Loading...
HomeMy WebLinkAboutWPO202100046 Review Comments WPO VSMP 2023-10-04�.i OF AL8 County of Albemarle m COMMUNITY DEVELOPMENT DEPARTMENT VSMP Permit Plan Review Project title: Barnes Lumber Project file number: WPO202100046 Plan preparer: Clint Shifflett [clint.shifflett@timmons.com] Owner or rep.: Frank Stoner [fstoner@milestonepartners.co] Plan received date: Aug. 12, 2021 Aug. 19, 2022 Date of comments: Sept. 13, 2021 Oct. 4, 2022 (Rev. 1) Reviewer: David James [djames2@albemarle.org] 401 McIntire Road, North Wing Charlottesville, VA 22902-4579 Telephone: 434- 2 9 6 - 58 32 WWW.ALBEMARLE.ORG County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is denied/approved. The rationale is given in the comments below. The VSMP application content requirements can be found in County Code section 17-401. A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary. 1. Please complete the Registration Statement. (Rev.1) Not addressed. Acknowledged, please complete prior to approval. 2. ter when obtained, (Rev.1) Acknowledged, please complete prior to pre -con request. 3. erway and list TM (Rev.1) Addressed. 4. Section 9 - Sign &date Signed Certification. (Rev.1) Not addressed. Acknowledged, please complete prior to approval. 5. delegating authors (Rev.1) Acknowledged, please complete prior to pre -con request. B. Pollution Prevention Plan (PPP) The PPP content requirements can be found in County Code section 17-404. 1. Update with revision changes. (Rev.1) Acknowledged. C. Stormwater Management Plan (SWMP) VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan is denied, and the reasons are provided in the comments below. The stormwater management plan content requirements can be found in County Code section 17- 403. 1. Provide pre -/post- land cover map showing percentage of each land cover. (Rev.1) Addressed. Engineering Review Comments Page 2 of 5 CRS17E1�yE TQ, i t 1 -7I]t ' Low spot.-" does water go from here? 111, CJ VFCHARLESR V JR AND 1 / PICKFORD,ETRBUI 2. Address potential drainage issue: V/ 1O FOR Tr (Rev.1) Addressed. 3. There are a few long ditches created please identity & provide ditch design (table). a. Show drainage area, slope/profile, cross-section showing geometry, 2410-yr levels, liner type needed/provided. (Rev.1) Addressed. 4. Sheet 7(1) - Longer flow paths that should be considered that begin at the upper elevation of drainage area. a. The drainage areas, CN values, etc. need to match those shown in the calcs, vice - versa. -------------------------- - r r r ------ (Rev.1) Addressed. 5. Sheet 7(3) - a. Provide slope, length & type information of barrel. b. Provide trash rack and detail over bottom orifice. (Rev.1) Addressed. 6. Design Calculations - a. Verify NOAA 24-hr precipitation values are correct. b. Provide post -development map of these areas. Do these areas match up with Engineering Review Comments Page 3 of 5 what's shown on Sheet 7(2)? (Rev.1) Addressed. 7. Provide inlet shaping (IS-1) in any drainage inlet structure with 4' or greater drop. (Rev.1) Addressed. 8. Provide safety slab (SL-1) in any drainage structure taller than 12'. (Rev.1) Addressed. 9. Sheet 8(1) - Provide end wall (EW-1) for 48" dia. pipe. (Rev.1) Addressed. 10. Show the HGL in the storm profiles. (Rev.1) Addressed. See comment #15. 11. Retaining wall must be located outside of SWM facility easement. (Rev.1) Acknowledged; N/A. 12. Provide forebays/gabion weir for detention pond. (Rev.1) Acknowledged; N/A. 13. There appears to be disturbance in the 100' stream buffer that will need to be mitigated. (Rev.1) Acknowledged. 14. Please provide approval/acceptance by VDOT if this pond is to be maintained by VDOT and not with the County. (Rev.1) Acknowledged; N/A. 15. (Rev.1) Sheet 8(1) - a. Add a note or callout(s) to provide water -tight fittings at pipe joint connections where the HGL is above the pipes (i.e. under pressure). b. Add note or callout(s) to provide water -tight fittings where pipes of dissimilar materials connect. D. Mitigation Plan (MP) The mitigation plan requirements can be found in County Code Chapter 17-406. 1. Submit plan for review. (Rev.1) Addressed. 2. (Rev.1) The mitigation area is 100' from the edge of stream (50' shown), see County GIS. E. Erosion and Sediment Control Plan (ESCP) Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is disapproved, and the reasons are provided in the comments below. The erosion control plan content requirements can be found in County Code section 17-402. 1. Please add the WPO# to title sheet. (Rev.1) Addressed. 2. Sheets 2 through can be removed. Keep the notes. (Rev.1) Acknowledged. 3. Existing Conditions Sheets -Show the 100' stream buffer accurately. (Rev.1) Not addressed. It's 100' from stream edge. Refer to County GIS. 4. E&SC Sheets - a. Please include all demo activities in your limits of disturbance. (Rev.1) Acknowledged. b. Provide CRS (VADEQ E&SC Spec. No. 3.03) or DC (VADEQ E&SC Spec. No. 3.39) for the roads. (Rev.1) Acknowledged. c. Show OP symbol at barrel end outfall. (Rev.1) Acknowledged. d. Provide CIP & OP here: SCALE 1*-W (Rev.1) Acknowledged. e. Add TP or adjust LOD line: i. Identify area (landscaping?) Engineering Review Comments Page 4 of 5 (Rev.1) Acknowledged. f. Add a baffle for phase II Sediment Basin to prevent short-circuiting. (Rev.1) Acknowledged. 5. Determine if anti -vortex is needed for SB and if so provide detail. (Rev.1) Acknowledged. 6. Please correct the amount disturbed in your LOD. 18.10 ac & 18.64 ac are shown on the plans. (Rev.1) Acknowledged. The VSMP permit application and all plans may be resubmitted for approval when all comments have been satisfactorily addressed. For re -submittals please provide 2 copies of the complete permit package with a completed application form. Engineering Review Comments Page 5 of 5 Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to discuss this review. Process: After approval, erosion and sediment control and stormwater management improvements must be bonded. The bonding process begins when the plan is approved, and the applicant submits a bond estimate request form and fee to the Department of Community Development. A plan reviewer will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted to the County, who will record the agreement. After bonding and agreements are complete, county staff enters project information in a DEQ database for state application processing, if a DEQ permit is required. DEQ reviews the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter, which must be posted at the construction site. After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference. Applicants must complete the request for a pre -construction conference form and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction conference will be scheduled with the County inspector. At the pre - construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; https://www.albemarle.org/government/commun ity-development/apply-for/engineeri ng-applications