Plan preparer:
Bryan Cichocki, PE /Timmons Group, bryan.cichocki(i�timmons.com
608 Preston Ave., Suite 200 / Charlottesville, VA 22903
Owner or rep.:
Pantops Hotel LLC, P.O. Box 3535, Williamsburg, VA 23185
Applicant:
HMP Properties, 5388 Discovery Park Blvd. #300, Williamsburg, VA 23188
hmp(i,hmphotels.com
Plan received date:
24 Jun 2022
(Rev. 1)
21Dec 2022
Date of comments:
8 Jul 2022
(Rev. 1)
6 Jan 2023
Plan Coordinator:
Kevin McCollum
Reviewer:
John Anderson, PE
Engineering has reviewed the final site plan and offers these review comments, which are ISP carryover comments.
For Final Site Plan approval:
1. C2.0
a. Please provide deed bk.-pg. ref. for existing public drainage easement for storm conveyance
leaving the Guadalajara property to the south, then transiting hotel development parcel. (FSP)
Addressed.
b. Show and label managed steep slopes. (FSP) Addressed.
c. Revise label reading `Use: vacant, TMP 78-11' since it is a commercial car sales parking lot with
non -vacant use (blue -circle area, image, below). (FSP) Partially addressed. Applicant response
(letter d. 21-Jun 2022): `The use for TMP parcel 78-11 has been updated to "commercial car sales
parking." ' As follow-up: Please ensure parcel ownership data for 78-11B 1 and 78-9C displays.
[Image removed with ESP comments.] (Rev. 1) Addressed.
d. Please consider and provide collection/conveyance (as needed) of storm runoff that may transit
existing drainage ditch that crosses the hotel site, a ditch beginning near the car sales parking lot
(blue www, below): [Image removed with ESP review comments.] (FSP) Addressed. Applicant:
`Given the updated survey, a drainage ditch does not exist through the proposed site. See Sheet
C2.0. Any off -site storm runoff that may flow from the car sales parking lot towards the site will
be captured by curb and routed to an existing storm inlet east of the proposed site (detailed
storrnwater management plans are included with the WPO plans).' Note: WP0202200027,
submitted 7/7/22, review pending.
e. Show /label existing sidewalk adjacent to Town and Country Lane. Determine and label ex.
sidewalk width. (FSP) Addressed.
f. Plan appears to propose elimination of this sidewalk; preserve walk as a required element of
public streets per subdivision street design guide, VDOT Road Design Manual, Appx. B(1).
Piet....& 2 satelliteimageFy:[Image deleted with ESP review comments] (FSP) Addressed.
Applicant: `The sidewalk along Town and Country Lane and Olympia Drive will be demolished
and reconstructed in order to install the retaining wall as part of this project. The proposed
sidewalk is shown on sheet C4.0 with a public access easement shown on C4. L'
Engineering Review Comments
Page 2 of 5
2. C4.0
a. Please revise label reading `retaining wall with fall protection barrier on top for vehicles and
pedestrians' to `retaining wall with guardrail' since guardrail is appropriate for vehicles. VDOT
GR-2 standard is available to include on plans. (FSP) Addressed.
b. Provide wheel stops for parking spaces fronting retaining wall. (FSP) Withdrawn. Applicant:
`Referencing the 16' deep parking spaces facing the retaining wall north of the project site, curb is
being proposed as a wheel stop so that the 2' planting strip can be utilized for the required vehicle
overhang. The 16' deep parking spaces are necessary to keep a 26' drive aisle along that section
of the site for fire access.'
c. Label narrowest width of curvilinear parking spaces in sections that do not label width at
narrowest dimension. (FSP) Addressed.
d. Revise parking space -sidewalk design; select from allowable parking -sidewalk configurations at p.
17, ACDSM, which requires, for example, wheel stops for 18' L spaces w/ 5' w sidewalks
(haps://www.albemarle.orgjEome/ShowDocument?id=270 ). (FSP) Addressed.
e. Identify curb type/s. (FSP) Addressed.
f. Label all sidewalk widths. (FSP) Addressed.
g. Provide HC-parking space signs. (FSP) Addressed.
h. East entrance to hotel may limit fire rescue (apparatus) access to site.
i. Engineering defers to ACFR (FSP) NA.
ii. If ACFR requests site access to include unrestricted access around the hotel, ensure
retaining wall design accommodates ACFR vehicle weight (65,000 - 80,0001b.), or
weight of vehicle class likely to respond from ACFR Station 16, Pantops. (FSP)
Addressed. Applicant: `Noted, retaining wall will be designed to accommodate the
ACFR vehicle weight.'
iii. If ACFR apparatus requires access around hotel, ensure retaining wall guardrail
accommodates overhang portion of ACFR vehicle, from front axle to front fender. (FSP)
Addressed. Applicant: `An Auto -turn analysis has been performed confirming the
accommodation of the ACFR vehicle. An exhibit of this analysis can be provided upon
request.' Asfollow-u : Please provide exhibit. (Rev. 1) Persists.
iv. (Please do not assume ACFR vehicles are permitted to stage vehicles or response or
presence within public RW of Town and Country Lane, or Olympia Drive.) (FSP)
Addressed. Applicant: `Noted, this is not being assumed. The drive aisle is 26' on the
north and south sides of the hotel to allow for vehicle staging.'
i. Provide GR-2 with labels for retaining wall located along linear and curvilinear parking along N
edge of hotel parking lot. (FSP) Addressed. Applicant `Guardrail has been called out on top of
the proposed retaining wall along Town and Country Lane and as well Olympia Drive. The
guardrail and retaining wall integration will be further designed and detailed by a structural
engineer for the second submission of the final site plan. A note of this has been provided with
the detail on Sheet C 1. L'
j. Increase 3' sidewalk width along Olympia Drive to meet VDOT minimum sidewalk width, 5'.
[See VDOT Road Design Manual, Appx. B(1), Sec. 41 LAQ) -
https://W W W. V irginiadot.ore/business/resources/LocDes/RDMJAppendB l .pdf ] (FSP) Addressed.
k. Provide CG-12 at E end of proposed sidewalk adjacent to Olympia Drive, W side of entrance to
hotel site. (FSP) Addressed.
I. Provide GR-2 detail. (FSP) Addressed.
in. Submit geotechnical PE -sealed retaining wall design for all wall ht. >4-ft. for Engineering review
prior to FSP approval. (FSP) Persists. Applicant: `The retaining wall design will not be submitted
with this first submission of the final site plan. The retaining wall will be designed by a structural
engineer and detailed for the second submission of the final site plan. We are actively working
with geotechnical and structural engineers to design a retaining wall that integrates a guardrail and
provides relief for the proposed outfall pipe.' (Rev. 1) Addressed. Michael R. Circeo, PE,
(geotechnical) retaining wall design d. 12/10/22 submitted.
Engineering Review Comments
Page 3 of 5
n. Note: All walls >3-ft. ht. not integral to building design will require building permit from building
inspections, CDD. (FSP) May persist. Applicant: `Acknowledged.' (Rev. 1) Persists. Applicant
response (12/20/22 letter): `Acknowledged.'
3. C5.0
a. Convert parking space with SWM facility manway access to a parking island so that manway
access is not obstructed by a parked vehicle. (FSP) NA. Applicant: `The UG detention system has
been removed as the downstream pond [sic, biofilter] was designed [for] this site. This has been
coordinated with county staff and calculations will be provided with the WPO plans.'
b. Provide drainage profiles (storm pipes, UG SWM detention facility). (FSP) Partially addressed.
As ollow-up7
i. Please provide profile label to require V2" steel plate in the floor of MH Str. 102. Ref.
VDOT Drainage Manual, p. 9-37, Sec. 9.4.8.7., Maximum grades. (Rev. 1) Addressed.
ii. Comment 3.b.i. also applies to any other step-down MH Str. where difference between
INV IN and INV OUT > 4-ft. (Rev. 1) Addressed.
iii. Please provide SL-1 profile label (safety slab) for MH Str. 102, and any other MH Str.
where the difference between top of structure and INV OUT > 12-ft. (Rev.1)
Addressed. [ MH Str. 102, no other str. has diff. > 12-11. between rim /INV OUT.]
iv. Revise depth /slope of pipe 107 so that 20' easement width for this pipe (C4. 1) may be
minimized to extent possible. 20' easement width jeopardizes hotel foundation (strip
footer) and likely conflicts with retaining wall. Amending depth /slope of pipe 107
requires adjustment to pipe 300, as well, but it appears possible to raise both pipes.
(Please see ACDSM easement width diagram, below, item 3.e.) (Rev. 1) Addressed.
Applicant: `Context has been provided on the storm profiles (see sheet C7.0) of the
building footer and its load plane. The building footer's load plane projects under the
proposed storm pipe (107). The horizontal distance between storm pipe 107 and the
building footer is 10'. The horizontal distance between storm pipe 107 and the retaining
wall is 14.5'.
c. Show /label a public drainage easement extending from UG detention system (SWM easement)
that is centered on the facility outfall pipe, OF, to the property boundary. (FSP) NA. Applicant:
`As mentioned above, the UG detention system has been removed with this submission. All
proposed drainage easements for the other storm structures/sewer have been provided on sheet
C4. L'
d. Provide detail for relieving arch or pipe sleeve where UG SWM facility outfall pipe, OF, is
proposed to pass beneath retaining wall near Olympia Drive. Consider and discuss alternatives, or
if no alternative SWM facility outfall location exists, establish this via notes, labels, etc. (FSP)
Persists. Applicant: `The retaining wall design will not be submitted for the first submission of the
final site plan. The retaining wall will be designed by a structural engineer and detailed for the
second submission of the final site plan. We are actively working with geotechnical and structural
engineers to design a retaining wall that integrates a guardrail and provides relief for the proposed
outfall pipe. As mentioned above, the UG detention system has been removed with this
submission.' (Rev. 1) Addressed. Applicant: `Details for the storm sewer pipe passing beneath
the retaining wall have been provided in the retaining wall design.' [Circeo RW design, 12/12/22]
e. It is not possible without SWM detention profile to evaluate proposed SWM facility easement
with precision. As design advances, please consult ACDSM, i, Easement diagram to
determine required SWM facility easement width. (FSP) Withdrawn. Applicant: `As mentioned
above, the UG detention system has been removed, and has been replaced with storm pipe for the
proposed storm system. All proposed easements have been provided on sheet C4. L' [ ACDSM
image /easement diagram removed with Rev. 1 comments.]
f Provide VDOT LD-204 inlet computations. Provide LD-229 storm drain design computations.
(FSP) Addressed. Applicant: `All VDOT LD-204 inlet computations and VDOT LD-229 storm
drainage computations will be included with the WPO resubmission.' Note: Ref.
WP0202200027, sheet C6.2.
Engineering Review Comments
Page 4 of 5
g. Proposed retaining walls are shown within existing public drainage easement, existing storm pipes
are shown crossing beneath or intersecting proposed retaining wall. Provide final site plan that
indicates existing storm drain pipes are relocated to avoid any construction or future maintenance
conflict with retaining walls. No permanent improvements of type proposed are allowed within
public drainage easement. (FSP) Addressed. Applicant: `The existing storm pipes have been
relocated to avoid any future conflicts with maintenance or construction with the proposed
retaining wall. The existing public drainage easement has been abandoned. A proposed public
drainage easement is provided on sheet C4. 1, with no permanent improvements proposed within.
See note on sheet C4. L'
h. Establish new public drainage easement centered on relocated existing storm drain lines. (FSP)
Persists (reE item 31). Applicant: `A new public drainage easement has been provided for the
relocated existing storm pipes, shown on sheet C4. L' (Rev. 1) Persists. Applicant: 'Anew public
drainage easement has been provided for the relocated existing storm pipes, shown on sheet C4.1.'
Also: `It is understood this comment repeats 3i below with the request /intent that the proposed
public drainage easements illustrated on plan sheet C4.1 shall be platted, submitted for
review/approval, and recorded prior to Final Site plan approval.'
i. Record new platted public drainage and SWM facility/access easements prior to WPO plan
approval. (FSP) Persists. Applicant: `New platted public drainage easements will be provided
with future submittal.' (Rev. 1) Persists. Ref. Applicant response, item 3h above.
j. Note: WPO plan approval is a prerequisite to FSP approval. (FSP) Acknowledged.
WPO202200027 received 7/7/22, review pending. (Rev. 1) Persists. Applicant: `Acknowledged.'
Also item 3k, below.
k. Furnish relevant design data with WPO, including weir plate, manway, weir orifice design, debris
cage, typ. details, plan/profile, etc., as needed. (FSP) May Persist with WPO plan. Applicant:
`All relevant stormwater information has been provided with WPO submission.' (Rev. 1)
Addressed. WPO202200027 review comments sent 1/6/23.
I. Avoid nuisance ponding at all locations across parking lots /across site access. Main entrance to
hotel appears somewhat susceptible to nuisance ponding /ice in winter. (FSP) Addressed.
Applicant: `With the grading and site constraints, the main entrance to the hotel is lower than the
entrance grading. Trench drains have been placed in front of the main entrance of the hotel, and
the pavement is crested near the entrance to ensure positive drainage away from the entrance.
Most of this area is covered with an overhang, reducing the actual runoff to this area. Inlet sizing
calculations will be provided with the WPO plans.' Note: Calcs shown on WPO plan, sheet C6.2.
m. Ensure parking lot grade near S entrance to hotel is < 5%' -5.25% impermissible. [18-4.12.15.c.]
(FSP) Addressed. Applicant: `With the grading constraints of the site and access requirements,
we currently have a maximum grade of 6% in the parking aisles and spaces. This is the maximum
one -point slope —the slopes parallel and perpendicular to the stalls are less than 5% in each
direction.'
n. Ensure slope, S entrance to hotel is <10% in every direction. [ 18-4.12.17.a.] (FSP) Addressed.
o. Revise grade, S entrance to hotel such that side -slope is traversable for tall (high -clearance) trucks,
side -slope is severe at this location posing risk of tipping /loss of control in wet or icy conditions.
(FSP) Addressed. Applicant: `The grading in the S entrance to the hotel has been revised to
reduce the severity of the cross slope to approx. 3%.'
p. Provide /label CG-6 wherever runoff concentrates against curbing, for example: loop around west
end of hotel. (FSP) Addressed.
q. Recommend YD-inlet above /connecting with storm pipe 6-4 at east end of hotel. (FSP)
Addressed.
r. Show /label CG-12 at HC-parking spaces at front of hotel. (FSP) Addressed.
s. Label parking lot island bullnose radii (or typ. R). (FSP) Addressed.
t. Please ensure each building egress is ADA-compliant with respect to landing, max. grade, etc.
(FSP) Addressed.
u. Collect /convey retaining wall weep discharge via system to prevents water crossing sidewalk/s.
(FSP) Addressed. Applicant: `Perforated pipe has been added behind the retaining wall to collect
Engineering Review Comments
Page 5 of 5
wall weep discharge and is being proposed to tie into storm pipe 101. See sheet C5.0. This specific
drainage system and tie-in will be fruther designed and detailed with the retaining wall and
submitted for the second submission of the final site plan. A note of this has been added to sheets
C4.0 and C5.0.'
v. Acquire /record off -site temporary construction easement to perform grading on TMP 07800-00-
00-009CO3 or provide copy of written agreement to perform grading across or at edge of this
parcel. Proposed site contours are infeasible without easement /Agreement from this TMP owner.
(FSP) Persists. Applicant: `Approaches for this are being coordinated and will be further
discussed with the next submission.' (Rev. 1) Addressed. Applicant: `Grading has been revised to
illustrate how grades can comfortably tie in without crossing the property line and as such off -site
easements and/or agreements are not required. See sheet C5.1. Further strict language has been
added to the plans to ensure the contractor will not cross the property line with installation of
improvements.'
4. Submit a WPO plan for hotel development at earliest convenience. (FSP) Addressed. WPO202200027
submitted.
5. Submit separate easement plat for public drainage and SWM facilities associated with this development.
Separate plat review process must be completed, plat approved and recorded, prior to WPO plan approval.
(FSP) Persists. Applicant: `A separate easement plat will be submitted with future submission.' (Rev. 1)
Persists. Ref. Applicant response, item 3h, above.
6. L1.0
a. Five canopy species (landscape plants) proposed along base of t4' wall have strong potential to
undermine wall, revise landscape plan. (FSP) Addressed. Applicant: `These trees have been
respaced along Olympia Drive to not undermine the above -mentioned wall.'
b. Restore, show, label, and dimension 5' sidewalk (Min. width) along both Town and Country Lane
and Olympia Drive since removing /not replacing an existing pedestrian facility within public RW
is not an option. (FSP) Addressed.
Please feel free to call if any questions: 434.296-5832 -x3069 ( ianderson2&albemarle.org ).
Thank you
I Anderson