HomeMy WebLinkAboutSDP201300013 Plan - Approved 2013-02-28MINOR S"i I PLAN
#3
M
...FED.,,F_,,,.RAL REAL I Y
INVES r,, mEN r I R us r
IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALLOF THE DRAWINGS AND SPECIFICATIONS ASSOCIATED WITH THIS PROJECT
WORK SCOPE PRIOR TO THE INITIATION OF CONSTRUCTION. SHOULD THE CONTRACTOR FIND A CONFLICT WITH THE DOCUMENTS RELATIVE TO
THE SPECIFICATIONS OR APPLICABLE CODES, IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE PROJECT ENGINEER OF RECORD IN
WRITING PRIOR TO THE START OF CONSTRUCTION. FAILURE BY THE CONTRACTOR TO NOTIFY THE PROJECT ENGINEER SHALL CONSTITUTE
ACCEPTANCE OF FULL RESPONSIBILITY BY THE CONTRACTOR TO COMPLETE THE SCOPE OF THE WORK AS DEFINED BY THE DRAWINGS AND IN
H: \I0 \V10I600D1 \0RANNCS \PUN SETS \IWON WE PLW AYDAIOT 3\VI01600.01SS0lW PFdWM 8Y: EVAKNEV AN 2.27.13 0 I2-% PM LAST
W
LOCATION OF SITE
SHOPPERS WORLD COURT
CHARLOTTESVILLE,, VA
ALBEMARLE COUNTY
TM 61 M -12 -1 C2
LOCATION MAP
COPYRIGHT ADC THE MAP PEOPLE
PERMIT USE NO. 20602153-5
SCALE: 1 " =2000'
OWNER /DEVELOPER
FEDERAL REALTY
INVESTMENT TRUST
1626 EAST JEFFERSON STREET
ROCKVILLE, MD 20852
CONTACT: CHRISTINE MCGUIRL
DIRECT: 301 - 998 -8393
FAX: 301-998-3705
PREPARED BY
B011 LER
E N G I N E E R I N G
28 BLACKWELL PARK LANE, SUITE 201
WARRENTON, VIRGINIA 20186
Phone: (540) 349 -4500
Fax: (540) 349 -0321
www.BohlerEngineering.com
CONTACT: MARK R. JOYCE, P.E.
MINOR AMENDMENT J#.3
PROPOSED CIL4NGES
FflRE- STRIPE EXISTING PARKING LOT
[2] INSTALL NEW CURB
CONTACT INFORMATION
REFERENCES
♦ BOUNDARY & TOPOGRAPHICIALTA SURVEY
ALTA/ACSM LAND TITLE SURVEY
PREPARED BY CONTROL POINT ASSOCIATES
PROJECT NUMBER: S075505.SR
DATE: 3108/2007
REVISED: 5/27 /2007
♦ SITE PLAN AMMAENDMENT #1
BOHLER ENGINEERING
PROJECT NUMBER: V101600.02
DATE: 3/09/2012
REVISED: 8/22/2012
♦ SITE PLAN AMMAENDMENT #2
BOHLER ENGINEERING
PROJECT NUMBER: V101600.02
DATE: 7/23/2012
REVISED: 8/30/20112
CO VERNING AGENCIES
♦ COUNTY OF ALBEMARLE DEPARTMENT OF
COMMUNITY DEVELOPMENT
401 McINTIRE ROAD
CHARLOTTESVILLE, VA 22902
TEL: (434) 296 -5832
FAX: (434) 972AI26
♦ COUNTY OF ALBEMARLE SERVICE AUTHORITY
166 SPOTNAP ROAD
CHARLOTTESVILLE, VA 22911
TEL: (434) 9774511
UTILITY CONT'ACT'S
♦ DOMINION ELECTRIC
ONE JAMES RIVER PLAZA (OJRP)
701 EAST CARY STREET
RICHMOND, VIRGINIA 23219
CONTACT - ANN MARIE KNIGHT
ANN.MARIE.A.KNIGHT @DOM.COM
434 972 6793
SHEET INDEX
SHEET TITLE
SHEET NUMBER
COVER SHEET
1
GENERAL NOTES AND LEGEND
2
SITE PLAN
3
SIGNATURE BLOCK DATE
CURRENT D
NT PLANNER
3.m.13
Li
rk Boa <�
o 2 .0
z .8 Wg�
Ww oo ao=
co -- in LL IL
F U
Rg
� $
w
C) Q � � a �
W V DC�O';Q o
J
�mazLZa �Ej
0��
C
o °
o o u a
W
REVISIONS __7l
REV DATE I COMMENT BY
THE FOLLOWING STATES REQUIRE NOTIFICATION BY
EXCAVATORS, DESIGNERS, OR ANY PERSON PREPARING TO
DISTURB THE EARTH'S SURFACE ANYWHERE IN THE STATE.
IN VIRGINIA, MARYLAND, THE DISTRICT OF COLUMBIA, AND
DELAWARE CALL - 811
(VW 1. 800- 245-4848)(PA 1 -800- 242- 1778)(DC 1-800. 257 -7777)
(VA 1- 800-5i52 -7001) (MD 11- 800. 257.7777) (DE 1-800- 282 -M5
NOT APPROVED FOR
CONSTRUCTION ,
PROJECT No. V101600.01
DRAWN BY: MJS
CHECKED BY: MRJ
DATE: 2/27/13
SCALE: AS NOTED
CAD I.D.: SSO
PROJECT: MINOR
SITE FLAN
AMENDMENT 3
FOR
FEDERAL
REALTY
INVESTMENT
TRUST
LOCATION OF SITE
SHOPPERS WORLD COURT
CHARLOTTESVILLE, VA
ALBEMARLE COUNTY
BOHLER
ENGINEERINGF
8 BLACKWELL PARK LANE, SUITE 201
WARRENTON, VIRGINIA 20186
Phone: (540) 349 -4500
Fax: (540) 349 -0321
www.BohlerEnaineedna.com
Ojw
pMK R. JOYCE y
Lic. No. 038523 w
l :ALW_0C
SHEET TITLE:
COVER SHEET
SHEET NUMBER:
OF 3
STANDARD DRAWING LEGEND
STANDARD ABBREVIATIONS
FOR ENTIRE PLAN SET
NOT TO SCALE
�oa
EXISTING NOTE
TYPICAL NOTE TEXT
PROPOSED NOTE
FOR P
R EN I E T R LAN SET
AC
ACRES
POG
POINT OF GRADE
ONSITE PRO PERTY
LINE / R.O.W. LINE
v;
Fzui
ADA
AMERICANS WITH
DISABILITYACT
PROP
PROPOSED
- -
NEIGHBORING
PROPERTY LINE /
INTERIOR PARCEL LINE
- -
-
EASEMENT
LINE
ARCH
ARCHITECTURAL.
PT
POINT OF TANGENCY
- - _ - - - - -
SETBACK
LINE
- - - - - - - -
BC
BOTTOM OF CURIB
PTCR
POINT OF TANGENCY, CURB
RETURN
BF
BASEMENT FLOOR
PVC
POLYVINYL CHLORIDE PIPE
CONCRETE CURB &
GUTTER
CURB AND GUTTER
BK
BLOCK
PVI
POINT OF VERTICAL
INTERSECTION
SPILL CURB I TRANSITION CURB
BL
BASELINE
PVT
POINT OF VERTICAL
TANGENCY
DEPRESSED CURB AND GUTTER
BLDG
BUILDING
R
RADIUS
BM
BUILDING
BENCHMARK
RCP
REINFORCED CONCRETE PIPE
UTILITY POLE
WITH LIGHT
o
BRL
BUILDING
RESTRICTION LIME
RET
WALL
RETAINING WALL
POLE
LIGHT
CF
CUBIC FEET
R/W
RIGHT OF WAY
�{
TRAFFIC
LIGHT
p
CL
CENTERLINE
S
SLOPE
O
UTILITY
POLE
O
CMP
CORRUGATED
METAL PIPE
SAN
SANITARY SEWER
TYPICAL
LIGHT
CONN
CONNECTION
SF
SQUARE FEET
CONC
CONCRETE
STA
STATION
ACORN
LIGHT
CPP
CORRUGATED
PLASTIC PIPE
STM
STORM
-� -
TYPICAL
SIGN
- i
CY
CUBIC YARDS
TBR
TO BE REMOVED
ZL
PARKING
COUNTS
DEC
DECORATIVE
TBRL
TO BE RELOCATED
DEP
DEPRESSED
TC
TOP OF CURB
DIP
DUCTILE IRON PIPE
TELE
TELEPHONE
-169- -
------- - - - - -- 170------ - - - - --
CONTOUR
LINE
187
DOM
DOMESTIC
TPF
TREE PROTECTION FENCE
TC 5164
OR 516,4
SPOT
ELEVATIONS
C516.00
TC 516.00
BC 515.55
ELEC
ELECTRIC
TW
TOP OF WALL
ELEV
ELEVATION
TYP
TYPICAL
SAN
SANITARY
LABEL
SAN
EP
EDGE OF PAVEMENT
UG
UNDERGROUND
-Xnr-
J
STORM
LABEL
X
#
ES
EDGE OF SHOULDER
UP
_
UTILITY POLE
SL
SANITARY SEWER
LATERAL
SL
EW
END WALL
W
WIDE
w
UNDERGROUND
WATER LINE
W
EX
EXISTING
W/L
WATER LINE
E-
UNDERGROUND
ELECTRIC LINE
E
FES
FLARED END
SECTION
W/M
WATER METER
G
UNDERGROUND
GAS LINE
FF
FINISHED FLOOR
t
PLUS OR MINUS
vH
OVERHEAD
WIRE
w
FH
FIRE HYDRANT
"
DEGREE
FG
FINISHED GRADE
0
DIAMETER
T
UNDERGROUND
TELEPHONE LINE
T
G
GRADE
#
NUMBER
C
UNDERGROUND
CABLE LINE
0
GF
GARAGE FLOOR (AT
DOOR)
- - - - - - - - - -
- - - - - - - - - -
STORM
SEWER
GH
GRADE HIGHER SIDE
OF WALL
S
SANITARY
SEWER MAIN
g
GL
GRADE LOWER SIDE
OF WALL
HYDRANT
icf
GRT
GRATE
O
SANITARY
MANHOLE
; �� 1
1��_ ;
GV
GATE VALVE
HOPE
HIGH DENSITY
POLYETHYLENE PIPE
( I
D
Q D
STORM
MANHOLE
� 0 `I
� 7
�
HP
HIGH POINT
WM
®
WATER
METER
HOR
HORIZONTAL
WV
WATER
VALVE
•
HW
HEADWALL
GAS
VALVE
TNT
INTERSECTION
®
GAS
METER
®
INV
INVERT
LF
LINEAR FOOT
TYPICAL END
SECTION
C�:D
LOC
LIMITS OF CLEARING
4
HEADWALL OR
ENDWALL
��
LOD
LIMITS OF
DISTURBANCE
LOS
LINE OF SIGHT
(9)
YARD
INLET
�
LP
LOW POINT
d
CURB
INLET
US
LANDSCAPE
O
CLEAN
OUT
O
MAX
MAXIMUM
(�
�✓
ELECTRIC
MANHOLE
Q
MIN
MINIMUM
TELEPHONE
MANHOLE
O
MH
MANHOLE
MJ
MECHANICAL JOINT
EB
ELECTRIC
FEB]
OC
ON CENTER
EP
ELECTRIC
PEDESTAL
EP
PA
POINT OF ANALYSIS
PC
POINT CURVATURE
PCCR
POINT OF
COMPOUND
CURVATURE, CURB
RETURN
MONITORING
WELL
®
TEST
PIT
`�'
PI
POINT OF
INTERSECTION
®
BENCHMARK
BORING
IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALL OF THE DRAWINGS AND SPECIFICATIONS ASSOCIATED WITH THIS PROJECT
WORK SCOPE PRIOR TO THE INITIATION OF CONSTRUCTION. SHOULD THE CONTRACTOR FIND A CONFLICT WITH THE DOCUMENTS RELATIVE TO
THE SPECIFICATIONS OR APPLICABLE CODES, IT IS THE CONTRACTORS RESPONSIBILITY TO NOTIFY THE PROJECT ENGINEER OF RECORD IN
WRITING PRIOR TO THE START OF CONSTRUCTION. FAILURE BY THE CONTRACTOR TO NOTIFY THE PROJECT ENGINEER SHALL CONSTITUTE
ACCEPTANCE OF FULL RESPONSIBILITY BY THE CONTRACTOR TO COMPLETE THE SCOPE OF THE WORK AS DEFINED BY THE DRAWINGS AND IN FULL
H: \10 \VI01600AI \OWIWf♦r,S \PW MS\WOR SITE PLAN IYDrD11Q1I 3\VI016&0ISSD.01VG PM90 BY: LVN0411YM 227.13 0 12:59 PM WST
GENERAL DEMOLITION ]PLAN NOTES
1, BOHLER ENGINEERING IS NOT RESPONSIBLE FOR JOB SITE SAFETY OR
SUPERVISION.
2. ALL DEMOLITION ACTIVITIES ARE TO BE PERFORMED IN ACCORDANCE WITH THESE
PLANS AND SPECIFICATIONS AS WELL AS ALL FEDERAL STATE AND LOCAL
REGULATIONS. ANY DISCREPANCIES OR DEVIATIONS SHALL BE IDENTIFIED BY THE
CONTRACTOR TO BOHLER ENGINEERING IN WRITING FOR RESOLUTION PRIOR TO
INITIATION OF SITE ACTIVITY.
3. PRIOR TO STARTING ANY DEMOLITION CONTRACTOR IS RESPONSIBLE FOR/TO:
A. ENSURING THAT COPIES OF ALL APPLICABLE PERMITS AND APPROVALS ARE
MAINTAINED ON -SITE AND AVAILABLE FOR REVIEW.
B. INSTALLING THE REQUIRED SOIL EROSION AND SEDIMENT CONTROL AND /OR
TREE PROTECTION MEASURES PRIOR TO SITE DISTURBANCE.
C. LOCATING (VERTICALLY AND HORIZONTALLY) ALL UTILITIES AND SERVICES,
INCLUDING, BUT NOT LIMITED TO GAS, WATER, ELECTRIC, SANITARY AND
STORM SEWER, TELEPHONE, CABLE, FIBER OPTIC CABLE, ETC. WITHIN THE
LIMITS OF DISTURBANCE. THE CONTRACTOR SHALL USE AND COMPLY WITH
THE REQUIREMENTS OF THE APPLICABLE UTILITY NOTIFICATION SYSTEM TO
LOCATE ALL THE UNDERGROUND UTILITIES.
D. PROTECTING AND MAINTAINING IN OPERATION, RA N, ALL ACTIVE SYSTEMS THAT
ARE NOT BEING REMOVED DURING ALL DEMOLITION ACTIVITIES.
E. FAMILIARIZING THEMSELVES WITH THE APPLICABLE UTILITY SERVICE
PROVIDER AND IS RESPONSIBLE FOR ALL COORDINATION REGARDING UTILITY
DEMOLITION REQUIRED FOR THE PROJECT. THE CONTRACTOR SHALL
PROVIDE THE OWNER WRITTEN NOTIFICATION THAT THE EXISTING UTILITIES
AND SERVICES HAVE BEEN TERMINATED AND ABANDONED IN ACCORDANCE
WITH JURISDICTION AND UTILITY COMPANY REQUIREMENTS.
F. COORDINATION WITH UTILITY COMPANIES REGARDING WORKING "OFF -PEAK"
HOURS OR ON WEEKENDS AS MAY BE REQUIRED TO MINIMIZE THE IMPACT ON
THE AFFECTED PARTIES.
G. A COMPLETE INSPECTION FOR CONTAMINANTS BY A LICENSED
ENVIRONMENTAL TESTING AGENCY, OF ALL BUILDINGS AND /OR STRUCTURES
TO BE REMOVED. SAME SHALL BE PERFORMED IN ACCORDANCE WITH ALL
APPLICABLE LOCAL, STATE, AND FEDERAL ENVIRONMENTAL REGULATIONS.
ANY /ALL CONTAMINANTS SHALL BE REMOVED AND DISPOSED OF BY A
FEDERALLY LICENSED CONTRACTOR IN ACCORDANCE WITH FEDERAL, STATE,
AND LOCAL REGULATIONS. ALL ENVIRONMENTAL WORK INCLUDING
HAZARDOUS MATERIAL, SOILS, ASBESTOS, OR OTHER REFERENCED OR
IMPLIED HEREIN IS THE SOLE RESPONSIBILITY OF THE OWNER'S
ENVIRONMENTAL CONSULTANT.
4. BOHLER ENGINEERING IS NOT RESPONSIBLE FOR JOB SITE SAFETY OR
SUPERVISION. CONTRACTOR IS TO PROCEED WITH THE DEMOLITION IN A
SYSTEMATIC AND SAFE MANNER, FOLLOWING ALL THE OSHA REQUIREMENTS, TO
ENSURE PUBLIC AND CONTRACTOR SAFETY.
5. THE CONTRACTOR SHALL PROVIDE ALL THE "MEANS AND METHODS" NECESSARY
TO PREVENT MOVEMENT, SETTLEMENT, OR COLLAPSE OF EXISTING STRUCTURES,
AND ANY OTHER IMPROVEMENTS THAT ARE REMAINING ON -SITE OR OFF -SITE. THE
DEMOLITION CONTRACTOR IS RESPONSIBLE FOR ALL REPAIRS OF DAMAGE TO ALL
ITEMS THAT ARE TO REMAIN AS A RESULT OF HIS ACTIVITIES. ALL REPAIRS SHALL
USE NEW MATERIAL. THE REPAIRS SHALL RESTORE THE ITEM TO THE
PRE - DEMOLITION CONDITION.
6. IN THE ABSENCE OF SPECIFICATIONS, THE CONTRACTOR SHALL PERFORM EARTH
MOVEMENT ACTIVITIES, DEMOLITION AND REMOVAL OF ALL FOUNDATION WALLS,
FOOTINGS, AND OTHER MATERIALS WITHIN THE LIMITS OF DISTURBANCE IN
ACCORDANCE WITH DIRECTION BY OWNER'S STRUCTURAL OR GEOTECHNICAL
ENGINEER.
7. EXPLOSIVES SHALL NOT BE USED WITHOUT PRIOR WRITTEN CONSENT OF BOTH
THE OWNER AND APPLICABLE GOVERNMENTAL AUTHORITIES. ALL THE REQUIRED
PERMITS AND EXPLOSIVE CONTROL MEASURES THAT ARE REQUIRED BY THE
FEDERAL, STATE, AND LOCAL GOVERNMENTS SHALL BE IN PLACE PRIOR TO
STARTING AN EXPLOSIVE PROGRAM. THE CONTRACTOR IS ALSO RESPONSIBLE FOR
ALL INSPECTION AND SEISMIC VIBRATION TESTING THAT IS REQUIRED TO MONITOR
THE EFFECTS ON ALL LOCAL STRUCTURES.
8. CONTRACTOR SHALL PROVIDE TRAFFIC CONTROL AND GENERALLY ACCEPTED
SAFE PRACTICES IN CONFORMANCE WITH: THE CURRENT "MANUAL ON UNIFORM
TRAFFIC CONTROL," AS WELL AS FEDERAL, STATE, AND LOCAL REGULATIONS WHEN
DEMOLITION RELATED ACTIVITIES IMPACT ROADWAYS OR ROADWAY
RIGHTS -OF -WAY.
9. CONDUCT DEMOLITION ACTIVITIES IN SUCH A MANNER TO ENSURE MINIMUM
INTERFERENCE WITH ROADS, STREETS, SIDEWALKS, WALKWAYS, AND OTHER
ADJACENT FACILITIES. STREET CLOSURE PERMITS MUST BE RECEIVED FROM THE
APPROPRIATE GOVERNMENTAL AUTHORITY.
10. DEMOLITION ACTIVITIES AND EQUIPMENT SHALL NOT USE AREAS OUTSIDE THE
DEFINED PROPERTY LINE WITHOUT WRITTEN PERMISSION OF THE APPLICABLE
PROPERTY OWNER, AND /OR APPROPRIATE GOVERNMENT AGENCY.
11. USE DUST CONTROL MEASURES TO LIMIT AIRBORNE DUST AND DIRT RISING AND
SCATTERING IN THE AIR IN ACCORDANCE WITH FEDERAL, STATE, AND /OR LOCAL
STANDARDS. AFTER THE DEMOLITION IS COMPLETE, ADJACENT STRUCTURES AND
IMPROVEMENTS SHALL BE CLEANED OF ALL DUST AND DEBRIS CAUSED BY THE
DEMOLITION OPERATIONS. THE CONTRACTOR IS RESPONSIBLE FOR RETURNING
ALL ADJACENT AREAS TO THEIR "PRE- DEMOLITION" CONDITION.
12. CONTRACTOR IS RESPONSIBLE TO SAFEGUARD SITE AS NECESSARY TO PERFORM
THE DEMOLITION IN SUCH A MANNER AS TO PREVENT THE ENTRY OF
UNAUTHORIZED PERSONS AT ANYTIME.
13. THIS DEMOLITION PLAN IS INTENDED TO IDENTIFY THOSE EXISTING
ITEMS /CONDITIONS WHICH ARE TO BE REMOVED. IT IS NOT INTENDED TO PROVIDE
DIRECTION OTHER THAN THAT ALL "MEANS AND METHODS" ARE TO BE IN
ACCORDANCE WITH STATE, FEDERAL, LOCAL, AND JURISDICTIONAL
REQUIREMENTS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL OSHA AND
OTHER SAFETY PRECAUTIONS NECESSARY TO PROVIDE A SAFE WORK SITE.
14. DEBRIS SHALL NOT BE BURIED ON THE SUBJECT SITE. ALL DEMOLITION WASTES
AND DEBRIS (SOLID WASTE) SHALL BE DISPOSED OF IN ACCORDANCE WITH ALL
TOWN, COUNTY, STATE, AND FEDERAL LAWS AND APPLICABLE CODES.
GENERAL SITE PLAN NOTES
1. ALL ADA ACCESSIBLE PARKING SPACES AND ACCESS ROUTES SHALL BE CONSTRUCTED TO MEET ADA
REQUIREMENTS.
2. PRIOR TO STARTING CONSTRUCTION, THE CONTRACTOR SHALL ENSURE THAT ALL REQUIRED PERMITS
AND APPROVALS HAVE BEEN O T B AINED. NO CONSTRUCTION OR FABRICATION SHALL BEGIN UNTIL THE
CONTRACTOR HAS RECEIVED AND THOROUGHLY REVIEWED ALL PLANS AND OTHER DOCUMENTS BY
ALL OF THE PERMITTING AUTHORITIES.
3. THE OWNER/CONTRACTOR SHALL BE FAMILIAR WITH AND RESPONSIBLE FOR ANY /ALL CERTIFICATIONS,
INSPECTIONS, ETC. REQUIRED BY ALL GOVERNING JURISDICTIONAL AGENCIES DURING AND AFTER
CONSTRUCTION FOR SIGN -OFF AND CERTIFICATE OF OCCUPANCY ISSUANCE INCLUDING BUT NOT
LIMITED TO PROCUREMENT OF SERVICES, SCHEDULING OF FIELD OBSERVATIONS AND COORDINATION
WITH REPRESENTATIVES OF THE APPROPRIATE PARTIES.
4. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THESE PLANS AND SPECIFICATIONS AND THE
REQUIREMENTS AND STANDARDS OF THE LOCAL GOVERNING AUTHORITY,
5. THE GEOTECHNICAL REPORT AND RECOMMENDATIONS SET FORTH THEREIN ARE A PART OF THE
TRU
REQUIRED CONSTRUCTION DOCUMENTS AND IN CASE OF CONFLICT SHALL TAKE PRECEDENCE UNLESS
Q C S C
SPECIFICALLY NOTED OTHERWISE ON THE PLANS. THE CONTRACTOR SHALL NOTIFY THE ENGINEER IN
WRITING OF ANY SUCH DISCREPANCY BETWEEN GEOTECHNICAL REPORT AND PLANS, ETC.
6. THE PROPERTY SURVEY SHALL BE CONSIDERED A PART OF THESE PLANS.
7. THESE PLANS ARE BASED ON INFORMATION PROVIDED TO BOHLER ENGINEERING AT THE TIME OF PLAN
PREPARATION. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS AND NOTIFY BOHLER
ENGINEERING IF ACTUAL SITE CONDITIONS DIFFER FROM THOSE SHOWN ON THE PLAN, OR IF THE
PROPOSED WORK WOULD BE INHIBITED BY ANY OTHER SITE FEATURES.
B. ALL DIMENSIONS SHOWN ON THE PLANS SHALL BE FIELD VERIFIED BY THE CONTRACTOR PRIOR TO
CONSTRUCTION. CONTRACTOR SHALL NOTIFY ENGINEER IN WRITING IF ANY DISCREPANCIES EXIST
PRIOR TO PROCEEDING WITH CONSTRUCTION. NO EXTRA COMPENSATION SHALL BE PAID TO THE
CONTRACTOR FOR WORK HAVING TO BE REDONE DUE TO DIMENSIONS OR GRADES SHOWN
INCORRECTLY ON THESE PLANS IF SUCH NOTIFICATION HAS NOT BEEN GIVEN.
9. CONTRACTOR SHALL REFER TO THE ARCHITECTURAL/BUILDING PLANS FOR EXACT LOCATIONS AND
DIMENSIONS OF ENTRY /EXIT POINTS, ELEVATIONS, PRECISE BUILDING DIMENSIONS, EXACT BUILDING
UTILITY LOCATIONS.
10. DEBRIS SHALL NOT BE BURIED ON THE SUBJECT SITE AND ALL UNSUITABLE EXCAVATED HAZARDOUS
MATERIAL, AND DEBRIS (SOLID WASTE) SHALL BE DISPOSED OF IN ACCORDANCE WITH ALL TOWN,
COUNTY, STATE AND FEDERAL LAWS AND APPLICABLE CODES.
11, CONTRACTOR IS RESPONSIBLE FOR ALL SHORING REQUIRED DURING EXCAVATION (TO BE PERFORMED
IN ACCORDANCE WITH CURRENT OSHA STANDARDS) AND ANY ADDITIONAL PROVISIONS TO ASSURE
STABILITY OF CONTIGUOUS STRUCTURES, AS FIELD CONDITIONS DICTATE.
12. CONTRACTOR IS TO EXERCISE EXTREME CARE WHEN PERFORMING ANY WORK ACTIVITIES ADJACENT
TO PAVEMENT, STRUCTURES, ETC. TO REMAIN. CONTRACTOR SHALL BE RESPONSIBLE FOR TAKING THE
APPROPRIATE MEASURES AS NECESSARY TO ENSURE THE STRUCTURAL STABILITY OF PAVEMENT,
STRUCTURES, ETC. TO REMAIN, AND TO PROVIDE A SAFE WORK AREA.
13. CONTRACTOR IS RESPONSIBLE FOR DOCUMENTING ALL EXISTING DAMAGE AND FOR NOTIFYING
CONSTRUCTION MANAGER PRIOR TO START OF CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR
REPAIRING THE DAMAGE DONE TO ANY EXISTING ITEM DURING CONSTRUCTION SUCH AS BUT NOT
LIMITED TO DRAINAGE, UTILITIES, PAVEMENT, STRIPING, CURB, ETC. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR AND SHALL REPLACE ALL SIGNAL INTERCONNECT CABLE, CONDUITS, AND ANY
UNDERGROUND ACCESSORY EQUIPMENT DAMAGED DURING CONSTRUCTION. REPAIR SHALL BE EQUAL
TO OR BETTER THAN EXISTING CONDITIONS.
14. ALL CONCRETE SHALL HAVE THE MINIMUM COMPRESSIVE STRENGTH AT 28 DAYS AS INDICATED IN
SPECIFICATIONS UNLESS OTHERWISE NOTED ON THE PLANS, DETAILS AND /OR GEOTECHNICAL REPORT.
15. ENGINEER IS NOT RESPONSIBLE `FOR CONSTRUCTION METHODS /MEANS FOR COMPLETION OF THE
WORK DEPICTED ON THESE PLANS NOR ANY CONFLICTS /SCOPE REVISIONS WHICH RESULT FROM SAME.
D
CONTRACTOR IS RESPONSIBLE FOR DETERMINING METHO S! MEANS FOR COMPLETION OF THE WORK
PRIOR TO THE COMMENCEMENT OF CONSTRUCTION AND NOTIFICATION OF OWNER AND ENGINEER OF
RECORD WHEN A CONFLICT IS IDENTIFIED.
16, ENGINEER OF RECORD IS NOT RESPONSIBLE FOR JOB SITE SAFETY NOR HAVE THEY BEEN RETAINED
FOR SUCH PURPOSES.
17. ALL CONTRACTORS MUST CARRY STATUTORY WORKER'S COMPENSATION INSURANCE, EMPLOYER'S
LIABILITY INSURANCE AND APPROPRIATE LIMITS OF COMMERCIAL GENERAL LIABILITY INSURANCE (CGL).
ALL CONTRACTORS MUST HAVE THEIR CGL POLICIES ENDORSED TO NAME BOHLER ENGINEERING, AND
ITS SUB - CONSULTANTS AS ADDITIONAL INSURED AND TO PROVIDE CONTRACTUAL LIABILITY COVERAGE
SUFFICIENT TO INSURE THE HOLD HARMLESS AND INDEMNITY OBLIGATIONS ASSUMED BY THE
CONTRACTORS., ALL CONTRACTORS MUST FURNISH BOHLER ENGINEERING WITH CERTIFICATIONS OF
INSURANCE AS EVIDENCE OF THE REQUIRED INSURANCE PRIOR TO COMMENCING WORK AND UPON
RENEWAL, OF EACH POLICY DURING THE ENTIRE PERIOD OF CONSTRUCTION, IN ADDITION, ALL
CONTRACTORS WILL, TO THE FULLEST EXTENT PERMITTED BY LAW, INDEMNIFY AND HOLD HARMLESS
BOHLER ENGINEERING AND ITS SUB- CONSULTANTS FROM AND AGAINST ANY DAMAGES, LIABILITIES OR
COSTS, INCLUDING REASONABLE ATTORNEYS' FEES AND DEFENSE COSTS, ARISING OUT OF OR IN ANY
WAY CONNECTED WITH THE PROJECT, INCLUDING ALL CLAIMS BY EMPLOYEES OF THE CONTRACTORS.
18. NEITHER THE PROFESSIONAL ACTIVITIES OF BOHLER ENGINEERING, NOR THE PRESENCE OF BOHLER
ENGINEERING OR ITS EMPLOYEES AND SUB - CONSULTANTS AT A CONSTRUCTION /PROJECT SITE, SHALL
RELIEVE THE GENERAL CONTRACTOR OF ITS OBLIGATIONS, DUTIES AND RESPONSIBILITIES INCLUDING,
BUT NOT LIMITED TO, CONSTRUCTION MEANS, METHODS, SEQUENCE, TECHNIQUES OR PROCEDURES
NECESSARY FOR PERFORMING, SUPERINTENDING AND COORDINATING THE WORK IN ACCORDANCE
WITH THE CONTRACT DOCUMENTS AND ANY HEALTH OR SAFETY PRECAUTIONS REQUIRED BY ANY
REGULATORY AGENCIES. BOHLER ENGINEERING AND ITS PERSONNEL HAVE NO AUTHORITY TO
EXERCISE ANY CONTROL OVER ANY CONSTRUCTION CONTRACTOR OR ITS EMPLOYEES IN CONNECTION
WITH THEIR WORK OR ANY HEALTH OR SAFETY PROGRAMS OR PROCEDURES. THE GENERAL
CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR JOB SITE SAFETY. BOHLER ENGINEERING SHALL BE
INDEMNIFIED BY THE GENERAL CONTRACTOR AND SHALL BE MADE ADDITIONAL INSURED UNDER THE
GENERAL CONTRACTOR'S POLICIES OF GENERAL LIABILITY INSURANCE.
19. BOHLER ENGINEERING SHALL REVIEW AND APPROVE OR TAKE OTHER APPROPRIATE ACTION ON THE
CONTRACTOR SUBMITTALS, SUCH AS SHOP DRAWINGS, PRODUCT DATA, SAMPLES, AND OTHER DATA,
WHICH THE CONTRACTOR IS REQUIRED TO SUBMIT, BUT ONLY FOR THE LIMITED PURPOSE OF
CHECKING FOR CONFORMANCE WITH THE DESIGN CONCEPT AND THE INFORMATION SHOWN IN THE
CONSTRUCTION MEANS OR METHODS, COORDINATION OF THE WORK WITH OTHER TRADES, OR
CONSTRUCTION SAFETY PRECAUTIONS, ALL OF WHICH ARE THE SOLE RESPONSIBILITY OF THE
CONTRACTOR. BOHLER ENGINEERING'S REVIEW SHALL BE CONDUCTED WITH REASONABLE
PROMPTNESS WHILE ALLOWING SUFFICIENT TIME TO PERMIT ADEQUATE REVIEW. REVIEW OF A
SPECIFIC ITEM SHALL NOT INDICATE THAT BOHLER ENGINEERING HAS REVIEWED THE ENTIRE
ASSEMBLY OF WHICH THE ITEM IS A COMPONENT. BOHLER ENGINEERING SHALL NOT BE RESPONSIBLE
FOR ANY DEVIATIONS FROM THE CONSTRUCTION DOCUMENTS NOT BROUGHT TO THE ATTENTION OF
BOHLER ENGINEERING IN WRITING BY THE CONTRACTOR. BOHLER ENGINEERING SHALL NOT BE
REQUIRED TO REVIEW PARTIAL SUBMISSIONS OR THOSE FOR WHICH SUBMISSIONS OF CORRELATED
ITEMS HAVE NOT BEEN RECEIVED.
20. IN AN EFFORT TO RESOLVE ANY CONFLICTS THAT ARISE DURING THE DESIGN AND CONSTRUCTION OF
THE PROJECT OR FOLLOWING THE COMPLETION OF THE PROJECT, BOHLER ENGINEERING AND THE
CONTRACTOR MUST AGREE THAT ALL DISPUTES BETWEEN THEM ARISING OUT OF OR RELATING TO THIS
AGREEMENT OR THE PROJECT SHALL BE SUBMITTED TO NON - BINDING MEDIATION UNLESS THE PARTIES
MUTUALLY AGREE OTHERWISE.
21. THE CONTRACTOR MUST INCLUDE A MEDIATION PROVISION IN ALL AGREEMENTS WITH INDEPENDENT
SUBCONTRACTORS AND CONSULTANTS RETAINED FOR THE PROJECT AND TO REQUIRE ALL
INDEPENDENT CONTRACTORS AND CONSULTANTS ALSO TO INCLUDE A SIMILAR MEDIATION PROVISION
IN ALL AGREEMENTS WITH THEIR SUBCONTRACTORS, SUB - CONSULTANTS, SUPPLIERS AND
FABRICATORS, THEREBY PROVIDING FOR MEDIATION AS THE PRIMARY METHOD FOR DISPUTE
RESOLUTION BETWEEN THE PARTIES TO ALL THOSE AGREEMENTS.
22. IF THE CONTRACTOR DEVIATES FROM THE PLANS AND SPECIFICATIONS, INCLUDING THE NOTES
CONTAINED THEREON, WITHOUT FIRST OBTAINING PRIOR WRITTEN AUTHORIZATION FOR SUCH
DEVIATIONS FROM THE OWNER AND ENGINEER, IT SHALL BE RESPONSIBLE FOR THE PAYMENT OF ALL
COSTS TO CORRECT ANY WORK DONE, ALL FINES OR PENALTIES ASSESSED WITH RESPECT THERETO
AND ALL COMPENSATORY OR PUNITIVE DAMAGES RESULTING THEREFROM. THE CONTRACTOR SHALL
INDEMNIFY AND HOLD THE OWNER AND ENGINEER HARMLESS FROM ALL SUCH COSTS TO CORRECT
ANY SUCH WORK AND FROM ALL SUCH FINES AND PENALTIES, COMPENSATION AND PUNITIVE DAMAGES
AND COSTS OF ANY NATURE RESULTING THEREFROM.
GENERAL GRADING & UTILITY PLAN NOTES
1. LOCATION OF ALL EXISTING AND PROPOSED SERVICES ARE APPROXIMATE AND MUST BE CONFIRMED INDEPENDENTLY WITH LOCAL
UTILITY COMPANIES PRIOR TO COMMENCEMENT OF ANY CONSTRUCTION OR EXCAVATION. SANITARY SEWER AND ALL OTHER UTILITY
SERVICE CONNECTION POINTS SHALL BE CONFIRMED INDEPENDENTLY BY THE CONTRACTOR IN FIELD PRIOR TO THE
COMMENCEMENT OF CONSTRUCTION. ALL DISCREPANCIES SHALL BE REPORTED IMMEDIATELY IN WRITING TO THE ENGINEER.
CONSTRUCTION S HALL COMMENCE BEGINNING AT THE LOWEST INVERT (POIN T OF CONNECTION) AND PROGRESS U P GRADIENT. ALL
PROPOSED INTERFACE POINTS (CROSSINGS) WITH EXISTING UNDERGROUND UTILITIES SHALL BE FIELD VERIFIED BY TEST PIT PRIOR
TO COMMENCEMENT OF CONSTRUCTION.
2. ALL UTILITIES AND SERVICES INCLUDING BUT NOT LIMITED TO GAS, WATER, ELECTRIC, SANITARY AND STORM SEWER, TELEPHONE,
CABLE, FIBER OPTIC CABLE, ETC. WITHIN THE LIMITS OF DISTURBANCE SHALL BE VERTICALLY AND HORIZONTALLY LOCATED. THE
CONTRACTOR SHALL USE AND COMPLY WITH THE REQUIREMENTS OF THE APPLICABLE UTILITY NOTIFICATION SYSTEM TO LOCATE ALL
THE UNDERGROUND UTILITIES. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRS OF DAMAGE TO ANY EXISTING UTILITIES DURING
CONSTRUCTION AT NO COST TO THE OWNER.
3. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALL OF THE DRAWINGS AND SPECIFICATIONS ASSOCIATED WITH THE
PROJECT WORK SCOPE PRIOR TO THE INITIATION OF CONSTRUCTION. SHOULD THE CONTRACTOR FIND A CONFLICT WITH THE
DOCUMENTS RELATIVE TO THE SPECIFICATIONS OR THE RELATIVE CODES, IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY
BOHLER ENGINEERING IN WRITING PRIOR TO THE START OF CONSTRUCTION. FAILURE BY THE CONTRACTOR TO NOTIFY THE PROJECT
EN GINEER SHAL L CO N STITUTE ACCEPTANCE OF FULL RESPONSIBILITY BY THE CONTRACTOR TO COMPLETE TH E SCOPE OF WORK AS
DEFINED BY THE DRAWINGS AND IN FULL COMPLIANCE WITH LOCAL REGULATIONS AND CODES.
4. DEFINE AND LOCATE VERTICALLY AND HORIZONTALLY ALL ACTIVE UTILITY AND /OR SERVICE SYSTEMS THAT ARE TO BE REMOVED,
THE CONTRACTOR IS RESPONSIBLE TO PROTECT AND MAINTAIN ALL ACTIVE SYSTEMS THAT ARE NOT BEING REMOVED /RELOCATED
DURING SITE ACTIVITY.
5. THE CONTRACTOR SHALL FAMILIARIZE THEMSELVES WITH THE APPLICABLE UTILITY SERVICE PROVIDER REQUIREMENTS AND IS
RESPONSIBLE FOR ALL COORDINATION REGARDING UTILITY DEMOLITION AS IDENTIFIED OR REQUIRED FOR PROJECT. THE
CONTRACTOR SMALL PROVIDE THE OWNER WRITTEN NOTIFICATION THAT THE EXISTING UTILITIES AND SERVICES HAVE BEEN
TERMINATED ABANDONED UTILITY COMPANY NATED AN N NED IN ACCORDANCE WITH JURISDICTION AND UTI REQUIREMENTS.
Q
6. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF SITE PLAN DOCUMENTS AND ARCHITECTURAL DESIGN FOR EXACT BUILDING
UTILITY CONNECTION LOCATIONS, GREASE TRAP REQUIREMENTS /DETAILS, DOOR ACCESS, AND EXTERIOR GRADING. THE UTILITY
SERVICE SIZES ARE TO BE DETERMINED BY THE ARCHITECT. THE CONTRACTOR SHALL COORDINATE INSTALLATION OF
UTILITIES /SERVICES WITH THE INDIVIDUAL COMPANIES, TO AVOID CONFLICTS AND ENSURE PROPER DEPTHS ARE ACHIEVED. THE
JURISDICTION UTILITY REQUIREMENTS SHALL ALSO BE MET, AS WELL AS COORDINATING THE UTILITY TIE- INS/CONNECTIONS PRIOR TO
CONNECTING TO THE EXISTING UTILITY /SERVICE. WHERE CONFLICTS EXIST WITH THESE SITE PLANS, ENGINEER IS TO BE NOTIFIED
PRIOR TO CONSTRUCTION TO RESOLVE SAME.
7. WATER SERVICE MATERIALS, BURIAL DEPTH, AND COVER REQUIREMENTS SHALL BE SPECIFIED BY THE LOCAL UTILITY COMPANY.
CONTRACTOR'S PRICE FOR WATER SERVICE SHALL INCLUDE ALL FEES AND APPURTENANCES REQUIRED BY THE UTILITY TO PROVIDE
A COMPLETE WORKING SERVICE.
8. ALL NEW UTILITIES /SERVICES, INCLUDING ELECTRIC, TELEPHONE, CABLE TV, ETC. ARE TO BE INSTALLED UNDERGROUND. ALL NEW
UTILITIES /SERVICES SHALL BE INSTALLED IN ACCORDANCE WITH THE UTILITY /SERVICE PROVIDER INSTALLATION SPECIFICATIONS AND
STANDARDS.
9. SITE GRADING SHALL BE PERFORMED IN ACCORDANCE WITH THESE PLANS AND SPECIFICATIONS AND THE RECOMMENDATIONS SET
FORTH IN THE GEOTECHNICAL REPORT REFERENCED IN THIS PLAN SET. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING
AND REPLACING WITH SUITABLE MATERIALS AS SPECIFIED IN THE GEOTECHNICAL REPORT. ALL EXCAVATED OR FILLED AREAS SHALL
BE COMPACTED AS OUTLINED IN THE GEOTECHNICAL REPORT. MOISTURE CONTENT AT TIME OF PLACEMENT SHALL BE SUBMITTED IN
COMPACTION REPORT PREPARED BY A QUALIFIE=D GEOTECHNICAL ENGINEER, REGISTERED WITH THE STATE WHERE THE WORK IS
PERFORMED, VERIFYING THAT ALL FILLED AREAS AND SUB -GRADE AREAS WITHIN THE BUILDING PAD AREA AND AREAS TO BE PAVED
HAVE BEEN COMPACTED IN ACCORDANCE WITH THESE PLANS AND SPECIFICATIONS AND THE RECOMMENDATIONS SET FORTH IN THE
GEOTECHNICAL REPORT. SUB -BASE MATERIAL FOR SIDEWALKS, CURB, OR ASPHALT SHALL BE FREE OF ORGANICS AND OTHER
UNSUITABLE MATERIALS. SHOULD SUB -BASE BE DEEMED UNSUITABLE BY OWNER OR OWNER'S REPRESENTATIVE, SUB -BASE IS TO BE
REMOVED AND FILLED WITH APPROVED FILL MATERIAL COMPACTED AS DIRECTED BY THE GEOTECHNICAL REPORT.
10. ALL FILL, COMPACTION, AND BACKFILL MATERIALS REQUIRED FOR UTILITY INSTALLATION SHALL BE AS PER THE RECOMMENDATIONS
PROVIDED IN THE GEOTECHNICAL REPORT AND SHALL BE COORDINATED WITH THE APPLICABLE UTILITY COMPANY SPECIFICATIONS.
11. THE CONTRACTOR SHALL COMPLY TO THE FULLEST EXTENT WITH THE LATEST OSHA STANDARDS AND REGULATIONS, OR ANY OTHER
AGENCY HAVING JURISDICTION FOR EXCAVATION AND TRENCHING PROCEDURES. THE CONTRACTOR IS RESPONSIBLE FOR
DETERMINING THE "MEANS AND METHODS" REQUIRED TO MEET THE INTENT AND PERFORMANCE CRITERIA OF OSHA, AS WELL AS ANY
OTHER ENTITY THAT HAS JURISDICTION FOR EXCAVATION AND /OR TRENCHING PROCEDURES.
12. PAVEMENT SHALL BE SAW CUT IN STRAIGHT LINES TO THE FULL DEPTH OF THE EXISTING PAVEMENT. ALL DEBRIS FROM REMOVAL
OPERATIONS SHALL BE REMOVED FROM THE SITE AT THE TIME OF EXCAVATION. STOCKPILING OF DEBRIS WILL NOT BE PERMITTED.
13. THE TOPS OF EXISTING MANHOLES, INLET STRUCTURES, AND SANITARY CLEANOUT TOPS SHALL BE ADJUSTED, IF REQUIRED, TO
MATCH PROPOSED GRADES IN ACCORDANCE WITH ALL APPLICABLE STANDARDS.
14. THE CONTRACTOR IS RESPONSIBLE FOR VERIFICATION OF EXISTING TOPOGRAPHIC INFORMATION AND UTILITY INVERT ELEVATIONS
PRIOR TO COMMENCEMENT OF ANY CONSTRUCTION. CONTRACTOR TO ENSURE 0.75% MINIMUM SLOPE ALONG ALL ISLANDS,
GUTTERS, AND CURBS; 1.0% ON ALL CONCRETE SURFACES; AND 1.0% MINIMUM ON ASPHALT, TO PREVENT PONDING. ANY
DISCREPANCIES THAT MAY AFFECT THE PUBLIC SAFETY OR PROJECT COST MUST BE IDENTIFIED TO THE ENGINEER IN WRITING
IMMEDIATELY. PROCEEDING WITH CONSTRUCTION WITHOUT NOTIFICATION IS DONE SO AT THE CONTRACTOR'S OWN RISK.
15. PROPOSED TOP 1 OF CURB ELEVATIONS ARE GENERALLY 6" ABOVE EXISTING LOCAL ASPHALT GRADE UNLESS OTHERWISE NOTED.
FIELD ADJUST TO CREATE A MINIMUM OF 0.75% GUTTER GRADE ALONG CURB FACE. ENGINEER TO APPROVE FINAL CURBING CUT
SHEETS PRIOR TO INSTALLATION.
16. REFER TO SITE PLAN FOR ADDITIONAL NOTES.
17. IN CASE OF DISCREPANCIES BETWEEN PLANS OR RELATIVE TO OTHER PLANS, THE SITE PLAN WILL TAKE PRECEDENCE. IMMEDIATELY
NOTIFY THE ENGINEER IN WRITING OF ANY CONFLICTS.
18. CONTRACTOR SHALL BE REQUIRED TO SECURE ALL NECESSARY PERMITS AND APPROVALS FORALL OFF -SITE MATERIAL SOURCES
AND DISPOSAL FACILITIES. CONTRACTOR SHALL SUPPLY A COPY OF APPROVALS TO ENGINEER AND OWNER PRIOR TO INITIATING
WORK.
PARKING CALCULATION:
EXISTING GROSS LEASABLE FLOOR AREA = 168,849 SF
EXISTING SPACES = 819
PROPOSED LEASABLE FLOOR AREA = 169,649 SF
EXISTING SPACE REMOVED WITH THIS PLAN = 5
SPACES PROPOSED WITH THIS PLAN =1
SPACES REQUIRED =806 (4.75/1000 SF)
SPACES PROVIDED = 815 (4.83/1000 SF)
in� 0
z
W�
►� W
�W
z
�z
W4
REVISIONS
REV DATE COMMENT BY
THE FOLLOWING STATES REQUIRE NOTIFICATION BY
EXCAVATORS, DESIGNERS, OR ANY PERSON PREPARING TO
DISTURB THE EARTFfS SURFACE ANYWHERE IN THE STATE.
IN VIRGINIA, MARYLAND„ THE DISTRICT OF COLUMBIA, AND
DELAWARE CALL - 811
(WV 1-80D-245-4848) (PA 1-800-242-1776) (DC 1- 800 - 257 -7777)
(VA1$00552- 7001)(MD 1-800. 257- 7777)(DE 1. 800 - 282 -8555
NOT APPROVED FOR
CONSTRUCTION
PROJECT No.: V101600.01
DRAWN BY: MJS
CHECKED BY: MRJ
DATE: 2/27/13
SCALE: AS NOTED
CAD I.D.: SSO
PROJECT: A INOIR
SITE PLAN
AMENDMENT 3
FOR
FEDERAL
REALTY
INVESTMENT
TR 4J ST
LOCATION OF SITE
SHOPPERS WORLD COURT
CHARLOTTESVILLE, VA
ALBEMARLE COUNTY
BOHLER
E N G I N E E R I N G
8 BLACKWELL PARK LANE, SUITE 201
WARRENTON, VIRGINIA 20186
Phone: (540) 349 -4500
Fax: (540) 349-0321
www.BohlerEngineering.com
��►LT A
V MAR .JOYCE
.p . No. 038523
� �OIYAL
SHEET TITLE:
GENERAL
NOTES
SHEET NUMBER:
2
OF 3
O.
J
IL
�oa
�
WW
O O
z cn
o�0�o
�Z3z
zoo
U
V
°
�
a
a
oo�k'�og
mF v) LL a.
v;
Fzui
♦���♦♦
W
Lo
0
Q
a
i�
a
x
O ♦
o_
ZYZ>LL
z
azoza.
i
Vi
1%
Q
REVISIONS
REV DATE COMMENT BY
THE FOLLOWING STATES REQUIRE NOTIFICATION BY
EXCAVATORS, DESIGNERS, OR ANY PERSON PREPARING TO
DISTURB THE EARTFfS SURFACE ANYWHERE IN THE STATE.
IN VIRGINIA, MARYLAND„ THE DISTRICT OF COLUMBIA, AND
DELAWARE CALL - 811
(WV 1-80D-245-4848) (PA 1-800-242-1776) (DC 1- 800 - 257 -7777)
(VA1$00552- 7001)(MD 1-800. 257- 7777)(DE 1. 800 - 282 -8555
NOT APPROVED FOR
CONSTRUCTION
PROJECT No.: V101600.01
DRAWN BY: MJS
CHECKED BY: MRJ
DATE: 2/27/13
SCALE: AS NOTED
CAD I.D.: SSO
PROJECT: A INOIR
SITE PLAN
AMENDMENT 3
FOR
FEDERAL
REALTY
INVESTMENT
TR 4J ST
LOCATION OF SITE
SHOPPERS WORLD COURT
CHARLOTTESVILLE, VA
ALBEMARLE COUNTY
BOHLER
E N G I N E E R I N G
8 BLACKWELL PARK LANE, SUITE 201
WARRENTON, VIRGINIA 20186
Phone: (540) 349 -4500
Fax: (540) 349-0321
www.BohlerEngineering.com
��►LT A
V MAR .JOYCE
.p . No. 038523
� �OIYAL
SHEET TITLE:
GENERAL
NOTES
SHEET NUMBER:
2
OF 3
O.
�
WW
O O
z cn
�,
zoo
U
V
°
�
a
a
o
a
U
W
REVISIONS
REV DATE COMMENT BY
THE FOLLOWING STATES REQUIRE NOTIFICATION BY
EXCAVATORS, DESIGNERS, OR ANY PERSON PREPARING TO
DISTURB THE EARTFfS SURFACE ANYWHERE IN THE STATE.
IN VIRGINIA, MARYLAND„ THE DISTRICT OF COLUMBIA, AND
DELAWARE CALL - 811
(WV 1-80D-245-4848) (PA 1-800-242-1776) (DC 1- 800 - 257 -7777)
(VA1$00552- 7001)(MD 1-800. 257- 7777)(DE 1. 800 - 282 -8555
NOT APPROVED FOR
CONSTRUCTION
PROJECT No.: V101600.01
DRAWN BY: MJS
CHECKED BY: MRJ
DATE: 2/27/13
SCALE: AS NOTED
CAD I.D.: SSO
PROJECT: A INOIR
SITE PLAN
AMENDMENT 3
FOR
FEDERAL
REALTY
INVESTMENT
TR 4J ST
LOCATION OF SITE
SHOPPERS WORLD COURT
CHARLOTTESVILLE, VA
ALBEMARLE COUNTY
BOHLER
E N G I N E E R I N G
8 BLACKWELL PARK LANE, SUITE 201
WARRENTON, VIRGINIA 20186
Phone: (540) 349 -4500
Fax: (540) 349-0321
www.BohlerEngineering.com
��►LT A
V MAR .JOYCE
.p . No. 038523
� �OIYAL
SHEET TITLE:
GENERAL
NOTES
SHEET NUMBER:
2
OF 3
O.
Q
I L ////z"/N-� 18.0'
43.1 ' /
a 2;7 7' rn
ammmmmm
t
20 10 5 0 20
1"= 20'
b
y
U
SEMINOLE TRAIL-U.S. R1113%'29
- GENERAL NOTE:
IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALL OF THE DRAWINGS AND SPECIFICATIONS ASSOCIATED WITH THIS PROJECT
WORK SCOPE PRIOR TO THE INITIATION OF CONSTRUCTION. SHOULD THE CONTRACTOR FIND A CONFLICT WITH THE DOCUMENTS RELATNE TO
THE SPECIFICATIONS OR APPLICABLE CODES, IT IS THE CONTRACTORS RESPONSIBILITY TO NOTIFY THE PROJECT ENGINEER OF RECORD IN
WRITING PRIOR TO THE START OF CONSTRUCTION. FAILURE BY THE CONTRACTOR TO NOTIFY THE PROJECT ENGINEER SHALL CONSTITUTE
ACCEPTANCE OF FULL RESPONSIBILITY BY THE CONTRACTOR TO COMPLETE THE SCOPE OF THE WORK AS DEFINED BY THE DRAWINGS AND IN
H: \IO \V1016W.01 \DRMMM \PtM SEIS\WOR SIZE PUN AMEN%M 3\VI01600.OISSDZ C PFJMM BY: EVAH)EWUM 227.13 0 12.59 PM LAST
STOP BAR
PROP. STOP I
BAR & STOP
SIGNS (TYP.) ® \\
f
w / o
20 10 5 (0 20
1"= 20'
n
7_�_
i
S
®-'- RESTRIPING (TYP)\
0
EX. PYLON SIGN; !/
PROP. 2'X13.3
M1( BA d ® JJ
� -58
---
� CCNC. CU,
PROP. STOP SIGN
i
YQ) PROP. STOP 5BAR ,gyp (
e
— 1 ®♦ e
1� STOP 8AR
- -- - - - - -- 9--
WV ,
PROP. CROSSWALK
o w W -w — (STAMPED ASPHALT)
I 1 ,
14.9 13 11 1
r i j e
J
® z
® I I PROP. SAWCUT LINE
.I 1
12 11 11 , I 11 12 t
,v `� - /� ► i I I 3.5 WIDE RAISED
MEDIAN ISLAND
W1 HEADER CURB_r
1 '
_ ROARAP —� I — —
- 4 " Ply 8" SAN. , 8"
0// 0// �
1'x1 co
STOP BAR
REBAR F0 0. 'ACC
411 DOUBLE YELLOW
CENTER STRIPE
mmmmmmm*
1 "= 50'
I
20 10 5 0 20
1 " =20'
PROP 2' PLANTER
BOX AREA
E
E s �♦
8
80
20 10 5 0 20
1 " =20'
J 0
LL
W � z
'j� QQa Q
Ld8JT
I.•I o o l_ 1011
O *****
w O o 3 a €;
O o V as
w o�Z$Z >LL �a
Z�
Z I OLLLL 'a 'm III
0 Hod I Z' 0 H
�Z a
W w z®
u
CZ
z
u a
F
9
REVISIONS
[REV I DATE I COMMENT BY
THE FOLLOWING STATES REQUIRE NOTIFICATION BY
EXCAVATORS, DESIGNERS, OR ANY PERSON PREPARING TO
DISTURB THE EARTH'S SURFACE ANYWHERE IN THE STATE.
IN VIRGINIA, MARYLAND, THE DISTRICT OF COLUMBIA, AND
DELAWARE CALL - 811
(VIN 1-800- 245-0848) (PA '1.800 - 242.1776) (DC 1-800- 257 -7777)
(VA 1. 800 - 552 -7001) (MD 9- 800 - 257 -7777) (DE 1. 800-2824566
NOT APPROVED FOR
CONSTRUCTION
PROJECT No.: V101600.01
DRAWN BY: MJS
CHECKED BY: MRJ
DATE: 2/27113
SCALE: AS NOTED
CAD I.D.: SSO
PROJECT: MINOR
SITE PLAN
AMENDMENT 3
FOR
FEDERAL
REALTY
INVESTMENT
TRUST
LOCATION OF SITE
SHOPPERS WORLD COURT
CHARLOTTESVILLE, VA
ALBEMA'RLE COUNTY
28 BLACKWELL PARK LANE, SUITE 201
WARRENTON, VIRGINIA 20186
Phone: (540) 349 -4500
Fax: (540) 349-0321
www.BohlerEngineering.com
TH q
�O /c. No. 038523
SHEET TITLE:
SITE PLAN
SHEET NUMBER:
3
OF 3
O