HomeMy WebLinkAboutWPO202000034 Calculations WPO VSMP 2023-01-04 BELVEDERE PHASE 5
H&H Calculations
BELVEDERE PHASE 5
Tax Map Parcels 62-16D
January 4th, 2023
LOCATION:
Albemarle, Virginia
DEVELOPER:
New Belvedere, Inc
610 West Rio Road
Charlottesville, VA 22901
PREPARED BY:
Dustin Greene, PE
Roudabush, Gale &Associates
999 Second Street SE
Charlottesville, VA 22902
INDEX
Executive Summary 2
Drainage Area Summaries 3
VRRM Spreadsheet 4
Post-developed Hydrographs 5-8
Routed Dry Pond 9-12
• CpLTF/o s
q11401.41111:161c:
ODUSTIN E.GREENE
C�
Lic.No.55833
4/11 4F
BELVEDERE PHASE 5
Executive Summary:
The purpose of this amendment is to show that the private storm sewer system for lots 245-254 was
not constructed in accordance with the approved plans. The backs of the townhouses and yards are
no longer draining to the retention basin as shown on sheet 3 of VSMP amendment#3 of Belvedere
phase IIB (WPO201600071). The rears of these lots now drain to the fire road dry pond as shown
on sheet A18.2 of this VSMP (WPO202000034) submittal. Changes to the outlet structure ensure
that the regulated storms are below the approved, post-developed flows,thus satisfying water
quantity requirements. Per conversation with county engineer 6/7/22 0.18 lbs/yr of nutrient credits
will be used to offset the phosphorous removal that would have been generated from the drainage
going to the retention pond. The original nutrient purchase of 9
68 lbs/yr of phosphorous per year and the remaining 0.18 lbs do not exceed the 10 lbs/yr of
phosphorous that would trigger onsite compliance strategies along with offsite requirements.
BELVEDERE PHASE 5
PRE-DEVELOPED POA#2
AREA=2.68 AC
CN = 65
Tc= 9.9 min
POST-DEVELOPED POA#2
AREA= 2.74 AC
CN = 69
Tc= 9.9min
UPDATED POST-DEVELOPED POA#2
AREA=2.96 AC
CN = 69
Tc= 9.9min
data Input cells
Project Name: BELVEDERE PHASES CLEAR ALL
Date: 6/9/2022 _ constant values
9MP Uraign Sprci/icutiurrs List:: 2013 Draft Stds&Specs calculation cells
final results
Site Information
Post-Development Project (Treatment Volume and Loads)
Land Cover (acres)
A Soils _ B Soils C Soils I.)Soils Totals
Forest/Open Space(acres)••undisturbed,
0.00
piutrcted lurrat/uperr spate uu it4uiesled land
Managed Turf(acres)--disturbed,graded lot
0.20
yards or other tort to be mowed/managed 0.20
Impervious Coder(acres) 0.10 0.10
0.30
Constants Runoff Coefflclents 4Rv) __
Annual Ramlell Ombra) 43 A Soils 8 Soils C Soils 1 U Soils_ -_.
Target Rainfall Event(Inches) 1 00 Furest/Open Space 0 02 U 03 U U4 • U 0'.
total Phosphorus(TP)EMI.png/L) 0.2b Managed Tuft 0 15 0 lU It 2. t►P.
total Nruugen(IN)kW(urg/L) - 1.86 bnpeiviuus Cuvri 0.95 0.95 I/'r'. II PS
taw(TP Load(Ib/our/yr) 0.41
Pi witless cortecnun tactut) 0.90
Post-Development Requirement for Site Area
TP Load Reduction Required(Ib/yr) 0.18
5
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2023 Wednesday,01/4/2023
Hyd. No. 65
Post Dev to POA#2
Hydrograph type = SCS Runoff Peak discharge = 2.616 cfs
Storm frequency = 1 yrs Time to peak = 722 min
Time interval = 2 min Hyd. volume = 7,540 cuft
Drainage area = 2.960 ac Curve number = 69
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 9.90 min
Total precip. = 3.02 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
Post Dev to POA#2
Q (cfs) Hyd. No. 65 -- 1 Year Q (cfs)
3.00 - - 3.00
2.00 — 2.00
1.00 1.00
0.00 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Hyd No. 65 Time (min)
6
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc v2023 Wednesday,01/4/2023
Hyd. No. 65
Post Dev to POA#2
Hydrograph type = SCS Runoff Peak discharge = 4.252 cfs
Storm frequency = 2 yrs Time to peak = 722 min
Time interval = 2 min Hyd. volume = 11,580 cuft
Drainage area = 2.960 ac Curve number = 69
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 9.90 min
Total precip. = 3.65 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
Post Dev to POA#2
0 (cfs) Hyd. No. 65 -- 2 Year 0 (cfs)
5.00 5.00
4.00 4.00
3.00 3.00
2.00 2.00
1.00 1.00
0.00 - - 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Hyd No. 65 Time (min)
7
. Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2023 Wednesday,01 /4/2023
Hyd. No. 65
Post Dev to POA#2
Hydrograph type = SCS Runoff Peak discharge = 9.921 cfs
Storm frequency = 10 yrs Time to peak = 722 min
Time interval = 2 min Hyd. volume = 25,966 cuft
Drainage area = 2.960 ac Curve number = 69
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 9.90 min
Total precip. = 5.52 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
Post Dev to POA#2
Q (cfs) Hyd. No. 65-- 10 Year Q (cfs)
10.00 10.00
8.00 - 8.00
6.00 6.00
4.00 - - . 4.00
2.00 2.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Hyd No. 65 Time (min)
8
• Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2023 Wednesday,01 /4/2023
Hyd. No. 65
Post Dev to POA#2
Hydrograph type = SCS Runoff Peak discharge = 22.50 cfs
Storm frequency = 100 yrs Time to peak = 720 min
Time interval = 2 min Hyd. volume = 58,423 cuft
Drainage area = 2.960 ac Curve number = 69
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 9.90 min
Total precip. = 9.07 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
Post Dev to POA#2
Q (cfs) Hyd. No. 65-- 100 Year Q (cfs)
24.00 24.00
20.00 20.00
16.00 16.00
12.00 12.00
8.00 8.00
4.00 4.00
0.00 - — - 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Hyd No. 65 Time (min)
9
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2023 Wednesday,01/4/2023
Hyd. No. 66
AB Fire Road Basin
Hydrograph type = Reservoir Peak discharge = 0.749 cfs
Storm frequency = 1 yrs Time to peak = 736 min
Time interval = 2 min Hyd. volume = 7,531 cuft
Inflow hyd. No. = 65 - Post Dev to POA#2 Max. Elevation = 427.38 ft
Reservoir name = Fire road basin AB Max. Storage = 1,879 cuft
Storage Indication method used.
AB Fire Road Basin
Q (cfs) Hyd. No. 66-- 1 Year Q (cfs)
3.00 3.00
2.00 2.00
1.00 1.00
0.00 J — 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Time (min)
Hyd No. 66 Hyd No. 65 Total storage used = 1,879 tuft
10
. Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,01 /4/2023
Hyd. No. 66
AB Fire Road Basin
Hydrograph type = Reservoir Peak discharge = 1.002 cfs
Storm frequency = 2 yrs Time to peak = 736 min
Time interval = 2 min Hyd. volume = 11,571 cuft
Inflow hyd. No. = 65 - Post Dev to POA#2 Max. Elevation = 427.88 ft
Reservoir name = Fire road basin AB Max. Storage = 3,446 cuft
Storage Indication method used.
AB Fire Road Basin
Q (cfs) Hyd. No. 66 --2 Year Q (cfs)
5.00 5.00
4.00 - 4.00
3.00 3.00
2.00 2.00
1.00 1.00
0.00 - — 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Time (min)
Hyd No. 66 Hyd No. 65 Total storage used = 3,446 cuft
11
. Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2023 Wednesday,01/4/2023
Hyd. No. 66
AB Fire Road Basin
Hydrograph type = Reservoir Peak discharge = 1.529 cfs
Storm frequency = 10 yrs Time to peak = 744 min
Time interval = 2 min Hyd. volume = 25,957 cuft
Inflow hyd. No. = 65 - Post Dev to POA#2 Max. Elevation = 429.37 ft
Reservoir name = Fire road basin AB Max. Storage = 9,855 cuft
Storage Indication method used.
AB Fire Road Basin
Q (cfs) Hyd. No. 66 -- 10 Year Q (cfs)
10.00 10.00
8.00 8.00
6.00 6.00
4.00 4.00
2.00 2.00
0.00 - - 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Time (min)
Hyd No. 66 Hyd No. 65 Total storage used = 9,855 cuft
12
- Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc v2023 Wednesday,01 /4/2023
Hyd. No. 66
AB Fire Road Basin
Hydrograph type = Reservoir Peak discharge = 2.202 cfs
Storm frequency = 100 yrs Time to peak = 756 min
Time interval = 2 min Hyd. volume = 58,414 cuft
Inflow hyd. No. = 65 - Post Dev to POA#2 Max. Elevation = 432.26 ft
Reservoir name = Fire road basin AB Max. Storage = 26,219 cuft
Storage Indication method used.
AB Fire Road Basin
Q (cfs) Hyd. No. 66 -- 100 Year Q (cfs)
24.00 24.00
20.00 20.00
16.00 16.00
12.00 - 12.00
8.00 8.00
4.00 4.00
0.00 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Time (min)
Hyd No. 66 Hyd No. 65 Total storage used = 26,219 cuft
Pond Report 13
Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,01 /4/2023
Pond No. 19 - Fire road basin AB
Pond Data
Contours-User-defined contour areas.Average end area method used for volume calculation.Begining Elevation=426.50 ft
Stage I Storage Table
Stage(ft) Elevation(ft) Contour area(sqft) Incr.Storage(cuft) Total storage(cult)
0.00 426.50 120 0 0
0 50 427.00 2,607 682 682
1 50 428.00 3,711 3,159 3,841
3 50 430.00 5,084 8,795 12,636
5 50 432.00 6,559 11,643 24,279
7 50 434.00 8,275 14,834 39,113
9.50 436 00 10,296 18,571 57,684
11 50 438 00 12,656 22,952 80,636
13 50 440 00 15,799 28,455 109,091
Culvert/Orifice Structures Weir Structures
[A] [B] [C] [PrfRsr] [A] [B] [C] [D]
Rise(in) = 15.00 6.00 0.00 0.00 Crest Len(ft) = 12.57 0 00 0 00 0.00
Span(in) = 15.00 6.00 0.00 0.00 Crest El.(ft) = 432.50 0.00 0.00 0.00
No.Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33
Invert El.(ft) = 426.10 426 50 0.00 0.00 Weir Type = 1 --- ---
Length(ft) = 186.47 0.70 0 00 0 00 Multi-Stage = Yes No No No
Slope(%) = 11.79 0.00 0.00 n/a
N-Value = .012 .013 .013 n/a
Orifice Coeff. = 0.60 0 60 0 60 0.60 Exfil.(in/hr) = 0.000(by Wet area)
Multi-Stage = n/a Yes No No TW Elev.(ft) = 0.00
Note'CulvertiOnfice outflows are analyzed under inlet(lc)and outlet(oc)control Weir nsers checked for onfice conditions(ic)and submergence(s)
Stage(ft) Stage/Discharge Elev(ft)
14.00 440.50
12.00 438.50
10.00 - 436.50
8.00 - - 434.50
6.00 - - 432.50
4.00 430.50
2.00 428.50
0.00 - 426.50
0.00 2 00 4 00 6 00 8.00 10.00 12.00 14.00 16 00 18.00 20.00 22.00
Discharge(cfs)
Total Q