Loading...
HomeMy WebLinkAboutWPO201200096 Plan - As-built 2023-01-06ROUDABUSH, GALE & ASSOC., Inc. A PKUFFSSIONAL CORPORATION Serving Virginia Since 1956 January 5th, 2023 John Anderson Albemarle County Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 RE: Belvedere 2A SWM As-Builts I hereby certify that to the best of my knowledge and belief the stormwater management facilities shown on these record drawings reflect the final, constructed condition of the site and that the stormwater facility has been constructed in substantial accordance with the approved plans and specifications except where it is shown otherwise. "Certify means to state or declare a professional opinion based on sufficient and appropriate onsite inspections, material tests, as - built survey data, and information provided by other professionals and the contractor, conducted during or after construction." This statement should be interpreted in conjunction with the accompanying plans titled "Belvedere Phase 2A VSMP As -Built Plan," dated 01/05/2023, where as -built conditions and field variances from approved plans, within reasonable tolerances, are recorded. Calculations have been provided with this submittal which verify that the facility meets its intended functionality based on the as -built information. A summary of these findings are shown below: 1. The pond currently provides 73,134 cu. ft of storage. This is greater than the design requirement of 70,320 cu. ft 2. The as -built 2-yr storm peak flow (4.516 cfs) is below that of the pre -developed 2-yr storm (4.83 cfs) 3. The as -built 10-yr storm peak flow (18.82 cfs) is below the pre -developed 10-yr storm (22.16 cfs) 4. The peak elevation of the 10-yr storm (417.17') is below the emergency spillway elevation (417.33) 5. The post -developed 100-yr storm peak elevation (417.90') is more than P below the dam crest elevation (420.0') 999 Second St. SE, Suite 201 Charlottesville, VA 22902 roudabush.com ®ROUDABUSH, GALE & ASSOC., Inc. A PROFESSIONAL CORPORATION Serving Virginia Since 1956 Signed, Jimmy L. Taggart, P.E. For Roudabush, Gale & Associates 999 Second St. SE, Suite 201 Charlottesville, VA 22902 roudabush.com 1 AS -BUILT HYDROLOGIC/HYDRAULIC CALCULATIONS FOR BELVEDERE PHASE 2A RETENTION BASIN January 5, 2023 Location: Albemarle County, Virginia Developer: New Belvedere, INC 610 West Rio Rd Charlottesville, VA 22901 Prepared By: Roudabush, Gale & Associates, INC 999 2°d St SE Charlottesville, VA 22902 P: 434.977.0205 F: 434.979.1681 Contents: 1. Cover Sheet 2. 2-Yr As -Built Routed O� 3. As -Built 2-Yr Pond Report a 4. 10-Yr As -Built Routed o U S. 100-Yr As -Built Routed o Ji y L. Taggart No.02u,41 I-s'-Z3 f 2 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Wednesday, 0114 / 2023 Hyd. No. 8 Alt 1 (Revised) Hydrograph type = Reservoir Peak discharge = 4.516 cfs Storm frequency = 2 yrs Time to peak = 12.68 hrs Time interval = 1 min Hyd. volume = 119,798 cult Inflow hyd. No. = 2 - Inflow Hydrograph (SCS Rdat.�d¢skomd) = 414.76 It Reservoir name = Revised Alternative 1 Max. Storage = 63,147 cult amrage imitation n 50.00 4000 tioIrN1 2000 Wk 0.00 V 3 t5 Hyd No. 8 Alt 1 (Revised) Hyd. No 8 -- 2 Year Q (Cfs) 6000 50.00 40.00 30.00 20.00 10.00 9 12 15 18 21 24 27 30 33 0.00 — Hyd No. 2 Total storage used = 63,147 tuft Time (hrs) 3 Pond Report Hydraflow Hydrographs Extension for Autodesk® Civil 3DO by Autodesk. Inc. v2023 Wetlnestlay, 01 / a 12023 Pond No. 6 - Revised Alternative 1 Pond Data Contours -User-defined contour areas Average end area method used for volume calculation. Begining Elevation = 411.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 000 411.00 14,596 0 100 300 412.00 414.00 15,618 15.107 0 15.107 500 41600 17,654 21.105 33272 48,379 700 418 00 23.239 38.759 44.344 87,138 9.00 _ 420.00 24.403 47,642 131,482 179,124 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrtRsrl [A] [B] [C] [D] Rise (in) Span (in) = 15.00 = 1500 4.00 6.00 0.00 Crest Len (ft) = 12.60 135.00 Inactive 0 00 No. Barrels = 1 4.00 4 6.00 0.00 Crest EL (ft) = 416.30 41730 415.DO 0.00 Invert EL (ft) = 405.07 411.40 4 414.35 0 0,00 Weir Coeff. Weir Type = 3.33 = 1 2.60 056 3.33 Length (ft) = 77,90 0.00 0.00 0 00 Mufti -Stage = Yes Broad ZS degV - Slope (%) = 0.42 0.00 0,00 n/a No Yes No N-Value = 012 .013 013 rva Orifice Coeff. Multi -Stage = 060 = 0.60 0.60 0.60 Exfil.(inftrn = 0.000 (by Wet area) n/a Yes Yes No TIN Elev. (ft) = 0.00 Stage (ft) 10.DC B.00 6.00 4.00 2.00 0.00 ----- vvo.v auu.0 1000.0 1200.0 1400.0 Total Q Note CWvaNpriria auNas are.reya4 un4c inW (ic)arie outlet(«Icantrol War nrrsrletlieE faairxe oontftiore Kl asl ( sibnerge«e(s) Stage / Discharge Elev (ft) 421 00 41900 417,00 415.00 413-00 411.00 16000 Discharge (cfs) 0 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3139) by Autodesk, Inc. v2023 Hyd. No. 8 Alt 1 (Revised) Hydrograph type = Reservoir Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 1 min Hyd. volume Inflow hyd. No. = 2 - Inflow Hydrograph (SCS R4ak-j[ °Ieslellimd) Reservoir name = Revised Alternative 1 Max. Storage Storage Indication method used ]HE am it 6M W Wednesday, 01 / 4 / 2023 = 18.82 cfs = 12.23 hrs = 234,926 cuft = 417.17 ft = 112,968 cult Alt 1 (Revised) Hyd. No. 8 — 10 Year O a W 15 18 21 24 27 30 Hyd No. 8 — Hyd No 2 1 ' ; Total storage used = 112,968 cult Q (cfs) 10000 OEM .e r� 40,00 im 0.00 33 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutodesMt, Civil 3D@ try Autodesk, Inc. v2023 Wednesday 01 14 / 2023 Hyd. No. 8 Alt 1 (Revised) Hydrograph type = Reservoir Peak discharge = 185.77 cfs Storm frequency = 100 yrs Time to peak = 12.02 hrs Time interval Inflow hyd. No. = 1 min Hyd. volume = 2 - Inflow Hydrograph (SCS Rdakfkwlziod) = 465,034 cuft = 417.90 Reservoir name = Revised Alternative 1 Max. Storage ft = 129,343 cuft Storage Indication method used Q (cfs) 210.00 180.00 1011111 120.00 30.00 M Alt 1 (Revised) Hyd. No. 8 — 100 Year Q (cfs) 210.00 18000 150.00 120.00 nffim o a 12 15 18 21 24 27 — Hyd No. 8 — Hyd No 2 Total storage used = 129,343 cuft Time (hrs)