HomeMy WebLinkAboutSDP201800045 Review Comments Final Site Plan and Comps. 2023-01-06$� oFAcs Syd Shoaf
CSenior Planner, Planning
County of Albemarle sshoaf@albemarle.org
_ Community Development Department Telephone: (434) 296-5832 ext. 3902
��BGIN�t'
Memorandum
To: Scott Collins, scoft0collings-engineering.com
Date: January 6, 2023
Re: SDP201800045 North Pointe — Northwest Residential Area — Final Site Plan — Review Comments
The County of Albemarle Planning Division will grant or recommend approval of the plan referenced above once the
following comments have been addressed: [Each comment is preceded by the applicable reference, which is to the
Subdivision/Zoning Ordinances unless otherwise specified.]
Comments from Review Comment Letter dated July 5, 2019:
[ZMA2013-14, ZMA2000-9] Proffer 5.3. 1(c). Phase III Road Improvements required to be approved and either
build or bonded before final site plan approval.
is Phase 111 Road War ovscrew, Prior toappmvaloftimbeivisionplaror
site plan tor am dcselopm,m of the Neighborhood Imestments Property or any portion thereof.
Owner shall obtain all associated permits and post all associated Fonds rct aired for The
commuction of the following read improvements (collectively. the "ase PhIII Road
lenpmveTnents-) to the ,sent any such road improvements hose not already been completed:
(i) U.S. Rome 29 Soulhboud - construction of left turn lone
with usper
(ill Nonhweet passage from U.S. Roue 29 to the south
pmpeny line of Tas Map 32. Pascal 22K u shown an the Application Plan.
(ill) U.S. Rowe 29 Ronhbeurd - construction of a right land
turn line. the geometries of which Brill be subject to V DO'f appmval.
(iv) If the traffic signal to he constructed by others is in place
prior to Omer commencing work on this Nunhemmust Entrance, and such tragic signal only
includes three legs. Owner shall add the fourth leg to the signal, which shall include additional
mum arms. signal heals and ancillary equipment ncvc s ' to suppon Nonhoest Passage's use
of the intersection. as dacrmined by VIX)L If such traffic signal is or in place and the
vehicular traffic generated by the Protect causes the VIx>T signal warants to be met. gal VOOI'
requires that a traffic signal he installed az a condition of the comme, permit. Owner shall innall
,u.h iranico net
Rev 3. Comments not addressed. Prior to subdivision plat approval and final site plan approval proffer 5.3.1(c
shall complied with by receiving road plans approvals, posting the associated bonds, and obtaining the associated
permits required to construct the phase III road improvements. Rev 4: Comment not addressed. Please see
Engineering's comment regarding Road Plans approval.
9. [ZMA2013-14, ZMA2000-9] Proffer 5.3.3.
5.3.3 Prior to the appmval of plans for improvements at any U.S. Roue 29 intersection.
Ouster shall provide VDDT traffic signal network liming plans that VDOT finds acceptably
address the impacts of the proposed traffic signals for peak traffic periods.
Rev 3. Comment not addressed. Prior to final site plan approval provide documentation from VDOT that
confirms this proffer is addressed. Rev 4: Comment addressed.
12. [ZMA2013-07 Application Plan] Once conservation lines are shown. Provide written certification from a licensed
surveyor or engineer confirming that the conservation line shown on the application plan for ZMA 2013-07 and the
conservation line shown on this site are in the exact same location. A note on the plans will suffice. Rev 3. The
application plan for this project is truly associated with ZMA2000-9. Please revise the note on sheet 6 to
reference ZMA2000-9. Rev 4: Comment addressed
25. [SP2006-34] Condition #2. County and VDOT approval of final design plans and hydrologic/hydraulic
computations for the stream crossing. Rev 3. SP conditions has not been satisfied. The final site plan shall not be
WWW.ALBEMARLE.ORG
401 McIntire Road, North Wing, I Charlottesville, VA 22902-4579
approved until SP2006-34 condition #2 has been satisfied. Rev 4: Comment stands. Comment will be
addressed once Road Plans and WPO Plans have been approved.
28. [ZMA2013-14, SP2006-34, SP2002-72] Conditions. All conditions of the SPs remain valid and shall be complied
with prior to final site plan approval. Rev 3. The final site plan shall not be approved until SP2006-34 conditions #4
and #2 have been satisfied.
Condition #4: County approval of a grading and erosion and sediment control plan prior to issuance of a grading
permit for modification of the existing stream crossing. Condition #2. County and VDOT approval of final desiqn
plans and hydrologic/hydraulic computations for the stream crossing.
Proffer 5.3.1(c) stipulates that prior to approval of a site plan or a plat that the Owner must obtain all associated
permits and post all associated bonds required to construct the phase III road improvements.
The grading and erosion and sediment control plan cannot be approved by the County until the final design plans
and hydrologic/hydraulic computations for the stream crossing are approved by VDOT and the County. Please
submit the final design plans and hydrologic/hydraulic computations for the stream crossing to VDOT and the
County for review. Rev 4: Comment stands. Comment will be addressed once Road Plans and WPO Plans
have been approved.
34. [ZMA2013-14, ZMA2000-9, 32.6.2(a), 32.5.2(n), 4.16, 32.5.2(n), 4.16] Recreational requirements of section 4.16
are applicable to Planned Development zoning districts. Demonstrate how the recreational regulations will be met
and if substitutions will be provided with the portion of the development. Rev 3. The letter previously provided to
meet this criteria is from SDP2016-61, which is no longer an active or valid state plan. Prior to final site plan
approval please submit a new signed and dated letter for the current plan. For reference, attached is the previous
version. Rev 4: Staff has received the revised substitution request. We will be able to support/approve it if
the site plan is revised so that one of the two pocket parks (either Pocket Park 0.08 acres and Pocket Park
0.16 acres) includes at least some of the recreation facilities listed under Section 18-4.16.2.1. Staff will be
glad to discuss this with the applicant further to identify specific amenity improvements in the pocket
parks.
38. [32.4.3.6] The final site plan shall not be approved until all SRC reviewers have approved the plan. Their
comments are attached. Rev 3. Comment not addressed. Rev 4: Pending review of all SRC reviewers.
45. [32.6.2(a), 32.5.2(o), 32.7.4.1(a), 32.7.1.1] Boundary line adjustment, easements and right-of-way dedication
plats, road plan, and WPO plan shall be approved prior to final site plan approval. Please submit these plans for
County review and approval. Ensure the road plan depicts all public and private streets. Notably, the first version
of the road plan, which was reviewed by Rachel for the previous version of the proposal only depicts the public
road. The private streets shall be included in the road plan. Rev 3. Comment not addressed. Rev 4: Comment
not addressed. Easement plat has not vet been approved and recorded. Prior to final site plan approval
easement plat must be recorded and the site plan needs to be updated to include recordation information
for all new easements within this project.
53. [ZMA2013-14, ZMA 2000-9, 32.6.2(a), 32.5.2(a)] There are a couple lots which appear not to meet the setbacks
now that the sidewalks are incorporated into the private street R/W. Specifically, lots 7,74, and 98. Revise so the
setbacks are met. Rev 3. Comment not addressed. Lot 74 does not meet the minimum front setback, it
appears to be 6' from the back of the sidewalk. Please revise. Rev 4: Comment addressed.
58. [ZMA2013-14, ZMA2000-9, 32.7.2.2, Engineering Design Standards Manual] Minimum Design. Prior to final
site plan approval the proposed guard rail mentioned in VDOT's review will need to be removed if unwarranted or
redesigned to VDOT standards. If it is to remain, it must be located within the VDOT ROW and not in an
WWW.ALBEMARLE.ORG
401 McIntire Road, North Wing, I Charlottesville, VA 22902-4579
easement on land to be dedicated to the County. Rev 4: Comment stands. Comment will be addressed once
Road Plans have been approved.
59. [32.7.5.1, 4.1] Water Supply and Sewage System. Each development and each lot shall be served by the public
water supply and the public sewer system. This development is relying on offsite infrastructure improvements for
its public sewer service. Additionally, the waterline is being extended to the property through the Rt 29 right-of-
way. Prior to final site plan and/or final subdivision plat approval the sewer and water connections shall either be
built or bonded. Rev 4: Comment stands. Comment may be addressed pending completion of ACSA
review.
60. [ZMA2013-14, ZMA2000-9] Proffer 9.2(b). Prior to final site plan and road plan approval the County
Transportation Planner shall review and approve the locations of the two proposed bus stop locations. The plans
were distributed to Kevin McDermott. His comments will be forwarded once received. Rev 4: Comment
addressed.
61. [ZMA2013-14, ZMA2000-9] Proffer 5.3.2. Prior to final site plan approval, the Owner shall make a $35,000 cash
contribution to the County for a cable or wireless radio system that will link one or more of the signals between
Lewis and Clark Drive and Airport Road.
5.3.2 Upon request by the County, Owner shall make a cash contribution to the County
or VDOT for the cost of a cable or wireless radio system that will link one or more of the signals
between Ixwis and Clark Drive and Airport Road; provided, however, that the total cash
contribution shall not exceed thirty-five thousand dollars ($35.000). Subject to matters of force
majeure, if the County does not request the funds, or does request the funds but the construction
of the system does not begin by the later of December 31. 2010 or three (3) years alter
completion of all of the Road Improvements, said funds shall be refunded to the Owner.
Rev 4: Comment was originally made for informational/notification purposes only. Approval of the final
site plan is not contingent upon this proffer being completed. County staff may be reach out to the
developer in the future regarding fulfillment of this proffer.
62. [ZMA2013-14, ZMA2000-9] Proffers. Please be aware that there are numerous proffers triggered by the issuance
of the first residential building permit, which effect the North Pointe Community, collectively referred to as the
'Project'. Some of these proffers involve cash payments and/or dedication of land to the County for a library, park,
and a school site. Rev 4: Comment was originally made for informational/notification purposes only.
Approval of the final site plan is not contingent upon these proffers being completed. County staff may be
reach out to the developer in the future regarding fulfillment of these proffers.
Please contact Syd Shoat in the Planning Division by using sshoafoalbemarle.org or 434-296-5832 ext. 3902 for further
information.
Comments from Other Reviewers:
Albemarle County Engineering Division — Matthew Wentland, mwentlandoalbemarle.org — Requested changes
Resubmit the two road plans (SUB201600196 and SUB201700112) and the VSMP plan (WP0201600062) for the North
Pointe Northwest development (see email to Collins on 12/14). The VSMP will need to be up-to-date (per Collins
comment response letter) and all plans should reflect any changes that may have been required by VDOT Structure
review. No fee will be required and the road plans can be submitted direct to me or through the portal. The road plans will
only need a minimal review.
Albemarle County Planning — Transportation —Alberic Karina-Plun, akplunoalbemarle.org — No objection.
WWW.ALBEMARLE.ORG
401 McIntire Road, North Wing, I Charlottesville, VA 22902-4579
Albemarle County Department of Fire & Rescue — Howard Lagomarsino, hlagomarsino(oalbemade.org — No objection.
Albemarle County Service Authority (ACSA) — Richard Nelson, rnelson0serviceauthority.org — Review pending.
Virginia Department of Transportation (VDOT) — John Wilson, John.c.wilson(&vdot.virginia.gov — Approved.
Albemarle County Building Inspections — Betty Slough, bslough(aialbemarle.org — No objection.
Albemarle County E911 Services — Andy Slack, aslack(5_albemarle.org — No objection.
Architecture Review Board (ARB) — Margaret Maliszewski, MMaliszewski(rDalbemarle.org —Approved.
WWW.ALBEMARLE.ORG
401 McIntire Road, North Wing, I Charlottesville, VA 22902-4579
(Z)
COMMONWEALTH of VIRGINIA
DEPARTMENT OF TRANSPORTATION
Stephen C. Brich, P.E. 1401 East Broad Street
Commissioner Richmond, Virginia 23219
January 9, 2022
County of Albemarle
Department of Community Development
401 McIntire Road
Charlottesville, VA 22902
Attn: Syd Shoaf
Re: SDP-2018-00045 - North Pointe Northwest, Residential Area
Review #5
Dear Mr. Shoaf
(804) 7862701
Fax: (804) 7862940
The Department of Transportation, Charlottesville Residency Transportation and Land Use
Section, has reviewed the above referenced plan as submitted by Collins Engineering, revised
October 23, 2022 and revised construction plans 5-30-2022, and find the plans generally
acceptable.
If further information is desired, please contact Max Greene at 434-422-9894.
A VDOT Land Use Permit will be required prior to any work within the right-of-way. The
owner/developer must contact the Charlottesville Residency Transportation and Land Use
Section at (434) 422-9399 for information pertaining to this process.
Sincerely,
John C. Wilson, P.E.
Assistant Resident Engineer
Area Land Use
Charlottesville Residency
VirginiaDOlorg
WE KEEP VIRGINIA MOVING