VSMP Permit Plan Review
Project title: Proffit Road Townhomes North - Amendment 2
Project file number: WPO201900057 - amendment2
Plan preparer: Shimp Engineering [Justin@shimp-engineering.com]
Owner or rep.: Albemarle Land Development LLC [brent@hallsautobodyinc.com]
Plan received date: 12/14/22
Date of comments: 12/30/22
Reviewer: Emily Cox
County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to
act on any VSMP permit by issuing a project approval or denial. This project is
approved/disapproved. The rationale is given in the comments below. The VSMP application
content requirements can be found in County Code section 17-401.
A. Stormwater Pollution Prevention Plan (SWPPP)
The SWPPP content requirements can be found in County Code section 17-405. A SWPPP
must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary.
1. SWPPP will need to be updated on site with the latest approved plans.
B. Pollution Prevention Plan (PPP)
The PPP content requirements can be found in County Code section 17-404.
1. Revised PPP does not appear to be necessary based on amendment.
C. Stormwater Management Plan (SWMP)
VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a
SWMP. This plan is disapproved, and the reasons are provided in the comments below. The
stormwater management plan content requirements can be found in County Code section 17-
403.
1. This plan appears to show changes to the grading other than areas circled in red bubble.
Please revise and show all applicable changes to the approved plans (original and
amendmentl).
2. This plan appears to show changes to drainage pipes. Please provide applicable drainage
areas and calculations.
3. This plan shows different grading in the stream. Please provide updated army corps of
engineer's approval for this work.
4. The proposed changes shown on this plan will require an update to the final site plan.
5. Ensure lots 18-22 are shown, as they were shown on the previously approved WPO
plans.
6. Please show all recorded easements.
D. Erosion and Sediment Control Plan (ESCP)
Engineering Review Comments
Page 2 of 3
Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP.
This plan is approved/disapproved, and the reasons are provided in the comments below. The
erosion control plan content requirements can be found in County Code section 17-402.
1. Please revise all applicable E&S sheets. For one example, the outlet protection for F1 is
different. Other locations of proposed pipes and grading that affect E&S appear to have
changed as well.
The VSMP permit application and all plans may be resubmitted for approval when all comments
have been satisfactorily addressed. For re -submittals please provide 2 copies of the complete
permit package with a completed application form.
Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a
meeting to discuss this review.
Process:
After approval, erosion and sediment control and stormwater management improvements must
be bonded. The bonding process begins when the plan is approved, and the applicant submits a
bond estimate request form and fee to the Department of Community Development. A plan
reviewer will prepare estimates and check parcel and easement information based on the
approved plans. The County's Management Analyst will prepare bond agreement forms, which
will need to be completed by the owner and submitted along with cash, certificates or sureties
for the amounts specified. The agreements will need to be approved and signed by the County
Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and
forms.
Stormwater Management Facilities Maintenance agreements will also need to be completed and
recorded. The County's Management Analyst or other staff will prepare the forms and check for
ownership and signature information. The completed forms will need to be submitted to the
County, who will record the agreement.
After bonding and agreements are complete, county staff enters project information in a DEQ
database for state application processing, if a DEQ permit is required. DEQ reviews the
application information based on local VSMP authority approval. At this time, the DEQ portion of
the application fees will need to be paid directly to the state. For fastest processing, this is done
electronically with the emails provided on the application. DEQ should notify applicants with
instructions on how to pay fees. When DEQ approves the application, they will issue a permit
coverage letter, which must be posted at the construction site.
After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction
conference. Applicants must complete the request for a pre -construction conference form and
pay the remainder of the application fee. The form identifies the contractor and responsible land
disturber, and the fee remaining to be paid. This will be checked by county staff, and upon
approval, a pre -construction conference will be scheduled with the County inspector. At the pre-
Engineering Review Comments
Page 3 of 3
construction conference, should everything proceed satisfactorily, a joint VSMP and grading
permit will be issued by the County so that work may begin.
County forms can be found on the county website forms center under engineering;
httos://www.al bemarle.ore/¢overnment/commu nits-development/aooly-for/engineeri ne-aool ications