Loading...
HomeMy WebLinkAboutWPO202000030 Correspondence 2022-12-30 (2)COLLINS ENGINEERING 200 GARRETT ST, SUITE K CHARLOTTESVILLE VA 22902 ® 434.293.3719 PH 434.293.2813 F% ww w. co I l i n s-e n g i n e e r i n g. co m December 27, 2022 Albemarle County Community Development Charlottesville, VA 22902 Attn: Albemarle County Engineering Department RE., 2415 Ivy Road Commercial Redevelopment - SWM Asbuilt plan Please allow this letter to serve as a Certification for the 2415 Ivy Road Commercial Redevelopment Stormwater Management facilities. Overall, the stormwater management facilities have been built and installed to the approved plans, as detailed on the attached asbuilt plan. Below is a summary of the asbuilt construction elements that have been completed and shown on the swm asbuilt plan: 1. The following items have been shown on the SWM plan: a. A signed and sealed asbuilt has been provided for final review and approval. b. The two pre-treatment cell facilities and detention basin have been installed per the design plans and detain the required amount of storage capacity per the original design. c. The asbuilt volumes for the facilities are shown in comparison to the design volumes. The contours and volume of the SWM facilities were asbuilted and this information is shown on the asbuilt plan for comparison to the original design. The volume of the asbuilt SWM facilities meet or exceed the original design. d. The contour and labels have been shown within the asbuilt SWM facilities for the design swm facility contours and asbuilt swm facility contours. 2. The plantings for the SWM facilities include just grass, as these are grass detention facilities that drain completely over a period of time after a rain event. 3. The information on the earthen embankment construction has been shown on the plans. 4. The owner has provided the F&R reports on the embankment compaction. 5. The pervious pavers have been installed per the design plan at the front parking lot areas. 6. Asbuilt swm facilities and outtall structure field information have been shown on the plans and compared to the original design information. Please allow this letter to serve as the final certification that the stormwater management features within the 2415 Ivy Road Commercial Redevelopment project have been completed and meet the design and SWM requirements. Sincerely, Scott Collins, PE