HomeMy WebLinkAboutSDP201300058 Plan - Approved 2013-11-04GENERAL NOTE:
r is THE RESPWS 181LITY OF THE CONTRACTOR TO REVIEW ALL OF TIE DRAWINGS A14D SPECIFMYMS ASSOCIATED WITH THIS PRQIEC
)RK SCOPE PRIOR TO THE INITIATION OF CONSTRUCTION. SHO" THE CONTRACTOR FIND A CONFLICT WITH THE DOCUMENTS RELATIVE
HE SPECIFICATIONS OR APPLICABLE CODES, IT IS THE CONTRACTORS RESPONSIBILITY TO NOTIFY THE PROJECT ENGINEER OF RECORD I
MNG PRIOR TO THE START OF CONSTRUCTM. FAILURE BY THE CONTRACTOR TO NOTIFY THE PROJECT ENGINEER SHMi CONSTITUTI
CEPTANCE OF FULL RESPONSiB1UTY BY THE 00MRACTOR 70 COMPLETE THE SCOPE OF THE WORK AS DEFINED BY THE DRAWINGS AND
FULL f F0R5�ANCF� WrM LOCAL R£GtliA7iA4SAND_COOES.
R \I3 \YI32042\U+ YM M\flh4 SDS\NM S9 FIA4\Yi3M2S00,M PFCt H BY. R(XM I025.13 0 5.02 PY .UST INFO BY: M
INITIA1 SIT 1 1 "1 AN
FOID
a
r
I - 11 —-1 2 1-0�6�,
.To
IL
LOCATION OF SITE
TAX MAP 78 -75A
CHARLOTTESVILLE, VA 22911
RIVANNA MAGISTERIAL DISTRICT
111
ALBEMARLE COUNTY
LOCATION MAP
COPYRIGHT ADC THE MAP PEOPLE
PERMIT USE NO. 20602153-5
SCALE: 1 " =2000'
CONTRACT PURCHASER/
DEVELOPER
RIVERSEND MANAGEMENT
321 E. MAIN STREET, SUITE 200
CHARLOTTESVILLE, VA 22902
CONTACT: ALAN TAYLOR
PHONE: 434245.3970
WM%IA I �01—
is •
Ms'
ENGINE ERIN(�
28 BLACKWELL PARK LANE, SUITE 209
WARRENTON, VIRGINIA 20186
Phone: (540) 349 -4500
Fax: (540) 349 -0321
www.BohlerEngi'neering.com
CONTACT: DANIEL R. HINES, P.E.
CONTACT INFORMATION
IZEFE.IE1yCES
♦ BOUNDARY & TOPOGRAPHIC /ALTA SURVEY:
TITLED - TOPOGRAPHIC SURVEY, PANTOPS SHOPPING CENTER, TMP
78 -75A, HICKMAN ROAD AND ROLKIN ROAD"
PREPARED BY ROUDABUSH, GALE & ASSOCIATES, INC.
914 MONTICELLO ROAD
CHARLOTTESVILLE, VA 22902
PHONE: 434- 977 -0205
DATED: 08/21/13
♦ GEOTECHNICAL REPORT:
TITLED "REPORT OF GEOTECHNICAL STUDY, ROLKIN ROAD RETAIL
BUILDING, ALBEMARLE COUNTY, VIRGINIA, F &R PROJECT NO. 7111-0129-
PREPARED BY FROEHLING & ROBERTSON, INC.
6181 ROCKFISH GAP TURNPIKE
CROZET, VA 23932 -33W
PHONE: 434 - 8235154
DATED: 09(25113
SPECIAL USE PERMIT:
TI CLED "SPECIAL USE PERMIT. FAR ROLKIN ROAD RETAIL CENTER"
PREPARED BY BOHLER ENGINEERING
28 BLACKWELL PARK LANE, SUITE 201
WARRENTON, VA 20186
PHONE: 540.349 -4500
DATED: 10/17/13
GO �Y -1 % ?I �l'.�i.t �Y G C110..J E NCIES
♦ COUNTY OF ALBEMARLE
DEPARTMENT OF COMI" IUNITY DEVELOPMENT
401 McINTIRE ROAD
CHARLOTTESVILLE, VA 22902
PHONE: 434- 296.5832
FAX: 434-972-4126
SHEET INDEX
SHEET TITLE
SHEET NUMBER
COVER SHEET
1
GENERAL NOTES
2 -3
101POGRAPHIC SURVEY (FOR INFORMATION ONLY)
4
EXIISTING CONDITIONS & DEMOLITION PLAN
5
SITE & UTILITY PLAN
6
GRADING PLAN
7
LANDSCAPE PLAN
8
ILI r(1,� l_ tT bA 1
Submittal Type
Reviewed and Approved by the
Community Development Department
Date_ 1% j2oI13
File# 3DPl� V�.1 ?( 6ml - bbw,ol 8
Vfir--
Signature
J
r� �Q
a H u
LL
W O N O '.'M[ .
19
W ° 1 499
z � k >�
xz �
a
0
w
W w
Eo
}
o o
A( 0
u
REVISIONS
REV DATE COMMENT BY
a
THE FOLLOWING STATES REQUIRE NOTIFICATION BY
EXCAVATORS, DESIGNERS, ORANY PERSON PREPARING TO
DISTURB THE EARTHS SURFACE ANYWHERE IN THE STATE.
IN VIRGINIA, MARYLAND, THE DISTRICT OF COLUMBIA, AND
DELAWARE CALL =811
(WV 1- aW245-4848) (PA 1-8W-242 -1776) (DC i- 840.267 - 777'7)
(YA 1.800552.7001) (MID 1- 8402674777) (DE 1-800- 282 8555)
NOT APPROVED FOR
CONSTRUCTION
PROJECT NO.: 732042
DRAWN BY: MJS /JLP
CHECKED BY: DRH
DATE: 10/28/13
SCALE: AS NOTED
CAD I.D.: SOO
PROJECT:
INITIAL
SITE PLAN
FOR
ROLKIN ROAD
RETAIL CENTER
LOCATION OF SITE
ROLKIN ROAD &ABBEY ROAD.
TAX MAP 78 -75A
CHARLOTTESVILLE, VA 22911
RIVANNA MAGISTERIAL
DISTRICT
ALBEMARLE COUNTY
BOHLER
E N G I N E E R I N G
28 BLACKWELL PARK LANE, SUITE 201
WARRENTON,'VIRGINIA, 20185
Phone: (540) 349-4500
Fax: (540) 349 -0321
w>Nw.BohlerEngineering "com `
w • .
w .
• 4
SHEET TITLE:
COVER
SHEET
SHEET NUMBER:
OF-8
GENERAL NOTES:
CONTRACTOR IS RESPONSIBLE FOR COMPLIANCE WITH THE NOTES AND SPECIFICATIONS CONTAINED HEREIN. CONTRACTOR
IS RESPONSIBLE TO ENSURE THAT ALL SUBCONTRACTORS FULLY AND COMPLETELY CONFORM TO AND COMPLY WITH THESE
REQUIREMENTS.
T E INCORPORATED BY REFERENCE AS 1. THE FOLLOWING DOCUMENTS AR ART OF THIS SITE PLAN:
. "BOUNDARY & TOPOGRAPHIC /ALTA SURVEY - TOPOGRAPHIC SURVEY, PANTOPS SHOPPING CENTER, TMP 78 -75A, HICKMAN
ROAD AND ROLKIN ROAD ", PREPARED BY ROUDABUSH, GALE & ASSOCIATES, INC., 08/21/13.
PRIOR TO THE START OF CONSTRUCTION, THE CONTRACTOR MUST VERIFY THAT HE/SHE HAS THE LATEST EDITION OF THE
DOCUMENTS REFERENCED ABOVE. THIS IS CONTRACTOR'S RESPONSIBILITY.
2. ALL ACCESSIBLE (A/KA ADA) PARKING SPACES MUST BE CONSTRUCTED TO MEET, AT A MINIMUM, THE MORE STRINGENT OF
THE REQUIREMENTS OF THE "AMERICANS WITH DISABILITIES ACT" (ADA) CODE (42 U.S.C. § 12101 et seq. AND 42 U.S.C. § 4151
et seq.) OR THE REQUIREMENTS OF THE JURISDICTION WHERE THE PROJECT IS TO BE CONSTRUCTED, AND ANY AND ALL
AMENDMENTS TO BOTH WHICH ARE IN EFFECT WHEN THESE PLANS ARE COMPLETED.
3. PRIOR TO STARTING CONSTRUCTION, THE CONTRACTOR IS RESPONSIBLE TO ENSURE THAT ALL REQUIRED PERMITS AND
APPROVALS. HAVE BEEN OBTAINED. NO CONSTRUCTION OR FABRICATION SHALL BEGIN UNTIL THE CONTRACTOR HAS
REC E IVE D AND THOROUGHLY REVIEWED THE COMMENTS TO ALL PLANS AND OTH ER DOCUMENTS R EVIEWED AN D
APPROV ED BY THE PERMITT I NG AUTHORITIES A ND CONFIRMED THAT ALL NECESSARY OR REQUIRED PERMITS HAVE BEEN
OBTAINED. CONTRACTOR MUST HAVE COPIES OF ALL PERMITS AND APPROVALS ON SITE AT ALL TIMES.
4. THE OWNER/CONTRACTOR MUST BE FAMILIAR WITH AND RESPONSIBLE FOR THE PROCUREMENT OF ANY AND ALL
CERTIFICATIONS REQUIRED FOR THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY.
5. ALL WORK MUST BE PERFORMED IN ACCORDANCE WITH THESE PLANS,. SPECIFICATIONS AND CONDITIONS OF APPROVAL,
AND ALL APPLICABLE REQUIREMENTS, RULES, REGULATIONS, STATUTORY REQUIREMENTS, CODES, LAWS AND STANDARDS
OF ALL GOVERNMENTAL ENTITIES WITH JURISDICTION OVER THIS PROJECT.
6. THE GEOTECHNICAL REPORT AND RECOMMENDATIONS SET FORTH HEREIN ARE A PART OF THE REQUIRED CONSTRUCTION
DOCUMENTS AND, IN CASE OF CONFLICT, DISCREPANCY OR AMBIGUITY, THE MORE STRINGENT REQUIREMENTS AND /OR
RECOMMENDATIONS CONTAINED IN THE PLANS AND THE GEOTECHNICAL REPORT AND RECOMMENDATIONS SHALL TAKE
PRECEDENCE UNLESS SPECIFICALLY NOTED OTHERWISE ON THE PLANS. THE CONTRACTOR MUST NOTIFY THE ENGINEER,
IN WRITING, OF ANY SUCH CONFLICT, DISCREPANCY OR AMBIGUITY BETWEEN THE GEOTECHNICAL REPORTS AND PLANS
AND SPECIFICATIONS PRIOR TO PROCEEDING WITH ANY FURTHER WORK.
7, THESE PLANS ARE BASED ON INFORMATION PROVIDED TO BOHLER ENGINEERING BY THE OWNER AND OTHERS PRIOR TO
THE TIME OF PLAN PREPARATION. CONTRACTOR MUST FIELD VERIFY EXISTING CONDITIONS AND NOTIFY BOHLER
ENGINEERING, IN WRITING, IMMEDIATELY IF ACTUAL SITE CONDITIONS DIFFER FROM THOSE SHOWN ON THE PLAN, OR IF
THE PROPOSED WORK CONFLICTS WITH ANY OTHER SITE FEATURES.
8. ALL DIMENSIONS SHOWN ON THE PLANS MUST BE FIELD VERIFIED BY THE CONTRACTOR PRIOR TO THE START OF
CONSTRUCTION. CONTRACTOR MUST NOTIFY ENGINEER, IN WRITING, IF ANY CONFLICTS, DISCREPANCIES, OR AMBIGUITIES
EXIST PRIOR TO PROCEEDING WITH CONSTRUCTION. NO EXTRA COMPENSATION WILL BE PAID TO THE CONTRACTOR FOR
WORK WHICH HAS TO BE REDONE OR REPAIRED DUE TO DIMENSIONS OR GRADES SHOWN INCORRECTLY ON THESE PLANS
PRIOR TO CONTRACTOR GIVING ENGINEER WRITTEN NOTIFICATION OF SAME AND ENGINEER, THEREAFTER, PROVIDING
CONTRACTOR WITH WRITTEN AUTHORIZATION TO PROCEED WITH SUCH ADDITIONAL WORK
9, CONTRACTOR MUST REFER TO THE ARCHITECTURAUBUILDING PLANS "OF 'RECORD" FOR EXACT LOCATIONS AND
DIMENSIONS OF ENTRYIEXIT POINTS, ELEVATIONS, PRECISE BUILDING DIMENSIONS, AND EXACT BUILDING UTILITY
LOCATIONS.
10. PRIOR TO THE START OF CONSTRUCTION, THE CONTRACTOR MUST COORDINATE THE BUILDING LAYOUT BY CAREFUL
REVIEW OF THE ENTIRE SITE PLAN AND THE LATEST ARCHITECTURAL PLANS (INCLUDING, BUT NOT LIMITED TO,
STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION PLAN, WHERE APPLICABLE). CONTRACTOR
MUST IMMEDIATELY NOTIFY OWNER, ARCHITECT AND SITE ENGINEER, IN WRITING, OF ANY CONFLICTS, DISCREPANCIES OR
AMBIGUITIES WHICH EXIST.
11. DEBRIS MUST NOT BE BURIED ON THE SUBJECT SITE AND ALL UNSUITABLE EXCAVATED MATERIAL AND DEBRIS (SOLID
WASTE) MUST BE DISPOSED OF IN ACCORDANCE WITH THE REQUIREMENTS OF ANY AND ALL GOVERNMENTAL AUTHORITIES
WHICH HAVE JURISDICTION OVER THIS PROJECTOR OVER CONTRACTOR.
12. THE CONTRACTOR IS RESPONSIBLE FOR IDENTIFYING WHEN SHORING IS REQUIRED AND FOR INSTALLING ALL SHORING
REQUIRED DURING EXCAVATION (TO BE PERFORMED IN ACCORDANCE WITH CURRENT OSHA STANDARDS) AND ANY
ADDITIONAL PRECAUTIONS TO BE TAKEN TO ASSURE THE STABILITY OF ADJACENT, NEARBY AND CONTIGUOUS
STRUCTURES AND PROPERTIES,
13. THE CONTRACTOR IS TO EXERCISE EXTREME CARE WHEN PERFORMING ANY WORK ACTIVITIES ADJACENT TO PAVEMENT,
STRUCTURES, ETC. WHICH ARE TO REMAIN EITHER FOR AN INITIAL PHASE OF THE PROJECT OR AS PART OF THE FINAL
CONDITION. CONTRACTOR IS RESPONSIBLE FOR TAKING ALL APPROPRIATE MEASURES REQUIRED TO ENSURE THE
STRUCTURAL STABILITY OF SIDEWALKS AND PAVEMENT, UTILITIES, BIALDINGS, AND INFRASTRUCTURE WHICH ARE TO
REMAIN, AND TO PROVIDE A SAFE WORK AREA FOR THIRD PARTIES, PEDESTRIANS AND ANYONE INVOLVED WITH THE
PROJECT..
14. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY DAMAGE DONE TO ANY NEW OR EXISTING CONSTRUCTION OR
PROPERTY DURING THE COURSE OF CONSTRUCTION, INCLUDING BUT NOT LIMITED TO DRAINAGE, UTILITIES, PAVEMENT,
STRIPING, CURB, ETC. AND SHALL BEAR ALL COSTS ASSOCIATED WITH SAME TO INCLUDE, BUT NOT BE LIMITED TO,
REDESIGN, RE- SURVEY, RE- PERMITTING AND CONSTRUCTION. THE CONTRACTOR IS RESPONSOLE FOR AND MUST REPLACE
ALL SIGNAL INTERCONNECTION CABLE, WIRING CONDUITS, AND. ANY UNDERGROUND ACCESSORY EQUIPMENT DAMAGED
DURING CONSTRUCTION AND MUST BEAR ALL COSTS ASSOCIATED WITH SAME. THE REPAIR OF ANY SUCH NEW OR
EXISTING, CONSTRUCTION OR PROPERTY MUST RESTORE SUCH CONSTRUCTION OR PROPERTY TO A CONDITION
EQUIVALENT TO OR BETTER THAN THE CONDITIONS PRIOR TO COMMENCEMENT OF THE CONSTRUCTION, AND IN
CONFORMANCE WITH APPLICABLE CODES, LAWS RULES, REGULATIONS, STATUTORY REQUIREMENTS AND STATUTES.
CONTRACTOR MUST BEAR ALL COSTS ASSOCIATED WITH SAME, CONTRACTOR I5 RESPONSIBLE TO DOCUMENT ALL
EXISTING DAMAGE AND TO NOTIFY THE OWNER AND THE CONSTRUCTION MANAGER PRIOR TO THE START OF
CONSTRUCTION.
15. ALL CONCRETE MUST BE AIR ENTRAINED AND HAVE THE MINIMUM COMPRESSIVE STRENGTH OF 4,000 PSI AT 28 DAYS
UNLESS OTHERWISE NOTED ON THE PLANS, DETAILS AND /OR GEOTECHNICAL REPORT. .
16. THE ENGINEER IS NOT RESPONSIBLE FOR CONSTRUCTION METHODS, MEANS, TECHNIQUES OR PROCEDURES, GENERALLY
OR FOR THE CONSTRUCTION MEAN, METHODS, TECHNIQUES OR PROCEDURES FOR COMPLETION OF THE WORK DEPICTED
BOTH ON THESE PLANS, AND FOR ANY CONFLICTSISCOPE REVISIONS WHICH RESULT. FROM SAME. CONTRACTOR IS
RESPONSIBLE FOR DETERMINING THE METHODSIMEANS FOR COMPLETION OF THE WORK PRIOR TO THE COMMENCEMENT
OF CONSTRUCTION.
17. THE ENGINEER OF RECORD IS NOT RESPONSIBLE FOR JOB SITE SAFETY. THE ENGINEER OF RECORD HAS NOT BEEN
RETAINED TO PERFORM OR BE RESPONSIBLE FOR JOB SITE SAFETY, SAME BEING WHOLLY OUTSIDE OF ENGINEER'S
SERVICES AS RELATED TO THE PROJECT. THE ENGINEER OF RECORD IS NOT RESPONSIBLE TO IDENTIFY OR REPORT ANY
JOB SITE SAFETY ISSUES, AT ANYTIME. .
18. ALL CONTRACTORS MUST CARRY THE SPECIFIED STATUTORY WORKER'S COMPENSATION INSURANCE, EMPLOYER'S
LIABILITY INSURANCE AND LIMITS OF COMMERCIAL GENERAL LIABILITY INSURANCE (CGL). ALL CONTRACTORS MUST HAVE
THEIR CGL POLICIES ENDORSED TO NAME BOHLER ENGINEERING, AND ITS PAST, PRESENT AND FUTURE OWNERS,
OFFICERS, DIRECTORS, PARTNERS, SHAREHOLDERS, MEMBERS, PRINCIPALS, COMMISSIONERS, AGENTS, SERVANTS,
EMPLOYEES, AFFILIATES, SUBSIDIARIES, AND RELATED ENTITIES, AND ITS SUBCONTRACTORS AND SUBCONSULTANTS AS
ADDITIONAL NAMED INSURED AND TO PROVIDE CONTRACTUAL LIABILITY COVERAGE SUFFICIENT TO INSURE THIS HOLD
HARMLESS AND INDEMNITY OBLIGATIONS ASSUMED BY THE CONTRACTORS. ALL CONTRACTORS MUST FURNISH BOHLER
ENGINEERING WITH CERTIFICATION$ OF INSURANCE AS EVIDENCE OF THE REQUIRED INSURANCE PRIOR TO COMMENCING
WORK AND UPON RENEWAL OF EACH POLICY DURING THE ENTIRE PERIOD OF CONSTRUCTION AND FOR ONE YEAR AFTER
THE COMPLETION OF CONSTRUCTION. IN ADDITION, ALL CONTRACTORS WILL, TO THE FULLEST EXTENT PERMITTED UNDER
THE LAW, INDEMNIFY, DEFEND AND HOLD HARMLESS BOHLER ENGINEERING AND ITS PAST, PRESENT AND FUTURE
OWNERS, OFFICERS, DIRECTORS, PARTNERS, SHAREHOLDERS, MEMBERS, PRINCIPALS, COMMISSIONERS, AGENTS,
SERVANTS, EMPLOYEES, AFFILIATES, SUBSIDIARIES, AND RELATED ENTITIES, AND ITS SUBCONTRACTORS AND
5UBCONSULTANTS FROM AND AGAINST ANY DAMAGES, INJURIES, CLAIMS, ACTIONS, PENALTIES, EXPENSES, PUNITIVE
DAMAGES, TORT DAMAGES, STATUTORY CLAIMS, STATUTORY CAUSES OF ACTION, LOSSES, CAUSES OF ACTION, LIABILITIES
OR COSTS, INCLUDING, BUT NOT LIMITED TO, REASONABLE ATTORNEYS' FEES AND DEFENSE COSTS, ARISING OUT OF OR IN
ANY WAY CONNECTED WITH OR TO THE PROJECT, INCLUDING ALL CLAIMS BY EMPLOYEES OF THE CONTRACTORS, ALL
CLAIMS BY THIRD PARTIES AND ALL CLAIMS RELATED TO THE PROJECT. CONTRACTOR MUST NOTIFY ENGINEER, IN
WRITING, AT LEAST THIRTY (30) DAYS PRIOR TO ANY TERMINATION, SUSPENSION OR CHANGE OF ITS INSURANCE
HEREUNDER.
19. BOHLER ENGINEERING WILL REVIEW OR TAKE OTHER APPROPRIATE ACTION ON THE CONTRACTOR SUBMITTALS, SUCH AS
SHOP DRAWINGS, PRODUCT DATA, SAMPLES, AND OTHER DATA, WHICH THE CONTRACTOR IS REQUIRED TO SUBMIT, BUT
ONLY FOR THE LIMITED PURPOSE OF CHECKING FOR CONFORMANCE WITH THE DESIGN INTENT AND THE INFORMATION
SHOWN IN THE CONSTRUCTION CONTRACT DOCUMENTS. .CONSTRUCTION MEANS AND /OR METHODS AND /OR TECHNIQUES
OR PROCEDURES, COORDINATION OF THE WORK WITH -OTHER TRADES, AND CONSTRUCTION SAFETY PRECAUTIONS ARE
THE SOLE RESPONSIBILITY OFi THE CONTRACTOR AND BOHLER HAS NO RESPONSIBILITY OR LIABILITY FOR SAME
HEREUNDER. BOHLER ENGINEERING'S SHOP DRAWING REVIEW WILL BE CONDUCTED WITH REASONABLE PROMPTNESS
WHILE ALLOWING SUFFICIENT TIME TO PERMIT ADEQUATE REVIEW, REVIEW OF A SPECIFIC ITEM MUST NOT INDICATE THAT
BOHLER ENGINEERING HAS REVIEWED THE ENTIRE ASSEMBLY OF WHICH THE ITEM IS A COMPONENT. BOHLER
ENGINEERING WILL NOT BE RESPONSIBLE FOR ANY DEVIATIONS FROM THE CONSTRUCTION DOCUMENTS NOT PROMPTLY
AND IMMEDIATELY BROUGHT TO ITS ATTENTION, IN WRITING, BY THE CONTRACTOR. BOHLER ENGINEERING WILL NOT BE
REQUIRED TO REVIEW PARTIAL SUBMISSIONS OR THOSE FOR WHICH SUBMISSIONS OF CORRELATED ITEMS HAVE NOT BEEN
RECEIVED.
20.NE1THER THE PROFESSIONAL ACTIVITIES OF BOHLER ENGINEERING, NOR THE PRESENCE OF BOHLER ENGINEERING
AND /OR ITS PAST, PRESENT AND FUTURE OWNERS, OFFICERS, DIRECTORS, PARTNERS, SHAREHOLDERS, MEMBERS,
PRINCIPALS, COMMISSIONERS, AGENTS, SERVANTS, EMPLOYEES, AFFILIATES, SUBSIDIARIES, AND RELATED ENTITIES, AND
ITS SUBCONTRACTORS AND SUBCONSULTANTS AT A CONSTRUCTION/PROJECT SITE, SHALL RELIEVE THE GENERAL
CONTRACTOR OF ITS OBLIGATIONS, DUTIES AND RESPONSIBILITIES INCLUDING, BUT NOT LIMITED TO, CONSTRUCTION
MEANS, METHODS, SEQUENCE, TECHNIQUES OR PROCEDURES NECESSARY FOR PERFORMING, OVERSEEING,
SUPERINTENDING AND COORDINATING THE WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AND COMPLIANCE
ANY HEALTH OR SAFETY PRECAUTIONS REQUIRED BY ANY REGULATORY AGENCIES WITH JURISDICTION OVER THE
PROJECT AND /OR PROPERTY. BOHLER ENGINEERING AND ITS PERSONNEL HAVE NO AUTHORITY TO EXERCISE ANY
CONTROL OVER ANY CONSTRUCTION CONTRACTOR OR ITS EMPLOYEES IN CONNECTION WITH THEIR WORK OR ANY HEALTH
OR SAFETY PROGRAMS OR PROCEDURES. THE GENERAL CONTRACTOR 1S SOLELY RESPONSIBLE FOR JOB SITE SAFETY.
BOHLER ENGINEERING SHALL BE INDEMNIFIED BY THE GENERAL CONTRACTOR AND MUST BE NAMED AN ADDITIONAL
INSURED UNDER THE GENERAL CONTRACTORS POLICIES OF GENERAL LIABILITY INSURANCE AS DESCRIBED ABOVE IN
NOTE 19 FOR JOB SITE SAFETY. .
21AF THE CONTRACTOR DEVIATES FROM THE PLANS AND SPECIFICATIONS, INCLUDING THE NOTES CONTAINED HEREIN,
WITHOUT . FIRST OBTAINING THE PRIOR WRITTEN AUTHORIZATION OF THE ENGINEER FOR SUCH DEVIATIONS, THE
CONTRACTOR IS SOLELY RESPONSIBLE FOR THE PAYMENT OF ALL COSTS INCURRED IN CORRECTING ANY WORK DONE
WHICH DEVIATES FROM THE PLANS, ALL FINES AND/OR. PENALTIES ASSESSED WITH RESPECT THERETO AND ALL
GENERALNOTE
IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALL OF THE DRAVANGS AND SPECIFICATIONS ASSOCIATED WITH THIS PROJECT
WORK SCOPE PRIOR TO THE INITIATION OF CONSTRUCTION. SHOULD THE CONTRACTOR FIND A CONFUCT WITH THE DOCUMENTS RELATIVE TO
THE SPECIFMTION$ ORAPPUCABLE CODES, IT 13 THE CONTRACTORS RESPONSINUTYTO WTIFYTHE PROJECT ENGWEEROF RECORD IN
WRITING PMOR TO THE START OF CONSTRICTION. FAILURE BY THE CONTRACTOR TO NOTIFY THE PRWECT ENG44EER %OIL CONSMUTE
ACCEPTANCE OF FILL RESPONSIBILITY BY THE CONTRACTOR TO COMPLETE THE SCOPE OF THE WORK AS DEFINED BY THE DRAWINGS AND IN
R, \I3 \VI32W2 \IXUri?iGSW4 SETS \NIW. SRE FLIYtri32012`T7 M pRA W 8F ROM 10.25.13 0 592 PU LAST SAM Bf: WAM
COMPENSATORY OR PUNITIVE DAMAGES RESULTING THEREFROM AND, FURTHER, SHALL DEFEND, INDEMNIFY AND HOLD
HARMLESS THE ENGINEER, TO THE FULLEST EXTENT PERMITTED UNDER THE LAW, IN ACCORDANCE WITH PARAGRAPH 19
HEREIN, FOR AND FROM ALL FEES, ATTORNEYS' FEES, DAMAGES, COSTS, JUDGMENTS, PENALTIES AND THE LIKE RELATED
TO SAME.
22. CONTRACTOR IS RESPONSIBLE FOR MAINTENANCE AND PROTECTION OF TRAFFIC PLAN FOR ALL WORK THAT AFFECTS
. PUBLIC TRAVEL EITHER IN THE R.O.W. OR ON SITE. THE COST FOR THIS ITEM MUST BE INCLUDED IN THE CONTRACTOR'S
PRICE.
23, ALL SIGNING AND PAVEMENT STRIPING MUST CONFORM TO MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES OR LOCALLY
APPROVED SUPPLEMENT.
24. ENGINEER IS NOT RESPONSIBLE FOR ANY IN JU RY OR DAMAG ES RES U LTING FROM CO NT RAC T ORS FAI L URE TO BUILD OR
CONSTRUCT IN STRICT ACCORDANCE WITH THE APPROVED PLANS. IF CONTRACTOR AND /OR OWNER FAIL BUILD OR
CONSTRUCT IN STRICT ACCORDANCE WITH APPROVED PLANS, THEY AGREE TO JOINTLY AND SEVERALLY INDEMNIFY AND
HOLD ENGINEER HARMLESS FOR ALL INJURIES AND D AMAGES T HA T ENGINEER SUFFERS AND COSTS THAT ENGINEER
INCURS.
25. OWNER MUST MAINTAIN AND PRESERVE ALL PHYSICAL SITE FEATU RE AND DESIGN FEATURES D EPICTED ON THE PLANS
AND RELATED DOCUMENTS, IN STRICT ACCORDANCE WITH THE APPROVED PLAN(S) AND DESIGN AND, FURTHER ENGINEER
1S NOT RESPONSIBLE FOR ANY FAILURE TO SO MAINTAIN OR PRESERVE SITE AND /OR DES I GN FEA T URES . IF OWNER FAILS
TO MAINTAIN AND /OR PRESERVE ALL PHYSICAL SITE FEATURES AND /OR DESIGN FEATURES DEPICTED ON THE PLANS AND
RELATED DOCUMENTS, OWNER AGREES TO INDEMNIFY AND HOLD ENGINEER HARMLESS FOR ALL INJURIES AND DAMAGES
D COSTS THAT ENGINEER INCURS RESULT OF SAID FAILURE.
THAT ENGINEER SUFFERS AN AS A SU
26. DIMENSIONS MUST BE TO FACE OF CURB EDGE OF PAVEMENT , OR EDGE OF BUILDING UNLESS NOTED OTHERWISE.
27. ALL CONSTRUCTION AND MATERIALS MUST COMPLY WITH AND CONFORM TO APPLICABLE FEDERAL, STATE AND LOCAL
E5 RULES AND CODES I REQUIREMENTS. REGULATIONS, LAWS, ORDINANCES, RU , AND ALL APPLICABLE OSHA R QUIREM NTS.
28.CONTRACTOR AND OWNER MUST INSTALL ALL ELEMENTS AND COMPONENTS IN STRICT COMPLIANCE WITH AND
ACCORDANCE WITH MANUFACTURER'S STANDARDS AND RECOMMENDED INSTALLATION CRITERIA AND SPECIFICATIONS, IF
CONTRACTOR AND /OR OWNER FAIL TO DO 80, THEY AGREE TO JOINTLY AND SEVERALLY INDEMNIFY AND HOLD ENGINEER
HARMLESS FOR ALL INJURIES AND DAMAGES THAT ENGINEER SUFFERS AND COSTS THAT ENGINEER INCURS AS A RESULT
OF SAID FAILURE.
29. CONTRACTOR IS RESPONSIBLE TO MAINTAIN ON-SITE STORMWATER POLLUTION PREVENTION PLAN (SWPPP) IN
COMPLIANCE WITH EPA REQUIREMENTS FOR SITES WHERE ONE (1) ACRE OR MORE (UNLESS THE LOCAL JURISDICTION
REQUIRES FEWER) IS DISTURBED BY CONSTRUCTION ACTIVITIES. CONTRACTOR IS RESPONSIBLE TO ENSURE THAT ALL
ACTIVITIES, INCLUDING THOSE OF SUBCONTRACTORS, ARE IN COMPLIANCE WITH THE SWPPP, INCLUDING BUT NOT LIMITED
TO LOGGING ACTIVITIES (MINIMUM ONCE PER WEEK AND AFTER RAINFALL EVENTS) AND CORRECTIVE MEASURES, AS
APPROPRIATE.
30. AS CONTAINED IN THESE DRAWINGS AND ASSOCIATED APPLICATION DOCUMENTS PREPARED BY THE SIGNATORY
PROFESSIONAL ENGINEER, THE USE OF THE WORDS CERTIFY OR CERTIFICATION CONSTITUTES AN EXPRESSION OF
"PROFESSIONAL OPINION" REGARDING THE INFORMATION WHICH IS THE SUBJECT OF THE UNDERSIGNED PROFESSIONAL
KNOWLEDGE OR BELIEF AND IN ACCORDANCE WITH COMMON ACCEPTED PROCEDURE CONSISTENT Will i 1 HE APPLICABLE
STANDARDS OF PRACTICE, AND DOES NOT CONSTITUTE A WARRANTY OR GUARANTEE, EITHER EXPRESSED OR IMPLIED.
GENERAL DEMOLITION NOTES:
1. THIS PLAN REFERENCES:
BOUNDARY & TOPOGRAPHIC/ALTA SURVEY:
TITLED "TOPOGRAPHIC SURVEY, PANTOPS SHOPPING CENTER, TMP 78 -75A, HICKMAN ROAD AND ROLKIN ROAD"
PREPARED BY ROUDABUSH, GALE & ASSOCIATES, INC.
914 MONTICELLO ROAD
CHARLOTTESVILLE, VA 22902
PHONE: 434977 -0205
DATED: 08/21/13
2. CONTRACTOR SHALL PERFORM ALL WORK IN ACCORDANCE WITH THE REQUIREMENTS OF THE OCCUPATIONAL SAFETY
AND HEALTH ACT OF 1970, (29 U.S.C. 651 et seq.), AS AMENDED AND ANY MODIFICATIONS, AMENDMENTS OR REVISIONS
TO SAME.
3. BOHLER ENGINEERING HAS NO CONTRACTUAL, LEGAL, OR OTHER RESPONSIBILITY FOR JOB SITE SAFETY OR JOB SITE
SUPERVISION, OR ANYTHING RELATED TO SAME.
4. THE DEMOLITION PLAN IS INTENDED TO PROVIDE GENERAL INFORMATION, ONLY, REGARDING ITEMS TO BE
DEMOLISHED AND /OR REMOVED. THE CONTRACTOR MUST ALSO REVIEW THE OTHER SITE ALAN DRAWINGS AND
INCLUDE IN DEMOLITION ACTIVITIES ALL INCIDENTAL WORK NECESSARY FOR THE CONSTRUCTION OF THE NEW SITE
IMPROVEMENTS.
5. CONTRACTOR MUST RAISE ANY QUESTIONS CONCERNING THE ACCURACY OR INTENT OF THESE PLANS OR
SPECIFICATIONS, CONCERNS REGARDING THE APPLICABLE SAFETY STANDARDS, OR THE. SAFETY OF THE
CONTRACTOR OR THIRD PARTIES IN PERFORMING THE WORK ON THIS PROJECT, WITH BOHLER ENGINEERING, IN
WRITING, AND RESPONDED TO BY BOHLER, IN WRITING, PRIOR TO THE INITIATION OF ANY SITE ACTIVITY AND ANY
DEMOLITION ACTIVITY. ALL DEMOLITION ACTIVITIES MUST BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS
OF THESE PLANS AND SPECIFICATIONS AND ALL APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS, RULES,
REQUIREMENTS, STATUTES, ORDINANCES AND CODES.
6. PRIOR TO STARTING ANY DEMOLITION, CONTRACTOR IS RESPONSIBLE FORITO:
A.OBTAINING ALL REQUIRED PERMITS AND MAINTAINING THE SAME ON SITE FOR REVIEW BY THE ENGINEER AND
OTHER PUBLIC AGENCIES HAVING JURISDICTION THROUGHOUT THE DURATION OF THE PROJECT, SITE WORK AND
DEMOLITION WORK.
AIWA. INSTRUCTIONS TO CONTRACTOR
CONTRACTORS MUST EXERCISE APPROPRIATE CARE AND PRECISION IN CONSTRUCTION OF ADA (HANDICAP)
ACCESSIBLE COMPONENTS AND ACCESS ROUTES FOR THE SITE. THESE COMPONENTS, AS CONSTRUCTED, MUST
COMPLY WITH THE CURRENT ADA STANDARDS AND REGULATIONS' BARRIER FREE ACCESS AND ANY MIODIFICATIONS,
REVISIONS OR UPDATES TO SAME. FINISHED SURFACES ALONG THE ACCESSIBLE ROUTE OF TRAVEL FROM PARKING
SPACE, PUBLIC TRANSPORTATION, PEDESTRIAN ACCESS, INTER - BUILDING ACCESS, TO POINTS OF ACCESSIBLE
BUILDING ENTRANCE/EXIT, MUST COMPLY WITH THESE ADA CODE REQUIREMENTS. THESE INCLUDE, BUT ARE NOT
LIMITED TO THE FOLLOWING:
• PARKING SPACES AND PARKING AISLES - SLOPE SHALL NOT EXCEED 1:50 (1/4" PER FOOT OR NOMINALLY 2.0 %) IN
ANY DIRECTION.
• CURB RAMPS - SLOPE MUST NOT EXCEED 1:12 (8.3 %) FOR A MAXIMUM OF SIX (6) FEET.
• LANDINGS - MUST BE PROVIDED AT EACH END OF RAMPS, MUST PROVIDE POSITIVE DRAINAGE, AIND MUST NOT
EXCEED 1:50 (1/4" PER FOOT OR NOMINALLY 2.0 %) IN ANY DIRECTION.
• PATH OF TRAVEL ALONG ACCESSIBLE ROUTE - MUST PROVIDE A 36 -INCH OR GREATER UNOBSTRUCTED WIDTH OF
TRAVEL. (CAR OVER AND /OR HANDRAILS CANNOT REDUCE THIS MINIMUM WIDTH). THE SLOPE MUST BE NO
GREATER. THAN 1:20 (5.0 %) IN THE DIRECTION OF TRAVEL, AND MUST NOT EXCEED 1:50 (1/4" PER FOOT OR
NOMINALLY 2.0 %) IN CROSS SLOPE. WHERE PATH OF TRAVEL WILL BE GREATER THAN 1:30 (5.0 %), ADA RAMP MUST
BE ADHERED TO. A MAXIMUM SLOPE OF 1:12 (8.3 %), FOR A MAXIMUM RISE OF 2.5 FEET, MUST BE PROVIDED. THE
RAMP MUST HAVE ADA HAND RAILS AND "LEVEL" LANDINGS ON EACH END THAT ARE CROSS SLOPED NO MORE
THAN 1:50 IN ANY DIRECTION (1/4" PER FOOT OR NOMINALLY 2.0 %) FOR POSITIVE DRAINAGE.
• DOORWAYS - MUST HAVE A "LEVEL" LANDING AREA ON THE EXTERIOR SIDE OF THE DOOR THAT IS SLOPED AWAY
FROM THE DOOR NO MORE THAN 1:50 (1/4" PER FOOT OR NOMINALLY 2.0 %) FOR POSITIVE DRAINAGE. THIS
LANDING AREA MUST BE NO LESS THAN 60 INCHES (5 FEET) LONG, EXCEPT WHERE OTHERWISE PERMITTED BY
ADA STANDARDS FOR ALTERNATIVE DOORWAY OPENING CONDITIONS. (SEE ICC /ANSI A117.1 -2003 AND OTHER
REFERENCED INCORPORATED BY COD.)
• WHEN THE PROPOSED CONSTRUCTION INVOLVES RECONSTRUCTION, MODIFICATION, REVISION OR EXTENSION OF
OR TO ADA COMPONENTS FROM EXISTING DOORWAYS OR SURFACES, CONTRACTOR MUST VERIFY EXISTING
ELEVATIONS SHOWN ON THE PLAN. NOTE THAT TABLE 405.2 OF THE DEPARTMENT OF JUSTICE'S ADA STANDARDS
FOR ACCESSIBLE DESIGN ALLOWS FOR STEEPER RAMP SLOPES, IN RARE CIRCUMSTANCES. THE CONTRACTOR
MUST IMMEDIATELY NOTIFY THE DESIGN ENGINEER OF ANY DISCREPANCIES AND /OR FIELD CONDITIONS THAT
DIFFER IN ANY WAY OR ANY RESPECT FROM WHAT IS SHOWN ON THE PLANS, IN WRITING, BEFORE
COMMENCEMENT OF WORK. CONSTRUCTED IMPROVEMENTS MUST FALL WITHIN THE MAXIMUM AND MINIMUM
LIMITATIONS IMPOSED BY THE BARRIER FREE REGULATIONS AND THE ADA REQUIREMENTS.
• THE CONTRACTOR MUST VERIFY THE SLOPES OF CONTRACTOR'S FORMS PRIOR TO POURING CONCRETE, IF ANY
NON - CONFORMANCE IS OBSERVED OR EXISTS, CONTRACTOR MUST IMMEDIATELY NOTIFY THE ENGINEER PRIOR
TO POURING CONCRETE. CONTRACTOR 1S RESPONSIBLE FOR ALL COSTS TO REMOVE, REPAIR AND REPLACE
NON - CONFORMING CONCRETE.
IT IS STRONGLY RECOMMENDED THAT THE CONTRACTOR REVIEW THE INTENDED CONSTRUCTION WITH THE LOCAL
BUILDING CODE PRIOR TO COMMENCEMENT OF CONSTRUCTION.
GENERAL GRADING & UTILITY NOTES
1. LOCATIONS OF ALL EXISTING AND PROPOSED SERVICES ARE APPROXIMATE AND MUST BE INDEPENDENTLY
CONFIRMED W I TH LOC AL UTILITY COMPANIES PRIOR TO COMMENCEMENT OF ANY CONSTRUCTION OR EXCAVATION.
SANITARY SEWER AND ALL OTHER UTILITY SERVICE CONNECTION POINTS MUST BE INDEPENDENTLY CONFIRMED BY
THE CONTRACTOR IN THE FIELD PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. ALL DISCREPANCIES MUST
IMMEDIATELY B REPORTED, THE ENGINEER. CONSTRUCTION M ST COMMENCE BEGINNING AT THE
MME LATELY E IN WRITING TO U
LOWEST INVERT (POINT OF CONNECTION) AND PROGRESS UP GRADIENT. PROPOSED INTERFACE POINTS (CROSSINGS)
WITH EXISTING UNDERGROUND UTILITIES SHALL BE FIELD VERIFIED BY TEST PIT PRIOR TO COMMENCEMENT OF
CONSTRUCTION.
2, CONTRACTOR MUST VERTICALLY AND HORIZONTALLY LOCATE ALL UTILITIES AND SERVICES INCLUDING, BUT NOT
LIMITED TO, GAS, WATER, ELECTRIC, SANITARY AND STORM SEWER, TELEPHONE, CABLE, FIBER OPTIC CABLE, ETC.
WITHIN THE LIMITS OF DISTURBANCE OR WORK SPACE, WHICHEVER IS GREATER. THE CONTRACTOR MUST USE, REFER
T NOTIFICATION T LL HE
TO, AND COMPLY WITH THE REQUIREMENTS OF THE APPLICABLE UTILITY SYSTEM O LOCATE A T
UNDERGROUND UTILITIES. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING ALL DAMAGE TO ANY EXISTING
UTILITIES DURING CONSTRUCTION, AT NO COST TO THE OWNER. CONTRACTOR SHALL BEAR ALL COSTS ASSOCIATED
WITH DAMAGE TO ANY EXISTING UTILITIES DURING CONSTRUCTION.
3. IT IS THE CONTRACTOR'S RESPONSIBILITY TO REVIEW ALL CONSTRUCTION CONTRACT DOCUMENTS INCLUDING, BUT
NOT LIMITED TO, ALL OF THE DRAWINGS AND SPECIFICATIONS ASSOCIATED WITH THE PROJECT WORK SCOPE PRIOR
TO THE INITIATION AND COMMENCEMENT OF CONSTRUCTION. SHOULD THE CONTRACTOR FIND A CONFLICT AND /OR
DISCREPANCY BETWEEN THE DOCUMENTS RELATIVE TO THE O IFICATIONS PE THE RELATIVE OR APPLICABLE
S C R
CODES REGULATIONS LAWS RULES STATUTES AND /OR ORDINANCES, IT S THE CONTRACTORS SOLE
O !
RESPONSIBILITY TO NOTIFY THE PROJECT ENGINEER OF RECORD, IN WRITING, OF SAID CONFLICT AND /OR
DISCREPANCY PRIOR TO THE START OF CONSTRUCTION. CONTRACTOR'S FAILURE TO NOTIFY THE PROJECT
ENGINEER SHALL CONSTITUTE CONTRACTOR'S FULL AND COMPLETE ACCEPTANCE OF ALL RESPONSIBILITY TO
COMPLETE THE SCOPE OF WORK AS DEFINED BY THE DRAWINGS AND IN FULL COMPLIANCE WITH ALL FEDERAL, STATE
AND LOCAL REGULATIONS, LAWS, STATUTES, ORDINANCES AND CODES AND, FURTHER, CONTRACTOR SHALL BE
RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH SAME.
4. THE CONTRACTOR MUST LOCATE AND CLEARLY AND UNAMBIGUOUSLY DEFINE VERTICALLY AND HORIZONTALLY ALL
ACTIVE AND INACTIVE UTILITY AND /OR SERVICE SYSTEMS THAT ARE TO BE REMOVED. THE CONTRACTOR IS
RESPONSIBLE TO PROTECT AND MAINTAIN ALL ACTIVE AND INACTIVE SYSTEMS THAT ARE NOT BEING
REMOVED /RELOCATED DURING SITE ACTIVITY.
5. THE CONTRACTOR MUST FAMILIARIZE ITSELF WITH THE APPLICABLE UTILITY SERVICE PROVIDER REQUIREMENTS AND
IS RESPONSIBLE FOR ALL COORDINATION REGARDING UTILITY DEMOLITION AS IDENTIFIED OR REQUIRED FOR THE
PROJECT. THE CONTRACTOR MUST PROVIDE THE OWNER WITH WRITTEN NOTIFICATION THAT THE EXISTING UTILITIES
AND SERVICES HAVE BEEN TERMINATED AND ABANDONED IN ACCORDANCE WITH THE JURISDICTION AND UTILITY
COMPANY REQUIREMENTS AND ALL OTHER APPLICABLE REQUIREMENTS, RULES, STATUTES, LAWS, ORDINANCES AND
CODES.
6. THE CONTRACTOR MUST INSTALL ALL STORM SEWER AND SANITARY SEWER COMPONENTS WHICH FUNCTION BY
GRAVITY PRIOR TO THE INSTALLATION OF ALL OTHER UTILITIES,
7. CON IrRI CTOR IS RESPONSIBLE FOR COORDINATION OF SITE PLAN DOCUMENTS AND ARCHITECTURAL DESIGN. FOR
EXACT BUILDING UTILITY CONNECTION LOCATIONS, GREASE TRAP REQUIREMENTSIDETAILS, DOOR ACCESS, AND
EXTERIOR GRADING. THE ARCHITECT WILL DETERMINE THE UTILITY SERVICE SIZES. THE CONTRACTOR MUST
COORDINATE INSTALLATION OF UTILITIES /SERVICES WITH THE INDIVIDUAL COMPANIES, TO AVOID CONFLICTS AND TO
ENSURE THAT PROPER DEPTHS ARE ACHIEVED. THE CONTRACTOR IS RESPONSIBLE FOR ,ENSURING THAT
INSTALLATION OF ALL IMPROVEMENTS COMPLIES WITH ALL UTILITY REQUIREMENTS WITH JURISDICTION AND /OR
CONTROL OF THE SITE, AND ALL OTHER APPLICABLE REQUIREMENTS, RULES, STATUTES, LAWS, ORDINANCES AND
CODES AND, FURTHER, IS RESPONSIBLE FOR COORDINATING THE UTILITY TIE -INS /CONNECTIONS PRIOR TO
CONNECTING TO THE EXISTING UTILITY /SERVICE. WHERE A CONFLICT(S) EXISTS BETWEEN THESE SITE PLANS AND THE
ARCHITECTURAL PLANS, OR WHERE ARCHITECTURAL PLAN UTILITY CONNECTION POINTS DIFFER, THE CONTRACTOR
MUST IMMEDIATELY NOTIFY THE ENGINEER, IN WRITING, AND PRIOR TO CONSTRUCTION, RESOLVE SAME,
8. WATER SERVICE MATERIALS, BURIAL DEPTH, AND COVER REQUIREMENTS MUST BE SPECIFIED BY THE LOCAL UTILITY
COMPANY. CONTRACTOR'S PRICE FOR WATER SERVICE MUST INCLUDE ALL FEES, COSTS AND APPURTENANCES
REQUIRED BY THE UTILITY TO PROVIDE FULL AND COMPLETE WORKING SERVICE. CONTRACTOR MUST CONTACT THE
APPLICABLE MUNICIPALITY TO CONFIRM THE PROPER WATER METER AND VAULT, PRIOR TO COMMENCING
CONSTRUCTION.
9. ALL NEW UTILITIES /SERVICES, INCLUDING ELECTRIC, TELEPHONE, CABLE TV, ETC. ARE TO BE INSTALLED
UNDERGROUND, ALL NEW UTILITIES /SERVICES MUST BE INSTALLED IN ACCORDANCE WITH THE UTILITYISERVICE
PROVIDER INSTALLATION SPECIFICATIONS AND STANDARDS.
10. SITE GRADING MUST BE PERFORMED IN ACCORDANCE WITH THESE PLANS AND SPECIFICATIONS AND THE
RECOMMENDATIONS SET FORTH IN THE GEOTECHNICAL REPORT REFERENCED IN THIS PLAN SET. THE CONTRACTOR IS
RESPONSIBLE FOR REMOVING AND REPLACING UNSUITABLE MATERIALS WITH SUITABLE MATERIALS AS SPECIFIED IN
THE GEOTECHNICAL REPORT. ALL EXCAVATED OR FILLED AREAS MUST BE COMPACTED AS OUTLINED IN THE
GEOTECHNICAL REPORT. MOISTURE CONTENT AT TIME OF PLACEMENT MUST BE SUBMITTED IN A COMPACTION
REPORT PREPARED BY A QUALIFIED GEOTECHNICAL ENGINEER, REGISTERED WITH THE STATE WHERE THE WORK IS
PERFORMED, VERIFYING THAT ALL FILLED AREAS AND SUBGRADE AREAS WITHIN THE BUILDING PAD AREA AND AREAS
TO BE PAVED HAVE BEEN COMPACTED IN ACCORDANCE WITH THESE PLANS, SPECIFICATIONS AND THE
RECOMMENDATIONS SET FORTH IN THE GEOTECHNICAL REPORT AND ALL APPLICABLE REQUIREMENTS, RULES,
STATUTES, LAWS, ORDINANCES AND CODES, SUBBASE MATERIAL FOR SIDEWALKS, CURB, OR ASPHALT MUST BE FREE
OF ORGANICS AND OTHER UNSUITABLE MATERIALS. SHOULD SUBBASE BE DEEMED UNSUITABLE BY
OWNER/DEVELOPER, OR OWNER/DEVELOPER'S REPRESENTATIVE, SUBBASE IS TO BE REMOVED AND FILLED WITH
APPROVED FILL MATERIAL COMPACTED AS DIRECTED BY THE GEOTECHNICAL REPORT. EARTHWORK ACTIVITIES
INCLUDING, BUT NOT LIMITED TO, EXCAVATION, BACKFILL, AND COMPACTING MUST COMPLY WITH THE
RECOMMENDATIONS IN THE GEOTECHNICAL REPORT AND ALL APPLICABLE REQUIREMENTS, RULES, STATUTES, LAWS,
ORDINANCES AND CODES. EARTHWORK ACTIVITIES MUST COMPLY WITH THE STANDARD STATE DOT SPECIFICATIONS
FOR ROADWAY CONSTRUCTION (LATEST EDITION) AND ANY AMENDMENTS OR REVISIONS THERETO.
11. ALL FILL, COMPACTION, AND BACKFILL MATERIALS REQUIRED FOR UTILITY INSTALLATION MUST BE AS PER THE
RECOMMENDATIONS PROVIDED IN THE GEOTECHNICAL REPORT AND MUST BE COORDINATED WITH THE APPLICABLE
UTILITY COMPANY SPECIFICATIONS. WHEN THE PROJECT DOES NOT HAVE GEOTECHNICAL RECOMMENDATIONS, FILL
AND COMPACTION MUST, AT A MINIMUM, COMPLY WITH THE STATE DOT REQUIREMENTS AND SPECIFICATIONS AND
CONSULTANT SHALL HAVE NO LIABILITY OR RESPONSIBILITY FOR OR AS RELATED TO FILL, COMPACTION AND BACKFILL.
FURTHER, CONTRACTOR IS FULLY RESPONSIBLE FOR EARTHWORK BALANCE.
12. THE CONTRACTOR MUST COMPLY, TO THE FULLEST EXTENT, WITH THE LATEST OSHA STANDARDS AND REGULATIONS,
ANDIOR ANY OTHER AGENCY WITH JURISDICTION FOR EXCAVATION AND TRENCHING PROCEDURES. THE CONTRACTOR
IS RESPONSIBLE FOR DETERMINING THE "MEANS AND METHODS" REQUIRED TO MEET THE INTENT AND PERFORMANCE
CRITERIA OF OSHA, AS WELL AS ANY OTHER ENTITY THAT HAS JURISDICTION FOR EXCAVATION AND /OR TRENCHING
PROCEDURES AND CONSULTANT SHALL HAVE NO RESPONSIBILITY FOR OR AS RELATED FOR OR AS RELATED TO
EXCAVATION AND TRENCHING PROCEDURES.
13, PAVEMENT MUST BE SAW CUT IN STRAIGHT LINES, AND EXCEPT FOR EDGE OF BUTT JOINTS, MUST EXTEND TO THE
FULL DEPTH OF THE EXISTING PAVEMENT. ALL DEBRIS FROM REMOVAL OPERATIONS MUST BE REMOVED FROM THE
SITE AT THE TIME OF EXCAVATION. STOCKPILING OF DEBRIS WILL NOT BE PERMITTED.
14, THE TOPS OF EXISTING MANHOLES, INLET STRUCTURES, AND SANITARY CLEANOUT TOPS MUST BE ADJUSTED, AS
NECESSARY, TO MATCH PROPOSED GRADES IN ACCORDANCE WITH ALL APPLICABLE STANDARDS, REQUIREMENTS,
RULES, STATUTES, LAWS; ORDINANCES AND CODES.
15. DURING THE INSTALLATION OF SANITARY SEWER, STORM SEWER, AND ALL UTILITIES, THE CONTRACTOR MUST
MAINTAIN A CONTEMPORANEOUS AND THOROUGH RECORD OF CONSTRUCTION TO IDENTIFY THE AS- INSTALLED
LOCATIONS OF ALL UNDERGROUND INFRASTRUCTURE. THE CONTRACTOR MUST CAREFULLY NOTE ANY
INSTALLATIONS THAT DEVIATE FROM THE INFORMATION CONTAINED IN THE UTILITY PLAN. THIS RECORD MUST BE KEPT
ON A CLEAN COPY OF THE SITE PLAN, WHICH CONTRACTOR MUST PROMPTLY PROVIDE TO THE OWNER AT THE
COMPLETION OF WORK.
16. WHEN THE SITE IMPROVEMENT PLANS INVOLVE MULTIPLE BUILDINGS, SOME OF WHICH MAY BE BUILT AT A LATER DATE,
THE CONTRACTOR MUST EXTEND ALL LINES, INCLUDING BUT NOT LIMITED TO STORM SEWER, SANITARY SEWER,
UTILITIES, AND IRRIGATION LINE, TO A POINT AT LEAST FIVE (5) FEET BEYOND THE PAVED AREAS FOR WHICH THE
CONTRACTOR IS RESPONSIBLE. CONTRACTOR MUST CAP ENDS.AS APPROPRIATE, MARK.LOCATLONS WITH A 2X4, AND
E WHICH CONTRACTOR T
MUST OTE E LOCATION FALL OF THE ABOVE ON A CLEAN COPY OF THE SITE PLAN W H C NTRA TOR MUS
T TH C 0 ,
PROMPTLY PROVIDE TO THE OWNER UPON COMPLETION OF THE WORK,
17. THE CONTRACTOR IS FULLY RESPONSIBLE FOR VERIFICATION OF EXISTING TOPOGRAPHIC INFORMATION AND UTILITY
INVERT ELEVATIONS PRIOR TO COMMENCING ANY CONSTRUCTION. CONTRACTOR MUST CONFIRM AND ENSURE 0.76%
MINIMUM SLOPE AGAINST ALL ISLANDS, GUTTERS, AND CURBS; 1.0% ON ALL CONCRETE SURFACES; AND 1.5% MINIMUM
ON ASPHALT (EXCEPT WHERE ADA REQUIREMENTS LIMIT GRADES), TO PREVENT PONDING. CONTRACTOR MUST
IMMEDIATELY IDENTIFY, IN WRITING TO THE ENGINEER, ANY DISCREPANCIES THAT MAY OR COULD AFFECT THE PUBLIC
SAFETY, HEALTH OR GENERAL WELFARE, OR PROJECT COST. IF CONTRACTOR PROCEEDS WITH CONSTRUCTION
WITHOUT PROVIDING PROPER NOTIFICATION, MUST BE AT THE CONTRACTOR'S OWN RISK AND, FURTHER,
CONTRACTOR SHALL INDEMNIFY, DEFEND AND HOLD HARMLESS THE DESIGN ENGINEER FOR ANY DAMAGES, COSTS,
INJURIES, ATTORNEY'S FEES AND THE LIKE WHICH RESULT FROM SAME.
18. PROPOSED TOP OF CURB ELEVATIONS ARE GENERALLY 6" ABOVE EXISTING LOCAL ASPHALT GRADE UNLESS
OTHERWISE NOTED. FIELD ADJUST TO CREATE A MINIMUM OF .075% GUTTER GRADE ALONG CURB FACE. IT IS
CONTRACTOR'S OBLIGATION TO ENSURE THAT DESIGN ENGINEER APPROVES FINAL CURBING CUT SHEETS PRIOR TO
INSTALLATION OF SAME.
19. REFER TO SITE PLAN FOR ADDITIONAL NOTES.
20. IN THE EVENT OF DISCREPANCIES AND /OR CONFLICTS BETWEEN PLANS OR RELATIVE TO OTHER PLANS, THE SITE PLAN
WILL TAKE PRECEDENCE AND CONTROL. CONTRACTOR MUST IMMEDIATELY NOTIFY THE DESIGN ENGINEER, IN
WRITING, OF ANY DISCREPANCIES AND /OR CONFLICTS.
21. CONTRACTOR MUST REQUIRED TO SECURE ALL NECESSARY AND /OR REQUIRED PERMITS AND APPROVALS FOR ALL
OFF SITE MATERIAL SOURCES AND DISPOSAL FACILITIES. CONTRACTOR MUST SUPPLY A COPY OF APPROVALS TO
ENGINEER AND OWNER PRIOR TO INITIATING WORK ANY WORK
22. WHERE RETAINING WALLS (WHETHER OR NOT THEY MEET THE JURISDICTIONAL DEFINITION) ARE IDENTIFIED ON PLANS„
ELEVATIONS IDENTIFIED ARE FOR THE EXPOSED PORTION OF THE WALL. WALL FOOTINGS /FOUNDATION ELEVATIONS
ARE NOT IDENTIFIED HEREIN AND ARE TO BE SET /DETERMINED BY THE CONTRACTOR BASED ON FINAL STRUCTURAL
DESIGN SHOP DRAWINGS PREPARED BY THE APPROPRIATE PROFESSIONAL LICENSED IN THE STATE WHERE THE
CONSTRUCTION OCCURS.
23. STORM DRAINAGE PIPE:
UNLESS INDICATED OTHERWISE, ALL STORM SEWER PIPE MUST BE REINFORCED CONCRETE PIPE (RCP) CLASS 111 WITH
SILT TIGHT JOINTS. WHEN HIGH - DENSITY POLYETHYLENE PIPE (HOPE) IS CALLED FOR ON THE PLANS, IT MUST
CONFORM TO AASHTO M294 AND TYPE S (SMOOTH INTERIOR WITH ANGULAR CORRUGATIONS) WITH GASKET FOR SILT
TIGHT JOINT, PVC PIPE FOR ROOF DRAIN CONNECTION MUST BE SDR 26 OR SCHEDULE 40 UNLESS INDICATED
OTHERWISE.
24.SANITARY SEWER PIPE MUST BE POLYVINYL CHLORIDE (PVC) SDR 35 EXCEPT WHERE INDICATED OTHERWISE.
SANITARY LATERAL MUST BE PVC SCHEDULE 40 OR PVC SDR 26 UNLESS INDICATED, IN WRITING, OTHERWISE,
25. STORM AND SANITARY SEWER PIPE LENGTHS INDICATED ARE NOMINAL AND MEASURED CENTER OF INLET ANDIOR
MANHOLES STRUCTURE TO CENTER OF STRUCTURE.
26. STORMWATER ROOF DRAIN LOCATIONS ARE BASED ON PRELIMINARY ARCHITECTURAL PLANS. CONTRACTOR IS
RESPONSIBLE TO AND FOR VERIFYING LOCATIONS OF SAME BASED ON FINAL ARCHITECTURAL PLANS.
27.SEWERS CROSSING STREAMS AND /OR LOCATION WITHIN 10 FEET OF THE STREAM EMBANKMENT, OR WHERE SITE
CONDITIONS SO INDICATE, MUST BE CONSTRUCTED OF STEEL, REINFORCED CONCRETE, DUCTILE IRON OR OTHER
SUITABLE MATERIAL.
SEWERS CONVEYING SANITARY FLOW COMBINED SANITARY AND STORMWATER FLOW OR INDUSTRIAL FLOW MUST BE
SEPARATED FROM WATER MAINS BY A DISTANCE OF AT LEAST 10 FEET HORIZONTALLY. IF SUCH LATERAL SEPARATION
IS NOT POSSIBLE, THE PIPES MUST BE IN SEPARATE TRENCHES WITH THE SEWER AT LEAST 18 INCHES BELOW THE
BOTTOM OF THE WATER MAIN, OR SUCH OTHER SEPARATION AS APPROVED BY THE GOVERNMENT AGENCY WITH
JURISDICTION OVER SAME.
• WHERE APPROPRIATE SEPARATION FROM A WATER MAIN IS NOT POSSIBLE, THE SEWER MUST BE ENCASED IN
CONCRETE, OR CONSTRUCTED OF DUCTILE IRON PIPE USING MECHANICAL OR SLIP -ON JOINTS FOR A DISTANCE OF
AT LEAST 10 FEET ON EITHER SIDE OF THE CROSSING. IN ADDITION, ONE FULL LENGTH OF SEWER PIPE SHOULD BE
LOCATED SO BOTH JOINTS WILL BE AS FAR FROM THE WATER LINE AS POSSIBLE. WHERE A WATER MAIN CROSSES
UNDER A SEWER, ADEQUATE STRUCTURAL. SUPPORT FOR THE SEWER MUST BE PROVIDED. .
2 8. WATER MA IN PIPING MUST BE INSTALLED IN ACCORDANCE WITH THE REQUIREMENTS EMENTS AND SPECIFICATIONS OF
THE
LOCAL WATER PURVEYOR. IN THE ABSENCE OF SUCH REQUIREMENTS, WATER MAIN PIPING MUST BE CEMENT-LINED
DUCTILE IRON (DIP) MINIMUM CLASS 52 THICKNESS. ALL PIPE AND APPURTENANCES MUST COMPLY WITH THE
APPLICABLE AWWA STANDARDS IN EFFECT AT THE TIME OF APPLICATION. .
29. CONTRACTOR MUST ENSURE THAT ALL UTILITY TRENCHES LOCATED IN EXISTING PAVED ROADWAYS INCLUDING
SEWER, WATER AND STORM SYSTEMS, MUST BE REPAIRED IN ACCORDANCE WITH REFERENCED MUNICIPAL, COUNTY
AND/OR N J007 DETAILS AS APPLICABL E CON TRA CTOR MUST COORDINATE INSPECTION ECTION AND APPROVAL OF
COMPLETED WORK WITH THE AGENCY WITH JURISDICTION OVER SAME.
30. WHERE BASEMENTS ARE TO BE PROVIDED FOR PROPOSED DWELLING UNITS, THE DEVELOPER SHALL, BY BORING OR
BY TEST PIT, DETERMINE THE DEPTH TO GROUNDWATER AT THE LOCATION OF THE PROPOSED DWELLINGS. WHERE
GROUNDWATER IS ENCOUNTERED IN THE BASEMENT AREA, BASEMENTS WILL NOT BE INSTALLED UNLESS SPECIAL
CONSTRUCTION METHODS ARE UTILIZED, TO BE REVIEWED AND APPROVED BY THE MUNICIPAL CONSTRUCTION CODE
OFFICIAL. IF AND WHERE SUMP PUMPS ARE INSTALLED, ALL DISCHARGES MUST BE CONNECTED TO THE STORM
SEWER. A CLEANOUT MUST BE PROVIDED PRIOR TO THE CONNECTION TO THE STORM DRAIN IN ORDER THAT
BLOCKAGES CAN BE ADDRESSED.
31. FOR SINGLE AND TWO- FAMILY RESIDENTIAL PROJECTS, WHERE THE PROPOSED DWELLING AND ADJACENT SPOT
ELEVATION(S) ARE SCHEMATIC FOR GENERIC BUILDING FOOTPRINT, GRADES MUST BE ADJUSTED BASED ON FINAL
ARCHITECTURAL PLANS TO PROVIDE A MINIMUM OF SIX (6) INCHES BELOW TOP OF BLOCK AND /OR SIX (6) INCHES
BELOW SIDING, WHICHEVER IS LOWEST, AND MUST PROVIDE POSITIVE DRAINAGE (2 % MIN.) AWAY FROM. DWELLING.
ALL CONSTRUCTION, INCLUDING GRADING, MUST COMPLY WITH THE LATEST LOCAL AND STATE BUILDING CODE AND
ALL OTHER APPLICABLE REQUIREMENTS, RULES, STATUTES, LAWS, ORDINANCES AND CODES. .
32. LOCATION OF PROPOSED UTILITY POLE RELOCATION IS AT THE SOLE DISCRETION OF UTILITY COMPANY.
33. CONSULTANT IS NEITHER LIABLE NOR RESPONSIBLE FOR ANY SUBSURFACE CONDITIONS AND FURTHEP, SHALL HAVE
NO LIABILITY FOR ANY HAZARDOUS MATERIALS, HAZARDOUS SUBSTANCES, OR POLLUTANTS ON, ABOUT OR UNDER
THE PROPERTY. .
LIGHTING NOTES:
1. THIS LIGHTING PLAN DEPICTS PROPOSED SUSTAINED ILLUMINATION LEVELS CALCULATED USING DATA PROVIDED
BY THE NOTED MANUFACTURER(S), ACTUAL SUSTAINED SITE ILLUMINATION LEVELS AND PERFORMANCE OF
LUMINAIRES MAY VARY DUE TO VARIATIONS IN WEATHER, ELECTRICAL VOLTAGE, TOLERANCE IN LAMPS, THE
SERVICE LIFE OF EQUIPMENT AND LUMINAIRES AND OTHER RELATED. VARIABLE FIELD CONDITIONS.
2. THE LIGHT LOSS FACTORS USED IN THESE LIGHTING CALCULATIONS ARE 0.90 FOR ALL LED LUMINAIRES, 0.80 FOR
ALL HIGH PRESSURE SODIUM LUMINAIRES OR 0.72 FOR ALL METAL HALIDE LUMINAIRES UNLESS OTHERWISE
SPECIFIED. THESE FACTORS ARE INDICATIVE OF TYPICAL LIGHTING INDUSTRY MODELING STANDARDS.
3. THE LIGHTING VALUES AND CALCULATION POINTS DEPICTED ON THIS PLAN ARE ALL ANALYZED ON A HORIZONTAL
GEOMETRIC PLANE AT ELEVATION ZERO (GROUND LEVEL) UNLESS OTHERWISE NOTED. THE VALUES DEPICTED
ON THIS PLAN ARE IN FOOTCANDLES.
4, THE LUMINAIRES, LAMPS AND LENSES MUST BE REGULARLY INSPECTED /MAINTAINED TO ENSURE THAT THEY
FUNCTION PROPERLY. THIS WORK SHOULD INCLUDE, BUT NOT BE LIMITED TO, FREQUENT VISUAL INSPECTIONS,
CLEANING OF LENSES, AND RELAMPING (IF NECESSARY) AT LEAST ONCE EVERY SIX (6) MONTHS. FAILURE TO
FOLLOW THE ABOVE STEPS COULD CAUSE THE LUMINARIES, LAMPS AND LENSES TO FAIL PROPERLY TO
FUNCTION.
5. WHERE APPLICABLE, THE EXISTING CONDITION LIGHT LEVELS ILLUSTRATED ARE REPRESENTATIVE OF AN
APPROXIMATION UTILIZING LABORATORY DATA FOR SIMILAR FIXTURES, UNLESS ACTUAL FIELD MEASUREMENTS
ARE TAKEN WITH A LIGHT METER AND ARE, CONSEQUENTLY, APPROXIMATIONS ONLY. DUE TO FACTORS SUCH
AS FIXTURE MAINTENANCE, EQUIPMENT TOLERANCES, WEATHER CONDITIONS, ETC,.ACTUAL LIGHT LEVELS MAY
DIFFER. EXISTING LIGHT LEVELS DENCTED ON THIS PLAN SHOULD BE CONSIDERED APPROXIMATE. .
6. THIS LIGHTING PLAN IS INTENDED TO SHOW THE LOCATIONS AND TYPE OF LUMINAIRES, ONLY. POWER SYSTEM,
CONDUITS, WIRING, VOLTAGES AND OTHER ELECTRICAL COMPONENTS ARE THE RESPONSIBILITY OF THE
ARCHITECT, MEP :AND /OR LIGHTING CONTRACTOR, AS . INDICATED IN THE CONSTRUCTION CONTRACT
DOCUMENTS. ,,,THESE ITEMS MUST BE INSTALLED AS REQUIRED BY STATE AND LOCAL REGULATIONS.
CONTRACTOR ,IS RESPONSIBLE FOR INSTALLING LIGHTING FIXTURES AND APPURTENANCES IN ACCORDANCE
WITH ALL APPLICABLE BUILDING AND ELECTRICAL CODES AND ALL OTHER APPLICABLE RULES, REGULATIONS,
LAWS AND STATUTES.
7. CONTRACTOR MUST BRING TO DESIGNER'S ATTENTION, PRIOR TO THE COMMENCEMENT OF CONSTRUCTION,
ANY LIGHT LOCATIONS THAT CONFLICT WITH DRAINAGE, UTILITIES, OR OTHER STRUCTURES.
8. IT IS LIGHTING CONTRACTOR'S RESPONSIBILITY TO COORDINATE WITH THE PROJECT ARCHITECT OR OWNER
REGARDING THE POWER SOURCE($) FROM WITHIN THE BUILDING, AND TIMING DEVICES NECESSARY TO MEET
THE DESIGN INTENT,
9. THE LIGHTING CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE CONTRACTOR REQUIREMENTS INDICATED IN
THE SITE PLAN, INCLUDING BUT NOT LIMITED TO, GENERAL NOTES, GRADING AND UTILITY NOTES, SITE SAFETY,
AND ALL GOVERNMENTAL RULES, LAWS, ORDINANCES, REGULATIONS AND THE LIKE.
10. THE CONTRACTOR MUST VERIFY THAT INSTALLATION OF LIGHTING FIXTURES 'COMPLIES WITH THE
REQUIREMENTS FOR SEPARATION FROM OVERHEAD ELECTRICAL WIRES AS INDICATED IN THE HIGH VOLTAGE
PROXIMITY REGULATIONS N.JAC.12 -186.
11. WHEN A BANK ATM IS INCLUDED IN THE PLAN, THE LIGHTING DESIGN REPRESENTS BOHLER'S UNDERSTANDING
AND INTERPRETATION OF THE REGULATORY LIGHTING LEVELS INTENDED BY PUBLISHED STANDARDS.
12. UPON OWNER'S ACCEPTANCE OF THE COMPLETED PROJECT, THE OWNER SHALL BE RESPONSIBLE FOR ALL
MAINTENANCE, SERVICING, REPAIR AND INSPECTION OF THE LIGHTING SYSTEM AND ALL OF ITS COMPONENTS
AND RELATED SYSTEMS, TO ENSURE ADEQUATE LIGHTING LEVELS ARE PRESENT AND FUNCTIONING AT ALL
TIMES. .
STORMWATER. MANAGEMENT /BMP NARRATIVE:
STORMWATER RUNOFF WILL BE COLLECTED INTO A SERIES OF CURB INLETS ONSITE, AND PIPED TO AN EXISTING
WET POND LOCATED 600'± SOUTHWEST OF THE SITE. THE EXISTING WET POND WAS SIZED AND BUILT WITH THE
DEPARTMENT OF MOTOR VEHICLES SITE, AND WAS DESIGNED TO ACCOMMODATE THE ENTIRE PANTOPS SHOPPING
AREA, INCLUDING THIS SITE. BECAUSE OF THIS, IT IS THE OPINION OF THE ENGINEER THAT THE EXISTING WET POND
WILL ADEQUATELY CONTROL THE RUNOFF CREATED BY THE ADDITIONAL IMPERVIOUS AREA FROM THIS PROPOSED
DEVELOPMENT.
' `3
,(F ,o
mp.ie
44*�
a
�w
W W
z
I 11-4
00
�z
w
= a..
A. i'?
'Y
i L
?•t`�`
. _j R
.�aQU
nQiwxz I
n� >Ooa
W zzz:5Wo
W o�a �iag
2 Mi� aV
IR �
p o < �
,� �: 3 � - a
0 ♦ � Q� il
U .a>-0}..-;: E
O zYZ >"a
. M mod
mzM .
. tOi� �aUUt- gei .
f+ + * *♦
n
W � Is,-
4
0 p . sal
z m H � .
W
O
Z
x
0 U
o .
0
H � H . 9
.
z w .a z U
O . ..O A 0'.
old . U Tk
. A, o
M
V. W
REVISIONS.
REV DATE I COMMENT I BY
0
r
,. .. .
THE FOLLOWING STATES REQUIRE NOTIFICATION BY '
EXCAVATORS; DESIGNERS, OR ANY. PERSON PREPARING TO
DISTURB THE EARTHS SURFACE ANYWHERE IN THE STATE.
IN VIRGINIA, MARYLAND, THE DISTRICT OF COLUMBIA, AND
DELAWARE CALL -811.
(WV 14WO2454M) (PA 1400- 242 -17-76) (DO 1-800- 257 -7771)
(VA 14005.524001) (MD 14800257 -7777) (DE 1- 800 - 282.8555
NOT APPROVED.FOR
CONSTRUCTION .. i
PROJECT NO.: V132042
DRAWN BY: MJS /JLP
CHECKED BY: DRH
DATE: 10/28/13
SCALE: NIA
CAD I.D.: . . S00
PROJECT:
INITIAL
SITE PLAN
FOR
ROLKIN ROAD
RETAIL CENTER.
LOCATION OF SITE
ROLKIN ROAD & ABBEY ROAD:
TAX MAP 78 -,75A
CHARLOTTESVILLE, VA 22911
RIVANNA MAGISTERIAL .
DISTRICT
ALBEMARLE COUNTY
BOHLER.
E N, G I N E.E R I N G
28 BLACKWELL PARK LANE, SUITE 201
WARRENTON, VIRGINIA 20186
Phone: (540) 348 -4500
Fax: (540) 349 -0321
www.BohlerEngineering.com
0I'1CCI iilLC:
GENERAL
NOTES
SHEET NUMBER:
.21
OF 8
o.
STANDARD DRAWING LEGEND
FOR ENTIRE PLAN SET
NOT TO SCALE
EXISTING. NOTE
TYPICAL NOTE TEXT
PROPOSED NOTE
`......`"",.� .,.' �. ......._.._""
ONSITE PROPERTY
LINE / R.O.W. LINE
..`........._. ..." «.»
- -
NEIGHBORING
PROPERTY LINE /
INTERIOR PARCEL LINE
- -
-
EASEMENT
LINE
- -
POINT OF TANGENCY
SETBACK
LINE
BOTTOM OF CURB
PTCR
POINT OF TANGENCY, CURB
RETURN
CONCRETE CURB 8,
GUTTER
CURB AND GUTTER
PVC
SPILL CURB I TRANSITION CURB
SK
BLOCK
PVt
DEPRESSED CURB AND GUTTER
-
BASELINE
�
L
UTI ITY PO LE
WITH LIGHT
BLDG
BUILDING
POLE
LIGHT
RADIUS
BM
TRAFFIC
LIGHT
RCP
O
UTILITY.
POLE
0
.
TYPICAL
LIGHT
g
CUBIC FEET
ACORN
LIGHT
RIGHT.OF WAY
-�--
TYPICAL
SIGN
- y--
zi�
PARKING
COUNTS
zi�
SAN
- - ��70- --- -
- ------ - - - - -- 169------ - - - - --
CONTOUR
LINE
O
187
TO 5164 OR 516.4
SPOT
ELEVATIONS
C516.00
TC 516.00
8C 515.55
STA
STATION
SAN
SANITARY
LABEL
SAN
#
X I
STORM
LABEL
X
#
SL
SANITARY SEWER
LATERAL
DEC
DECORATIVE
y/
UNDERGROUND
WATER LINE
W__
DEPRESSED
TBRL
UNDERGROUND
ELECTRIC LINE
E
G
UNDERGROUND
GAS LINE
G
OH
OVERHEAD
WIRE
H
T
UNDERGROUND
TELEPHONE LINE
T
C
UNDERGROUND
CABLE LINE
C
- -
-- -- - - - --- -
_ - _
STORM
SEWER
TOP OF WALL
EP
S
SANITARY
SEWER MAIN
S
ES
HYDRANT
UG
UNDERGROUND
SANITARY
MANHOLE
i
r
STORM
MANHOLE
MANHOLE
®M
WATER
METER •
WIDE
WV
WATER
VALVE
W/L
O
GAS
VALVE
FINISHED FLOOR
®
GAS
METER .
FH
.
TYPICAL END
SECTION
PLUS OR MINUS
GG
FINISHED GRADE
HEADWALL OR
ENDWALL
a�
u
G
r `
t'm l
YARD
INLET
DIAMETER
GF
CURB
INLET
9
p
CLEAN
OUT
0
O
ELECTRIC
MANHOLE
ut
T
Q
TELEPHONE
MANHOLE
T
O
E6
ELECTRIC
BOX
HIGH DENSITY
POLYETHYLENE PIPE
EP
ELECTRIC
PEDESTAL
pP
HORIZONTAL
HW
MONITORING
WELL
INT
��
TEST
PIT
.
®
BENCHMARK
LOC
LIMITS OF CLEARING
BORING
LIMITS OF .
DISTURBANCE
r GENERAL NOTE:
IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALL OF THE DRANNINGS AND SPECIFICATIONS ASSOCIATED WITH THIS PROJECT
WORK SCOPE PRIOR TO THE INITIATION OF CONSTRUCTION. SHOULD THE OONTRACTORFINDACONFUCT WITH THE DOCUMENTS RELATNETO
THE SPEGFK;ATIA`NS OR AFPUCABL.E CODES, IT IS THE CONTRACTORS RESPONSIMLTTY TO NOTIFY THE PROJECT ENGINEEROF RECORD IN
WRITING PRIOR TO THE START OF CONSTRUCTION. FAILURE BY THE CONTRACTOR TO NOTIFY THE PROJECT ENGINEER SHAU.00NSTiiUTE
ACCEPTANCE OF FULL RESPONSIBILITY BY THE CONTRACTOR TO COMPLETE THE SCOPE OF THE WORK AS DEFINED BY THE DRAW NGSAND IN
FULL_CONFONMANCE WITH LOCAL REGULkT10NS AND MS- -
mlAvf32m \ORAk'm \HA4 SETS \HIT4. sm pwNy132642500m P(+is BY: KYNJ;iii 102&13 0 5:0 pu Lw sm sr WNW
STANDARD ABBREVIATIONS
07800- 00- 00 -075AO
FOR ENTiRE PLAN SET
AC
ACRES
PGG
POINT OF GRADE
ADA
AMERICANS WITH
DISABILITY ACT
PROP
PROPOSED
ARCH
ARCHITECTURAL
PT
POINT OF TANGENCY
bC
BOTTOM OF CURB
PTCR
POINT OF TANGENCY, CURB
RETURN
BF
BASEMENT FLOOR
PVC
POLYVINYL CHLORIDE PIPE
SK
BLOCK
PVt
POINT OF VERTICAL
INTERSECTION
BL
BASELINE
PVT
POINT OF VERTICAL
TANGENCY
BLDG
BUILDING
R
RADIUS
BM
BUILDING
BENCHMARK
RCP
REINFORCED CONCRETE PIPE
t3RL
BUILDING
RESTRICTION LINE
RET.
WALL
RETAINING WALL
CF
CUBIC FEET
R/W
RIGHT.OF WAY
CL
CENTERLINE
S
SLOPE
CMP
CORRUGATED
METAL PIPE
SAN
SANITARY SEWER
CONN
CONNECTION
SF
SQUAREFEET.
CONC
CONCRETE
STA
STATION
CPP
CORRUGATED
PLASTIC PIPE
STM
STORM
CY
CUBIC YARDS
$!W
SIDEWALK
DEC
DECORATIVE
TBR
TO BE REMOVED
DEP
DEPRESSED
TBRL
TO BE RELOCATED
DIP
DUCTILE IRON PIPE
TC
TOP OF CURB
DOM
DOMESTIC
TELE
TELEPHONE
ELEC
ELECTRIC
TPF
TREE PROTECTION FENCE
ELEV
ELEVATION
TW
TOP OF WALL
EP
EDGE OF PAVEMENT
TYP
TYPICAL
ES
EDGE OF SHOULDER
UG
UNDERGROUND
EW
END WALL
UP
UTILITY POLE
EX
EXISTING
W
WIDE
FES
FLARED END
SECTION
W/L
WATER LINE
FF
FINISHED FLOOR
W/M
WATER METER
FH
FIRE HYDRANT
PLUS OR MINUS
FG
FINISHED GRADE
DEGREE
G
GRADE
0
DIAMETER
GF
GARAGE FLOOR (AT
DOOR)
9
NUMBER
GH .
GRADE HIGHER SIDE
OF WALL
GL
GRADE.LOWER SIDE
OF WALL
GIRT
GRATE
GV
GATE VALVE
HDPE
HIGH DENSITY
POLYETHYLENE PIPE
HP
HIGH POINT
HOR
HORIZONTAL
HW
HEADWALL
INT
INTERSECTION
INV
INVERT
LF
LINEAR FOOT
LOC
LIMITS OF CLEARING
LOD
LIMITS OF .
DISTURBANCE
LOS
LINE OF SIGHT
LP
LOW POINT
US
LANDSCAPE
MAX
MAXIMUM
MIN
MINIMUM
MH
MANHOLE
MJ
MECHANICALJOINT
OC
ON CENTER
PA
POINT OF ANALYSIS
PC
POINT CURVATURE
PCCR
PCINT OF
COMPOUND
CURVATURE,CURB
RETURN
PI
POINT OF
INTERSECTION
VDOT GENERAL NOTES
REVISED 3/28/13
1, THESE PLANS WERE PREPARED IN ACCORDANCE WITH THE REQUIREMENTS OF VDOT SECONDARY STREET ACCEPTANCE REQUIREMENTS (SSAR
24VAC -30 -92 EFFECTIVE DECEMBER 31, 2011 AND VOOT ROAD DESIGN MANUAL APPENDIX 51).
2. METHODS AND MATERIALS USED SHALL CONFORM TO CURRENT COUNTYITOWN AND VDOT STANDARDS AND SPECIFICATIONS.
3. ALL UTILITIES, INCLUDING ALL POLES, ARE TO BE RELOCATED AT THE DEVELOPER'S EXPENSE, PRIOR TO CONSTRUCTION,
4. OPEN CUTTING OF PAVED OR SURFACE TREATED ROADS IS NOT PERMITTED. ALL UTILITIES WHICH WILL BE PLACED UNDER EXISTING STREETS ARE TO BE
BORED OR JACKED. ANY EXCEPTIONS, DUE TO EXTENUATING CIRCUMSTANCES, ARE TO BE ADDRESSED AT THE PERMIT STAGE,
5. ANY TYPE OF REVERSE CURB (SPILL CURB, CG -6R, ETC.) AND TRANSITION TO THESE CURBS SHALL NOT BE USED WITH THE PUBLIC RIGHT OF WAY.
6. THE DEVELOPER IS RESPONSIBLE FOR ANY DAMAGE TO EXISTING ROADS AND UTILITIES WHICH OCCUR AS A RESULT OF PROJECT CONSTRUCTION WITHIN
OR CONTIGUOUS TO EXISTING RIGHT OF WAY,
7. A SMOOTH GRADE SHALL BE MAINTAINED FROM THE CENTERLINE OF THE EXISTING ROAD TO THE PROPOSED EDGE OF PAVEMENT TO PRECLUDE THE
FORMING OF FALSE GUTTERS AND /OR THE PONDING OF ANY WATER IN THE ROADWAY.
8. STANDARD GUARDRAILS AND /OR HANDRAILS SHALL BE INSTALLED AT HAZARDOUS LOCATIONS AS DESIGNATED DURING FIELD REVIEW BY THE
COUNTYITOWN INSPECTOR OR VDOT.
9. THE DEVELOPER IS RESPONSIBLE FOR ALL TRAFFIC CONTROL, THE DEVELOPER SHALL SUBMIT A SIGNING, STRIPING AND /OR SIGNALIZATION PLAN TO THE
VDOT LAND DEVELOPMENT SECTION A MINIMUM OF THIRTY DAYS PRIOR TO PERMIT APPLICATION. THE DEVELOPER SHALL NOT COMMENCE
CONSTRUCTION OF ANY PAVEMENT COURSE WITHOUT AN APPROVED STRIPING PLAN,
10. PAVEMENT DESIGN IS BASED ON AN ASSUMED CBR VALUE OF 10 (USE CBR VALUE OF 6 IN LOUDOUN CO). SOIL TESTS OF SUBGRADE MUST BE SUBMITTED
FOR ACTUAL DETERMINATION OF REQUIRED THICKNESS OF THE PAVEMENT INCLUDING LAYERS OF ASPHALT AND SUBBASE PRIOR TO SUBBASE
PLACEMENT.
11. ALL UNTREATED AGGREGATE USED IN BASE OR SUBBASE COURSES SHALL BE 21B, EXCEPT ON ROADS WITH ADT OF 1000 VPD OR LESS, WHERE 21A
AGGREGATE MAY BE USED, WHEN 21B AGGREGATE IS USED, UD-4 UNDERDRAINS MUST BE PROVIDED.
12. A 4" (MIN.) LAYER OF STONE IS REQUIRED BENEATH CURB AND GUTTER (MAY BE SHOWN ON TYPICAL SECTION IN LIEU OF A NOTE).
13. ADDITIONAL DITCH LININGS OR SILTATION AND EROSION CONTROL MEASURES SHALL BE PROVIDED, AT THE DEVELOPER'S EXPENSE, AS DETERMINED
NECESSARY BY VOOT AND /OR THE COUNTY/TOWN DURING FIELD REVIEW. ALL COSTS SHALL BE ASSUMED BY THE DEVELOPER.
14. THE ENTIRE SURFACE OF THE ROADWAY (OLD AND NEW PORTIONS) SHALL BE OVERLAID AND RE-STRIPED AS REQUIRED BY VDOT PERSONNEL. OVERLAY
OF EXISTING PAVEMENT SHALL BE MINIMUM OF 1.25" DEPTH; ANY COSTS ASSOCIATED WITH PAVEMENT OVERLAY, OR THE MILLING OF EXISTING PAVEMENT
TO OBTAIN REQUIRED DEPTH, SHALL BE ASSUMED BY THE DEVELOPER.
15. DEVELOPER IS RESPONSIBLE FOR DESIGN AND CONSTRUCTION OF ANY TRAFFIC SIGNAL INSTALLATION OR MODIFICATION WHICH WILL BE NECESSARY AS
A RESULT OF DEVELOPMENT OF THIS SITE.
16. ALL RIGHT OF WAY DEDICATED TO PUBLIC USE SHALL BE CLEAR AND UNENCUMBERED.
17. THE COUNTY/TOWN SHALL OBTAIN A PERMIT FOR ALL SIDEWALKS WITHIN THE RIGHT OF WAY THAT DO NOT QUALIFY FOR VDOT MAINTENANCE,
18. TRAFFIC CONTROL DEVICES OR ADVISORY SIGNS, SUCH AS MULTIWAY STOPS, SPEED LIMITS, WATCH FOR CHILDREN, PEDESTRIAN TRAFFIC ETC., SHALL
NOT BE INSTALLED UNLESS SPECIFICALLY SHOWN ON THESE PLANS OR A VOOT APPROVED PLAN REVISION. SPEED STUDY CERTIFIED BY PROFESSIONAL
ENGINEER SHOULD BE SUBMITTED FOR VDOT APPROVAL PRIOR TO THE STREET ACCEPTANCE FOR ANY ROAD TO BE POSTED OTHER THAN THE
STATUTORY SPEED LIMIT. SHOULD UNAPPROVED SIGNS BE NOTED AT THE TIME OF VDOT INSPECT(ON, THE ROAD ACCEPTANCE PROCESS SHALL BE
TERMINATED IMMEDIATELY AND NOT RECOMMENCED UNTIL A DETERMINATION IS MADE REGARDIING.THE APPROVAL OF ANY ADDITIONAL SIGNS,
IMMEDIATE REMOVAL OF SUCH SIGNS SHALL NOT NEGATE THE NEED FOR THE SUBMISSION OF A (REVISION.
19. LANDSCAPING AND IRRIGATION SYSTEMS SHALL NOT BE INSTALLED WITHIN THE PUBLIC RIGHT OF WAY EXCEPT AS SHOWN ON THESE PLANS OR A VDOT
APPROVED REVISION.
20. BEGINNING JULY 1, 2009 ALL LAND USE PERMIT APPLICATIONS ARE REQUIRED TO PROVIDE AT LEAST ONE (1) PERSON WHO, AT MINIMUM, IS VERIFIED BY
VDOT IN BASIC WORK ZONE TRAFFIC CONTROL FOR ALL PERMITTED ACTIVITIES WITHIN STATE MAINTAINED RIGHT OF WAY WHICH INVOLVES INSTALLING,
MAINTAINING, OR REMOVING WORK ZONE TRAFFIC CONTROL DEVICES. THIS PERSON SHALL BE RESPONSIBLE FOR THE PLACEMENT, MAINTENANCE AND
REMOVAL OF ALL WORK ZONE TRAFFIC CONTROL DEVICES.
PROPOSED EASEMENT LEGEND
07800- 00- 00 -075AO
SI
- -
SIGHT DISTANCE
1
--- --
STORM DRAIN
ASSOCIATED PLANS:
- -�---
SANITARY SEWER
RIVANNA DISTRICT
-
WATER
RETAIL BUILDING
- --
PUBLIC ACCESS
1.67± ACRES
- - --
COMMON SHARED
MINIMUM
---- -
INGRESS - EGRESS
8787 SF
---- ---- ---
PUBLIC UTILITY
50'
- --
VARIABLE WIDTH S
30'
ALBEMARLE COUNTY ENGINEERING
GENERAL CONSTRUCTION NOTES FOR SITE PLANS.
1. PRIOR TO ANY CONSTRUCTION WITHIN ANY EXISTING PUBLIC RIGHT -OF -WAY, INCLUDING CONNECTION TO ANY
EXISTING ROAD, 'A PERMIT SHALL BE OBTAINED FROM THE VIRGINIA DEPARTMENT OF TRANSPORTATION
(VOOT). THIS PLAN AS DRAWN MAY NOT ACCURATELY REFLECT THE REQUIREMENTS OF THE PERMIT. WHERE .
ANY DISCREPANCIES OCCUR THE REQUIREMENTS OF THE PERMIT SHALL GOVERN.
2. ALL PAVING, DRAINAGE RELATED MATERIALS AND CONSTRUCTION METHODS SHALL CONFORM TO CURRENT
SPECIFICATIONS AND STANDARDS OF VDOT UNLESS OTHERWISE NOTED.
3. EROSION AND SILTATION CONTROL MEASURES SHALL BE PROVIDED IN ACCORDANCE WITH THE APPROVED
EROSION CONTROL PLAN AND SHALL BE INSTALLED PRIOR TO ANY CLEARING, GRADING OR OTHER
CONSTRUCTION.
4. ALL SLOPES AND DISTURBED AREAS ARE TO BE FERTILIZED, SEEDED AND MULCHED. THE MAXIMUM
ALLOWABLE SLOPE IS 2:1 (HORIZONTAL .-VERTICAL). WHERE REASONABLY OBTAINABLE, LESSER SLOPES OF 3.1
OR BETTER ARE TO BE ACHIEVED.
5. PAVED, RIP -RAP OR STABILIZATION MAT LINED DITCH MAY BE REQUIRED WHEN IN THE OPINION OF THE
ALBEMARLE COUNTY DIRECTOR OF ENGINEERING, OR THE DIRECTORS DESIGNEE, IT IS DEEMED NECESSARY
IN ORDER TO STABILIZE A DRAINAGE CHANNEL. '
6. ALL TRAFFIC CONTROL SIGNS SHALL CONFORM WITH THE VIRGINIA MANUAL FOR UNIFORM TRAFFIC CONTROL
DEVICES.
7. UNLESS OTHERWISE NOTED ALL CONCRETE PIPE SHALL BE REINFORCED CONCRETE PIPE - CLASS 111.
8. ALL EXCAVATION FOR UNDERGROUND PIPE INSTALLATION MUST COMPLY WITH OSHA STANDARDS FOR THE
CONSTRUCTION INDUSTRY (29 CFR PART 1926).
ZONING AND SITE TABULATIONS
PARCEL:
07800- 00- 00 -075AO
%
ZONING AND OVERLAY DISTRICTS:
PLANNED DEVELOPMENT - MIXED USE - COMMERCIAL (PD -MC)
BUILDING:
ENTRANCE CORRIDOR (EC)
0
ASSOCIATED PLANS:
"SPECIAL USE PERMIT FOR ROLKtN ROAD RETAIL CENTER" - (PENDING APPROVAL)
MAGISTERIAL DISTRICT:
RIVANNA DISTRICT
25
PROPOSED USE:
RETAIL BUILDING
INTERIOR PARING
TOTAL SITE AREA
1.67± ACRES
35,200 SF
48
MINIMUM
PROVIDED
BUILDING YARD SETBACKS:
8787 SF
13
RESIDENTIAL
50'
NIA
PUBLIC RIW
30'
NIA
OFF - STREET PARKING/LOADING SPACE YARD SETBACKS:
RESIDENTIAL
21D';/
NIA
PUBLIC R/W
10'
NIA
COMMERCIAL SF:
N/A
10,510 SF
PARKING TABULATION:
REQUIRED
PROVIDED
RETAIL PARKING
(55 SPACES! 1,000 SF) f
*
58 SPACES
58 SPACES
STACKING SPACES
5 SPACES
8 SPACES
HANDICAP SPACES
3 SPACES
4 SPACES
LOADING SPACES
(1) SPACE FOR FIRST 8,0008F, PLUS (1) SPACE FOR EACH ADDITIONAL 20,OOOSF
1 SPACE
1 SPACE /,-,
MAXIMUM
PROVIDED
HEIGHT OF ALL STRUCTURES:
35'
30'
LAND USE SCHEDULE;
LANDSCAPE PLAN REQUIRED: YES
a
ULF
¢aa0
�a 12
Z�ZzzgWO
U Ufw�wF '
p z mrcnl,_ao
I^< U
W p o�
U �ZZ >O
�DLLW
Z ,4
Z mZ
v°J. wo O(W) p-
9
w sz-a
O O UO 4
a a,
$ z Z�
Old
REVISIONS
REV DATE COMMENT BY
0
THE FOLLOWING STATES REQUIRE NOTIFICATION BY
EXCAVATORS, DESIGNERS. OR ANY PERSON PREPARING TO
DISTURB THE EARTHS SURFACE ANYWHERE IN THE STATE.
IN VIRGINIA, MARYLAND, THE DISTRICT -OF COLUMBIA, AND
DELAWARE CALL. 811
(WV 1.8W-245.4848) (PA 1-800. 242 -1776) (DC 1.8I00.257 -7777)
(VA 1- 800.552.7001)(MD 14�W257.7777)(DE 1. 800.282.8555
NOT APPROVED .FOR
CONSTRUCTION
PROJECT No.: V132042
DRAWN BY: MJS /JLP
CHECKED BY: DRH
DATE: 10/28/13
SCALE: NIA
CAD LD.: SDO
PROJECT: °° �[
INI �[. I.>�L
SITE PLAN
FOR
ROLKIN ROAD.
R .' TAIL C ENTER .
LOCATION OF SITE
ROLKIN ROAD & ABBEY ROAD
TAX MAP 78 -75A .
CHARLOTTESVILLE, VA 22911
RIVANNA MAGISTERIAL
DISTRICT
ALBEMARLE COUNTY
BOKLE.R.
ENGINEERING
28 BLACKWELL PARK LANE, SUITE 201
WARRENTON, VIRGINIA 20186
Phone: (540 } 349 -4500
Fax; (540) 349 -0321
www. BohlerEngineering.com
o DANIEL R. HINES "P
.p LIC. N .0 3176
�0 1d�is
oNA�.
SHEET TITLE:
SHEET NUMBER:
1
Nil
PRE- DEVELOPMENT
%
POST DEVELOPMENT
%
BUILDING:
0 SF
0
10,510 SF
14
PRIVATE ROADS
18,248 SF
25
18,248 SF
25
INTERIOR PARING
0 SF
0
35,200 SF
48
OPEN SPACE:
54,497 SF
75
8787 SF
13
TOTAL: 72,745 SF
100
72,745 SF
100
LANDSCAPE PLAN REQUIRED: YES
a
ULF
¢aa0
�a 12
Z�ZzzgWO
U Ufw�wF '
p z mrcnl,_ao
I^< U
W p o�
U �ZZ >O
�DLLW
Z ,4
Z mZ
v°J. wo O(W) p-
9
w sz-a
O O UO 4
a a,
$ z Z�
Old
REVISIONS
REV DATE COMMENT BY
0
THE FOLLOWING STATES REQUIRE NOTIFICATION BY
EXCAVATORS, DESIGNERS. OR ANY PERSON PREPARING TO
DISTURB THE EARTHS SURFACE ANYWHERE IN THE STATE.
IN VIRGINIA, MARYLAND, THE DISTRICT -OF COLUMBIA, AND
DELAWARE CALL. 811
(WV 1.8W-245.4848) (PA 1-800. 242 -1776) (DC 1.8I00.257 -7777)
(VA 1- 800.552.7001)(MD 14�W257.7777)(DE 1. 800.282.8555
NOT APPROVED .FOR
CONSTRUCTION
PROJECT No.: V132042
DRAWN BY: MJS /JLP
CHECKED BY: DRH
DATE: 10/28/13
SCALE: NIA
CAD LD.: SDO
PROJECT: °° �[
INI �[. I.>�L
SITE PLAN
FOR
ROLKIN ROAD.
R .' TAIL C ENTER .
LOCATION OF SITE
ROLKIN ROAD & ABBEY ROAD
TAX MAP 78 -75A .
CHARLOTTESVILLE, VA 22911
RIVANNA MAGISTERIAL
DISTRICT
ALBEMARLE COUNTY
BOKLE.R.
ENGINEERING
28 BLACKWELL PARK LANE, SUITE 201
WARRENTON, VIRGINIA 20186
Phone: (540 } 349 -4500
Fax; (540) 349 -0321
www. BohlerEngineering.com
o DANIEL R. HINES "P
.p LIC. N .0 3176
�0 1d�is
oNA�.
SHEET TITLE:
SHEET NUMBER:
1
Nil
r/
THIS TOPOGRAPHIC SURVEY WAS COMPLETED UNDER THE DIRECT AND
RESPONSIBLE CHARGE OF, eDWARD d. CAMPBELL III FROM AN ACTUAL
GROUND OR () AIRBORNE SURVEY MADE UNDER MY SUPERVISION; THAT
THE IMAGERY AND /OR ORIGINAL DATA WAS OBTAINED ON AUGUST 16TH AND 20TH, 2013;
AND THAT THIS PLAT, MAP, OR DIGITAL GEOSPATIAL DATA INCLUDING
METADATA MEETS MINIMUM ACCURACY STANDARDS UNLESS OTHERWISE NOTE
Fire
Hydrant
EDWARD D. CAMPBELL, III
Lic. No. 1599
548.61 +
RAP
PK Nail rf
found BM Set -
NE Face t
547.69 +
Top 547.88 Q> \
15,}fDPE Out - 543.2
' 547.0
' 546.51 +
w
COQ
DI -38, L =6'
Top - 543.97
15 HDPE In - 538.75
TMP 78 - 75A3
BM Set/ 552.27
SE Rim,of MH in Median
551.45 +
+ 551.07
\ PK Nail\ /
mound \ �6 0
Evator
valve4�
PK Nail . \
550.82 + / / found 'Y \
Px Nail , \
found
/ 550,78 + \
550
13117 '\1
\ \ Drafnoge Waterline Located from
PK_�Rail Flume,,, j Blue Paint on Pavement
550 .. ® _S� ®pti.,.,e 549.45 found
522.03 -K " DI -3C, L =6' ' 1
333 Top - 519.70 71 ` r 53Q
,'cor walk 18 HDPE Out 515.10 27 g0 1 0.03 "" 28.49 129.64
I 528.46
<. Yrait?Y \
520. + 520.90 + ?_7.47 Sanitary afva
1
1 334 Top i; /pvc Lateral
bw 522.02
��, 52 .1 26.84 52X, 03
! 520. 9 + 520.6A +26' X30 /
�Py \20 . �4 + R =35 00 ,�9--
�a�
A-4-3 '03 Sanitary Nil \
N34 °40'-14 ^" W i24.3 +/ \ ,p., Top 52 '00
o,�� Le gS2 3 + �st�
\ 520.91 + y/ `;' 2 + BM\�et - 52 85 d'y ✓
520.30 + �t C/r �> SE t! e of D.f S
520.14 + 520.60 40 /� 3 Ben Iron foun e
`� .e �Q•9��t �� \�\` DI-313, - 5 =8' \
`. 5pHDPE ins- 518.\ Q c
\
DI 3S, L= Q Q 52 + 1 „HDPE In 519.15
Top -- 520. 521.21 + �2S� j -5 i" 2 ' HDPE Out 519.0\
18 HDPE In/OX- 514.05 \
\ / • �2S St?�lyA \ s �
446// \
�j C D0 3C, L=8' \ 3
\
�\ 521, 88 + 15'HDPE Out - 519,
M,et .r
SOURCE OF DATUM:
1. VERTICAL - NAVD88
2. HORIZONTAL - PLAT D.B. 2019 p. 125
SITE BENCHMARKS:
SE Rim. of MH in Mediam in Rolkin Road - 552.27
SE
Face
of
D.I.
in
Ad j.
Lot -
525.85
NE
Face
of
D.I.
at
SW
Corner
of Property on 'Rolkin Road - 548.03
SOURCE OF TITLE:
D.B. 2019 p.122, p. 125 (plat)
540
+ 538.56 /
Hydro. t
/ \ / ;voter /
/
valve
+ 537.51 \ / water
mete
TMP 78 - 758
TAI \
SCALE 1" = 20'
NliEL RAY HIKES 20 10 o 20 40
iC. N 04 76 �� `•
SCALE IN FEET \ ,
S`S�ONAI. Ea
INFORMATION ONLY-..-
a 0
(0 0
Z 0 N¢
� o
F9
p a�W _@�
wz
a, z
J
um
Q UQ r
0 N
o z�
°cc. N
UA
o
rr , 0
°:0W.
.z. wo
U N
z 9
W
cc cc orn
W Q U �.
Q0) w
W i
CL
DATE
AUG. 21, 2013
SCALE
1 u = 2a HORZ
CONTOUR INTERVAL.
2 FEET
Q
w a W
F- o
W Z _ a
.Z
U J 0
C2 W o� > cc
Zh
IL � Q Z 3 o.
a a. a. o,
Cr
a Z Ilt
o 1.0 <
z U < 0.-
2
FILE NUMBER..
85"
c: E15543 rod l ig trk18543to po /p
SHEET
j N
t
i
I i
l
CAR
E "-• ti �/
S
l
20' ACSA VIA TERLINE
ESM'T DB 2035 P. 512
k �
r
1 ,
f
f
r 1 ;
r
f i
f r
k
f
/ WATERLINE LOCATED FROM
BLUE PAINT ON PAVEMENT '
A= 21834'
R- 835.6T
EX, DRAINAGE S47 °3T39'E
} ( ( 35.0&'_ 40 /
It
�� � _- ....__„_{y--- .--- -- -•Y! K "- -� —'f{r W W ly W fY- �'-==- -- _%l= _._...,_,_,I /`L"_ --, 4 J f_
r
z�035RC /r%5 1z
ra
-12 - - � ��_
n� f; I
fir.
j 1 40' &DrH ACCESS tsMr.
-- -'
PRIVA TE
S55 °OT34'E 66.89
E'
X1�rING INGRESS AND EGRESS` -
j
IT DB 2019 PG 125
jt ,--------- --.-_. j a �1 ~'` �;-• - -.,., , S40 °Or g4 � ;r- _.�����7'C�`d '`� -.... , i`.� ',
EX P/ALK
"
i. ' / .. _ -' _ -..• rte..... - n...r- _.r-- / , r"`^r'. _ h � ` '-�•'
�_ ----- ---` -- ---- - - - -r- --._._ --_.._ �= •°:�w`T CON E.r �'
EX. ST P BAR / it f
-- ' TMP78- 75A _________ __
r
r r �,.
( A;.
I f' , -' FANTOPSOFF10EBUILDINGLLC ;''
15` 4�A. DOMINIaN POP/ER '
' ZONE PLANNED DEVELOPMENT f q
DB 2078 P. 251
IS FROM FACE OF BAS ° MEOD C01i2MERCUL
'' ,
SAN OHIBIT ON PAGE 256 + r USE VACANT
1 r r a rr
AND .15' CENTRAL TELEPHONE t� \J i , ; ` .A.REA. L672AC.
&MIT. DB 21.37 P 447 i � � % /
e
/ ! r , r \ y r /
1
t ti
X15' < ESIAT D�`2913; p 16'
T31P 78 - 75B
r 1
- SlbLAND LW, 2050ABBEY
1 ,
ROAD"O� P ANpNE CLLC
D
f b
EVA LOP NTMMED
RCIA.L
1 v f / CO
- _ 1 ___ __ _ ,SSE.• QFF EUILDEVG
a / '
r
It
/� T' - - -_ ----------------------- --------------------
_"-- r -- 540 — - - _ __- ____ _______ _ _ _ ___ __ _ _ -- -
ir r r _ __" _ ---- --- - -- - -r _ -,__� • /
�+ ' SAN MN
I i ' J - ' -" �-- RIM 526.00
EXISTING INGRESS AND EGR ,' r . / / / - _ __ -------- _ - -- // INN IN - 519.49
` / -
ESM'T DB 2019 PG f25 f r; ii / /. -``` .- __ __-- - -- --• •- . - -_„Wv OUT _ 518.3Z0'ACSA
- � � ,�( � ~----• -_._., ESfa j pB "SAN /TORY SEIyER
-30' BUILDING 53'0
r ,, If r - ~ -- .SETBACK
r i ! r / ; ; ' / ,- " --'------------------------
-- - - - - -' - - - - --
panr r / -----------------------------------
r ,
-- ' - -_ --_ __ __ -__TOP - ^.527.4? __ - - -� Ol -3B, L =8
i -" ` TOP 525.79
�� �^ '" ___- __-_____ 15'WE IN - 51
r r , _ - F 18'HDP£ IN - 51
r
, 24 NAPE OUT
Dl -3C, L =8'
i ' i , / . ,• 4j .' .' /' A= 137.19 .
R =60.04' . - -O �r TOP - 522,07
, f' /` , ' /' �' / 47 131 15'NDPE OUT - 519.
r. N 78 °38`46' W- 55°00'O6"W
L�109.20' /
, .. , / , ; ,' A= 26.34' 21.9r /
t i' �' r' t ,' ' i `: a R= 35.00'
i j ,` r I` �r ,i ` J` i` Q A=43 °03'41"
r / / /`' R N 34 °40'14` W f
a
8 h L�25.69' HICKMAN ROAD
1 f , r r f / r , TOP - .! / a
r !/ � . TO 60' PU8N0 RIGHT -OF --WAY
r , / r � � � 1..
18'HOPE Our 151510 x
([0 TOP - 520.87 �
18 HDPE 11y 10UT - 574.05
41.039...'_°
N55- OT34MJ
g ,b T - 7
7� 5A
I r �
� � ' r) PYT
, g , 5 ;
r / r r D DEVELOPMENT
��n ��� Ex. S rr�p &A .. M !I / 1r ZONE PL LNNE
COMMERCIAL t r
,71,SOOFF.TCEBUILD21V'G 1 r c
! O ^� 0 'x. , r r ,�. •J
r' �r �� °j • � =T rr , if A 11AULT
+ f r 1
GENERAL NOTE:
S THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALL OF THE ORAWINGS AND SPECIFICATIONS ASSOCtVED WTTH THIS PROJE
tK SCOPE PRIOR TO THE INITIATION OF CONSTRUCTION. SHOULD THE CONTRACTOR F IND A CONFLICT WITH THE DOCUMENTS RELATTV
E SPECIFICATIONS OR APPLICABLE CODES, IT IS THE CONTRACTORS RESPONSIBILITY TO NOTIFY THE PROJECT ENGINEER OF RECORE
TIM PRIOR TO THE START OF CONSTRUCTION. FAILURE BY THE CONTRACTOR TO NOTIFY THE PROJECT ENG €NEER SHALT. CORSTRtJ
EPTAICE OF FULL RESPONSIBII 1Y BY THE CONTRACTOR TO COMPLETE THE SCOPE OF THE WORK AS DEFINED BY THE DRAWINGS AD
FULL CONFORAUW CE WRH LOCAL REGIllAT1OYS A1iD��,�.
R \13 \V*M2 \CRA1r+3:S\PLM SETS` ffri L SItE K$N\V1326f2S50.0'A'C PECNM BL WAXER 1925.13 6 5.01 FU IV SM P. WAXER
2�
1 " =20'
SURVEY NOTES:
SOURCE OF DATUM:
1. VERTICAL - NAVD88
2. HORIZONTAL - PLAT D.B. 2019 P. 125
SITE BENCHMARKS:
SE RIM OF MH IN MEDIAN IN ROLKIN ROAD- 552.27
SE FACE OF DI IN ADJ. LOT - 525.85
NE FACE OF DI AT SW CORNER OF PROPERTY ON ROLKIN ROAD - 548.03
SOURCE OF TITLE:
D.B. 2019 P. 122, P. 125 (PLAT)
DOTES:
1. REFER TO SHEET 2 FOR GENERAL DEMOLITION NOTES.
D,ZWSZ Gl
Z (LT O?W ap�
u W N IA
Z. u.' 0
� z vi�0000ee
go k� U
?iii li
O O a
�Z
� x
O + :
�
.: ,a
Fi >x2Lu a
zd
u° z
aocWil- af 3.
e♦eee♦ �
a�
z
O .
Ez- p,
o . o z .
q
¢` 0
d
U
REVISIONS
REV DATE COMMENT BY
THE FOLLOWING STATES REQUIRE NOTIFICATION BY
EXCAVATORS, DESIGNERS, OR ANY PERSON PREPARING TO
DISTURB THE EARTH'S SURFACE ANYWHERE IN THE STATE.
IN VIRGINLA, MARYLAND. THE DISTRICT OF COLUMBIA, AND
DELAWARE CAL€. - 011
(1W 1-866.245-4848) (PA 1.800. 242 -1776) (DC 1.800.257 -7777)
(VA 1- 800552 -7001) (MD 1.800- 257 -7777) (DE 1.806.282 8555)
NOT APPROVED FOR
CONSTRUCTION
PROJECT No.: V132042
DRAWN BY: MJS /JLP
CHECKED BY: DRH
DATE: 10/28/13 .
SCALE: 1"=20'
CAD I.D.: SSO
PROJECT:
INITIAL
SITE PLAN
.
FOP,
A OA I pp � R✓
AD .
RETAIL CENTER
LOCATION OF SITE
ROLKIN ROAD & ABBEY ROAD
TAX MAP 78 -76A
CHARLOTTESVILLE; VA 22911
RIVANNA MAGISTERIAL .
DISTRICT
ALBEMARLE COUNTY
BOHLER
E N G I N E E R I N G
28 BLACKWELL PARK LANE, SUITE 201
WARRENTON, VIRGINIA 20186
Phone: (540) 349 -4500
Fax: (540) 349 -0321.
www.BohlerEngineering.com
DANIEL R. HINES '''
.p Lie. 043176 �
�0 100 %/
ti
SHEET TITLE:
EXISTING
CONDITIONS
DEMOLITION,
PLAN
SHEET NUMBER:
OF 8
w
!t,
i
i,E
k
k
20 ' ACSA Y/ATERLINE
ESG/ T 0,9 2035 P. 512
f 4
1
4 /
/ YIATERUNE LOCATED FROM
/ 6LUE PAINT ON PAVEMENT
i
�S51,4600'E EX. DRAINAGE
FLUME
k 35.06'
ABBEY ROA
w
40' WIDTH Acc£ss EsMr.
I
i
�q �yr�oe EX sr.
GENERAL NOTE: .
THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALL OF THE DRANiNGSAND SPECIFICATIONS ASSOCIATED WITH THIS PROA
SCOPE PRIOR TO THE INITIATION OF OWSTRUCTION. SHOULD THE CONTRACTOR FIND ACONFUCT WITH THE OOCUMENTS RELATIN
:SPECIFICATIONS OR APPLICABLE CODES, IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE PROJECT ENGINEEROF MOOR
ITING PRIOR TO THE START OF CONSTRUCTION, FAILURE BY THE CONTRACTOR TO NOTIFY THE PROJECT ENGINEER "a CONSTLTi
PTANCE OF FULL RESPONSIBILITY BY THE CONTRACTOR TO COMPLETE THE SCOPE OF THE WORK AS DEFINED BY THE DRAW%IGSA1 MUW"GULATIONSAND CODES.
tt \73\4132W2\OWJ�XS \Ft/A SEIS\QANi SfIE WAt!\Y332012557.1ThG PP3{!m BC Rt /UGER Io.n.la o 5:.� 1'u LtisT snvm Br: arwc�
r
,
,
r
,
,
,
! ,
!
f�
,l-
GENERAL NOTE: .
THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALL OF THE DRANiNGSAND SPECIFICATIONS ASSOCIATED WITH THIS PROA
SCOPE PRIOR TO THE INITIATION OF OWSTRUCTION. SHOULD THE CONTRACTOR FIND ACONFUCT WITH THE OOCUMENTS RELATIN
:SPECIFICATIONS OR APPLICABLE CODES, IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE PROJECT ENGINEEROF MOOR
ITING PRIOR TO THE START OF CONSTRUCTION, FAILURE BY THE CONTRACTOR TO NOTIFY THE PROJECT ENGINEER "a CONSTLTi
PTANCE OF FULL RESPONSIBILITY BY THE CONTRACTOR TO COMPLETE THE SCOPE OF THE WORK AS DEFINED BY THE DRAW%IGSA1 MUW"GULATIONSAND CODES.
tt \73\4132W2\OWJ�XS \Ft/A SEIS\QANi SfIE WAt!\Y332012557.1ThG PP3{!m BC Rt /UGER Io.n.la o 5:.� 1'u LtisT snvm Br: arwc�
R= 835.67
G =14 °5951"
347°3r39'E
L --218.12'
i
, fr
r
,
r
,
,
,
,
s
s
,
,
r
,
I
,
,
,
s
,
,
s
,
F
1 nc I
Im
ESU�y 20js P Sly I I ila
um
P. LIGHTP EX E
or
OBJ
P. f --,
Ll
/1
rr
Y�4TER
VAULT
1
20ACS4 WATERUNE
ESM'T OB 2913 P. 163
i
TMP 78. 75B
• � SIDLAND LL C, 2050 ABBEY
,ROAD "C "LLC; SOP%ACLLC
ZONE. • PLANNED
DEVELOPMENTMIXED
COMMERCIAL
1
USE OFFICEBUILDING
L
SAN dVH
�81M 526.00
lNV IN - 519.49
- -- _1NV OUT - 5163 ZO' gCS4 S� /OTARY
1TOP - 525.79°-- -
157YOPE IN -- 5181
16 HOPE IN - 51.E 1
24'NDPE OUT - 519.
3C, 1 =8'
DI -
TOP 522.07
OUT
15 "rfDPE
21.97'
HICKMAN ROAD
60' P081/0 RIGHT- OF -YIAY
fl
20 10 5 0
1"=20'
NOTES:
1. REFER TO SHEET 2 FOR GENERAL NOTES.
J
I,.
uz �
j►1S jpn U
V o¢za�
ziz� ;a
LL .;
w
W O� O� a �
W 0 ♦ 7) 3
F-i }0qLLIa
t� W
-
C) O U gi
O U Z5,
REVISIONS
REV DATE COMMENT " BY
Q .
THE FOLLOWING STATES REQUIRE NOTIFICATION BY
EXCAVATORS, DESIGNERS, OR ANY PERSON PREPARING TO
DISTURB THE EARTH'S SURFACE ANYWHERE IN THE STATE.
IN VIRGINIA, MARYLAND, THE DISTRICT OF COLUMBIA, AND
DELAWARE CALL. - 811
(WV 1-WO-2454M) (PA 14WO.242- 1776) (DC 14WO- 257 -7T77)
%(VA14H0.652-7001)(MD 1- 800.257 -7777) (DE 1- 800. 282 -6555
NOT APPROVED FOR
CONSTRUCTION
PROJECT No.: V132042
DRAWN BY: MJS /JLP
CHECKED BY: DRH
DATE' 10/28/13
SCALE:
CAD IA.: SSO
PROJECT:
INITIAL.
SITE PLAN
FOR
ROLKIN ROAD
RETA.IL, CENTER
LOCATION OF SITE
ROLKIN ROAD & ABBEY ROAD
TAX MAP 78 -75A
CHARLOTTESVILLE, VA 2291.1
RIVANNA MAGISTERIAL
DISTRICT
ALBEMARLE COUNTY
BOHLER
ENGINEERING'
28 BLACKWELL. PARK LANE, SUITE 201
WARRENTON, VIRGINIA 20186
Phone: (540)349 -4500
Fax: (540)348 -0321
www,BohlerEngineering.com
V DoL xv, �,'
AN EL R. HINES 5
.p LIC. N .04 176 4'
NA4
SHEET TITLE:
SITE & UTILITY
PLAN
SHEET NUMBER:
6
OF a
.ti
r
,
,
r
,
,
,
! ,
!
,l-
R= 835.67
G =14 °5951"
347°3r39'E
L --218.12'
i
, fr
r
,
r
,
,
,
,
s
s
,
,
r
,
I
,
,
,
s
,
,
s
,
F
1 nc I
Im
ESU�y 20js P Sly I I ila
um
P. LIGHTP EX E
or
OBJ
P. f --,
Ll
/1
rr
Y�4TER
VAULT
1
20ACS4 WATERUNE
ESM'T OB 2913 P. 163
i
TMP 78. 75B
• � SIDLAND LL C, 2050 ABBEY
,ROAD "C "LLC; SOP%ACLLC
ZONE. • PLANNED
DEVELOPMENTMIXED
COMMERCIAL
1
USE OFFICEBUILDING
L
SAN dVH
�81M 526.00
lNV IN - 519.49
- -- _1NV OUT - 5163 ZO' gCS4 S� /OTARY
1TOP - 525.79°-- -
157YOPE IN -- 5181
16 HOPE IN - 51.E 1
24'NDPE OUT - 519.
3C, 1 =8'
DI -
TOP 522.07
OUT
15 "rfDPE
21.97'
HICKMAN ROAD
60' P081/0 RIGHT- OF -YIAY
fl
20 10 5 0
1"=20'
NOTES:
1. REFER TO SHEET 2 FOR GENERAL NOTES.
J
I,.
uz �
j►1S jpn U
V o¢za�
ziz� ;a
LL .;
w
W O� O� a �
W 0 ♦ 7) 3
F-i }0qLLIa
t� W
-
C) O U gi
O U Z5,
REVISIONS
REV DATE COMMENT " BY
Q .
THE FOLLOWING STATES REQUIRE NOTIFICATION BY
EXCAVATORS, DESIGNERS, OR ANY PERSON PREPARING TO
DISTURB THE EARTH'S SURFACE ANYWHERE IN THE STATE.
IN VIRGINIA, MARYLAND, THE DISTRICT OF COLUMBIA, AND
DELAWARE CALL. - 811
(WV 1-WO-2454M) (PA 14WO.242- 1776) (DC 14WO- 257 -7T77)
%(VA14H0.652-7001)(MD 1- 800.257 -7777) (DE 1- 800. 282 -6555
NOT APPROVED FOR
CONSTRUCTION
PROJECT No.: V132042
DRAWN BY: MJS /JLP
CHECKED BY: DRH
DATE' 10/28/13
SCALE:
CAD IA.: SSO
PROJECT:
INITIAL.
SITE PLAN
FOR
ROLKIN ROAD
RETA.IL, CENTER
LOCATION OF SITE
ROLKIN ROAD & ABBEY ROAD
TAX MAP 78 -75A
CHARLOTTESVILLE, VA 2291.1
RIVANNA MAGISTERIAL
DISTRICT
ALBEMARLE COUNTY
BOHLER
ENGINEERING'
28 BLACKWELL. PARK LANE, SUITE 201
WARRENTON, VIRGINIA 20186
Phone: (540)349 -4500
Fax: (540)348 -0321
www,BohlerEngineering.com
V DoL xv, �,'
AN EL R. HINES 5
.p LIC. N .04 176 4'
NA4
SHEET TITLE:
SITE & UTILITY
PLAN
SHEET NUMBER:
6
OF a
.ti
I N
1 �
F
1
20' ACSA Y/ATERLIN£
ESM'T 08 2035 P. 512
R�
so �
-
t fig$
a V> /
c�ti/ EX. DRAINAGE
S51 4600E h FL ME
N _ QL
,,ABBEY
ACCESS PUT,
55 °OrE ss.as't PRIVATE
S 34 " ;
r
f
r
r
1
l tI NO'T'ES:
1. REFER TO SHEET 2 FOR GENERAL GRADING AND UTILITY NOTES.
z
H
i I
1
w
EI I
� J�" If it 1 i i �jV fL ` \ rill
6� \ �6
�oP = EX. STOP BAP I
rT
r
rr
r r
GENERAL NOTE:
S THE RESPONSIBIM OF THE CONTRACTOR TO REVIEIYALL OF THE DRAWINGS AND SPECIFICATIONS ASSOCIATED WTTH THIS PROXI
K SCOPE PRIOR TO THE INITIATION OF CONSTRUCTION. SHOULD THE CONTRACTOR FLNDA CONFLICT WITH THE DOCUMENTS REIATM
SPEGFICATIONS 09 APPLICABLE CODES, R IS THE CONTRACTORS RESPONSIBILITY TO NOTIFY THE PROJECT ENGINEER OF RECORD
ZITING PRIOR TO THE START OF CONSTRUCTION. FAILURE BY THE CONTRACTOR TO NOTIFY THE PROJECT ENG INUR SHALL OON5TRU
EPTANCE OF FULL RESPONSIBILITY BY THE CONTRACTOR TO COMPLETE THE SCOPE OF THE WORKAS DEFINED BY THE DRAY64GS AN
lk \I3\V132042 \CPANa'VGS�PLAV SLZAUnk 511E IiAAYI3M25g1ANG PfiW 8f; HfAW 1025,13 0 5A6 N LAST SAM M REAM
. � -211 4 W, �fklN�'
-_� ^ -- _ ESI,!'T 0¢`2913; f? 1t
J r r
Jf i rr r
r ,
r
-
r ,
r /r
1 ----------
r
SAN MH
I—RI,Y 526.00
1w IN -- 519.49
----NV OUT - 518.3E0' ICS,4 £qN /TQ/�Y SEW
163 EiP
�( TOP -- 525 79
( 15 HOPE IN - 518.2
18 HOPE IN - 519.1
24 HOPE OUT - 519.'Q
-91-K, 55,22
roP - 5,22 07
151H0PE OUT 513.3
— N55 °00'O6"W
21.9T '
HICKMAN' ROAD
60' PUBLIC RIGHT- OF -Y /AY
. 1
f
f '
20 10 5 0 20
1 "= 20'
u-
z�z�w
o�
O z o3v��u aU
Lu
0 0� Q
O ♦ gq .
x
m xd 0 LL
m
.-
9
z z
�o�is
U � 0 A
a
REVISIONS
REV DATE COMMENT BY
0
THE FOLLOWING STATSS REQUIRE NOTIFICATION BY
EXCAVATORS, DESIGNERS, OR ANY PERSON PREPARING TO
DISTURB THE EARTH'S SURFACE ANYWHERE IN THE STATE.
IN VIRGINIA, MARYLAND, THE DISTRICT OF COLUMBIA. AND
DELAWARE CALL - 611
r 1- 800-2454M) (PA 1. 800.242 -1776) (DC 1.806.257-7717)
1. 800. 552-7001) (MD 14800.257.7777).(DE 1.800- 2828555
NOT APPROVED FOR
CONSTRUCTION
PRO] ECT No.: V132042
DRAWN BY: MJS /JLP
CHECKED BY: DRH
DATE: 10/28/13
SCALE: 1.=20'
CAD E.D.: SSO
PROJECT:
INITIAL
SITE PLAN
FOR
ROLKIN. ROAD
RETAIL CENTER
LOCATION OF SITE
ROLKIN ROAD & ABBEY ROAD
TAX MAP 7&75A
CHARLOTTESVILLE, VA 22911
RIVANNA MAGISTERIAL
DISTRICT .
ALBEMARLE ECOUNTY
BORLER
E N G IN E E RI N G
28 BLACKWELL PARK LANE, SUITS 201
WARRENTON, VIRGINIA 20186
Phone: (540) 349.4500
Fax: (540) 349 -0321
vw.BohlerEngineering.com
SHEET TITLE:
GRADING
PLAN.
SHEET NUMBER:
7
OF 8 "
`v i
911
so
20' ACSA W TER0VE
_ ES „f'T DB 2035 P. 512 _
� {CC y1�,,{�Ar
N55 "01 34 �I1
h�3�5
T'X. STQSB
GENERA!. NOTE
$THE RESPONSIBILITY OFTHE CONTRACTOR TO REVIEWALL OF THE ORAWINSS AND SPECIFICAT03ASSOCiMO VM THISPROJE
BC SCOPE PRIOR TO THE INITIATION OF CONSTRUCTION. SHOW THE CONTRACTOR FWD A CONFLICT M THE DOCUMENTS REIAT(V
E SPECIFICATIONS OR APPLICABLE CODES, IT IS THE CONTRACTORS RESPONSIBILITY TO NOTIFY THE PROJECT ENGINEER OF RECM
21TING PRIOR TO THE START OF CONSTRUCTION. FAILURE BY THE CONTRACTOR TO NOTIFY THE PROJECT ENGINEER SHALL O MSTTTU
EPTANCE OF FULL RE" $1BILITY BY THE CONTRACTOR TO COMPLETE THE SCOPE OF THE WOW AS DEFINED SY THE DRAWINGS AIN
FULI��CONFORAVNCE IM LOCAL RE AND CODES.
#k \t3 \YI32042 \C4GASiCS\tihV SETS \MR Siff HAA11132342M MC POO 8i; KAXER 1025.13 0 6:18 PII I1ST S1YW BY: RYNJCER
F
40' WIDTH ACCESSSMI
pRIVATr f
540
r
t J
� f
r
� _ I
I
j
/ / J
Grj2:J•fjN. J6,;'
J
r '
f �
COMPLIANCE CHART FOR THE A.LBERMA,.RLE
COUNTY ZONING ORDINANCE
SECTION
REQUIREMENTS
CALCULATIONS (REQUIRED /PROPOSED)
COMPLIANCE
32.7.9.6-(C)
REQUIRED
��}}
STREET TREES SHALL BE PLANTED WITH
HICKMAN ROAD:
'J
EVEN SPACING IN A ROW ADJACENT TO THE
PUBLIC STREET RIGHT -OF -WAY. ONE (1)
REQUIRED:
LARGE STREET TREE SHALL BE REQUIRED
185 LF OF RIGHT -OF -WAY (EXCLUDES
FOR EVERY FIFTY (50) FEET OF ROAD
ENTRANCES)
FRONTAGE, OR PORTION THEREOF, IF
185 LF/ 50 LF = 3.7 OR 4
TWENTY -FIVE (25) FEET OR MORE. WHERE
PERMITTED, ONE (1) MEDIUM SHADE TREE
4 STREET TREES REQUIRED
SHALL BE REQUIRED FOR EVERY FORTY
(40) FEET OF ROAD FRONTAGE, OR
PROVIDED:
VARIATION
32.7.9.6
PORTION THEREOF, IF TWENTY (20) FEET
REQUESTED FOR
STREET TREE
OR MORE. THE AGENT .MAY APPROVE
4 TREES PROVIDED
SPACING
PLANTINGS
MINOR VARIATION IN SPACING.
NOTE:
A MINOR VARIATION IN SPACING IS
PROPOSED DUE TO THE PRESENCE OF A
REQUIRED RETAINING WALL. THOUGH THE
SPACING REQUIREMENT HAS NOT BEEN
ACHIEVED, THE TOTAL NUMBER OF
0�
REQUIRED PLANTINGS HAS BEEN
PROVIDED.
"W INDICATES PLANT MATERIAL. UTILIZED
TO FULFIL REQUIREMENT
32.7.9.7 (B)
REQUIRED:
INTERIOR LANDSCAPING: EXCLUSIVE OF
AREA OF PARKING LOT 25,71 SF
THE REQUIREMENTS OF SECTION
1,286 X 5% =1,286 SF 1►
32.7.9.7(A) AND (C), AN AREA EQUAL TO
FIVE (5) PERCENT OF THE PAVED PARKING
1,286 SF OF INTERIOR LANDSCAPING
AND VEHICULAR CIRCULATION AREA
AREA REQUIRED
SHALL BE LANDSCAPED WITH TREES OR
SHRUBS. THIS SHALL INCLUDE ONE (1)
58 PARKING SPACES PROVIDED
LARGE OR MEDIUM SHADE TREE PER TEN
58110 = 6 PARKING LOT TREES REQUIRED
(10) PARKING SPACES OR PORTION
COMPLIES,
THEREOF, IF FIVE (5) SPACES OR MORE.
PROVIDED:
32.7.9.7
INTERIOR LANDSCAPING SHALL BE
PARKING LOT
LOCATED IN REASONABLY DISPERSED
1,366 SF OF INTERIOR LANDSCAPING
LANDSCAPING
PLANTING ISLANDS OR PERIMETER AREAS.
AREA PROVIDED
SHRUB PLANTINGS ADJACENT TO A
(5.3% INTERIOR LANDSCAPING AREA
BUILDING SHALL NOT BE COUNTED AS
PROVIDED)
INTERIOR LANDSCAPING.
6 PARKING LOT TREES PROVIDED
"A" INDICATES PLANT MATERIAL UTILIZED
TO FULFIL REQUIREMENT
32.7.9.9 (A)
REQUIRED:
THE FOREGOING NOTWITHSTANDING, A
TEN (10) PERCENT TREE CANOPY
MINIMUM TREE CANOPY SHALL BE
PROVIDED IN ACCORDANCE WITH THIS
SITE AREA = 72,833 SF
SECTION. "TREE CANOPY" OR "TREE
72,833 SF X 10% = 7,263 SF
COVER" SHALL INCLUDE ALL AREAS OF
COVERAGE BY PLAT MATERIAL EXCEEDING
7,283 SF OF INTERIOR LANDSCAPING AREA
FIVE. (6) FEET IN HEIGHT AT MATURITY OF
REQUIRED
TEN (10) YEARS AFTER PLANTING.
SELECTION OF SPECIES FOR PLANTING
PROVIDED:
SHAD. BE IN CORRD WITH SECTION
32.7.9.4(A). SPECIFICATIONS FOR
7,398 SF OF PROPOSED TREE CANOPY.
TREE CANOPY
PLANTINGS SHALL BE W COORD WITH
SECTION 32.7.8.5(8). EXISTING TREES TO
SEE LANDSCAPE SCHEDULE ON THIS
BE PRESERVED IN ACCORDANCE WITH
SHEET FOR A BREAKDOWN OF PROPOSED
COMPLIES
SECTION 32.7.9.4(8) TOGETHER WITI I
TREE PLANTINGS.
TREES REQUIRED UNDER SECTION 32.7.9.6,
32.7.9.7, AND 32.7.9.8 SHALL COUNT
TOWARD SATISFACTION OF THE MINIMUM
TREE CANOPY,
32.7.9.9(B)
TEN (10) PERCENT TREE CANOPY FOR A
SITE TO BE DEVELOPED WITH
COMMERCIAL, OFFICE, OR INDUSTRIAL
USES,
J
r� JQ
V n >zazw�
p: Rnat-
z9N"Lcl_,lH ,,
rr
~ O wwt°- v~i� LL. ao
tu
LL
w O 0
W4 OU e °c�oa� ff�:
z Y >
mz�z�d �
V 7z
z
�-
W w z
th O 'O U
w &
Z
O 0 w
U
REVISIONS
REV DATE COMMENT BY
THE FOLLOWING STATES REQUIRE NOTIFICATION BY .
EXCAVATORS, DESIGNERS, OR ANY PERSON PREPARING TO
DISTURB THE EARTHS SURFACE ANYWHERE IN THE STATE.
IN VIRGINIA, MARYLAND, THE DISTRICT OF COLUMBIA, AND
DELAWARE CALL- 811
(WV 1800. 245.4848) (PA 1-800-242.1776) (DC 1.800.257 -7777)
(VA 1.800.552.7001) (MD 1.800.257 -7777) (DE 1- 800 - 282.8555)
NOT APPROVED FOR
CONSTRUCTION
PROJECT No.: V132042
DRAWN BY: MJS /JLP
CHECKED BY: w DRH
DATE: 10/28/13
' "
LANDSCAPE SCHEDULE
SCALE: II .: LS4
530
- -\ KEY QTY BOTANICAL NAME COMMON NAME STOCK SIZE STOCK TYPE REMARKS CANOPY CANOPY CREDIT PROJECT:
CREDIT SUBTOTAL j� j�
SHADE TREEfS) �N��JI.�"�il
��'~ vARAF -I ,4, ACER RUBRUM'AUTUMN FLAME' AUTUMN FLAME RED MAPLE 110 - 2” CAL. B +B SINGLE LEADER; FULL 397 1,588 ✓
r RQG. v-2, 2j ACER RUBRUM'OCTOBER GLORY OCTOBER GLORY RED MAPLE 1 112 - 2" CAL. B +B SINGLE LEADER; FULL 397✓ 794 ✓ j��
Yc � %1t3 QUERCUS PHELLOG WILLOW OAK 1 1/2 - 2" CAL. B +B SINGLE LEADER; FULL 370✓ 1,110 SITE PLAN
�!
�P —ZS <3:D' ZELKOVA SERRATA'GREEN VASE GREEN VASE ZELKOVA 1 112 - 2" CAL. B +B SINGLE LEADER; FULL 350✓ 11050
12 4,542 ✓ FOR
ORNAMENTAL TREES) ROLKIN ROAD.
/SAN /,IH ACP'y "6 ACER CAMPESTRE HEDGE MAPLE 1 112 - 2" CAL. B +B SINGLE LEADER; FULL 230/ 1,380
�RIM 526.00 =3 CERCIS CANADENSIS MULTI -STEM EASTERN REDBUD 1 112 - 2" CAL. B +B CLUMP; MIN. 3 STEMS 124✓ 372 ✓
IN% IN - 519.49 4CVWK -6— CRATAEGUS VIRIDIS'WINTER KING' WINTER KING HAWTHORN 11/2 - 2" CAL, B +B SINGLE LEADER; FULL 184✓ 1,104 ����`" '" ����
OUT 518 "O' �CSA NTrq 15 2,656
E r �~���' •Y / PIE '650
LOCATION OF SITE
__.__ 63 EVERGREEN SHRUB (S)
it RHODODENDRON X GUMPO PINK AZALEA 15-18" #3 CAN
SATSUKI'GUMPOPINII ROLKIN ROAD &ABBEY ROAD
�� - - - -- A TAX MAP 78 -75A
la l.COG L63 JUNIPERUS CHINENSIS'OLD GOLD' OLD GOLD JUNIPER 15-18" SPRD. #3 CAN �i( CHARLOTTESVILLE, VA 22911
RIVANNA MAGISTERIAL
01 -38, L= _ DISTRICT
`1( TOP - 525.79 --__ LEGEND ALBEMARLE COUNTY
-- -_� 15 — HOPE IN 518.2
j 18 H,9PE IN - 519.15
24'NDPE OUT - 519.0 INDICATES PLANT
BED/ AREA TO BE
MULCHED
TOP - 52207
15'hJOPE OUT - 519.,3
-- N55°QO'06`IN I
r
21.9r I
HICKMAN ROAD
60' PU9L1C R1CHT - -OF -WAY
f
f o
# da,
f
#
t
20� 10 5 0 20
1 "= 20'
Lm BC)HLElZ
E N GI N E E R I N G
28 BLACKWELL PARK LANE, SUITE 201
WARRENTON, VIRGINIA 20186
Phone: (540) 349-4500
Fax: (540).349-0321
www.BohlerEngi<neering.com
I1
}
A A'
►yi � ;r. r ���
SHEET TITLE:
LANDSCAPE
PLAN
SHEET NUMBER:
8
`p OF 8