HomeMy WebLinkAboutSUB201500149 Assessment - Environmental 2022-08-05 (3) Concrete Reports
f&p Concrete Placement 10-8-18 Concrete
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax 434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville.VA 22902
Date: 10/08/2018 Location: Site-Curb&Gutter
Category: Concrete Location Details: Degraw Street from DI#8 to DI# 10
Coverage: Concrete Placement
Type: Observation Frequency: Periodic
Weather: Partly sunny Wind(mph):
Air Temp.(deg.F): 75 Personnel: Butler, Shane , Technician
Description of Work Completed
Work Performed: The F&R representative arrived on the jobsite as requested to observe the placement of 10 yards of
concrete.
Tests Performed: Air, slump, and temperature test
Field Notes: Observed the placement of 10 yards of concrete for curb and gutter on Degraw Street.
Cubic Yards Placed: 10.00 Concrete Summary Prepared: Yes
Determination: As Specified Discrepancy Recorded?: No
AN
Page 1 of 2
01111) Concrete Placement Client: Project:
Summary Riverbend Development 71W0013
10-8-18 CONC 455 Second Street SE#400 Amity Estates Phase I
Crozet Office Report Date:10/24/2018 Charlottesville,VA 22902 Avinity Loop
6185 Rockfish Gap Turnpike Charlottesville,VA 22902
Crozet.VA 22932
Phone 434-823-51541 Fax 434-8234764
Placement Date: 10/8/2018 Placement Location: Site-Curb&Gutter Placement Method: Chute Technician: Butler,Shane
Weather: Location Details: Degraw Street from DI#8 to DI#10 Mix Design: BC curb Specified Strength(psi): 3000
Contractor. Eagle Rapalo Concrete Supplier: Allied Concrete
Truck# Load 1 Came Placement Air Content Unit Weight Concrete Air Temp On-Site Specimens Sample
Sample Set Ticket# Vol(yd') Times Time(min) Consistency (%) (lb/ft.) Temp(F) (F) Admixtures Cast Specimen Size Type
182122 2 364 10/10 Batched 10 01 EDT 89 Slump 3-1/2 1 Result 5 5 - None 5 4"X 8" CC
10144431 Arrived'10 40 EDT
Empty 11 30 EDT
Page 2 of 2
p Field Report 10-16-18 DFR
� Various ~ Report Date: 10/24/2018
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71 W0013
Phone.434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 10/16/2018 Location: Utility Trench
Category: Soils/Earthwork Location Details: Sanitary Sewer, Montague Street. Road Station
11+25 to 10+00
Type: Observation Frequency: Periodic
Weather: Partly cloudy
Air Temp.(deg.F): 62 F&R Personnel: Butler, Shane , Technician
Description of Work Completed
Work Completed: The F&R representative arrived on the jobsite as requested to observe ongoing site work
Field Notes: Observed continued excavation of the utility trench for sanitary sewer and laterals on Montague st from
station 11+25 to station 10+00. No fill was placed on this date.
Determination: As Specified
Page 1 of 3
FAR Concrete Placement 10-16-18 Concrete
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax 434-823-4764 Charlottesville,VA 22902 Amity Loop
Charlottesville,VA 22902
Date: 10/16/2018 Location: Site-Curb&Gutter
Category: Concrete Location Details: 8'West of DI#10 to 25' East of DI#10
and from DI#6- 18 feet going West.
Coverage: Concrete Placement
Type: Observation Frequency: Periodic
Weather: Partly cloudy Wind(mph):
Air Temp.(deg.F): 60 Personnel: Butler, Shane , Technician
Description of Work Completed
Work Performed: The F&R representative arrived on the jobsite as requested to observe the placement of 8.5 yards of
concrete.
Tests Performed: Air, slump, and temperature test
Field Notes: Observed the placement of 8.5 yards of concrete
Cubic Yards Placed: 8.50 Concrete Summary Prepared: Yes
Determination: As Specified Discrepancy Recorded?: No
Page 2 of 3
�poR Concrete Placement Client: Project:
o t' Summary Riverbend Development 71W0013
..„ ' --J',.u_ - 10-16-18 CONC 455 Second Street SE#400 Amity Estates Phase I
Crow OM. Report Date:10/24/2018 Charlottesville,VA 22902 Avi y Loople,VA 22902
6185 Rockfish Gap Turnpike
Crc¢eL VA 22932
Phone 434-823.5154I Fax.434-823-4764
Placement Date: 10/16/2018 Placement Location: Site-Curb&Gutter Placement Method: Chute Technician: Butler,Shane
Weather: Location Details: 8'West of Dl#10 to 25 feet East of Mix Design: BC curb Specified Strength(psi): 3000
DI#10 and from DI#6-going West
for 18'
Contractor: Eagle Rapalo concrete Supplier.Allied Concrete
Truck# Load/Come Placement Air Content Unit Weight Concrete Air Temp On-Site Specimens Sample
Sample Set Ticket# Vol(yd') Times Time(min) Consistency )%) (Ib/ft') Temp(F) (F) Admixtures Cast Specimen Size Type
182909 3 285 8 5/8.5 Batched 12 27 EDT 88 Slump 3 in Result'5 1 None 5 4"X 8" CC
10229710 Anived 13 00 EDT
Empty 13 55 EDT
Page 3 of 3
Fill Monitoring 11-23-18Fill
F&R
.• „,
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 11/23/2018 Location: Utility Trench
Category: Soils/Earthwork Location Details: Sanitary sewer from manhole#5 to manhole
#6 on Moffat st.
Coverage: Fill Monitoring
Type: Observation Frequency: Periodic
Weather: Cloudy Wind(mph):
Air Temp.(deg.F): 34 Personnel: Butler, Shane , Technician
Description of Work Completed
General Contractor: Contour Earthwork Contour
Subcontractor:
Work Description: The F&R representative arrived on the jobsite as requested to observe ongoing site work.
Fill Monitoring Summary
Placement Depth/Elev. Fill Moisture Fill Material Lift Compaction Vibration Density
Location Reference Condition Description Thickness Equipment Used? Tests
(inches) Taken
Utility adjacent Moist Reddish brown silty 8" Rammax Yes Yes
trench,Sanitary subgrade soil with small rock
sewer from
manhole#5 to
manhole#6 on
Moffat st.
Elev.(ft.)-4.00
to
Elev.(ft.)0.00
Observations&Comments: Observed the placement of fill in 8"loose lifts and compacted with several passes of vibratory
rammax.
Determination: As Specified
Discrepancy Recorded?: No
Please Note:Inspections, field notes, test results and recommendations herein were recorded under the weather conditions and
construction activities occurring at the time of our site visit. If inclement weather and/or construction activities occur after our visit that
may impact the soil and/or base stone subgrade, F&R should be notified and afforded an opportunity to revisit the site and
revise our report as may be needed.
Page 1 of 2
(8) Soil Nuclear Gauge Client: Project:
W) 11-23-18 Density Riverbend Development 71W0013
Report Date:12/1/2018 455 Second Street SE#400 Amity Estates Phase I
et croxoenc.W Test Method:ASTM D6938 Charlottesville,VA 22902 Amity Loop
6185 Rockfish Gap Tkxr6a ke Charlottesville,VA 22902
Crozet VA 22932
Phone-434-823.51541 Fax 434-823-4764
Test Results
Optimum Maximum In Place In Place Probe Min/Max
Retest Test Soil Moisture Dry Density Moisture Dry Density Depth Percent Comp.
Test# Of Date Proctor ID Method Classification (%) (pcf) _ (%) (pct) (in) Compaction (%) Remark
252 11/23/18 3747RC ML 26.6 94.6 29 6 91 5 4 97 95/102
253 11/23/18 3747RC ML 26.6 94 6 29.6 91.0 4 96 95/102
254 11/23/18 3747RC ML 26 6 94.6 29.2 91 1 4 96 95/102
255 11/23/18 3747RC ML 26.6 94.6 29 5 90 7 4 96 95/102
256 11/23/18 3747RC ML 26 6 94 6 29.4 91.4 4 97 95/102
257 11/23/18 3747RC ML 26 6 94.6 29 5 91 5 4 97 95/102
258 11/23/18 3747RC ML 26.6 94 6 29 2 91 5 4 97 95/102
259 11/23/18 3747RC ML 26 6 94.6 29 4 91 5 4 97 95/102
Test Information
Gauge
Test# Test Location Elevation Reference Make/Model/SN/Calibrated Field Technician
252 Utility Trench-Sanitary Sewer Manhole#5 to manhole#6 on Moffat st.Station 8+75 3.0 FT below adjacent SG Troxler/3411 B/12980/ Butler,Shane
253 Utility Trench-Sanitary Sewer:Manhole#5 to manhole#6 on Moffat st Station 7+75 3 0 FT below adjacent SG Troxler/3411 B/12980/ Butler,Shane
254 Utility Trench-Sanitary Sewer Manhole#5 to manhole#6 on Moffat st.Station 9+00 2 0 FT below adjacent SG Troxler/34118/12980/ Butler,Shane
255 Utility Trench-Sanitary Sewer Manhole#5 to manhole#6 on Moffat st.Station 8+30 2 0 FT below adjacent SG Troxler/3411 B/12980/ Butler,Shane
256 Utility Trench-Sanitary Sewer Manhole#5 to manhole#6 on Moffat st.Station 8+90 1 0 FT below adjacent SG Troxler/341113/12980/ Butler,Shane
257 Utility Trench-Sanitary Sewer Manhole#5 to manhole#6 on Moffat st.Station 8+45 1 0 FT below adjacent SG Troxler/34118/12980/ Butler,Shane
258 Utility Trench-Sanitary Sewer Manhole#5 to manhole#6 on Moffat st.Station 8+05 0 0 FT below adjacent SG Troxler/34118/12980 I Butler,Shane
259 Utility Trench-Sanitary Sewer Manhole#5 to manhole#6 on Moffat st Station 8+95 0 0 FT below adjacent SG Troxler/3411 B/12980/ Butler,Shane
Remarks Comments
Tests are"Direct Transmission'(Method A)unless probe depth is noted as
'Backscatter Gauge calibration data on file with the testing agency
Page 2 of 2
19 CPU
rConcrete Sample Pickup 28- 4/201
1 OAR ASTM C31 r Report Date: 2/24/2019
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71 W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax 434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 02/08/2019 Location: Site-Curb&Gutter
Category: Concrete Location Details: .
Coverage: Sample Pickup
Type: Sample Retrieval(Only) Frequency: Periodic
Weather: Cloudy
Air Temperature(deg.F): 44 Personnel: Butler, Shane . Technician
Description of Work Completed
Work Performed: F&R representative arrived on the jobsite as requested to retrieve one set of 5 cylinders and take back
to the lab for testing.
Number of Sets Collected: 1
Condition of Specimens: Found as Cast
Initial Curing: Protected
Min/Max Temp.Recorded: No
Determination: No Discrepancies recorded with respect to items inspected.
Page 1 of 1
Concrete Placement Client: Project:
F&R Summary Riverbend Development 71W0013
2-14-19 CONC 455 Second Street SE#400 Avinity Estates Phase I
Crozet Office os[.,o. Report Date:2/24/2019 Charlottesville,VA 22902 Amity Loop
6185 Rockfish Gap Tumpike Charlottesville,VA 22902
Crozet.VA 22932
Phone 434-823-5154 1 Fax 434-823-4764
Placement Date: 2/14/2019 Placement Location: Site-Curb&Gutter Placement Method: Chute Technician: Butler,Shane
Weather: Location Details: Moffat st from station 14+00 to Mix Design: BC curb Specified Strength(psi): 3000
station 12+40
Contractor: Eagle Rapalo concrete Supplier:Allied Concrete
Truck# Load Volume Placement Air Content Unit Weight Concrete Air Temp On-Site Specimens Sample
Sample Set Ticket# Ind') Times Time(min) Consistency (%) (lb/ft') Temp(F) (F) Admixtures Cast Specimen Size Type
193938 6 305 9 Batched 11 53 EST 87 Slump 3-1/4 in Result.7.2 60 48 None 5 4"X 8" CC
10147503 Arrived 12 25 EST Spec.3-5 Spec 4 5-7 5
Empty 1320 EST
Page 1 of 1
fpp Concrete Sample Pickup 2-15-19CPU
OAR ASTM C31 Report Date: 2/28/2019
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71 W0013
Phone.434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Amity Loop
Charlottesville,VA 22902
Date: 02/15/2019 Location: Jobsite
Category: Concrete Location Details: jobsite
Coverage: Sample Pickup
Type: Sample Retrieval(Only) Frequency: Periodic
Weather: Partly sunny
Air Temperature(deg.F): 52 Personnel: Butler, Shane , Technician
Description of Work Completed
Work Performed: The F&R representative arrived on the Jobsite as requested to retrieve one set of 5 cylinders and take
back to the lab for testing.
Number of Sets Collected: 1
Condition of Specimens: Found as Cast
Initial Curing: Protected
Min/Max Temp.Recorded: No
Determination: No Discrepancies recorded with respect to items inspected.
Page 1 of 1
fop Field Report 2-19-19 DFR
I� Various Report Date: 2/28/2019
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71 W0013
Phone 434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 02/19/2019 Location: Jobsite
Category: General Location Details:
Type: Observation Frequency: Periodic
Weather: Sunny
Air Temp.(deg.F): 38 F&R Personnel: Butler, Shane . Technician
Description of Work Completed
Work Completed: The F&R representative arrived on the jobsite as requested to observe ongoing site work.
Field Notes: Upon arrival, no earthwork crews on site,
Eagle Rapalo Concrete crew was on site and preparing for C&G concrete placement. F&R remained
on site to observe and test concrete placement.
Determination: No Discrepancies recorded with respect to items inspected.
Page 1 of 2
41D Concrete Placement Client: Project:
Summary Riverbend Development 71W0013
.. '"` 2-19-19 CONC 455 Second Street SE#400 Amity Estates Phase I
Crozet Ofece.oe�..e . Report Date:2/28/2019 Charlottesville,VA 22902 Avinity Loop
6185 Rockfish Gap Turnpike Charlottesville,VA 22902
Crozet.VA 22932
Phone 434-823-5154 I Fee 434-823-4764
Placement Date: 2/19/2019 Placement Location: Site-Curb&Gutter Placement Method: Chute Technician: Butler,Shane
Weather: Location Details: South side of Moffat st from station Mix Design: BC306 Specified Strength(psi): 3000
10+25 to station 11+75
Contractor: Eagle Rapalo concrete Supplier: Allied Concrete
Truck# Load/Cume Placement Air Content Unit Weight Concrete Air Temp On-Site Specimens Sample
Sample Set Ticket# Vol(yd') Times Time(min) Consistency (%) (Ib/h'l Temp(F) (F) Admixtures Cast Specimen Size Type
194608 7 317 10/10 Batched 11.29 EST 87 Slump 3-1/4 In Result 7 2 Norm 5 a'X 6" CC
10147593 Arrived 12 00 EST Spec 3-5 Spec 4 5-7 5
Emply 12 56 EST
Page 2 of 2
r&n Field Report 2-21-19OFR
K Various Report Date: 2/28/2019
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone 434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 02/21/2019 Location: Jobsite
Category: General Location Details:
Type: Observation Frequency: Periodic
Weather: Overcast
Air Temp.(deg.F): 35 F&R Personnel: Butler, Shane , Technician
Description of Work Completed
Work Completed: The F&R representative arrived on the jobsite as requested to observe ongoing site work.
Field Notes: Upon arrival, there were no crews on the jobsite due to prior days snowfall.
Determination: No Discrepancies recorded with respect to items inspected.
Page 1 of 2
Concrete Sample Pickup2-21-19
CPU
ASTM C31
��p' Report Date: 2/28/2019
r
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone.434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax.434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 02/21/2019 Location: Jobsite
Category: Concrete Location Details: jobsite
Coverage: Sample Pickup
Type: Sample Retrieval(Only) Frequency: Periodic
Weather: Overcast
Air Temperature(deg.F): 35 Personnel: Butler, Shane , Technician
Description of Work Completed
Work Performed: The F&R representative arrived on the jobsite as requested to retrieve one set of 5 cylinders and take
back to the lab for testing.
Number of Sets Collected: 1
Condition of Specimens: Found as Cast
Initial Curing: Cure Box/Cooler
Min/Max Temp.Recorded: No
Determination: No Discrepancies recorded with respect to items inspected.
Page 2 of 2
Concrete Placement Client: Project:
&� Summary Riverbend Development 71W0013
2-25-19 CONC 455 Second Street SE#400 Amity Estates Phase I
Crozet Office Report Date:2/28/2019 Charlottesville,VA 22902 Avinity Loop
6185 Rockfish Gap T ur mke Charlottesville,VA 22902
Crozet.VA 22932
Phone.434-823.5154 I Fax.434-823-4764
Placement Date: 2/25/2019 Placement Location: Site-Curb&Gutter Placement Method: Chute Technician: Butler,Shane
Weather: Location Details: From DI#58 around cul de sac to Mix Design: BC curb Specified Strength(psi): 3000
station 10+25
Contractor: Eagle Supplier: Allied Concrete
Truck# Load/Cume Placement Air Content Unit Weight Concrete Air Temp On-Site Specimens Sample
Sample Set Ticket# Vol(yd') Times Time(min) Consistency NO (Ib/h') Temp(F) (F) Admixtures Cast Specimen Size Type
—
195001 8 302 8 i 8 Batched 11 11 EST 89 'Slump 3 in Result 6 0 None 5 4"X 8' CC
10147694 Arrived 1145EST
Empty 12.40 EST
Page 1 of 1
fop Concrete Sample Pickup 2-26-19CPU
I� ASTM C31 Report Date: 2/28/2019
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet.VA 22932 Riverbend Development 71 W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 02/26/2019 Location: Jobsite
Category: Concrete Location Details: jobsite
Coverage: Sample Pickup
Type: Sample Retrieval(Only) Frequency: Periodic
Weather: Mostly sunny
Air Temperature(deg.F): 35 Personnel: Butler, Shane , Technician
Description of Work Completed
Work Performed: The F&R representative arrived on the jobsite as requested to retrieve one set of 5 cylinders and take
back to the lab for testing.
Number of Sets Collected: 1
Condition of Specimens: Found as Cast
Initial Curing: Cure Box/Cooler
Min/Max Temp.Recorded: No
Determination: No Discrepancies recorded with respect to items inspected.
Page 1 of 1
f&p Concrete Placement
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71 W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax 434-823-4764 Charlottesville,VA 22902 Amity Loop
Charlottesville,VA 22902
Date: 08/02/2019 Location: Site-Curb&Gutter
Category: Concrete Location Details: Moffat St from station 6+75 to station
5+30
Coverage: Concrete Placement
Type: Observation Frequency: Periodic
Weather: Partly sunny Wind(mph):
Air Temp.(deg.F): 80 Personnel: Butler, Shane , Technician
Description of Work Completed
Work Performed: The F&R representative arrived on the job site as requested to observe the placement of 7 yards of
concrete.
Tests Performed: Air, slump,and temperature test
Cubic Yards Placed: 7.00 Concrete Summary Prepared: No
Determination: No Discrepancies recorded with respect to items inspected.
1.The results provided herein relate only to the items inspected and/or tested. Page 1 of 2
2.This report shall not be reproduced,except in full,without the prior written approval of F&R.
Concrete Placement Client: Project:
E&R Summary Riverbend Development 71 W0013
Report Date:8112/2019 455 Second Street SE#400 Amity Estates Phase I
Crozet Office Charlottesville,VA 22902 Avinity Loop
6185 Rockfish Gap Turnpike Charlottesville,VA 22902
Crozet.VA 22932
Phone.434-823-5154 1 Fax 434-823-4764
Placement Date: 8/2/2019 Placement Location: Site-Curb&Gutter Placement Method: Chute Technician: Butler,Shane
Weather: Location Details: Moffat st from station 6+75 to Mix Design: A3 Curb Specified Strength(psi): 3000
station 5+30
Contractor: Angel concrete Supplier: Allied Concrete
Truck# Load i Cume Placement Air Content Unit Weight Concrete Air Temp On-Site Specimens Sample
Sample Set Ticket# Vol(yd') Times Time(min) Consistency (%) )ib/lt) Temp(F) (F) Admixtures Cast Specimen Size Type
215206 9 320 7/7 Batched'11 11 EDT 88 Slump 3 in Result 7 2 73 None 5 V S 3" CC
10152281 Arrived 1145EDT
Empty 12 39 EDT
1. The results provided herein relate only to the items inspected and/or tested Page 2 of 2
2 Thus report shall not be reproduced,except in full,without the pnor wntten approval of F&R.
f&D Concrete Sample Pickup
ASTM C31 Report Date: 8/12/2019
t�
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71 W0013
Phone 434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Amity Loop
Charlottesville,VA 22902
Date: 08/05/2019 Location: Jobsite
Category: Concrete Location Details: .
Coverage: Sample Pickup
Type: Sample Retrieval(Only) Frequency: Periodic
Weather: Overcast
Air Temperature(deg.F): 77 Personnel: Butler, Shane , Technician
Description of Work Completed
Work Performed: The F&R representative arrived on the job site as requested to retrieve one set of 5 cylinders and take
back to the lab for testing.
Number of Sets Collected: 1
Condition of Specimens: Found as Cast
Initial Curing: Protected
Min/Max Temp.Recorded: No
Determination: No Discrepancies recorded with respect to items inspected.
1.The results provided herein relate only to the items inspected and/or tested. Page 1 of 1
2.This report shall not be reproduced, except in full,without the prior written approval of F&R.
Concrete Placement Client: Project:
&� Summary Riverbend Development 71W0013
""`—= Report Date:10/31/2019 455 Second Street SE tt 400 Avinity Estates Phase I
Crozet Office Charlottesville,VA 22902 Avinity Loop
6185 Rockfish Gap Turnpike Charlottesville,VA 22902
Crozet.VA 22932
Phone'434.823.51541 Fax 434-823-4764
Placement Date: 9/3/2019 Placement Location: Building-Footing Placement Method: Buggy Technician:Weeks,Steven
Weather: Location Details: Clubhouse Mix Design: 30019C Specified Strength(psi): 3000
Contractor: TT Supplier. Wilson Ready Mix
Truck 6 Load I Cume Placement Air Content Unit Weight Concrete Air Temp On-Site Specimens Sample
Sample Set Ticket 6 Vol(yd') Times Time(min) Consistency (%) (lb/ft') Temp(F) (F) Admixtures Cast Specimen Size Type
218932 10 262 9/9 Batched 0531 EDT 131 Slump 4 rn Result 1 9 84 None 5 4"X 8" CC
62003 Amved 06 27 EDT
Empty 07042 EDT
218938 1 250 9/18 Batched 0627 EDT 116 6 00 Gal Water(9 BL
62005 Arrived 07 17 EDT yd')
Empty 0823 EDT
1. The results provided herein relate only to the items Inspected and/or tested. Page 1 of 1
2 This report shall not be reproduced,except in full,without the pnor wntten approval of F&R.
foph Concrete Sample Pickup
ASTM C31 Report Date: 10/31/2019
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71 W0013
Phone:434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 09/04/2019 Location: Jobsite
Category: Concrete Location Details: .
Coverage: Sample Pickup
Type: Sample Retrieval(Only) Frequency: Periodic
Weather: Sunny
Air Temperature(deg.F): 73 Personnel: Butler, Shane , Technician
Description of Work Completed
Work Performed: The F&R representative arrived on the jobsite as requested to retrieve one set of 5 cylinders and take
back to the lab for testing.
Number of Sets Collected: 1
Condition of Specimens: Found as Cast
Initial Curing: Protected
Min/Max Temp.Recorded: No
Determination: N/A
1.The results provided herein relate only to the items inspected and/or tested. Page 1 of 1
2.This report shall not be reproduced,except in full,without the prior written approval of F&R.
Concrete Placement 10-18-18 Concrete
FAR
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71 W0013
Phone:434-823-5154 455 Second Street SE#400 Amity Estates Phase I
Fax.434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 10/18/2018 Location: Site-Curb&Gutter
Category: Concrete Location Details: From DI#12 to DI#14 and from DI#20
to DI#24
Coverage: Concrete Placement
Type: Observation Frequency: Periodic
Weather: Sunny Wind(mph):
Air Temp.(deg.F): 55 Personnel: Butler, Shane , Technician
Description of Work Completed
Work Performed: The F&R representative arrived on the jobsite as requested to observe the placement of 10 yards of
concrete.
Tests Performed: Air, slump, and temperature test
Field Notes: Observed the placement of 10 yards of concrete on Montague Street for curb and gutter.
Cubic Yards Placed: 10.00 Concrete Summary Prepared: Yes
Determination: As Specified Discrepancy Recorded?: No
Page 1 of 2
Concrete Placement Client: Project:
t�j� Summary Riverbend Development 71W0013
10-18-19 CONC 455 Second Street SE#400 Amity Estates Phase I
Crozet office Charlottesville,VA 22902 Amity Loop
6185 Rockfish Gap Tumpike Report Date:10/24/2018
Charlottesville,VA 22902
Crozet.VA 22932
Phone 434-82 3-5154 1 Fax 434-823-4764
Placement Date: 10/18/2018 Placement Location: Site-Curb&Gutter Placement Method: Chute Technician: Butler,Shane
Weather: Location Details: From DI#12 to DI#14 and from DI Mix Design: BC curb Specified Strength(psi): 3000
#20 to DI#24
Contractor: Eagle Rapalo concrete Supplier: Allied Concrete
Truck# Load/Cu me Placement Air Content Unit Weight Concrete Air Temp On-Site Specimens Sample
Sample Set Ticket# Vol(yd') Times Time(min) Consistency MI (lb/ft') Temp(F) (F) Admixtures Cast Specimen Size Type
183165 4 375 10/10 Batched 10 53 EDT 88 Slump 3-3/4 in Result 7 1 None 5 CC
10144684 Arrived 11 20 EDT
Empty 12 21 EDT
Page 2 of 2
0 Concrete Placement Client: Project:
Summary Rlverbend Development 71W0013
3-17-20 CONC 455 Second Street SE#400 Avinity Estates Phase I
Crozet Office Report Date:3/19/2020 Charlottesville,VA 22902 Avinity Loop
6185 Rockfish Gap Turnoke Charlottesville,VA 22902
Crozet.VA 22932
Phone:434-823-5154 I Fax 434-823-4764
Placement Date: 3/17/2020 Placement Location: Site-Curb&Gutter Placement Method: Chute Technician: McTaggart,Elizabeth R
Weather: Overcast Location Details: Pebble Drive cul de sac Mix Design: BCCURB Specified Strength(psi): 3000
Contractor: Contour Supplier:Allied Concrete
Truck* Load I Came Placement Air Content Unit Weight 'Concrete Air Temp On-Site Specimens Sample
Sample Set Ticket* Vol(yd.) Times Time(min) Consistency (%) (11a/fP) Temp(F) (F) Admixtures Cast Specimen Size Type
237132 11 379 818 Batched 10'58 EDT 107 Slump 2-1/2 in Result.5 0 70 56 None 5 4"X 8" CC
10239733 Amved 1130 EDT
Empty 12 45 EDT
1 The results provided herein relate only to the items inspected and/or tested. Page 1 of 1
2. This report shall not be reproduced,except in full,without the prior wntten approval of F&R.
fop Concrete Sample Pickup 3-18-20CPU
t� ASTM C31 Report Date: 3/19/2020
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone 434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax.434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 03/18/2020 Location: Jobsite
Category: Concrete Location Details: Jobsite
Coverage: Sample Pickup
Type: Sample Retrieval(Only) Frequency: Periodic
Weather: Mostly cloudy Wind(mph):
Air Temperature(deg.F): 56 Personnel: Butler, Shane , Technician
Description of Work Completed
Work Performed: The F&R representative arrived on the job site as requested to retrieve one set of 5 cylinders and take
back to the lab for testing.
Number of Sets Collected: 1
Condition of Specimens: Found as Cast
Initial Curing: Exposed
Min/Max Temp.Recorded: No
Determination: N/A
1.The results provided herein relate only to the items inspected and/or tested. Page 1 of 1
2.This report shall not be reproduced,except in full,without the prior written approval of F&R.
rsip Concrete Sample Pickup 4'-2oCPU
I� ASTM C31 Report Date: 5/4/2020
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike
Crozet,VA 22932 Riverbend Development 71W0013
Phone.434-823-5154 455 Second Street SE#400 Avinity Estates Phase I
Fax:434-823-4764 Charlottesville,VA 22902 Avinity Loop
Charlottesville,VA 22902
Date: 04/01/2020 Location: Jobsite
Category: Concrete Location Details: Jobsite
Coverage: Sample Pickup
Type: Sample Retrieval(Only) Frequency: Continuous
Weather: Cloudy
Air Temperature(deg.F): 53 Personnel: Hartwell,Zachary R , Technician
Description of Work Completed
Work Performed: The F&R representative arrived on-site as requested to retrieve concrete cylinders
Number of Sets Collected: 1
Condition of Specimens: Found as Cast
Initial Curing: Exposed
Min/Max Temp.Recorded: No
Determination: No Discrepancies recorded with respect to items inspected.
-WI 1\ 1
1.The results provided herein relate only to the items inspected and/or tested. Page 1 of 1
2.This report shall not be reproduced,except in full,without the prior written approval of F&R.
f8cR Concrete Compressive Strength Report Date: 10/23/2018
Test Method:ASTM C 39 Sample: 179454
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike Riverbend Development 71W0013
Crozet,VA 22932 455 Second Street SE#400 Avinity Estates Phase I
Phone:434-823-5154 Charlottesville,VA 22902 Avinity Loop
Fax:434-823-4764 Charlottesville,VA 22902
Sample Details
Set#: 1 Technician: Butler,Shane Batched: 05 54 EDT
Specimen Size: 4"X 8" Cast By: Butler,Shane Sampled: 07.15 EDT
Specimens In Set: 5 Date Cast: 09/07/18 Cast: 07 20 EDT
Truck/Ticket#: 352/10143812 Sampled From: Chute Truck Empty: 07:20 EDT
Contractor: Eagle Rapalo concrete Placement Method: Chute Placement Time: 86(min)
Location
Placement Location: Site-Curb&Gutter
Location Details: Montague street,Right side from station 12+25 to station 11+00
Sample Location/Notes: Montague street,right side station 12+25
Batch Log Specifications
Supplier: Allied Concrete Mix Design: BC curb Strength: 3000(psi)
Plant: 01
On-Site Admixtures: None
Field Measurements
Weather: Slump(in): 3(ASTM C143) Plastic Unit Weight:
Air Temperature(F): Concrete Temp(F): Air Content: 5.2(ASTM C231)
Load Volume: 10(yd')
Lab Test Results
Testing Lab:Froehling&Robertson Inc -71,6181 Rockfish Gap Turnpike,Crozet,VA,22932
Specimen Test Test Field/Lab Average Cylinder Cylinder Max Load Strength Fracture Break Capping
Number Age Days Date Cure Days Diameter(in) Area(in') (Ibs) (psi) Type Remark Method
1-1 7 ,09/14/18 3/4 4.00 12.57 43,000 3,420 2 N
1-2 28 10/05/18 3/25 4.00 12.57 56,000 4,460 2 P N
1-3 28 10/05/18 3/25 4.00 12.57 55,000 4,380 2 P N
1-4 28 10/05/18 3/25 4 00 12.57 55,000 4,380 2 P N
Test Age Average Strengths(psi):7 Day-3420,28 Day-4400
Capping Methods
P:Compressive strength meets/exceeds design strength N: Unbonded Caps(ASTM C1231)
Tested By:Rodney D Miller(1,2,3,4)
X /\ '4 \ I
TYPE 1 TYPE 2 TYPE 3 TYPE 4 TYPE 5 TYPE 6
1. Specimens cast in general accordance with ASTM C31 by F&R Personnel unless otherwise noted. Page 1 of 1
2. The results provided herein relate only to the items inspected and/or tested
3 This report shall not be reproduced,except in full,without the prior written approval of F&R.
f&R Concrete Com ressive Stren th CTR No 2
p 9 Report Date: 12/1/2018
Test Method:ASTM C 39 Sample: 182122
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike Riverbend Development 71W0013
Crozet,VA 22932 455 Second Street SE#400 Avinity Estates Phase I
Phone 434-823-5154 Charlottesville,VA 22902 Avinity Loop
Fax•434-823-4764 Charlottesville,VA 22902
Sample Details
Set#: 2 Technician: Butler,Shane Batched: 10.01 EDT
Specimen Size: 4"X 8" Cast By: Butler,Shane Sampled: 10 45 EDT
Specimens In Set: 5 Date Cast: 10/08/18 Cast: 10.50 EDT
Truck/Ticket#: 364/10144431 Sampled From: Chute Truck Empty: 11 30 EDT
Contractor: Eagle Rapalo Concrete Placement Method: Chute Placement Time: 89(min)
Location
Placement Location: Site-Curb&Gutter
Location Details: Degraw Street from DI#8 to DI#10
Sample Location/Notes: Next to DI#8
Batch Log Specifications
Supplier: Allied Concrete Mix Design: BC curb Strength: 3000(psi)
Plant: Allied Concrete
On-Site Admixtures: None
Field Measurements
Weather: Slump(in): 3-1/2(ASTM C143) Plastic Unit Weight:
Air Temperature(F): Concrete Temp(F): Air Content: 5.5(ASTM C231)
Load Volume: 10(yd')
Lab Test Results
Testing Lab:Froehling&Robertson Inc -71,6181 Rockfish Gap Turnpike,Crozet,VA,22932
Specimen Test Test Field/Lab Average Cylinder Cylinder Max Load Strength Fracture Break Capping
Number Age Days Date Cure Days Diameter(in) Area(inz) (Ibs) (psi) Type Remark Method
2-1 7 10/15/18 1 /6 4.00 12.57 38,000 3,020 2 N
2-2 28 11/05/18 1 /27 4 00 12.57 45,000 3,580 2 P N
2-3 28 11/05/18 1 /27 4 00 12.57 43,000 3,420 2 P N
2-4 28 11/05/18 1 /27 4 00 12 57 43,000 3,420 2 P N
Test Age Average Strengths(psi):7 Day-3020,28 Day-3470
Capping Methods
P:Compressive strength meets/exceeds design strength N:Unbonded Caps(ASTM C1231)
Tested By:Rodney D Miller(1,2,3,4)
X i , ik \ 7 7
TYPE 1 TYPE 2 TYPE 3 TYPE 4 TYPE 5 TYPE 6
1. Specimens cast in general accordance with ASTM C31 by F&R Personnel unless otherwise noted. Page 1 of 1
2. The results provided herein relate only to the items inspected and/or tested.
3. This report shall not be reproduced,except in full,without the prior written approval of F&R.
f&R Concrete Compressive Strength CTR No 3
pReport Date: 12/1/2018
Test Method:ASTM C 39 Sample: 182909
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike Riverbend Development 71W0013
Crozet,VA 22932 455 Second Street SE#400 Avinity Estates Phase I
Phone'434-823-5154 Charlottesville,VA 22902 Avinity Loop
Fax-434-823-4764 Charlottesville,VA 22902
Sample Details
Set#: 3 Technician: Butler,Shane Batched: 12 27 EDT
Specimen Size: 4"X 8" Cast By: Butler,Shane Sampled: 13 05 EDT
Specimens In Set: 5 Date Cast: 10/16/18 Cast: 13:10 EDT
Truck/Ticket#: 285/10229710 Sampled From: Chute Truck Empty: 13 55 EDT
Contractor: Eagle Rapalo concrete Placement Method: Chute Placement Time: 88(min)
Location
Placement Location: Site-Curb&Gutter
Location Details: 8'West of DI#10 to 25 feet East of DI#10 and from DI#6-going West for 18'
Sample Location/Notes: 25'East of DI#10
Batch Log Specifications
Supplier: Allied Concrete Mix Design: BC curb Strength: 3000(psi)
Plant: Allied Concrete
On-Site Admixtures: None
Field Measurements
Weather: Slump(in): 3(ASTM C143) Plastic Unit Weight:
Air Temperature(F): Concrete Temp(F): Air Content: 5 1 (ASTM C231)
Load Volume: 8.5(yd3)
Lab Test Results
Testing Lab:Froehling&Robertson Inc -71,6181 Rockfish Gap Turnpike,Crozet,VA,22932
Specimen Test Test Field/Lab Average Cylinder Cylinder Max Load Strength Fracture Break Capping
Number Age Days Date Cure Days Diameter(in) Area(ins) (Ibs) (psi) Type Remark Method
3-1 7 10/23/18 1/6 4.00 12.57 59,000 4,690 2 N
3-2 28 11/13/18 1 /27 4 00 12.57 75,000 5,970 2 P N
3-3 28 11/13/18 1 /27 4 00 12.57 72,000 5,730 2 P N
3-4 28 11/13/18 1 /27 4 00 12 57 78,000 6,210 2 P N
Test Age Average Strengths(psi):7 Day-4690,28 Day-5970
Capping Methods
P:Compressive strength meets/exceeds design strength N:Unbonded Caps(ASTM C1231)
Tested By:Rodney D Miller(1,2,3,4)
X /\ 'N/4 \ / "
TYPE 1 TYPE 2 TYPE 3 TYPE 4 TYPE 5 TYPE 6
1 Specimens cast in general accordance with ASTM C31 by F&R Personnel unless otherwise noted. Page 1 of 1
2. The results provided herein relate only to the items inspected and/or tested.
3. This report shall not be reproduced,except in full,without the prior written approval of F&R.
f&R Concrete Compressive Strength CTR No 4
PReport Date: 12/1/2018
Test Method:ASTM C 39 Sample: 183165
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike Riverbend Development 71W0013
Crozet,VA 22932 455 Second Street SE#400 Avinity Estates Phase I
Phone.434-823-5154 Charlottesville,VA 22902 Avinity Loop
Fax.434-823-4764 Charlottesville,VA 22902
Sample Details
Set#: 4 Technician: Butler,Shane Batched: 10:53 EDT
Specimen Size: 4"X 8" Cast By: Butler,Shane Sampled: 1125 EDT
Specimens In Set: 5 Date Cast: 10/18/18 Cast: 11 30 EDT
Truck/Ticket#: 375/10144684 Sampled From: Chute Truck Empty: 12:21 EDT
Contractor: Eagle Rapalo concrete Placement Method: Chute Placement Time: 88(min)
Location
Placement Location: Site-Curb&Gutter
Location Details: From DI#12 to DI#14 and from DI#20 to DI#24
Sample Location/Notes: North end of DI#24
Batch Log Specifications
Supplier: Allied Concrete Mix Design: BC curb Strength: 3000(psi)
Plant: Allied Concrete
On-Site Admixtures: None
Field Measurements
Weather: Slump(in): 3-3/4(ASTM C143) Plastic Unit Weight:
Air Temperature(F): Concrete Temp(F): Air Content: 7.1 (ASTM C231)
Load Volume: 10(yd')
Lab Test Results
Testing Lab:Froehling&Robertson Inc.-71,6181 Rockfish Gap Turnpike,Crozet,VA,22932
Specimen Test Test Field/Lab Average Cylinder Cylinder Max Load Strength Fracture Break Capping
Number Age Days Date Cure Days Diameter(in) Area(in2) (Ibs) (psi) Type Remark Method
4-1 7 10/25/18 1 /6 4.00 12 57 35,000 2,780 2 N
4-2 28 11/15/18 1 /27 4.00 12.57 50,000 3,980 2 P N
4-3 28 11/15/18 1 /27 4.00 12.57 46,000 3,660 2 P N
4-4 28 11/15/18 1 /27 4 00 12.57 48,000 3,820 2 P N
Test Age Average Strengths(psi):7 Day-2780,28 Day-3820
Capping Methods
P:Compressive strength meets/exceeds design strength N:Unbonded Caps(ASTM C1231)
Tested By:Rodney D Miller(1,2,3,4)
A ...,
l 1 k` \ i
yi
TYPE 1 TYPE 2 TYPE 3 TYPE 4 TYPE 5 TYPE 6
1. Specimens cast in general accordance with ASTM C31 by F&R Personnel unless otherwise noted. Page 1 of 1
2. The results provided herein relate only to the items inspected and/or tested.
3. This report shall not be reproduced,except in full,without the prior written approval of F&R.
f&R Concrete Compressive Strength CTR No 9
PReport Date: 11/2/2019
Test Method:ASTM C 39 Sample:215206
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike Riverbend Development 71W0013
Crozet,VA 22932 455 Second Street SE#400 Avinity Estates Phase I
Phone 434-823-5154 Charlottesville,VA 22902 Avinity Loop
Fax:434-823-4764 Charlottesville,VA 22902
Sample Details
Set#: 9 Technician: Butler,Shane Batched: 11 11 EDT
Specimen Size: 4"X 8" Cast By: Butler,Shane Sampled: 11 50 EDT
Specimens In Set: 5 Date Cast: 08/02/19 Cast: 11 55 EDT
Truck/Ticket#: 320/10152281 Sampled From: Chute Truck Empty: 12.39 EDT
Contractor: Angel concrete Placement Method: Chute Placement Time: 88(min)
Location
Placement Location: Site-Curb&Gutter
Location Details: Moffat st from station 6+75 to station 5+30
Sample Location/Notes: Left side of Moffat st. Station 6+75
Batch Log Specifications
Supplier: Allied Concrete Mix Design: A3 Curb Strength: 3000(psi)
Plant: 01
On-Site Admixtures: None
Field Measurements
Weather: Slump(in): 3(ASTM C143) Plastic Unit Weight:
Air Temperature(F): Concrete Temp(F): 78(ASTM C1064) Air Content: 7.2(ASTM C231)
Load Volume: 7(yd3)
Lab Test Results
Testing Lab:Froehling&Robertson Inc.-71,6185 Rockfish Gap Turnpike,Crozet,VA,22932
Specimen Test Test Field/Lab Average Cylinder Cylinder Max Load Strength Fracture Break Capping
Number Age Days Date Cure Days Diameter(in) Area(in2) (Ibs) (psi) Type Remark Method
9-1 7 08/09/19 3/4 4.00 12.57 55,000 4,380 2 N
9-2 28 08/30/19 3/25 4.00 12.57 66,000 5,250 2 P N
9-3 28 08/30/19 3/25 4.00 12.57 69,000 5,490 2 P N _
9-4 28 08/30/19 3/25 4.00 12.57 68,000 5,410 2 P N
Test Age Average Strengths(psi):7 Day-4380,28 Day-5380
Capping Methods
P:Compressive strength meets/exceeds design strength N:Unbonded Caps(ASTM C1231)
Tested By: Rodney D Miller(1,2,3,4)
Checked In:08/05/2019(1,2,3,4)
7
X /\ ''y4 \ r 'N
TYPE 1 TYPE 2 TYPE 3 TYPE 4 TYPE 5 TYPE 6
1 Specimens cast in general accordance with ASTM C31 by F&R Personnel unless otherwise noted. Page 1 of 1
2. The results provided herein relate only to the items inspected and/or tested.
3. This report shall not be reproduced,except in full,without the prior written approval of F&R.
F&R Concrete Com ressive Strength CTR No 10
P 9 Report Date: 11/2/2019
Test Method:ASTM C 39 Sample:218932
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike Riverbend Development 71W0013
Crozet,VA 22932 455 Second Street SE#400 Avinity Estates Phase I
Phone 434-823-5154 Charlottesville,VA 22902 Avinity Loop
Fax 434-823-4764 Charlottesville,VA 22902
Sample Details
Set#: 10 Technician: Weeks,Steven Batched: 05 31 EDT
Specimen Size: 4"X 8" Cast By: Weeks,Steven Sampled: 06:32 EDT
Specimens In Set: 5 Date Cast: 09/03/19 Cast: 06 47 EDT
Truck/Ticket#: 262/62003 Sampled From: Chute Truck Empty: 07.42 EDT
Contractor: TT Placement Method: Buggy Placement Time: 131 (min)
Location
Placement Location: Building-Footing
Location Details: Clubhouse
Sample Location I Notes: East side
Batch Log Specifications
Supplier: Wilson Ready Mix Mix Design: 30019C Strength: 3000(psi)
Plant: Wilson Ready Mix
On-Site Admixtures: None
Field Measurements
Weather: Slump(in): 4(ASTM C143) Plastic Unit Weight:
Air Temperature(F): Concrete Temp(F): 84(ASTM C1064) Air Content: 1 9(ASTM C231)
Load Volume: 9(yd')
Lab Test Results
Testing Lab:Froehling&Robertson Inc.-71,6185 Rockfish Gap Turnpike,Crozet,VA,22932
Specimen Test Test Field/Lab Average Cylinder Cylinder Max Load Strength Fracture Break Capping
Number Age Days Date Cure Days Diameter(in) Area(in2) (Ibs) (psi) Type Remark Method
10-1 7 09/10/19 1 /6 4 00 12.57 47,000 3,740 2 N
10-2 28 10/01/19 1 /27 4 00 12.57 61,000 4,850 3 P N
10-3 28 10/01/19 1 /27 4 00 12.57 65,000 5,170 2 P N
10-4 28 10/01/19 1 /27 4.00 12 57 64,500 5,130 2 P N
Test Age Average Strengths(psi):7 Day-3740,28 Day-5050
Capping Methods
P:Compressive strength meets/exceeds design strength N:Unbonded Caps(ASTM C1231)
Tested By:Rodney D Miller(1,2,3,4)
Checked In:09/04/2019(1,2,3,4)
X /\ ii4, \ 7 7 \
TYPE 1 TYPE 2 TYPE 3 TYPE 4 TYPE 5 TYPE 6
1 Specimens cast in general accordance with ASTM C31 by F&R Personnel unless otherwise noted. Page 1 of 1
2. The results provided herein relate only to the items inspected and/or tested
3. This report shall not be reproduced,except in full,without the prior written approval of F&R.
pppp Concrete Compressive Strength CTR No 11
��`I` Test Method:ASTM C 39 p g Report Date::5/4/2020
o 11
Sample:237132
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike Riverbend Development 71W0013
Crozet,VA 22932 455 Second Street SE#400 Avinity Estates Phase I
Phone 434-823-5154 Charlottesville,VA 22902 Avinity Loop
Fax:434-823-4764 Charlottesville,VA 22902
Sample Details
Set#: 11 Technician: McTaggart, Elizabeth R Batched: 10 58 EDT
Specimen Size: 4"X 8" Cast By: McTaggart,Elizabeth R Sampled: 11:30 EDT
Specimens In Set: 5 Date Cast: 03/17/20 Cast: 11.39 EDT
Truck/Ticket#: 379/10239733 Sampled From: Chute Truck Empty: 12.45 EDT
Contractor: Contour Placement Method: Chute Placement Time: 107(min)
Location
Placement Location: Site-Curb&Gutter
Location Details: Pebble Drive cul de sac
Sample Location/Notes: Pebble Drive cul de sac
Batch Log Specifications
Supplier: Allied Concrete Mix Design: BCCURB Strength: 3000(psi)
Plant: 02
On-Site Admixtures: None
Field Measurements
Weather: Overcast Slump(in): 2-1/2(ASTM C143) Plastic Unit Weight:
Air Temperature(F): 56 Concrete Temp(F): 70(ASTM C1064) Air Content: 5.0(ASTM C231)
Load Volume: 8(yd3)
Lab Test Results
Testing Lab:Froehling&Robertson Inc.-71,6185 Rockfish Gap Turnpike,Crozet,VA,22932
Specimen Test Test Field I Lab Average Cylinder Cylinder Max Load Strength Fracture Break Capping
Number Age Days Date Cure Days Diameter(in) Area(in2) (Ibs) (psi) Type Remark Method
11-1 7 03/24/20 1 /6 4.00 12.57 58,000 4,610 3 N
11-2 28 04/14/20 1 /27 4.00 12.57 79,000 6,290 2 N
11-3 28 04/14/20 1 /27 4 00 12.57 82,500 6,560 2 N
11-4 28 04/14/20 1 /27 4.00 12.57 83,000 6,600 3 N
Test Age Average Strengths(psi):7 Day-4610,28 Day-6480
Capping Methods
Tested By: II George A Sanders(1),Jesse L McLaughlin(2,3,4) N:Unbonded Caps(ASTM C1231)
Checked In:03/18/2020(1,2,3,4)
X ^ \ / fl
TYPE 1 TYPE 2 TYPE 3 TYPE 4 TYPE 5 TYPE 6
1. Specimens cast in general accordance with ASTM C31 by F&R Personnel unless otherwise noted. Page 1 of 1
2. The results provided herein relate only to the items inspected and/or tested.
3. This report shall not be reproduced,except in full,without the prior written approval of F&R.
rp Concrete Compressive Strength CTR No 12
a� PReport Date:5/4/2020
Test Method:ASTM C 39 Sample:238882
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike Riverbend Development 71W0013
Crozet,VA 22932 455 Second Street SE#400 Avinity Estates Phase I
Phone.434-823-5154 Charlottesville,VA 22902 Avinity Loop
Fax:434-823-4764 Charlottesville,VA 22902
Sample Details
Set#: 12 Technician: Hartwell,Zachary R Batched: 09:39 EDT
Specimen Size: 4"X 8" Cast By: Hartwell,Zachary R Sampled: 10.35 EDT
Specimens In Set: 5 Date Cast: 03/31/20 Cast: 10 45 EDT
Truck/Ticket#: 380/10159807 Sampled From: Chute Truck Empty: 11:30 EDT
Contractor: Contour Placement Method: Chute Placement Time: 111 (min)
Location
Placement Location: Site-Sidewalk
Location Details: Pebble Drive,cul de sac
Sample Location/Notes: Pebble Drive,cul de sac
Batch Log Specifications
Supplier: Allied Concrete Mix Design: BCCURB Strength: 3000(psi)
On-Site Admixtures: None
Field Measurements
Weather: Slump(in): 3-3/4(ASTM C143) Plastic Unit Weight:
Air Temperature(F): Concrete Temp(F): 73(ASTM C1064) Air Content: 7 5(ASTM C231)
Load Volume: 10(yd3)
Lab Test Results
Testing Lab:Froehling&Robertson Inc.-71,6185 Rockfish Gap Turnpike,Crozet,VA,22932
Specimen Test Test Field/Lab Average Cylinder Cylinder Max Load Strength Fracture Break Capping
Number Age Days Date Cure Days Diameter(in) Area(in') (Ibs) (psi) Type Remark Method
12-1 7 04/07/20 1 /6 4.00 12 57 42,000 3,340 3 N
12-2 28 04/28/20 1 /27 4.00 12.57 55,000 4,380 2 P N
12-3 28 04/28/20 1 /27 4.00 12.57 54,500 4,340 2 P N
12-4 28 04/28/20 1 /27 4.00 12.57 55,500 4,420 2 P N
Test Age Average Strengths(psi):7 Day-3340,28 Day-4380
Capping Methods
P:Compressive strength meets/exceeds design strength N:Unbonded Caps(ASTM C1231)
Tested By:Jesse L McLaughlin(1), Reshad Khaterzai(2,3,4)
Checked In:04/01/2020(1,2,3,4)A \ \ l
f /
TYPE 1 TYPE 2 TYPE 3 TYPE 4 TYPE 5 TYPE 6
1. Specimens cast in general accordance with ASTM C31 by F&R Personnel unless otherwise noted Page 1 of 1
2 The results provided herein relate only to the items inspected and/or tested.
3 This report shall not be reproduced,except in full,without the prior written approval of F&R.
f&R Concrete Compressive Strength
Test Method:ASTM C 39 Report Date:8J9/2019
pSample: 192479
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike Riverbend Development 71W0013
Crozet,VA 22932 455 Second Street SE#400 Avinity Estates Phase I
Phone:434-823-5154 Charlottesville,VA 22902 Avinity Loop
Fax:434-823-4764 Charlottesville,VA 22902
Sample Details
Set#: 5 Technician: Butler,Shane Batched: 12 34 EST
Specimen Size: 4"X 8" Cast By: Butler,Shane Sampled: 13 15 EST
Specimens In Set: 5 Date Cast: 02/04/19 Cast: 13 20 EST
Truck/Ticket#: 369/10147288 Sampled From: Chute Truck Empty: 13.59 EST
Contractor: Eagle Rapalo concrete Placement Method: Chute Placement Time: 85(min)
Location
Placement Location: Site-Curb&Gutter
Location Details: Montague st from DI#14 to DI#15
Sample Location/Notes: Next to DI#14
Batch Log Specifications
•
Supplier: Allied Concrete Mix Design: BC curb Strength: 3000(psi)
Plant: 01 Air: 4.5-7 5(%)
On-Site Admixtures: None Slump: 3-5(in)
Field Measurements
Weather: Slump(in): 3-1/4(ASTM C143) Plastic Unit Weight:
Air Temperature(F): 56 Concrete Temp(F): 65(ASTM C1064) Air Content: 7.3(ASTM C231)
Load Volume: 10(yd3)
Standard Cure I Field Cure
Lab Test Results
Testing Lab:Froehling&Robertson Inc.-71,6185 Rockfish Gap Turnpike,Crozet,VA,22932
Specimen Test Test Field/Lab Average Cylinder Cylinder Max Load Strength Fracture Break Capping
Number Age Days Date Cure Days Diameter(in) Area(in2) (Ibs) (psi) Type Remark Method
5-1 7 02/11/19 4/3 4.00 12.57 50,000 3,980 2 N
5-2 28 03/04/19 4/24 4.00 12.57 67,500 5,370 3 P N
5-3 28 03/04/19 4/24 4.00 12.57 67,000 5,330 2 P N _
5-4 28 03/04/19 4/24 4.00 12.57 68,000 5,410 4 P N
Test Age Average Strengths(psi):7 Day-3980,28 Day-5370
Capping Methods
P:Compressive strength meets/exceeds design strength N:Unbonded Caps(ASTM C1231)
Tested By:Rodney D Miller(1,2,3,4)
Checked In:02/08/2019(1,2,3,4)
A k\ \ /
TYPE 1 TYPE 2 TYPE 3 TYPE 4 TYPE 5 TYPE 6
1. Specimens cast in general accordance with ASTM C31 by F&R Personnel unless otherwise noted. Page 1 of 1
2 The results provided herein relate only to the items inspected and/or tested.
3 This report shall not be reproduced,except in full,without the prior written approval of F&R
f8,R Concrete Com ressive Stren th
Test Method:ASTM C 39 Report Date:8/9/2019
P 9 Sample: 193938
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike Riverbend Development 71W0013
Crozet,VA 22932 455 Second Street SE#400 Avinity Estates Phase I
Phone.434-823-5154 Charlottesville,VA 22902 Avinity Loop
Fax.434-823-4764 Charlottesville,VA 22902
Sample Details
Set#: 6 Technician: Butler,Shane Batched: 11 53 EST
Specimen Size: 4"X 8" Cast By: Butler,Shane Sampled: 12 30 EST
Specimens In Set: 5 Date Cast: 02/14/19 Cast: 12:35 EST
Truck/Ticket#: 305/10147503 Sampled From: Chute Truck Empty: 13 20 EST
Contractor: Eagle Rapalo concrete Placement Method: Chute Placement Time: 87(min)
Location
Placement Location: Site-Curb&Gutter
Location Details: Moffat st from station 14+00 to station 12+40
Sample Location/Notes: Moffat st.Station 14+00
Batch Log Specifications
Supplier: Allied Concrete Mix Design: BC curb Strength: 3000(psi)
Plant: 01 Air: 4 5-7.5(%)
On-Site Admixtures: None Slump: 3-5(in)
Field Measurements
Weather: Slump(in): 3-1/4(ASTM C143) Plastic Unit Weight:
Air Temperature(F): 48 Concrete Temp(F): 60(ASTM C1064) Air Content: 7 2(ASTM C231)
Load Volume: 9(yd3)
Standard Cure Field Cure
Lab Test Results
Testing Lab:Froehling&Robertson Inc -71,6185 Rockfish Gap Turnpike,Crozet,VA,22932
Specimen Test Test Field/Lab Average Cylinder Cylinder Max Load Strength Fracture Break Capping
Number Age Days Date Cure Days Diameter(in) Area(in2) (Ibs) (psi) Type Remark Method
6-1 7 02/21/19 1/6 4 00 12.57 53,000 4,220 2 N
6-2 28 03/14/19 1 /27 4.00 12 57 72,000 5,730 2 P N
6-3 28 03/14/19 1 /27 4.00 12 57 68,000 5,410 2 P N
6-4 28 03/14/19 1 /27 4.00 12.57 72,500 5,770 2 P N
Test Age Average Strengths(psi):7 Day-4220,28 Day-5640
Capping Methods
P:Compressive strength meets/exceeds design strength N:Unbonded Caps(ASTM C1231)
Tested By:Rodney D Miller(1,2,3,4)
Checked In:02/15/2019(1,2,3,4)
X ) A 1 \ / /
/\ A \
TYPE 1 TYPE 2 TYPE 3 TYPE 4 TYPE 5 TYPE 6
1. Specimens cast in general accordance with ASTM C31 by F&R Personnel unless otherwise noted Page 1 of 1
2. The results provided herein relate only to the items inspected and/or tested
3 This report shall not be reproduced,except in full,without the prior written approval of F&R.
f8,R Concrete Compressive Strength Report Date:8/12/2019
Sample: 194608 P 9
Test Method:ASTM C 39
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike Riverbend Development 71W0013
Crozet,VA 22932 455 Second Street SE#400 Avinity Estates Phase I
Phone:434-823-5154 Charlottesville,VA 22902 Avinity Loop
Fax.434-823-4764 Charlottesville,VA 22902
Sample Details
Set#: 7 Technician: Butler,Shane Batched: 11:29 EST
Specimen Size: 4"X 8" Cast By: Butler,Shane Sampled: 12 05 EST
Specimens In Set: 5 Date Cast: 02/19/19 Cast: 12 10 EST
Truck/Ticket#: 317/10147593 Sampled From: Chute Truck Empty: 12:56 EST
Contractor: Eagle Rapalo concrete Placement Method: Chute Placement Time: 87(min)
Location
Placement Location: Site-Curb&Gutter
Location Details: South side of Moffat st from station 10+25 to station 11+75
Sample Location/Notes: Station 10+25
Batch Log Specifications
Supplier: Allied Concrete Mix Design: BC306 Strength: 3000(psi)
Plant: 01
On-Site Admixtures: None
Field Measurements
Weather: Slump(in): 3-1/4(ASTM C143) Plastic Unit Weight:
Air Temperature(F): Concrete Temp(F): Air Content: 7.2(ASTM C231)
Load Volume: 10(yd3)
Standard Cure I Field Cure
Lab Test Results
Testing Lab:Froehling&Robertson Inc.-71,6185 Rockfish Gap Turnpike,Crozet,VA,22932
Specimen Test Test Field/Lab Average Cylinder Cylinder Max Load Strength Fracture Break Capping
Number Age Days Date Cure Days Diameter(in) Area(in2) (Ibs) (psi) Type Remark Method
7-1 7 02/26/19 2/5 4 00 12.57 52,000 4,140 2 N
7-2 28 03/19/19 2/26 4.00 12 57 68,500 5,450 2 P N
7-3 28 03/19/19 2/26 4.00 12.57 69,500 5,530 2 P N
7-4 28 03/19/19 2/26 4.00 12.57 71,000 5,650 2 P N
Test Age Average Strengths(psi):7 Day-4140,28 Day-5540
Capping Methods
P:Compressive strength meets/exceeds design strength N:Unbonded Caps(ASTM C1231)
Tested By: Rodney D Miller(1,2,3,4)
Checked In:02/21/2019(1,2,3,4)
X \ \ / / \
TYPE 1 TYPE 2 TYPE 3 TYPE 4 TYPE 5 TYPE 6
1. Specimens cast in general accordance with ASTM C31 by F&R Personnel unless otherwise noted. Page 1 of 1
2. The results provided herein relate only to the items inspected and/or tested.
3. This report shall not be reproduced,except in full,without the prior written approval of F&R.
rpppp Compressiveg Concrete Strength Report Date:8/12/2019
o`I� Test Method:ASTM C 39 Sample: 195001
Crozet Office Client: Project:
6185 Rockfish Gap Turnpike Riverbend Development 71W0013
Crozet,VA 22932 455 Second Street SE#400 Avinity Estates Phase I
Phone 434-823-5154 Charlottesville,VA 22902 Avinity Loop
Fax 434-823-4764 Charlottesville,VA 22902
Sample Details
Set#: 8 Technician: Butler,Shane Batched: 11 11 EST
Specimen Size: 4"X 8" Cast By: Butler,Shane Sampled: 11,50 EST
Specimens In Set: 5 Date Cast: 02/25/19 Cast: 11 55 EST
Truck/Ticket#: 302/10147694 Sampled From: Chute Truck Empty: 12.40 EST
Contractor: Eagle Placement Method: Chute Placement Time: 89(min)
Location
Placement Location: Site-Curb&Gutter
Location Details: From DI#58 around cul de sac to station 10+25
Sample Location/Notes: Next to DI#58 on West side
Batch Log Specifications
Supplier: Allied Concrete Mix Design: BC curb Strength: 3000(psi)
Plant: 01
On-Site Admixtures: None
Field Measurements
Weather: Slump(in): 3(ASTM C143) Plastic Unit Weight:
Air Temperature(F): Concrete Temp(F): Air Content: 6.0(ASTM C231)
Load Volume: 8(yd')
Standard Cure Field Cure
Lab Test Results
Testing Lab:Froehling&Robertson Inc -71,6185 Rockfish Gap Turnpike,Crozet,VA,22932
Specimen Test Test Field/Lab Average Cylinder Cylinder Max Load Strength Fracture Break Capping
Number Age Days Date Cure Days Diameter(in) , Area(ins) (Ibs) (psi) Type . Remark Method
8-1 7 03/04/19 1 /6 4.00 12.57 25,000 1,990 2 N
8-2 28 • 03/25/19 1 /27 4.00 , 12 57 52,000 4,140 2 P N
8-3 28 • 03/25/19 1 /27 4.00 12 57 51,000 4,060 2 P N
8-4 28 03/25/19 1 /27 4.00 12.57 52,500 4,180 2 P N
Test Age Average Strengths(psi):7 Day-1990,28 Day-4120
Capping Methods
P:Compressive strength meets/exceeds design strength N:Unbonded Caps(ASTM C1231)
Tested By:Rodney 0 Miller(1,2,3,4)
Checked In:02/26/2019(1,2,3,4)
X /\ , f4 \ 7 7
TYPE 1 TYPE 2 TYPE 3 TYPE 4 TYPE 5 TYPE 6
1. Specimens cast in general accordance with ASTM C31 by F&R Personnel unless otherwise noted. Page 1 of 1
2 The results provided herein relate only to the items inspected and/or tested.
3 This report shall not be reproduced,except in full,without the prior written approval of F&R.