYZED FOR CHANNEL AND ASBUILT NOTES: FLOOD PROTECTION COMPLIANCE. CHANNEL PROTECTION REQUIREMENTS ARE MET FOR THIS PROJECT VIA 9VAC25-870-66, SUBSECTION B.3.a (ENERGY i. ALBEMARLE COUNTY ENGINEERING WILL REQUESTAN ASBUILT PLAN FOR THE PROPOSED SWM DESIGN. BALANCE). FLOOD PROTECTION COMPLIANCE FOR THIS PROJECT IS MET VIA 9VAC25-870-66, SUBSECTION C.22.b (10-YR POST FLOW < 10-YEAR PRE 2. ASBUILT INFORMATION WILL INCLUDE, BUT IS NOT LIMITED TO, A GEOTECHNICAL INSPECTION REPORT FOR THE DRY DETENTION EMBANKMENT FLOW). CHANNEL AND FLOOD PROTECTION COMPLIANCE IS ACHIEVED PRIMARILY THROUGH THE OVERALL REDUCTION IN IMPERVIOUS AREAS & THE THAT REVEALS A SUITABLE MATERIAL WITH CLAY CORE/CUT-OFF TRENCH MEETING THE MINIMUM REQUIREMENTS OUTLINED IN THIS PLAN. ATTENUATION IN THE DRY DETENTION BASIN & ITS PRE-TREATMENT CELLS. TYPICAL CURB CUT DETAIL NTS TOP OF CURB ISOMETRIC VIEW NTS NOTES: 1. ENERGY DISSIPATION SHAL: BE DES'ONED WITH A M:N:MUM DEPTH OF S INCHES. UTTER FLOW LI.NW PROJECTED CVITFR FLCW LINE DISSIPATION SECTION A -A NTS ROAD PAVEMENT 1" DROP BELOW PROJECTEIJ GUTTER FLOW LINE AT FACE OF CURB SECTION B--B NTS SEE NOTE 1 OF CURB 'inc laced hook 2 1/" rP m attached with 3/8' fastener dia. holes Q �C ® IN a � cc ®P Isometric 1/4- HOPE plate (optional) PL Ps ri,�r. culvert HDPF st roc Loral Pin,lic with 2-1/8- holes and I/4" plate �1 manuincturcd byPloeiic Solutions Inc. or cqual J00 0000 .. ..r....r.a-.-•r" -fib"'•'' shown with optional plate 4 kin OM HDPF shun Lirnl Plnatic with 2-1/8" holes and 1/4- plate 1vct ion manufactured by Plastic solutions Inc or eR6al 5�'8' din holr 0 0 o O O 0 0 single BMP Elevation arlflce PLASTIC DEBRIS CAGE SOLUTIONS P.O. flax d786 Finctmer tv 22W4 INC. 877-877-5727 an.gAA!C-diaiaaxam w° W O w n l__ / V r� `o W - Q 0 LL 3 w Q 2 0 U Z U W o LU Y J W Q Q c U�.,/ ° - L U) cl c ° � Ul W 00 Z w w W z dJ / - n/ Z Z L O w ram- Z UZ o J C) Q J / O 0 C) \�J U ® / X L U Ln N W ° J J � T1 F c ° o (V w CL U JOB NO. 192171 0 ° SCALE AS SHOWN ° c SHEET NO. o 0 S oc F DRY DETENTION BASIN CONSTRUCTION NOTES: FACILITY PLANTING SPECIFICATIONS: 1. THE DETENTION BASIN SHALL HAVE TURF GROUND COVER SUCH AS GRASS OR SOME OTHER FORM OF A VEGETATIVE GROUNDCOVER. LANDSCAPING BEYOND THIS IS OPTIONAL AND IS NOT REQUIRED. 2. THE PROPOSED INTERIOR SIDE SLOPES OF THE BASIN SHALL BE A MAXIMUM OF 4:1, OR 3:1 IF SAFETY BENCHES ARE PROVIDED AT THE TOP OF THE FACILITY, TO REDUCE THE RISK OF EROSION. THE PROPOSED FLOOR SLOPES SHALL BE GRADED TO PROVIDE POSITIVE DRAINAGE AT ALL TIMES TO THE RISER STRUCTURE. 3. WOODY VEGETATION SHALL NOT BE PLANTED OR ALLOWED TO GROW WITHIN 15 FEET OF THE TOE OF THE EMBANKMENT NOR WITHIN 25 FEET OF THE PRINCIPAL SPILLWAY STRUCTURE. 4. THE SOILS IN THE STORMWATER BUFFER AREA ARE OFTEN SEVERELY COMPACTED DURING THE CONSTRUCTION PROCESS, TO ENSURE STABILITY THE DENSITY OF THESE COMPACTED SOILS CAN BE SO GREAT THAT IT EFFECTIVELY PREVENTS ROOT PENETRATION AND, THEREFORE, MAY LEAD TO PREMATURE MORTALITY OR LOSS OF VIGOR. AS A RULE OF THUMB, PLANTING HOLES SHOULD BE THREE TIMES DEEPER AND WIDER THAN THE DIAMETER OF THE FOOTBALL FOR BALL -AND -BURLAP STOCK, AND FIVE TIMES DEEPER AND WIDER FOR CONTAINER -GROWN STOCK. 5. AVOID SPECIES THAT REQUIRE FULL SHADE, OR ARE PRONE TO WIND DAMAGE. EXTRA MULCHING AROUND THE BASE OF TREES AND SHRUBS IS STRONGLY RECOMMENDED AS A MEANS OF CONSERVING MOISTURE AND SUPPRESSING WEEDS. 1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LAYOUT OF ALL WORK COVERED UNDER THESE PLANS. 2. LANDSCAPE CONTRACTOR SHALL REFER TO THE STANDARDIZED LANDSCAPE SPECIFICATIONS FOR THE STATE OF VIRGINIA FOR ADDITIONAL INFORMATION. THE CONTRACTOR SHALL ABIDE BY ITS CONTENTS; HOWEVER ANY NOTES OR SPECIFICATIONS ON THE PLANS SHALL SUPERSEDE THOSE OUTLINED IN THE SPECIFICATIONS MANUAL (COPIES ARE AVAILABLE FOR A FEE FROM THE ARGI NIA CHAPTER OF THE AM ERICAN SOCIETY OF LANDSCAPE ARCHITECTS, VI RGI NIA NURSERYMEN'S ASSOCIATION, INC. AND THE VI RGI NIA SOCIETY OF LANDSCAPE DESIGNERS). ALL DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF COLLINS ENGINEERING PRIOR TO THE CORRESPONDING CONSTRUCTION ACTIVITY. 3. ALL PLANT MATERIAL SHALL MEET THE MINIMUM SPECIFICATIONS AND STANDARDS DESCRIBED IN THE CURRENT ISSUE OF THE AMERICAN STANDARD FOR NURSERY STOCK, PUBLISHED BY THE AMERICAN ASSOCIATION OF NURSERYMEN, 1250 STREET, NW, SUITE 500, WASHINGTON, DC 20005. 4. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD AND NOTIFY THE DESIGNER OF ANY VARIANCE FROM THE PLAN. 5. THE LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE LOCATION OF ANY ONSITE UTILITIES (CALL MISS UTILITY AT 1-800-552-7001 BEFORE ANY EXCAVATION). 6. REFER TO THE APPROVED FINAL SITE PLANS FOR ANY DETAILED SITE INFORMATION. 7. ALL WORK SHALL BE COORDINATED WITH OTHER PARTIES. 8. PLANTS WILL BE PREPARED FOR SHIPMENT IN A MANNER THAT WILL NOT CAUSE DAMAGE TO THE BARK, BUDS, BRANCHES, STEMS, OR OVERALL SHAPE OF THE STOCK. CONTAINER GROWN PLANTS WILL BE TRANSPORTED IN THE CONTAINERS IN WHICH THEY HAVE GROWN. 9. ALL PLANT MATERIAL, UNLESS OTHERWISE SPECIFIED, SHALL BE UNIFORMLY BRANCHED AND HAVE A VIGOROUS ROOT SYSTEM. PLANT MATERIAL SHALL BE HEALTHY, VIGOROUS, AND FREE FROM DEFECTS, DECAY, DISEASES, INSECT PEST EGGS, AND ALL FORMS OF INFESTATION. ALL PLANT MATERIAL SHALL BE FRESH, FREE FROM TRANSPLANT SHOCK OR VISIBLE WILT. PLANTS DEEMED UNHEALTHY WILL BE REJECTED. 10. ALL CONTAINER STOCK SHALL HAVE BEEN PROPAGATED IN A CONTAINER LONG ENOUGH FOR THE ROOT SYSTEM TO HAVE DEVELOPED SUFFICIENTLYTO HOLD ITS SOIL. CONTAINER STOCK WITH POORLY DEVELOPED ROOT SYSTEMS WILL NOT BE ACCEPTED. 11. PLANTS NOT INSTALLED ON THE DAY OF ARRIVAL ON SITE SHALL BE STORED AND PROTECTED BY THE CONTAINER. OUTSIDE STORAGE AREAS WILL BE SHADED AND PROTECTED FROM THE WIND AND SUN. PLANTS STORED ON SITE SHALL BE PROTECTED FROM ANY DRYING AT ALL TIMES BY COVERING THE BALLS OR ROOTS WITH MOIST SAWDUST, WET BURLAP, WOOD CHIPS, SHREDDED BARK, PEAT MOSS, OR OTHER SIMILAR MULCHING MATERIAL. 12. THE OWNER RESERVES THE RIGHT TO SUBSTITUTE PLANT MATERIAL TYPE, SIZE AND/OR QUANTITY. ANY SUBSTITUTIONS MUST BE APPROVED BY THE INSPECTOR INITIALLY, AND THEN THE DESIGNER. 13. MINOR FIELD ADJUSTMENTS MAY BE NECESSARY DUE TO SITE CONDITIONS (EX: ROOTBALL AND UTILITY CONFLICT). MAJOR ADJUSTMENTS MUST BE APPROVED BY THE DESIGNER. 14. NO PLANTING SHALL OCCUR WHEN THE SOIL IS FROZEN. 15. PLANT MATERIAL SHALL BE PLACED IN EXISTING SOIL WITH EACH PLANTING PIT EXCAVATED TO A SIZE SUFFICIENT TO CONTAIN THE ENTIRE ROOT BALL OR ROOT MASS, WITHOUT CRAMPING ROOTSTOCK. 16. THE CONTRACTOR SHALL MAINTAIN A ONE (1) CALENDAR YEAR 90%CARE AND REPLACEMENT WARRANTY FOR ALL PLANTINGS. THE PERIOD OF CARE AND REPLACEMENT SHALL BEGIN AFTER INSPECTION AND APPROVAL OF THE COMPLETE INSTALLATION OF ALL PLANTS AND CONTINUE FOR ONE CALENDAR YEAR. 17. THE CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND DISPOSAL OF TRASH AND DEBRIS WITHIN THE LIMITS OF THE PLANTING ON A DAILY BASIS. 18. THE CONTRACTOR WILL NOT BE RESPONSIBLE FOR PLANT MATERIAL THAT HAS BEEN DAMAGED BY VANDALISM FIRE OR OTHER ACTIVITIES BEYOND THE CONTRACTOR's CONTROL. FACILITY CONSTRUCTION 1. DETENTION BASINS MAY SERVE AS SEDIMENT BASINS AND/OR TRAPS DURING PROJECT CONSTRUCTION. IF THIS IS DONE, THE VOLUME SHALL BE BASED ON THE MORE STRINGENT SIZING RULE (EROSION AND SEDIMENT CONTROL REQUIREMENTS VS. STORMWATER TREATMENT REQUIREMENTS). INSTALLATION OF THE PERMANENT RISER SHALL BE INITIATED DURING THE CONSTRUCTION PHASE, AND DESIGN ELEVATIONS SHALL BE SET WITH FINAL CLEANOUT OF THE SEDIMENT BASIN AND CONVERSION TO THE POST -CONSTRUCTION POND IN MIND. APPROPRIATE PROCEDURES SHALL BE IMPLEMENTED TO PREVENT DISCHARGE OF TURBULENT WATERS WHEN THE BASIN IS BEING CONVERTED TO AN DETENTION BASIN. 2. THE DETENTION BASIN SHALL ONLY BE CONSTRUCTED AFTER THE CONTRIBUTING DRAINAGE AREA TO THE POND IS COMPLETELY STABILIZED. IF THE PROPOSED POND SITE WILL BE USED AS A SEDIMENT TRAP OR BASIN DURING THE CONSTRUCTION PHASE, THEN THE FACILITY WILL BE DEWATERED, DREDGED AND RE -GRADED TO DESIGN DIMENSIONS AFTER THE ORIGINAL SITE CONSTRUCTION IS COMPLETE. MODIFICATIONS SHALL BE MADE TO THE RISER, ORIFICES AND BARRELS AS REQUIRED SO THAT THEY ARE CONSISTENT WITH THE FINAL CONSTRUCTION SPECIFICATIONS. 3. THE CONTRACTOR SHALL ASSEMBLE CONSTRUCTION MATERIALS ON -SITE, MAKING SURE THEY MEET DESIGN SPECIFICATIONS AND ARE PREPARED AT STAGING AREAS WHEN POSSIBLE. 4. THE CONTRACTOR SHALL CLEAR AND STRI P THE PROJECT AREA I F REQU I RED TO TH E DESIRED SU B-GRADE. S. INSTALL E&S CONTROLS PRIOR TO CONSTRUCTION OF THE BASIN, INCLUDING TEMPORARY DE -WATERING DEVICES AND STORMWATER DIVERSION PRACTICES. ALL AREAS SURROUNDING THE BASIN THAT ARE GRADED OR DENUDED DURING CONSTRUCTION SHALL BE PLANTED WITH TURF GRASS, NATIVE PLANTINGS, OR OTHER APPROVED METHODS OF SOIL STABILIZATION. 6. CONTRACTOR SHALL EXCAVATE THE CORE TRENCH AND INSTALL THE SPILLWAY PIPE DURING THE ESC PHASE. 7. CONTRACTOR SHALL ALSO INSTALLTHE RISER, OUTFLOW STRUCTURE AND/OR THE BARREL(s) WITH PERMANENT COLLARS DURING THE ESC PHASE. CONTRACTOR SHALL ENSURE THE TOP INVERT OF THE OVERFLOW WEIR IS CONSTRUCTED LEVEL AT THE DESIGN ELEVATION. 8. THE CONTRACTOR SHALL CONSTRUCT THE EMBANKMENT AND ANY INTERNAL BERMS IN 8-TO 12-INCH LIFTS, COMPACTION SHALL BE COMPLETED IN LIFTS WITH APPROPRIATE EQUIPMENT. THE CONTRACTOR SHALLALSO ADHERE TO THE CLAY LINER SPECIFICATIONS OUTLINED IN TABLE 14.4 BELOW: Table 14.4. clay Liner speclficadons Property Test Method Unit Specification Permeability ASTM D-2434 Cm/sec t x 1U Plasticity Index of Clay ASTM D4231424 % Not less than 15 Licluid Limitof Cla ASTM D-2216 % Not less than 30 Clay Partide,s Passing ASTM 0422 % Not less than 30 Clay compaction ASTMD-2216 % - 95% of standard Proctordensity Source- Vlrgrma Stormwaler Management Harmco0lt (lye!) 9. UPON COMPLETION OF THE EMBANKMENT GRADING, THE CONTRACTOR SHALL EXCAVATE/GRADE UNTILTHE APPROPRIATE ELEVATION AND DESIRED CONTOURS ARE ACHIEVED FOR THE BOTTOM AND SIDE SLOPES OF THE BASIN. 10. CONTRACTOR SHALLTHEN CONSTRUCT THE EMERGENCY SPILLWAY IN CUT OR STRUCTURALLY STABILIZED SOILS. 11. THE CONTRACTOR SHALLTHEN FINISH CONSTRUCTION OF ALL OUTLET STRUCTURES, INCLUDING DOWNSTREAM RIP -RAP APRON PROTECTION IF APPLICABLE. 12. THE CONTRACTOR SHALL NEXT STABILIZE EXPOSED SOILS BY HYDROSEEDING OR SEEDING OVER STRAW. 13. THE CONTRACTOR SHALLTHEN INSTALLTHE APPROPRIATE BASIN LANDSCAPING IN ACCORDANCE WITH THE APPROVED PLANS, IF APPLICABLE. FACILITY MAINTENANCE: MAINTENANCE OF THE DETENTION BASIN IS DRIVEN BY ANNUAL INSPECTIONS THAT EVALUATE THE CONDITION AND PERFORMANCE OF THE FACILITIES. DURING THESE INSPECTIONS THE FOLLOWING TASKS SHALL BE PERFORMED BY THE CONTRACTOR IN THE FIRST YEAR FOLLOWING INSTALLATION AND THE OWNER THEREAFTER: 1. MEASURE SEDIMENT ACCUMULATION LEVELS IN THE BASIN. 2. MONITOR THE GROWTH OF THE GROUNDCOVER AND ANY TREES AND SHRUBS PLANTED, AS APPLICABLE. RECORD THE SPECIES AND THEIR APPROXIMATE COVERAGE, AND NOTE THE PRESENCE OF ANY INVASIVE PLANT SPECIES, AS APPLICABLE. 3. INSPECT THE CONDITION OF STORMWATER INLETS TO THE BASIN FOR MATERIAL DAMAGE, EROSION OR UNDERCUTTING. 4. INSPECT THE BANKS OF UPSTREAM AND DOWNSTREAM CHANNELS FOR EVIDENCE OF SLOUGHING, ANIMAL BURROWS, BOGGY AREAS, WOODY GROWTH, OR GULLY EROSION THAT MAY UNDERMINE EMBANKMENT INTEGRITY. 5. INSPECT BASIN OUTFALL CHANNEL FOR EROSION UNDERCUTTING RIP -RAP DISPLACEMENT WOODY GROWTH etc. 6. INSPECT CONDITION OF PRINCIPAL SPILLWAY AND RISER FOR EVIDENCE OF SPALLING, JOINT FAILURE, LEAKAGE, CORROSION OR OTHER FAILURES. 7. INSPECT CONDITION OF ALL TRASH RACKS, REVERSE SLOPED PIPES OR FLASHBOARD RISERS AS APPLICABLE FOR EVIDENCE OF CLOGGING, LEAKAGE, DEBRIS ACCUMULATION OR OTHER FAILURES. 8. INSPECT MAINTENANCE ACCESS TO ENSURE IT IS FREE OF WOODY VEGETATION, AND CHECK TO SEE WHETHER VALVES, MANHOLES AND LOCKS CAN BE OPENED AND OPERATED. 9. INSPECT INTERNAL AND EXTERNAL SIDE SLOPES OF THE BASIN FOR EVIDENCE OF SPARSE VEGETATIVE COVER, EROSION, OR SLUMPING. 10. OWNER OR CONTRACTOR SHALL MAKE NEEDED REPAIRS IMMEDIATELY. FACILITY INSPECTION: MULTIPLE INSPECTIONS ARE CRITICAL TO ENSURE THE BASIN(s) ARE PROPERLY CONSTRUCTED. BECAUSE THE TIMING OF THE INSTALLATION IS DICTATED BY THE CONTRACTOR, THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING THE ENGINEER AND INSPECTOR PRIOR TO INSTALLATION. MULTIPLE SITE VISITS AND INSPECTIONS ARE REQUIRED TO BE SCHEDULED BY THE CONTRACTOR WITH THE ENGINEER AND INSPECTOR DURING THE FOLLOWING STAGES OF THE DETENTION BASIN's CONSTRUCTION PROCESS: 1. PRE -CONSTRUCTION MEETING 2. INITIAL SITE PREPARATION (INCLUDING INSTALLATION OF PROJECT E&S CONTROLS) 3. EXCAVATION/GRADING (e.g., INTERIM/FINAL ELEVATIONS) 4. INSTALLATION OF THE EMBANKMENT THE RISER PRIMARY SPILLWAY AND THE OUTLET STRUCTURE s . 4. DETENTION BASIN INSTALLATION (e.g., INTERIM AND FINAL ELEVATIONS) S. PLANTING PHASE WITH AN EXPERIENCED LANDSCAPE ARCHITECT PRESENT DIRECTING IF APPLICABLE 6. FINAL INSPECTION (DEVELOP A PUNCH LIST FOR FACILITY ACCEPTANCE) PERMEABLE PAVER INSTALLATION GENERAL NOTES: 1. EACH LAYER/LIFT OF NO. 2 AND NO. 57 STONE REQUIRES A MINIMUM CENTRIFUGAL FORCE COMPACTION OF 53,000. 2. CONSTRUCTION & PREPARATION OF PERMEABLE PAVERS STONE BASE AND UNDERDRAIN SYSTEM SHALL BE IN ACCORDANCE w/ MANUFACTURER SPECIFICATIONS. 3. CONTRACTOR SHALL CONDUCT A GEOTECHNICAL INVESTIGATION OF THE SOIL UNDERNEATH THE PROPOSED PAVERS AFTER FINAL GRADE HAS BEEN ACHIEVED TO DETERMINE THE INFILTRATION AND CBR RATINGS. CONTRACTOR SHALL PROVIDE THE ENGINEER WITH THESE RESULTS PRIOR TO ORDERING AND INSTALLATION OF THE STONE BASE FOR THE PERMEABLE PAVERS 0 TO ENSURE AN ADEQUATE DESIGN. IF A CBR RATIO OF THE PAVERS UNDERLYING SOILS IS LESS THAN 4 /o THEN THE CONTRACTOR SHALL COMPACT THE SOIL TO AT LEAST 95% OF STANDARD PROCTOR DENSITY. 4. ALL OPEN GRADED STONE LAYERS SHALL BE CLEAN & DOUBLE WASHED IN ACCORDANCE WITH DEQ REGULATIONS. "CLEAN" STONE IS SCREENED TO SIZE AND THE BULK OF THE FINES DUST IS REMOVED BUT THERE IS STILL DUST ON THE STONE. "WASHED" STONE IS WASHED THROUGH THE SCREENING PROCESS AND OR MANUALLY WASHED. S. WHERE UNDERDRAIN CLEANOUTS ARE PROPOSED WITHIN PAVED AREAS & ARE SUBJECT TO VEHICULAR TRAFFIC, CLEANOUTS SHALL BE ENCASED IN 018" CONCRETE PAD FOR THE UPPER 24'. THE CLEANOUT FRAME & LID SHALL BE CONSTRUCTED OF CAST IRON, OR A SIMILAR MATERIAL THAT IS STRUCTURALLY FORTIFIED. 6. THE PERMEABLE PAVERS' STONE BASE SHALL HAVE A FILTER FABRIC UNDERLAYMENT BENEATH IT. UNDERLAYMENT SHALL BE CAPABLE OF PASSING RUNOFF THROUGH IT TO ALLOW FOR ADEQUATE INFILTRATION. CONTRACTOR SHALL WORK CLOSELY WITH THE UNDERLAYMENT's MANUFACTURER ENSURING THE SELECTED MATERIAL IS SUFFICIENT AND ALL CONSTRUCTION REQUIREMENTS ARE MET. 7. THE PERMEABLE PAVER STONE BED SHALL INCLUDE 4" UNDERDRAINS, AS SHOWN, WITH 1% MIN. WITH POSITIVE DRAINAGE. FIGURE 7.4 SITE -SPECIFIC NOTES: 1. THE 'PERMEABLE JOINT MATERIAL' SHALL BE VDOT #8, #89 OR #9 AGGREGATE IN THE OPENINGS BETWEEN THE PAVERS. 2. THE 'OPEN -GRADED BEDDING COURSE' SHALL BE 2" THICK VDOT #8 AGGREGATE. 3. THE 'OPEN -GRADED BASE RESERVOIR' SHALL BE 4" THICK VDOT #57 CLEAN STONE. RESERVOIR TO BE CRUSHED AGGREGATE. 4. THE 'OPEN -GRADED SUBBASE RESERVOIR' SHALL BE 9" THICK VDOT #2 CLEAN STONE. RESERVOIR TO BE CRUSHED AGGREGATE. 5. THE 'GEOTEXTILE UNDER SUBBASE' SHALL BE TENSAR TX-5 TRIANGULAR GRID, OR EQUIVALENT. 6. THE 'UNDERDRAIN' SHALL BE 4" PERFORATED RIGID PVC WITH A MINIMUM 1% SLOPE. NOTE, UNDERDRAINS LOCATED OUTSIDE OF THE PERMEABLE PAVERS SHALL BE RIGID NON -PERFORATED PVC PIPES WITH A MINIMUM 1% SLOPE. THE UNDERDRAINS SHALL HAVE A 12" DEEP x 24" WIDE STONE INFILTRATION SUMP LOCATED BENEATH THE PIPE. MIN 54 6 .00EP 56q. iTC 564.iEP 564.2TC ' 54 6 .oEP kX , Concrete Paver- Permeahle .Joint Material -Open-graded Bedding Course Open -graded Base Reservoir Open -graded Subbase Reservoir U nderdrain (as required) Optional Geotextile Under Subbase Uncompacted Subgrade Soil Figure 7.3. Typical Detail (Source: Smith. 2009) Permeatle Pavement Su'wa Matenal Bedding Layer (act cirecied by manurcurer) / Reservor Layer, Iab'e i.2 `--- Perforated Undendrayl. Schedule 40 PVC Figure 7.4. Typical Section Permeable Pavement Level 1 Storrnxr^' Ra ROUND SERIES TRASHI RAI (OR EQUIVALENT) CONCRETE MANHOLE STANDARD 601NCH RACK SHOWN DIMENSIONS IN INCHES :JUI StormNaxTM Round Series for -Concrete Manhole Vat No. Set Dim Dist Min N1 RS-24 17K 14% 2B - 24 t30 Bs36 n 14 401% 36 RS60 27% 1334 66% 6o STEPS 562.4 Plastic Sohltions, Inc. CUSTOMER, PO Bow 43a6, VArchcstcr, VA 2160/ 238 AWCdec M. INnrJwsro, VA 22603 Ia7r1877•S721 phae PROJECT; IS" 7ZZ-2219 Ow hdpe//www.0-&c-s.I,dk- n "WE amucruwa Pwmc ar PImnc 99W S.N n ' xi Non-Wov a Uaole de islder only) ISOMETRIC CONCRETE STRUCTURE DIMENSIONS INSIDE STRUCTURE DIMENSION OUTSIDE STRUCTURE DIMENSION AVAILABLE OPTIONS CROSS BRACING FOR OVERHANG HDPE ANTI -VORTEX PLATE DATE DRUM W. AMR= DETAIL COORDINATES FOR THE PERVIOUS PAVERS SWM FACILITY: N: 4991.8475; E: 5064.8556 PROPOSED PERMEABLE PAVERS DETAIL SCALE: 1"= 20' a .I L 15662� o 2O , ASBUILT I PROP99f!,O, PERMEABLE PAVERS TO PROVIDE STORMWATER QUALITY I TREATMENT. THE PERMEABLE PAVERS SHALL ACT AS AN INFILTRATING DEVICE FOR INITIAL RUNOFF, PROVIDING GROUNDWATER RECHARGE. ANY EXCESS RUNOFF NOT INFILTRATED SHALL BE DIRECTED TO UNDERDRAINS AND BE SLOWLY RELEASED WHILE THE STORMWATER IS DETAINED. DURING SIGNIFICANT RAINFALL EVENTS, THE TERTIARY I RUNOFF WILL FLOW INTO DROP INLET 2 FOR EMERGENCY BYPASS. 11"mmommi ,l mmmmm 1 lli�----Fl � 07 RIPWAS 4 0 9 I" MAO mxF e ?Z Z s Y >` Element of C.- co 9 who will Potential Problem £ % How to Fix Problem Address Comments BMP m to E Problem a` > e = There is excessive Remove Immediately. tamer or trash and debris professional There is evidence of Owner or Contributing erosmo and -'of bare or Stabilize immediately- professional Drainage Area a osed soil There is excessive OwnerOr F landscape waste and Remove immediately. . ional yard clippings Check that tree roots have not penetrated the pavement and leaf residue has not Adjacent Trees and shrubs are dogged the pavement. Owner or Vegetation within 5 feet of the Vegetation that limits access Professional pavement surface or interferes with the permeable pavement operation must be pruned or removed There is excessive trash, debris or Remove immediately Owner or Inlets, Pre - Professional Treatment Cells accumulation accumulation and Flow There is evidence of Owner or Diversion erosion and I or Stabilize immediately professional Structures esyosed soil Clean out sediment or Evidence of dogging debris- Remove and viash or Professional replace stone as needed Pavement Mosquito proliferation water and Eliminate standing w Owner or Surface Ae.tahllzh vAaatahnn, trovit for nreti' -4Slnnal mosquitoes as needed. It sprays are considered, then use a licensed pest controller to apply an approved mosquito larvicide (only if absolutely necessary). Stabilize immediatery. Mow, irrigate and apply organic There is evidence of (not chemical) fertilizer, as erosion and I or bare needed to keepgrass 9 healthy and dense enough to Owner or or exposed soil in grid provide filtering while pfofesswital paver areas protecting the underlying soil Remove any grass clippinas There is loose Remove immediately and material (e.g-, bark vacuum sweep the area to Professional sand, etc.) stored on prevent clogging the the pavement surface pavement pores. Pavement is stained The surface must be kept andror clogged or dean and free of leaves, water is ; debris, and sediment by Pavement the indicatingg me vacuum sweeping (Wfmout Surface pavement is not brooms of v+ater spray) draining properly immediately and, otherwise. Measure the at a frequency consistent drawdown rate in the v+igl the use and loadings observation well for three (3) days encountered at a minimum. followng a storm annual dry -weather event that exceeds sweeping in the Spring). Professional 1!2 inch of rain. If Where paving blocks are standing water i Still installed, the sweeper must observed in the well be calibrated so it does not after three days, this pick up the stones between s a Gear sign that the the paver blocks. Following pavement is dogged. the vacuum sweeping, test There are significant pavement sedions by amounts of sediment pouring water from 5 gallon have accumulated buckets, to ensure proper between the pavers. drainage. There is evidence of Strulctu al surface detenortati0n. such as slumping, Repair or replace affected Professional Integrity Craddng. spelling or areas, as necessary. broken pavers. Observation Is each observation Repair, as necessary- Professional Wells well still capped? outlets are obstructed or Bros ion and soil Remove obstructions and Owner or Outlet exposure is evident stabilize eroded or exposed Professional below the outlet. areas. 0 7 IL I 3 35 m a.00TC i 6z. TC 6z.1 TC 6 .00TC 5 4 5 5 1. EP �� 5 3 6 0 6z.oEP 6z.1 EP I 5 5 6z. oEP 5 5 5 6 .zoTC 5 S 53 - l 56z.7SEP S &-BETAILS-ON-IRIS li SHEET FOR MINIMUM PERMEABLE `\\ CLEANOUT, PAVER SPECIFICATIONS, TYPICAL. \ TYP, 56 .21 \ E 559. c �,. - _ col iC04 � I �, CONTRACTOR SHALL CONNECT ' /% PROPOSED UNDERDRAINS INTO STR. 2. v \ - PROPOSED 04" R _ ' e , RIGID -- , ,D. `I � �� PERFORATED PVC - ��-- -__ n- t/. I UNDERDRAINS, TYP. _ 0 I r0 e 1 - e ., - .i Perforated cc SECTION A-9: TYPIC LL GR.kPHIC_AL DETAILS Homogeneous fill J r---------� �` ll .r I 4 min �\ �) �' I�Cut off trench-4' below suitable I material Salarrock L--_-_------i TYPICAL HOMOGENEOUS EMBANKMENT f aN FOUNDATION DRAIN dram Send, 9v.d or rock i drain cuoet �Trunsilion filer CHIMNEY DRAIN kin Transition fill ,-Rock or grovel Blanket drain BLANKET DRAIN Rock or gravel drain -n''-,. 3 ..: . Tronm ion filfer TOE DRAIN aourre: Sk_s tngrnecrrnv tre0 %1am4nl Fi=ui a A- lit. Homo erreolls Enibuitka+errls it Seepage Controls GENERAL EMBANKMENT NOTES: THE EMBANKMENTS SHALL HAVE A COMPACTED CLAY CORE WITH A CUTOFF TRENCH & BE IN ACCORDANCE WITH THE DETAILS SHOWN IN THIS PLAN. BERMS AND SPILLWAYS SHALL BE STABILIZED WITH EC-3 MATTING & RIPRAP AS APPLICABLE AND THE REMAINING DISTURBED SLOPES SHALL BE STABILIZED WITH EC-2 MATTING. ALL BERM FILL MATERIAL SHALL CONSIST OF ML, CL, SC OR GC SOILS & BE FREE OF WOOD, ROOTS, ROCKS OR ANY OTHER NON COMPACTING SOIL. COMPACTED FILL SHALL BE PROCTOR MAXIMUM DRY DENSITY ASTM D698 AND HAVE A MINIMUM OF 95% OF MAXIMUM DRY DENSITY AND 2%OF OPTIMUM MOISTURE CONTENT. ALL FILL MATERIAL AND CONSTRUCTION SHALL BE APPROVED BY AN ONSITE GEOTECHNICAL ENGINEER PRESENT DURING THE CONSTRUCTION OF THE EMBANKMENTS AND FILL AREAS. PERMEABLE PAVER CONSTRUCTION NOTES: NECESSARY EROSION & SEDIMENT CONTROL SPECIFICATIONS:LrTH �F tiv 1. All permeable pavement areas shall be fully protected from sediment intrusion by silt fence or construction fencing, particularly if they we intended to infiltrate runoff. ! 2. Permeable pavement areas shall ideally remain outside the limit of disturbance, if possible, during construction to prevent soil compaction by heavy equipment. If it is not possible, the contractor shall take precautions to limit construction equipment over the proposedOTT R. LLIN: permeable pavement new. Permeable pavement areas shall be clearly marked on all construction documents and grading plans. To (Kic. prevent soil compaction, heavy vehicular and foot traffic shall be limited or kept out of permeable pavement areas during and immediately No. 035791after construction. 3. During construction, care shall be taken to avoid tracking sediments onto any permeable pavement surface to avoid clogging. i 2� i 2�22 x4. Any area of the site intended ultimately to be a permeable pavement area shall generally not be used as the site of a temporary sediment 6 1i basin. Where locating a sediment basin on an area intended for permeable pavement is unavoidable, the invert of the sediment basin must SSIONAL '1 y be a minimum of 2 feet above the final design elevation of the bottom of the aggregate reservoir course. All sediment deposits in the excavated area shall be carefully removed prior to installing the sub -base, base and surface materials. NOTE, THE CONTRACTOR SHALL HAVE FINAL AUTHORITY OVER THE CONSTRUCTION SEQUENCING AND THE STEPS LISTED BELOW ARE INTENDED TO SERVE AS A GUIDE. THE CONTRACTOR SHALL COMMUNICATE ALL PROCESSES AND TIMELINES WITH THE INSPECTOR AHEAD OF TIME TO ALLOW THE INSPECTOR SUFFICIENT TIME TO APPROVE OR DISAPPROVE THE PROGRESSION OF THE CONSTRUCTION, AS REQUIRED. 1. Construction of the permeable pavement shall only begin after the entire contributing drainage area has been stabilized. The proposed site shall be checked for existing utilities prior to any excavation. Do not install the system in rain or snow, and do not install frozen aggregate materials. o r 2. As noted above, temporary erosion and sediment (E&S) controls are needed during installation to divert stormwater away from the iz rn permeable pavement area until it is completed. Special protection measures such as erosion control fabrics may be needed to protect .-I N vulnerable side slopes from erosion during the excavation process. The proposed permeable pavement area must be kept free from n .�i sediment during the entire construction process. Construction materials that we contaminated by sediments must be removed and replaced 0 p with clean materials. w Q w Q 3. Where possible, excavators or backhoes should work from the sides to excavate the reservoir layer to its appropriate design depth and Z Z dimensions. For micro -scale and small-scale pavement applications, excavating equipment shall have arms with adequate extension so O Q g Z they do not have to work inside the footprint of the permeable pavement area (to avoid compaction). Contractors can use a cell 2 F F a w g a construction approach, whereby the proposed permeable pavement area is split into 500 to 1000 s . ft. temporary cells with a 10 to 15 foot PP Y P P P P P 9 P arY U O earth bridge in between, so that cells can be excavated from the side. Excavated material shall be placed away from the open excavation U f f so as to not jeopardize the stability of the side walls. Z w =) f 4. The native soils along the bottom and sides of the permeable pavement system shall be scarified or tilled to a depth of 3 to 4 inches prior 0 w ,I --I to the placement of the filter layer or filter fabric. In large scale paving applications with weak soils, the soil subgrade may need to be O z Q � compacted to 95% of the Standard Proctor Density to achieve the desired load -bearing capacity. (NOTE: If this density is required then it 1�1 0 Z Z F a m effective] eliminates the infiltration function of the sub rode. In such a case the following minimum sub odes shall be installed, Y 8 g 8r � > Z > Z kin beginning from the top subgmde: 2: thick No. 8 aggregate bedding course below the pavers, 4" thick VDOT No. 57 clean stone filter r w w O O � Q course (open graded, crushed aggregate), 12' thick VDOT No. 2 clean stone reservoir course (crushed aggregate base course) with a Tensar below V / N � U U 0 TX-5 triangular grid, or equivalent, the system. LU 5. The filter layer shall be installed on the bottom of the reservoir layer and, where appropriate, filter fabric can be placed on the sides. CL 6. Provide a minimum of 2 inches of aggregate above and below the underdrains. The underdrains shall slope down towards the outlet at a w w positive grade The up -gradient end of underdrains in the reservoir layer shall be capped. Where an underdrain pipe is connected to a W (n in structure, there shall be no perforations within 1 foot of the structure. Ensure that there are no perforations in clean -outs and observation w w wells within I foot of the surface. Ce 0Y nS 7. Spread, with a maximum of 6-inch lifts, the appropriate clean, washed stone aggregate. Place at least 4 inches of additional aggregate above the underdrain and then compact it using a vibrato roller in static mode until there is no visible movement of the aggregate. Do P 8 vibratory not crush the aggregate with the roller. 8. Install over -drain if required and connect into outlet conveyance system. 9. Install the desired depth of the bedding layer as follows: For permeable pavers, the bedding layer for open -jointed pavement blocks shall consist of a minimum of 2 inches of washed ASTM D 448 No.8 stone. Install paving materials in accordance with manufacturer or industry specifications. The basic installation process is described in greater detail by Smith (2006). The basic installation process is described in greater detail by Smith (Smith 2011). Permeable paverjob foremen shall successfully complete the PICP Installer Technician Course training program offered by the Interlocking Concrete Pavement Institute. The following installation method also applies to clay paving units. Contact manufacturers of composite units for installation specifications. 0 0 0 a a. Moisten, place and level the No. 2 stone sub -base and compact it in minimum 12-inch [hick lifts with four passes of a 10-ton steel drum static roller until there is no visible movement The first two passes are in vibratory mode with the final two passes in static mode. The filter aggregate should be moist to facilitate movement into the reservoir course. b. Place edge restraints before the base layer, bedding and pavers are installed. Permeable interlocking pavement systems require edge restraints to prevent vehicle loads from moving the pavers. Edge restraints may be standard concrete curbs or curb and gutters., c. Moisten, place and level the No. 57 base stone in a single lift (4 inches thick minimum). Compact it into the reservoir course beneath with at least four (4) passes of a 10-ton steel drum static roller until there is no visible movement. The first two passes are in vibratory mode, with the final two passes in static mode. Q o ti o "'I ti .--I � .+ ti N ti � N M N W N ,N\-I 'N-I d. Place and screed the bedding course material (typically No. 8 stone, 2 inches thick). 7 e. Pavers may be placed by hand or with mechanical installers. L f Fill gaps at the edge of the paved areas with cut pavers or edge units. When cut pavers are needed, cut the pavers with a paver splitter Q or masonry saw. Cut pavers are ideally no smaller than one-third (1/3) of the full unit size, if subject to tire movement. J g. Fill the joints and openings with stone. Joint openings must be filled with No. 8, 89 or 9 stone per the paver manufacturer's Sweepand from the ^ 0- recommendation. remove excess stones P aver surface. 0) 0 h. Compact and sea[ the avers into the bedding course with a minimum low -amplitude 5 000 lbf, 75- to 95-Hz late compactor. Do not P P 8 P . P P 7- compact within 6 feet of the unrestrained edges of the pavers. I�_ i. Thoroughly sweep the surface after construction to remove all excess aggregate. M J j. Inspect the area for settlement. Any paving units that settle must be reset and re -inspected. , k. The contractor should return to the site within 6 months to top up the paver joints with stones. (y) Z I-1 =) CONSTRUCTION INSPECTION: Inspections before, during to that is built in these and after construction are required ensure permeable pavement accordance with ,;I - specifications. Contractor shall use a detailed inspection checklist that requires sign -offs by qualified individuals at critical stages of ® � ' ^ V , construction and t ensure that the contractor's interpretation of he plan is consistent with the designer's intent The basic elements of a � permeable pavement construction checklist can be found on this sheet Once the final construction inspection has been completed, provide the a report to the County Inspector for approval. 0!u CONSTRUCTION MAINTENANCE: N It is difficult to prescribe the specific types or frequency of maintenance tasks that are needed to maintain the hydrologic function of Q C G permeable pavement systems over time, so the Contractor shall adhere to the manufacturer's requirements for the first year following construction, and the Owner thereafter. The following tasks must be avoided on all ' A permeable pavements: N 1. sanding 2. N J re -sealing 3. re -surfacing 4. power washing I ~I Q 5. storage of snow piles containing sand 6. of mulch or materials \Q\ W / storage soil w T construction staging on unprotected pavement A maintenance task for large-scale applications involves regenerative air vacuum sweeping on a frequency consistent with the u i J 7 L Q preventative use and loadings encountered in the parking lot. Many consider an annual, dry -weather sweeping in the spring months to be important. The J Z LU contract for sweeping should specify that a vacuum sweeper be used that does not use water spray, since spraying may lead to subsurface clogging. Vacuum settings for large-scale interlocking applications should be calibrated so they do not up the small stones paver pick Z between pavement blocks. U) Table 7.& Recommended Maintenance Tasks for Permeable Pavement Practices Maintenance Task 1 FreQ uenc . For the first 6 months following construction, the practice and contributing drainage area should be Inspected at least After installation twice after storm events that exceed 112 inch of rainfall. Conduct any needed repairs or stabilization. . Mow grass in grid paver applications At least 1 time every 1-2 months during the growing season . Stabilize the CDA to prevent erosion . Remove any soil or sediment deposited on pavement. As needed • Replace or repair any necessary Pavement surface areas that are degenerating ors allin . Vacuum pavement with a standard street sweeper to 2-4 times per year (depending prevent clogging on use Conduct a maintenance inspection Annually Spot weedinof grassapplications . Remove any accumulated sediment In pre-treatment cells Once every 2 to 3 years and inflow points . Conduct maintenance using a regenerative street sweeper If clogged . Replace any necessary joint material 1 Required frequency of maintenance will depend on pavement use, traffic loads. and surrounding land use. CONSTRUCTION MAINTENANCE INSPECTIONS: It is highly recommended that a spring maintenance inspection and cleanup be conducted at each permeable pavement site, particularly at large-scale applications. Maintenance of permeable pavement is driven by annual inspections that evaluate the condition and performance of the practice. Any permeable pavement installation that captures external drainage area run-on should be inspected more frequently during the fins[ year four P P P(run-on) P 9 Y g Y ( seasons to ensure that there are no unexpected loads of sediment or pavement articulates from the contributing area. If so theproperty P P P g . owner should assess ways to limit the contributions, or the maintenance schedule should be adjusted to ensure the pavement does not become clogged. The followingare suggested routine annual maintenance inspection points for permeable pavements: 88 P P P 1. The drawdown rate should be measured at the observation well for three 3 days following a storm event in excess of 1/2-inch in depth. () Y 8 eP If standingwater is still observed in the well after three days, this is a clear sign that clogging is a problem. Y , 8n 88 8 2. Inspect the surface of the permeable pavement for evidence of sediment deposition, or mic debris staining or Funding that may indicate P P P P . 8 g P g Y surface clogging. If an signs of clogging are noted schedule a vacuum sweeper no brooms or water spray) to remove deposited material. Y gin 88 g eP ( P Y) P Then test sections b pouring water from a five gallon bucket to ensure the work. YP g g Y 3. Inspect the structural rote of the pavement surface looking for signs of surface deterioration such as slumping, cracking, spatting or P integrity P g gin P g, g, P g broken pavers. Replace or repair affected areas, as necessary. 4. Check inlets pretreatment cells and an flow diversion structures for sediment buildup and structural damage. Note if an sediment needs .P Y P g Y to be removed. 5. Inspect the condition of the observation well and make sure it is still capped. 6. Generally inspect any contributing drainage area for any controllable sources of sediment or erosion. SESSIONui 0 11J 2 I~- LU O 0 _J LU G1� `J QLU z Z o GQ C u ILL Y J W t_ a Q H1 U U) 1 U cl� L CZ LJJ o i Z 0ui N/ L.1_ CC G r 0U) U) U J Q NW L.1_ Q J a V 0 C) N ® \ I--! Ln w U T I loz ne N w JOB NO. 192171 SCALE AS SHOWN SHEET NO. 9 D 0 v D `D n i D n J 5 5 5 D D n 5 `n D 5 D i D D 0 ID D n 0 D_ C d I n J 7 5 D n a D > A D J X D D n D D D D 0 J D 0 A a v 2401DI APPROx, DRAIN AREA =1604 SO IN APPRO%,WEIGHT =67.50LBS L O 11l A g Y O N 4Ox.5D 02&O5 ° 02250 DIMENSIONS ARE FOR REFERENCE ONLY ACTUAL DIMENSIONS MAYVARY THIS PRINT MSCLOSEMIDECT MATTER IN WHICH ORAWNBY CM WiMtlAL TOOVERDMATE DIMENSIONS ARE IN INCHES NYLOPLAST HAS. PROPRIETARY RIGHTS. THE RECEIPT BUFORO, W 30518 GRATE HAS LIGHT DUTY RATING OR POSSESSION OF THIS MNTWESNOT CONFER wTE Td PHNIININ9.OMS QUALITY: MATERIALS SHALL CONFORM TO ASIM A536 GRADE 70%05 TR^''�`-R ORLCENBE THE USE OFTHE DESIGN OR NVto as PA%InN9]}t190 PAINT: CASTINGSAREFURNISHEDWIN A BLACK PAINT TECHNICAL INPoRMATION SHOWN HEREIN REWSEDBY JAC PROIECTNOMAME ✓ .'"Uwlaiwc. REPRODUCTION OF THIS PRNTORANYINFORMATION TIDE SIZE OF OPENING MEETS REQUIREMENTS OF AMERICAN DISABILITY CONTAINED HEREIN, ORMWUFACTUREOF,WY DATE yy11 xN NDROP IN ACT AS STATED IN FEDERAL REGISTER PART III, DEPARTMENT OF ARTICLE HEREFROM, FOR TTE DOQWURE TDOTHERS JUSTICE, 26 CFR PART 36. N FORBIDDEN, EXCEPT BY SPECIFIC NILBTBL PERMISSION FROM HYLORA4T. am.• nauv BNON7E A BONE 1B b1E3T 1OP1 CHRISM 1N1N10Li5 REV D DROP IN GRATE iDP SqL Y 0601 DI 0801DI 1001 DI D NYLOPLAST DROP IN GRATES FITINSIDE1201 ADS N-121HANCOR DUAL WALL, SDR 35 1501 D SEWER PVC, 8 SCH 40 DWV PVC PIPE _= 1801DI 2401 DI L_ TNIS PRINT DISCLOSES SUBJECT MATTERIN WHICH DRAWNSY AWA MATERIAL BINAROMAVE NYLOPUST HAS PROPRETARY RIGHTS, THE RECEIPT BUFORD, CA 9051E OR POSSESSION OF THIS PRINT DOES NOT CONFER TRANSFER, OR LICENSE THE USE OF THE DESIGN OR DATE w" NN(770) 99LW Nylo ast FAA(710) 90E-2000 TECH INFORMATION SHOWN HEREIN REVISED BY EBC PROTECT NO.RMME M"AwnYbPlasws,mn REPRODUCTION OF THIS PRIM OR ANV INFORMATION TIM CONTANEOHERRN.ORMANUFACMREOFANY ARTICLE HEREFROM, FOR THE DISCLOSURE TO OTTERS DATE 7d10 EIN• N N DROP IN GUTS INSTALLATION IS FORBIDOEN.EACEPi EYY SPECIFIC WRITTEN BIMG SIZE A SCALE 10 WU 10F1 PERMISSIONFROMNYLOPLST. �,omavnr BOB NO. 7011A1D011 REY E 10 IN 24 IN DROP -IN LOCKING KIT- P/N 1024DROPLOCK DRAIN BASIN LOCKING DEVICE SHALL BE STAINLESS STEEL TO BE USED WITH PVC RISER ONLY WALL MOUNT SHOULD BE INSTALLED 1.3W-2A0" _�......-..RE TOP 1 WALL MOUNT SHOULD BE INSTALLED 1.3r-2.00' BELOW THE STRUCTURE TOP OR POSSESSION OF THIS PRINT DOES NOT CONFER TRANSFER, OR LICENSE THE USE OF THE DESIGN OR TECHNICAL INFORMATION SHOWN HEREIN REPRODUCTION OF THIS PRWORMY INF~TW CCNTAMEDHEREN ORMANUFAC1JREOF ANY ARTICLE HEREFROM. FOR THE DNOLOSURETOOTIMM INLINE DRAIN TRAS F 559.56- P 557.18 PROFILE SCALES 1"=5' (V) 1"=50'(H) 570 570 EXISTING 00-yr PEAK WSE m561.25 GRADE TOP OF 10-yr PEAK WSE 5598 RY DETE TION 2-yr PEAK WS =559.6 BASIN EL EV.- TYP. 1-yr PEAK WSE 559.5 \\\\ 562.22 565 565 CONTR CTOR INSTALL EMB IN AC ORDAN SIGNS ON SH ET 9. 560 560 ASBUILT RADE 11 33. LF STIR. 12, A 048" TRACK TO SERVE AS HOPE S7 THE RIS LF 24HDPE ANDPIPE R. RISE WITH A SHALL BE SET IN TH REINED CED CONCRETE ASBUILT 555 OUNDATION. 048" ELEVATIONS ' & TO INCLUDE (1) ONE BAS N FLOO s LU SHALL H =RMANENT 012" LOW -FLOW RIFICE ITH AN (o.5 i MIN.) ALL LO NVERT ELEV_- . ALL ORIFICE 0 ENINGS SHALL HAVE STATE APPROVED TRAS (RACKS, TO PRE\ ENT FLO ATION T E RISER TYPICAL. SEE THE DETAILS ON SHE 9, OR FIRMLY MBEDD D 6" INT AN 18" T :QUIVALENT, FORA DITIONA L INFOR ATION. REINFORCED CON CRETE F UNDATI w w JJ W W L7 LO W L1- 550 M Ln w C)O CU V In Ln CD550 C) CU L + + + + 0 00 0 50 1 00 1 25 HALL VKMENT w/ SHOWN 557.21 V ELEV.=95ga9. IVE POSITIVE SLOPE \TIONS TO THE RISER. SASE SHALL BE TICK IN THAT IS 8'x8'. DETENTION BASIN CROSS SECTION COORDINATES FOR DETENTION BASIN SWM FACILITY: N: 5397.0704; E: 5077.6391 A ASBUIL PROfeSH FLOOR SH. MIN.) If 570 570 XISTINC GRADE 565 -yr PE K WSE 56125 565 -yr PE K WSE 5 9.85 '-yr PE K WSE=559,6 STR.1 -yr PE K WSE 559.54 24" YA RIM EL RIM TO 560 560 SBUILT PR9Pe ED GRA E f 558.93 ,CELL's L W ELEV. ELL 55'9:'B� SLOPE( ALLHAV POSITIV .5% LALLLO ATIONSIOTHERISER. 555 555 5' P C LF @ , 93.5 LIF° 550 550 J J D o W W N N � LE, � L7 L3 Ln 1n U7 LE, Ln N W LE. 0+50 0+75 D DRAIN INLET V.=559,0W. 558.93 BE SET AT FLOOR ELEV -TOP OF NORTHERN PRE-TREATM ENT CELL ELEV.=g6iRP ' TYP. � 562.3 -CONTRACTOR SHALL INSTALL EMBANKMENT IN ACCORDANCE w/ THE DESIGNS SHOWN ON SHEET 9. NORTHERN PRE-TREATMENT CELL CROSS SECTION COORDINATES FOR NORTHERN PRE-TREATMENT SWM FACILITY: N: 5314.8088; E: 5017.1779 STR. 24 24" YARD DRAIN INLET RIM ELEV.=5 +-_-0' 561.50 559.94 EXISTING 015" ORIFICE WITH INV. SET AT i 100-yr PEAK WSE=561,25 GR DE 565 FLOOR ELEV. OF 568-89'. ORIFICE INCLUDE TRASHRACK. SEE SHEET 8 TOP 562.26 PRE-TRE ELEV. ASBUILT ASBUILT ARAP95ES CELL's LOW E FLOOR SHALL HAVE POS MIN.) IN ALL LOCATI OF ATMENT �RRPR4F+1 GRADE ONS 565 SOUTH RN ELL 560 "7 560 55994 LEV.= CELL ITIVE SL E(0.5% TOT E RISER. 555 555 TOP EVENT F OTATIOI I STIR. 24's ASE SHALL BE FIRMLY EM EDDED 6.' INTO A 3.8" THICK REINFORCED CON RETE FOUNDATION THAT IS 'x4' 550 550 LLI n o (U CD ELL M (U ('7 (ULn Ln� FOR DETAIL, OR EQUIVALENT CONTRACTOR SHALL INSTALL EMBANKMENT IN ACCORDANCE w/ THE DESIGNS SHOWN ON SHEET 9. 23 15' PVC 129.W LF @ 0.58f 121.8 LF 0.5% 0+50 Ow MATERIAL $134VIIAO1AAE SOUTHERN PRE-TREATMENT CELL EMPORD,wDN1E " N to last'�9 CROSS SECTION JJC PRO.ECTNOMAME TTL 'TAT ROUND. LOIN-NNORDP-INLOGNMD NIT COORDINATES FOR SOUTHERN PRE-TREATMENT SWM FACILITY: A SCALE 11>S MEET 10i1 DPIf NO. 7N1A10.A5! REV A N: 5170.4056; E: 5018.9404 fl PROPOSED DRY DETENTION BASIN & PRE-TREATMENT CELLS DETAIL LOW AREA DRAINS TO YARD INLET. SCALE: 1"=20' -AREA DOES NOT PROVIDE ANY SWM P - _ FUNCTIOP. THE YARD INLET CAPTURES OFFSITE RUNOFF AND- ROUTES IT fl - - THROUGH THE SITE VIA STORM SEWER. THIS AREA IS ENCOMPASSED WITHIN' THE SWM MAINTENANCE & ACCESS \ •�?2\ - ESMT. IN THE EVENT THE PIPE NEEDS TO -BE`CLEANED DUE TO A CLOGGING. \ fl \ STIR. 10 24" YARD DRAIN INLET fl RIM ELEV.=56B-B64 559.99' RIM TO BE SET AT FLOOR ELEV. \ FACILITY, ACCESS, & \ DRAINAGE EASEMENT. A v DB.5504, PG.281-297 \ \ \ \\ FLOOR DIMENSIONS ARE f \ ` APPROXIMATELY- 16'Lx6'W �` A \ GENTLY SLOPED DRIVE \ \ \ L TOP OF DETENTION BASIN -� \\ AISLE CROSS SLOPE & 6" _ \ _ CURB TO SERVE AS \ - V.- ' TYP. \ ELE 56�, 6 2' SAFETY MEASURE ABOVE DRY DETENTION BASIN \ E, \ , , 7 561.73' \CURB CUT (TYP.) TO PROVIDE CURB LOW=b6- \ TO PREVENT FLOTATION THE RISER / STORM WATER INFLOW TO POND /BASE SHALL BE FIRMLY EMBEDDED 6" T C56222' yn INTO AN 18" THICK REINFORCED ,ti.. CEDAR- CONCRETE FOUNDATION V A THAT IS 8'x8' OHF o A CURB CUT 56L7 LOW T/C s \ 562.22• \END RIP AP' AT \ Oy P \FLOOR,. 35T3� 5 .2 STIR 12 - 48" HOPE STANDPIPE END 0 RAP AT - W/TRASH RACK FLOOR, S5� RIM _-_."_ 559.56' \ ` \ \END RIPRAP AT \FLOOR 5rr7-9R .2 r i ONE 12" LOW FLOW ORIFICE W/ TRASH RACK (INV= 554ai9) 557.18' 56 . I\ I\ I/ Elevation (ft) Area of Contours (sf) Volume (cf) 557.19 272 0 558.1 549 326 559.00 1,017 1,097 560.00 1,624 2,406 561.00 2,318 4,367 562.00 3,068 7,051 562.25 3,260 7,842 Southern Pre -Treatment Cell Elevation (ft) Area of Contours (sf) Volume (cf) 557.19 0 0 558.00 0 0 559.00 0 0 560.00 11 4 561.00 60 36 562.00 332 214 562.25 - - Northern Pre -Treatment Cell Elevation (ft) Area of Contours (sf) Volume (cf) 557.19 0 0 558.00 0 0 559.00 123 41 560.00 348 267 561.00 685 774 562.00 1117 1,666 562.25 Total Facilitv Geometry Elevation (ft) Area of Contours (sf) Volume (cf) 557.19 272 0 558.00 558 329 559.00 682 948 560.00 1,468 1,998 561.00 1,807 3,633 562.00 2,241 5,653 562.25 3,260 6,337 `v .? CURB CUT LOW-SFr+-.G- CURB. Cu,T Low=56?61.82 - - C= * 562 30'. \ ` v v v _..v IPRAP AT FLOOR,-U �T/C \ \ \ INV 557.25' END R PRAP T PR8PEISEDETENTION BASIN. FLOOR `\ FLOOR _ 557.2 ' DIMENSIONS APPROXIMATELY= VARIABLE WIDTH PUBLIC 43'Lxll'W. SEE THIS SHEET FOR FACILITY, ACCESS, & SCALED PROFILE OF THE DETENTION 15 DRAINAGE EASEMENT. BAS( N's CROSS SECTION, TYP. \ CURB vCUT LOW \ \ 0.6.5504, PG.281-297 \\ T/C 562 2.2 % '--8 BASIN FLOOR LOW ELEV. 5Fr7='C'' �l ASBUILT 557.21. \ ` ` \ \ I \ ` ND RIP AP A I FLOOR, ` �\ vn ` STR. 14 558.9 CURB CUT W 563.33 563.10 EP 24" YARD DRAIN INLET T%G ELEV.= 62.75 563.60 TC o ` \ ` RIM ELEV.=55999� 558.89'° >\ - STR. 16 \ 56Y3.60C °° 5632 "£P \ \\ \ RIM TO BE SET AT FLOOR ELEV. .A I: •. `� , � I I � � � '�, p ° 24" YARD DRAIN INLET, a o ° \ ` ` °'I L-- LLLJJJ L RIM ELEV.=56+-60i 563 82 T[, Toy STORMWATERMANAGEMENTFACILITYGRADING NORTHERN PRE-TREATMENT 562.00 -- CELL. FLOOR DIMENSIONS i Dry Detention Basin Asbuilt Dry Detention Basin APPROXIMATELY 20'Lx7'W. SEE --------- ------ -- THIS SHEET FOR SCALED ` --- - Asbuilt Southern Cel I Elevation (ft) Area of Contours (sf) Volume (cf) 557.21 0 0 558.00 0 0 559.00 0 0 560.00 4 1 561.00 87 38 562.00 366 248 562.25 - - r Asbuilt Northern Pre -Treatment Cell Elevation (ft) Area of Contours (sf) Volume (cf) 557.21 0 0 558.00 0 0 559.00 92 31 560.00 398 258 561.00 711 805 562.00 1159 1,731 562.25 Asbuilt Total Facility Geometry Elevation (ft) Area of Contours (sf) Volume (cf) 557.21 251 0 558.00 610 330 559.00 1,113 1,179 560.00 2,156 2,785 561.00 3,126 5,411 562.00 4,641 9,269 562.25 3,259 10,252 PROFILE OF ITS CROSS SECTION. \ I ASBU � I I \ I I'R6P65E� CELL FLOOR ` \ 564.00 EP I• vv 564.50 TC \ \\ \ 564.25 PVMT 1 \\ , xHIGH PT \ \ \ LOW AREAS DRAINING TO YARD INLETS. THESE AREAS DO NOT PROVIDE ANY SWM FUNCTION. YARD INLETS OUTFALL INTO PRE-TREATMENT ` \ CELLS #1 & #2. THESE AREAS ARE ` \\ \ 562 00 ENCOMPASSED WITHIN THE SWM MAINTENANCE ` \ & ACCESS ESMT. IN THE EVENT THE PIPES \\ \ \ DISCHARGING INTO THE PRE-TREATMENT CELLS NEED TO BE CLEANED DUE TO A CLOGGING. 'AT SOUTHERN PRE-TREATMENT CELL, THE RIPRAP FROM THE 4 CURB CUTS SHALL \ EXTEND TO, AND COVER, THE CELL's FLOOR. CURB CUT LOW=56i6G562.07' \\\ T/C=5Fri-&+562.54' \ \a.. \\ CURB CUT (TYP.) TO PROVIDE STORMWATER INFLOW TO POND vv `� 562 22 EP v 562 72 TC \ - \ STR. 24 24' YARD DRAIN INLET v,1 A 561.48 v \ RIM ELEV.-56+_w \ `�� 24" YARD DRAIN INLET 015" ORIFICE WITH INV. SET AT FLOOR ELEV. RIM ELEV.=5&1-- � \ OF 566H@94 ORIFICE TO INCLUDE TRASHRACK. _ 561.50' II $59.9q /SEE SHEET 8 FOR DETAIL, OR EQUIVALENT. \ , ii \ \ t \ ... v \\% \ 1 1 559.94' I P49PQ-&E CELL FLOOR LOW ELEV.=56968: TO PREVENT FLOTATION STR. 24's pSBUILT\ \ C T LO =5 1 72 _ BASE SHALL BE FIRMLY EMBEDDED 6" INTO AN 18" THICK REINFORCED 3' CONCRETE FOUNDATION THAT IS 4'x4' 16 i A vCURB UT = 62. 562.00 \ \\ \1.64 CUR C\ \v vv T `,56 .15' SOUTHERN PRE-TREATMENT m �I ENTRANCE CELL, FLOOR DIMENSIONS 562.40 APPROXIMATELY=10'Lxl'W. SEE THIS SHEET FOR SCALED 24"YARD DRAIN INLET PROFILE OF ITS CROSS SECTION. ` \\ 561.79' \ ` Lic. No. 035791 12/12/22 o rT j rn .H N w w ( Z p J g Z - a F F a g U) ILL-0 d I v, w w R_ d Z�� a V) f 0 V)> Lu O oDO Q u Z W C) O 0¢ L U) Y� ce LU w LU w `7 a a ceL N + N J Oai 0 0 v / � G/1 3 0 0 0 0 IZ 5 n > c ° (!) � o JB, I� ° Q a 0 LU z o 0 LU = w c z ° L.L LU O n C w `o LU/ E1 0 / V O LU Q ` m U W 0 L.L 0 J Lu a I""' 0 Q c ~� o U� E L_L c G ° LU U O � w w C � z TT� � O m z V / w U Z 0 Q U 0 Q 0 O n 0 0 ` u r � U x H1 ° LIB w ° J J O T� F c ° w 0 LU E ^o (V = o o_ Ln JOB NO. 192171 0 SCALE ° AS SHOWN ° c SHEET NO. o 9A Elevation (ft) Area of Contours (sf) Volume (Cf) 557.21 251 0 558.00 610 330 559.00 1,021 1,136 560.00 1,754 2,508 561.00 2,328 4,542 562.00 3,116 7,254 562.25 3,259 8,051 PIPE DESIGN n = 0.013 for RCP n = 0.01 for HDPE Pipe Hydrology Pipe su w ib J L E C N �°.' V ._' N 6 E 2 ° 2 m o a°i ° ° o c " m in m E m o = 'o m c m E rn c o E m E o m ° c m 2 c o. E m 0 Y c 'O Cl L� c c - .- r N >= N .t-. m E ° N Cl LL fn W Q U U U F°- CJ fJ - - J c (n ❑ IL IL Pipe run: 12-EX IVY 12 8 1.66 0.57 0.946 0.946 7.50 5.94 5.62 9.72 557.19 557.01 35.6 0.01 0.0051 24 17.42 5.68 0.10 8 6 0.00 0.30 0.000 2.296 19.51 4.02 0.00 9.72 556.91 556.19 143.0 0.01 0.0050 24 17.39 5.67 0.42 6 2B 2.19 0.35 0.767 3.063 19.93 3.98 3.05 12.18 556.09 555.82 53.7 0.01 0.0050 24 17.38 5.97 0.15 2B 2 0.00 0.30 0.000 3.063 20.08 3.96 0.00 12.18 555.72 555.29 85.7 0.01 0.0050 24 17.36 5.96 0.24 2 1 B 0.00 0.30 0.000 3.063 20.32 3.94 0.00 12.18 555.19 554.10 218.9 0.01 0.0050 24 17.29 5.94 0.61 1B 1A 0.00 0.30 0.000 3.382 20.93 3.88 0.00 13.12 554.00 553.15 170.3 0.01 0.0050 24 17.31 6.06 0.47 1A EX IVY 2.14 0.76 1.626 5.008 21.40 3.84 6.24 19.22 553.05 552.43 1 77.4 0.01 0.0080 1 24 21.92 7.86 0.16 Pipe run: 10-8 10 8 1 3.00 0.45 1 1.350 1.350 1 19.00 1 4.07 1 5.49 1 7.69 1 557.82 1 557.01 1 162.1 1 0.01 1 0.0050 1 24 1 17.33 1 5.32 1 0.51 Pipe run: 22-113 22 1 1 B 1 0.58 0.55 1 0.319 0.319 1 7.20 1 6.01 1 1.92 1 1.92 1 554.75 1 554.10 1 53.8 1 0.01 1 0.0121 1 15 1 7.69 1 5.21 0.17 Pipe run: 28-OUT 28 26 0.09 0.83 0.075 0.075 5.00 6.67 0.50 1.50 560.11 559.82 58.4 0.01 0.0050 15 4.95 3.50 0.28 26 24 0.18 0.83 0.149 0.224 5.28 6.58 0.98 1.50 559.82 559.71 21.4 0.01 0.0050 15 4.95 3.50 0.10 24 OUT 0.48 0.45 0.216 0.440 9.50 5.47 1.18 2.41 559.71 559.09 124.0 0.01 0.0050 15 4.95 4.00 0.52 Pipe run: 16-OUT 16 14 0.12 0.70 0.084 0.084 5.00 6.67 1 0.,% 0.56 558.17 557.74 85.2 0.01 0.0050 15 4.95 2.62 0.54 14 1 OUT 0.52 0.52 0.270 0.354 13.50 4.76 1 1.29 4.10 557.74 957.28 93.8 0.01 0.0050 15 4.95 4.50 0.35 Pipe run: 20-18 20 1 18 0.14 0.85 0.119 0.119 5.00 6.67 1 0.79 0.79 556.37 556.03 17.8 0.01 0.0191 24 31.27 3.99 0.07 Desimi Year: 10 Proi ect: Ivv Road Job #: 192171 Prenared bv: 114 INLET STATION OUTLET WATER SURFACE ELEV LA D. Qa zw SfD Hf JUNCTION LOSS FINAL H INLET WATER SURFACE ELEV. RIM ELEV V° II° QN VIN Qi*Vi Vi /2g HI ANGLE Ho Ht 1.311t .511t 557.63 17.79 24 0.79 0.000 0.00 0.3 0.0 20 0.00 0 0 0.00 NA 0.00 0.00 557.63 560.33 558.28 93.84 15 4.10 0.003 0.32 3.3 0.0 14 0.6 0.5 0.2555 0.0 0.00 0 0 0.04 NA 0.02 0.34 558.62 559.00 558.74 85.18 15 0.56 0.000 0.01 0.5 0.0 16 0.00 90 0 0.00 NA 0.00 0.01 558.75 561.50 560.09 123.97 15 2.41. 0.001 0.15 2.0 0.0 24 1.5 1.2 1.8284 0.0 0.01 0 0 0.02 NA 0.01 0.16 560.25 561.50 560.71 21.36 15 1 1.50 10.000 0.01 1 1.2 1 0.0 26 1.5 1.2 1.8284 0.0 0.01 60 0.013 0.03 NA 0.01 0.02 560.73 561.50 560.82 58.40 15 1.50 0.000 0.03 1.2 0.0 28 0.00 90 0 0.01 NA 0.00 0.03 560.85 561.75 555.33 53.78 15 1.92 0.001 0.04 1.6 0.0 22 0.00 89 0 0.01 NA 0.00 0.05 555.38 560.20 558.61 162.08 24 7.69 0.001 0.16 2.4 0.0 10 0.00 0 0 0.02 NA 0.01 0.17 558.78 560.00 554.03 77.40 24 19.22 0.006 0.48 6.1 0.1 1A 13.1 4.2 54.798 0.3 0.09 66 0.149 0.39 NA 0.19 0.67 554.70 558.28 554.75 170.31 24 13.12 0.003 0.49 4.2 0.1 I 12.2 3.9 47.205 0.2 0.08 23 0.037 0.19 NA 0.09 0.58 555.33 560.50 555.70 218.88 24 12.18 0.002 0.54 3.9 0.1 2 12.2 3.9 47.205 0.2 0.08 78 0.142 0.28 NA 0.14 0.68 556.38 559.50 556.89 85.71 24 12.18 0.002 0.21 3.9 0.1 2B 12.2 3.9 47.205 0.2 0.08 90 0.163 0.30 NA 0.15 0.36 557.25 563.00 557.42 53.69 24 12.18 0.002 0.13 3.9 0.1 6 9.7 3.1 30.045 0.1 0.05 90 0.104 0.21 NA 0.11 0.24 557.66 562.75 557.79 143.04 24 9.72 0.002 0.22 3.1 0.0 8 7.7 5.3 40.917 0.4 0.15 64 0.241 0.43 NA 0.22 0.44 558.23 562.40 558.61 35.63 24 9.72 0.002 0.06 3.1 0.0 12 1 0.00 90 0 0.04 NA 0.02 0.10 1 558.71 559.45 DRAINAGE DESCRIPTIONS STR. NO. PIPE INFORMATION INLET I NFORMATI ON COMMENTS DIA. (in.) LENGTH* (ft.) SLOPE (%) INVERT IN INVERT OUT MATERIAL INLET TYPE Curb Type INLET STATION SLOT LENGTH RIM* ELEVATION 12 24" RISER SEE SIN CG-6 0.00 - 559.45 VDOT STD. IS-1 REQ'D 11 24 35.63 0.51% 557.19 557.01 PVC 8 VDOT MH-1 CG-6 0.00 - 562.40 VDOT STD. IS-1 REQ'D 7 24 143.04 0.50% 1 556.91 556.19 1 PVC 6 VDOT MH-1 CG-6 0.00 - 562.75 VDOT STD. IS-1 REQ'D 5 1 24 1 53.69 0.50% 556.09 555.82 PVC 2B VDOT MI -1 CG-6 0.00 - 563.00 VDOT STD. IS-1 REQ'D 2C 24 85.71 0.50% 555.72 555.29 PVC 2 VDOT MI N1 CG-6 0.00 - 559.50 VDOT STD. IS-1 REQ'D 2A 24 218.88 0.50% 555.19 554.10 PVC 1B VDOTMH-1 CG-6 0.00 - 560.50 VDOTSTD. IS-1 REQ'D 1C 24 170.31 0.50% 554.00 553.15 PVC NTRACTOR SHAL 1A VDOTMH-1 CG-6 0.00 - 558.28 VDOTSTD.IS-1 REQ'D [STR. 30 SUC S FLUSH WITH ' 1AA 24 77.40 0.80% 553.05 552.43 PVC & THAT IT INTE 10 24" YARD DRAIN CG-6 0.00 - 560.00 VDOT STD. IS-1 REQ'D KISTING STORN ITLY OUTFALLIN 9 24 162.08 0.50% 557.82 557.01 PVC STR. IVY, AS f 22 DI-3C CG-6 0.00 8 560.20 VDOT STD. IS-1 REQ'D 21 15 53.78 1.21% 554.75 554.10 PVC 3 STR IVY CAN 28 24" YARD DRAIN CG-6 0.00 - 561.75 VDOT STD. IS-1 REQ'D ), A NEW DRO EQUIVALENT 1 - 27 15 58.40 0.50% 560.11 559.82 PVC SHALL BE INS NEW DROP IP 26 24" YARD DRAIN CG-6 0.00 - 561.50 VDOT STD. IS-1 REQ'D DATE THE PR( TION FROM ', 25 15 21.36 0.51% 559.82 559.71 PVC 24 24" YARD DRAIN CG-6 0.00 - 561.50 VDOT STD. IS-1 REQ'D 23 15 123.97 0.50% 559.71 559.09 PVC 16 24" YARD DRAIN CG-6 0.00 - 561.50 VDOT STD. IS-1 REQ'D 15 15 85.18 0.50% 558.17 557.74 PVC 14 24" YARD DRAIN CG-6 0.00 - 559.00 VDOT STD. IS-1 REQ'D 13 15 93.84 0.49% 557.74 557.28 PVC 20 1 DI-313 CG6 1 0.00 1 8 560.33 VDOT STD. IS-1 REQ'D 19 24 1 17.79 1 1.91% 556.37 556.03 RCPIII PROFILE NOTES: 1. SEE THIS SHEET FOR THE DRAINAGE PROFILES RELATED TC THE PROPOSED SWM FACILITY AND ITS TRUNK OUTFALL. St THE FINAL SITE PLAN FOR ALL OTHER PROFILES, INCLUDIN THE REMAINING DRAINAGE PROFILES THAT TIE INTO THE TRUNK STORM SEWER OUTFALLING THE SWM FACILITY. 2. SEE THIS SHEET FOR THE 10-YEAR HYDRAULIC GRADE LINE CALCULATIONS, THE PIPE CAPACITY CALCULATIONS & THE DRAINAGE DESCRIPTIONS FOR THE PROPOSED DRAINAGE SYSTEM. SEE THE FINAL SITE PLAN FOR THE FULL DEPICTIC OF THE DRAINAGE SYSTEM. NOTES: 1. ALL STORM PIPE SHALL BE CLASS III RCP UNLESS NOTED OTHERWISE. A MINIMUM OF 2' COVER OVER STORM PIPES MUST BE PROVIDED. 2. ALL ROADWAY EMBANKMENT MATERIAL SHALL CONSIST PREDOMINANTLY OF SOIL AND BE PLACED IN SUCCESSIVE UNIFORM LAYERS NOT MORE THAN 8 INCHES IN THICKNESS BEFORE COMPACTION OVER THE ENTIRE ROADBED AREA IN ACCORDANCE WITH VDOT 2007 ROAD AND BRIDGE SPECIFICATION 303.04. 3. ALL FILL MUST MEET 95% COMPACTION. 4. MINIMUM 3' OF COVER MUST BE MAINTAINED OVER SANITARY SEWER. 5. MINIMUM 3' OF COVER MUSS BE MAINTAINED OVER W/L 6. MINIMUM 1' OF VERTICAL SEPARATION FROM STORM SEWER & W/L AND 1.5' OF SEPARATION BETWEEN W/L & SANITARY SEWER MUST BE PROVIDED. 7. VDOT STD. IS-1 INLET SHAPING REQUIRED ON ALL STORM STRUCTURES. 8. VDOT STD SL-1 SAFETY SLAB REQUIRED WHERE DROP GREATER THAN 12' (NO SL-1 ON SANITARY MHS). 9. THE DUCTILE IRON WATERLINES SHALL BE WRAPPED IN POLYETHYLENE ENCASEMENT IF NEEDED BASED ON SOIL CONDITIONS, WHICH WILL BE TESTED AND INSPECTED DURING THE CONSTRUCTION PROCESS. VERTICAL SCALE 5 0 9 5 10 ( IN FEET ) 1 inch = 5 It. HORIZONTAL SCALE ( IN FEET ) 1 inch = 50 It 20 J IK: a, VUUI JIU. Mr1-1 STA. 17+72.26 570 TP=562.49 562.34 570 INV IN: §Fq;z.9; TO 10 5 INV IN: 99;49; TO 12 556.91 INV OUT: 54,51- TO 6 556.82 565 565 STR 10, 24" YA E SEE DETAI S ON 'SL I SHLIET 9A STA 11+6 .08 560 TP= 560 (A)7S57.79 59.97 N 24" PVC 555 162.88 1: 0-9.58% 555 5L 54% 552 552 J J W LL O O O (0 0)°U N co O O O M O It N O 07 10+00 10+50 11+00 11+50 12+0012+25 FSTR 3-o - STR8 Li STR:lB, VDOT STD. MH-1 w STA. 12+70.93 560.55 570 STR:30, MODIFIED VDOT STD. MH-1 TP=969.99X554.30 d STA. 10+30.95 INV IN: 9 TO 22 o O TP=558.12 558.14 INV IN: 56449 TO 2 554.22 x M�� INV IN: 55E.66 TO 32 INV OUT: §94.99 TO 32 w o o0 N EX INV IN/ 555.56± TO EX B10 Ln INV OUT: 55258 TO EX STR IVY STR:2, VDOT STD. MH-1 565 - o n 552.70 55 .59 ONT CTOR HALL STA. 14+89.82 fl� o N INSTAL STR 32's 555.45 TP=559.58 I- 0 F-) L0 (n +N0') z_ o STR:32, MODIFIED IM FLUSH WITH THE INV IN: SSS.29 TO ?&6 x oui VDOT MH-1 I XISTI G PAV MENT INV OUT: 666.+9 TO 1B w �_ z z_ STA. 11+89.24 _ FIELD a li > 553.58 TP- C XX H THAT 560 n n�? w w INV IN: 553-58 TO EX B2 T71 HE EX. INV IN: �99 TO 16 2CEPT5 INV OUT: 5b3-48 TO 30 / DRAIN - G INTO 24" PVC 0.53% 553. 2 HOWN. 555 0 15A.441E 0 6.569' IAA NOT BE. INLET 29 47/731 24" PVC HROAT 24" CL III RCP 218.88 1: 08.58% -ALLED. -CONTRACTOR SHALL 01.69 I_F 0 0.52% 217. LF 0.5100 LET TO VERTICALLY RELOCATE THE 76.6 LF 0.660 IPOSED 550 EXISTING WATER LA ERAL V CONT CTON SHALL1 VERTI ALLY ELO( E TR. 30. MIN. EPARA ON R ;QUIRED. THEE ISTIN PRIV TE GA LATE L, V 548 24" PVC MIN. EPARA ION R QUIRE . ,ter ® J N r� O O Co J W W 00 00 00 00 0) O � � u7 u7 � u7 W� LO LO LO LO T) T) 10+00 10+50 11+00 11+50 12+00 12+50 13+00 STR:26, 24" YARD DRAIN SEE DETAILS ON VSMP c To. �n ten" vn on nonini SET. SHEET 9A SEE'DETAILS ON V MP + SET, SHEET9A TP= 61.50 570 INV TO 28 570 59.58 E 1.48 INV OJT/ 0 24 INV T 26 59.70 59.70 ST :28 4" YARD DR 559.58 SE DETA LS ON VSMP SE SHE T 9A 565 STA'. 12+ 3.73 565 TP 561.79 INV OUT: TO 2 559.9 560 27, 560 25 i 15" PVC YARD DRAIN INV. UT 15" PVC 125.97-1: 0 9.58995 U. iD 558.98 121.8 LF 1 0.5% 555 STR. 24 TO I CLUDE pJ15" O IFICE 15" PVC YARD DRAIN 555 559.9 . ORIFI E TO INCLUDE 20.7 F 0.6% 552 TRA RACK. SEE VSMP SET, SHEET 8 552 FORD TAIL, OR EQUIVALENT. J J O r O °U O O O 00 (O W W (D L0 O(D (o N (D N (D N 00 N n (DLO (0 In c0 n c0 n W U_ D DRAIN VSMP R:26, VO INV IN: INV OUT: i 24" r r u7 N O O O U) Lf) (D (DLO Ln 13+50 14+00 14+50 15+00 STR Zz - EX STR IVY 10+00 10+50 11+00 11+50 12+00 12+5012+75 STR 28 - BASIN AT STR 14 STR:14, 24" YARD DRAIN-, SET, SHEE 9A 570 STA 10+93.84 558.8S 570 57.72 =YAF INV IN: TO 16 SEE DETAILS ON INV OUT: TO -SET, SHEET 9A SIX + 9.02 TP 561.3 565 INV OUT: SSSA 565 560 560 14 wv.o T 13 15 15" PVC 15" PVC YARD DRAIN 555 98.04^ : 0 8.58% 85.18 If 0 8.58% 555 93.5 LF 0.5 ° 552 552 JJ N O O .0 W W Lo c6 CD N (D O 1- N w0 ` L0 nL0 L0 L0 `nLO IN D DRAII VSMP Lie. No. 035791,E 12/12/22 �4J CD F L n rn ti N r w w f 0 o Z f 0 g Z = a k U. f Ul (U £ w w 0 a f ~O~ Z W j (/1 0O O W > f wLn Op O ¢ O ." f I- N Z a CO > > > V�U U u � K Ln ^in a d > Ln WLn rY 0Y Ice N N LL N N N N00 M N TO 14 00 558.20 L9 V_ r- (y) M 0) N M N O WCID N N W> LU 10+00 10+50 11+00 11+50 12+0012+25 A J STR 16 - BASIN AT STR 12 STR:6, VDOT STD. MH-1 STA. 16+29.22 556.09 TP=562.;F INV IN: 556:+9 TO 8 INV OUT: S86.89 TO iB 1555.981 21 LF 0 STR:8, VDOT STD. MH-1 %D STA. 17+72.26 In 556.94 TP=569-'48 562.34 03 � INV IN:-66;z-9a TO 10 r_ ' INV IN: -&&;W91 TO 12 O INV 0UT: FF� TO 6 N 00 55 .91 156.82 <a fn fn � 24 PVC " PVC 139 0 LF 0. .69-BF 0 3.5 LF 1 O.i6% w Of 2 00 U 0 f CP 00 57 LJJ Ln ~ C0 O Ul (n > 56 l__: w Z U) 56 SEE S M PL NSF R j ADDITIONAL ETAIL I PERTA NING 0 STI 1: Of 2449.99-LPE" HD0 8 55 33.7 LF 10.80°/ 0 O O N 55C U O (f� N L O 0 (D to N (D cD (y r) (0 (D N (D I.rj Lo (O (D (D (P � U-)u7 � LO U) In Ln LO Ln In 15+50 16+00 16+50 17+00 17+50 18+00 18+5018+75 z Q m \Lf) 1 LU � z Q O J W J LU LU D 0 LU Q 1 Q W U LU O O U Q LL I� Ln u J U o N w rr = a Ln JOB NO. 192171 SCALE AS SHOWN SHEET NO. 10