Loading...
HomeMy WebLinkAboutWPO202200046 Review Comments WPO VSMP 2023-01-12� AI �h �lRGIN�P COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 229024596 Phone (434) 296-5832 Fax (434) 9724126 VSMP Permit Plan Review Project title: Southwood Blocks 9-11 Atlantic Townhouse and Condo Construction Project file number: WP02022-00046 Plan preparer: Timmons Group — Matt Denhard [matt.denhard@timmons.com] Owner or rep.: Karen Carr — Atlantic Builders [kcan@atlanticbuilders.com] Plan received date: October 3151,2022 November 22" d, 2022 - Revision 1 Date of comments: November 215, 2022 December 151, 2022- Revision 1 Reviewer: Geoff Elsie County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is Approved The rationale is given in the comments below. The VSMP application content requirements can be found in County Code section 17-401. A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary. 1. The SWPPP must contain the Coverage Letter issued by DEQ, include in SWPPP once obtained. — To be completed with final permit approval. 2. Registration Statement must have a start and stop date listed. — Corrected Revision 1 B. Pollution Prevention Plan (PPP) The PPP content requirements can be found in County Code section 17-404. 1. The PPP exhibit specific to the townhome and condo project will need to be included in the SWPPP. — Completed Revision 1 C. Stormwater Management Plan (SWMP) VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan is approved, and the reasons are provided in the comments below. The stormwater management plan content requirements can be found in County Code section 17-403. 1. Approved as submitted, Stormwater Management to be handled under WPO2021-00004 D. Erosion and Sediment Control Plan (ESCP) Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is approved, and the reasons are provided in the comments below. The erosion control plan content requirements can be found in County Code section 17-402. 1. The submitted Erosion and Sediment Control Plan meets the minimum standards of the VSMP Engineering Review Comments Page 2 of 2 program. The VSMP permit application and all plans may be resubmitted for approval when all comments have been satisfactorily addressed. For re -submittals, please provide either 2 copies of the complete permit package or one digital copy with a completed application form. Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to discuss this review. Process: After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate request form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted along with court recording fees. After bonding and agreements are complete, county staff will need to enter project information in a DEQ database for state application processing. DEQ will review the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter. This should be copied to the county. After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference. Applicants will need to complete the request for a pre -construction conference form and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction conference will be scheduled with the County inspector. At the pre -construction conference, should everything proceed satisfactorily, ajoint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; htto://www.albemarle.ore/det)tforms.ast)?det)artrnent edengwDo File: WP0201600083 Better Living Berkmar Rev 03-27-17_doc