HomeMy WebLinkAboutSDP202200071 Review Comments Initial Site Plan 2023-01-05a$ County of Albemarle
m COMMUNITY DEVELOPMENT DEPARTMENT
Site Plan Review
Project title: Gold Eagle Pool and Health Club — Initial Site Plan
Project file number: SDP202200071
Plan preparer: Scott Collins, PE, Collins Engineering
200 Garrett Street, Suite K, Charlottesville, VA 22902
scott(&,,collins-engineering. com
Owner or rep.: J. W. Sieg & Co. Inc. — Attn: Derek Sieg
P. O. Box 298
Charlottesville, VA 22902
Plan received date:
28 Dec 2022
Date of comments:
5 January 2023
Review coordinator:
Cameron Langille
Reviewer:
John Anderson, PE
401 McIntire Road, North Wing
Charlottesville, VA 22902-4579
Telephone: 434-296-5832
WWW.ALBEMARLE.ORG
Engineering has completed review of the Initial Site Plan and offers the following review comments:
1. Provide Tier 3 Groundwater Assessment [ ref. 17-1003] prior to approval of Initial Site Plan.
2. General (for FSP approval)7
a. Approved WPO required for FSP approval.
b. WPO plan approval requires:
i. Recorded SWM facility Maintenance Agreement.
ii. Recorded SWM facility /public drainage easement, with deeds.
iii. Note: Sheet 4 shows offsite SWM facility (biofrlter /IMP 75-56).
iv. Owner, TMP 75-56, THE PINES GROUP LLC, will need to be signatory to SWM
maintenance agreement/public drainage /SWM deed/easement, and WPO plan bond,
since SWM is proposed on this parcel.
v. Recorded temp grading /access easement, TMP 75-56, to construct /grade SWM.
3. Sheet 2: Coordinate with ACF&R /VDOT /Planning on required improvements, especially roadway width,
to existing Gold Eagle Drive, existing 60' public RW.
4. Provide section for pavement widening of existing Gold Eagle Drive.
5. Provide Aabel `No Parking' signs along Gold Eagle Drive if EP-EP paved width =20'.
6. Coordinate improvements to Gold Eagle Drive (pavement width, as example) with VDOT /ACF&R. Since
Gold Eagle Drive is 60' public RW, VDOT may partner /schedule mill -pave of existing R/W to coincide
with pavement widening, widening appears to be required from entrance to TMP 75-55D to TMP 75-55.
7. Please coordinate drain field approval with VDH /relevant local authority. (VDH may have jurisdiction).
8. Sheet 3
a. Label sidewalk width, 5' Min. required.
b. Sheet 1 note indicates no retaining walls with this development, sheet 3 appears to incl. retaining
wall linework. Please revise note, if necessary, and provide TWBW elevations with FSP.
Thank you. Please call if any questions — tel. 434.296-5832-x3069, or email ianderson2(a),,albemarle.ora.
SDP202200071_Gold Eagle Pool_Health_ISP_010523.docx