HomeMy WebLinkAboutSUB201500149 Assessment - Environmental 2022-08-05 &p Proofroll Activity 4-12-18 DFR
f
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone 434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax 434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 04/12/2018 Location: Jobsite
Category: Soils/Earthwork Location Details: Bergen St to Lots 49 through 61
Coverage: Proofroll
Type: Observation Frequency: Periodic
Weather: Sunny Wind(mph):
Air Temp.(deg.F): 60 Personnel: Butler, Jason , Senior Technician
Description of Work Completed
Work Description: The F&R representative arrived onsite, as requested, to observe the proofrolling of the existing
subgrade located approximately from Bergen St to Lots 49 through 61. Utilizing a loaded tandem-
axle dump truck, the aforementioned location was proofrolled and no pumping or rutting was
observed. However, the area around the intersection of Degraw and Montague appeared to be wet
and may contain a natural spring.The contractor stated that a french drain would be installed in an
attempt to divert the water.
Proof Roll Equipment: Loaded Tandem Axle Dump Truck
Subgrade Material Description: Red Sandy SILT(MH)with gravels
Note: Subgrade descriptions indicated in this report are based on visual observation and should be
considered approximate. Subsurface conditions in unexplored locations may vary from those
encountered and noted herein.
Summary of Proofroll: Corrections Not Required.Area Tested Appeared Stable w/No Appreciable Pumping or Rutting.
Determination: As Specified
Discrepancy Recorded?: No
Page 1 of 1
fQp Field Observation Form 4-13-18 DFR
a`I� Various Report Date:4/30/2018
FROCNIINp i Rp![Rl1p N.INC.
frR.'.mp sm.yS.,,IRfA
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71 W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 04/13/2018 Location: Site-Other
Category: Soils/Earthwork Location Details: Intersection of Degraw St.and Montague St.
Type: Observation Frequency: Periodic
Weather: Sunny
Air Temp.(deg.F): 76 F&R Personnel: Butler, Shane ,Technician
Description of Work Completed
Work Completed: The F&R representative arrived on the jobsite as requested for observation and inspection of site
operations.
Observations: Observed contractor begin construction of French drain at intersection of Degraw and Montague
streets, heading NE towards Lot#61. Contractor utilized VDOT No. 3 stone in the drain.
Determination: As Specified
Page 1 of 1
rp Field Observation Form 4-15-18 Sample PU
aR Various Report Date:4/30/2018
FROCNIINO ao:ENTSON.INC.
fivpineervig
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71 W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 04/15/2018 Location: Jobsite
Category: Soils/Earthwork Location Details: cut area
Coverage: Sample Retrieval
Type: Observation Frequency: Periodic
Weather: Sunny
Air Temp.(deg.F): 60 F&R Personnel: Butler, Jason
Description of Work Completed
Work Completed: Obtained 1 soil sample for testing.
Determination: As Specified
Page 1 of 1
r&A Fill Monitoring 4-26-18 Fill
PROF noecnreoH.INC.
9 maummns.<im
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71VV0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 04/26/2018 Location: Utility Trench
Category: Soils/Earthwork Location Details: Stormwater between Structures 6 and 26
Coverage: Fill Monitoring
Type: Observation Frequency:
Weather: Sunny Wind(mph):
Air Temp.(deg.F): 75 Personnel: Butler, Jason , Senior Technician
Description of Work Completed
Work Description: Placement and compaction of soils
Fill Monitoring Summary
Placement Depth/Elev. Fill Moisture Fill Material Lift Compaction Vibration Density
Location Reference Condition Description Thickness Equipment Used? Tests
(inches) Taken
Utility trench for adjacent Moist Brown Sandy SILT 12 Sheepsfoot Yes Yes
Stormwater subgrade with gravels Roller/
between Trench
Structures 6 and Compactor
26
Elev.(ft.)-5.00
to
Elev.(ft.)-1.00
Observations&Comments: The F&R representative arrived onsite, as requested,to observe the excavation and backfilling of the
utility trench for Stormwater between Structures 6 and 26.The utility trench appeared to be excavated to
the correct dimensions. Soils were backilled in loose 12 inch thick lifts and compacted with a vibratory
trench compactor and sheepsfoot roller.Visual and manual methods, including nuclear density
testing,were used to evaluate fill placement;see attached density results.
Other Tests Performed: Nuclear Density Testing
Determination: As Specified
Discrepancy Recorded?: No
Page 1 of 2
f&p Soil Nuclear Gauge Client: Project:
I� 4-26-18 Density Riverbend Development 71W0013
FROCNLINo•aoea-T•ON,INC. Report Date: 4/30/2018 455 Second Street SE#400 Avinity Estates Phase I
CrozetOffices'"a„rye Test Method:ASTM D6938 Charlottesville,VA 22902 Avinity Loop
6185 Rockfish Gap Turnpike Charlottesville,VA 22902
Crozet,VA 22932
Phone:434-823-5154 I Fax:434-823-4764
Test Results
Optimum Maximum In Place In Place Probe Min/Max
Retest Test Soil Moisture Dry Density Moisture Dry Density Depth Percent Comp.
Test# Of Date Proctor ID Method Classification (%) (pcf) (%) (pcf) (in) Compaction (%) Remark
1 4/26/18 3747RC ML 26.6 94.6 28.4 92.4 8 98 95/105 A
2 4/26/18 3747RC ML 26.6 94.6 29.3 90.7 8 96 95/105 A
3 4/26/18 3747RC ML 26.6 94.6 29.0 92.2 8 97 95/105 A
4 4/26/18 3747RC ML 26.6 94.6 27.4 91.7 8 97 95/105 A
5 4/26/18 3747RC ML 26.6 94.6 28.0 91.8 8 97 95/105 A
Test Information
Gauge
Test# Test Location Elevation Reference Make I Model/SN I Calibrated Field Technician
1 Utility Trench-Storm Sewer:Between Structures 6 and 26 5.0 Below adjacent subgrade Troxler/3440/18920/ Butler,Jason
2 Utility Trench-Storm Sewer:Between Structures 6 and 26 4.0 Below adjacent subgrade Troxler/3440/18920/ Butler,Jason
3 Utility Trench-Storm Sewer:Between Structures 6 and 26 3.0 Below adjacent subgrade Troxler/3440/18920/ Butler,Jason
4 Utility Trench-Storm Sewer:Between Structures 6 and 26 2.0 Below adjacent subgrade Troxler/3440/18920/ Butler,Jason
5 Utility Trench-Storm Sewer:Between Structures 6 and 26 1.0 Below adjacent subgrade Troxler/3440/18920/ Butler,Jason
Remarks Comments
A:Tests results comply with specifications Tests are"Direct Transmission"(Method A)unless probe depth is noted as
"Backscatter".Gauge calibration data on file with the testing agency.
Page 2 of 2
r& Fill Monitoring 4-30-18 All
FROE Ra.e�soN.
(warner,1.6ty Sam UZI
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71 W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 04/30/2018 Location: Utility Trench
Category: Soils/Earthwork Location Details: Storm sewer between structures 6 and 26
Coverage: Fill Monitoring
Type: Observation
Weather: Sunny Wind(mph):
Air Temp.(deg.F): 70 Personnel: Steff, Ronald C ,
Description of Work Completed
Please Note:Inspections, field notes, test results and recommendations herein were recorded under the specific weather conditions and
construction activities occurring at the time of our site visit. lf, after we leave the site, weather events and/or construction activities occur
that may modify soil subgrade conditions, we should be notified and given the opportunity to revisit the site and revise our report based
upon the new conditions.Any approval of subgrade conditions provided in this report is subject to the condition that weather events
and/or construction activities have not occurred that would change our inspections, field notes, test results, or recommendations.
Work Description: On site as requested for observation and testing of excavation and backfill of utility trench.
Fill Monitoring Summary
Placement Depth/Elev. Fill Moisture Fill Material Lift Compaction Vibration Density
Location Reference Condition Description Thickness Equipment Used? Tests
(inches) Taken
Storm sewer adjacent Moist Brown Sandy silt with 12 Sheepsfoot Yes Yes
between subgrade gravels Roller
structures 6 and
26
Elev.(ft.)2.00
to
Elev.(ft.)0.00
Other Tests Performed: Nuclear density testing
Determination: As Specified
Discrepancy Recorded?: No
Page 1 of 2
f&D Soil Nuclear Gauge Client: Project:
I� 4-30-18 Density Riverbend Development 71W0013
Fnp•MLING s•0aF•r•06,INC. Report Date: 6/3/2018 455 Second Street SE#400 Avinity Estates Phase
Crozet Office Test Method:ASTM D6938 Charlottesville,VA 22902 Avinity Loop
6185 Rockfish Gap Turnpike Charlottesville,VA 22902
Crozet,VA 22932
Phone:434-823-5154 I Fax:434-823-4764
Test Results
Optimum " Maximum In Place In Place Probe Min/Max
Retest Test Soil Moisture Dry Density Moisture Dry Density Depth Percent Comp.
Test# Of Date Proctor ID Method Classification (%) _ (pcf) (%) (pcf) (in) Compaction (%) Remark
6 4/30/18 3747RC ML 26.6 94.6 27.2 91.3 6 97 95/105
Test Information
Gauge
Test# Test Location Elevation Reference Make/Model/SN/Calibrated Field Technician
6 Utility Trench-Storm Sewer:Storm sewer between structures 6 and 26 1.0 FT below adjacent Humboldt/5001 P/709/ Steff,Ronald C
subgrade
Remarks Comments
Tests are"Direct Transmission"(Method A)unless probe depth is noted as
"Backscatter".Gauge calibration data on file with the testing agency.
Page 2 of 2
F&R Fill Monitoring 5-1-18 Fill
Ao NE s&,188NINC.
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71 W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 05/01/2018 Location: Site-Other
Category: Soils/Earthwork Location Details: Cul-de-sac at eastern end of Moffat St and Lots
39 through 41
Coverage: Fill Monitoring
Type: Observation
Weather: Sunny Wind(mph):
Air Temp.(deg.F): 75 Personnel: Butler, Jason , Senior Technician
Description of Work Completed
Please Note:Inspections, field notes, test results and recommendations herein were recorded under the specific weather conditions and
construction activities occurring at the time of our site visit. If, after we leave the site, weather events and/or construction activities occur
that may modify soil subgrade conditions, we should be notified and given the opportunity to revisit the site and revise our report based
upon the new conditions.Any approval of subgrade conditions provided in this report is subject to the condition that weather events
and/or construction activities have not occurred that would change our inspections, field notes, test results, or recommendations.
Work Description: Soil Placement/Compaction
Fill Monitoring Summary
Placement Depth/Elev. Fill Moisture Fill Material Lift Compaction Vibration Density
Location Reference Condition Description Thickness Equipment Used? Tests
(inches) Taken
Cul-de-sac at adjacent Moist Reddish Brown 12" Sheepsfoot Yes No
eastern end of subgrade Sandy SILT(ML)with Roller
Moffat St and Lots rock
39 through 41
Elev.(ft.)-11.00
to
Elev.(ft.)-10.00
Observations&Comments: The F&R representative arrived on site, as requested,to observe the placement and compaction of
soils at the Cul-de-sac at eastern end of Moffat St and Lots 39 through 41. Fill material placed on this
date consisted of Reddish Brown Sandy SILT(ML)with some rock being removed from the
Strormwater Management Pond adjacent to the Service road. Fill Material was placed in approximately
12 inches lifts and compacted with a vibratory Sheeps Foot Roller. Due to size of oversized Rock,
density test could not be performed. No pumping or rutting was observed throughout placement.
Determination: As Specified
Discrepancy Recorded?: No
Page 1 of 1
Fill Monitoring 5-2-18 Fill
F&R
FROEHL,NG s ROBERTSON.IRO.
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 05/02/2018 Location: Site-Other
Category: Soils/Earthwork Location Details: Cul-de-sac at eastern end of Moffat St and Lots
39 through 41
Coverage: Fill Monitoring
Type: Observation
Weather: Sunny Wind(mph):
Air Temp.(deg.F): 80 Personnel: Butler, Jason , Senior Technician
Description of Work Completed
Please Note:Inspections, field notes, test results and recommendations herein were recorded under the specific weather conditions and
construction activities occurring at the time of our site visit. If, after we leave the site, weather events and/or construction activities occur
that may modify soil subgrade conditions, we should be notified and given the opportunity to revisit the site and revise our report based
upon the new conditions.Any approval of subgrade conditions provided in this report is subject to the condition that weather events
and/or construction activities have not occurred that would change our inspections, field notes, test results, or recommendations.
Work Description: Soil Placement/Compaction
Fill Monitoring Summary
Placement Depth/Elev. Fill Moisture Fill Material Lift Compaction Vibration Density
Location Reference Condition Description Thickness Equipment Used? Tests
(inches) Taken
Cul-de-sac at adjacent Moist Reddish Brown 12" Sheepsfoot Yes No
eastern end of subgrade Sandy SILT(ML)with Roller
Moffat St and Lots rock
39 through 41
Elev.(ft.)-10.00
to
Elev.(ft.)-9.00
Observations&Comments: The F&R representative arrived on site, as requested,to observe the placement and compaction of
soils at the Cul-de-sac at eastern end of Maffat St and Lots 39 through 41. Fill material placed on this
date consisted of Reddish Brown Sandy SILT(ML)with rock being removed from the Stromiwater
Management Pond adjacent to the Service road. Fill Material was placed in approximately 12 inches
lifts and compacted with a vibratory Sheeps Foot Roller. Due to size of oversized Rock,density test
could not be performed. No pumping or rutting was observed throughout placement.
Other Tests Performed: probed with a steel rod
Determination: As Specified
Discrepancy Recorded?: No
Page 1 of 1
f&D Fill Monitoring 5-3-18Fill
OE 6 WO9[WTYON.INC.
v 4Smbify Saxe INI
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone 434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville.VA 22902
Date: 05/03/2018 Location: Site-Other
Category: Soils/Earthwork Location Details: Cul-de-sac at eastern end of Moffat St and Lots
39 through 41
Coverage: Fill Monitoring
Type: Observation
Weather: Sunny Wind(mph):
Air Temp.(deg.F): 90 Personnel: Butler, Jason Senior Technician
Description of Work Completed
Please Note:Inspections, field notes, test results and recommendations herein were recorded under the specific weather conditions and
construction activities occurring at the time of our site visit. lf, after we leave the site, weather events and/or construction activities occur
that may modify soil subgrade conditions, we should be notified and given the opportunity to revisit the site and revise our report based
upon the new conditions. Any approval of subgrade conditions provided in this report is subject to the condition that weather events
and/or construction activities have not occurred that would change our inspections, field notes, test results, or recommendations.
Work Description: Soil Placement/Compaction
Fill Monitoring Summary
Placement Depth/Elev. Fill Moisture Fill Material Lift Compaction Vibration Density
Location Reference Condition Description Thickness Equipment Used? Tests
(inches) Taken
Cul-de-sac at adjacent Moist Reddish Brown 12" Sheepsfoot Yes No
eastern end of subgrade Sandy SILT(ML)with Roller
Moffat St and Lots rock
39 through 41
Elev.(ft.)-9.00
to
Elev. (ft.)-8.00
Observations&Comments: The F&R representative arrived on site, as requested,to observe the placement and compaction of
soils at the Cul-de-sac at eastern end of Moffat St and Lots 39 through 41. Fill material placed on this
date consisted of Reddish Brown Sandy SILT(ML)with rock being removed from the Strormwater
Management Pond adjacent to the Service road. Fill Material was placed in approximately 12 inches
lifts and compacted with a vibratory Sheeps Foot Roller. Due to size of oversized Rock,density test
could not be performed. No pumping or rutting was observed throughout placement.
Other Tests Performed: probed with a steel rod
Determination: As Specified
Discrepancy Recorded?: No
Page 1 of 1
F&R Fill Monitoring 5-4-18 Fill
rwoe weecwreon.iHc.
8.668,6,88 s186e81866 1681
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71 W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 05/04/2018 Location: Site-Other
Category: Soils/Earthwork Location Details: Cul-de-sac at eastern end of Moffat St and Lots
39 through 41
Coverage: Fill Monitoring
Type: Observation
Weather: Sunny Wind(mph):
Air Temp.(deg.F): 90 Personnel: Butler, Jason , Senior Technician
Description of Work Completed
Please Note:Inspections, field notes, test results and recommendations herein were recorded under the specific weather conditions and
construction activities occurring at the time of our site visit. If, after we leave the site, weather events and/or construction activities occur
that may modify soil subgrade conditions, we should be notified and given the opportunity to revisit the site and revise our report based
upon the new conditions.Any approval of subgrade conditions provided in this report is subject to the condition that weather events
and/or construction activities have not occurred that would change our inspections, field notes, test results, or recommendations.
Work Description: Soil Placement/Compaction
Fill Monitoring Summary
Placement Depth/Elev. Fill Moisture Fill Material Lift Compaction Vibration Density
Location Reference Condition Description Thickness Equipment Used? Tests
(inches) Taken
Cul-de-sac at adjacent Moist Reddish Brown 12" Sheepsfoot Yes No
eastern end of subgrade Sandy SILT(ML)with Roller
Moffat St and Lots rock
39 through 41
Elev.(ft.)-8.00
to
Elev.(ft.)-6.00
Observations&Comments: The F&R representative arrived on site,as requested,to observe the placement and compaction of
soils at the Cul-de-sac at eastern end of Moffat St and Lots 39 through 41. Fill material placed on this
date consisted of Reddish Brown Sandy SILT(ML)with rock being removed from the Strormwater
Management Pond adjacent to the Service road. Fill Material was placed in approximately 12 inches
lifts and compacted with a vibratory Sheeps Foot Roller. Due to size of oversized Rock,density test
could not be performed. No pumping or rutting was observed throughout placement.
Determination: As Specified
Discrepancy Recorded?: No
Page 1 of 1
F&R Fill Monitoring 5-7-18 Fill
FACIEMLING VIONERT•ON.iNC.
nporrrmp S,oDauySm 1lBI
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 05/07/2018 Location: Site-Other
Category: Soils/Earthwork Location Details: Cul-de-sac at eastern end of Moffat St and Lots
39 through 41
Coverage: Fill Monitoring
Type: Observation
Weather: Sunny Wind(mph):
Air Temp.(deg.F): 75 Personnel: Butler, Jason , Senior Technician
Description of Work Completed
Please Note:Inspections, field notes, test results and recommendations herein were recorded under the specific weather conditions and
construction activities occurring at the time of our site visit. If, after we leave the site, weather events and/or construction activities occur
that may modify soil subgrade conditions, we should be notified and given the opportunity to revisit the site and revise our report based
upon the new conditions.Any approval of subgrade conditions provided in this report is subject to the condition that weather events
and/or construction activities have not occurred that would change our inspections, field notes, test results, or recommendations.
Work Description: Soil Placement/Compaction
Fill Monitoring Summary
Placement Depth/Elev. Fill Moisture Fill Material Lift Compaction Vibration Density
Location Reference Condition Description Thickness Equipment Used? Tests
(inches) Taken
Cul-de-sac at adjacent Moist Reddish Brown 12" Sheepsfoot Yes No
eastern end of subgrade Sandy SILT(ML)with Roller
Moffat St and Lots rock
39 through 41
Elev.(ft.)-6.00
to
Elev.(ft.)-5.00
Observations&Comments: The F&R representative arrived on site, as requested,to observe the placement and compaction of
soils at the Cul-de-sac at eastern end of Moffat St and Lots 39 through 41. Fill material placed on this
date consisted of Reddish Brown Sandy SILT(ML)with rock being removed from the Strormwater
Management Pond adjacent to the Service road. Fill Material was placed in approximately 12 inches
lifts and compacted with a vibratory Sheeps Foot Roller. Due to size of oversized Rock,density test
could not be performed. No pumping or rutting was observed throughout placement.
Determination: As Specified
Discrepancy Recorded?: No
Page 1 of 1
F&R Fill Monitoring 5-8-18 Fill
cNG[NIING 6 Roarala ON.INC.
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71 W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 05/08/2018 Location: Site-Other
Category: Soils/Earthwork Location Details: Cul-de-sac at eastern end of Moffat St and Lots
39 through 41
Coverage: Fill Monitoring
Type: Observation
Weather: Sunny Wind(mph):
Air Temp.(deg.F): 80 Personnel: Butler, Jason , Senior Technician
Description of Work Completed
Please Note:Inspections, field notes, test results and recommendations herein were recorded under the specific weather conditions and
construction activities occurring at the time of our site visit. lf, after we leave the site, weather events and/or construction activities occur
that may modify soil subgrade conditions, we should be notified and given the opportunity to revisit the site and revise our report based
upon the new conditions.Any approval of subgrade conditions provided in this report is subject to the condition that weather events
and/or construction activities have not occurred that would change our inspections, field notes, test results, or recommendations.
Work Description: Soil Placement/Compaction
Fill Monitoring Summary
Placement Depth/Elev. Fill Moisture Fill Material Lift Compaction Vibration Density
Location Reference Condition Description Thickness Equipment Used? Tests
(inches) Taken
Cul-de-sac at adjacent Moist Reddish Brown 1211 Sheepsfoot Yes No
eastern end of subgrade Sandy SILT(ML)with Roller
Moffat St and Lots rock
39 through 41
Elev.(ft.)-5.00
to
Elev.(ft.)-4.00
Observations&Comments: The F&R representative arrived on site, as requested,to observe the placement and compaction of
soils at the Cul-de-sac at eastern end of Moffat St and Lots 39 through 41. Fill material placed on this
date consisted of Reddish Brown Sandy SILT(ML)with rock being removed from the Strormwater
Management Pond adjacent to the Service road. Fill Material was placed in approximately 12 inches
lifts and compacted with a vibratory Sheeps Foot Roller. Due to size of oversized Rock,density test
could not be performed. No pumping or rutting was observed throughout placement.
Determination: As Specified
Discrepancy Recorded?: No
Page 1 of 1
F&R Fill Monitoring 5-9-18 Fill
rROENLINO L R09ERT•ON.INC.
[npnre pSW Say Since IYI
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71 W0013
Phone:434.823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 05/09/2018 Location: Site-Other
Category: Soils/Earthwork Location Details: Cul-de-sac at eastern end of Moffat St and Lots
39 through 41
Coverage: Fill Monitoring
Type: Observation
Weather: Sunny Wind(mph):
Air Temp.(deg.F): 80 Personnel: Butler, Jason , Senior Technician
Description of Work Completed
Please Note:Inspections, field notes, test results and recommendations herein were recorded under the specific weather conditions and
construction activities occurring at the time of our site visit. If, after we leave the site, weather events and/or construction activities occur
that may modify soil subgrade conditions, we should be notified and given the opportunity to revisit the site and revise our report based
upon the new conditions.Any approval of subgrade conditions provided in this report is subject to the condition that weather events
and/or construction activities have not occurred that would change our inspections, field notes, test results,or recommendations.
Work Description: Soil Placement/Compaction
Fill Monitoring Summary
Placement Depth/Elev. Fill Moisture Fill Material Lift Compaction Vibration Density
Location Reference Condition Description Thickness Equipment Used? Tests
(inches) Taken
Cul-de-sac at adjacent Moist Reddish Brown 12" Sheepsfoot Yes No
eastern end of subgrade Sandy SILT(ML)with Roller
Moffat St and Lots rock
39 through 41
Elev.(ft.)-4.00
to
Elev.(ft.)-3.00
Observations&Comments: The F&R representative arrived on site, as requested,to observe the placement and compaction of
soils at the Cul-de-sac at eastern end of Moffat St and Lots 39 through 41. Fill material placed on this
date consisted of Reddish Brown Sandy SILT(ML)with rock being removed from the Strormwater
Management Pond adjacent to the Service road. Fill Material was placed in approximately 12 inches
lifts and compacted with a vibratory Sheeps Foot Roller. Due to size of oversized Rock,density test
could not be performed. No pumping or rutting was observed throughout placement.
Determination: As Specified
Discrepancy Recorded?: No
Page 1 of 1
r81` Fill Monitoring 5-10-18 Fill
F .,., ,a,
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71 W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 05/10/2018 Location: Site-Other
Category: Soils/Earthwork Location Details: Cul-de-sac at eastern end of Moffat St and Lots
39 through 41
Coverage: Fill Monitoring
Type: Observation
Weather: Cloudy Wind(mph):
Air Temp.(deg.F): 80 Personnel: Butler, Jason , Senior Technician
Description of Work Completed
Please Note:Inspections, field notes, test results and recommendations herein were recorded under the specific weather conditions and
construction activities occurring at the time of our site visit. If, after we leave the site, weather events and/or construction activities occur
that may modify soil subgrade conditions, we should be notified and given the opportunity to revisit the site and revise our report based
upon the new conditions.Any approval of subgrade conditions provided in this report is subject to the condition that weather events
and/or construction activities have not occurred that would change our inspections, field notes, test results, or recommendations.
Work Description: Soil Placement/Compaction
Fill Monitoring Summary
Placement Depth/Elev. Fill Moisture Fill Material Lift Compaction Vibration Density
Location Reference Condition Description Thickness Equipment Used? Tests
(inches) Taken
Cul-de-sac at adjacent Moist Reddish Brown 12" Sheepsfoot Yes No
eastern end of subgrade Sandy SILT(ML)with Roller
Moffat St and Lots rock
39 through 41
Elev.(ft.)-3.00
to
Elev.(ft.)-2.00
Observations&Comments: The F&R representative arrived on site, as requested,to observe the placement and compaction of
soils at the Cul-de-sac at eastern end of Moffat St and Lots 39 through 41. Fill material placed on this
date consisted of Reddish Brown Sandy SILT(ML)with rock being removed from the Strormwater
Management Pond adjacent to the Service road. Fill Material was placed in approximately 12 inches
lifts and compacted with a vibratory Sheeps Foot Roller. Due to size of oversized Rock,density test
could not be performed. No pumping or rutting was observed throughout placement.
Determination: As Specified
Discrepancy Recorded?: No
Page 1 of 1
f&D Fill Monitoring 5-11-18 Fill
if/OEM-INN s 14 COMM.ON.INC.
ENNeer.y SmN1t,i.ae Itll
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71 W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 05/11/2018 Location: Site-Other
Category: Soils/Earthwork Location Details: Cul-de-sac at eastern end of Moffat St and Lots
39 through 41
Coverage: Fill Monitoring
Type: Observation
Weather: Sunny Wind(mph):
Air Temp.(deg.F): 85 Personnel: Butler, Jason , Senior Technician
Description of Work Completed
Please Note:Inspections, field notes, test results and recommendations herein were recorded under the specific weather conditions and
construction activities occurring at the time of our site visit. lf, after we leave the site, weather events and/or construction activities occur
that may modify soil subgrade conditions, we should be notified and given the opportunity to revisit the site and revise our report based
upon the new conditions.Any approval of subgrade conditions provided in this report is subject to the condition that weather events
and/or construction activities have not occurred that would change our inspections, field notes, test results, or recommendations.
Work Description: Soil Placement/Compaction
Fill Monitoring Summary
Placement Depth/Elev. Fill Moisture Fill Material Lift Compaction Vibration Density
Location Reference Condition Description Thickness Equipment Used? Tests
(inches) Taken
Cul-de-sac at adjacent Moist Reddish Brown 12" Sheepsfoot Yes No
eastern end of subgrade Sandy SILT(ML)with Roller
Moffat St and Lots rock
39 through 41
Elev.(ft.)-2.00
to
Elev.(ft.)-1.00
Observations&Comments: The F&R representative arrived on site, as requested,to observe the placement and compaction of
soils at the Cul-de-sac at eastern end of Moffat St and Lots 39 through 41. Fill material placed on this
date consisted of Reddish Brown Sandy SILT(ML)with rock being removed from the Strormwater
Management Pond adjacent to the Service road. Fill Material was placed in approximately 12 inches
lifts and compacted with a vibratory Sheeps Foot Roller. Due to size of oversized Rock,density test
could not be performed. No pumping or rutting was observed throughout placement.
Determination: As Specified
Discrepancy Recorded?: No
Page 1 of 1
F&R Fill Monitoring 5-25-18 Fill
FNGEMLINO i INC
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71 W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 05/25/2018 Location: Utility Trench-Reclaimed Water Line
Category: Soils/Earthwork Location Details: Utility
Coverage: Fill Monitoring
Type: Observation
Weather: Cloudy Wind(mph):
Air Temp.(deg.F): 70 Personnel: Butler, Jason , Senior Technician
Description of Work Completed
Please Note:Inspections, field notes, test results and recommendations herein were recorded under the specific weather conditions and
construction activities occurring at the time of our site visit. If, after we leave the site, weather events and/or construction activities occur
that may modify soil subgrade conditions, we should be notified and given the opportunity to revisit the site and revise our report based
upon the new conditions. Any approval of subgrade conditions provided in this report is subject to the condition that weather events
and/or construction activities have not occurred that would change our inspections, field notes, test results, or recommendations.
Work Description: Soil Placement/Compaction
Fill Monitoring Summary
Placement Depth/Elev. Fill Moisture Fill Material Lift Compaction Vibration Density
Location Reference Condition Description Thickness Equipment Used? Tests
(inches) Taken
Stormwater adjacent Moist Reddish Brown 12" Sheepsfoot Yes No
Management subgrade Sandy SILT(ML)with Roller
Pond adjacent to rock
Service Road
Elev.(ft.)-3.00
to
Elev.(ft.)-1.00
Observations&Comments: The F&R representative arrived on site, as requested,to observe the placement and compaction of
soils in Stormwater Management Pond. Fill material placed on this date consisted of Reddish Brown
Sandy SILT(ML)with rock. Fill Material was placed in approximately 12 inches lifts and compacted
with a vibratory Sheeps Foot Roller. Due to size of oversized Rock,density test could not be performed.
Determination: As Specified
Discrepancy Recorded?: No
Page 1 of 1
f&D Proofroll Activity 6-14-18 Proofroll
rNOEN INO i ROBERTSON.ING.
EN Ner.p UNNN BEE Mil
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71 W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 06/14/2018 Location: Road-Driving Lane
Category: Soils/Earthwork Location Details: Bergen Street STA12+00 to STA14+75
Coverage: Proofroll
Type: Observation Frequency:
Weather: Sunny Wind(mph):
Air Temp.(deg.F): 87 Personnel: Butler, Jason , Senior Technician
Description of Work Completed
Work Description: Proofroll
Proof Roll Equipment: Loaded Tandem Axle Dump Truck
Subgrade Material Description: Red SILT
Note: Subgrade descriptions indicated in this report are based on visual observation and should be
considered approximate.Subsurface conditions in unexplored locations may vary from those
encountered and noted herein.
Summary of Proofroll: Corrections Not Required:Area Tested Appeared Stable w/No Appreciable Pumping or Rutting.
Determination: As Specified
Discrepancy Recorded?: No
Note: Inspections, field notes, test results and recommendations herein were recorded under the weather conditions and construction
activities occurring at the time of our site visit. If inclement weather and/or construction activities occur after our visit that
may impact the soil and/or stone base subgrade, F&R should be notified and afforded an opportunity to revisit the site and
revise our report as may be needed.
Page 1 of 1
f&p Field Report 6-26-18 DFR
I� Various Report Date: 7/31/2018
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71 W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 06/26/2018 Location: Utility Trench
Category: Soils/Earthwork Location Details: Manhole 1 to 8 on Bergen Street
Coverage: Subgrade Observation
Type: Observation Frequency:
Weather: partly cloudy
Air Temp.(deg.F): 80 F&R Personnel: Brown,William D
Description of Work Completed
Work Completed: On site as requested for observation and testing of site activities.
Field Notes: Contractor excavated for and placed structures MH1 and MH8 on Bergen St. F&R evaluated bearing
materials for structures prior to placement. No fill placed this day.
Determination: As Specified
Page 1 of 5
f&D MSE Wall Inspection 6-26-18 Retaining Wall
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 06/26/2018 Location: Retaining Wall-MSE
Category: Soils/Earthwork Location Details: Clubhouse retaining wall[Sta 0+60 to
1+60]
Coverage: MSE Wall Inspection Checklist Block Courses/Elevations:510 to 511
Type: Observation Frequency: Continuous
Weather: Cloudy Wind Velocity(mph): 5
Air Temperature(deg F): 75 F&R Personnel: Brown,William D,
Technician
Work Description: F&R representative arrived on site as requested for observation and testing of fill placement at clubhouse
retaining wall.
(1)CONSTRUCTION MATERIALS
(A)Fill Materials
Fill Samples Collected? No
(B)Block
Block Meets Project Specifications: Satisfactory
Block is Clean and Free of Adhered Dirt,Cement,etc.: Satisfactory
Broken/Cracked Block Not Placed: Satisfactory
Block Sample Collected?: No
(C)Geogrid
Geogrid Ribs Intact/Undamaged: Satisfactory
Geogrid clean,free of mud/concrete/other adherences: Satisfactory
(2)FOUNDATION SUPPORT SYSTEM
(A)Soil Types Encountered
(B)Subgrade Conditions
(C)Moisture Conditions
(D)Leveling Pad
(3)BLOCK PLACEMENT
Block Interlocking: Flat contact surfaces with no interlocking
Wall Laid True to Line: Difficult to assess due to curvatures
Wall Top Reasonably Level: Satisfactory(visual)
Stone Infill: Satisfactory
Wall Top Capped: N/A-not yet constructed to top
Page 2 of 5
f&p MSE Wall Inspection 6-26-18 Retaining Wall
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
(4)BACKFILL AND DRAINAGE
(A)Fill Type and Density
Type of Fill Required by Design: Granular Soil with Some Clay/Sand
Fill Matches Required Fill Type: Satisfactory
Lift Thicknesses: Satisfactory
Lighter Compaction Equipment Used Near Wall: Satisfactory
Fill Compaction Testing Performed: Yes
Fill Density Results Reported: Yes
Fill Tests Meet Minimum Dry Density Requirement: Satisfactory
Fill Tests Meet Moisture Content Requirements: Satisfactory
(B)Geogrid Placement
Wall Design Drawings: Available
Grid material used is approved: Yes
Grid placed at correct block courses: Satisfactory
Grid Lengths: Satisfactory (in general accordance with drawings)
Grid Placed on Level Surface(s): Satisfactory
Grid Tensile Strength Oriented Perpendicular to Wall: Satisfactory
Parallel Grid Edges Close but No Overlap: Satisfactory
Grid Secured Correctly Under Block: Satisfactory
(5)DRAINAGE SYSTEM
(A)Drainage Pipe Placement
Pipe Type As Specified: Satisfactory
Pipe Diameter per Design: Satisfactory
Pipe Perforations(Slotted Vs.Holes,Etc.): Satisfactory
Pipe Wrapped in Filter Fabric: N/A
Pipe Daylighted at Wall Ends: Satisfactory
Weeps Spacing per Design: Satisfactory
Weeps Properly Connected Through Wall: Satisfactory
(B)Drainage Layer
Drainage Material as Specified: Satisfactory
Material Clean/Uncontaminated: Satisfactory
Drainage Layer Horizontal Thickness per Design: Satisfactory
Capped with Filter Fabric: Not required
DETERMINATION
Page 3 of 5
F&R MSE Wall Inspection 6-26-18 Retaining Wall
cROENLI CI a w wreor+,INC.
Fero y=bln m iai
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71 W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Determination: As Specified
Discrepancy Recorded?: No
Page 4 of 5
f&p Soil Nuclear Gauge Client: Project:
I� 6-26-18 Density Riverbend Development 71 W0013
rIWOENLINO 6 INC Report Date: 7/25/2018 455 Second Street SE#400 Avinity Estates Phase I
Crozet Office Test Method:ASTM D6938 Charlottesville,VA 22902 Avinity Loop
6185 Rockfish Gap Turnpike Charlottesville,VA 22902
Crozet,VA 22932
Phone:434-823-5154 i Fax.434-823-4764
Test Results
Optimum Maximum In Place In Place Probe Min/Max
Retest Test Soil Moisture Dry Density Moisture Dry Density Depth Percent Comp.
Test# Of Date Proctor ID Method Classification (%) (pcf) (%) (pcf) (in) Compaction (%) Remark
10 6/26/18 3747RC ML 26.6 94.6 26.8 95.6 8 101 95/105
11 6/26/18 3747RC ML 26.6 94.6 25.8 95.9 8 101 95/105
12 6/26/18 3747RC ML 26.6 94.6 27.4 96.1 8 102 95/105
Test Information
Gauge
Test# Test Location Elevation Reference Make/Model/SN/Calibrated Field Technician
10 Retaining Wall-MSE:Clubhouse retaining wall[Sta 0+90] 510.0 Troxler/3440/18920/ Brown,William D
11 Retaining Wall-MSE:Clubhouse retaining wall[Sta 1+45] 510.0 Troxler/3440/18920/ Brown,William D
12 Retaining Wall-MSE:Clubhouse retaining wall[Sta 1+20] 511.0 Troxler/3440/18920/ Brown,William D
Remarks Comments
Tests are"Direct Transmission"(Method A)unless probe depth Is noted as
"Backscatter".Gauge calibration data on file with the testing agency.
Page 5 of 5
F&R Fill Monitoring 7-6-18Fill
ROE � tr sONINC.
(n
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71 W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 07/06/2018 Location: Utility Trench
Category: Soils/Earthwork Location Details: Manhole 2 on Degraw Street
Coverage: Fill Monitoring
Type: Observation Frequency: Periodic
Weather: Sunny Wind(mph):
Air Temp.(deg.F): 93 Personnel: Brown,William D , Technician
Description of Work Completed
Work Description: F&R representative arrived on site as requested for observation of placement of manhole and DI boxes.
Fill Monitoring Summary
Placement Depth/Elev. Fill Moisture Fill Material Lift Compaction Vibration Density
Location Reference Condition Description Thickness Equipment Used? Tests
(inches) Taken
Manhole 2 on adjacent Moist/ Brown, rocky sandy 12" Smooth Yes No
Degraw Street subgrade Somewhat Silt Drum Roller
Elev.(ft.)-12.00 Dry /Trench
to Compactor
Elev.(ft.)0.00
Observations&Comments: Visual and manual methods were used to evaluate fill placement. Fill observed by F&R today at the
referenced location and elevation was found satisfactory.
Determination: As Specified
Discrepancy Recorded?: No
Please Note:Inspections, field notes, test results and recommendations herein were recorded under the weather conditions and
construction activities occurring at the time of our site visit. If inclement weather and/or construction activities occur after our visit that
may impact the soil and/or base stone subgrade, F&R should be notified and afforded an opportunity to revisit the site and
revise our report as may be needed.
Page 1 of 1
6 Fill Monitoring 7-9-18 Fill
ERCEMLINO 6 RC RERiR CN.1NC.
E'0...IMp StMy Sarre MI
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71 W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-8234764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 07/09/2018 Location: Utility Trench
Category: Soils/Earthwork Location Details: Sanitary Sewer from MH2 towards MH1 on
Degraw St
Coverage: Fill Monitoring
Type: Observation Frequency: Periodic
Weather: Sunny Wind(mph):
Air Temp.(deg.F): 93 Personnel: Brown,William D , Technician
Description of Work Completed
Work Description: F&R representative arrived on site as requested for observation of placement of manhole and DI boxes.
Fill Monitoring Summary
Placement Depth/Elev. Fill Moisture Fill Material Lift Compaction Vibration Density
Location Reference Condition Description Thickness Equipment Used? Tests
(inches) Taken
Sanitary Sewer adjacent Moist/ Brown, rocky sandy 12" Smooth Yes No
from MH2 towards subgrade Somewhat Silt Drum Roller
MH1 on Degraw Dry /Trench
St Compactor
Elev.(ft.)-12.00
to
Elev.(ft.)0.00
Observations&Comments: Visual and manual methods were used to evaluate fill placement. Fill observed by F&R today at the
referenced location and elevation was found satisfactory.
Determination: As Specified
Discrepancy Recorded?: No
Please Note:Inspections, field notes, test results and recommendations herein were recorded under the weather conditions and
construction activities occurring at the time of our site visit. If inclement weather and/or construction activities occur after our visit that
may impact the soil and/or base stone subgrade, F&R should be notified and afforded an opportunity to revisit the site and
revise our report as may be needed.
Page 1 of 1
r8l Proofroll Activity 7-16-18 Proofroll
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 07/16/2018 Location: Road-Driving Lane
Category: Soils/Earthwork Location Details: Sta 8+50 to 7+50 on Degraw Street.
Coverage: Proofroll
Type: Observation Frequency: Periodic
Weather: Cloudy Wind(mph):
Air Temp.(deg.F): 86 Personnel: Brown,William D , Technician
Description of Work Completed
Work Description: F&R representative arrived on site as requested for proofroll on Degraw Street.
Proof Roll Equipment Loaded Tandem Axle Dump Truck
Subgrade Material Description: reddish brown sandy Silt and 21A
Note: Subgrade descriptions indicated in this report are based on visual observation and should be
considered approximate.Subsurface conditions in unexplored locations may vary from those
encountered and noted herein.
Summary of Proofroll: Corrections Not Required:Area Tested Appeared Stable w/No Appreciable Pumping or Rutting.
Other Comments/Observations: Observed a proofroll of the road soil subgrade materials and 21A stone after placement in the
referenced area.
Determination: As Specified
Discrepancy Recorded?: No
Note: Inspections, field notes, test results and recommendations herein were recorded under the weather conditions and construction
activities occurring at the time of our site visit. If inclement weather and/or construction activities occur after our visit that
may impact the soil and/or stone base subgrade, F&R should be notified and afforded an opportunity to revisit the site and
revise our report as may be needed.
Page 1 of 1
F&R Fill Monitoring 7-18-18 Fill
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax 434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 07/18/2018 Location: Utility Trench
Category: Soils/Earthwork Location Details: Bergen St, Storm Sewer, MH32 towards 30A
Coverage: Fill Monitoring
Type: Observation Frequency: Periodic
Weather: Sunny Wind(mph):
Air Temp.(deg.F): 84 Personnel: Brown,William D , Technician
Description of Work Completed
Work Description: F&R representative arrived on site as requested for observation and testing of fill placement in utility trench
on Bergen Street.
Fill Monitoring Summary
Placement Depth/Elev. Fill Moisture Fill Material Lift Compaction Vibration Density
Location Reference Condition Description Thickness Equipment Used? Tests
(inches) Taken
Storm Sewer, adjacent Slightly Dry Brown sandy Silt 12" Sheepsfoot Yes Yes
MH32 towards subgrade Roller/
30A Trench
Elev.(ft.)-13.00 Compactor
to
Elev.(ft.)-4.00
Observations&Comments: Visual and manual methods were used to evaluate fill placement when density testing was not
possible due to trench depths. Fill observed by F&R today at the referenced location and elevation
was found satisfactory.
Determination: As Specified
Discrepancy Recorded?: No
Please Note:Inspections, field notes, test results and recommendations herein were recorded under the weather conditions and
construction activities occurring at the time of our site visit. If inclement weather and/or construction activities occur after our visit that
may impact the soil and/or base stone subgrade, F&R should be notified and afforded an opportunity to revisit the site and
revise our report as may be needed.
Page 1 of 2
f&D Soil Nuclear Gauge Client: Project:
I� 7-18-18 Density Riverbend Development 71W0013
.Ao� 4 AasE•*•�" "� Report Date: 7/31/2018 455 Second Street SE#400 Avinity Estates Phase I
Crozet Office Test Method:ASTM D6938 Charlottesville,VA 22902 Avinity Loop
6185 Rockfish Gap Turnpike Charlottesville,VA 22902
Crozet,VA 22932
Phone:434-823-5154 I Fax:434-823-4764
Test Results
Optimum Maximum In Place In Place Probe Min/Max
Retest Test Soil Moisture Dry Density Moisture Dry Density Depth Percent Comp.
Test# Of Date Proctor ID Method Classification (%) (pcf) (%) (pcf) (in) Compaction (%) Remark
24 7/18/18 3747RC ML 26.6 94.6 27.5 99.4 6 105 95/105
25 7/18/18 3747RC ML 26.6 94.6 26.9 99.2 6 105 95/105
Test Information
Gauge
Test# Test Location Elevation Reference Make/Model/SN/Calibrated Field Technician
24 Utility Trench-Storm Sewer:Storm Sewer,MH32 towards 30A 6.0 FT below FG Troxler/3411 B/12980/ Brown,William D
25 Utility Trench-Storm Sewer:Storm Sewer,MH32 towards 30A 4.0 FT below FG Troxler/3411 B/12980/ Brown,William D
Remarks Comments
Tests are"Direct Transmission"(Method A)unless probe depth is noted as
"Backscatter".Gauge calibration data on file with the testing agency.
Page 2 of 2
f&p Fill Monitoring 7-19-18 Fill
FROENLINGI 6 ROBERTSON.INC.
rYnnv St�9,'S.I[r 1aH1
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 07/19/2018 Location: Utility Trench
Category: Soils/Earthwork Location Details: Storm Sewer, MH32 towards 30A
Coverage: Fill Monitoring
Type: Observation Frequency: Periodic
Weather: Sunny Wind(mph):
Air Temp.(deg.F): 84 Personnel: Brown,William D , Technician
Description of Work Completed
Work Description: F&R representative arrived on site as requested for observation and testing of fill placement in utility trench
on Bergen Street.
Fill Monitoring Summary
Placement Depth/Elev. Fill Moisture Fill Material Lift Compaction Vibration Density
Location Reference Condition Description Thickness Equipment Used? Tests
(inches) Taken
Storm Sewer, adjacent Slightly Dry Brown, rocky silt 12" Sheepsfoot Yes Yes
MH32 towards subgrade Roller/
30A Trench
Elev.(ft.)-4.00 Compactor
to
Elev.(ft.)0.00
Determination: As Specified
Discrepancy Recorded?: No
Please Note:Inspections, field notes, test results and recommendations herein were recorded under the weather conditions and
construction activities occurring at the time of our site visit. If inclement weather and/or construction activities occur after our visit that
may impact the soil and/or base stone subgrade, F&R should be notified and afforded an opportunity to revisit the site and
revise our report as may be needed.
Page 1 of 2
f&p Soil Nuclear Gauge Client: Project:
I� 7-19-18 Density Riverbend Development 71 W0013
"•OEM • a • �•• .1eT•0 ,INC. Report Date:7/31/2018 455 Second Street SE#400 Avinity Estates Phase I
frgw ',Stobbty S"m IYI
Crozet Office Test Method:ASTM D6938 Charlottesville,VA 22902 Avinity Loop
6185 Rockfish Gap Turnpike Charlottesville,VA 22902
Crozet,VA 22932
Phone:434-823-5154 I Fax.434-823-4764
Test Results
Optimum Maximum In Place In Place Probe Min/Max
Retest Test Soil Moisture Dry Density Moisture Dry Density Depth Percent Comp.
Test# Of Date Proctor ID Method Classification (%) (pcf) (%) (pcf) (in) Compaction (%) Remark
21 7/19/18 3747RC ML 26.6 94.6 28.7 99.7 6 105 95/105
22 7/19/18 3747RC ML 26.6 94.6 27.9 98.7 6 104 95/105
23 7/19/18 3747RC ML 26.6 94.6 27.5 99.4 6 105 95/105
Test Information
Gauge
Test# Test Location Elevation Reference Make I Model/SN/Calibrated Field Technician
21 Utility Trench-Storm Sewer:Storm Sewer,MH32 towards 30A 3.0 FT below FG Troxler/3411 B/12980/ Brown,William D
22 Utility Trench-Storm Sewer:Storm Sewer,MH32 towards 30A 2.0 FT below FG Troxler/3411B/12980/ Brown,William D
23 Utility Trench-Storm Sewer:Storm Sewer,MH32 towards 30A 1.0 FT below FG Troxler/3411 B/12980/ Brown,William D
Remarks Comments
Tests are"Direct Transmission"(Method A)unless probe depth is noted as
"Backscatter".Gauge calibration data on file with the testing agency.
Page 2 of 2
f&D Field Report 7-25-18 DFR
I� Various Report Date: 7/31/2018
cwocHUHw s wowswrma.we.
Enm<.,.o s..r irti
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71 W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 07/25/2018 Location: Utility Trench
Category: General Location Details: Sanitary Sewer, Bergen St[Sta 13+50 to
12+50](between MH8&MH9)
Coverage: Site Observation
Type: Observation Frequency: Periodic
Weather: Cloudy
Air Temp.(deg.F): 89 F&R Personnel: Brown, William D ,Technician
Description of Work Completed
Work Completed: F&R representative arrived on site as requested for observation of sanitary sewer line being placed.
Field Notes: Start Elevation:-12ft
Contractor excavated for and placed pipe at referenced location. No fill placed this day.
Detennination: As Specified
Page 1 of 1
I%bField Report 7-26-18 DFR
I� Various Report Date: 7/31/2018
PROCHLING n ao B[Ni{ON.INC.
rnw..r.mv SemNy s...2UJ
Crozet Office Client: Project:
6185 Rockfish Gap Tumpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 07/26/2018 Location: Utility Trench
Category: General Location Details: Sanitary Sewer
Bergen St[Sta 12+50 to 11+50](between MH8
to MH9 and towards MH10)
Bergen St[Sta 13+50 to 12+50](between MH8
to MH9)
Coverage: Site Observation
Type: Observation Frequency: Periodic
Weather: Cloudy
Air Temp.(deg.F): 89 F&R Personnel: Brown,William D ,Technician
Description of Work Completed
Work Completed: F&R representative arrived on site as requested for observation of sanitary sewer line being placed.
Field Notes: Contractor excavated for and placed pipe from Road Sta 12+50 to 11+50.
Additionally, backfill of previously placed pipe(Road Sta 13+50 to 12+50-12ft to Oft)began. Visual
and manual methods were used to evaluate fill placement. Fill observed by F&R today at the
referenced location and elevation was found satisfactory.
Determination: As Specified
Page 1 of 1
fb Field Report 7-27-18 Fill
�cl( Various Report Date: 8/6/2018
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71 W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 07/27/2018 Location: Utility Trench
Category: General Location Details: Sanitary Sewer
Bergen St[Sta 11+50 to 11+00](between MH9
to MH10)
Bergen St[Sta 12+50 to 11+50](between MH8
to MH9 and towards MH10)
Coverage: Site Observation
Type: Observation Frequency: Periodic
Weather: Cloudy
Air Temp.(deg.F): 89 F&R Personnel: Brown,William D ,Technician
Description of Work Completed
Work Completed: F&R representative arrived on site as requested for observation of sanitary sewer line being placed.
Field Notes: Contractor excavated for and placed pipe from Road Sta 11+50 to 11+00.
Additionally, backfill of previously placed pipe(Road Sta 12+50 to 11+50-12ft to Oft)began. Visual
and manual methods were used to evaluate fill placement. Fill observed by F&R today at the
referenced location and elevation was found satisfactory.
Determination: As Specified
Page 1 of 1
Field Report 7-28/8 Fill
Various Report Date: 8/6/2018
rnoewurin s cwreow.l..c.
Enpneemp Stab.Sena 16.1
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71 W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 07/28/2018 Location: Utility Trench
Category: Soils/Earthwork Location Details: Sanitary Sewer
Bergen St[Sta 11+00 to 10+50](between MH9
to MH10)
Bergen St[Sta 11+50 to 11+00](between MH9
to MH10)
Coverage: Subgrade Observation
Type: Observation Frequency: Periodic
Weather: Sunny
Air Temp.(deg.F): 85 F&R Personnel: Brown,William D ,Technician
Description of Work Completed
Work Completed: F&R representative arrived on site as requested for observation and testing of fill placement in utility
trench on Bergen Street.
Field Notes: Contractor excavated for and placed pipe from Road Sta 11+00 to 10+50.
Additionally, backfill of previously placed pipe(Road Sta 11+50 to 11+00-12ft to Oft)began. Visual
and manual methods were used to evaluate fill placement. Fill observed by F&R today at the
referenced location and elevation was found satisfactory.
Determination: As Specified
Page 1 of 1
f&D Fill Monitoring 7-30-18 Fill
',ewer,Strteld.Saxe MB
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71VV0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 07/30/2018 Location: Utility Trench
Category: Soils/Earthwork Location Details: Sta 12+50 to 10+50 on Bergen Street
Coverage: Fill Monitoring
Type: Observation Frequency: Periodic
Weather: Cloudy Wind(mph):
Air Temp.(deg.F): 78 Personnel: Brown,William D , Technician
Description of Work Completed
Work Description: F&R representative arrived on site as requested for observation and testing of fill placement in utility trench
on Bergen Street
Fill Monitoring Summary
Placement Depth/Elev. Fill Moisture Fill Material Lift Compaction Vibration Density
Location Reference Condition Description Thickness Equipment Used? Tests
(inches) Taken
Sta 12+50 to adjacent Moist/ brown sandy silt with 12" Sheepsfoot Yes Yes
10+50 on Bergen subgrade Somewhat some gravels Roller/
Street Dry Trench
Elev.(ft.)-8.00 Compactor
to
Elev.(ft.)0.00
Observations&Comments: Fill placement continued over previously placed sanitary sewer lines. Visual and manual methods
were used to evaluate fill placement. Fill observed by F&R today at the referenced location and
elevation was found satisfactory.
Other Tests Performed: Nuclear Density Gauge
Determination: As Specified
Discrepancy Recorded?: No
Please Note:Inspections, field notes, test results and recommendations herein were recorded under the weather conditions and
construction activities occurring at the time of our site visit. If inclement weather and/or construction activities occur after our visit that
may impact the soil and/or base stone subgrade, F&R should be notified and afforded an opportunity to revisit the site and
revise our report as may be needed.
Page 1 of 2
f&D Soil Nuclear Gauge Client: Project:
I� 7-30-18 Density Riverbend Development 71W0013
r•oems_,mo.•011••*•01,1•INC. Report Date: 8/6/2018 455 Second Street SE#400 Avinity Estates Phase I
Crozet Office Test Method:ASTM D6938 Charlottesville,VA 22902 Avinity Loop
6185 Rockfish Gap Turnpike Charlottesville,VA 22902
Crozet,VA 22932
Phone:434-823-5154 I Fax.434-823-4764
Test Results
Optimum Maximum In Place In Place Probe Min/Max
Retest Test Soil Moisture Dry Density Moisture Dry Density Depth Percent Comp.
Test# Of Date Proctor ID Method Classification (%) (pcf) (%) (pcf) (in) Compaction (%) Remark
30 7/30/18 3747RC ML 26.6 94.6 29.2 97.2 6 103 95/105
31 7/30/18 3747RC ML 26.6 94.6 28.4 98.3 6 104 95/105
32 7/30/18 3747RC ML 26.6 94.6 28.8 98.3 6 104 95/105
33 7/30/18 3747RC ML 26.6 94.6 26.7 99.3 6 105 95/105
34 7/30/18 3747RC ML 26.6 94.6 27.8 98.1 6 104 95/105
Test Information
Gauge
Test# Test Location Elevation Reference Make I Model I SN/Calibrated Field Technician
30 Utility Trench-Sanitary Sewer:Bergen St,Sta 12+50 to 10+50 3.0 FT below FG Troxler/3430/36329/ Brown,William D
31 Utility Trench-Sanitary Sewer:Bergen St,Sta 12+50 to 10+50 3.0 FT below FG Troxler/3430/36329/ Brown,William D
32 Utility Trench-Sanitary Sewer:Bergen St,Sta 12+50 to 10+50 2.0 FT below FG Troxler/3430/36329/ Brown,William D
33 Utility Trench-Sanitary Sewer:Bergen St,Sta 12+50 to 10+50 2.0 FT below FG Troxler/3430/36329/ Brown,William D
34 Utility Trench-Sanitary Sewer:Bergen St,Sta 12+50 to 10+50 1.0 FT below FG Troxler/3430/36329/ Brown,William D
Remarks Comments
Tests are"Direct Transmission"(Method A)unless probe depth is noted as
"Backscatter".Gauge calibration data on file with the testing agency.
Page 2 of 2
f&D Field Report 8-2-18 DFR
I� Various Report Date: 8/30/2018
TRCENLING i 1.3EERT6DN.INC.
rron<..,c wens sn..pI
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71 W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 08/02/2018 Location: Utility Trench
Category: Soils/Earthwork Location Details: Sewer lines on Bergen Street
Coverage: Subgrade Observation
Type: Observation Frequency: Periodic
Weather: Rainy
Air Temp.(deg.F): 78 F&R Personnel: Brown,William D ,Technician
Description of Work Completed
Work Completed: F&R representative arrived on site as requested for observation of site activities. Upon arrival,
representative was notified that they were performing pressure testing on sewer lines on Bergen
Street and no inspections were needed today.
Determination: As Specified
Page 1 of 1
F&R Fill Monitoring 8-6-18 Fill
ERCIENLING S.ROBERTSON.INC.
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71 W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 08/06/2018 Location: Utility Trench
Category: Soils/Earthwork Location Details: Bergen street.Water line station 15+25 to
station 13+75
Coverage: Fill Monitoring
Type: Observation Frequency: Periodic
Weather: Sunny Wind(mph):
Air Temp.(deg.F): 92 Personnel: Butler, Shane , Technician
Description of Work Completed
Work Description: The F&R representative arrived on the jobsite as requested to observe ongoing site work.
Fill Monitoring Summary
Placement Depth/Elev. Fill Moisture Fill Material Lift Compaction Vibration Density
Location Reference Condition Description Thickness Equipment Used? Tests
(inches) Taken
Bergen street. adjacent Moist Brown Sandy soils 8" Rammax Yes Yes
Water line station subgrade with light gravel
15+25 to station
13+75
Elev.(ft.)-3.00
to
Elev.(ft.)0.00
Observations&Comments: Observed the placement of fill to the utility trench for the water main. Fill placed in 8 inch lifts and
compacted with several passes of vibratory rammax.
Other Tests Performed: Nuclear density tests were performed
Determination: As Specified
Discrepancy Recorded?: No
Please Note:Inspections, field notes, test results and recommendations herein were recorded under the weather conditions and
construction activities occurring at the time of our site visit. If inclement weather and/or construction activities occur after our visit that
may impact the soil and/or base stone subgrade, F&R should be notified and afforded an opportunity to revisit the site and
revise our report as may be needed.
Page 1 of 3
f& Soil Nuclear Gauge Client: Project:
I� 8-6-18 Density Riverbend Development 71W0013
r,o�� ,9 n 9aoaEareo�• �� Report Date: 8/30/2018 455 Second Street SE#400 Avinity Estates Phase I
Crozet Office Test Method:ASTM D6938 Charlottesville,VA 22902 Avinity Loop
6185 Rockfish Gap Turnpike Charlottesville,VA 22902
Crozet,VA 22932
Phone:434-823-5154 I Fax:434-823-4764
Test Results
Optimum Maximum In Place In Place Probe Min/Max
Retest Test Soil Moisture Dry Density Moisture Dry Density Depth Percent Comp.
Test# Of Date Proctor ID Method Classification (%) _ (pcf) (%) (pcf) (in) Compaction (%) Remark
46 8/6/18 3747RC ML 26.6 94.6 27.1 91.9 6 97 95/102
47 8/6/18 3747RC ML 26.6 94.6 27.4 91.0 6 96 95/102
48 8/6/18 3747RC ML 26.6 94.6 27.6 91.1 6 96 95/102
49 8/6/18 3747RC ML 26.6 94.6 27.4 91.1 6 96 95/102
50 8/6/18 3747RC ML 26.6 94.6 27.6 91.2 6 96 95/102
51 8/6/18 3747RC ML 26.6 94.6 27.4 91.5 6 97 95/102
52 8/6/18 3747RC ML 26.6 94.6 27.0 91.6 6 97 95/102
53 8/6/18 3747RC ML 26.6 94.6 27.3 91.3 6 97 95/102
Test Information
Gauge
Test# Test Location Elevation Reference Make/Model I SN/Calibrated Field Technician
46 Utility Trench-Water Main:Bergen street station 15+25 to station 13+75 3.0 Foot below subgrade Troxler/3411 B/12980/ Butler,Shane
47 Utility Trench-Water Main: Bergen street station 15+25 to station 13+75 3.0 Foot below subgrade Troxler/3411 B/12980/ Butler,Shane
48 Utility Trench-Water Main:Bergen street station 15+25 to station 13+75 3.0 Foot below subgrade Troxler/3411 B/12980/ Butler,Shane
49 Utility Trench-Water Main:Bergen street station 15+25 to station 13+75 2.0 Foot below subgrade Troxler/3411 B/12980/ Butler,Shane
50 Utility Trench-Water Main:Bergen street station 15+25 to station 13+75 2.0 Foot below subgrade Troxier/3411 B/12980/ Butler,Shane
51 Utility Trench-Water Main:Bergen street station 15+25 to station 13+75 2.0 Foot below subgrade Troxier/3411 B/12980/ Butler,Shane
52 Utility Trench-Water Main:Bergen street station 15+25 to station 13+75 1.0 Foot below subgrade Troxier/3411 B/12980/ Butler,Shane
53 Utility Trench-Water Main:Bergen street station 15+25 to station 13+75 1.0 Foot below subgrade Troxler/3411B/12980/ Butler,Shane
Remarks Comments
Tests are"Direct Transmission"(Method A)unless probe depth is noted as
"Backscatter".Gauge calibration data on file with the testing agency.
Page 2 of 3
f& Soil Nuclear Gauge Client: Project:
I� 8-6-18 Density Riverbend Development 71W0013
r = EEEEE,ON,,. Report Date: 8/30/2018 455 Second Street SE#400 Avinity Estates Phase I
Crozet Office Test Method:ASTM D6938 Charlottesville,VA 22902 Avinity Loop
6185 Rockfish Gap Turnpike Charlottesville, VA 22902
Crozet,VA 22932
Phone:434-823-5154 I Fax:434-823-4764
Test Results
Optimum Maximum In Place In Place Probe Min/Max
Retest Test Soil Moisture Dry Density Moisture Dry Density Depth Percent Comp.
Test# Of Date Proctor ID Method Classification (%) (pcf) (%) (pcf) (in) Compaction (%) Remark
54 8/6/18 3747RC ML 26.6 94.6 27.8 91.1 6 96 95/102
55 8/6/18 3747RC ML 26.6 94.6 27.4 91.2 6 96 95/102
56 8/6/18 3747RC ML 26.6 94.6 27.6 91.0 6 96 95/102
57 8/6/18 3747RC ML 26.6 94.6 27.2 91.5 6 97 95/102
Test Information
Gauge
Test# Test Location Elevation Reference Make/Model/SN/Calibrated Field Technician
54 Utility Trench-Water Main: Bergen street station 15+25 to station 13+75 1.0 Foot below subgrade Troxler/3411B/12980/ Butler,Shane
55 Utility Trench-Water Main:Bergen street station 15+25 to station 13+75 0.0 Foot below subgrade Troxler/3411B/12980/ Butler,Shane
56 Utility Trench-Water Main:Bergen street station 15+25 to station 13+75 0.0 Foot below subgrade Troxler/3411B/12980/ Butler,Shane
57 Utility Trench-Water Main:Bergen street station 15+25 to station 13+75 0.0 Foot below subgrade Troxler/3411 B/12980/ Butler,Shane
Remarks Comments
Tests are"Direct Transmission"(Method A)unless probe depth is noted as
"Backscatter".Gauge calibration data on file with the testing agency.
Page 3 of 3
f&D Fill Monitoring 8-7-18Fill
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71 W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 08/07/2018 Location: Utility Trench
Category: Soils/Earthwork Location Details: Bergen street. Water line station 13+75 to
station 11+00
Coverage: Fill Monitoring
Type: Observation Frequency: Periodic
Weather: Sunny Wind(mph):
Air Temp.(deg.F): 89 Personnel: Butler, Shane , Technician
Description of Work Completed
Work Description: The F and R representative arrived on the jobsite as requested to observe ongoing site work.
Fill Monitoring Summary
Placement Depth/Elev. Fill Moisture Fill Material Lift Compaction Vibration Density
Location Reference Condition Description Thickness Equipment Used? Tests
(inches) Taken
Bergen street. adjacent Moist Brown Sandy soils 8" Rammax Yes Yes
Water line station subgrade with light gravel
13+75 to station
11+00
Elev.(ft.)-3.00
to
Elev.(ft.)0.00
Observations&Comments: Observed the placement of fill to the utility trench for the water main. Fill placed in 8 inch lifts and
compacted with several passes of vibratory rammax.
Other Tests Performed: Nuclear density tests were performed
Determination: As Specified
Discrepancy Recorded?: No
Please Note:Inspections, field notes, test results and recommendations herein were recorded under the weather conditions and
construction activities occurring at the time of our site visit. If inclement weather and/or construction activities occur after our visit that
may impact the soil and/or base stone subgrade, F&R should be notified and afforded an opportunity to revisit the site and
revise our report as may be needed.
Page 1 of 3
f&D Soil Nuclear Gauge Client: Project:
t� 8-7-18 Density Riverbend Development 71W0013
Fao „F,No a ROBERT•ON.INC. Report Date: 8/30/2018 455 Second Street SE#400 Avinity Estates Phase I
Crozet Office Test Method:ASTM D6938 Charlottesville,VA 22902 Avinity Loop
6185 Rockfish Gap Turnpike Charlottesville,VA 22902
Crozet,VA 22932
Phone:434-823-5154 I Fax:434-823-4764
Test Results
Optimum Maximum In Place In Place Probe Min/Max
Retest Test Soil Moisture Dry Density Moisture Dry Density Depth Percent Comp.
Test# Of Date Proctor ID Method Classification (%) (pcf) (%) (pcf) (in) Compaction (%) Remark
58 8/7/18 3794RC MH 27.6 95.6 28.3 92.9 6 97 95/102
59 8/7/18 3794RC MH 27.6 95.6 28.1 92.9 6 97 95/102
60 8/7/18 3794RC MH 27.6 95.6 27.9 94.0 6 98 95/102
61 8/7/18 3794RC MH 27.6 95.6 28.0 92.9 6 97 95/102
62 8/7/18 3794RC MH 27.6 95.6 27.8 92.9 6 97 95/102
63 8/7/18 3794RC MH 27.6 95.6 30.3 92.2 6 96 95/102
64 8/7/18 3794RC MH 27.6 95.6 29.8 91.8 6 96 95/102
65 8/7/18 3794RC MH 27.6 95.6 29.5 92.2 6 96 95/102
Test Information
Gauge
Test# Test Location Elevation Reference Make/Model/SN/Calibrated Field Technician
58 Utility Trench-Top 3':Bergen street utility trench for water main station 13+75 to 3.0 Below Adjacent grade Troxler/3411 B/12980/ Butler,Shane
station 11+00
59 Utility Trench-Top 3':Bergen street utility trench for water main station 13+75 to 3.0 Below Adjacent grade Troxler/3411 B/12980/ Butler,Shane
station 11+00
60 Utility Trench-Top 3':Bergen street utility trench for water main station 13+75 to 3.0 Below Adjacent grade Troxler/3411 B/12980/ Butler,Shane
station 11+00
61 Utility Trench-Top 3':Bergen street utility trench for water main station 13+75 to 3.0 Below Adjacent grade Troxler/3411 B/12980/ Butler,Shane
station 11+00
62 Utility Trench-Top 3':Bergen street utility trench for water main station 13+75 to 2.0 Below Adjacent grade Troxler/3411 B/12980/ Butler,Shane
station 11+00
63 Utility Trench-Top 3':Bergen street utility trench for water main station 13+75 to 2.0 Below Adjacent grade Troxler/3411 B/12980/ Butler,Shane
station 11+00
64 Utility Trench-Top 3':Bergen street utility trench for water main station 13+75 to 2.0 Below Adjacent grade Troxler/3411 B/12980/ Butler,Shane
station 11+00
65 Utility Trench-Top 3': Bergen street utility trench for water main station 13+75 to 2.0 Below Adjacent grade Troxler/3411 B/12980/ Butler,Shane
station 11+00
Remarks Comments
Tests are"Direct Transmission"(Method A)unless probe depth is noted as
"Backscatter".Gauge calibration data on file with the testing agency.
Page 2 of 3
f&D Soil Nuclear Gauge Client: Project:
I� 8-7-18 Density Riverbend Development 71W0013
Report Date: 8/30/2018 455 Second Street SE#400 Avinity Estates Phase
Crozet Office Test Method:ASTM D6938 Charlottesville,VA 22902 Avinity Loop
6185 Rockfish Gap Turnpike Charlottesville,VA 22902
Crozet,VA 22932
Phone:434-823-5154 I Fax:434-823-4764
Test Results
Optimum Maximum In Place In Place Probe Min/Max
Retest Test Soil Moisture Dry Density Moisture Dry Density Depth Percent Comp.
Test# Of Date Proctor ID Method Classification (%) (pcf) (%) (pcf) (in) Compaction (%) Remark
66 8/7/18 3794RC MH 27.6 95.6 29.2 92.2 6 96 95/102
67 8/7/18 3794RC MH 27.6 95.6 29.0 93.1 6 97 95/102
68 8/7/18 3794RC MH 27.6 95.6 29.8 91.5 6 96 95/102
69 8/7/18 3794RC MH 27.6 95.6 29.8 91.9 6 96 95/102
70 8/7/18 3794RC MH 27.6 95.6 29.1 93.0 6 97 95/102
71 8/7/18 3794RC MH 27.6 95.6 29.2 92.8 6 97 95/102
72 8/7/18 3794RC MH 27.6 95.6 29.5 92.4 6 97 95/102
73 8/7/18 3794RC MH 27.6 95.6 29.5 92.2 6 96 95/102
Test Information
Gauge
Test# Test Location Elevation Reference Make/Model/SN/Calibrated Field Technician
66 Utility Trench-Top 3':Bergen street utility trench for water main station 13+75 to 1.0 Below Adjacent grade Troxler/3411 B/12980/ Butler,Shane
station 11+00
67 Utility Trench-Top 3':Bergen street utility trench for water main station 13+75 to 1.0 Below Adjacent grade Troxler/3411 B/12980/ Butler,Shane
station 11+00
68 Utility Trench-Top 3':Bergen street utility trench for water main station 13+75 to 1.0 Below Adjacent grade Troxler/3411 B/12980/ Butler,Shane
station 11+00
69 Utility Trench-Top 3':Bergen street utility trench for water main station 13+75 to 1.0 Below Adjacent grade Troxler/3411 B/12980/ Butler,Shane
station 11+00
70 Utility Trench-Top 3':Bergen street utility trench for water main station 13+75 to 0.0 Below Adjacent grade Troxler/3411 B/12980/ Butler,Shane
station 11+00
71 Utility Trench-Top 3':Bergen street utility trench for water main station 13+75 to 0.0 Below Adjacent grade Troxler/3411 B/12980/ Butler,Shane
station 11+00
72 Utility Trench-Top 3':Bergen street utility trench for water main station 13+75 to 0.0 Below Adjacent grade Troxler/3411 B/12980/ Butler,Shane
station 11+00
73 Utility Trench-Top 3':Bergen street utility trench for water main station 13+75 to 0.0 Below Adjacent grade Troxler/3411 B/12980/ Butler,Shane
station 11+00
Remarks Comments
Tests are"Direct Transmission"(Method A)unless probe depth is noted as
"Backscatter".Gauge calibration data on file with the testing agency.
Page 3 of 3
f&p Fill Monitoring 8-8-18Fill
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71 W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 08/08/2018 Location: Utility Trench
Category: Soils/Earthwork Location Details: Trenches for service water line for lots 2&63,
lots 3&65. and lots 4&66
Coverage: Fill Monitoring
Type: Observation Frequency: Periodic
Weather: Sunny Wind(mph):
Air Temp.(deg.F): 90 Personnel: Butler, Shane , Technician
Description of Work Completed
Work Description: The F and R representative arrived on the jobsite as requested to observe ongoing site work.
Fill Monitoring Summary
Placement Depth/Elev. Fill Moisture Fill Material Lift Compaction Vibration Density
Location Reference Condition Description Thickness Equipment Used? Tests
(inches) Taken
Trenches for adjacent Moist/Very Reddish brown silty 8" Rammax Yes Yes
service water line subgrade Moist soil with small rock
for lots 2&63, lots
3&65, and lots
4&66
Elev.(ft.)3.00
to
Elev.(ft.)0.00
Observations&Comments: Observed the placement of fill in 8"loose lifts and compacted with several passes of vibratory
rammax.
Other Tests Performed: Nuclear density tests
Determination: As Specified
Discrepancy Recorded?: No
Please Note:Inspections, field notes, test results and recommendations herein were recorded under the weather conditions and
construction activities occurring at the time of our site visit. If inclement weather and/or construction activities occur after our visit that
may impact the soil and/or base stone subgrade, F&R should be notified and afforded an opportunity to revisit the site and
revise our report as may be needed.
Page 1 of 3
f&D Soil Nuclear Gauge Client: Project:
I� 8-8-18 Density Riverbend Development 71W0013
�•��� "°_•teaT•��• �_• Report Date: 8/30/2018 455 Second Street SE#400 Avinity Estates Phase I
Crozet Office Test Method:ASTM D6938 Charlottesville, VA 22902 Avinity Loop
6185 Rockfish Gap Turnplke Charlottesville, VA 22902
Crozet,VA 22932
Phone:434-823-5154 I Fax:434-823-4764
Test Results
Optimum Maximum In Place In Place Probe Min/Max
Retest Test Soil Moisture Dry Density Moisture Dry Density Depth Percent Comp.
Test# Of Date Proctor ID Method Classification (%) (pcf) (%) (pcf) (in) Compaction (%) Remark
74 8/8/18 3794RC MH 27.6 95.6 29.6 91.4 6 96 95/102
75 8/8/18 3794RC MH 27.6 95.6 29.3 92.1 6 96 95/102
76 8/8/18 3794RC MH 27.6 95.6 29.5 92.2 6 96 95/102
77 8/8/18 3794RC MH 27.6 95.6 29.1 93.1 6 97 95/102
78 8/8/18 3794RC MH 27.6 95.6 29.0 92.9 6 97 95/102
79 8/8/18 3794RC MH 27.6 95.6 29.1 92.8 6 97 95/102
80 8/8/18 3794RC MH 27.6 95.6 29.7 91.5 6 96 95/102
81 8/8/18 3794RC MH 27.6 95.6 29.4 92.2 6 96 95/102
Test Information
Gauge
Test# Test Location Elevation Reference Make/Model/SN/Calibrated Field Technician
74 Utility Trench: For water services for lot 2 and lot 63 2.0 Feet below adjacent Troxler/3411 B/12980/ Butler,Shane
grade
75 Utility Trench: For water services for lot 2 and lot 63 1.0 Feet below adjacent Troxler/3411 B/12980/ Butler,Shane
grade
76 Utility Trench:For water services for lot 2 and lot 63 0.0 Feet below adjacent Troxler/3411 B/12980/ Butler,Shane
grade
77 Utility Trench: For water services for lot 3 and lot 65 2.0 Feet below adjacent Troxler/3411 B/12980/ Butler,Shane
grade
78 Utility Trench: For water services for lot 3 and lot 65 1.0 Feet below adjacent Troxler/3411 B/12980/ Butler,Shane
grade
79 Utility Trench: For water services for lot 3 and lot 65 0.0 Feet below adjacent Troxler/3411B/12980/ Butler,Shane
grade
80 Utility Trench:For water services for lot 4 and lot 66 2.0 Feet below adjacent Troxler/3411 B/12980/ Butler,Shane
grade
81 Utility Trench:For water services for lot 4 and lot 66 1.0 Feet below adjacent Troxler/3411 B/12980/ Butler,Shane
grade
Remarks Comments
Tests are"Direct Transmission"(Method A)unless probe depth is noted as
"Backscatter".Gauge calibration data on file with the testing agency.
Page 2 of 3
f&p Soil Nuclear Gauge Client: Project:
I� 8-8-18 Density Riverbend Development 71W0013
..Oe O RO.....
ON,INC. Report Date: 8/30/2018 455 Second Street SE#400 Avinity Estates Phase I
Crozet Office Test Method:ASTM D6938 Charlottesville,VA 22902 Avinity Loop
6185 Rockfish Gap Turnpike Charlottesville,VA 22902
Crozet,VA 22932
Phone:434-823-5154 I Fax:434-823-4764
Test Results
Optimum Maximum In Place In Place Probe Min/Max
Retest Test Soil Moisture Dry Density Moisture Dry Density Depth Percent Comp.
Test# Of Date Proctor ID Method Classification (%) (pcf) (%) (pcf) (in) Compaction (%) Remark
82 8/8/18 3794RC MH 27.6 95.6 29.2 93.1 6 97 95/102
Test Information
Gauge
Test# Test Location Elevation Reference Make/Model/SN I Calibrated Field Technician
82 Utility Trench:For water services for lot 4 and lot 66 0.0 Feet below adjacent Troxler/3411 B/12980/ Butler,Shane
grade
Remarks Comments
Tests are"Direct Transmission"(Method A)unless probe depth is noted as
"Backscatter".Gauge calibration data on file with the testing agency.
Page 3 of 3
f&D Fill Monitoring 8-9-18 Fill
FROEMLING IS ROBERTSON,INC.
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 08/09/2018 Location: Utility Trench
Category: Soils/Earthwork Location Details: Trenches for service water line for lots 5&68,
lots 6&69, and lots 7&70,71
Coverage: Fill Monitoring
Type: Observation Frequency: Periodic
Weather: Sunny Wind(mph):
Air Temp.(deg.F): 91 Personnel: Butler, Shane , Technician
Description of Work Completed
Work Description: The F and R representative arrived on the jobsite as requested to observe ongoing site work.
Fill Monitoring Summary
Placement Depth/Elev. Fill Moisture Fill Material Lift Compaction Vibration Density
Location Reference Condition Description Thickness Equipment Used? Tests
(inches) Taken
Trenches for adjacent Moist/Very Reddish brown silty 8" Rammax Yes Yes
service water line subgrade Moist soil with small rock
for lots 5&68, lots
6&69, and lots
7&70,71
Elev.(ft.)3.00
to
Elev.(ft.)0.00
Observations&Comments: Observed the placement of fill in 8"loose lifts and compacted with several passes of vibratory
rammax.
Other Tests Performed: Nuclear density tests
Determination: As Specified
Discrepancy Recorded?: No
Please Note:Inspections, field notes, test results and recommendations herein were recorded under the weather conditions and
construction activities occurring at the time of our site visit. If inclement weather and/or construction activities occur after our visit that
may impact the soil and/or base stone subgrade, F&R should be notified and afforded an opportunity to revisit the site and
revise our report as may be needed.
Page 1 of 3
f&D Soil Nuclear Gauge Client: Project:
I� 8-9-18 Density Riverbend Development 71W0013
AOE� ,�_�b wOeCRT9_O�- Report Date: 8/30/2018 455 Second Street SE#400 Avinity Estates Phase
Crozet Office Test Method:ASTM D6938 Charlottesville,VA 22902 Avinity Loop
6185 Rockfish Gap Turnpike Charlottesville,VA 22902
Crozet,VA 22932
Phone:434-823-51541 Fax:434-823-4764
Test Results
Optimum Maximum In Place In Place Probe Min/Max
Retest Test Soil Moisture Dry Density Moisture Dry Density Depth Percent Comp.
Test# Of Date Proctor ID Method Classification (%) (pcf) (%) (pcf) (in) Compaction (%) Remark
83 8/9/18 3794RC MH 27.6 95.6 29.7 91.9 6 96 95/102
84 8/9/18 3794RC MH 27.6 95.6 29.5 91.8 6 96 95/102
85 8/9/18 3794RC MH 27.6 95.6 29.7 92.0 6 96 95/102
86 8/9/18 3794RC MH 27.6 95.6 29.7 91.8 6 96 95/102
87 8/9/18 3794RC MH 27.6 95.6 28.3 93.7 6 98 95/102
88 8/9/18 3794RC MH 27.6 95.6 29.4 92.6 6 97 95/102
89 8/9/18 3794RC MH 27.6 95.6 29.1 92.7 6 97 95/102
90 8/9/18 3794RC MH 27.6 95.6 29.3 93.2 6 97 95/102
Test Information
Gauge
Test# Test Location Elevation Reference Make/Model/SN/Calibrated Field Technician
83 Utility Trench:For water services for lot 5 and lot 68 2.0 Feet below adjacent Troxler/3411 B/12980/ Butler,Shane
grade
84 Utility Trench: For water services for lot 5 and lot 68 1.0 Feet below adjacent Troxler/3411 B/12980/ Butler,Shane
grade
85 Utility Trench:For water services for lot 5 and lot 68 0.0 Feet below adjacent Troxler/3411 B/12980/ Butler,Shane
grade
86 Utility Trench: For water services for lot 6 and lot 69 2.0 Feet below adjacent Troxler/3411 B/12980/ Butler,Shane
grade
87 Utility Trench:For water services for lot 6 and lot 69 1.0 Feet below adjacent Troxler/3411 B/12980/ Butler,Shane
grade
88 Utility Trench: For water services for lot 6 and lot 69 0.0 Feet below adjacent Troxler/3411 B/12980/ Butler,Shane
grade
89 Utility Trench:For water services for lot 7 and lot 70 2.0 Feet below adjacent Troxler/3411 B/12980/ Butler,Shane
grade
90 Utility Trench: For water services for lot 7 and lot 70 1.0 Feet below adjacent Troxler/3411 B/12980/ Butler,Shane
grade
Remarks Comments
Tests are"Direct Transmission"(Method A)unless probe depth is noted as
"Backscatter".Gauge calibration data on file with the testing agency.
Page 2 of 3
f&D Soil Nuclear Gauge Client: Project:
l' 8-9-18 Density Riverbend Development 71W0013
..oC Report Date: 8/30/2018 455 Second Street SE#400 Avinity Estates Phase I
Crozet Office Test Method: ASTM D6938 Charlottesville,VA 22902 Avinity Loop
6185 Rockfish Gap Turnpike Charlottesville,VA 22902
Crozet,VA 22932
Phone:434-823-5154 I Fax:434-823-4764
Test Results
Optimum Maximum In Place In Place Probe Min/Max
Retest Test Soil Moisture Dry Density Moisture Dry Density Depth Percent Comp.
Test# Of Date Proctor ID Method Classification (%) (pcf) (%) (pcf) (in) Compaction (%) Remark
91 8/9/18 3794RC MH 27.6 95.6 28.8 93.4 6 98 95/102
92 8/9/18 3794RC MH 27.6 95.6 29.3 92.7 6 97 95/102
93 8/9/18 3794RC MH 27.6 95.6 30.3 92.2 6 96 95/102
94 8/9/18 3794RC MH 27.6 95.6 29.2 93.2 6 97 95/102
Test Information
Gauge
Test# Test Location Elevation Reference Make/Model/SN/Calibrated Field Technician
91 Utility Trench: For water services for lot 7 and lot 70 0.0 Feet below adjacent Troxler/3411 B/12980/ Butler,Shane
grade
92 Utility Trench:For water services for lot 71 2.0 Feet below adjacent Troxler/3411B/12980/ Butler,Shane
grade
93 Utility Trench: For water services for lot 71 1.0 Feet below adjacent Troxler/3411 B/12980/ Butler,Shane
grade
94 Utility Trench:For water services for lot 71 0.0 Feet below adjacent Troxler/3411 B/12980/ Butler,Shane
grade
Remarks Comments
Tests are"Direct Transmission"(Method A)unless probe depth is noted as
"Backscatter".Gauge calibration data on file with the testing agency.
Page 3 of 3
f&D Fill Monitoring 8-10-18 Fill
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71 W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 08/10/2018 Location: Utility Trench
Category: Soils/Earthwork Location Details: Trenches for service water line for lots 8&72,
lot 73, lots 9&74, lots 10&75 and lot 76.
Coverage: Fill Monitoring
Type: Observation Frequency: Periodic
Weather: Sunny Wind(mph):
Air Temp.(deg.F): 91 Personnel: Butler, Shane , Technician
Description of Work Completed
General Contractor: Contour Earthwork Contour
Subcontractor:
Work Description: The F and R representative arrived on the jobsite as requested to observe ongoing site work.
Fill Monitoring Summary
Placement Depth/Elev. Fill Moisture Fill Material Lift Compaction Vibration Density
Location Reference Condition Description Thickness Equipment Used? Tests
(inches) Taken
Trenches for adjacent Moist/Very Reddish brown silty 8" Rammax Yes Yes
service water line subgrade Moist soil with small rock
for lots 8&72, lot
73, lots 9&74, lots
10&75 and lot 76.
Elev.(ft.)3.00
to
Elev.(ft.)0.00
Observations&Comments: Observed the placement of fill in 8"loose lifts and compacted with several passes of vibratory
rammax.
Other Tests Performed: Nuclear density tests
Determination: As Specified
Discrepancy Recorded?: No
Please Note:Inspections, field notes, test results and recommendations herein were recorded under the weather conditions and
construction activities occurring at the time of our site visit. If inclement weather and/or construction activities occur after our visit that
may impact the soil and/or base stone subgrade, F&R should be notified and afforded an opportunity to revisit the site and
revise our report as may be needed.
Page 1 of 3
f&D Soil Nuclear Gauge Client: Project:
t� 8-10-18 Density Riverbend Development 71W0013
GROFam INC Report Date: 8/30/2018 455 Second Street SE#400 Avinity Estates Phase I
" °�u�aeAre�".
Crozet Office Test Method:ASTM D6938 Charlottesville,VA 22902 Avinity Loop
6185 Rockfish Gap Turnpike Charlottesville,VA 22902
Crozet,VA 22932
Phone:434-823-51541 Fax:434-823-4764
Test Results
Optimum Maximum In Place In Place Probe Min/Max
Retest Test Soil Moisture Dry Density Moisture Dry Density Depth Percent Comp.
Test# Of Date Proctor ID Method Classification (%) (pcf) (%) _ (pcf) (in) Compaction (%) Remark
95 8/10/18 3794RC MH 27.6 95.6 28.8 93.4 6 98 95/102
96 8/10/18 3794RC MH 27.6 95.6 29.1 93.0 6 97 95/102
97 8/10/18 3794RC MH 27.6 95.6 29.0 93.1 6 97 95/102
98 8/10/18 3794RC MH 27.6 95.6 28.6 93.7 6 98 95/102
99 8/10/18 3794RC MH 27.6 95.6 28.9 93.4 6 98 95/102
100 8/10/18 3794RC MH 27.6 95.6 29.0 93.9 6 98 95/102
101 8/10/18 3794RC MH 27.6 95.6 29.0 93.6 6 98 95/102
102 8/10/18 3794RC MH 27.6 95.6 28.6 94.1 6 98 95/102
Test Information
Gauge
Test# Test Location Elevation Reference Make/Model/SN/Calibrated Field Technician
95 Utility Trench: For water services for lot 8 and lot 72 2.0 Feet below adjacent Troxler/3411 B/12980/ Butler,Shane
grade
96 Utility Trench:For water services for lot 8 and lot 72 1.0 Feet below adjacent Troxler/3411 B/12980/ Butler,Shane
grade
97 Utility Trench: For water services for lot 8 and lot 72 0.0 Feet below adjacent Troxler/3411 B/12980/ Butler,Shane
grade
98 Utility Trench: For water services for lot 73 2.0 Feet below adjacent Troxler/3411 B/12980/ Butler,Shane
grade
99 Utility Trench: For water services for lot 73 1.0 Feet below adjacent Troxler/3411 B/12980/ Butler,Shane
grade
100 Utility Trench:For water services for lot 73 0.0 Feet below adjacent Troxler/3411 B/12980/ Butler, Shane
grade
101 Utility Trench:For water services for lots 9 and 74 2.0 Feet below adjacent Troxler/3411 B/12980/ Butler,Shane
grade
102 Utility Trench: For water services for lots 9 and 74 1.0 Feet below adjacent Troxler/3411 B/12980/ Butler,Shane
grade
Remarks Comments
Tests are"Direct Transmission"(Method A)unless probe depth is noted as
"Backscatter".Gauge calibration data on file with the testing agency.
Page 2 of 3
r&p Soil Nuclear Gauge Client: Project:
I� 8-10-18 Density Riverbend Development 71W0013
FROON ..v .....
`:..;O;,INC. Report Date: 8/30/2018 455 Second Street SE#400 Avinity Estates Phase I
EngeCrozet Office Test Method: ASTM D6938 Charlottesville,VA 22902 Avinity Loop
6185 Rockfish Gap Tumpike Charlottesville,VA 22902
Crozet,VA 22932
Phone:434-823-5154 I Fax:434-823-4764
Test Results
Optimum Maximum In Place In Place Probe Min/Max
Retest Test Soil Moisture Dry Density Moisture Dry Density Depth Percent Comp.
Test# Of Date Proctor ID Method Classification (%) (pcf) (%) (pcf) (in) Compaction (%) Remark
103 8/10/18 3794RC MH 27.6 95.6 29.0 93.6 6 98 95/102
104 8/10/18 3794RC MH 27.6 95.6 29.0 93.3 6 98 95/102
105 8/10/18 3794RC MH 27.6 95.6 28.9 94.1 6 98 95/102
106 8/10/18 3794RC MH 27.6 95.6 28.3 94.2 6 99 95/102
107 8/10/18 3794RC MH 27.6 95.6 28.8 94.2 6 99 95/102
108 8/10/18 3794RC MH 27.6 95.6 29.2 93.5 6 98 95/102
109 8/10/18 3794RC MH 27.6 95.6 29.1 92.8 6 97 95/102
Test Information
Gauge
Test# Test Location Elevation Reference Make/Model/SN/Calibrated Field Technician
103 Utility Trench:For water services for lots 9 and 74 0.0 Feet below adjacent Troxler/3411 B/12980/ Butler,Shane
grade
104 Utility Trench: For water services for lots 10 and 75 2.0 Feet below adjacent Troxler/3411 B/12980/ Butler,Shane
grade
105 Utility Trench: For water services for lots 10 and 75 1.0 Feet below adjacent Troxler/3411 B/12980/ Butler,Shane
grade
106 Utility Trench: For water services for lots 10 and 75 0.0 Feet below adjacent Troxler/3411 B/12980/ Butler,Shane
grade
107 Utility Trench:For water services for lot 76 2.0 Feet below adjacent Troxler/3411 B/12980/ Butler,Shane
grade
108 Utility Trench:For water services for lot 76 1.0 Feet below adjacent Troxler/3411 B/12980/ Butler,Shane
grade
109 Utility Trench:For water services for lot 76 0.0 Feet below adjacent Troxler/3411 B/12980/ Butler,Shane
grade
Remarks Comments
Tests are"Direct Transmission"(Method A)unless probe depth is noted as
"Backscatter".Gauge calibration data on file with the testing agency.
Page 3 of 3
f&D Fill Monitoring 8-13-18 Fill
ROE F R s8N.INC
8:
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville.VA 22902
Date: 08/13/2018 Location: Utility Trench
Category: Soils/Earthwork Location Details: Trenches for service water line for lots
11,12,77,78, lots 13&79, and lots 80&81
Coverage: Fill Monitoring
Type: Observation Frequency: Periodic
Weather: Sunny Wind(mph):
Air Temp.(deg.F): 91 Personnel: Butler, Shane , Technician
Description of Work Completed
Work Description: The F and R representative arrived on the jobsite as requested to observe ongoing site work.
Fill Monitoring Summary
Placement Depth/Elev. Fill Moisture Fill Material Lift Compaction Vibration Density
Location Reference Condition Description Thickness Equipment Used? Tests
(inches) Taken
Trenches for adjacent Moist/Very . Reddish brown silty 8" Rammax Yes Yes
service water line subgrade Moist soil with small rock
for lots
11,12,77,78, lots
13&79, and lots
80&81
Elev.(ft.)3.00
to •
Elev.(ft.)0.00
Observations&Comments: Observed the placement of fill in 8"loose lifts and compacted with several passes of vibratory
rammax.
Other Tests Performed: Nuclear density tests
Determination: As Specified
Discrepancy Recorded?: No
Please Note:Inspections, field notes, test results and recommendations herein were recorded under the weather conditions and
construction activities occurring at the time of our site visit. If inclement weather and/or construction activities occur after our visit that
may impact the soil and/or base stone subgrade, F&R should be notified and afforded an opportunity to revisit the site and
revise our report as may be needed.
Page 1 of 3
f&D Soil Nuclear Gauge Client: Project:
t� 8-13-18 Density Riverbend Development 71W0013
.aoCHf a" -L FICISEIWTSON.
INC. Report Date: 8/30/2018 455 Second Street SE#400 Avinity Estates Phase I
Crozet Office Test Method:ASTM D6938 Charlottesville, VA 22902 Avinity Loop
6185 Rockfish Gap Turnpike Charlottesville,VA 22902
Crozet,VA 22932
Phone:434-823-5154 I Fax:434-823-4764
Test Results
' Optimum Maximum In Place In Place Probe Min/Max
Retest Test Soil Moisture Dry Density Moisture Dry Density Depth Percent Comp.
Test# _Of Date _ Proctor ID Method Classification (%) (pcf) (%) (pcf) (in) _Compaction (%) Remark
110 8/13/18 3794RC MH 27.6 95.6 28.8 93.4 6 98 95/102
111 8/13/18 3794RC MH 27.6 95.6 29.3 92.9 6 97 95/102
112 8/13/18 3794RC MH 27.6 95.6 28.8 93.0 6 97 95/102
113 8/13/18 3794RC MH 27.6 95.6 29.1 93.1 6 97 95/102
114 8/13/18 - 3794RC MH 27.6 95.6 28.4 93.4 6 98 95/102
115 8/13/18 3794RC MH 27.6 95.6 28.4 94.1 6 98 95/102
116 8/13/18 3794RC MH 27.6 95.6 28.9 93.9 6 98 95/102
117 8/13/18 3794RC MH - 27.6 95.6 29.3 92.7 6 97 95/102
Test Information
Gauge
Test# Test Location Elevation Reference Make/Model/SN/Calibrated Field Technician
110 Utility Trench: For water services for lot 11,12,77,78 2.0 Feet below adjacent Troxler/3411 B/12980/ Butler,Shane
grade
111 Utility Trench: For water services for lot 11,12,77,78 1.0 Feet below adjacent Troxler/3411B/12980/ Butler,Shane
grade
112 Utility Trench:For water services for lot 11,12,77,78 0.0 Feet below adjacent Troxler/3411B/12980/ Butler,Shane
grade
113 Utility Trench:For water services for lots 13 and 79 2.0 Feet below adjacent Troxler/3411B/12980/ Butler,Shane
grade
114 Utility Trench: For water services for lots 13 and 79 1.0 Feet below adjacent Troxler/3411B/12980/ Butler,Shane
grade
115 Utility Trench: For water services for lots 13 and 79 0.0 Feet below adjacent Troxler/3411 B/12980/ Butler,Shane
grade
116 Utility Trench:For water services for lots 80 and 81 2.0 Feet below adjacent Troxler/3411 B/12980/ Butler,Shane
grade
117 Utility Trench: For water services for lots 80 and 81 1.0 Feet below adjacent Troxler/3411 B/12980/ Butler,Shane
grade
Remarks Comments
Tests are"Direct Transmission"(Method A)unless probe depth is noted as
"Backscatter".Gauge calibration data on file with the testing agency,
Page 2 of 3
f&p Soil Nuclear Gauge Client: Project:
I� 8-13-18 Density Riverbend Development 71W0013
Report Date: 8/30/2018 455 Second Street SE#400 Avinity Estates Phase
Crozet Office Test Method:ASTM D6938 Charlottesville,VA 22902 Avinity Loop
6185 Rockfish Gap Turnpike Charlottesville,VA 22902
Crozet,VA 22932
Phone:434-823-5154 I Fax:434-823-4764
Test Results
Optimum Maximum In Place In Place Probe Min/Max
Retest Test Soil Moisture Dry Density Moisture Dry Density Depth Percent Comp.
Test# Of Date Proctor ID Method Classification (%) (pcf) (%) (pcf) (in) Compaction (%) Remark
118 8/13/18 3794RC MH 27.6 95.6 28.7 93.8 6 98 95/102
Test Information
Gauge
Test# Test Location Elevation Reference Make/Model/SN/Calibrated Field Technician
118 Utility Trench:For water services for lots 80 and 81 0.0 Feet below adjacent Troxler/3411 B/12980/ Butler,Shane
grade
Remarks Comments
Tests are"Direct Transmission"(Method A)unless probe depth is noted as
"Backscatter".Gauge calibration data on file with the testing agency.
Page 3 of 3
f&D Fill Monitoring 8-15-18 Fill
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71 W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 08/15/2018 Location: Utility Trench
Category: Soils/Earthwork Location Details: Bergen street.Water line station 11+00 to
station 10+00
Coverage: Fill Monitoring
Type: Observation Frequency: Periodic
Weather: Sunny Wind(mph):
Air Temp.(deg.F): 88 Personnel: Butler, Shane , Technician
Description of Work Completed
Work Description: The F and R representative arrived on the jobsite as requested to observe ongoing site work.
Fill Monitoring Summary
Placement Depth/Elev. Fill Moisture Fill Material Lift Compaction Vibration Density
Location Reference Condition Description Thickness Equipment Used? Tests
(inches) Taken
Bergen street. adjacent Moist Brown Sandy soils 8" Rammax Yes Yes
Water line station subgrade with light gravel
11+00 to station
10+00
Elev.(ft.)-3.00
to
Elev.(ft.)0.00
Observations&Comments: Observed the placement of fill to the utility trench for the water main. Fill placed in 8 inch lifts and
compacted with several passes of vibratory rammax.
Other Tests Performed: Nuclear density tests were performed
Determination: As Specified
Discrepancy Recorded?: No
Please Note:Inspections, field notes, test results and recommendations herein were recorded under the weather conditions and
construction activities occurring at the time of our site visit. If inclement weather and/or construction activities occur after our visit that
may impact the soil and/or base stone subgrade, F&R should be notified and afforded an opportunity to revisit the site and
revise our report as may be needed.
Page 1 of 3
rsiz Soil Nuclear Gauge Client: Project:
8-15-18 Density Riverbend Development 71W0013
FRO i•OaE•T•ON.INC. Report Date: 8/30/2018 455 Second Street SE#400 Avinity Estates Phase I
Crozet Office Test Method: ASTM D6938 Charlottesville, VA 22902 Avinity Loop
6185 Rockfish Gap Turnpike Charlottesville,VA 22902
Crozet,VA 22932
Phone:434-823-5154 I Fax:434-823-4764
Test Results
Optimum Maximum In Place In Place Probe Min/Max
Retest Test Soil Moisture Dry Density Moisture Dry Density Depth Percent Comp.
Test# Of Date Proctor ID Method Classification (%) (pcf) (%) (pcf) (in) Compaction (%) Remark
119 8/15/18 3794RC MH 27.6 95.6 28.7 93.5 6 98 95/102
120 8/15/18 3794RC MH 27.6 95.6 29.0 93.1 6 97 95/102
121 8/15/18 3794RC MH 27.6 95.6 28.8 93.5 6 98 95/102
122 8/15/18 3794RC MH 27.6 95.6 28.6 93.8 6 98 95/102
123 8/15/18 3794RC MH 27.6 95.6 28.6 94.1 6 98 95/102
124 8/15/18 3794RC MH 27.6 95.6 28.8 94.1 6 98 95/102
125 8/15/18 3794RC MH 27.6 95.6 28.8 92.9 6 97 95/102
126 8/15/18 3794RC MH 27.6 95.6 29.0 93.2 6 97 95/102
Test Information
Gauge
Test# Test Location Elevation Reference Make/Model/SN/Calibrated Field Technician
119 •Utility Trench-Water Main:Station 11+00 to station 10+00 2.0 Below existing grade Troxler/3411 B/12980/ Butler,Shane
120 Utility Trench-Water Main:Station 11+00 to station 10+00 2.0 Below existing grade Troxler/3411 B/12980/ Butler,Shane
121 Utility Trench-Water Main:Station 11+00 to station 10+00 2.0 Below existing grade Troxler/3411 B/12980/ Butler,Shane
122 Utility Trench-Water Main:Station 11+00 to station 10+00 1.0 Below existing grade Troxler/3411 B/12980/ Butler,Shane
123 Utility Trench-Water Main:Station 11+00 to station 10+00 1.0 Below existing grade Troxler/3411 B/12980/ Butler,Shane
124 Utility Trench-Water Main:Station 11+00 to station 10+00 1.0 Below existing grade Troxler/3411 B/12980/ Butler,Shane
125 Utility Trench-Water Main:Station 11+00 to station 10+00 0.0 Below existing grade Troxler/3411 B/12980/ Butler,Shane
126 Utility Trench-Water Main:Station 11+00 to station 10+00 0.0 Below existing grade Troxler/3411 B/12980/ Butler,Shane
Remarks Comments
Tests are"Direct Transmission"(Method A)unless probe depth is noted as
"Backscatter".Gauge calibration data on file with the testing agency.
Page 2 of 3
f&p Soil Nuclear Gauge Client: Project:
I� 8-15-18 Density Riverbend Development 71W0013
F.oEHf °s.ROB RTSON,'N_ Report Date: 8/30/2018 455 Second Street SE#400 Avinity Estates Phase I
Crozet Office Test Method: ASTM D6938 Charlottesville, VA 22902 Avinity Loop
6185 Rockfish Gap Turnpike Charlottesville,VA 22902
Crozet,VA 22932
Phone:434-823-5154 I Fax:434-823-4764
Test Results
Optimum Maximum In Place In Place Probe Min/Max
Retest Test Soil Moisture Dry Density Moisture Dry Density Depth Percent Comp.
Test# Of Date Proctor ID Method Classification (%) (pcf) (%) (pcf) (in) Compaction (%) Remark
127 8/15/18 3794RC MH 27.6 95.6 28.7 93.1 6 97 95/102
Test Information
Gauge
Test# Test Location Elevation Reference Make/Model/SN I Calibrated Field Technician
127 Utility Trench-Water Main:Station 11+00 to station 10+00 0.0 Below existing grade Troxler/3411B/12980/ Butler,Shane
Remarks Comments
Tests are"Direct Transmission"(Method A)unless probe depth is noted as
"Backscatter".Gauge calibration data on file with the testing agency.
Page 3 of 3
4 b Field Report 8-16-18 DFR
I� Various Report Date: 8/30/2018
FRO � RT9pw.iwC.
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71 W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 08/16/2018 Location: Utility Trench
Category: Soils/Earthwork Location Details: Moffat street station 11+80 to station 12+20
Type: Observation Frequency: Periodic
Weather: Partly sunny
Air Temp.(deg.F): 88 F&R Personnel: Butler, Shane , Technician
Description of Work Completed
Work Completed: The F and R representative arrived on the jobsite as requested to observe ongoing site work.
Field Notes: Observed excavation on the utility trench for water main from station 11+80 to station 12+20. No fill
placed on this day.
Determination: As Specified
Page 1 of 1
f&p Field Report 8-17-18 DFR
I� Various Report Date: 8/30/2018
E S 6 ROBERTSON.INC.
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71 W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 08/17/2018 Location: Site-Roadway
Category: Soils/Earthwork Location Details: Bergen street
Type: Observation Frequency: Periodic
Weather: Mostly sunny
Air Temp.(deg.F): 89 F&R Personnel: Butler, Shane ,Technician
Description of Work Completed
Work Completed: The F and R representative arrived on the jobsite as requested to observe ongoing site work.
Field Notes: Observed excavation of Bergen street to bring to grade. Obtained a soil sample for CBR testing.
Determination: As Specified
Page 1 of 1
Fill Monitoring 8-20-18 Fill
F&R
FRO ROBERTS ON.
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71 W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 08/20/2018 Location: Utility Trench
Category: Soils/Earthwork Location Details: Sanitary sewer line on Degraw st. From
station 0+00 to station 0+50
Coverage: Fill Monitoring
Type: Observation Frequency: Periodic
Weather: Overcast Wind(mph):
Air Temp.(deg.F): 83 Personnel: Butler, Shane , Technician
Description of Work Completed
General Contractor: Contour Earthwork Contour
Subcontractor:
Work Description: The F and R representative arrived on the jobsite as requested to observe ongoing site work.
Fill Monitoring Summary
Placement Depth/Elev. Fill Moisture Fill Material Lift Compaction Vibration Density
Location Reference Condition Description Thickness Equipment Used? Tests
(inches) Taken
Sanitary sewer adjacent Moist/Very Reddish brown silty 8" Rammax Yes Yes
line on Degraw st. subgrade Moist soil with small rock.
From station 0+00
to station 0+50
Elev.(ft.)-3.00
to
Elev.(ft.)0.00
Observations&Comments: Observed the placement of fill to the utility trench for sanitary sewer on Degraw st. From station 0+00 to
station 0+50. Fill placed in 8"loose lifts and compacted with several passes of vibratory rammax.
Other Tests Performed: Nuclear density tests
Determination: As Specified
Discrepancy Recorded?: No
Please Note:Inspections, field notes, test results and recommendations herein were recorded under the weather conditions and
construction activities occurring at the time of our site visit. If inclement weather and/or construction activities occur after our visit that
may impact the soil and/or base stone subgrade, F&R should be notified and afforded an opportunity to revisit the site and
revise our report as may be needed.
Page 1 of 2
fon Soil Nuclear Gauge Client: Project:
OAK 8-20-18 Density Riverbend Development 71W0013
•ROe E �_ Report Date: 8/30/2018 455 Second Street SE#400 Avinity Estates Phase I
Crozet Office Test Method:ASTM D6938 Charlottesville, VA 22902 Avinity Loop
6185 Rockfish Gap Turnpike Charlottesville,VA 22902
Crozet,VA 22932
Phone:434-823-5154 I Fax:434-823-4764
Test Results
Optimum Maximum In Place In Place Probe Min/Max
Retest Test Soil Moisture Dry Density Moisture Dry Density Depth Percent Comp.
Test# Of Date Proctor ID Method Classification (%) (pcf) (%) (pcf) (in) Compaction (%) Remark
128 8/20/18 3794RC MH 27.6 95.6 29.7 92.0 6 96 95/102
129 8/20/18 3794RC MH 27.6 95.6 29.5 _ 91.8 6 96 95/102
130 8/20/18 3794RC MH 27.6 95.6 29.3 92.4 _ 6 97 95/102
131 8/20/18 3794RC MH 27.6 95.6 29.9 91.1 6 95 95/102
Test Information
Gauge
Test# Test Location Elevation Reference Make/Model/SN/Calibrated Field Technician
128 Utility Trench-Sanitary Sewer: Degraw St,Station 0+00 to station 0+50 3.0 Foot below adjacent Troxler/3411 B/12980/ Butler,Shane
grade
129 Utility Trench-Sanitary Sewer:Degraw St,Station 0+00 to station 0+50 2.0 Foot below adjacent Troxler/3411 B/12980/ Butler,Shane
grade
130 Utility Trench-Sanitary Sewer:Degraw St,Station 0+00 to station 0+50 1.0 Foot below adjacent Troxler/3411 B/12980/ Butler,Shane
grade
131 Utility Trench-Sanitary Sewer:Degraw St,Station 0+00 to station 0+50 0.0 Foot below adjacent Troxler/3411 B/12980/ Butler,Shane
grade
Remarks Comments
Tests are"Direct Transmission"(Method A)unless probe depth is noted as
"Backscatter".Gauge calibration data on file with the testing agency.
Page 2 of 2
F&R Fill Monitoring 8-23-18 Fill
FROE/-11-ING S.ROBERTSON.INC.
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 08/23/2018 Location: Utility Trench
Category: Soils/Earthwork Location Details: Sanitary sewer line on Degraw st. From
station 0+50 to station 2+00
Coverage: Fill Monitoring
Type: Observation Frequency: Periodic
Weather: Sunny Wind(mph):
Air Temp.(deg.F): 80 Personnel: Butler, Shane , Technician
Description of Work Completed
Work Description: The F and R representative arrived on the jobsite as requested to observe ongoing site work.
Fill Monitoring Summary
Placement Depth/Elev. Fill Moisture Fill Material Lift Compaction Vibration Density
Location Reference Condition Description Thickness Equipment Used? Tests
(inches) Taken
Sanitary sewer adjacent Moist/Very Reddish brown silty 8" Rammax Yes Yes
line on Degraw st. subgrade Moist soil with small rock.
From station 0+50
to station 2+00
Elev.(ft.)-3.00
to
Elev.(ft.)0.00
Observations&Comments: Observed the placement of fill to the utility trench for sanitary sewer on Degraw st. from station 0+50 to
station 2+00. Fill placed in 8"loose lifts and compacted with several passes of vibratory rammax.
Other Tests Performed: Nuclear density tests
Determination: As Specified
Discrepancy Recorded?: No
Please Note: Inspections, field notes, test results and recommendations herein were recorded under the weather conditions and
construction activities occurring at the time of our site visit. If inclement weather and/or construction activities occur after our visit that
may impact the soil and/or base stone subgrade, F&R should be notified and afforded an opportunity to revisit the site and
revise our report as may be needed.
Page 1 of 3
f&D Soil Nuclear Gauge Client: Project:
I� 8-23-18 Density Riverbend Development 71W0013
Report Date: 8/30/2018 455 Second Street SE#400 Avinity Estates Phase I
Crozet office, Test Method:ASTM D6938 Charlottesville,VA 22902 Avinity Loop
6185 Rockfish Gap Turnpike Charlottesville,VA 22902
Crozet,VA 22932
Phone:434-823-5154 I Fax:434-823-4764
Test Results
Optimum Maximum In Place In Place Probe Min/Max
Retest Test Soil Moisture Dry Density Moisture Dry Density Depth Percent Comp.
Test# Of Date Proctor ID Method Classification (%) _ (pcf) (%) (pcf) (in) Compaction (%) Remark
132 8/23/18 3794RC MH 27.6 95.6 28.9 94.1 6 98 95/102
133 8/23/18 3794RC MH 27.6 95.6 28.5 94.1 6 98 95/102
134 8/23/18 3794RC MH 27.6 95.6 28.7 94.1 6 98 95/102
135 8/23/18 3794RC MH 27.6 95.6 28.5 94.4 6 99 95/102
136 8/23/18 3794RC MH 27.6 95.6 28.8 93.7 6 98 95/102
137 8/23/18 3794RC MH 27.6 95.6 28.9 94.0 6 98 95/102
138 8/23/18 3794RC MH 27.6 95.6 28.3 94.4 6 99 95/102
139 8/23/18 3794RC MH 27.6 95.6 28.5 94.0 6 98 95/102
Test Information
Gauge
Test# Test Location Elevation Reference Make I Model/SN/Calibrated Field Technician
132 Utility Trench-Sanitary Sewer:Degraw st.Station 0+50 to station 1+00 3.0 Below Adjacent grade Troxler/3411 B/12980/ Butler,Shane
133 Utility Trench-Sanitary Sewer:Degraw st.Station 0+50 to station 1+00 2.0 Below Adjacent grade Troxler/3411 B/12980/ Butler,Shane
134 Utility Trench-Sanitary Sewer:Degraw st.Station 0+50 to station 1+00 1.0 Below Adjacent grade Troxler/3411 B/12980/ Butler,Shane
135 Utility Trench-Sanitary Sewer: Degraw st.Station 0+50 to station 1+00 0.0 Below Adjacent grade Troxler/3411 B/12980/ Butler,Shane
136 Utility Trench-Sanitary Sewer: Degraw st.Station 1+00 to station 1+50 3.0 Below Adjacent grade Troxler/3411 B/12980/ Butler,Shane
137 Utility Trench-Sanitary Sewer:Degraw st.Station 1+00 to station 1+50 2.0 Below Adjacent grade Troxler/3411 B/12980/ Butler,Shane
138 Utility Trench-Sanitary Sewer: Degraw st.Station 1+00 to station 1+50 1.0 Below Adjacent grade Troxler/3411 B/12980/ Butler,Shane
139 Utility Trench-Sanitary Sewer: Degraw st.Station 1+00 to station 1+50 0.0 Below Adjacent grade Troxler/3411 B/12980/ Butler,Shane
Remarks Comments
Tests are"Direct Transmission"(Method A)unless probe depth is noted as
"Backscatter".Gauge calibration data on file with the testing agency.
Page 2 of 3
f& Soil Nuclear Gauge Client: Project:
I� 8-23-18 Density Riverbend Development 71W0013
Report Date: 8/30/2018 455 Second Street SE#400 Avinity Estates Phase I
Crozet Office Test Method:ASTM D6938 Charlottesville, VA 22902 Avinity Loop
6185 Rockfish Gap Turnpike Charlottesville,VA 22902
Crozet,VA 22932
Phone:434-823-5154I Fax:434-823-4764
Test Results
Optimum Maximum In Place In Place Probe Min/Max
Retest Test Soil Moisture Dry Density Moisture Dry Density Depth Percent Comp.
Test# Of Date Proctor ID Method Classification (%) (pcf) (%) (pcf) (in) Compaction (%) Remark
140 8/23/18 3794RC MH 27.6 95.6 28.9 94.0 6 98 95/102
141 8/23/18 3794RC MH 27.6 95.6 28.5 94.1 6 98 95/102
142 8/23/18 3794RC MH 27.6 95.6 28.3 94.3 6 99 95/102
143 8/23/18 3794RC MH 27.6 95.6 28.6 93.9 6 98 95/102
Test Information
Gauge
Test# Test Location Elevation Reference Make/Model/SN I Calibrated Field Technician
140 Utility Trench-Sanitary Sewer: Degraw st.Station 1+50 to station 2+00 3.0 Below Adjacent grade Troxler/3411 B/12980/ Butler,Shane
141 Utility Trench-Sanitary Sewer: Degraw st.Station 1+50 to station 2+00 2.0 Below Adjacent grade Troxler/3411B/12980/ Butler,Shane
142 Utility Trench-Sanitary Sewer: Degraw st.Station 1+50 to station 2+00 1.0 Below Adjacent grade Troxler/3411 B/12980/ Butler,Shane
143 Utility Trench-Sanitary Sewer:Degraw st.Station 1+50 to station 2+00 0.0 Below Adjacent grade Troxler/3411 B/12980/ Butler,Shane
Remarks Comments
Tests are"Direct Transmission"(Method A)unless probe depth is noted as
"Backscatter".Gauge calibration data on file with the testing agency.
Page 3 of 3
Field Report 8-29-18 DFR
I J' Various p Report Date: 8/30/2018
r+a s1.1011ERTSON.INC.
-_-- ^a .auro+wsa1an
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71 W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 08/29/2018 Location: Utility Trench
Category: Soils/Earthwork Location Details: Montague street
Type: Observation Frequency: Periodic
Weather: Sunny
Air Temp.(deg.F): 90 F&R Personnel: Butler, Shane , Technician
Description of Work Completed
Work Completed: The F and R representative arrived on the jobsite as requested to observe ongoing site work.
Tests Performed: Not ready for testing at this time
Field Notes: Observed the beginning excavation of the trench for the water line on Montague street.
Determination: As Specified
Page 1 of 1
F&R Fill Monitoring 8-30-18 Fill
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71 W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 08/30/2018 Location: Utility Trench
Category: Soils/Earthwork Location Details: Storm water drain on Montague st from DI#10
to DI#12 then across the street to DI#24.
Coverage: Fill Monitoring
Type: Observation Frequency: Periodic
Weather: Sunny Wind(mph):
Air Temp.(deg.F): 91 Personnel: Butler, Shane , Technician
Description of Work Completed
Work Description: The F&R representative arrived on the jobsite as requested to observe ongoing site work.
Fill Monitoring Summary
Placement Depth/Elev. Fill Moisture Fill Material Lift Compaction Vibration Density
Location Reference Condition Description Thickness Equipment Used? Tests
(inches) Taken
Storm water drain adjacent Moist Reddish brown silty 8" Rammax Yes Yes
on Montague st subgrade soil
from DI#10 to DI
#12 then across
the street to DI#24
Elev.(ft.)-4.00
to
Elev.(ft.)0.00
Observations&Comments: Observed the placement of fill in 8"loose lifts and compacted with several passes of vibratory
rammax.
Other Tests Performed: Nuclear density tests were performed
Determination: As Specified
Discrepancy Recorded?: No
Please Note:Inspections, field notes, test results and recommendations herein were recorded under the weather conditions and
construction activities occurring at the time of our site visit. If inclement weather and/or construction activities occur after our visit that
may impact the soil and/or base stone subgrade, F&R should be notified and afforded an opportunity to revisit the site and
revise our report as may be needed.
Page 1 of 3
&D Soil Nuclear Gauge Client: Project:
f I� 8-30-18 Density Riverbend Development 71W0013
Report Date: 10/19/2018 455 Second Street SE#400 Avinity Estates Phase I
Crozet Office Test Method:ASTM D6938 Charlottesville,VA 22902 Avinity Loop
6185 Rockfish Gap Turnpike Charlottesville,VA 22902
Crozet,VA 22932
Phone:434-823-5154 I Fax:434-823-4764
Test Results
Optimum Maximum In Place In Place Probe Min/Max
Retest Test Soil Moisture Dry Density Moisture Dry Density Depth Percent Comp.
Test# Of Date Proctor ID Method Classification (%) (pcf) (%) (pcf) (in) Compaction (%) Remark
144 8/30/18 3794RC MH 27.6 95.6 28.3 92.9 6 97 95/102
145 8/30/18 3794RC MH 27.6 95.6 28.0 92.9 6 97 95/102
146 8/30/18 3794RC MH 27.6 95.6 29.5 92.2 6 96 95/102
147 8/30/18 3794RC MH 27.6 95.6 29.6 91.4 6 96 95/102
148 8/30/18 3794RC MH 27.6 95.6 29.4 92.2 6 96 95/102
149 8/30/18 3794RC MH 27.6 95.6 29.5 91.8 6 96 95/102
150 8/30/18 3794RC MH 27.6 95.6 29.0 92.9 6 97 95/102
151 8/30/18 3794RC MH 27.6 95.6 29.5 92.2 6 96 95/102
Test Information
Gauge
Test# Test Location Elevation Reference Make/Model/SN/Calibrated Field Technician
144 Utility Trench-Top 3':Storm water drain on Montague st from DI#10 to DI"12 then 3.0 Foot below grade Troxler/3411 B/12980/ Butler,Shane
across the street to DI#24.
145 Utility Trench-Top 3':Storm water drain on Montague st from DI#10 to DI"12 then 2.0 Foot below grade Troxler/3411 B/12980/ Butler,Shane
across the street to DI#24.
146 Utility Trench-Top 3':Storm water drain on Montague st from DI#10 to DI"12 then 1.0 Foot below grade Troxler/3411B/12980/ Butler,Shane
across the street to DI#24.
147 Utility Trench-Top 3':Storm water drain on Montague st from DI#10 to DI"12 then 3.0 Foot below grade Troxler/3411 B/12980/ Butler,Shane
across the street to DI#24.
148 Utility Trench-Top 3':Storm water drain on Montague st from DI#10 to DI"12 then 2.0 Foot below grade Troxler/3411 B/12980/ Butler,Shane
across the street to DI#24.
149 Utility Trench-Top 3':Storm water drain on Montague st from DI#10 to DI"12 then 1.0 Foot below grade Troxler/3411 B/12980/ Butler,Shane
across the street to DI#24.
150 Utility Trench-Top 3':Storm water drain on Montague st from DI#10 to DI"12 then 3.0 Foot below grade Troxler/3411 B/12980/ Butler,Shane
across the street to DI#24.
151 Utility Trench-Top 3':Storm water drain on Montague st from DI#10 to DI"12 then 2.0 Foot below grade Troxler/3411 B/12980/ Butler,Shane
across the street to DI#24.
Remarks Comments
Tests are"Direct Transmission"(Method A)unless probe depth is noted as
"Backscatter".Gauge calibration data on file with the testing agency.
Page 2 of 3
f&p Soil Nuclear Gauge Client: Project:
I� 8-30-18 Density Riverbend Development 71 W0013
y- Report Date: 10/19/2018 455 Second Street SE#400 Avinity Estates Phase I
Crozet Office Test Method:ASTM D6938 Charlottesville,VA 22902 Avinity Loop
6185 Rockfish Gap Turnpike Charlottesville, VA 22902
Crozet,VA 22932
Phone:434-823-5154 I Fax:434-823-4764
Test Results
Optimum Maximum In Place In Place Probe Min/Max
Retest Test Soil Moisture Dry Density Moisture Dry Density Depth Percent Comp.
Test# Of Date Proctor ID Method Classification (%) (pcf) (%) (pcf) (in) Compaction (%) Remark
152 8/30/18 3794RC MH 27.6 95.6 29.1 92.7 6 97 95/102
Test Information
Gauge
Test# Test Location Elevation Reference Make/Model/SN/Calibrated Field Technician
152 Utility Trench-Top 3':Storm water drain on Montague st from DI#10 to DI"12 then 1.0 Foot below grade Troxler/3411 B/12980/ Butler,Shane
across the street to DI#24.
Remarks Comments
Tests are"Direct Transmission"(Method A)unless probe depth is noted as
"Backscatter".Gauge calibration data on file with the testing agency.
Page 3 of 3
F&R Fill Monitoring 9-4-18 Fill
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 09/04/2018 Location: Utility Trench
Category: Soils/Earthwork Location Details: Degraw street. Water line station 7+25 to
station 6+00
Coverage: Fill Monitoring
Type: Observation Frequency: Periodic
Weather: Sunny Wind(mph):
Air Temp.(deg.F): 91 Personnel: Butler, Shane , Technician
Description of Work Completed
Work Description: The F&R representative arrived on the jobsite as requested to observe ongoing site work.
Fill Monitoring Summary
Placement Depth/Elev. Fill Moisture Fill Material Lift Compaction Vibration Density
Location Reference Condition Description Thickness Equipment Used? Tests
(inches) Taken
Degraw street. adjacent Moist Brown Sandy soils 8" Rammax Yes Yes
Water line station subgrade with light gravel
7+25 to station
6+00
Elev.(ft.)-3.00
to
Elev.(ft.)0.00
Observations&Comments: Observed the placement of fill in the utility trench for the water line. Fill placed in 8 inch lifts and
compacted with several passes of vibratory rammax.
Determination: As Specified
Discrepancy Recorded?: No
Please Note:Inspections, field notes, test results and recommendations herein were recorded under the weather conditions and
construction activities occurring at the time of our site visit. If inclement weather and/or construction activities occur after our visit that
may impact the soil and/or base stone subgrade, F&R should be notified and afforded an opportunity to revisit the site and
revise our report as may be needed.
Page 1 of 2
f&D Soil Nuclear Gauge Client: Project:
I� 9-4-18 Density Riverbend Development 71W0013
Report Date: 10/19/2018 455 Second Street SE#400 Avinity Estates Phase I
Crozet Office Test Method:ASTM D6938 Charlottesville, VA 22902 Avinity Loop
6185 Rockfish Gap Turnpike Charlottesville,VA 22902
Crozet,VA 22932
Phone:434-823-5154 I Fax:434-823-4764
Test Results
Optimum Maximum In Place In Place Probe Min/Max
Retest Test Soil Moisture Dry Density Moisture Dry Density Depth Percent Comp.
Test# Of Date Proctor ID Method Classification (%) (pcf) (%) (pcf) (in) Compaction (%) Remark
153 9/4/18 3747RC ML 26.6 94.6 29.5 92.1 6 97 95/102
154 9/4/18 3747RC ML 26.6 94.6 29.3 92.6 6 98 95/102
155 9/4/18 3747RC ML 26.6 94.6 29.3 92.8 6 98 95/102
156 9/4/18 3747RC ML 26.6 94.6 29.5 92.6 6 98 95/102
157 9/4/18 3747RC ML 26.6 94.6 28.7 93.1 6 98 95/102
158 9/4/18 3747RC ML 26.6 94.6 29.6 91.9 6 97 95/102
Test Information
Gauge
Test# Test Location Elevation Reference Make/Model/SN/Calibrated Field Technician
153 Utility Trench-Water Main:Degraw st.Station 7+25 to station 6+00 3.0 Below existing grade Troxler/3411 B/12980/ Butler,Shane
154 Utility Trench-Water Main:Degraw st.Station 7+25 to station 6+00 3.0 Below existing grade Troxler/3411 B/12980/ Butler,Shane
155 Utility Trench-Water Main:Degraw st.Station 7+25 to station 6+00 2.0 Below existing grade Troxler/3411 B/12980/ Butler,Shane
156 Utility Trench-Water Main:Degraw st.Station 7+25 to station 6+00 2.0 Below existing grade Troxler/3411 B/12980/ Butler,Shane
157 Utility Trench-Water Main: Degraw st.Station 7+25 to station 6+00 1.0 Below existing grade Troxler/3411 B/12980/ Butler,Shane
158 Utility Trench-Water Main: Degraw st.Station 7+25 to station 6+00 1.0 Below existing grade Troxler/3411 B/12980/ Butler,Shane
Remarks Comments
Tests are"Direct Transmission"(Method A)unless probe depth is noted as
"Backscatter".Gauge calibration data on file with the testing agency.
Page 2 of 2
Fill Monitoring 9-5-18 Fill
F&R
FaoE E�. R E s aft:
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71 W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 09/05/2018 Location: Utility Trench
Category: Soils/Earthwork Location Details: Montague st,
Sanitary sewer from MH#2 going towards
MH#3 for 120'
Storm water drain from DI#14 TO DI#15
Coverage: Fill Monitoring
Type: Observation Frequency: Periodic
Weather: Sunny Wind(mph):
Air Temp.(deg.F): 92 Personnel: Butler, Shane , Technician
Description of Work Completed
Work Description: The F&R representative arrived on the jobsite as requested to observe ongoing site work.
Fill Monitoring Summary
Placement Depth/Elev. Fill Moisture Fill Material Lift Compaction Vibration Density
Location Reference Condition Description Thickness Equipment Used? Tests
(inches) Taken
Montague st, adjacent Moist Reddish brown silty 8" Sheepsfoot Yes Yes
Sanitary sewer subgrade soil with small rock Roller/
from MH#2 going Rammax
towards MH#3 for
120'
Storm water drain
from DI#14 TO
DI#15
Elev.(ft.)-3.00
to
Elev.(ft.)0.00
Observations&Comments: Observed the placement of fill in 8"loose lifts and compacted with several passes of vibratory rammax
and sheepsfoot roller.
Determination: As Specified
Discrepancy Recorded?: No
Please Note:Inspections, field notes, test results and recommendations herein were recorded under the weather conditions and
construction activities occurring at the time of our site visit. If inclement weather and/or construction activities occur after our visit that
may impact the soil and/or base stone subgrade, F&R should be notified and afforded an opportunity to revisit the site and
revise our report as may be needed.
Page 1 of 3
rsiz Soil Nuclear Gauge Client: Project:
9-5-18 Density Riverbend Development 71W0013
FACIEre °ER elON.CIINC. Report Date: 10/19/2018 455 Second Street SE#400 Avinity Estates Phase I
NLI '^q Nob„
Crozet office Test Method:ASTM D6938 Charlottesville,VA 22902 Avinity Loop
6185 Rockfish Gap Turnpike Charlottesville,VA 22902
Crozet,VA 22932
Phone:434-823-5154 I Fax:434-823-4764
Test Results
Optimum Maximum In Place In Place Probe Min/Max
Retest Test Soil Moisture Dry Density Moisture Dry Density Depth Percent Comp.
Test# Of Date Proctor ID Method Classification (%) (pcf) (%) (pcf) (in) Compaction (%) Remark
159 9/5/18 3794RC MH 27.6 95.6 29.4 92.4 6 97 95/102
160 9/5/18 3794RC MH 27.6 95.6 29.6 92.1 6 96 95/102
161 9/5/18 3794RC MH 27.6 95.6 29.2 92.7 6 97 95/102
162 9/5/18 3794RC MH 27.6 95.6 29.3 92.8 6 97 95/102
163 9/5/18 3794RC MH 27.6 95.6 29.4 92.4 6 97 95/102
164 9/5/18 3794RC MH 27.6 95.6 29.4 92.9 6 97 95/102
165 9/5/18 3794RC MH 27.6 95.6 29.0 92.6 6 97 95/102
166 9/5/18 3794RC MH 27.6 95.6 29.4 92.6 6 97 95/102
Test Information
Gauge
Test# Test Location Elevation Reference Make/Model/SN/Calibrated Field Technician
159 Utility Trench-Top 3':Montague st.Sanitary sewer from MH#2 going 120'towards 3.0 Foot below adjacent Troxler/3411 B/12980/ Butler,Shane
MH#3 subgrade
160 Utility Trench-Top 3':Montague st.Sanitary sewer from MH#2 going 120'towards 3.0 Foot below adjacent Troxler/3411 B/12980/ Butler,Shane
MH#3 subgrade
161 Utility Trench-Top 3':Montague st.Sanitary sewer from MH#2 going 120'towards 2.0 Foot below adjacent Troxler/3411 B/12980/ Butler,Shane
MH#3 subgrade
162 Utility Trench-Top 3':Montague st.Sanitary sewer from MH#2 going 120'towards 2.0 Foot below adjacent Troxler/3411 B/12980/ Butler,Shane
MH#3 subgrade
163 Utility Trench-Top 3':Montague st.Sanitary sewer from MH#2 going 120'towards 1.0 Foot below adjacent Troxler/3411 B/12980/ Butler,Shane
MH#3 subgrade
164 Utility Trench-Top 3':Montague st.Sanitary sewer from MH#2 going 120'towards 1.0 Foot below adjacent Troxler/3411 B/12980/ Butler,Shane
MH#3 subgrade
165 Utility Trench-Top 3':Montague st.Storm water drain from DI#14 to DI#15. 3.0 Foot below adjacent Troxler/3411 B/12980/ Butler,Shane
subgrade
166 Utility Trench-Top 3':Montague st.Storm water drain from DI#14 to DI#15. 3.0 Foot below adjacent Troxler/3411 B/12980/ Butler,Shane
subgrade
Remarks Comments
Tests are"Direct Transmission"(Method A)unless probe depth is noted as
"Backscatter".Gauge calibration data on file with the testing agency.
Page 2 of 3
r8l Soil Nuclear Gauge Client: Project:
� 9-5-18 Density Riverbend Development 71 W0013
„o „dp Report Date: 10/19/2018 455 Second Street SE#400 Avinity Estates Phase
Crozet Office Test Method:ASTM D6938 Charlottesville, VA 22902 Avinity Loop
6185 Rockfish Gap Turnpike Charlottesville,VA 22902
Crozet,VA 22932
Phone:434-823-5154 I Fax:434-823-4764
Test Results
Optimum Maximum In Place In Place Probe Min/Max
Retest Test Soil Moisture Dry Density Moisture Dry Density Depth Percent Comp.
Test# Of Date Proctor ID Method Classification (%) (pcf) (%) (pcf) (in) Compaction (%) Remark
167 9/5/18 3794RC MH 27.6 95.6 29.6 92.7 6 97 95/102
168 9/5/18 3794RC MH 27.6 95.6 29.7 92.0 6 96 95/102
169 . 9/5/18 3794RC MH 27.6 95.6 29.5 92.3 6 97 95/102
170 9/5/18 3794RC MH 27.6 95.6 29.6 92.0 6 96 95/102
Test Information
Gauge
Test# Test Location Elevation Reference Make/Model/SN/Calibrated Field Technician
167 Utility Trench-Top 3':Montague st.Storm water drain from DI#14 to DI#15. 2.0 Foot below adjacent Troxler/3411 B/12980/ Butler,Shane
subgrade
168 Utility Trench-Top 3':Montague st.Storm water drain from DI#14 to DI#15. 2.0 Foot below adjacent Troxler/3411 B/12980/ Butler,Shane
subgrade
169 Utility Trench-Top 3':Montague st.Storm water drain from DI#14 to DI#15. 1.0 Foot below adjacent Troxler/3411 B/12980/ Butler,Shane
subgrade
170 Utility Trench-Top 3':Montague st.Storm water drain from DI#14 to DI#15. 1.0 Foot below adjacent Troxler/3411 B/12980/ Butler,Shane
subgrade
Remarks Comments
Tests are"Direct Transmission"(Method A)unless probe depth is noted as
"Backscatter".Gauge calibration data on file with the testing agency.
Page 3 of 3
Field Report 9-r18 DFR
��R Various p Report Date: 10/19/2018
889~,
..8 Sal y Sere,88,
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone:434 823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 09/06/2018 Location: Utility Trench
Category: Soils/Earthwork Location Details: Sanitary sewer, MH2 from 120ft to 180ft
towards MH3
Type: Observation Frequency: Periodic
Weather: Sunny
Air Temp.(deg.F): 91 F&R Personnel: Butler,Shane ,Technician
Description of Work Completed
Work Completed: The F&R representative arrived on the jobsite as requested to observe ongoing site work.
Field Notes: Observed the excavation of utility trench for sanitary sewer on Montague street,MH2 from 120ft to 180ft
towards MH3. No fill placed this day.
Determination: As Specified
Page 1 of 1
F&R Fill Monitoring 9-7-18 Fill
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 09/07/2018 Location: Utility Trench
Category: Soils/Earthwork Location Details: Montague street, sanitary sewer 120'from
MH#2 and extending to 200'from MH#2.
Coverage: Fill Monitoring
Type: Observation Frequency: Periodic
Weather: Sunny Wind(mph):
Air Temp.(deg.F): 89 Personnel: Butler, Shane , Technician
Description of Work Completed
Work Description: The F&R representative arrived on the jobsite as requested to observe ongoing site work.
Fill Monitoring Summary
Placement Depth/Elev. Fill Moisture Fill Material Lift Compaction Vibration Density
Location Reference Condition Description Thickness Equipment Used? Tests
(inches) Taken
Montague street, adjacent Moist Reddish brown silty 8" Sheepsfoot Yes Yes
sanitary sewer subgrade soil with small rock Roller/
120'from MH#2 Rammax
and extending to
200'from MH#2.
Elev.(ft.)-3.00
to
Elev.(ft.)0.00
Observations&Comments: Observed the placement of fill in 8"loose lifts and compacted with several passes of vibratory rammax
and sheepsfoot roller.
Determination: As Specified
Discrepancy Recorded?: No
Please Note:Inspections, field notes, test results and recommendations herein were recorded under the weather conditions and
construction activities occurring at the time of our site visit. If inclement weather and/or construction activities occur after our visit that
may impact the soil and/or base stone subgrade, F&R should be notified and afforded an opportunity to revisit the site and
revise our report as may be needed.
Page 1 of 3
f&D Soil Nuclear Gauge Client: Project:
I� 9-7-18 Density Riverbend Development 71W0013
FROENLING 6 13066616101,INC. Report Date: 10/19/2018 455 Second Street SE#400 Avinity Estates Phase I
Crozet Office pjee Test Method:ASTM D6938 Charlottesville,VA 22902 Avinity Loop
6185 Rockfish Gap Turnpike Charlottesville,VA 22902
Crozet,VA 22932
Phone:434-823-5154 I Fax:434-823-4764
Test Results
Optimum Maximum In Place In Place Probe Min/Max
Retest Test Soil Moisture Dry Density Moisture Dry Density Depth Percent Comp.
Test# Of Date Proctor ID Method Classification (%) (pcf) (%) (pcf) (in) Compaction (%) Remark
171 9/7/18 3794RC MH 27.6 95.6 29.1 92.5 6 97 95/102
172 9/7/18 3794RC MH 27.6 95.6 29.3 92.6 6 97 95/102
173 9/7/18 3794RC MH 27.6 95.6 29.6 92.0 6 96 95/102
174 9/7/18 3794RC MH 27.6 95.6 28.9 93.2 6 97 95/102
175 9/7/18 3794RC MH 27.6 95.6 28.7 93.1 6 97 95/102
176 9/7/18 3794RC MH 27.6 95.6 29.2 92.9 6 _ 97 95/102
Test Information
Gauge
Test# Test Location Elevation Reference Make/Model/SN/Calibrated Field Technician
171 Utility Trench-Sanitary Sewer: 120'from MH2 and extending South to 200'from MH2 3.0 Foot below existing Troxler/3411 B/12980/ Butler,Shane
subgrade
172 Utility Trench-Sanitary Sewer: 120'from MH2 and extending South to 200'from MH2 3.0 Foot below existing Troxler/3411 B/12980/ Butler,Shane
subgrade
173 Utility Trench-Sanitary Sewer: 120'from MH2 and extending South to 200'from MH2 2.0 Foot below existing Troxler/3411 B/12980/ Butler,Shane
subgrade
174 Utility Trench-Sanitary Sewer: 120'from MH2 and extending South to 200'from MH2 2.0 Foot below existing Troxler/3411 B/12980/ Butler,Shane
subgrade
175 Utility Trench-Sanitary Sewer: 120'from MH2 and extending South to 200'from MH2 1.0 Foot below existing Troxler/3411 B/12980/ Butler,Shane
subgrade
176 Utility Trench-Sanitary Sewer: 120'from MH2 and extending South to 200'from MH2 1.0 Foot below existing Troxler/3411 B/12980/ Butler,Shane
subgrade
Remarks Comments
Tests are"Direct Transmission"(Method A)unless probe depth is noted as
"Backscatter".Gauge calibration data on file with the testing agency.
Page 2 of 3
f&D Concrete Placement Client: Project:
I� Summary Riverbend Development 71W0013
FROEHLINO 6 9-7-18 CONC 455 Second Street SE#400 Avinity Estates Phase I
Crozet Office Report Date: 10/19/2018 Charlottesville,VA 22902 Avinity Loop
6185 Rockfish Gap Turnpike Charlottesville,VA 22902
Crozet.VA 22932
Phone:434-823-5154i Fax:434-823-4764
Placement Date: 9/7/2018 Placement Location: Site-Curb&Gutter Placement Method: Chute Technician: Butler,Shane
Weather: Location Details: Montague street,Right side from Mix Design: BC curb Specified Strength(psi): 3000
station 12+25 to station 11+00
Contractor: Eagle Rapalo concrete Supplier: Allied Concrete
Truck# Load/Cume Placement Air Content Unit Weight Concrete Air Temp On-Site Specimens Sample
Sample Set Ticket 4 Vol(yd') Times Time(min) Consistency (%) (lb/ft') Temp(F) (F) Admixtures Cast Specimen Size Type
179454 1 352 10/10 Batched:05:54 EDT 86 Slump:3 in. Result:5.2 None 5 4"X 8" CC
10143812 Arrived:06:45 EDT
Empty:07:20 EDT
Page 3 of 3
DFR
I J`QR Field Report Report Date: 12-1 8 10/19/2018
Various
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville.VA 22902
Date: 09/12/2018 Location: Utility Trench
Category: Soils/Earthwork Location Details: Storm, DI#15
Type: Observation Frequency: Periodic
Weather: Cloudy
Air Temp.(deg.F): 74 F&R Personnel: Butler, Shane , Technician
Description of Work Completed
Work Completed: The F&R representative arrived on the jobsite as requested to observe ongoing site work.
Field Notes: Observed continued excavation with hoeram to break through rock to be able to place manhole for
DI#15.
Determination: As Specified
Page 1 of 1
// Field Report
Various 9-13-18 DFR
FQ� Report Date: 10/19/2018
v
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 09/13/2018 Location: Utility Trench
Category: Soils/Earthwork Location Details: Storm, DI#15
Type: Observation Frequency: Periodic
Weather: Cloudy
Air Temp.(deg.F): 74 F&R Personnel: Butler,Shane , Technician
Description of Work Completed
Work Completed: The F&R representative arrived on the jobsite as requested to observe ongoing site work.
Field Notes: Observed continued excavation with hoeram to break through rock to be able to place manhole for
DI#15. Observed the cleaning out of the trench, and the placement of the manhole. No fill placed on
this day.
Determination: As Specified
Page 1 of 1
f&D Field Report 9-19-18 DFR
I� Various Report Date: 10/23/2018
CROEMLINGI S.ROBERTSON.INC.
y eEJry Lxr 1881
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71 W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 09/19/2018 Location: Utility Trench
Category: Soils/Earthwork Location Details: Sanitary sewer trench on Montague street
Type: Observation Frequency: Periodic
Weather: Sunny
Air Temp.(deg.F): 82 F&R Personnel: Butler, Shane , Technician
Description of Work Completed
Work Completed: The F&R representative arrived on the jobsite as requested to observe ongoing site work.
Field Notes: Observed excavation of utility trench for sanitary sewer on Montague street. No fill was placed at this
time.
Determination: As Specified
Page 1 of 1
Field Re ort
Various 9-20-18 DFR
& p Report Date: 10/23/2018
r
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71 W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 09/20/2018 Location: Utility Trench
Category: Soils/Earthwork Location Details: Sanitary sewer trench on Montague street
Type: Observation Frequency: Periodic
Weather: Sunny
Air Temp.(deg.F): 82 F&R Personnel: Butler, Shane , Technician
Description of Work Completed
Work Completed: The F&R representative arrived on the jobsite as requested to observe ongoing site work.
Field Notes: Observed excavation of utility trench for sanitary sewer on Montague street. No fill was placed at this
time.
Determination: As Specified
Page 1 of 1
Field Re ort
Various 9-21-18 DFR
� 1` I' Report Date: 10/23/2018
v�
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville.VA 22902 Avinity Loop
Charlottesville.VA 22902
Date: 09/21/2018 Location: Utility Trench
Category: Soils/Earthwork Location Details: Between DI#16 and DI#18
Type: Observation Frequency: Periodic
Weather: Overcast
Air Temp.(deg.F): 75 F&R Personnel: Butler, Shane , Technician
Description of Work Completed
Work Completed: The F&R representative arrived on the jobsite as requested to observe ongoing site work.
Field Notes: Observed excavation of utility trench for storm water drain on Montague st. No fill was placed at this
time.
Determination: As Specified
Page 1 of 1
Field Re ort
Various 9-26-18 DFR
I r p Report Date: 10/23/2018
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71 W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 09/26/2018 Location: Utility Trench
Category: Soils/Earthwork Location Details: Sanitary Sewer: Montague Street, Road Station
12+25 to 11+50
Type: Observation Frequency: Periodic
Weather: Sunny
Air Temp.(deg.F): 75 F&R Personnel: Butler,Shane , Technician
Description of Work Completed
Work Completed: The F&R representative arrived on the jobsite as requested to to observe ongoing site work.
Field Notes: Observed excavation on utility trench for sanitary sewer on Montague st. No fill was placed at this time.
Determination: As Specified
Page 1 of 1
pp p
Field Report 10-1-18 Sod Sample
�O�R Various Report Date: 10/23/2018
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71 W0013
Phone'434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 10/01/2018 Location: Site-Roadway
Category: Soils/Earthwork Location Details: Montague Street, station 15+00
Moffat Street,station 13+75
Type: Observation Frequency: Periodic
Weather: Sunny
Air Temp.(deg.F): 82 F&R Personnel: Butler, Shane , Technician
Description of Work Completed
Work Completed: The F&R representative arrived on the jobsite as requested to observe ongoing site work.
Field Notes: Obtained two soil samples to take back to the lab for CBR testing.
Determination: As Specified
Page 1 of 4
Fill Monitoring 10-1-18 Fill
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone 434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 10/01/2018 Location: Utility Trench
Category: Soils/Earthwork Location Details: Sanitary Sewer, Montague Street. road station
14+00 to station 11+50
Coverage: Fill Monitoring
Type: Observation Frequency: Periodic
Weather: Sunny Wind(mph):
Air Temp.(deg.F): 82 Personnel: Butler, Shane , Technician
Description of Work Completed
Work Description: The F&R representative arrived on the jobsite as requested to observe ongoing site work.
Fill Monitoring Summary
Placement Depth/Elev. Fill Moisture Fill Material Lift Compaction Vibration Density
Location Reference Condition Description Thickness Equipment Used? Tests
(inches) Taken
Sanitary Sewer, adjacent Moist/Very Reddish brown silty 8" Sheepsfoot Yes Yes
Montague Street, subgrade Moist soil with gravels Roller/
road station Rammax
14+00 to station
11+50
Elev.(ft.)-3.00
to
Elev.(ft.)0.00
Observations&Comments: Observed the placement of fill in 8 inch loose lifts and compacted with several passes of vibratory
rammax and vibratory sheepsfoot roller.
Other Tests Performed: Nuclear density tests
Determination: As Specified
Discrepancy Recorded?: No
Please Note'Inspections, field notes, test results and recommendations herein were recorded under the weather conditions and
construction activities occurring at the time of our site visit. If inclement weather and/or construction activities occur after our visit that
may impact the soil and/or base stone subgrade, F&R should be notified and afforded an opportunity to revisit the site and
revise our report as may be needed
Page 2 of 4
raSoil Nuclear Gauge
I` g 10-1-18 Density Client: Project:Riverbend Development 71W0013
Report Date: 10/23/2018 455 Second Street SE#400 Avinity Estates Phase I
Crozet mop
<.,..,.,,n, Test Method:ASTM D6938 Charlottesville,VA 22902 Avinity Loop
6185 Rockfish Gap Turnpike Charlottesville,VA 22902
Crozet,VA 22932
Phone 434-823-5154 I Fax 434-823-4764
Test Results
Optimum Maximum In Place In Place Probe Min/Max
Retest Test Soil Moisture Dry Density Moisture Dry Density Depth Percent Comp.
Test# Of Date Proctor ID Method Classification (%) (pcf) (%) (pcf) (in) Compaction (%) Remark
177 10/1/18 3794RC MH 27.6 95.6 29.1 93.1 4 97 95/102
178 10/1/18 3794RC MH 27.6 95.6 29.0 92.9 4 97 95/102
179 10/1/18 3794RC MH 27.6 95.6 29.2 93.2 4 97 95/102
180 10/1/18 3794RC MH 27.6 95.6 28.1 93.4 4 98 95/102
181 10/1/18 3794RC MH 27.6 95.6 29.4 93.1 4 97 95/102
182 10/1/18 3794RC MH 27.6 95.6 29.1 94.0 4 98 95/102
183 10/1/18 3794RC MH 27.6 95.6 29.4 92.6 4 97 95/102
184 10/1/18 3794RC MH 27.6 95.6 30.0 92.4 4 97 95/102
Test Information
Gauge
Test# Test Location Elevation Reference Make/Model/SN/Calibrated Field Technician
177 Utility Trench-Top 3':Montague street station 14+00 to station 11+50 3.0 Feet below adjacent Troxler/3411B/12980/ Butler,Shane
grade
178 Utility Trench-Top 3':Montague street station 14+00 to station 11+50 3.0 Feet below adjacent Troxler/3411B/12980/ Butler,Shane
grade
179 Utility Trench-Top 3':Montague street station 14+00 to station 11+50 3.0 Feet below adjacent Troxler/3411B/12980/ Butler,Shane
grade
180 Utility Trench-Top 3':Montague street station 14+00 to station 11+50 3.0 Feet below adjacent Troxler/3411B/12980/ Butler,Shane
grade
181 Utility Trench-Top 3'.Montague street station 14+00 to station 11+50 2.0 Feet below adjacent Troxler/3411B/12980/ Butler,Shane
grade
182 Utility Trench-Top 3':Montague street station 14+00 to station 11+50 2.0 Feet below adjacent Troxler/3411B/12980/ Butler,Shane
grade
183 Utility Trench-Top 3':Montague street station 14+00 to station 11+50 2.0 Feet below adjacent Troxler/3411B/12980/ Butler,Shane
grade
184 Utility Trench-Top 3':Montague street station 14+00 to station 11+50 2.0 Feet below adjacent Troxler/3411B/12980/ Butler,Shane
grade
Remarks Comments
Tests are"Direct Transmission"(Method A)unless probe depth is noted as
"Backscatter".Gauge calibration data on file with the testing agency.
Page 3 of 4
f&D Soil Nuclear Gauge Client: Project:
I� 10-1-18 Density Riverbend Development 71W0013
rHUr.,L,,Li>«„U.,,n,.nINC Report Date: 10/23/2018 455 Second Street SE#400 Avinity Estates Phase I
Crozet Office Test Method:ASTM D6938 Charlottesville,VA 22902 Avinity Loop
6185 Rockfish Gap Turnpike Charlottesville,VA 22902
Crozet,VA 22932
Phone 434-823-5154I Fax:434-823-4764
Test Results
Optimum Maximum In Place In Place Probe Min/Max
Retest Test Soil Moisture Dry Density Moisture Dry Density Depth Percent Comp.
Test# Of Date Proctor ID Method Classification (%) (pcf) (%) (pcf) (in) Compaction (%) Remark
185 10/1/18 3794RC MH 27.6 95.6 28.9 _ 94.1 4 98 95/102
186 10/1/18 3794RC MH 27.6 95.6 29.5 92.4 4 97 95/102
187 10/1/18 3794RC MH 27.6 95.6 29.2 92.7 4 97 95/102
188 10/1/18 / 3794RC MH 27.6 95.6 29.4 92.8 4 97 95/102
Test Information
Gauge
Test# Test Location Elevation Reference Make/Model/SN/Calibrated Field Technician
185 Utility Trench-Top 3':Montague street station 14+00 to station 11+50 1.0 Feet below adjacent Troxler/34118/12980/ Butler,Shane
grade
186 Utility Trench-Top 3':Montague street station 14+00 to station 11+50 1.0 Feet below adjacent Troxler/34118/12980/ Butler,Shane
grade
187 Utility Trench-Top 3':Montague street station 14+00 to station 11+50 1.0 Feet below adjacent Troxler/3411B/12980/ Butler,Shane
grade
188 Utility Trench-Top 3':Montague street station 14+00 to station 11+50 1.0 Feet below adjacent Troxler/3411 B/12980 I Butler,Shane
grade
Remarks Comments
Tests are"Direct Transmission"(Method A)unless probe depth is noted as
"Backscatter".Gauge calibration data on file with the testing agency.
Page 4 of 4
F&R Fill Monitoring 10-2-18 Fill
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 10/02/2018 Location: Utility Trench
Category: Soils/Earthwork Location Details: Sanitary Sewer, Montague Street. road station
15+00 to 14+00
Coverage: Fill Monitoring
Type: Observation Frequency: Periodic
Weather: Partly sunny Wind(mph):
Air Temp.(deg.F): 81 Personnel: Butler, Shane , Technician
Description of Work Completed
General Contractor: Contour Earthwork Contour
Subcontractor:
Work Description: The F&R representative arrived on the jobsite as requested to observe ongoing site work.
Fill Monitoring Summary
Placement Depth/Elev. Fill Moisture Fill Material Lift Compaction Vibration Density
Location Reference Condition Description Thickness Equipment Used? Tests
(inches) Taken
Sanitary Sewer, adjacent Moist Reddish brown silty 8" Sheepsfoot Yes Yes
Montague Street, subgrade soil with small rock Roller/
road station Rammax
15+00 to 14+00
Elev.(ft.)-3.00
to
Elev.(ft.)0.00
Observations&Comments: Observed the placement of fill in 8"loose lifts and compacted with several passes of vibratory rammax
and sheepsfoot roller.
Other Tests Performed: Nuclear density tests
Determination: As Specified
Discrepancy Recorded?: No
Please Note. Inspections, field notes, test results and recommendations herein were recorded under the weather conditions and
construction activities occurring at the time of our site visit. If inclement weather and/or construction activities occur after our visit that
may impact the soil and/or base stone subgrade, F&R should be notified and afforded an opportunity to revisit the site and
revise our report as may be needed.
Page 1 of 3
r&D Soil Nuclear Gauge Client: Project:
I� 10-2-18 Density Riverbend Development 71W0013
Report Date: 10/23/2018 455 Second Street SE#400 Avinity Estates Phase I
Crozet Office Test Method:ASTM D6938 Charlottesville,VA 22902 Avinity Loop
6185 Rockfish Gap Turnpike Charlottesville,VA 22902
Crozet,VA 22932
Phone 434-823-5154 I Fax 434-823-4764
Test Results
Optimum Maximum In Place In Place Probe Min/Max
Retest Test Soil Moisture Dry Density Moisture Dry Density Depth Percent Comp.
Test# Of Date Proctor ID Method Classification (%) (pcf) (%) (pcf) (in) Compaction (%) Remark
189 10/2/18 3794RC MH 27.6 95.6 29.8 92.2 4 96 95/102
190 r 10/2/18 3794RC MH 27.6 95.6 29.2 93.0 4 97 95/102
191 10/2/18 3794RC MH 27.6 95.6 28.8 93.1 4 97 95/102
192 10/2/18 3794RC MH 27.6 95.6 29.0 93.5 4 98 95/102
193 10/2/18 3794RC MH 27.6 95.6 28.8 93.5 4 98 95/102
194 10/2/18 3794RC MH 27.6 95.6 28.9 93.3 4 98 95/102
195 10/2/18 3794RC MH 27.6 95.6 29.0 93.7 4 98 95/102
196 10/2/18 3794RC MH 27.6 95.6 28.8 94.0 4 98 95/102
Test Information
Gauge
Test# Test Location Elevation Reference Make/Model/SN/Calibrated Field Technician
189 Utility Trench-Water Main:Montague street station 15+00 to station 14+00 3.0 Foot below adjacent Troxler/3411B/12980/ Butler,Shane
grade
190 Utility Trench-Water Main:Montague street station 15+00 to station 14+00 3.0 Foot below adjacent Troxler/3411B/12980/ Butler,Shane
grade
191 Utility Trench-Water Main:Montague street station 15+00 to station 14+00 3.0 Foot below adjacent Troxler/3411B/12980/ Butler,Shane
grade
192 Utility Trench-Water Main.Montague street station 15+00 to station 14+00 2.0 Foot below adjacent Troxler/3411B/12980/ Butler,Shane
grade
193 Utility Trench-Water Main:Montague street station 15+00 to station 14+00 2.0 Foot below adjacent Troxler/3411B/12980/ Butler,Shane
grade
194 Utility Trench-Water Main.Montague street station 15+00 to station 14+00 2.0 Foot below adjacent Troxler/3411B/ 12980/ Butler,Shane
grade
195 Utility Trench-Water Main Montague street station 15+00 to station 14+00 1.0 Foot below adjacent Troxler/3411B/12980/ Butler,Shane
grade
196 Utility Trench-Water Main:Montague street station 15+00 to station 14+00 1.0 Foot below adjacent Troxler/3411B/12980/ Butler,Shane
grade
Remarks Comments
Tests are"Direct Transmission"(Method A)unless probe depth is noted as
"Backscatter".Gauge calibration data on file with the testing agency.
Page 2 of 3
Soil Nuclear Gauge Client: Project:
UF&p 10-2-18 Density Riverbend Development 71W0013
��d��1tlUN: Report Date: 10/23/2018 455 Second Street SE#400 Avinity Estates Phase I
Crozet Office Test Method:ASTM D6938 Charlottesville,VA 22902 Avinity Loop
6185 Rockfish Gap Turnpike Charlottesville,VA 22902
Crozet.VA 22932
Phone 434-823-5154I Fax'434-823-4764
Test Results
Optimum Maximum In Place In Place Probe Min/Max
Retest Test Soil Moisture Dry Density Moisture Dry Density Depth Percent Comp.
Test# Of Date Proctor ID Method Classification_ (%) (pcf) (%) (pcf) (in) Compaction (%) Remark
197 10/2/18 3794RC MH 27.6 95.6 29.0 _ 93.8 4 98 95/102
Test Information
Gauge
Test# Test Location Elevation Reference Make/Model/SN/Calibrated Field Technician
197 Utility Trench-Water Main:Montague street station 15+00 to station 14+00 1.0 Foot below adjacent Troxler/3411 B/ 12980/ Butler,Shane
grade
Remarks Comments
Tests are"Direct Transmission"(Method A)unless probe depth is noted as
"Backscatter" Gauge calibration data on file with the testing agency.
Page 3 of 3
F&R Fill Monitoring 10-3-18 Fill
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 10/03/2018 Location: Utility Trench
Category: Soils/Earthwork Location Details: Water Line, Montague Street, Road Station
13+80 to 12+60
Coverage: Fill Monitoring
Type: Observation Frequency: Periodic
Weather: Partly cloudy Wind(mph):
Air Temp.(deg.F): 70 Personnel: Butler, Shane , Technician
Description of Work Completed
Work Description: The F&R representative arrived on the jobsite as requested to observe ongoing site work.
Fill Monitoring Summary
Placement Depth/Elev. Fill Moisture Fill Material Lift Compaction Vibration Density
Location Reference Condition Description Thickness Equipment Used? Tests
(inches) Taken
Water Line, adjacent Moist/Very Reddish brown Silt 8" Sheepsfoot Yes Yes
Montague Street, subgrade Moist Roller/
Road Station Rammax
13+80 to 12+60
Elev.(ft.)-3.00
to
Elev.(ft.)0.00
Observations&Comments: Observed the placement of fill to the utility trench for water main on Montague st. Fill placed in 8"loose
lifts and compacted with several passes of vibratory rammax and vibratory sheepsfoot roller.
Visual and manual methods were used to evaluate fill placement. Fill observed by F&R today at the
referenced location and elevation was found satisfactory.
Other Tests Performed: Nuclear density tests were performed
Determination: As Specified
Discrepancy Recorded?: No
Please Note:Inspections, field notes, test results and recommendations herein were recorded under the weather conditions and
construction activities occurring at the time of our site visit. If inclement weather and/or construction activities occur after our visit that
may impact the soil and/or base stone subgrade, F&R should be notified and afforded an opportunity to revisit the site and
revise our report as may be needed.
Page 1 of 3
f&D Soil Nuclear Gauge Client: Project:
I� 10-3-18 Density Riverbend Development 71W0013
Report Date: 10/24/2018 455 Second Street SE#400 Avinity Estates Phase I
Crozet Office Test Method:ASTM D6938 Charlottesville,VA 22902 Avinity Loop
6185 Rockfish Gap Turnpike Charlottesville,VA 22902
Crozet,VA 22532
Phone 434-823-5154 I Fax 434-823-4764
Test Results
Optimum Maximum In Place In Place Probe Min/Max
Retest Test Soil Moisture Dry Density Moisture Dry Density Depth Percent Comp.
Test# Of Date Proctor ID Method Classification (%) (pcf) (%) (pcf) (in) Compaction (%) Remark
198 10/3/18 3794RC MH 27.6 95.6 28.9 93.0 4 97 95/102
199 10/3/18 3794RC MH 27.6 95.6 28.4 93.6 4 98 95/102
200 10/3/18 3794RC MH 27.6 95.6 28.1 94.0 4 98 95/102
201 10/3/18 3794RC MH 27.6 95.6 28.1 94.3 4 99 95/102
202 10/3/18 3794RC MH 27.6 95.6 28.4 93.7 4 98 95/102
203 10/3/18 3794RC MH 27.6 95.6 28.6 93.7 4 98 95/102
204 10/3/18 3794RC MH 27.6 95.6 28.1 93.6 4 98 95/102
205 10/3/18 3794RC MH 27.6 95.6 28.1 93.9 4 98 95/102
Test Information
Gauge
Test# Test Location Elevation Reference Make/Model/SN/Calibrated Field Technician
198 Utility Trench-Water Main.Montague street station 13+80 to station 12+60 3.0 Foot below adjacent Troxler/3411B/12980/ Butler,Shane
grade
199 Utility Trench-Water Main:Montague street station 13+80 to station 12+60 3.0 Foot below adjacent Troxler/3411B/12980/ Butler,Shane
grade
200 Utility Trench-Water Main:Montague street station 13+80 to station 12+60 3.0 Foot below adjacent Troxler/3411 B/12980/ Butler,Shane
grade
201 Utility Trench-Water Main.Montague street station 13+80 to station 12+60 2.0 Foot below adjacent Troxler/3411B/12980/ Butler,Shane
grade
202 Utility Trench-Water Main:Montague street station 13+80 to station 12+60 2.0 Foot below adjacent Troxler/3411B/12980/ Butler,Shane
grade
203 Utility Trench-Water Main:Montague street station 13+80 to station 12+60 2.0 Foot below adjacent Troxler/341113/12980/ Butler,Shane
grade
204 Utility Trench-Water Main.Montague street station 13+80 to station 12+60 1.0 Foot below adjacent Troxler/'3411B/12980/ Butler,Shane
grade
205 Utility Trench-Water Main'Montague street station 13+80 to station 12+60 1.0 Foot below adjacent Troxler/3411B/12980/ Butler,Shane
grade
Remarks Comments
Tests are"Direct Transmission"(Method A)unless probe depth is noted as
"Backscatter".Gauge calibration data on file with the testing agency.
Page 2 of 3
FaRSoil Nuclear Gauge
I` g 10-3-18 Density Client: Project:Riverbend Development 71W0013
Report Date: 10/24/2018 455 Second Street SE#400 Avinity Estates Phase I
Crozet Office Test Method:ASTM D6938 Charlottesville,VA 22902 Avinity Loop
6185 Rockfish Gap Turnpike Charlottesville,VA 22902
Crozet,VA 22932
Phone 434-823-5154 I Fax 434-823-4764
Test Results
Optimum Maximum In Place In Place Probe Min/Max
Retest Test Soil Moisture Dry Density Moisture Dry Density Depth Percent Comp.
Test# Of Date Proctor ID Method Classification (%) (pcf) (%) (pcf) (in) Compaction (c/a) Remark
206 10/3/18 3794RC MH 27.6 95.6 28.1 _ 94.4 4 99 95/102
Test Information
Gauge
Test# Test Location Elevation Reference Make/Model/SN/Calibrated Field Technician
206 Utility Trench-Water Main:Montague street station 13+80 to station 12+60 1.0 Foot below adjacent Troxler/3411B/12980/ Butler,Shane
grade
Remarks _ Comments
Tests are"Direct Transmission"(Method A)unless probe depth is noted as
"Backscatter".Gauge calibration data on file with the testing agency.
Page 3 of 3
C b Field Report 10-4-18 DFR
f� Various Report Date: 10/24/2018
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 10/04/2018 Location: Utility Trench
Category: Soils/Earthwork Location Details: Utility trench for water services on Montague
street
Type: Observation Frequency: Periodic
Weather: Sunny
Air Temp.(deg.F): 87 F&R Personnel: Butler, Shane , Technician
Description of Work Completed
Work Completed: The F&R representative arrived on the jobsite as requested to observe ongoing site work.
Field Notes: Observed excavation on utility trench for water services on Montague street. No fill was placed at this
time.
Determination: As Specified
Page 1 of 1
fo&n Fill Monitoring 10-5-18 Fill
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone 434-823-5154 455 Second Street SE#400 Amity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Amity Loop
Charlottesville,VA 22902
Date: 10/05/2018 Location: Utility Trench
Category: Soils/Earthwork Location Details: Water service, Montague Street, Road Station
14+80 to 12+60
Coverage: Fill Monitoring
Type: Observation Frequency: Periodic
Weather: Overcast Wind(mph):
Air Temp.(deg.F): 75 Personnel: Butler, Shane , Technician
Description of Work Completed
General Contractor: Contour Earthwork Contour
Subcontractor:
Work Description: The F&R representative arrived on the jobsite as requested to observe ongoing site work.
Fill Monitoring Summary
Placement Depth/Elev. Fill Moisture Fill Material Lift Compaction Vibration Density
Location Reference Condition Description Thickness Equipment Used? Tests
(inches) Taken
Water service, adjacent Moist Reddish brown Silt 8" Sheepsfoot Yes Yes
Montague Street, subgrade with little gravel and Roller/
Road Station sand Rammax
14+80 to 12+60
Elev (ft.)-2.00
to
Elev.(ft.)0.00
Observations&Comments: Observed the placement of fill inthe utility trench for water services on Montague street station 14+80 to
station 12+60.
Other Tests Performed: Nuclear density tests were performed
Determination: As Specified
Discrepancy Recorded?: No
Please Note. Inspections, field notes, test results and recommendations herein were recorded under the weather conditions and
construction activities occurring at the time of our site visit. If inclement weather and/or construction activities occur after our visit that
may impact the soil and/or base stone subgrade, F&R should be notified and afforded an opportunity to revisit the site and
revise our report as may be needed
Page 1 of 2
r&p Soil Nuclear Gauge Client: Project:
I� 10-5-18 Density Riverbend Development 71W0013
Report Date: 10/24/2018 455 Second Street SE#400 Avinity Estates Phase I
Crozet Office Test Method:ASTM D6938 Charlottesville,VA 22902 Avinity Loop
6185 Rockfish Gap Turnpike Charlottesville,VA 22902
Crozet,VA 22932
Phone 434-823-5154 I Fax'434-823-4764
Test Results
Optimum Maximum In Place In Place Probe Min/Max
Retest Test Soil Moisture Dry Density Moisture Dry Density Depth Percent Comp.
Test# Of Date Proctor ID Method Classification (%) (pcf) (%) (pcf) (in) Compaction (%) Remark
207 10/5/18 3794RC MH 27.6 95.6 28.9 93.2 4 97 95/102
208 10/5/18 3794RC MH 27.6 95.6 28.4 1 93.3 4 98 95/102
209 10/5/18 3794RC MH 27.6 95.6 28.5 93.7 4 98 95/102
Test Information
Gauge
Test# Test Location Elevation Reference Make/Model/SN/Calibrated Field Technician
207 Utility Trench:Water service trench on Montague st station 14+80 _ 1.0 Below existing grade Troxler/3411 B/12980/ Butler,Shane
208 Utility Trench:Water service trench on Montague st station 13+80 1.0 Below existing grade Troxler/3411 B/12980/ Butler,Shane
209 Utility Trench:Water service trench on Montague st station 12+80 1.0 Below existing grade Troxler/3411B/12980/ Butler,Shane
Remarks Comments
Tests are"Direct Transmission"(Method A)unless probe depth is noted as
"Backscatter".Gauge calibration data on file with the testing agency.
Page 2 of 2
(&n Fill Monitoring 10-9-18 Fill
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax 434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 10/09/2018 Location: Utility Trench
Category: Soils/Earthwork Location Details: Storm, Montague Street, DI#16 to DI#66
Coverage: Fill Monitoring
Type: Observation Frequency: Periodic
Weather: Mostly cloudy Wind(mph):
Air Temp.(deg.F): 77 Personnel: Butler, Shane , Technician
Description of Work Completed
Work Description: The F&R representative arrived on the jobsite as requested to observe ongoing site work.
Fill Monitoring Summary
Placement Depth/Elev. Fill Moisture Fill Material Lift Compaction Vibration Density
Location Reference Condition Description Thickness Equipment Used? Tests
(inches) Taken
Storm, Montague adjacent Moist Reddish brown Silt 8" Sheepsfoot Yes Yes
Street, DI#16 to subgrade Roller/
DI#66 Rammax
Elev.(ft.)-3.00
to
Elev.(ft.)0.00
Observations&Comments: Observed the placement of fill in 8"loose lifts and compacted with several passes vibratory rammax
and sheepsfoot roller.
Other Tests Performed: Nuclear density tests were performed
Determination: As Specified
Discrepancy Recorded?: No
Please Note. Inspections, field notes, test results and recommendations herein were recorded under the weather conditions and
construction activities occurring at the time of our site visit. If inclement weather and/or construction activities occur after our visit that
may impact the soil and/or base stone subgrade, F&R should be notified and afforded an opportunity to revisit the site and
revise our report as may be needed.
Page 1 of 3
F&D Soil Nuclear Gauge Client: Project:
I� 10-9-18 Density Riverbend Development 71W0013
Report Date: 10/24/2018 455 Second Street SE#400 Avinity Estates Phase I
Crozet Office Test Method:ASTM D6938 Charlottesville,VA 22902 Avinity Loop
6185 Rockfish Gap Turnpike Charlottesville,VA 22902
Crozet,VA 22932
Phone 434-823-5154 I Fax 434-823-4764
Test Results
Optimum Maximum In Place In Place Probe Min/Max
Retest Test Soil Moisture Dry Density Moisture Dry Density Depth Percent Comp.
Test# Of Date Proctor ID Method Classification (%) (pcf) (%) (pcf) (in) Compaction (%) Remark
210 10/9/18 3794RC MH 27.6 95.6 28.2 93.1 4 97 95/102
211 10/9/18 3794RC MH 27.6 95.6 28.7 93.1 4 97 95/102
212 10/9/18 3794RC MH 27.6 95.6 29.0 92.7 4 97 95/102
213 10/9/18 3794RC MH 27.6 95.6 29.2 92.5 4 97 95/102
214 10/9/18 3794RC MH 27.6 95.6 28.9 93.2 4 97 95/102
215 10/9/18 3794RC MH 27.6 95.6 29.2 92.8 4 97 95/102
216 10/9/18 3794RC MH 27.6 95.6 29.8 92.1 4 96 95/102
217 10/9/18 3794RC MH 27.6 95.6 29.7 92.0 4 96 95/102
Test Information
Gauge
Test# Test Location Elevation Reference Make/Model/SN/Calibrated Field Technician
210 Utility Trench:Montague street from DI#16 to DI#66 3.0 Below Adjacent grade Troxler/3411B/12980/ Butler,Shane
211 Utility Trench Montague street from DI#16 to DI#66 3.0 Below Adjacent grade Troxler/3411B/12980/ Butler,Shane
212 Utility Trench:Montague street from DI#16 to DI#66 3.0 Below Adjacent grade Troxler/3411B/12980/ Butler,Shane
213 Utility Trench Montague street from DI#16 to DI#66 2.0 Below Adjacent grade Troxler/3411B/12980/ Butler,Shane
214 Utility Trench:Montague street from DI#16 to DI#66 2.0 Below Adjacent grade Troxler/3411B/12980/ Butler,Shane
215 Utility Trench Montague street from DI#16 to DI#66 2.0 Below Adjacent grade Troxler/3411 B/12980/ Butler,Shane
216 Utility Trench Montague street from DI#16 to DI#66 1.0 Below Adjacent grade Troxler/3411B/12980/ Butler,Shane
217 Utility Trench. Montague street from DI#16 to DI#66 1.0 Below Adjacent grade Troxler/3411B/12980/ Butler,Shane
Remarks Comments
Tests are"Direct Transmission"(Method A)unless probe depth is noted as
"Backscatter".Gauge calibration data on file with the testing agency.
Page 2 of 3
r&D Soil Nuclear Gauge
I` g 10-9-18 Density Client: Project:Riverbend Development 71W0013
.141.1ENL,N.,a w�d.N,nuN INC. Report Date: 10/24/2018 455 Second Street SE#400 Avinity Estates Phase I
Crozet otfic. Test Method:ASTM D6938 Charlottesville,VA 22902 Avinity Loop
6185 Rockfish Gap Turnpike Charlottesville,VA 22902
Crozet,VA 22932
Phone 434-823-5154 I Fax:434-823-4764
Test Results
Optimum Maximum In Place In Place Probe Min/Max
Retest Test Soil Moisture Dry Density Moisture Dry Density Depth Percent Comp.
Test# Of Date Proctor ID Method Classification_ (%) (pcf) (%) (pcf) (in) Compaction (%) Remark
218 10/9/18 3794RC MH 27.6 95.6 28.5 93.2 4 97 95/102
Test Information
Gauge
Test# Test Location Elevation Reference Make/Model/SN/Calibrated Field Technician
218 Utility Trench:Montague street from DI#16 to DI#66 1.0 Below Adjacent grade Troxler/3411 B/ 12980/ Butler,Shane
Remarks Comments
`Tests are"Direct Transmission"(Method A)unless probe depth is noted as
"Backscatter".Gauge calibration data on file with the testing agency.
Page 3 of 3
pp p
Field Report 10-10-18 DFR
f OAR Various Report Date: 10/24/2018
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone:434-823-5154 455 Second Street SE#400 Amity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 10/10/2018 Location: Utility Trench
Category: Soils/Earthwork Location Details: Sanitary Sewer, Montague Street, Road Station
11+25 to 11+70
Bergen Street roadway
Type: Observation Frequency: Periodic
Weather: Partly cloudy
Air Temp.(deg.F): 75 F&R Personnel: Butler, Shane , Technician
Description of Work Completed
Work Completed: The F&R representative arrived on the iobsite as requested to observe ongoing site work.
Field Notes: Observed excavation on utility trench for sanitary sewer on Montague st from station 11+25 to station
11+70. Not ready for testing at this time.
Checked stone depth on full length of Bergen street. Majority of the road was+6in, Sta 3+00 to 5+00
was+8in.
Determination: As Specified
Page 1 of 1
Field Report 10-15-18 DFR
��R Various p Report Date: 10/24/2018
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone.434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 10/15/2018 Location: Utility Trench
Category: Soils/Earthwork Location Details: Sanitary Sewer, Montague Street, Road Station
11+25 to 10+00
Type: Observation Frequency: Periodic
Weather: Mostly cloudy
Air Temp.(deg.F): 66 F&R Personnel: Butler, Shane , Technician
Description of Work Completed
Work Completed: The F&R representative arrived on the jobsite as requested to observe ongoing site work
Field Notes: Observed continued excavation of the utility trench for sanitary sewer on Montague st from station
11+25 to station 10+00. No fill was placed on this date.
Determination: As Specified
Page 1 of 1
p Field Report 10-16-18DFR
� Various p Report Date: 10/24/2018
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone:434-823-5154 455 Second Street SE#400 Amity Estates Phase I
Fax 434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 10/16/2018 Location: Utility Trench
Category: Soils/Earthwork Location Details: Sanitary Sewer, Montague Street, Road Station
11+25 to 10+00
Type: Observation Frequency: Periodic
Weather: Partly cloudy
Air Temp.(deg.F): 62 F&R Personnel: Butler, Shane , Technician
Description of Work Completed
Work Completed: The F&R representative arrived on the jobsite as requested to observe ongoing site work
Field Notes: Observed continued excavation of the utility trench for sanitary sewer and laterals on Montague st from
station 11+25 to station 10+00. No fill was placed on this date.
Determination: As Specified
•
Page 1 of 3
Concrete Placement 10 16 18 Concrete
F&R
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71 W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Amity Loop
Charlottesville,VA 22902
Date: 10/16/2018 Location: Site-Curb&Gutter
Category: Concrete Location Details: 8'West of DI#10 to 25' East of DI#10
and from DI#6-18 feet going West.
Coverage: Concrete Placement
Type: Observation Frequency: Periodic
Weather: Partly cloudy Wind(mph):
Air Temp.(deg.F): 60 Personnel: Butler, Shane , Technician
Description of Work Completed
Work Performed: The F&R representative arrived on the jobsite as requested to observe the placement of 8.5 yards of
concrete.
Tests Performed: Air, slump, and temperature test
Field Notes: Observed the placement of 8.5 yards of concrete
Cubic Yards Placed: 8.50 Concrete Summary Prepared: Yes
Determination: As Specified Discrepancy Recorded?: No
Page 2 of 3
Concrete Placement Client: Project:
UR Summary Riverbend Development 71W0013
10-16-18 CONC 455 Second Street SE#400 Avinity Estates Phase
Crozet Office Report Date: 10/24/2018 Charlottesville,VA 22902 Avinity Loop
6185 Rockfish Gap Turnpike Charlottesville,VA 22902
Crozet,VA 22932
Phone 434-823-5154 I Fax 434-823-4764
Placement Date: 10/16/2018 Placement Location: Site-Curb&Gutter Placement Method: Chute Technician: Butler,Shane
Weather: Location Details: 8'West of DI#10 to 25 feet East of Mix Design: BC curb Specified Strength(psi): 3000
DI#10 and from DI#6-going West
for 18'
Contractor: Eagle Rapalo concrete Supplier: Allied Concrete
Truck# Load/Cume Placement Air Content Unit Weight Concrete Air Temp On-Site Specimens Sample
Sample Set Ticket# Vol(yd') Times Time(min) Consistency (%) (Ib/ft') Temp(F) (F) Admixtures Cast Specimen Size Type
18,1U41 3 285 8.5,8.5 Batched:12:27 EDT 88 Slump 3 in. Result 5.1 Nune 5 4"X 8" CC
1(1229/1(1 Arrived'13:00 EDT
Empty:13:55 EDT -
Page 3 of 3
O Field Report 10-17-18DFR
I J Various Report Date: 10/24/2018
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone'434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax'434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 10/17/2018 Location: Utility Trench
Category: Soils/Earthwork Location Details: Storm water drain on Montague Street, Road
station 11+25 to 10+25
Type: Observation Frequency: Periodic
Weather: Partly sunny
Air Temp.(deg.F): 65 F&R Personnel: Butler, Shane , Technician
Description of Work Completed
Work Completed: The F&R representative arrived on the jobsite as requested to observe ongoing site work.
Field Notes: Observed excavation on utility trench for storm water drain on Montague st from station 11+25 to
station 10+25. No fill was placed at this time.
Determination: As Specified
Page 1 of 4
Fill Monitoring 10-17-18Fill
iROENLING ROBERTSON
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 10/17/2018 Location: Utility Trench
Category: Soils/Earthwork Location Details: Sanitary Sewer, Montague Street, Road Station
11+25 to 10+00
Coverage: Fill Monitoring
Type: Observation Frequency: Periodic
Weather: Partly sunny Wind(mph):
Air Temp.(deg.F): 65 Personnel: Butler, Shane , Technician
Description of Work Completed
Work Description: The F&R representative arrived on the jobsite as requested to observe ongoing site work.
Fill Monitoring Summary
Placement Depth/Elev. Fill Moisture Fill Material Lift Compaction Vibration Density
Location Reference Condition Description Thickness Equipment Used? Tests
(inches) Taken
Utility trench excavation Moist Reddish brown silty 8" Sheepsfoot Yes Yes
Elev.(ft.)-3.00 subgrade soil with small rock Roller/
to Rammax
Elev.(ft.)0.00
Observations&Comments: Observed the placement of fill in 8"loose lifts and compacted with several passes vibratory rammax
and sheepsfoot roller.
Discrepancy Recorded?: No
Please Note Inspections, field notes, test results and recommendations herein were recorded under the weather conditions and
construction activities occurring at the time of our site visit. If inclement weather and/or construction activities occur after our visit that
may impact the soil and/or base stone subgrade, F&R should be notified and afforded an opportunity to revisit the site and
revise our report as may be needed
Page 2 of 4
r&D Soil Nuclear Gauge Client: Project:
I� 10-17-18 Density Riverbend Development 71 W0013
Report Date: 10/24/2018 455 Second Street SE#400 Avinity Estates Phase I
Crozet Office Test Method:ASTM D6938 Charlottesville,VA 22902 Avinity Loop
6185 Rockfish Gap Turnpike Charlottesville,VA 22902
Crozet,VA 22932
Phone 434-823-5154 I Fax 434-823-4764
Test Results
Optimum Maximum In Place In Place Probe Min/Max
Retest Test Soil Moisture Dry Density Moisture Dry Density Depth Percent Comp.
Test# Of Date Proctor ID Method Classification (%) (pcf) (%) (pcf) (in) Compaction (%) Remark
219 10/17/18 3794RC MH 27.6 95.6 28.3 93.0 4 97 95/102
220 10/17/18 3794RC MH 27.6 95.6 28.4 93.1 4 97 95/102
221 10/17/18 3794RC MH 27.6 95.6 28.9 93.2 4 97 95/102
222 10/17/18 3794RC MH 27.6 95.6 28.8 93.5 4 98 95/102
223 10/17/18 3794RC MH 27.6 95.6 28.4 92.8 4 97 95/102
224 10/17/18 3794RC MH 27.6 95.6 28.0 93.9 4 98 95/102
225 10/17/18 3794RC MH 27.6 _ 95.6 28.6 93.7 4 98 _ 95/102
226 10/17/18 3794RC MH 27.6 95.6 27.9 93.9 4 98 95/102
Test Information
Gauge
Test# Test Location Elevation Reference Make/Model/SN/Calibrated Field Technician
219 Utility Trench-Sanitary Sewer:Montague street station 11+25 to station 10+00 3.0 Foot below adjacent Troxler/3411B/12980/ Butler,Shane
grade
220 Utility Trench-Sanitary Sewer:Montague street station 11+25 to station 10+00 3.0 Foot below adjacent Troxler/3411 B/12980/ Butler,Shane
grade
221 Utility Trench-Sanitary Sewer:Montague street station 11+25 to station 10+00 3.0 Foot below adjacent Troxler/3411 B/12980/ Butler,Shane
grade
222 Utility Trench-Sanitary Sewer:Montague street station 11+25 to station 10+00 2.0 Foot below adjacent Troxler/3411B/12980/ Butler,Shane
grade
223 Utility Trench-Sanitary Sewer:Montague street station 11+25 to station 10+00 2.0 Foot below adjacent Troxler/3411B/ 12980/ Butler,Shane
grade
224 Utility Trench-Sanitary Sewer:Montague street station 11+25 to station 10+00 2.0 Foot below adjacent Troxler/3411B/12980/ Butler,Shane
grade
225 Utility Trench-Sanitary Sewer:Montague street station 11+25 to station 10+00 1.0 Foot below adjacent Troxler/3411B/12980/ Butler,Shane
grade
226 Utility Trench-Sanitary Sewer.Montague street station 11+25 to station 10+00 1.0 Foot below adjacent Troxler/3411 B/12980/ Butler,Shane
grade
Remarks Comments
Tests are"Direct Transmission"(Method A)unless probe depth is noted as
"Backscatter".Gauge calibration data on file with the testing agency.
Page 3 of 4
r&D Soil Nuclear Gauge Client: Project:
I� 10-17-18 Density Riverbend Development 71 W0013
fwUr VILINla ew„U INC. Report Date: 10/24/2018 455 Second Street SE#400 Avinity Estates Phase I
Crozet Office Test Method:ASTM D6938 Charlottesville,VA 22902 Avinity Loop
6185 Rockfish Gap Turnpike Charlottesville,VA 22902
Crozet,VA 22932
Phone.434-823-5154 I Fax 434-823-4764
Test Results
Optimum Maximum In Place In Place Probe Min/Max
Retest Test Soil Moisture Dry Density Moisture Dry Density Depth Percent Comp.
Test# Of Date Proctor ID Method Classification (%) (pcf) (%) (pcf) (in) Compaction (%) Remark
227 10/17/18 3794RC MH 27.6 95.6 28.3 93.8 4 98 95/102
Test Information
Gauge
Test# Test Location Elevation Reference Make/Model/SN/Calibrated Field Technician
227 Utility Trench-Sanitary Sewer.Montague street station 11+25 to station 10+00 1.0 Foot below adjacent Troxler/3411 B/ 12980/ Butler,Shane
grade
Remarks Comments
Tests are"Direct Transmission"(Method A)unless probe depth is noted as
"Backscatter".Gauge calibration data on file with the testing agency.
Page 4 of 4
Field Report
Various 10-19-18 DFR
� Report Date: 10/24/2018
c�
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71 W0013
Phone.434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 10/19/2018 Location: Utility Trench
Category: Soils/Earthwork Location Details: Water Main, Montague Street, Road Station
5+25 to 6+25
Type: Observation Frequency: Periodic
Weather: Sunny
Air Temp.(deg.F): 60 F&R Personnel: Butler, Shane , Technician
Description of Work Completed
Work Completed: The F&R representative arrived on the jobsite as requested to observe ongoing site work.
Field Notes: Observed excavation on utility trench for water main on Montague st from station 5+25 to station 6+25.
No fill was placed at this time.
Determination: As Specified
Page 1 of 3
E&R Fill Monitoring 10-19-18 Fill
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 10/19/2018 Location: Utility Trench
Category: Soils/Earthwork Location Details: Storm Sewer, Montague Street, Road Station
11+25 to 10+25
Coverage: Fill Monitoring
Type: Observation Frequency: Periodic
Weather: Sunny Wind(mph):
Air Temp.(deg.F): 55 Personnel: Butler, Shane , Technician
Description of Work Completed
Work Description: The F&R representative arrived on the jobsite as requested to observe ongoing site work.
Fill Monitoring Summary
Placement Depth/Elev. Fill Moisture Fill Material Lift Compaction Vibration Density
Location Reference Condition Description Thickness Equipment Used? Tests
(inches) Taken
Storm Sewer, adjacent Moist Reddish brown silty 8" Sheepsfoot Yes Yes
Montague Street, subgrade soil with small rock Roller/
Road Station Rammax
11+25 to 10+25
Elev.(ft.)-3.00
to
Elev.(ft.)0.00
Observations&Comments: Observed the placement of fill in 8"loose lifts and compacted with several passes vibratory rammax
and sheepsfoot roller.
Determination: As Specified
Discrepancy Recorded?: No
Please Note:Inspections, field notes, test results and recommendations herein were recorded under the weather conditions and
construction activities occurring at the time of our site visit. If inclement weather and/or construction activities occur after our visit that
may impact the soil and/or base stone subgrade, F&R should be notified and afforded an opportunity to revisit the site and
revise our report as may be needed
Page 2 of 3
F&R Soil Nuclear Gauge
g 10-19-18 Density Client: Project:Riverbend Development 71W0013
Report Date: 10/24/2018 455 Second Street SE#400 Avinity Estates Phase I
Crozet Office Test Method:ASTM D6938 Charlottesville,VA 22902 Avinity Loop
6185 Rockfish Gap Turnpike Charlottesville,VA 22902
Crozet,VA 22932
Phone'434-823-5154 I Fax.434-823-4764
Test Results
Optimum Maximum In Place In Place Probe Min/Max
Retest Test Soil Moisture Dry Density Moisture Dry Density Depth Percent Comp.
Test# Of Date Proctor ID Method Classification (%) (pcf) (%) (pcf) (in) Compaction (%) Remark
228 10/19/18 3794RC MH 27.6 95.6 28.7 93.1 4 97 95/105
229 10/19/18 3794RC MH 27.6 95.6 28.9 92.7 4 97 95/105
230 10/19/18 3794RC MH 27.6 95.6 29.0 92.8 4 97 95/105
231 10/19/18 3794RC MH 27.6 95.6 29.2 92.5 4 97 95/105
232 10/19/18 3794RC MH 27.6 95.6 29.0 92.3 4 97 95/105
233 _ 10/19/18 3794RC MH 27.6 95.6 29.1 92.4 4 97 95/105
Test Information
Gauge
Test# Test Location Elevation •Reference Make/Model/SN/Calibrated Field Technician
228 Utility Trench-Storm Sewer:Montague street station 11+25 to station 10+25 3.0 Foot below adjacent Troxler/3411 B/12980/ Butler,Shane
grade
229 Utility Trench-Storm Sewer:Montague street station 11+25 to station 10+25 3.0 Foot below adjacent Troxler/3411 B/12980/ Butler,Shane
grade
230 Utility Trench-Storm Sewer:Montague street station 11+25 to station 10+25 2.0 Foot below adjacent Troxler/3411 B/12980/ Butler,Shane
grade
231 Utility Trench-Storm Sewer:Montague street station 11+25 to station 10+25 2.0 Foot below adjacent Troxler/3411 B/12980/ Butler,Shane
grade
232 Utility Trench-Storm Sewer:Montague street station 11+25 to station 10+25 1.0 Foot below adjacent Troxler/3411 B/12980/ Butler,Shane
grade
233 Utility Trench-Storm Sewer:Montague street station 11+25 to station 10+25 1.0 Foot below adjacent Troxler/3411 B/ 12980/ Butler,Shane
grade
Remarks Comments
Tests are"Direct Transmission"(Method A)unless probe depth is noted as
"Backscatter".Gauge calibration data on file with the testing agency
Page 3 of 3
Q p
Field Report 10-23-18 DFR
I Various Report Date: 12/1/2018
ROENItNO 6 ROBERTSON.INC.
Mymmiy 5„6,ty S.mr Lau
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 10/23/2018 Location: Utility Trench
Category: Soils/Earthwork Location Details: Montague street water services trench
Type: Observation Frequency: Periodic
Weather: Sunny
Air Temp.(deg.F): 64 F&R Personnel: Butler, Shane , Technician
Description of Work Completed
Work Completed: The F&R representative arrived on the jobsite as requested to observe ongoing site work.
Field Notes: Observed excavation of utility trench for water services on Montague street, no fill would be placed at
this time.
Determination: As Specified
Page 1 of 1
Field Report
Various 10-24-18 DFR
&p r Report Date: 12/1/2018
t`
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71 W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 10/24/2018 Location: Utility Trench
Category: Soils/Earthwork Location Details: Station 0+00 to station 1+00 on Degraw St
Type: Observation Frequency: Periodic
Weather: Sunny
Air Temp.(deg.F): 55 F&R Personnel: Butler, Shane , Technician
Description of Work Completed
Work Completed: The F&R representative arrived on the jobsite as requested to observe ongoing site work.
Field Notes: Observed excavation on utility trench for gas line on Degraw st. From station 1+00 to station 0+00.
Stone dust placed around pipe.
Determination: As Specified
Page 1 of 3
FAD Proofroll Activity 10-24-18 Proofroll
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone:434-823-5154 455 Second Street SE#400 Amity Estates Phase I
Fax 434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 10/24/2018 Location: Site-Roadway
Category: Soils/Earthwork Location Details: Stone Subbase
Bergen street from station 10+00 to 15+00
Degraw st. From 6+00 to 9+00
Coverage: Proofroll Elevation: Oft below SG
Type: Observation Frequency: Periodic
Weather: Sunny Wind(mph):
Air Temp.(deg.F): 55 Personnel: Butler, Shane , Technician
Description of Work Completed
Work Description: The F&R representative arrived on the jobsite as requested to do a proofroll of stone subbase on
Bergen street.
Proof Roll Equipment: Loaded Tandem Axle Dump Truck
Subgrade Material Description: 21A
Note: Subgrade descriptions indicated in this report are based on visual observation and should be
considered approximate. Subsurface conditions in unexplored locations may vary from those
encountered and noted herein.
Summary of Proofroll: Corrections Not Required Area Tested Appeared Stable w/No Appreciable Pumping or Rutting.
Other Comments/Observations: Additionally, density tests were taken and stone depths were verified on stone subbase at
referenced locations. Stone depths were found to range from 6.5in to 8+in.
Determination: As Specified
Discrepancy Recorded?: No
Note: Inspections, field notes, test results and recommendations herein were recorded under the weather conditions and construction
activities occurring at the time of our site visit. If inclement weather and/or construction activities occur after our visit that
may impact the soil and/or stone base sub grade, F&R should be notified and afforded an opportunity to revisit the site and
revise our report as maybe needed.
Page 2 of 3
F&R Soil Nuclear Gauge Client: Project:
10-24-18 Density Riverbend Development 71W0013
Report Date: 12/1/2018 455 Second Street SE#400 Avinity Estates Phase I
Crozet Office Test Method:ASTM D6938 Charlottesville,VA 22902 Avinity Loop
6185 Rockfish Gap Turnpike Charlottesville,VA 22902
Crozet,VA 22932
Phone.434-823-5154 I Fax'434-823-4764
Test Results
Optimum Maximum In Place In Place Probe Min/Max
Retest Test Soil Moisture Dry Density Moisture Dry Density Depth Percent Comp.
Test# Of Date Proctor ID Method Classification (%) (pcf) (%) (pcf) (in) Compaction (%) Remark
264 . 10/24/18 MM 21A 21-A 4.7 148.0 4.8 146.2 Backscatter 99 - 95/105
265 10/24/18 MM 21A 21-A 4.7 148.0 3.3 147.0 _Backscatter 99 95/105
266 _ 10/24/18 MM 21A 21-A 4.7 _ 148.0 4.0 146.0 Backscatter 99 95/105
267 10/24/18 MM 21A 21-A 4.7 148.0 4.7 142.6 Backscatter 96 95/105
268 10/24/18 MM 21A 21-A 4.7 148.0 5.0 141.5 Backscatter 96 95/105
269 10/24/18 MM 21A 21-A 4.7 148.0 5.1 143.4 Backscatter 97 95/105
Test Information
Gauge
Test# Test Location Elevation Reference Make/Model/SN/Calibrated Field Technician
264 Site-Roadway:Bergen Street,Sta 10+50 0.0 FT below stone subbase Troxler/3411B/12980/ Butler,Shane
265 Site-Roadway:Bergen Street,Sta 13+00 0.0 FT below stone subbase Troxler/3411B/12980/ Butler,Shane
266 Site-Roadway:Bergen Street,Sta 14+50 0.0 FT below stone subbase Troxler/3411B/12980/ Butler,Shane
267 Site-Roadway:Degraw Street,Sta 6+50 0.0 FT below stone subbase Troxler/3411B/12980/ Butler,Shane
268 Site-Roadway:Degraw Street,Sta 7+75 0.0 FT below stone subbase Troxler/3411B/12980/ Butler,Shane
269 Site-Roadway:Degraw Street,Sta 8+50 0.0 FT below stone subbase Troxler/3411B/12980/ Butler,Shane
Remarks Comments
Tests are"Direct Transmission"(Method A)unless probe depth is noted as
"Backscatter".Gauge calibration data on file with the testing agency.
Page 3 of 3
p p
Field Report 10-25-18 DFR
I Various Report Date: 12/1/2018
ROBERTSON.INC
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 10/25/2018 Location: Utility Trench
Category: Soils/Earthwork Location Details: Utility trench for storm water drain on Montague
st from manhole#60 to manhole#64
Type: Observation Frequency: Periodic
Weather: Sunny
Air Temp.(deg.F): 50 F&R Personnel: Butler, Shane , Technician
Description of Work Completed
Work Completed: The F&R representative arrived on the jobsite as requested to observe ongoing site work
Field Notes: Observed excavation on utility trench for storm water drain on Moffat st. No fill was placed at this time.
Determination: As Specified
Page 1 of 1
r8, Fill Monitoring 10-26-18 Fill
40BERTSON INC
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71 W0013
Phone:434-823-5154 455 Second Street SE#400 Amity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 10/26/2018 Location: Utility Trench
Category: Soils/Earthwork Location Details: From manhole#60 to manhole#64
Coverage: Fill Monitoring
Type: Observation Frequency: Periodic
Weather: Overcast Wind(mph):
Air Temp.(deg.F): 44 Personnel: Butler, Shane , Technician
Description of Work Completed
Work Description: The F&R representative arrived on the jobsite as requested to observe ongoing site work.
Fill Monitoring Summary
Placement Depth/Elev. Fill Moisture Fill Material Lift Compaction Vibration Density
Location Reference Condition Description Thickness Equipment Used? Tests
(inches) Taken
Utility trench, From adjacent Moist Reddish brown silty 8" Rammax Yes Yes
manhole#60 to subgrade soil with small rock
manhole#64
Elev.(ft.)-4.00
to
Elev.(ft.)0.00
Observations&Comments: Observed the placement of fill in 8"loose lifts and compacted with several passes of vibratory rammax
Determination: As Specified
Discrepancy Recorded?: No
Please Note•Inspections, field notes, test results and recommendations herein were recorded under the weather conditions and
construction activities occurring at the time of our site visit. If inclement weather and/or construction activities occur after our visit that
may impact the soil and/or base stone subgrade, F&R should be notified and afforded an opportunity to revisit the site and
revise our report as may be needed.
Page 1 of 2
f&D Soil Nuclear Gauge Client: Project:
I� 10-26-18 Density Riverbend Development 71W0013
Report Date: 12/1/2018 455 Second Street SE#400 Avinity Estates Phase I
Crozet Office Test Method:ASTM D6938 Charlottesville,VA 22902 Avinity Loop
6185 Rockfish Gap Turnpike Charlottesville,VA 22902
Crozet,VA 22932
Phone 434-823-51541 Fax 434-823-4764
Test Results
Optimum Maximum In Place In Place Probe Min/Max
Retest Test Soil Moisture Dry Density Moisture Dry Density Depth Percent Comp.
Test# Of Date Proctor ID Method Classification (%) (pcf) (%) (pcf) (in) Compaction (%) Remark
234 10/26/18 3794RC MH 27.6 95.6 28.3 _ 93.2 4 97 95/102
235 10/26/18 3794RC MH 27.6 95.6 28.7 93.1 4 97 95/102
236 10/26/18 3794RC MH 27.6 95.6 28.6 92.8 4 97 95/102
237 10/26/18 3794RC MH 27.6 95.6 28.4 93.7 4 98 95/102
Test Information
Gauge
Test# Test Location Elevation Reference Make/Model/SN/Calibrated Field Technician
234 Utility Trench-Top 3':From manhole#60 to manhole#64 3.0 Below Adjacent subgrade Troxler/3411 B/12980/ Butler,Shane
235 Utility Trench-Top 3':From manhole#60 to manhole#64 2.0 Below Adjacent subgrade Troxler/3411 B/12980/ Butler,Shane
236 Utility Trench-Top 3':From manhole#60 to manhole#64 1.0 Below Adjacent subgrade Troxler/3411B/12980/ Butler,Shane
237 Utility Trench-Top 3':From manhole#60 to manhole#64 0.0 Below Adjacent subgrade Troxler/3411 B/12980/ Butler,Shane
Remarks Comments
Tests are"Direct Transmission"(Method A)unless probe depth is noted as
"Backscatter".Gauge calibration data on file with the testing agency.
Page 2 of 2
}/ Field Report 10-29-18 DFR
i�R Various Report Date: 12/1/2018
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71 W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 10/29/2018 Location: Utility Trench
Category: Soils/Earthwork Location Details: Intersection of Moffat st and Bergen st
Type: Observation Frequency: Periodic
Weather: Sunny
Air Temp.(deg.F): 60 F&R Personnel: Butler, Shane , Technician
Description of Work Completed
Work Completed: The F&R representative arrived on the jobsite as requested to observe ongoing site work.
Field Notes: Observed excavation on utility trench to relocate T for water main. No fill was placed at this time.
Determination: As Specified
Page 1 of 1
f&p Fill Monitoring 10-30-18 Fill
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone:434-823-5154 455 Second Street SE#400 Amity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 10/30/2018 Location: Utility Trench
Category: Soils/Earthwork Location Details: From manhole#60 to manhole#62
Coverage: Fill Monitoring
Type: Observation Frequency: Periodic
Weather: Partly sunny Wind(mph):
Air Temp.(deg.F): 60 Personnel: Butler, Shane , Technician
Description of Work Completed
Work Description: The F&R representative arrived on the jobsite as requested to observe ongoing site work.
Fill Monitoring Summary
Placement Depth/Elev. Fill Moisture Fill Material Lift Compaction Vibration Density
Location Reference Condition Description Thickness Equipment Used? Tests
(inches) Taken
Utility trench, From adjacent Moist Reddish brown silt 8" Rammax Yes Yes
manhole#60 to subgrade with little sand
manhole#62
Elev.(ft.)-4.00
to
Elev.(ft.)0.00
Observations&Comments: Observed the placement of fill in 8"loose lifts and compacted with several passes of vibratory rammax
Determination: As Specified
Discrepancy Recorded?: No
Please Note:Inspections, field notes, test results and recommendations herein were recorded under the weather conditions and
construction activities occurring at the time of our site visit. If inclement weather and/or construction activities occur after our visit that
may impact the soil and/or base stone subgrade, F&R should be notified and afforded an opportunity to revisit the site and
revise our report as may be needed.
Page 1 of 2
r&p Soil Nuclear Gauge Client: Project:
I� 10-30-18 Density Riverbend Development 71W0013
Report Date: 12/1/2018 455 Second Street SE#400 Avinity Estates Phase I
Crozet Office Test Method:ASTM D6938 Charlottesville,VA 22902 Avinity Loop
6185 Rockfish Gap Turnpike Charlottesville,VA 22902
Crozet,VA 22932
Phone 434-823-51541 Fax 434-823-4764
Test Results
Optimum Maximum In Place In Place Probe Min/Max
Retest Test Soil Moisture Dry Density Moisture Dry Density Depth Percent Comp.
Test# Of Date Proctor ID Method Classification (%) (pcf) (%) (pcf) (in) Compaction (%) Remark
238 10/30/18 3794RC MH 27.6 95.6 28.6 93.8 4 98 95/102
239 10/30/18 3794RC MH 27.6 95.6 28.8 94.0 4 98 95/102
240 10/30/18 3794RC MH 27.6 95.6 28.8 93.7 4 98 95/102
241 10/30/18 3794RC MH _ 27.6 95.6 29.2 93.0 4 97 95/102
Test Information
Gauge
Test# Test Location Elevation Reference Make/Model/SN/Calibrated Field Technician
238 Utility Trench-Top 3':From manhole#60 to manhole#62 3.0 Below Adjacent subgrade Troxler/3411 B/12980/ Butler,Shane
239 Utility Trench-Top 3'.From manhole#60 to manhole#62 2.0 Below Adjacent subgrade Troxler/3411 B/12980/ Butler,Shane
240 Utility Trench-Top 3'.From manhole#60 to manhole#62 1.0 Below Adjacent subgrade Troxler/3411 B/12980/ Butler,Shane
241 Utility Trench-Top 3':From manhole#60 to manhole#62 0.0 Below Adjacent subgrade Troxler/3411B/12980/ Butler,Shane
Remarks Comments
Tests are"Direct Transmission"(Method A)unless probe depth is noted as
"Backscatter".Gauge calibration data on file with the testing agency.
Page 2 of 2
f&D Field Report 11-7-18DFR
I� Various Report Date: 12/1/2018
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 11/07/2018 Location: Utility Trench
Category: Soils/Earthwork Location Details: Manhole#1
Type: Observation Frequency: Periodic
Weather: Partly cloudy
Air Temp.(deg.F): 62 F&R Personnel: Butler, Shane , Technician
Description of Work Completed
Work Completed: The F&R representative arrived on the jobsite as requested to observe ongoing site work.
Field Notes: Observed excavation to raise manhole to planned grade. No fill placed at this location on this day.
Determination: As Specified
Page 1 of 2
Fill Monitoring 117"'8F'"
E&R
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone 434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 11/07/2018 Location: Utility Trench
Category: Soils/Earthwork Location Details: Bergen street next to DI#30
Coverage: Fill Monitoring
Type: Observation Frequency: Periodic
Weather: Partly cloudy Wind(mph):
Air Temp.(deg.F): 62 Personnel: Butler, Shane , Technician
Description of Work Completed
Work Description: The F&R representative arrived on the jobsite as requested to observe ongoing site work.
Fill Monitoring Summary
Placement Depth/Elev. Fill Moisture Fill Material Lift Compaction Vibration Density
Location Reference Condition Description Thickness Equipment Used? Tests
(inches) Taken
Utility adjacent Moist/Very 21A, and brown sandy 8" Rammax Yes No
trench, Bergen subgrade Moist silt
street next to DI
#30
Elev.(ft.)-2.00
to
Elev.(ft.)0.00
Observations&Comments: Observed the placement of 21A around and over conduit,then one 8"loose lift of soil,then 21A to bring
to grade. All lifts compacted with several passes of vibratory rammax.
Visual and manual methods were used to evaluate fill placement. Fill observed by F&R today at the
referenced location and elevation was found satisfactory.
Determination: As Specified
Discrepancy Recorded?: No
Please Note Inspections, field notes, test results and recommendations herein were recorded under the weather conditions and
construction activities occurring at the time of our site visit. If inclement weather and/or construction activities occur after our visit that
may impact the soil and/or base stone subgrade, F&R should be notified and afforded an opportunity to revisit the site and
revise our report as may be needed
Page 2 of 2
F&R Proofroll Activity 11-8-18 Proofroll
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone 434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 11/08/2018 Location: Site-Roadway
Category: Soils/Earthwork Location Details: Soil Subgrade
Montague st. Station 15+25 to station 14+50
parking area for clubhouse
Coverage: Proofroll Elevation: Oft below SG
Type: Observation Frequency: Periodic
Weather: Partly cloudy Wind(mph):
Air Temp.(deg.F): 60 Personnel: Butler, Shane , Technician
Description of Work Completed
Work Description: The F&R representative arrived on the jobsite as requested to observe proofroll of soil subgrade on
Montague st.
Proof Roll Equipment: Loaded Single Axle Dump Truck
Subgrade Material Description: reddish brown sandy silt
Note: Subgrade descriptions indicated in this report are based on visual observation and should be
considered approximate. Subsurface conditions in unexplored locations may vary from those
encountered and noted herein.
Summary of Proofroll: Corrections Not Required Area Tested Appeared Stable w/No Appreciable Pumping or Rutting.
Determination: As Specified
Discrepancy Recorded?: No
Note: Inspections, field notes, test results and recommendations herein were recorded under the weather conditions and construction
activities occurring at the time of our site visit. If inclement weather and/or construction activities occur after our visit that
may impact the soil and/or stone base subgrade, F&R should be notified and afforded an opportunity to revisit the site and
revise our report as may be needed.
Page 1 of 1
&D Field Report 11-19-18DFR
1� Various Report Date: 12/1/2018
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 11/19/2018 Location: Utility Trench
Category: Soils/Earthwork Location Details: Trench for sanitary sewer on Moffat st from
manhole#5 to station 12+50
Type: Observation Frequency: Periodic
Weather: Mostly cloudy
Air Temp.(deg.F): 52 F&R Personnel: Butler, Shane , Technician
Description of Work Completed
Work Completed: The F&R representative arrived on the jobsite as requested to observe ongoing site work.
Field Notes: Observed excavation on utility trench for sanitary sewer on Moffat st. No fill was placed at this time.
Determination: As Specified
Page 1 of 3
Asphalt Placement 11-19-18 Asphalt
F&R
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone 434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax-434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 11/19/2018 Location: Road-Driving Lane
Category: Asphalt Location Details: Montague Street from stations 13+50 to
16+00
Degraw Street from stations 5+00 to
7+75
Bergen Street from stations 12+00 to
16+00.
Coverage: Asphalt Placement
Air Temp.(deg.F): 50 Submitted By: Robertson, Katherine B
Inspector Title: Technician
Equipment Type/Quantity: One Paver, one smooth drum roller, one bobcat and various hand tools
Labor Type/Quantity: 8
Asphalt Contractor: S.L Williamson Asphalt Supplier: S.L Williamson
Work Description: Onsite as requested to observe and inspect asphalt placement.
Tests Performed: Density Test
Courses Placed: Base
Base Course Summary
Mix ID Subbase/Surface Condition(Pre-Placement) Tack Coat Quantity Required Roller Pattern
Applied Placed Thickness
(tons) (in.)
BM 25.0 55 degrees and rising No 2.0
Mix ID Required Marshall ' Marshall/Rice Sample(s) Samples No.of Samples
Compaction(%) (pcf)/Rice Value Provided By Taken Performed By
•
BM 25.0 91.5 2.589 Supplier No
Base Course Temperature Log
Time(EST) Base Temp.(deg F) Laydown Temp.(deg F)
11.30 52 291
Determination: As Specified
Page 2 of 3
F&D Bituminous Density Client: Project:
I� 11-19-18 Asphalt Density Riverbend Development 71W0013
.MUEHL,NU>,�dEH,kiLIN, ,U Report Date: 12/1/2018 455 Second Street SE#400 Avinity Estates Phase I
Crozet Office Test Method:ASTM D 2950 Charlottesville,VA 22902 Avinity Loop
6185 Rockfish Gap Turnpike Charlottesville,VA 22902
Crozet.VA 22932
Phone 434-823-5154 I Fax:434-823-4764
Test Results
r
Max In Place Probe Min/Max
Retest Test Mix Thickness Max Density Density Density Depth Percent Comp. Gauge
Test# Of Date Test Location Material Design (in) (pcf) Source (pcf) (in) Comp. (%) Remark SN Technician
1 11/19/18 Site-Parking Lot- Base BM25.0 2 161.6 Supplied 148.1 Backscatter 92 92/102 3560 Robertson,
Asphalt:Clubhouse Value Katherine B
Parking Lot
2 11/19/18 Road-Driving Lane: Base BM25.0 2 161.6 Supplied 148.0 Backscatter 92 92/102 3560 Robertson,
Montague St,Sta 14+50 Value Katherine B
3 11/19/18 Road-Driving Lane: Base BM25.0 2 161.6 Supplied 148.8 Backscatter 92 92/102 3560 Robertson,
Degraw St,Sta 6+30 Value Katherine B
4 11/19/18 Road-Driving Lane: Base BM25.0 2 161.6 Supplied 148.4 Backscatter 92 92/102 3560 Robertson,
Bergen St,Sta 12+00 Value _ Katherine B
5 11/19/18 Road-Driving Lane: Base BM25.0 2 161.6 Supplied 148.4 Backscatter 92 92/102 3560 Robertson,
Bergen St,Sta 13+50 Value _ Katherine B
6 11/19/18 Road-Driving Lane: Base BM25.0 2 161.6 Supplied 149.2 Backscatter 92 92/102 3560 Robertson,
Bergen St,Sta 16+00 Value Katherine B
Remarks Comments
Tests are"Direct Transmission"(Method A)unless probe depth is noted as"Backscatter"
Gauge Information
Gauge SN Make Model Density Count Moisture Count Standard Count Date Last Calibration Date Last Calibrated By
3560 Instrotek 3500 2730 757 11/19/18
Page 3 of 3
Field Re ort
Various 11-20-18 DFR
�Q``� p Report Date: 12/1/2018
�v
GROENLINO St ROBERTSON,INC
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax.434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 11/20/2018 Location: Utility Trench
Category: Soils/Earthwork Location Details: Trench for sanitary sewer on Moffat st from
manhole# 5 to manhole#6
Type: Observation Frequency: Periodic
Weather: Partly sunny
Air Temp.(deg.F): 54 F&R Personnel: Butler, Shane , Technician
Description of Work Completed
Work Completed: The F&R representative arrived on the jobsite as requested to observe ongoing site work.
Field Notes: Observed excavation on utility trench for sanitary sewer on Moffat st. No fill was placed at this time.
Determination: As Specified
Page 1 of 4
F&R Asphalt Placement 11-20-18 Asphalt
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone 434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 11/20/2018 Location: Road-Driving Lane
Category: Asphalt Location Details: Degraw St(ALL)
Bergen Street(ALL)
Clubhouse Parking Lot
Montague Street, Sta 14+75 to 15+50
Coverage: Asphalt Placement
Air Temp.(deg.F): 50 Submitted By: Robertson, Katherine B
Inspector Title: Technician
Equipment Type/Quantity: One Paver, one smooth drum roller, one bobcat and various hand tools
Labor Type/Quantity: 8
Asphalt Contractor: S.L Williamson Asphalt Supplier: S.L Williamson
Work Description: Onsite as requested to observe and inspect asphalt placement.
Tests Performed: Density Test
Courses Placed: Base
Base Course Summary
Mix ID Subbase/Surface Condition(Pre-Placement) Tack Coat Quantity Required Roller Pattern
Applied Placed Thickness
(tons) (in.)
BM 25.0 50 degrees and rising Yes 2.0
Mix ID Required Marshall Marshall/Rice Sample(s) Samples No.of Samples
Compaction(%) (pcf)/Rice Value Provided By Taken Performed By
BM 25.0 91.5 2.589 Supplier No
Base Course Temperature Log
Time(EST) Base Temp.(deg F) Laydown Temp.(deg F)
11:30 50 290
Determination: As Specified
Page 2 of 4
18, Bituminous Density Client: Project:
I� 11-20-18 Asphalt Density Riverbend Development 71W0013
,NUr,,l,nili a w�etH,„Lln INC. Report Date: 12/1/2018 455 Second Street SE#400 Avinity Estates Phase I
Crozet Office Test Method:ASTM D 2950 Charlottesville,VA 22902 Avinity Loop
6185 Rockfish Gap Turnpike Charlottesville,VA 22902
Crozet,VA 22932
Phone 434-823-5154 I Fax 434-823-4764
Test Results
Max In Place Probe Min/Max
Retest Test Mix Thickness Max Density Density Density Depth Percent Comp. Gauge
Test# Of Date Test Location Material Design (in) (pcf) Source (pcf) (in) Comp. (%) Remark SN Technician
7 11/20/18 Road-Driving Lane' Base BM25.0 2 161.6 Supplied 148.8 Backscatter 92 92/102 963 Robertson,
Degraw Street,Sta Value Katherine B
8+75 _ _
8 11/20/18 Road-Driving Lane: Base BM25.0 2 161.6 Supplied 148.6 Backscatter 92 92/102 963 Robertson,
Degraw Street,Sta Value Katherine B
7+00
9 11/20/18 Road-Driving Lane: Base BM25.0 2 161.6 Supplied 149.1 Backscatter 92 92/102 963 Robertson,
Degraw Street,Sta Value Katherine B
6+15
10 11/20/18 Road-Driving Lane. Base BM25.0 2 161.6 Supplied 157.9 Backscatter 98 92/102 963 Robertson,
Bergen Street, 15+00, Value Katherine B
Left Lane
11 11/20/18 Road-Driving Lane. Base BM25.0 2 161.6 Supplied 152.9 Backscatter 95 92/102 963 Robertson,
Bergen Street, 13+00, Value Katherine B
Left Lane _
12 11/20/18 Road-Driving Lane. Base BM25.0 2 161.6 Supplied 153.4 Backscatter 95 92/102 963 Robertson,
Bergen Street, 11+25, Value Katherine B
Left Lane
13 11/20/18 Road-Driving Lane: Base BM25.0 2 161.6 Supplied 154.8 Backscatter 96 92/102 963 Robertson,
Clubhouse Parking Lot _ Value Katherine B
14 11/20/18 Road-Driving Lane' Base BM25.0 2 161.6 Supplied 153.7 Backscatter 95 92/102 963 Robertson,
Montague Street,Sta Value Katherine B
15+10 _
15 11/20/18 Road-Driving Lane' Base BM25.0 2 161.6 Supplied 153.3 Backscatter 95 92/102 963 Robertson,
Bergen Street, Right Value Katherine B
Lane,Sta 14+75
16 11/20/18 Road-Driving Lane' Base BM25.0 2 161.6 Supplied 153.6 Backscatter 95 92/102 963 Robertson,
Bergen Street, Right Value Katherine B
Lane,Sta 13+00 _
17 11/20/18 Road-Driving Lane. Base BM25.0 2 161.6 Supplied 152.8 Backscatter 95 92/102 963 Robertson,
Bergen Street, Right Value Katherine B
Lane,Sta 11+60
Remarks Comments
Tests are"Direct Transmission"(Method A)unless probe depth is noted as"Backscatter"
Page 3 of 4
f&D Bituminous Density Client: Project:
I� 11-20-18 Asphalt Density Riverbend Development 71W0013
FIRUENLIN.e.lit3:..,o ON,INC Report Date: 12/1/2018 455 Second Street SE#400 Avinity Estates Phase I
Crozet Office Test Method:ASTM D 2950 Charlottesville,VA 22902 Avinity Loop
6185 Rockfish Gap Turnpike Charlottesville,VA 22902
Crozet,VA 22932
Phone.434-823-5154I Fax 434-823-4764
Gauge Information
Gauge SN Make Model Density Count Moisture Count Standard Count Date Last Calibration Date Last Calibrated By
963 Troxler 4640 3676 1061 11/20/18
Page 4 of 4
Field Report
Various 11-21-18 DFR
&p r Report Date: 12/1/2018
f`
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone 434-823-5154 455 Second Street SE#400 Amity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 11/21/2018 Location: Utility Trench
Category: Soils/Earthwork Location Details: Trench for sanitary sewer on Moffat st from
manhole#5 to manhole#6
Type: Observation Frequency: Periodic
Weather: sunny
Air Temp.(deg.F): 55 F&R Personnel: Butler, Shane , Technician
Description of Work Completed
Work Completed: The F&R representative arrived on the jobsite as requested to observe ongoing site work.
Field Notes: Observed excavation on utility trench for sanitary sewer on Moffat st. , observed the beginning of fill
placement to the utility trench. Fill being placed in 8"loose lifts. Not ready for testing at this time
Determination: As Specified
Page 1 of 1
fppRField Report Report Date: 2/24/2o 9
OA Various 1-4-19
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone.434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 01/04/2019 Location: Utility Trench
Category: Soils/Earthwork Location Details: From DI#56 to DI#58
Type: Observation Frequency: Periodic
Weather: Overcast then rain
Air Temp.(deg.F): 42 F&R Personnel: Butler, Shane , Technician
Description of Work Completed
Work Completed: F&R representative arrived on the jobsite as requested to observe ongoing site work.
Field Notes: Observed excavation on utility trench for storm water drain. No fill was placed at this time.
Determination: No Discrepancies recorded with respect to items inspected.
Page 1 of 1
E&R Fill Monitoring 1-7-19 Fill
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71 W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 01/07/2019 Location: Utility Trench
Category: Soils/Earthwork Location Details: From DI#56 to DI#58
Coverage: Fill Monitoring
Type: Observation Frequency: Spot Check
Weather: Mostly cloudy Wind(mph):
Air Temp.(deg.F): 40 Personnel: Butler, Shane , Technician
Description of Work Completed
Please Note- The tests and/or observations below and those recorded at this project site on this date in other F&R reports represent spot
checks, only at the locations noted. Fulltime observation of materials placed or of placement methods should not be inferred
General Contractor: Contour Earthwork Contour
Subcontractor:
Work Description: F&R representative arrived on the jobsite as requested to observe the placement of fill to the utility trench.
Fill Monitoring Summary
Placement Depth/Elev. Fill Moisture Fill Material Lift Compaction Vibration Density
Location Reference Condition Description Thickness Equipment Used? Tests
(inches) Taken
Utility trench for adjacent Moist/Very Reddish brown elastic 8" Sheepsfoot Yes Yes
storm water drain subgrade Moist silt Roller/
Elev.(ft.)-3.00 Rammax
to
Elev.(ft.)0.00
Observations&Comments: Observed the placement of fill in 8"loose lifts and compacted with several passes of vibratory rammax
and vibratory sheepsfoot roller.
Other Tests Performed: Nuclear density tests
Determination: No Discrepancies recorded with respect to items inspected.
Please Note Inspections, field notes, test results and recommendations herein were recorded under the weather conditions and
construction activities occurring at the time of our site visit. If inclement weather and/or construction activities occur after our visit that
may impact the soil and/or base stone subgrade, F&R should be notified and afforded an opportunity to revisit the site and
revise our report as maybe needed.
Page 1 of 3
r&R Soil Nuclear Gauge Client: Project:
1-7-19 NG tests Riverbend Development 71W0013
Report Date: 2/24/2019 455 Second Street SE#400 Avinity Estates Phase
Crozet Office,.,,.,,;..,......,,. Test Method:ASTM D6938 Charlottesville,VA 22902 Avinity Loop
6185 Rockfish Gap Turnpike Charlottesville,VA 22902
Crozet,VA 22932
Phone 434-823-5154 I Fax.434-823-4764
Test Results
Optimum Maximum In Place In Place Probe Min/Max
Retest Test Soil Moisture Dry Density Moisture Dry Density Depth Percent Comp.
Test# Of Date Proctor ID Method Classification (%) (pcf) (%) (pcf) (in) Compaction (%) Remark
294 1/7/19 3794RC MH 27.6 95.6 30.5 91.4 4 96 95/102
295 1/7/19 3794RC MH _ 27.6 95.6 29.7 93.2 4 97 95/102
296 1/7/19 3794RC MH 27.6 95.6 30.2 93.0 4 97 95/102
297 1/7/19 3794RC MH 27.6 95.6 30.1 93.6 _ 4 98 95/102
298 1/7/19 3794RC MH 27.6 95.6 29.7 93.8 4 98 95/102
299 1/7/19 3794RC MH 27.6 95.6 29.7 93.9 4 98 95/102
300 1/7/19 3794RC MH 27.6 95.6 29.0 _ 94.1 4 98 95/102
301 1/7/19 3794RC MH 27.6 95.6 29.6 93.8 4 98 95/102
Test Information
Gauge
Test# Test Location Elevation Reference Make/Model/SN/Calibrated Field Technician
294 Utility Trench-Storm Sewer:From DI#56 to DI#58 3.0 FT below SG Troxler/3411B/12980/ Butler,Shane
295 Utility Trench-Storm Sewer:From DI#56 to DI#58 3.0 FT below SG Troxler/3411 B/12980/ Butler,Shane
296 Utility Trench-Storm Sewer:From DI#56 to DI#58 - 3.0 FT below SG Troxler/3411B/12980/ Butler,Shane
297 Utility Trench-Storm Sewer From DI#56 to DI#58 2.0 FT below SG Troxler/3411 B/12980/ Butler,Shane
298 Utility Trench-Storm Sewer From DI#56 to DI#58 2.0 FT below SG Troxler/3411B/12980/ Butler,Shane
299 Utility Trench-Storm Sewer: From DI#56 to DI#58 2.0 FT below SG Troxler/3411B/12980/ Butler,Shane
300 Utility Trench-Storm Sewer. From DI#56 to DI#58 1.0 FT below SG Troxler/3411 B/12980/ Butler,Shane
301 Utility Trench-Storm Sewer:From DI#56 to DI#58 1.0 FT below SG Troxler/3411 B/12980/ Butler,Shane
Remarks Comments
Tests are"Direct Transmission"(Method A)unless probe depth is noted as
"Backscatter".Gauge calibration data on file with the testing agency
Page 2 of 3
Soil Nuclear Gauge Client: Project:
Uf&D 1-7-19 NG tests Riverbend Development 71W0013
eNIMilln1.3 H� ,NG Report Date:2/24/2019 455 Second Street SE#400 Avinity Estates Phase I
Crozet Office
Test Method:ASTM D6938 Charlottesville,VA 22902 Avinity Loop
6185 Rockfish Gap Turnpike Charlottesville,VA 22902
Crozet,VA 22932
Phone.434-823-5154 I Fax 434-823-4764
Test Results
Optimum Maximum In Place In Place Probe Min/Max
Retest Test Soil Moisture Dry Density Moisture Dry Density Depth Percent Comp.
Test# Of Date Proctor ID Method Classification (%) (pcf) (%) (pcf) (in) Compaction (%) Remark
302 1/7/19 3794RC MH 27.6 95.6 29.2 94.5 4 99 95/102
303 1/7/19 3794RC MH 27.6 95.6 28.9 94.1 4 98 95/102
304 1/7/19 3794RC MH 27.6 95.6 29.2 94.1 4 98 95/102
305 1/7/19 3794RC MH 27.6 95.6 29.4 93.9 4 98 95/102
Test Information
Gauge
Test# Test Location Elevation Reference Make/Model/SN/Calibrated Field Technician
302 Utility Trench-Storm Sewer:From DI#56 to DI#58 1.0 FT below SG Troxler/3411B/12980/ Butler,Shane
303 Utility Trench-Storm Sewer:From DI#56 to DI#58 0.0 FT below SG Troxler/3411 B/12980/ Butler,Shane
304 Utility Trench-Storm Sewer:From DI#56 to DI#58 0.0 FT below SG Troxler/3411B/12980/ Butler,Shane
305 Utility Trench-Storm Sewer:From DI#56 to DI#58 0.0 FT below SG Troxler/3411B/12980/ Butler,Shane
Remarks Comments
Tests are"Direct Transmission"(Method A)unless probe depth is noted as
"Backscatter".Gauge calibration data on file with the testing agency.
Page 3 of 3
f&D Field Report 1-8-19 DFR
1� Various p Report Date: 2/24/2019
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone.434-823-5154 455 Second Street SE#400 Amity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 01/08/2019 Location: Utility Trench
Category: Soils/Earthwork Location Details: Montague street station 11+20 to T joint at
center of intersection of Montague st and Moffat
st for water main.
Type: Observation Frequency: Periodic
Weather: Partly sunny
Air Temp.(deg.F): 58 F&R Personnel: Butler, Shane , Technician
Description of Work Completed
Work Completed: F&R representative arrived on the jobsite as requested to observe ongoing site work.
Field Notes: Observed excavation on utility trench for water main on Montague st. No fill was placed on this date.
Determination: No Discrepancies recorded with respect to items inspected.
Page 1 of 1
1-9-19 Fill Placement
f&D Fill Monitoring
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71 W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax'434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 01/09/2019 Location: Utility Trench
Category: Soils/Earthwork Location Details: Water main on Montague st from station 11+20
to T joint
at center of intersection of Montague st and
Moffat st.
Coverage: Fill Monitoring
Type: Observation Frequency: Spot Check
Weather: Partly sunny Wind(mph):
Air Temp.(deg.F): 44 Personnel: Butler, Shane , Technician
Description of Work Completed
Please Note- The tests and/or observations below and those recorded at this project site on this date in other F&R reports represent spot
checks, only at the locations noted Fulltime observation of materials placed or of placement methods should not be inferred
General Contractor: Contour Earthwork Contour
Subcontractor:
Work Description: F&R representative arrived on the jobsite as requested to observe ongoing site work.
Fill Monitoring Summary
Placement Depth/Elev. Fill Moisture Fill Material Lift Compaction Vibration Density
Location Reference Condition Description Thickness Equipment Used? Tests
(inches) Taken
Utility trench for adjacent Wet/Very Reddish brown silty 8" Sheepsfoot Yes Yes
water main subgrade Moist soil with small rock Roller/
Elev.(ft.)-3.00 Rammax
to
Elev.(ft.)0.00
Observations&Comments: Observed the placement of fill in 8"loose lifts and compacted with several passes of vibratory rammax
and vibratory sheepsfoot roller.
Other Tests Performed: Nuclear density tests were performed
Determination: No Discrepancies recorded with respect to items inspected.
Please Note:Inspections, field notes, test results and recommendations herein were recorded under the weather conditions and
construction activities occurring at the time of our site visit. If inclement weather and/or construction activities occur after our visit that
may impact the soil and/or base stone subgrade, F&R should be notified and afforded an opportunity to revisit the site and
revise our report as may be needed.
Page 1 of 3
0 Soil Nuclear Gauge Client: Project:
I� 1-9-19 NG tests Riverbend Development 71W0013
N1tlUN Report Date: 2/24/2019 455 Second Street SE#400 Avinity Estates Phase I
Crozet Office
Test Method:ASTM D6938 Charlottesville,VA 22902 Avinity Loop
6185 Rockfish Gap Turnpike Charlottesville,VA 22902
Crozet,VA 22932
Phone 434-823-5154I Fax.434-823-4764
Test Results
Optimum Maximum In Place In Place Probe Min/Max
Retest Test Soil Moisture Dry Density Moisture Dry Density Depth Percent Comp.
Test# Of Date Proctor ID Method Classification (%) (pcf) (%) (pcf) (in) Compaction (%) Remark
306 1/9/19 3747RC ML 26.6 94.6 29.5 91.8 6 97 95/102
307 1/9/19 3747RC ML 26.6 s 94.6 29.1 92.3 _ 6 98 95/102
308 _ 1/9/19 3747RC ML 26.6 94.6 29.3 92.0 6 97 95/102
309 1/9/19 3747RC ML 26.6 94.6 29.0 92.5 6 98 95/102
310 - 1/9/19 3747RC ML 26.6 94.6 29.1 92.1 6 97 95/102
311 1/9/19 3747RC ML 26.6 94.6 29.1 92.3 6 98 95/102
_ 312 1/9/19 3747RC ML 26.6 94.6 28.9 92.4 6 98 95/102
313 1/9/19 3747RC ML 26.6 94.6 29.1 92.4 6 98 95/102
Test Information
Gauge
Test# Test Location Elevation Reference Make/Model/SN/Calibrated Field Technician
306 Utility Trench-Water Main:Montague street station 11+00 3.0 FT below SG Troxler/3411 B/12980/ Butler,Shane
307 Utility Trench-Water Main.Montague street station 10+60 3.0 FT below SG Troxler/3411 B/12980/ Butler,Shane
308 Utility Trench-Water Main.Montague street station 10+20 3.0 FT below SG Troxler/3411B/12980/ Butler,Shane
309 Utility Trench-Water Main:Montague street station 11+10 2.0 FT below SG Troxler/3411B/12980/ Butler,Shane
310 •Utility Trench-Water Main.Montague street station 10+70 2.0 FT below SG Troxler/3411B/12980/ Butler,Shane
311 Utility Trench-Water Main: Montague street station 10+30 2.0 FT below SG Troxler/3411B/12980/ Butler,Shane
312 Utility Trench-Water Main:Montague street station 10+20 1.0 FT below SG Troxler/3411B/ 12980/ Butler,Shane
313 Utility Trench-Water Main:Montague street station 10+60 1.0 FT below SG Troxler/3411B/12980/ Butler,Shane
Remarks Comments
Tests are"Direct Transmission"(Method A)unless probe depth is noted as
"Backscatter".Gauge calibration data on file with the testing agency.
Page 2 of 3
&R Soil Nuclear Gauge Client: Project:
1-9-19 NG tests Riverbend Development 71W0013
Report Date: 2/24/2019 455 Second Street SE#400 Avinity Estates Phase I
Crozet Office Test Method:ASTM D6938 Charlottesville,VA 22902 Avinity Loop
6185 Rockfish Gap Turnpike Charlottesville,VA 22902
Crozet,VA 22932
Phone 434-823-51541 Fax 434-823-4764
Test Results
Optimum Maximum In Place In Place Probe Min/Max
Retest Test Soil Moisture Dry Density Moisture Dry Density Depth Percent Comp.
Test# Of Date Proctor ID Method Classification (%) (pcf) (%) - (pcf) (in) Compaction (%) Remark
314 1/9/19 3747RC ML 26.6 94.6 29.5 92.0 6 97 95/102
315 1/9/19 3747RC ML 26.6 94.6 29.1 92.1 6 97 95/102
316 1/9/19 3747RC ML 26.6 94.6 29.1 92.3 6 98 95/102
317 1/9/19 3747RC ML 26.6 94.6 29.0 92.3 6 98 95/102
Test Information
Gauge
Test# Test Location Elevation Reference Make/Model/SN/Calibrated Field Technician
314 Utility Trench-Water Main:Montague street station 11+00 1.0 FT below SG Troxler/3411B/12980/ Butler,Shane
315 Utility Trench-Water Main:Montague street station 11+05 0.0 FT below SG Troxler/3411 B/12980/ Butler,Shane
316 Utility Trench-Water Main:Montague street station 10+65 0.0 FT below SG Troxler/3411B/12980/ Butler,Shane
317 Utility Trench-Water Main:Montague street station 10+05 0.0 FT below SG Troxler/3411B/12980/ Butler,Shane
Remarks Comments
Tests are"Direct Transmission"(Method A)unless probe depth is noted as
"Backscatter".Gauge calibration data on file with the testing agency.
Page 3 of 3
Field Re ort
Various 1-10-19 DFR
FaO p Report Date: 2/24/2019
GROEMLING E.ROBERTSON.INC
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax-434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 01/10/2019 Location: Utility Trench
Category: Soils/Earthwork Location Details: Water main from T joint at center of intersection
of Montague st and Moffat st to T joint at center
of intersection of Bergen street ant Moffat st.
Coverage: Subgrade Observation
Type: Observation Frequency: Periodic
Weather: Sunny
Air Temp.(deg.F): 40 F&R Personnel: Butler, Shane , Technician
Description of Work Completed
Work Completed: F&R representative arrived on the jobsite as requested to observe ongoing site work.
Field Notes: Observed excavation on utility trench for water main. No fill was placed at this time.
Determination: No Discrepancies recorded with respect to items inspected.
Page 1 of 1
/&n Fill Monitoring 1-11-19 Fill Placement
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone.434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 01/11/2019 Location: Utility Trench-Top 3'
Category: Soils/Earthwork Location Details: Water main from T joint at center of intersection
of Montague st and Moffat st to end of water
main at station 10+00.
Coverage: Fill Monitoring
Type: Observation Frequency: Full Time
Weather: Sunny Wind(mph):
Air Temp.(deg.F): 38 Personnel: Butler, Shane , Technician
Description of Work Completed
General Contractor: Contour Earthwork Contour
Subcontractor:
Work Description: F&R representative arrived on the jobsite as requested to observe the placement of fill.
Fill Monitoring Summary
Placement Depth/Elev. Fill Moisture Fill Material Lift Compaction Vibration Density
Location Reference Condition Description Thickness Equipment Used? Tests
(inches) Taken
Utility trench excavation Moist Reddish brown silty 8" Rammax Yes Yes
Elev.(ft.)-3.00 subgrade soil with small rock
to
Elev.(ft.)0.00
Observations&Comments: Observed the placement of fill in 8"loose lifts and compacted with several passes of vibratory
rammax.
Other Tests Performed: Nuclear density tests
Determination: No Discrepancies recorded with respect to items inspected.
Please Note•Inspections, field notes, test results and recommendations herein were recorded under the weather conditions and
construction activities occurring at the time of our site visit. If inclement weather and/or construction activities occur after our visit that
may impact the soil and/or base stone subgrade, F&R should be notified and afforded an opportunity to revisit the site and
revise our report as may be needed.
Page 1 of 3
f&D Soil Nuclear Gauge Client: Project:
I� 1-11-19 NG tests Riverbend Development 71W0013
,NLItH,,141,6wLIn.N,nLJN_INC. Report Date: 2/24/2019 455 Second Street SE#400 Avinity Estates Phase I
Crozet Office Test Method:ASTM D6938 Charlottesville,VA 22902 Avinity Loop
6185 Rockfish Gap Turnpike Charlottesville,VA 22902
Crozet,VA 22932
Phone 434-823-51541 Fax 434-823-4764
Test Results
Optimum Maximum In Place In Place Probe Min/Max
Retest Test Soil Moisture Dry Density Moisture Dry Density Depth Percent Comp.
Test# Of Date Proctor ID Method Classification (%) (pcf) (%) (pcf) (in) Compaction (%) Remark
318 _ 1/11/19 3747RC ML 26.6 94.6 29.3 91.8 6 97 95/102
319 1/11/19 3747RC ML 26.6 94.6 29.0 92.2 6 97 95/102
320 1/11/19 3747RC ML 26.6 94.6 28.9 92.5 6 98 95/102
321 1/11/19 3747RC ML 26.6 94.6 29.1 92.2 6 97 95/102
322 1/11/19 3747RC ML 26.6 94.6 29.3 92.3 6 98 95/102
323 1/11/19 3747RC ML 26.6 94.6 29.0 92.3 6 98 95/102
324 1/11/19 3747RC ML 26.6 94.6 29.1 92.1 6 97 95/102
325 1/11/19 3747RC ML 26.6 94.6 29.1 92.3 6 98 95/102
Test Information
Gauge
Test# Test Location Elevation Reference Make/Model/SN/Calibrated Field Technician
318 Utility Trench-Top 3':Water main from T at the center of the intersection of Montague 2.0 FT below SG Troxler/3411 B/ 12980/ Butler,Shane
st and Moffat st to the end of the water main at station 10+00.
319 Utility Trench-Top 3':Water main from T at the center of the intersection of Montague 2.0 FT below SG Troxler/3411 B/12980/ Butler,Shane
st and Moffat st to the end of the water main at station 10+00.
320 Utility Trench-Top 3':Water main from Tat the center of the intersection of Montague 2.0 FT below SG Troxler/34118/12980/ Butler,Shane
st and Moffat st to the end of the water main at station 10+00.
321 Utility Trench-Top 3':Water main from Tat the center of the intersection of Montague 2.0 FT below SG Troxler/3411 B/ 12980/ Butler,Shane
st and Moffat st to the end of the water main at station 10+00.
322 Utility Trench-Top 3':Water main from Tat the center of the intersection of Montague 2.0 FT below SG Troxler/3411B/12980/ Butler,Shane
st and Moffat st to the end of the water main at station 10+00.
323 Utility Trench-Top 3':Water main from T at the center of the intersection of Montague 1.0 FT below SG Troxler/34118/12980/ Butler,Shane
st and Moffat st to the end of the water main at station 10+00.
324 Utility Trench-Top 3':Water main from T at the center of the intersection of Montague 1.0 FT below SG Troxler/3411 B/12980/ Butler,Shane
st and Moffat st to the end of the water main at station 10+00. _
325 Utility Trench-Top 3.:Water main from Tat the center of the intersection of Montague 1.0 FT below SG Troxler/3411 B/12980/ Butler,Shane
st and Moffat st to the end of the water main at station 10+00.
Remarks Comments
Tests are"Direct Transmission"(Method A)unless probe depth is noted as
"Backscatter".Gauge calibration data on file with the testing agency.
Page 2 of 3
Uf&R Soil Nuclear Gauge Client: Project:
1-11-19 NG tests Riverbend Development 71W0013
Report Date:2/24/2019 455 Second Street SE#400 Avinity Estates Phase I
Crozet Office Test Method:ASTM D6938 Charlottesville,VA 22902 Avinity Loop
6185 Rockfish Gap Turnpike Charlottesville, VA 22902
Crozet,VA 22932
Phone 434-823-5154 I Fax:434-823-4764
Test Results
Optimum Maximum In Place In Place Probe Min/Max
Retest Test Soil Moisture Dry Density Moisture Dry Density Depth Percent Comp.
Test# Of Date Proctor ID Method Classification (%) (pcf) (%) (pcf) (in) Compaction (%) Remark
326 1/11/19 3747RC ML 26.6 94.6 _ 28.9 92.3 6 98 95/102
327 1/11/19 3747RC ML 26.6 94.6 29.3 92.1 6 97 95/102
328 1/11/19 3747RC ML 26.6 94.6 29.1 92.1 6 97 95/102
329 1/11/19 3747RC ML 26.6 94.6 28.9 92.4 6 98 95/102
330 1/11/19 3747RC ML 26.6 94.6 29.1 92.2 6 97 95/102
331 1/11/19 3747RC ML 26.6 94.6 28.9 92.5 6 98 95/102
332 1/11/19 3747RC ML _ 26.6 94.6 29.0 _ 92.5 6 98 95/102
Test Information
Gauge
Test# Test Location Elevation Reference Make/Model/SN/Calibrated Field Technician
326 Utility Trench-Top 3':Water main from T at the center of the intersection of Montague 1.0 IFT below SG Troxler/3411B/12980/ Butler,Shane
st and Moffat st to the end of the water main at station 10+00.
327 Utility Trench-Top 3':Water main from T at the center of the intersection of Montague 1.0 FT below SG Troxler/3411B/12980/ Butler,Shane
st and Moffat st to the end of the water main at station 10+00. _
328 Utility Trench-Top 3':Water main from T at the center of the intersection of Montague 0.0 FT below SG Troxler/3411 B/12980/ Butler,Shane
st and Moffat st to the end of the water main at station 10+00.
329 Utility Trench-Top 3':Water main from Tat the center of the intersection of Montague 0.0 FT below SG Troxler/3411B/12980/ Butler,Shane
st and Moffat st to the end of the water main at station 10+00.
330 Utility Trench-Top 3':Water main from T at the center of the intersection of Montague 0.0 FT below SG Troxler/3411B/12980/ Butler,Shane
st and Moffat st to the end of the water main at station 10+00.
331 Utility Trench-Top 3':Water main from T at the center of the intersection of Montague 0.0 FT below SG Troxler/3411 B/12980/ Butler,Shane
st and Moffat st to the end of the water main at station 10+00.
332 Utility Trench-Top 3':Water main from T at the center of the intersection of Montague 0.0 'FT below SG Troxler/3411B/ 12980/ Butler,Shane
st and Moffat st to the end of the water main at station 10+00.
Remarks Comments
Tests are"Direct Transmission"(Method A)unless probe depth is noted as
"Backscatter".Gauge calibration data on file with the testing agency.
Page 3 of 3
f&D Field Report 1-15-19 DFR
tt Various Report Date: 2/24/2019
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 01/15/2019 Location: Utility Trench
Category: Soils/Earthwork Location Details: Water services on Moffat st.
Coverage: Subgrade Observation
Type: Observation Frequency: Periodic
Weather: Sunny
Air Temp.(deg.F): 40 F&R Personnel: Butler, Shane , Technician
Description of Work Completed
Work Completed: F&R representative arrived on the jobsite as requested to observe ongoing site work.
Tests Performed: Not ready for testing at this time
Field Notes: Observed excavation on utility trenches for water services on Moffat st. No fill was placed at this time.
Determination: No Discrepancies recorded with respect to items inspected.
Page 1 of 1
F&R Fill Monitoring 1-16-19 Fill Placement
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone.434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 01/16/2019 Location: Utility Trench
Category: Soils/Earthwork Location Details: Trench for water services on Moffat st from
station 13+00 to station 11+00
Coverage: Fill Monitoring
Type: Observation Frequency: Spot Check
Weather: Sunny Wind(mph):
Air Temp.(deg.F): 47 Personnel: Butler, Shane , Technician
Description of Work Completed
Please Note: The tests and/or observations below and those recorded at this project site on this date in other F&R reports represent spot
checks, only at the locations noted. Fulltime observation of materials placed or of placement methods should not be inferred.
General Contractor: Contour Earthwork Contour
Subcontractor:
Work Description: F&R representative arrived on the jobsite as requested to observe the placement of fill.
Fill Monitoring Summary
Placement Depth/Elev. Fill Moisture Fill Material Lift Compaction Vibration Density
Location Reference Condition Description Thickness Equipment Used? Tests
(inches) Taken
Utility trench excavation Moist/Very Reddish brown silty 8" Rammax Yes Yes
Elev.(ft.)-3.00 subgrade Moist soil with small rock
to
Elev.(ft.)0.00
Observations&Comments: Observed the placement of fill in 8"loose lifts and compacted with several passes of vibratory
rammax.
Other Tests Performed: Nuclear density tests
Determination: No Discrepancies recorded with respect to items inspected.
Please Note:Inspections, field notes, test results and recommendations herein were recorded under the weather conditions and
construction activities occurring at the time of our site visit. If inclement weather and/or construction activities occur after our visit that
may impact the soil and/or base stone subgrade, F&R should be notified and afforded an opportunity to revisit the site and
revise our report as may be needed.
Page 1 of 3
f&D Soil Nuclear Gauge Client: Project:
I� 1-16-19 NG tests Riverbend Development 71W0013
,14�E�1-,NLi K,.dLNTe13,_INC Report Date: 2/24/2019 455 Second Street SE#400 Avinity Estates Phase I
y.MunY Smwer:v.,IYBI
Crozet mace Test Method:ASTM D6938 Charlottesville,VA 22902 Avinity Loop
6185 Rockfish Gap Turnpike Charlottesville,VA 22902
Crozet,VA 22932
Phone 434-823-5154 I Fax 434-823-4764
Test Results
Optimum Maximum In Place In Place Probe Min/Max
Retest Test Soil Moisture Dry Density Moisture Dry Density Depth Percent Comp.
Test# Of Date Proctor ID Method _Classification (%) (pcf) (%) (pcf) (in) Compaction (%) Remark
333 1/16/19 3794RC MH _ 27.6 95.6 29.4 92.9 6 97 95/102
334 1/16/19 3794RC MH 27.6 95.6 30.3 92.0 6 96 95/102
335 1/16/19 3794RC _ MH 27.6 95.6 29.6 92.9 6 97 95/102
336 1/16/19 3794RC MH 27.6 95.6 29.6 93.1 6 97 95/102
337 1/16/19 3794RC _ MH 27.6 95.6 29.9 92.2 6 96 95/102
338 1/16/19 3794RC MH 27.6 95.6 29.6 92.2 6 96 95/102
339 1/16/19 3794RC MH 27.6 95.6 29.7 92.6 6 97 95/102
340 1/16/19 3794RC MH _ 27.6 95.6 30.0 92.1 6 96 95/102
Test Information
Gauge
Test# Test Location Elevation Reference Make/Model/SN/Calibrated Field Technician
333 Utility Trench-Top 2':Water service trench on Moffat st from station 13+00 to station 2.0 FT below SG Troxler/3411B/12980/ Butler,Shane
11+00
334 Utility Trench-Top 2':Water service trench on Moffat st from station 13+00 to station 2.0 FT below SG Troxler/3411B/ 12980/ Butler,Shane
11+00
335 Utility Trench-Top 2':Water service trench on Moffat st from station 13+00 to station 2.0 FT below SG Troxler/3411B/12980/ Butler,Shane
11+00
336 Utility Trench-Top 2'.Water service trench on Moffat st from station 13+00 to station 1.0 FT below SG Troxler/3411B/12980/ Butler,Shane
11+00
337 Utility Trench-Top 2':Water service trench on Moffat st from station 13+00 to station 1.0 FT below SG Troxler/3411B/ 12980/ Butler,Shane
11+00
338 Utility Trench-Top 2':Water service trench on Moffat st from station 13+00 to station 1.0 FT below SG Troxler/3411B/ 12980/ Butler,Shane
11+00
339 Utility Trench-Top 2':Water service trench on Moffat st from station 13+00 to station 0.0 FT below SG Troxler/3411B/12980/ Butler,Shane
11+00
340 Utility Trench-Top 2':Water service trench on Moffat st from station 13+00 to station 0.0 FT below SG Troxler/3411 B/12980/ Butler,Shane
11+00
Remarks Comments
Tests are"Direct Transmission"(Method A)unless probe depth is noted as
"Backscatter" Gauge calibration data on file with the testing agency.
Page 2 of 3
14
Soil Nuclear Gauge Client: Project:
1-16-19 NG tests Riverbend Development 71W0013
Report Date:2/24/2019 455 Second Street SE#400 Avinity Estates Phase
Crozet Office Test Method:ASTM D6938 Charlottesville,VA 22902 Avinity Loop
6185 Rockfish Gap Turnpike Charlottesville,VA 22902
Crozet,VA 22932
Phone 434-823-5154 I Fax:434-823-4764
Test Results
Optimum Maximum In Place In Place Probe Min/Max
Retest Test Soil Moisture Dry Density Moisture Dry Density Depth Percent Comp.
Test# Of Date Proctor ID Method Classification (%) (pcf) (%) (pcf) (in) Compaction (%) Remark
341 1/16/19 3794RC MH 27.6 95.6 29.8 92.1 _ 6 96 95/102
Test Information
Gauge
Test# Test Location Elevation Reference _ Make/Model/SN/Calibrated Field Technician
341 Utility Trench-Top 2':Water service trench on Moffat st from station 13+00 to station 0.0 FT below SG Troxler/3411 B/12980/ Butler,Shane
11+00
Remarks Comments
Tests are"Direct Transmission"(Method A)unless probe depth is noted as
"Backscatter".Gauge calibration data on file with the testing agency.
Page 3 of 3
F&R Fill Monitoring 1-17-19 Fill Placement
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone 434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 01/17/2019 Location: Utility Trench
Category: Soils/Earthwork Location Details: Trench for water services on Moffat st from
station 11+00 to station 10+00
Coverage: Fill Monitoring
Type: Observation Frequency: Spot Check
Weather: Sunny Wind(mph):
Air Temp.(deg.F): 47 Personnel: Butler, Shane , Technician
Description of Work Completed
Please Note: The tests and/or observations below and those recorded at this project site on this date in other F&R reports represent spot
checks, only at the locations noted Fulltime observation of materials placed or of placement methods should not be inferred
General Contractor: Contour Earthwork Contour
Subcontractor:
Work Description: F&R representative arrived on the jobsite as requested to observe the placement of fill.
Fill Monitoring Summary
Placement Depth/Elev. Fill Moisture Fill Material Lift Compaction Vibration Density
Location Reference Condition Description Thickness Equipment Used? Tests
(inches) Taken
Utility trench excavation Moist/Very Reddish brown silty 8" Rammax Yes Yes
Elev.(ft.)-3.00 subgrade Moist soil with small rock
to
Elev.(ft.)0.00
Observations&Comments: Observed the placement of fill in 8"loose lifts and compacted with several passes of vibratory
rammax.
Other Tests Performed: Nuclear density tests were performed
Determination: No Discrepancies recorded with respect to items inspected.
Please Note Inspections, field notes, test results and recommendations herein were recorded under the weather conditions and
construction activities occurring at the time of our site visit. If inclement weather and/or construction activities occur after our visit that
may impact the soil and/or base stone subgrade, F&R should be notified and afforded an opportunity to revisit the site and
revise our report as may be needed.
Page 1 of 2
ro Soil Nuclear Gauge Client: Project:
1-17-19 NG tests Riverbend Development 71W0013
��r•., a w��.�,d��, Report Date:2/24/2019 455 Second Street SE#400 Avinity Estates Phase I
Crozet Office Test Method:ASTM D6938 Charlottesville,VA 22902 Avinity Loop
6185 Rockfish Gap Turnpike Charlottesville,VA 22902
Crozet,VA 22932
Phone 434-823-5154 I Fax 434-823-4764
Test Results
Optimum Maximum In Place In Place Probe Min/Max
Retest Test Soil Moisture Dry Density Moisture Dry Density Depth Percent Comp.
Test# Of Date Proctor ID Method Classification (%) (pcf) (%) (pcf) (in) Compaction (%) Remark
342 1/17/19 3794RC MH 27.6 95.6 29.3 92.6 6 97 95/102
343 1/17/19 3794RC MH 27.6 95.6 29.2 92.5 6 97 95/ 102
344 1/17/19 3794RC MH 27.6 95.6 29.5 92.1 6 96 95/102
345 1/17/19 3794RC MH 27.6 95.6 29.4 92.8 6 97 95/102
346 1/17/19 3794RC MH 27.6 95.6 29.7 92.4 6 97 95/102
347 1/17/19 3794RC MH 27.6 95.6 29.5 92.2 6 96 95/102
Test Information
Gauge
Test# Test Location Elevation Reference Make/Model/SN/Calibrated Field Technician
342 Utility Trench-Top 2':Water service trench on Moffat st from station 11+00 to station 2.0 FT below SG Troxler/3411 B/12980/ Butler,Shane
10+00
343 Utility Trench-Top 2'.Water service trench on Moffat st from station 11+00 to station 2.0 FT below SG Troxler/3411 B/12980/ Butler,Shane
10+00
344 Utility Trench-Top 2':Water service trench on Moffat st from station 11+00 to station 1.0 FT below SG Troxler/3411B/12980/ Butler,Shane
10+00
345 Utility Trench-Top 2':Water service trench on Moffat st from station 11+00 to station 1.0 FT below SG Troxler/3411 B/ 12980/ Butler,Shane
10+00
346 Utility Trench-Top 2'.Water service trench on Moffat st from station 11+00 to station 0.0 FT below SG Troxler/3411 B/12980/ Butler,Shane
10+00
347 Utility Trench-Top 2':Water service trench on Moffat st from station 11+00 to station 0.0 FT below SG Troxler/3411 B/12980/ Butler,Shane
10+00
Remarks Comments
Tests are"Direct Transmission"(Method A)unless probe depth is noted as
"Backscatter".Gauge calibration data on file with the testing agency
Page 2 of 2
F&R Fill Monitoring 1-22-19 Fill Placement
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71 W0013
Phone.434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 01/22/2019 Location: Utility Trench
Category: Soils/Earthwork Location Details: Station 10+00 on Moffat st. For hydrant and
last of the water services.
Coverage: Fill Monitoring
Type: Observation Frequency: Full Time
Weather: Partly sunny Wind(mph):
Air Temp.(deg.F): 32 Personnel: Butler, Shane , Technician
Description of Work Completed
General Contractor: Contour Earthwork Contour
Subcontractor:
Work Description: F&R representative arrived on the jobsite as requested to observe the placement of fill.
Fill Monitoring Summary
Placement Depth/Elev. Fill Moisture Fill Material Lift Compaction Vibration Density
Location Reference Condition Description Thickness Equipment Used? Tests
(inches) Taken
Utility trench adjacent Moist/Very Reddish brown silty 8" Sheepsfoot Yes Yes
Elev.(ft.)-3.00 subgrade Moist soil with small rock Roller/
to Rammax
Elev.(ft.)0.00
Observations&Comments: Observed the placement of fill in 8"loose lifts and compacted with several passes of vibratory rammax
and vibratory sheepsfoot roller.
Other Tests Performed: Nuclear density tests
Determination: No Discrepancies recorded with respect to items inspected.
Please Note:Inspections, field notes, test results and recommendations herein were recorded under the weather conditions and
construction activities occurring at the time of our site visit. If inclement weather and/or construction activities occur after our visit that
may impact the soil and/or base stone subgrade, F&R should be notified and afforded an opportunity to revisit the site and
revise our report as may be needed.
Page 1 of 2
f& Soil Nuclear Gauge Client: Project:
I� 1-22-19 NG tests Riverbend Development 71 W0013
___..
PN_He ROBEwIL�H ��- Report Date:2/25/2019 455 Second Street SE#400 Avinity Estates Phase I
Mwm✓q vmxM wnelW
Crozet office Test Method:ASTM D6938 Charlottesville,VA 22902 Avinity Loop
6185 Rockfish Gap Turnpike Charlottesville,VA 22902
Crozet,VA 22932
Phone 434-823-5154I Far 434-823.4764
Test Results
Optimum Maximum In Place In Place Probe Min/Max
Retest Test Soil Moisture Dry Density Moisture Dry Density Depth Percent Comp.
Test# Of Date Proctor ID Method Classification (%) (pcf) (%) (pcf) (in) Compaction (%) Remark
348 1/22/19 3794RC MH 27.6 95.6 29.8 91.8 6 96 95/102
349 1/22/19 3794RC MH 27.6 95.6 30.3 91.6 6 96 95/102
350 1/22/19 3794RC MH 27.6 95.6 30.4 91.2 6 95 95/102
351 1/22/19 3794RC MH 27.6 95.6 30.2 91.5 6 96 95/102
352 1/22/19 3794RC MH 27.6 95.6 30.4 91.1 6 95 95/102
353 1/22/19 3794RC MH 27.6 95.6 30.1 91.5 6 96 95/102
354 1/22/19 3794RC MH 27.6 95.6 30.1 91.6 6 96 95/102
355 1/22/19 3794RC MH 27.6 95.6 29.8 91.9 6 96 95/102
Test Information
Gauge
Test# Test Location Elevation Reference Make/Model/SN I Calibrated Field Technician
348 Utility Trench-Top 3':Station 10+00 on Moffat st for hydrant and last 3 water services 3.0 FT below SG Troxler/3411B/12980/ Butler,Shane
349 Utility Trench-Top 3':Station 10+00 on Moffat st for hydrant and last 3 water services 3.0 FT below SG Troxler/3411B/12980/ Butler,Shane
350 Utility Trench-Top 3':Station 10+00 on Moffat st for hydrant and last 3 water services 2.0 FT below SG Troxler/3411B/12980/ Butler,Shane
351 Utility Trench-Top 3':Station 10+00 on Moffat st for hydrant and last 3 water services 2.0 FT below SG Troxler/3411 B/12980/ Butler,Shane
352 Utility Trench-Top 3':Station 10+00 on Moffat st for hydrant and last 3 water services 1.0 FT below SG Troxler/3411B/12980/ Butler,Shane
353 Utility Trench-Top 3"Station 10+00 on Moffat st for hydrant and last 3 water services 1.0 FT below SG Troxler/3411 B/12980/ Butler,Shane
354 Utility Trench-Top 3':Station 10+00 on Moffat st for hydrant and last 3 water services 0.0 FT below SG Troxler/3411B/12980/ Butler,Shane
355 Utility Trench-Top 3':Station 10+00 on Moffat st for hydrant and last 3 water services 0.0 FT below SG Troxler/3411 B/12980/ Butler,Shane
Remarks Comments
Tests are"Direct Transmission"(Method A)unless probe depth is noted as
"Backscatter".Gauge calibration data on file with the testing agency.
Page 2 of 2
F&R Fill Monitoring 1-23-19 Fill Placement
,ROENLINO E.ROBERTSON INC
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 01/23/2019 Location: Utility Trench
Category: Soils/Earthwork Location Details: For ARV at lot#49 on Montague st
Coverage: Fill Monitoring
Type: Observation Frequency: Full Time
Weather: Overcast Wind(mph):
Air Temp.(deg.F): 41 Personnel: Butler, Shane , Technician
Description of Work Completed
General Contractor: Contour Earthwork Contour
Subcontractor:
Work Description: F&R representative arrived on the jobsite as requested to observe the placement of fill.
Fill Monitoring Summary
Placement Depth/Elev. Fill Moisture Fill Material Lift Compaction Vibration Density
Location Reference Condition Description Thickness Equipment Used? Tests
(inches) Taken
'
Utility trench excavation Moist/Very Reddish brown silty 8" Rammax Yes Yes
Elev (ft.)-3.00 subgrade Moist soil with small rock
to
Elev.(ft.)0.00
Observations&Comments: Observed the placement of fill in 8"loose lifts and compacted with several passes of vibratory
rammax.
Other Tests Performed: Nuclear density tests
Determination: No Discrepancies recorded with respect to items inspected.
Please Note:Inspections, field notes, test results and recommendations herein were recorded under the weather conditions and
construction activities occurring at the time of our site visit. If inclement weather and/or construction activities occur after our visit that
may impact the soil and/or base stone subgrade, F&R should be notified and afforded an opportunity to revisit the site and
revise our report as may be needed.
Page 1 of 2
F8,p Soil Nuclear Gauge Client: Project:
I� 1-23-19 NG tests Riverbend Development 71W0013
Report Date:2/25/2019 455 Second Street SE#400 Avinity Estates Phase I
Crozet Office sn Test Method:ASTM D6938 Charlottesville,VA 22902 Avinity Loop
6185 Rockfish Gap Turnpike Charlottesville,VA 22902
Crozet,VA 22932
Phone 434-823-5154 I Fax.434-823-4764
Test Results
Optimum Maximum In Place In Place Probe Min/Max
Retest Test Soil Moisture Dry Density Moisture Dry Density Depth Percent Comp.
Test# Of Date Proctor ID Method _Classification (%) (pcf) _ (%) (pcf) (in) Compaction (%) Remark
356 1/23/19 3794RC MH 27.6 95.6 30.0 91.8 6 96 95/102
357 1/23/19 3794RC MH 27.6 95.6 30.2 91.5 6 96 95/102
358 1/23/19 3794RC MH 27.6 95.6 _ 29.9 91.5 6 96 95/102
359 1/23/19 3794RC MH 27.6 95.6 30.1 91.6 6 96 95/102
Test Information
Gauge
Test# Test Location Elevation Reference Make/Model/SN/Calibrated Field Technician
356 Utility Trench-Top 3'.ARV at lot 49 on Montague st 3.0 FT below SG Troxler/3411B/12980/ Butler,Shane
357 Utility Trench-Top 3'.ARV at lot 49 on Montague st 2.0 FT below SG Troxler/3411B/12980/ Butler,Shane
358 Utility Trench-Top 3'.ARV at lot 49 on Montague st 1.0 FT below SG Troxler/3411B/12980/ Butler,Shane
359 Utility Trench-Top 3'.ARV at lot 49 on Montague st 0.0 FT below SG Troxler/3411 B/12980/ Butler,Shane
Remarks Comments
Tests are"Direct Transmission"(Method A)unless probe depth is noted as
"Backscatter".Gauge calibration data on file with the testing agency.
Page 2 of 2
fpp Field Report 1-28-19 DFR
OAR Various p Report Date: 2/28/2019
,ROENLING St ROBERTSON.INC
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone:434-823-5154 455 Second Street SE#400 Amity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 01/28/2019 Location: Site-Roadway
Category: Soils/Earthwork Location Details: Service road off of Rt. 20
Coverage: Subgrade Observation
Type: Observation Frequency: Periodic
Weather: Sunny
Air Temp.(deg.F): 39 F&R Personnel: Butler, Shane , Technician
Description of Work Completed
Work Completed: F&R representative arrived on the jobsite as requested to observe ongoing site work.
Field Notes: Observed excavation to widen roadway. Observed removal of debris, roots, and topsoil. Observed the
placement of stone where aforementioned was removed.
Determination: No Discrepancies recorded with respect to items inspected.
Page 1 of 1
Field Re ort
Various 1-29-19 DFR
�OaO Dr p Report Date: 2/28/2019
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 01/29/2019 Location: Site-Roadway
Category: Soils/Earthwork Location Details: Service road off of Rt. 20
Type: Observation Frequency: Periodic
Weather: Overcast
Air Temp.(deg.F): 38 F&R Personnel: Butler, Shane , Technician
Description of Work Completed
Work Completed: The F&R representative arrived on the jobsite as requested to observe ongoing site work.
Field Notes: Observed excavation to widen roadway. Observed removal of debris, roots, and topsoil. Observed the
placement of stone where aforementioned was removed.
Determination: No Discrepancies recorded with respect to items inspected.
Page 1 of 1
Field Report
&DRVarious 1-31-19 DFR
eport Date: 2/28/2019
r
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone 434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 01/31/2019 Location: Utility Trench
Category: Soils/Earthwork Location Details: East side of Bergen street
Type: Observation Frequency: Periodic
Weather: Sunny
Air Temp.(deg.F): 23 F&R Personnel: Butler, Shane , Technician
Description of Work Completed
Work Completed: The F&R representative arrived on the jobsite as requested to observe ongoing site work.
Tests Performed: Proofroll
Field Notes: Observed the excavation for and placement of conduit.Also observed cutting of soils on building lots
62-66 to bring area to soil subgrade elevation.
Determination: No Discrepancies recorded with respect to items inspected.
Page 1 of 2
F&R Proofroll Activity 1-31-19 Proofroll
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone 434-823-5154 455 Second Street SE#400 Amity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 01/31/2019 Location: Building Pad
Category: Soils/Earthwork Location Details: Lots 62-66
Coverage: Proofroll Elevation: Planned soil subgrade
Type: Observation Frequency: Periodic
Weather: Sunny Wind(mph):
Air Temp.(deg.F): 23 Personnel: Butler, Shane , Technician
Description of Work Completed
Work Description: The F&R representative arrived on the jobsite as requested to observe ongoing site work
Proof Roll Equipment: Loaded Articulated Dump Truck
Subgrade Material Description: Moist reddish brown silty soil with small rock
Note: Subgrade descriptions indicated in this report are based on visual observation and should be
considered approximate. Subsurface conditions in unexplored locations may vary from those
encountered and noted herein.
Summary of Proofroll: Corrections Not Required.Area Tested Appeared Stable w/No Appreciable Pumping or Rutting.
Determination: No Discrepancies recorded with respect to items inspected.
Note: Inspections, field notes, test results and recommendations herein were recorded under the weather conditions and construction
activities occurring at the time of our site visit. If inclement weather and/or construction activities occur after our visit that
may impact the soil and/or stone base sub grade, F&R should be notified and afforded an opportunity to revisit the site and
revise our report as may be needed.
Page 2 of 2
F&R Proofroll Activity 2-4-19 Proofroll
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone 434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 02/04/2019 Location: Site-Roadway
Category: Soils/Earthwork Location Details: Montague st from DI#14 to DI#15
Coverage: Proofroll Elevation: Finished grade
Type: Observation Frequency: Periodic
Weather: Sunny Wind(mph):
Air Temp.(deg.F): 56 Personnel: Butler, Shane , Technician
Description of Work Completed
Work Description: F&R representative arrived on the jobsite as requested to observe ongoing site work.
Proof Roll Equipment: Loaded Tandem Axle Dump Truck
Subgrade Material Description: Brown Sandy silty soil with small rock
Note: Subgrade descriptions indicated in this report are based on visual observation and should be
considered approximate. Subsurface conditions in unexplored locations may vary from those
encountered and noted herein.
Summary of Proofroll: Corrections Not Required:Area Tested Appeared Stable w/No Appreciable Pumping or Rutting.
Other Comments/Observations: Observed loaded tandem axle dump truck make several passes with no visual pumping or rutting.
Determination: No Discrepancies recorded with respect to items inspected.
Note: Inspections, field notes, test results and recommendations herein were recorded under the weather conditions and construction
activities occurring at the time of our site visit. If inclement weather and/or construction activities occur after our visit that
may impact the soil and/or stone base sub grade, F&R should be notified and afforded an opportunity to revisit the site and
revise our report as may be needed.
Page 1 of 3
r Field Report
Various 2-4-19 DFR
� Report Date: 2/24/2019
O
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax.434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 02/04/2019 Location: Site-Roadway
Category: Soils/Earthwork Location Details: Montague st from station 14+40 to station
13+50
Coverage: Subgrade Observation
Type: Observation Frequency: Periodic
Weather: Sunny
Air Temp.(deg.F): 56 F&R Personnel: Butler, Shane , Technician
Description of Work Completed
Work Completed: F&R representative arrived on the iobsite as requested to observe ongoing site work.
Field Notes: Observed the placement of 6 inches of 21A to the roadway to bring it up to stone finished grade.
Determination: No Discrepancies recorded with respect to items inspected.
Page 2 of 3
FOQQ Concrete Placement Client. Project:
a'` Summary Riverbend Development 71W0013
455 Second Street SE#400 Avinity Estates Phase I
2-4-19 CONC
Crozet Office Report Date: 2/24/2019 Charlottesville,VA 22902 Avinity Loop
6185 Rockfish Gap Turnpike Charlottesville,VA 22902
Crozet,VA 22932
Phone 434-823-5154I Fax 434-823-4764
Placement Date: 2/4/2019 Placement Location: Site-Curb&Gutter Placement Method: Chute Technician: Butler,Shane
Weather: Location Details: Montague st from DI#14 to DI#15 Mix Design: BC curb Specified Strength(psi): 3000
Contractor: Eagle Rapalo concrete Supplier: Allied Concrete
Truck# Load/Cume Placement Air Content Unit Weight Concrete Air Temp On-Site Specimens Sample
Sample Set Ticket# Vol(yd') Times Time(min) Consistency (%) (Ib/W) Temp(F) (F) Admixtures Cast Specimen Size Type
1924/J 8 369 10/10 Batched: 12:34 EST 85 Slump.3-1'4 in. Result.7.3 65 56 ROIler 5 4"X 8" CC
10147288 Arrived.13.10 EST Spec.3-5 Spec:4.5-7.5
Empty:13:59 EST
Page 3 of 3
Fill Monitoring 3-7-19Fill
F&R
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71 W0013
Phone.434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Amity Loop
Charlottesville,VA 22902
Date: 03/07/2019 Location: Building Pad
Category: Soils/Earthwork Location Details: East side of Montague St.from STA 13+50 to
station 11+00
Coverage: Fill Monitoring
Type: Observation Frequency: Spot Check
Weather: Sunny Wind(mph):
Air Temp.(deg.F): 30 Personnel: Butler, Shane , Technician
Description of Work Completed
Please Note. The tests and/or observations below and those recorded at this project site on this date in other F&R reports represent spot
checks, only at the locations noted. Fulltime observation of materials placed or of placement methods should not be inferred
General Contractor: Contour Earthwork Contour
Subcontractor:
Work Description: F&R representative arrived on the jobsite as requested to observe ongoing site work.
Fill Monitoring Summary
Placement Depth/Elev. Fill Moisture Fill Material Lift Compaction Vibration Density
Location Reference Condition Description Thickness Equipment Used? Tests
(inches) Taken
Building Pads; excavation Moist/Very Reddish brown silty 8" Sheepsfoot Yes Yes
East side of subgrade Moist soil with small rock Roller
Montague St.from
STA 13+50 to
station 11+00
Elev.(ft.)-1.00
to
Elev.(ft.)0.00
Observations&Comments: Observed the placement of fill in 8"loose lifts and compacted with several passes of vibratory
sheepsfoot roller.
Other Tests Performed: Nuclear density tests were performed
Determination: No Discrepancies recorded with respect to items inspected.
Please Note. Inspections, field notes, test results and recommendations herein were recorded under the weather conditions and
construction activities occurring at the time of our site visit. If inclement weather and/or construction activities occur after our visit that
may impact the soil and/or base stone subgrade, F&R should be notified and afforded an opportunity to revisit the site and
revise our report as may be needed.
1.The results provided herein relate only to the items inspected and/or tested. Page 1 of 2
2.This report shall not be reproduced, except in full,without the prior written approval of F&R.
r&p Soil Nuclear Gauge Client: Project:
I� 3-7-19 NG Riverbend Development 71W0013
Report Date:4/29/2019 455 Second Street SE#400 Avinity Estates Phase I
Crozet Office'14L Test Method:ASTM D6938 Charlottesville,VA 22902 Avinity Loop
6185 Rockfish Gap Turnpike Charlottesville,VA 22902
Crozet,VA 22932
Phone 434-823-5154 I Fax 434-823-4764
Test Results
. 1
Optimum Maximum In Place In Place Probe Min/Max
Retest Test Soil Moisture Dry Density Moisture Dry Density Depth Percent Comp.
Test# Of Date Proctor ID Method Classification (%) (pcf) (%) (pcf) (in) Compaction (%) Remark
360 3/7/19 3794RC MH 27.6 95.6 25.7 92.9 6 97 95/102
361 _ 3/7/19 3794RC MH 27.6 95.6 25.7 92.7 6 97 95/102
362 3/7/19 3794RC MH 27.6 95.6 26.6 92.2 6 96 95/102
363 3/7/19 3794RC MH 27.6 95.6 26.9 92.1 6 96 95/102
364 3/7/19 3794RC MH 27.6 95.6 26.2 92.4 6 97 95/102
Test Information
Gauge
Test# Test Location Elevation Reference Make/Model/SN/Calibrated Field Technician
360 Building Pad:East side of Montague St.from STA 13+50 to 11+00 0.0 Foot below subgrade Troxler/3411 B/12980/ Butler,Shane
361 Building Pad:East side of Montague St.from STA 13+50 to 11+00 0.0 Foot below subgrade Troxler/3411B/12980/ Butler,Shane
362 Building Pad:East side of Montague St.from STA 13+50 to 11+00 0.0 Foot below subgrade Troxler/3411 B/12980/ Butler,Shane
363 Building Pad:East side of Montague St.from STA 13+50 to 11+00 0.0 Foot below subgrade Troxler/3411 B/12980/ Butler,Shane
364 Building Pad:East side of Montague St.from STA 13+50 to 11+00 0.0 Foot below subgrade Troxler/3411B/12980/ Butler,Shane
Remarks Comments
Tests are"Direct Transmission"(Method A)unless probe depth is noted as
"Backscatter".Gauge calibration data on file with the testing agency.
1. The results provided herein relate only to the items inspected and/or tested. Page 2 of 2
2. This report shall not be reproduced, except in full,without the prior written approval of F&R.
��^ Field Report
Various Report Date: 8/12/2019
,RCIEHLINCI S.ROBERTSON.INC.
K
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71 W0013
Phone 434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax 434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 07/24/2019 Location: Site-Roadway
Category: Soils/Earthwork Location Details: Intersection of Montague St and Moffat St to
end of culdasac
Type: Observation Frequency: Periodic
Weather: Sunny
Air Temp.(deg.F): 75 F&R Personnel: Butler, Shane , Technician
Description of Work Completed
Work Completed: The F&R representative arrived on the job site as requested to observe ongoing site work.
Field Notes: Observed excavation on roadway to get ready for stone placement.
Determination: No Discrepancies recorded with respect to items inspected
1.The results provided herein relate only to the items inspected and/or tested. Page 1 of 1
2.This report shall not be reproduced, except in full,without the prior written approval of F&R.
rsi Proofroll Activity
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 07/25/2019 Location: Site-Roadway
Category: Soils/Earthwork Location Details: Moffat St from station 6+60 to station 2+80
Coverage: Proofroll Elevation: Planned soil subgrade
Type: Observation Frequency: Periodic
Weather: Mostly sunny Wind(mph):
Air Temp.(deg.F): 82 Personnel: Butler, Shane , Technician
Description of Work Completed
Work Description: The F&R representative arrived on the job site as requested to observe ongoing site work.
Proof Roll Equipment: Loaded Articulated Dump Truck
Subgrade Material Description: Brown silty sandy soil with some gravel
Note: Subgrade descriptions indicated in this report are based on visual observation and should be
considered approximate. Subsurface conditions in unexplored locations may vary from those
encountered and noted herein.
Summary of Proofroll: Corrections Not Required Area Tested Appeared Stable w/No Appreciable Pumping or Rutting.
Other Comments/Observations: Observed excavation to bring the roadway to grade. Observed a loaded articulated dump truck make
several passes with no appreciable pumping or rutting.
Determination: No Discrepancies recorded with respect to items inspected.
Note: Inspections, field notes, test results and recommendations herein were recorded under the weather conditions and construction
activities occurring at the time of our site visit. If inclement weather and/or construction activities occur after our visit that
may impact the soil and/or stone base subgrade, F&R should be notified and afforded an opportunity to revisit the site and
revise our report as may be needed.
1.The results provided herein relate only to the items inspected and/or tested. Page 1 of 1
2.This report shall not be reproduced, except in full,without the prior written approval of F&R.