HomeMy WebLinkAboutARB201300002 Plan - Approved 2013-01-08PORTICO
c h u r c h
PORTICO CHURCH - NORTH
EXTERIOR SIGNAGE
PORTICO CHURCH - NORTH
EXTERIOR SIGNAGE
Store
ck Metal
tics
Exterior
� � ] : � [ K � Z � L' l � 13 � l 7 0 ► [ � ] : � � 7
EXTERIOR SECONDARY SIGNAGE SCHEMATIC
12.14.12
METAL PANEL
PAINTED BLACK
DIE -CUT VINYL
GRAPHICS
120"
GROUND LEVEL
SIGN 1 (NOT TO SCALE)
EQ 6-9 5/16"
0
o
ih
PO
c h u r c h
SIGN 2 (NOT TO SCALE)
2 -0°
0
ih
r7
1
�0
3' -0"
10' -6"
METAL RETURN (BEHIND)
PAINTED BLACK
METAL RETURN C
SIGNBOX W/ OPE
BACK FOR HALO
BACK -LIT WHITE
ACRYLIC RING
TRANSLUCENT V
COLOR:PEACOC
CORRUGATED ST
BACKER
STRUCTURAL STE
13'-
G R(
EXISTING ROOF
2' -0" EQ
GOOSENECK
LIGHTING
20W HALOGEN
300 -350 LUMEN
PIN - MOUTED
METAL LETTER'
CORRUGATED
BACKER
1
C
EXISTING ROC
PORTICO CHURCH - NORTH
EXTERIOR SIGNAGE SCHEMATIC
02.19.13
_ PIN - MOUTED METAL LETTERS
FINISH: PAINTED WHITE
TRANSPARENT VINYL ON PUSH THROUGH
ACRYLIC FOR ILLUMINATION, ICE BLUE VINYL
METAL SIGNBOX W/ OPEN
BACK FOR HALO EFFECT
FINISH: PAINTED BLACK
BOTH CABINET SIGNS TO HAVE AN OPAQUE
BACKGROUND, ONLYTHE BLUE GRAPHIC
AND WHITE RING SHALL ILLUMINATE
15W MAX LED, 900 LUMENS /CAN
The level of illumination provided bythe LED lights
will not exceed the illumination produced by a single
stroke of 30 milliamp (ma) neon
CORRUGATED STEEL
BACKER PAINTED BLACK
SECTION AT LOGO
NOT TO SCALE)
SECTION AT LOGO LETTERS
(NOT TO SCALE)
PORTICO CHURCH
BRANDING GUIDELINES
PRIMARY LOGO
PORTICO
c h u r c h
CO LO RS
PANTONE: BLACK
C:60 MAO Y:40 K:100
TEXT:
C:0 M:0 Y:0 K:100
HEX: #00000
PANTONE: 319
C:49 M:0 Y:16 K:0
HEX: #61 C8D2
PANTONE: 1655
C:0 M:80 Y:95 K:0
HEX: #DE5328
PANTONE: 402
C:0 M:0 Y:0 K:80
HEX: #99999
HORIZONTAL LOGO - RIGHT
PORTICO
c h u r c h
HORIZONTAL LOGO - LEFT
LOGO - 1 COLOR
1 1
PORTICO
c h u r c h
PORTICO
c h u r c h
BRAND MARK - 2 COLOR
BRAND MARK - 1 COLOR
n
II
COUNTY OF ALBEMARLE
Department of Community Development
REVISED APPLICATION SUBMITTAL
This form must be returned with your revisions to ensure proper tracking and distribution. County staff
has indicated below what they think will be required as a resubmission of revisions. If you need to submit
additional information please explain on this form for the benefit of the intake staff. All plans must be
collated and folded to fit into legal size files, in order to be accepted for submittal.
TO: Brent Nelson DATE:
02/27/13
PROJECT NAME: ARB- 2013 -02: Portico Church Sign
Submittal Type Requiring Revisions () indicates submittal code
County Project Number
# Copies
Erosion & Sediment Control Plan (E &S)
# Copies
Distribute To:
Mitigation Plan (MP)
2
Brent Nelson
Waiver Request (WR)
Stormwater Management Plan (SWMP)
Road Plan (RP)
Private Road Request, with private/ public comparison (PRR)
Private Road Request — Development Area (PRR -DA)
Preliminary Site Plan (PSP)
Final Site Plan (or amendment) (FSP)
Final Plat (FP)
Preliminary Plat (PP)
Easement Plat (EP)
Boundary Adjustment Plat (BAP)
Rezoning Plan (REZ)
Special Use Permit Concept Plan (SP -CP)
Reduced Concept Plan (R -CP)
Proffers (P)
Bond Estimate Request (BER)
Draft Groundwater Management Plan (D -GWMP)
Final Groundwater Management Plan (F -GWMP)
Aquifer Testing Work Plan (ATWP)
Groundwater Assessment Report (GWAR)
Architectural Review Board (ARB)
ARB2013 -2
1 digital
Other: Please explain
(For staff use only)
Submittal Code
# Copies
Distribute To:
Submittal Code
# Copies
Distribute To:
ARB
2
Brent Nelson