Loading...
HomeMy WebLinkAboutWPO201400016 Plan - Approved 2014-05-215 MENU N/A WESTMINSTER CANTERBURY Ai IIIIIIIIIIIIIIIII11D - I -V"- __ Lie TMI[i L14F]I* __ ___ STORMWA.TER MANAGEMENT &EROSION AND SEDIMENT PLAN SITE DATA 1. ENGINEER: TIMMONS GROUP 919 2ND STREET SE CHARLOTTESVILLE, VA 22902 CONTACT: JOHN HASH JOHN.HASH @TIMMONS.COM 2. TAX MAP 78 PARCELS 55(A)6 3. MAGISTERIAL DISTRICT: RIVANNA 4. SITE AREA: 63.35 ACRES 5. OPEN SPACE 19.31 ACRES (30.5 %) 6. ZONING: PLANNED RESIDENTIAL DEVELOPMENT (PRD) ZMA 1999 -09 7. COMPREHENSIVE PLAN DESIGNATION /DENSITY: URBAN DENSITY RESIDENTIAL 8. PRESENT USES: RESIDENTIAL, ELDER CARE, ASSISTED LIVING, INDEPENDENT LIVING COTTAGES 9. PROPOSED USE: BUILDING ADDITION AND SIDEWALK IMPROVEMENTS 10. RECREATIONAL AREA: NONE 11. THE SITE IS NOT WITHIN A DRINKING WATER RESERVOIR WATERSHED. 12. THIS PROPERTY IS NOT LOCATED WITHIN A DEFINED 100 YEAR FLOOD ZONE. 13. MINIMUM SETBACKS: ALL SETBACKS (FRONT, SIDE, REAR) EQUIVALENT TO SETBACKS ON ADJACENT TRACTS PER ZONING (VARIES). THE PARCELS OF WESTMINSTER CANTERBURY ARE ADJACENT TO THE FOLLOWING ZONING AREAS: 1. R1 - RESIDENTIAL (786 -013-9, 78B -OC -3) 1. R6 - RESIDENTIAL (78 -12, 78 -55D2, 78F -01 -A) 2. PRD - PLANNED RESIDENTIAL DEVELOPMENT (78A -01 -A, 78.55A 15 7 8 & 9,78-204+,78-414+) 14. UTILITIES: A. WATER - AVAILABLE ON SITE BY ALBEMARLE COUNTY SERVICE AUTHORITY B. SEWER - AVAILABLE ON SITE BY ALBEMARLE COUNTY SERVICE AUTHORITY 15. EMPLOYEES: NO NEW EMPLOYEES 16. WATER QUALITY AND WILL BE ADDRESSED BY A FILTERRA BOX 17, PARKING: NO ADDITIONAL PARKING SPACES REQUIRED 18. PREVIOUS COUNTY OF ALBEMARLE APPROVALS: A. SITE PLAN - SDP - 2010 -002 B. SITE PLAN - SDP - 2006 -109 C. WATER PROTECTION - WPO- 2010 -001 D. WATER PROTECTION - WPO- 2006 -082 E. SPECIAL USE PERMIT - SP2010 -00023 F. REZONING - ZMA 1999 -09 20. TOPO & SURVEY: TIMMONS GROUP 2815 N. AUGUSTA ST., SUITE C STAUNTON, VA 24401 PERFORMED: 02 -11 -2014 HORIZONTAL DATUM: NAD 83, VIRGINIA STATE GRID, SOUTH ZONE. VERTICAL DATUM: BASED ON NAVD 88. DATUM ESTABLISHED THROUGH LEICA SMARTNET REFERENCING STATION LOYI, CHARLOTTESVILLE VIRGINIA. 21. THE "APPLICABLE AREA" SURROUNDING THE PROPOSED WORK IS 0.08 ACRES, OF WHICH 0.03 ACRES IS IMPERVIOUS IN THE EXISTING CONDITION. THE IMPERVIOUS AREA IN THE PROPOSED CONDITION IS 0.05 ACRES. THE 0.02 ACRE INCREASE OF IMPERVIOUS AREA WILL NOT BE ENOUGH TO CHANGE THE CALCULATED FLOWS OR VOLUMES OF THE 18.74 ACRE DRAINAGE AREA WHICH THIS PROJECT IS LOCATED IN, ADDITIONALLY, WATER QUALITY TREATMENT WILL BE PROVIDED BY A FILTERRA BOX, WHICH SHOULD SLOW THE TIME OF CONCENTRATION SLIGHTLY. 2 RIVANNA MAGISTERIAL DISTRICT ALBEMARLE COUNTY, VIRGINIA 2/24/14 Zi Sheet Number Sheet Title CO.0 COVER C0.1 OVERALL KEY PLAN C1.0 EROSION AND SEDIMENT CONTROL PLAN C2.0 EXISTING CONDITIONS AND SITE PLAN C2.1 STORMWATER DETAILS ALBEMARLE COUNTY SERVICE AUTHORITY VIA GENIA DEPARMENT OF TRANSPORTATION ATION HEALTH DEPARTMENT Y�Yn7�ti GgLIA IY�MA i:d `ty.Al/ 9 �r s `1 VICINITY MAP SCALE: 1" = 1,000' OWNER: WESTMINSTER - CANTERBURY OF THE BLUE RIDGE 250 PANTOPS MOUNTAIN ROAD CHARLOTTESVILLE, VA 22901 CONTACT: GARY SELMECZI TELEPHONE: 434.972.2622- FAX: 434.972,3173 ENGINEER OF RECORD: TIMMONS GROUP 919 2ND STREET, S.E. CHARLOTTESVILLE, VA 22902 CONTACT: JOHN HASH, P.E. TELEPHONE: 434 - 327 -1691 SheetIndex Sheet Number Sheet Title CO.0 COVER C0.1 OVERALL KEY PLAN C1.0 EROSION AND SEDIMENT CONTROL PLAN C2.0 EXISTING CONDITIONS AND SITE PLAN C2.1 STORMWATER DETAILS TUTAL NUMBER OF bftt15 = 5 APPROVALS DATE DEPARTMENT OF COMMMTY DEVELOPMENT PLANNER/ZONING ENGINEER DRAWING INSPECTIONS SHEET ARB DEPARTMENT OF FIRE RESCUE ALBEMARLE COUNTY SERVICE AUTHORITY VIA GENIA DEPARMENT OF TRANSPORTATION ATION HEALTH DEPARTMENT APPROVED by the Albemarle COLinty Community Develop en'. Department Date 2i i 'le - - -wMa 41=14 KEYPLAN GENERAL NOTES PLAN NOTES Ofi O �y Y' JOHN D. HASH Lic. No. 31371 PROJECT TITLE CATERED LIVING Westminster tCanterbury OF T H E B L U E R I D G E 250 PANTOPS MOUNTAIN ROAD CHARLOTTESVILLE, VA 22911 TIMMONS GROUP 919 2nd Street SE Charlottesville, VA 22902 TEL 434.295.5624 FAX 434.295.8317 www.timmons,com Architecture IYI Engineering Planning Interiors SECS Inc. 305 South Jefferson Street Roanoke, Virginia 24011.2003 540.344.6664 Fax 540.343.6925 www.sfcs.com PROJECT DESIGNER DHK PROJECT ARCHITECT DBF PROJECT ENGINEER SBG, TFR, CMF, P JM DRAWN BY CK CHECKED BY ; JH APPROVED BY ; JH NO. REVISION DESCRIPTION DATE REV15ED PER COMMENTS 04/22/14 DRAWING TITLE COVER SHEET COMM. NO. DATE 9112.00 February 24, 2014 DRAWING SHEET C0.0 1 of _5 1 AREA OF NEW MENU CADD VERSION PLOT SCALE 1" = 100' PLOT DATE SAVE DATE COMM NO. DRAWING NO. SCALE 1"=100' 0 100' 200' KEYPLAN GENERAL NOTES PLAN NOTES Q.p, Uc. No, 31371 "= L —OXAL �1 PROJECT TITLE CATERED LIVING Westminster tCanterbury OF T H E B L U E R I D G E 250 PANTOPS MOUNTAIN ROAD CHARLOTTESVILLE, VA 22911 ale * *% TIMMONS GROUP 919 2nd Street SE Charlottesville, VA 22902 TEL 434,295.5624 FAX 434.295.8317 www,timmons.com Architecture Z..,, Engineering S C S Planning Interiors SFCS Inc. 305 South Jefferson Street Roanoke, Virginia 24011.2003 540.344.6664 Fax 540.343.6925 www.sfcs.com PROJECT DESIGNER DHK PROJECT ARCHITECT DBF PROJECT ENGINEER 55C, TFR, CMF, PJM DRAWN BY OK CHECKED BY JH APPROVED BY ; JH NO. REVISION DESCRIPTION DATE REV15E0 PER COMMENTS 04/22/14 DRAWING TITLE OVERALL KEY PLAN COMM. NO. DATE 9112.00 February 24, 2014 DRAWING SHEET Co.1 2 of 5 MENU CADD VERSION PLOT SCALE 1" =10' PLOT DATE SAVE DATE COMM NO. DRAWING -907 EROSION AND SEDIMENT CONTROL NARRATIVE PROJECT DESCRIPTION THIS PROJECT INCLUDES THE DEMOLITION OF AN EXISTING COVERED PORCH AREA AT WESTMINSTER CANTERBURY AND REPLACEMENT WITH A NEW BUILDING ADDITION, RESULTING IN PARKING AND SIDEWALK MODIFICATIONS. TOTAL IMPACT OF PROJECT IS 0.06 ACRES ADJACENT PROPERTY THESE IMPROVEMENTS ARE BEING MADE WITHIN THE PROPERTY OF WESTMINSTER CANTERBURY OF THE BLUE RIDGE. THE PROPOSED IMPROVEMENTS ARE LOCATED CENTRALLY WITHIN THE PROPERTY, WHICH IS SURROUNDED ON ALL SIDES BY RESIDENTIAL AREAS AND ALSO CONNECTS TO US -250. EXISTING SITE CONDITIONS THE SITE IS AT THE LOCATION OF WESTMINSTER CANTERBURY OF THE BLUE RIDGE. CURRENTLY, THERE IS AN EXISTING COVERED PORCH AREA, SIDEWALK AND PARKING IN THE LOCATION OF THE PROPOSED WORK. IT IS SURROUNDED BY GRASSY AND WOODED AREAS, AS WELL AS COTTAGES. THE ADJACENT COTTAGES WILL NOT BE DISTURBED. OFF -SITE AREAS NO OFF -SITE AREAS WILL BE DISTURBED DURING THIS PROJECT. CRITICAL EROSION AREAS THERE ARE NO CRITICAL SLOPES WITHIN THE LIMITS OF DISTURBANCE SOILS 71 C - RABUN CLAY LOAM, 7 TO 15 PERCENT SLOPES, 80+ INCHES TO RESTRICTIVE FEATURE, WELL - DRAINED 72C3 - RABUN CLAY, 7 TO 15 PERCENT SLOPES, SEVERELY ERODED, 80+ INCHES TO RESTRICTIVE FEATURE, WELL - DRAINED EROSION AND SEDIMENT CONTROL MEASURES UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE CURRENT ADDITION OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK. THE MINIMUM STANDARDS OF THE VESCH SHALL BE ADHERED TO UNLESS OTHERWISE WAIVED OR APPROVED BY A VARIANCE BY LOCAL AUTHORITIES HAVING JURISDICTION. STORMWATER RUNOFF CONSIDERATIONS UPON COMPLETION OF THIS PROJECT, STORMWATER WILL BE CONVEYED THROUGH THE EXISTING STORMWATER PIPE SYSTEMS, SINCE THERE WILL BE NO INCREASE IN EITHER FLOW RATE OR VOLUME. STRUCTURAL PRACTICES: 1. TEMPORARY CONSTRUCTION ENTRANCE - 3.02 A TEMPORARY CONSTRUCTION ENTRANCE SHALL BE PROVIDED AT THE LOCATION INDICATED ON THE PLANS. IT IS IMPERATIVE THAT THIS MEASURE BE MAINTAINED THROUGHOUT CONSTRUCTION. ITS PURPOSE IS TO REDUCE THE AMOUNT OF MUD TRANSPORTED ONTO PAVED PUBLIC ROADS BY MOTOR VEHICLES OR RUNOFF. 2. DUST CONTROL - 3.39 DUST CONTROL IS TO BE USED THROUGHOUT THE SITE IN AREAS SUBJECT TO SURFACE AND AIR MOVEMENT. VEGETATIVE PRACTICES: 1. TOPSOIL (TEMPORARY STOCKPILE) - 3.30 TOPSOIL SHALL BE STRIPPED FROM AREAS TO BE GRADED AND STOCKPILED FOR LATER SPREADING, STOCKPILE LOCATIONS SHALL BE LOCATED ONSITE AND SHALL BE STABILIZED WITH TEMPORARY SILT FENCE AND VEGETATION. 2. TEMPORARY SEEDING - 3.31 ALL DENUDED AREAS WHICH WILL BE LEFT DORMANT FOR MORE THAN 30 DAYS SHALL BE SEEDED WITH FAST GERMINATING TEMPORARY VEGETATION IMMEDIATELY FOLLOWING GRADING OF THOSE AREAS. SELECTION OF THE SEED MIXTURE SHALL DEPEND ON THE TIME OF YEAR IT IS APPLIED. 3. PERMANENT SEEDING - 3.32 FOLLOWING GRADING ACTIVITIES, ESTABLISH PERENNIAL VEGETATIVE COVER BY PLANTING SEED TO REDUCE EROSION, STABILIZE DISTURBED AREAS, AND ENHANCE NATURAL BEAUTY, MANAGEMENT STRATEGIES 1. PROVIDE TEMPORARY SEEDING OR OTHER STABILIZATION IMMEDIATELY AFTER GRADING. 2. ISOLATE TRENCHING FOR UTILITIES AND DRAINAGE FROM DOWNSTREAM CONVEYANCES IN ORDER TO MINIMIZE PERIMETER CONTROLS. 3. ALL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE MAINTAINED UNTIL THEY ARE NO LONGER REQUIRED TO COMPLY WITH THE CONTRACT DOCUMENTS OR STATE LAW. PERMANENT STABILIZATION ALL NON -PAVED AREAS DISTURBED BY CONSTRUCTION SHALL BE STABILIZED WITH PERMANENT SEEDING IMMEDIATELY FOLLOWING FINISHED GRADING. SEEDING SHALL BE IN ACCORDANCE WITH STD. & SPEC. 3.32, PERMANENT SEEDING. SEED TYPE SHALL BE AS SPECIFIED FOR "MINIMUM CARE LAWNS" AND "GENERAL SLOPES" IN THE HANDBOOK. MULCH (STRAW OR FIBER) SHALL BE USED ON ALL SEEDED SURFACES. IN ALL SEEDING OPERATIONS SEED, FERTILIZER AND LIME SHALL BE APPLIED PRIOR TO MULCHING. SEQUENCE OF INSTALLATION PHASE 1, A PRE - CONSTRUCTION MEETING IS REQUIRED WITH ALBEMARLE COUNTY E &S INSPECTOR, CONTRACTOR, OWNER, AND ENGINEER. THIS MEETING SHALL TAKE PLACE ON -SITE. CLEARING LIMITS MUST BE FLAGGED PRIOR TO THE MEETING WITH ONE (1) WEEK OF NOTICE. 2. INSTALL CONSTRUCTION ENTRANCE. 3, INSTALL INLET PROTECTION, AND SILT FENCE AS SHOWN ON PHASE I PLAN. 4. AFTER ALL EROSION AND SEDIMENT CONTROL MEASURES ARE IN PLACE, SITE WORK CAN BEGIN, 5. BEGIN DEMOLITION OF EXISTING BUILDING. 6. SEED ALL DENUDED AREAS PER VESCH STANDARDS. PHASE II 1. FINE GRADE PROJECT AREA. APPLY PERMANENT SOIL STABILIZATION TO THESE AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS ACHIEVED. 2. ONCE CONSTRUCTION IS COMPLETE AND ALL CONTRIBUTING AREAS ARE STABILIZED, EROSION CONTROL MEASURES CAN BE REMOVED UPON APPROVAL FROM THE E &S INSPECTOR, GENERAL EROSION AND SEDIMENT CONTROL NOTES: ES -1: UNLESS OTHERWISE INDICATED, CONSTRUCT AND MAINTAIN ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE LATEST EDITION OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS VR 625 -02 -00 EROSION AND SEDIMENT CONTROL REGULATIONS. ES -2: THE CONTROLLING EROSION AND SEDIMENT CONTROL AUTHORITY WILL MAKE A CONTINUING REVIEW AND EVALUATION OF THE METHODS AND EFFECTIVENESS OF THE EROSION CONTROL PLAN. ES -3: PLACE ALL EROSION AND SEDIMENT CONTROL MEASURES PRIOR TO OR AS THE FIRST STEP IN CLEARING, GRADING, OR LAND DISTURBANCE. ES -4: MAINTAIN A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN ON THE SITE AT ALL TIMES. ES -5: PRIOR TO COMMENCING LAND - DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO, OFFSITE BORROW OR WASTE AREA), SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE ARCHITECT /ENGINEER AND THE CONTROLLING EROSION AND SEDIMENT CONTROL AUTHORITY FOR REVIEW AND ACCEPTANCE. ES -6: PROVIDE ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE RESPONSIBLE LAND DISTURBER, (MODIFIED NOTE) ES -7: ALL DISTURBED AREAS SHALL DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND - DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT. ES -8: DURING DEWATERING OPERATIONS, PUMP WATER INTO AN APPROVED FILTERING DEVICE. ES -9: INSPECT ALL EROSION CONTROL MEASURES DAILY AND AFTER EACH RUNOFF- PRODUCING RAINFALL EVENT, MAKE ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES IMMEDIATELY. MINIMUM STANDARDS: AN EROSION AND SEDIMENT CONTROL PROGRAM ADOPTED BY A DISTRICT OR LOCALITY MUST BE CONSISTENT WITH THE FOLLOWING CRITERIA, TECHNIQUES AND METHODS: MS -1. PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT FOR LONGER THAN 30 DAYS. PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE TO BE LEFT DORMANT FOR MORE THAN ONE YEAR. MS -2. DURING CONSTRUCTION OF THE PROJECT, SOIL STOCKPILES AND BORROW AREAS SHALL BE STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING MEASURES, THE APPLICANT IS RESPONSIBLE FOR THE TEMPORARY PROTECTION AND PERMANENT STABILIZATION OF ALL SOIL STOCKPILES ON SITE AS WELL AS BORROW AREAS AND SOIL INTENTIONALLY TRANSPORTED FROM THE PROJECT SITE. MS -3. A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED. PERMANENT VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT IS UNIFORM, MATURE ENOUGH TO SURVIVE AND WILL INHIBIT EROSION. MS -4. SEDIMENT BASINS AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS AND OTHER MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP IN ANY LAND - DISTURBING ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE. MS -5. STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES SUCH AS DAMS, DIKES AND DIVERSIONS IMMEDIATELY AFTER INSTALLATION. MS -6. SEDIMENT TRAPS AND SEDIMENT BASINS SHALL BE DESIGNED AND CONSTRUCTED BASED UPON THE TOTAL DRAINAGE AREA TO BE SERVED BY THE TRAP OR BASIN. A. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT TRAP SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA AND THE TRAP SHALL ONLY CONTROL DRAINAGE AREAS LESS THAN THREE ACRES, B. SURFACE RUNOFF FROM DISTURBED AREAS THAT IS COMPRISED OF FLOW FROM DRAINAGE AREAS GREATER THAN OR EQUAL TO THREE ACRES SHALL BE CONTROLLED BY A SEDIMENT BASIN. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT BASIN SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA. THE OUTFALL SYSTEM SHALL, AT A MINIMUM, MAINTAIN THE STRUCTURAL INTEGRITY OF THE BASIN DURING A 25 -YEAR STORM OF 24 -HOUR DURATION. RUNOFF COEFFICIENTS USED IN RUNOFF CALCULATIONS SHALL CORRESPOND TO A BARE EARTH CONDITION OR THOSE CONDITIONS EXPECTED TO EXIST WHILE THE SEDIMENT BASIN IS UTILIZED. MS -7. CUT AND FILL SLOPES SHALL BE DESIGNED AND CONSTRUCTED IN A MANNER THAT WILL MINIMIZE EROSION. SLOPES THAT ARE FOUND TO BE ERODING EXCESSIVELY WITHIN ONE YEAR OF PERMANENT STABILIZATION SHALL BE PROVIDED WITH ADDITIONAL SLOPE STABILIZING MEASURES UNTIL THE PROBLEM IS CORRECTED. MS -8. CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL SLOPES UNLESS CONTAINED WITHIN AN ADEQUATE TEMPORARY OR PERMANENT CHANNEL, FLUME OR SLOPE DRAIN STRUCTURE. MS -9. WHENEVER WATER SEEPS FROM A SLOPE FACE, ADEQUATE DRAINAGE OR OTHER PROTECTION SHALL BE PROVIDED. MS -10. ALL STORM SEWER INLETS THAT ARE MADE OPERABLE DURING CONSTRUCTION SHALL BE PROTECTED SO THAT SEDIMENT -LADEN WATER CANNOT ENTER THE CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED OR OTHERWISE TREATED TO REMOVE SEDIMENT, MS -11. BEFORE NEWLY CONSTRUCTED STORMWATER CONVEYANCE CHANNELS OR PIPES ARE MADE OPERATIONAL, ADEQUATE OUTLET PROTECTION AND ANY REQUIRED TEMPORARY OR PERMANENT CHANNEL LINING SHALL BE I NSTALLED IN BOTH THE CONVEYANCE CHANNEL AND RECEIVING CHANNEL, MS -12, WHEN WORK IN A LIVE WATERCOURSE IS PERFORMED, PRECAUTIONS SHALL BE TAKEN TO MINIMIZE ENCROACHMENT, CONTROL SEDIMENT TRANSPORT AND STABILIZE THE WORK AREA TO THE GREATEST EXTENT POSSIBLE DURING CONSTRUCTION, NONERODIBLE MATERIAL SHALL BE USED FOR THE CONSTRUCTION OF CAUSEWAYS AND COFFERDAMS. EARTHEN FILL MAY BE USED FOR THESE STRUCTURES IF ARMORED BY NONERODIBLE COVER MATERIALS. MS -13. WHEN A LIVE WATERCOURSE MUST BE CROSSED BY CONSTRUCTION VEHICLES MORE THAN TWICE IN ANY SIX -MONTH PERIOD, A TEMPORARY VEHICULAR STREAM CROSSING CONSTRUCTED OF NONERODIBLE MATERIAL SHALL BE PROVIDED, MS -14. ALL APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS PERTAINING TO WORKING IN OR CROSSING LIVE WATERCOURSES SHALL BE MET. MS -15. THE BED AND BANKS OF A WATERCOURSE SHALL BE STABILIZED IMMEDIATELY AFTER WORK IN THE WATERCOURSE IS COMPLETED. MS -16. UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING STANDARDS IN ADDITION TO OTHER APPLICABLE CRITERIA: A. NO MORE THAN 500 LINEAR FEET OF TRENCH MAY BE OPENED AT ONE TIME. B. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES. C. EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH, AND DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY AFFECT FLOWING STREAMS OR OFF -SITE PROPERTY. D. MATERIAL USED FOR BACKFILLING TRENCHES SHALL BE PROPERLY COMPACTED IN ORDER TO MINIMIZE EROSION AND PROMOTE STABILIZATION. E. RESTABILIZATION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THESE REGULATIONS. F. APPLICABLE SAFETY REGULATIONS SHALL BE COMPLIED WITH. MS -17. WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR PUBLIC ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY VEHICULAR TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT IS TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE, THE ROAD SURFACE SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER, THIS PROVISION SHALL APPLY TO INDIVIDUAL DEVELOPMENT LOTS AS WELL AS TO LARGER LAND - DISTURBING ACTIVITIES. MS -18. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS OTHERWISE AUTHORIZED BY THE LOCAL PROGRAM AUTHORITY, TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENTATION. MS -19. PROPERTIES AND WATERWAYS DOWNSTREAM FROM DEVELOPMENT SITES SHALL BE PROTECTED FROM SEDIMENT DEPOSITION, EROSION AND DAMAGE DUE TO INCREASES IN VOLUME, VELOCITY AND PEAK FLOW RATE OF STORMWATER RUNOFF FOR THE STATED FREQUENCY STORM OF 24 -HOUR DURATION IN ACCORDANCE WITH THE STANDARDS AND CRITERIA LISTED IN THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK, CHAPTER 8 PAGES 20 -24. EROSION CONTROL MEASURES * VIRGINIA EROSION & SEDIMENT CONTROL HANDBOOK SPECIFICATION NUMBER ...� LIMITS OF CLEARING AND GRADING - CE PAVED CONSTRUCTION ENTRANCE SF SILT FENCE 3.05 IP INLET PROTECTION 3.08 TS TEMPORARY SEEDING 3.31 PS PERMANENT SEEDING 3,32 MU MULCHING 3.35 DC DUST CONTROL 3.39 s i \ I V '6& t � I �I \ I fy t TS DC tom/ � SF / t I / ` 6r�vk, \ 1 \ 1 t � 1 1 \ m \ \ \ M ITS OF \ ' 'ISTURBANCE = 0`08 ACRES \ 1 I \ 1 Opp, \ \ 1 / J88 / TS s DC - \ - -�- - SOIL TYPE' 71C SOIL TYPE: 72C3 IP r _UGP -r- C__\ -- -UGP -` UGP / _ 1 r MANAGED SLOPES THIS AREA / ` \ i \ 1 \ � t t � "k 4 J- %1 1 1 \ \ \ \ \ ' iMITS OF \ ISTURBANCE = 0\08 ACRES 1 1 I I i I I \ \ \ / MU k SF 6.• - I IP _•_- -UGP r--"" C-�^ UGP d \ ` r MANAGED SLOPES THIS ~ Albearle County AREA \ 1 e ~ \ bl t I \ '--- Engineering Review Reference Details Page 3 or4 m CE SrOrJE I. 70' WN. _I CONSTRUCTION TABLE 3.32 -D ACCESS � S" SV -2A ASPHALT -CP C"OuRSF ExtS'IP;G �� a� � nAVrMrNr "r i f / I. , _rrr S': r•„ ! ._'; .+�... 'a �:••! -r� . -itp °. 1 .l__..,......._. � AREA 6" NI:N. 21A AGGREGAI BASE PROFILE STONE l0' M N, C!)N'Sr'tl)' IION r,C AE SS Q ASPFIALT PAVED F_ / WASHRACK TOTAL LBS, PER ACRE Ifrr \t. Pv r EXIST N G 2% 2 "/, / PAVFVFVT -J 2% '2' NTN' � _ P;� , r yr oRA NAGF 0N +UST Exr.ND FlL'_'.41STH L\J I rO SEDIVENJT OF INGRESS AND EGRESS ` OPrRATOV rRA °PING f F:VICr PLAN II Z To sr IUFNir _ IRA�PiN1( UEVCL r s ..yy �y�i f r "• ` f �f r4'f �i �r:+'•f r3 F• I 1 f t l�R! •C \- FILTER CLC'li -/ SECTION A -A a ii"awn water tap of 1 utch nitwt he hitstated %vitlt a adnituutu 1 utch Wilcock shutoff vah'e supplyut, a wash hose with a diameter of 1.5 utches for adequate constant pressure. Wash water uttist be tarried away trout the eutrauce t01111 approved settli►i, area to remove seduneu,t. All sednnent sliail be prevented fiom eatelu>„ stone drains, ditches or watercumses. PAVED WASH RACK NO SCA.E PAVE CONSTRUCTION ENTRANCE No Scale MMEMEM GRAVEL CURB INLET SEDIMENT FILTER GRAVEL FILTER 12' RUNOFF WATER WIRE MESH FILTERED WATER IT SEDIMENT o' • - a; CONCRETE''" GUTTER 12" CURB INLET * GRAVEL SHALL BE VDOT #3, #357 OR 5 COARSE AGGREGATE. SPECIFIC APPLICATION: THIS METHOD OF INLET PROTECTION IS APPLICABLE AT CURB INLETS WHERE PONDING IN FRONT OF THE IP STRUCTURE IS NOT LIKELY TO CAUSE INCONVENIENCE OR DAMAGE 3.07 -6 TO ADJACENT STRUCTURES AND UNPROTECTED AREAS. STORM WATER INLET PROTECTION No Scale SCALE V=10' 0 10' 20' SCALE V=10' Now 0 10' 20' TABLE 3,31 -B TABLE 3.32 -D ACCEPTABLE TEMPORARY SEEDING PLANT MATERIALS SITE SPECIFIC SEEDING MIXTURES FOR PIEDMONT AREA "QUICK REFERENCE FOR ALL REGIONS" TOTAL LBS, PER ACRE PLANTING DATES SPECIES RATE (LBS. /ACRE) MINIMUM CARE LAWN COMMERCIAL OR RESIDENTIAL 175 -200 LBS. SEPT. 1 - FEB. 15 50/50 MIX OF KENTUCKY 31 OR TURF -TYPE TALL FESCUE 90 -100% ANNUAL RYEGRASS IMPROVED PERENNIAL RYEGRASS 0 -5% (LOLIUM MULTI- FLORUM) KENTUCKY BLUEGRASS 0 -5% & 50 -100 CEREAL (WINTER) RYE GENERAL SLOPE (3:1 OR LESS) (SECALE CEREALE) KENTUCKY 31 FESCUE 128 LBS. RED TOP GRASS 2 LBS. FEB. 16 - APR. 30 ANNUAL RYEGRASS 60 -100 SEASONAL NURSE CROP * 20 LBS. (LOLIUM MULTI- FLORUM) 150 LBS. LOW - MAINTENANCE SLOPE (STEEPER THAN 3:1) MAY 1 - AUG. 31 GERMAN MILLET 50 KENTUCKY 31 FESCUE 108 LBS. TS (SETARIA ITALICA) 3.31 O RED TOP GRASS SEASONAL NURSE CROP * 2 LBS, 20 LBS. CROWNVETCH *` 20 LBS, TEMPORARY SEEDING PLANT MATERIALS 150 LBS. No Scale * USE SEASONAL NURSE CROP IN ACCORDANCE WITH SEEDING DATES 1. SET POSTS AND EXCAVATE A 4 "X4" 2. STAPLE WIRE FENCING TO AS STATED BELOW: TRENCH UPSLOPE ALONG THE LINE OF THE POSTS, FEBRUARY 16TH THROUGH APRIL ... ............................... ANNUAL RYE POSTS. _ 1-1 MAY 1ST THROUGH AUGUST 15TH ............................ FOXTAIL MILLET i 4 3, ATTACH THE FILTER FABRIC TO 4. BACKFILL AND COMPACT THE THE WIRE FENCE AND EXTEND IT INTO EXCAVATED SOIL. THE TRENCH. SF 3.05 -1 CONSTRUCTION OF A SILT FENCE WITH WIRE SUPPORT No Scale AUGUST 16TH THROUGH OCTOBER ............................... ANNUAL RYE NOVEMBER THROUGH FEBRUARY 15TH ........................ WINTER RYE ** SUBSTITUTE SERICEA LESPEDEZA FOR CROWNVETCH EAST OF FARMVILLE, VA (MAY THROUGH SEPTEMBER USE HULLED SERICEA, ALL OTHER PERIODS, USE UNHULLED SERICEA). IF FLATPEA IS USED IN LIEU OF CROWNVETCH, INCREASE RATE TO 30 LBS. /ACRE. ALL LEGUME SEED MUST BE PROPERLY INOCULATED, WEEPING LOVEGRASS MAY BE ADDED TO ANY SLOPE OR LOW- MAINTENANCE MIX DURING WARMER SEEDING PERIODS ADD 10 -20 LBS /ACRE IN MIXES KEYPLAN GENERAL NOTES PLAN NOTES Ok'�, U. No, 31371 C'SSIONAL 01 PROJECT TITLE CATERED LIVING Westminster tCanterbury OF T H E B L U E R I D G E 250 PANTOPS MOUNTAIN ROAD CHARLOTTESVILLE, VA 22911 TIMMONS GROUP 919 2nd Street SE Charlottesville, VA 22902 TEL 434.295.5624 FAX 434.295.8317 www,timmons.com S C S Architecture Engineering Planning Interiors SECS Inc. 305 South Jefferson Street Roanoke, Virginia 24011.2003 540.344.6664 Fax 540.343.6925 www.sfcs.com PROJECT DESIGNER DHK PROJECT ARCHITECT DEW PROJECT ENGINEER ; 550, TFR, GMF, PJM DRAWN BY GK CHECKED BY 1H APPROVED BY JH NO. REVISION DESCRIPTION DATE RE\/15ED PER GOMMENT5 04/22/14 ' DRAWING TITLE PS EROSION AND PERMANENT SEEDING MIX FOR PIEDMONT AREA No Scale SEDIMENT CONTROL PLAN COMM. NO. DATE 9112.00 February 24, 2014 DRAWING SHEET C1.0 3 OF 5 11� MENU CADD VERSION PLOT SCALE lit = 10' PLOT DATE SAVE DATE COMM NO. DRAWING NO. GENERAL WATER & SEWER CONDITIONS ALBEMARLE COUNTY GENERAL CONSTRUCTION NOTES 1. WORK SHALL BE SUBJECT TO INSPECTION BY ALBEMARLE COUNTY SERVICE I FOR EROSION AND SEDIMENT CONTROL AUTHORITY INSPECTORS. THE CONTRACTOR WILL BE RESPONSIBLE FOR NOTIFYING THE PROPER SERVICE AUTHORITY OFFICIALS AT THE START OF THE 1, THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO WORK. THE PRE - CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE 2. THE LOCATION OF EXISTING UTILITIES ACROSS THE LINE OF THE PROPOSED COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR WORK ARE NOT NECESSARILY SHOWN ON THE PLANS AND WHERE SHOWN, ARE TO THE FINAL INSPECTION, ONLY APPROXIMATELY CORRECT, THE CONTRACTOR SHALL ON HIS OWN 2. ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CONSTRUCTED INITIATIVE LOCATE ALL UNDERGROUND LINES AND STRUCTURES AS NECESSARY, AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND 3. ALL MATERIALS AND CONSTRUCTION SHALL COMPLY WITH THE CURRENT EDITION SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL 1 OF THE GENERAL WATER AND SEWER CONSTRUCTION SPECIFICATIONS AS HANDBOOK AND VIRGINIA REGULATIONS VR 625 -02 -00 EROSION AND ADOPTED BY THE ALBEMARLE COUNTY SERVICE AUTHORITY, SEDIMENT CONTROL REGULATIONS. 4. DATUM FOR ALL ELEVATIONS SHOWN IN NATIONAL GEODETIC SURVEY, 3. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED 5, THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING "MISS UTILITY" PRIOR TO OR AS THE FIRST STEP IN CLEARING. (1 -800- 552 - 7001). 4. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL 6. ALL WATER AND SEWER PIPES SHALL HAVE A MINIMUM OF 3 FEET OF COVER BE MAINTAINED ON THE SITE AT ALL TIMES. MEASURED FROM THE TOP OF PIPE, OVER THE CENTERLINE OF PIPE. THIS 5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER INCLUDES ALL FIRE HYDRANT LINES, SERVICE LATERALS, AND WATER LINES, ETC, THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO, 7. ALL WATER AND SEWER APPURTENANCES ARE TO BE LOCATED OUTSIDE OF OFF -SITE BORROW OR WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A ROADSIDE DITCHES. SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW 8. VALVES ON DEADEND LINES SHALL BE RODDED TO PROVIDE ADEQUATE AND APPROVAL BY THE PLAN APPROVING AUTHORITY. RESTRAINT FOR THE VALVE DURING A FUTURE EXTENSION OF THE LINE. 6, THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY 9. WATER PRESSURE MAY BE LESS THAN 40 PSI. PRIVATE BOOSTER PUMPS MAY BE ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT REQUIRED. EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN APPROVING 10. ALL COMMERICIAL BUILDINGS WILL BE REQUIRED TO HAVE A BACKFLOW AUTHORITY, PREVENTER 7, ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL GENERAL CONSTRUCTION NOTES FOR SITE PLANS MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED, 1, PRIOR TO ANY CONSTRUCTION WITHIN ANY EXISTING PUBLIC RIGHT OF 8. DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN WAY, INCLUDING CONNECTION TO ANY EXISTING ROAD, A PERMIT SHALL APPROVED FILTERING DEVICE. BE OBTAINED FROM THE VIRGINIA DEPARTMENT OF TRANSPORTATION 9. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES (VDOT). THIS PLAN AS DRAWN MAY NOT ACCURATELY REFLECT THE PERIODICALLY AND AFTER EACH RUNOFF - PRODUCING RAINFALL EVENT, REQUIREMENTS OF THE PERMIT. WHERE ANY DISCREPANCIES OCCUR ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS THE REQUIREMENTS OF THE PERMIT SHALL GOVERN, OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY, 2, ALL PAVING, DRAINAGE RELATED MATERIALS AND CONSTRUCTION 10. ALL FILL MATERIAL TO BE TAKEN FROM AN APPROVED, DESIGNATED METHODS SHALL CONFORM TO CURRENT SPECIFICATIONS AND BORROW AREA. STANDARDS OF VDOT UNLESS OTHERWISE NOTED, 11. ALL WASTE MATERIALS SHALL BE TAKEN TO AN APPROVED WASTE AREA, 3. EROSION AND SILTATION CONTROL MEASURES SHALL BE PROVIDED IN EARTH FILL SHALL BE INERT MATERIALS ONLY, FREE OF ROOTS, STUMPS, ACCORDANCE WITH THE APPROVED EROSION CONTROL PLAN AND SHALL WOOD, RUBBISH, AND OTHER DEBRIS. BE INSTALLED PRIOR TO ANY CLEARING, GRADING OR OTHER 12. BORROW OR WASTE AREAS ARE TO BE RECLAIMED WITHIN 7 DAYS OF CONSTRUCTION, COMPLETION PER ZONING ORDINANCE SECTION 5.1,28, 13. ALL INERT MATERIALS SHALL BE TRANSPORTED IN COMPLIANCE WITH ALBEMARLE COUNTY GENERAL CONSTRUCTION NOTES SECTION 13 -301 OF THE CODE OF ALBEMARLE, 14, BORROW, FILL OR WASTE ACTIVITY INVOLVING INDUSTRIAL -TYPE POWER FOR STORMWATER MANAGMENT PLANS EQUIPMENT SHALL BE LIMITED TO THE HOURS OF 7;OOAM TO 9:OOPM. 1, ALL DAMS AND CONSTRUCTED FILL TO BE WITHIN 95% OF MAXIMUM DRY 15. BORROW, FILL OR WASTE ACTIVITY SHALL BE CONDUCTED IN A SAFE DENSITY AND 2% OF OPTIMUM MOISTURE CONTENT. ALL FILL MATERIAL MANNER THAT MAINTAINS LATERAL SUPPORT, OR ORDER TO MINIMIZE ANY TO BE APPROVED BY A GEOTECHNICAL ENGINEER, A GEOTECHNICAL HAZARD TO PERSONS, PHYSICAL DAMAGE TO ADJACENT LAND AND ENGINEER IS TO BE PRESENT DURING CONSTRUCTION OF DAMS, STRUCTURES /IMPROVEMENTS, AND DAMAGE TO ANY PUBLIC STREET 2, PIPE AND RISER JOINTS ARE TO BE WATERTIGHT WITHIN STORMWATER BECAUSE OF SLIDES, SINKING, OR COLLAPSE. MANAGEMENT FACILITIES 16. THE DEVELOPER SHALL RESERVE THE RIGHT TO INSTALL, MAINTAIN, 3, FOR TEMPORARY SEDIMENT TRAPS OR BASINS WHICH ARE TO BE REMOVE OF CONVERT TO PERMANENT STORMWATER MANAGEMENT CONVERTED TO PERMANENT STORMWATER MANAGEMENT FACILITIES; FACILITIES WHERE APPLICABLE ALL EROSION CONTROL MEASURES CONVERSION IS NOT TO TAKE PLACE UNTIL THE SITE IS STABILIZED, REQUIRED BY THIS PLAN REGARDLESS OF SALE OF AN LOT, UNIT, AND PERMISSION HAS BEEN OBTAINED FROM THE COUNTY EROSION BUILDING OR OTHER PORTION OF THE PROPERTY. CONTROL INSPECTOR. 17. TEMPORARY STABILIZATION SHALL BE TEMPORARY SEEDING AND 4. ALL SLOPES AND DISTURBED AREAS ARE TO BE FERTILIZED, SEEDED AND MULCHING. SEEDING IS TO BE AT 75 LBS /ACRE, AND IN THE MONTHS OF MULCHED, THE MAXIMUM ALLOWABLE SLOPE IS 2:1 SEPTEMBER TO FEBRUARY TO CONSIST A 50/50 MIX OF ANNUAL RYEGRASS (HORIZONTAL: VERTICAL). WHERE REASONABLY OBTAINABLE, LESSER AND CEREAL WINTER RYE, OR IN MARCH AND APRIL TO CONSIST OF SLOPES OF 3:1 OR BETTER ARE TO BE ACHIEVED, ANNUAL RYE, OR MAY THROUGH AUGUST TO CONSIST OF GERMAN MILLET, 5, PAVED, RIP -RAP OR STABILIZATION MAT LINED DITCH MAY BE REQUIRED STRAW MULCH IS TO BE APPLIED AT 80LBS /100SF, ALTERNATIVES ARE WHEN IN THE OPINION OF THE ALBEMARLE COUNTY DIRECTOR OF SUBJECT TO APPROVAL BY THE COUNTY EROSION CONTROL INSPECTOR, ENGINEERING, OR THE DIRECTOR'S DESIGNEE, IT IS DEEMED NECESSARY 18. PERMANENT STABILIZATION SHALL BE LIME AND FERTILIZER, PERMANENT IN ORDER TO STABILIZE A DRAINAGE CHANNEL, SEEDING, AND MULCH, AGRICULTURAL GRADE LIMESTONE SHALL BE 6. ALL TRAFFIC CONTROL SIGNS SHALL CONFORM WITH THE VIRGINIA APPLIED AT 90LBS /1000SF, INCORPORATED INTO THE TOP 4.6 INCHES OF MANUAL FOR UNIFORM TRAFFIC CONTROL DEVICES. SOIL. FERTILIZER SHALL BE APPLIED AT 1000LBS /ACRE AND CONSIST OF A 7, UNLESS OTHERWISE NOTED ALL CONCRETE PIPE SHALL BE REINFORCED 10 -20 -10 NUTRIENT MIX, PERMANENT SEEDING SHALL BE APPLIED AT CONCRETE PIPE - CLASS III, 180LBS /ACRE AND CONSIST OF 95% KENTUCKY 31 OR TALL FESCUE AND 8, ALL EXCAVATION FOR UNDERGROUND PIPE INSTALLATION MUST COMPLY 0 -5% PERENNIAL RYEGRASS OR KENTUCKY BLUEGRASS. STRAW MULCH IS WITH OSHA STANDARDS FOR THE CONSTRUCTION INDUSTRY (29 CFR TO BE APPLIED AT 80LBS /100SF. ALTERNATIVES ARE SUBJECT TO PART 1926). APPROVAL BY THE COUNTY EROSION CONTROL INSPECTOR. 19, MAINTENANCE: ALL MEASURES SHALL BE INSPECTED WEEKLY AND AFTER GENERAL NOTES EACH RAINFALL EVENT, ANY DAMAGE OR CLOGGING TO STRUCTURAL 1, LAND USE PERMITS (CE -7P) MUST BE OBTAINED FROM THE VIRGINIA MEASURES SHALL BE REPAIRED IMMEDIATELY, SILT TRAPS SHALL BE CLEANED WHEN 50% OF THE WET STORAGE VOLUME IS FILLED WITH DEPARTMENT OF TRANSPORTATION PRIOR TO BEGINNING ANY SEDIMENT. ALL SEEDED AREAS SHALL BE RESEEDED WHEN NECESSARY TO CONSTRUCTION WITHIN THE EXISTING STATE MAINTAINED RIGHT OF ACHIEVE A GOOD STAND OF GRASS. SILT FENCE AND DIVERSION DYKES WAY (INCLUDING ACCESS), WHICH COLLECT SEDIMENT TO HALF THEIR HEIGHT SHALL BE CLEANED 2, PRIOR TO ANY CONSTRUCTION, THE CONTRACTOR SHALL CONSULT THE AND REPAIRED IMMEDIATELY, ENGINEER AND VERIFY THE APPROVAL OF THE PLANS BY ALL FEDERAL, 20. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE STATE AND LOCAL AGENCIES. REMOVED WITHIN 30 DAYS OF FINAL SITE STABILIZATION, WHEN 3. THE CONTRACTOR SHALL VERIFY THE ELEVATIONS OF ALL POINTS OF MEASURES ARE NO LONGER NEEDED, SUBJECT TO APPROVAL BY THE CONNECTION OR PROPOSED WORK TO EXISTING CURBS, SANITARY COUNTY EROSION CONTROL INSPECTOR. LINES, WATERLINES, ETC, PRIOR TO CONSTRUCTION, 21. THIS PLAN SHALL BE VOID IF THE OWNER DOES NOT OBTAIN A PERMIT 4. UPON DISCOVERY OF SOILS THAT ARE UNSUITABLE FOR FOUNDATIONS, WITHIN 1 YEAR OF THE DATE OF APPROVAL, (WATER PROTECTION SUBGRADES, OR OTHER ROADWAY CONSTRUCTION PURPOSES, THE ORDINANCE SECTION 17 -204G) CONTRACTOR SHALL IMMEDIATELY CONTACT A GEOTECHNICAL ENGINEER 22. PERMANENT VEGETATION SHALL BE INSTALLED ON ALL DENUDED AREA AND VDOT. THESE AREAS SHALL BE EXCAVATED BELOW PLAN GRADE AS WITHINI NINE (9) MONTHS AFTER THE DATE THE LAND DISTURBING DIRECTED BY THE GEOTECHNICAL ENGINEER, BACKFILLED WITH ACTIVITY COMMENCED, (WATER PROTECTION ORDINANCE SECTION SUITABLE MATERIAL AND COMPACTED IN ACCORDANCE WITH CURRENT 17.2076) VDOT SPECIFICATIONS. 5. ALL STORM SEWER DESIGN AND CONSTRUCTION TO BE IN ACCORDANCE LEGEND WITH VDOT I AND I LD -94 (D) 121,13, RO'A�S 6. ALL STORM SEWER PIPE SHALL BE REINFORCED TONGUE AND GROVE CONCRETE PIPE IN ACCORDANCE WITH ASTM -C -76, PIPE WITHIN THE SEWER RIGHT OF WAY SHALL BE MINIMUM CLASS III OR GREATER IN SPECIFICATIONS. TRAFFIC STOP BAR ® S-- -- -5-- EXISTING SANITARY SEWER ACCORDANCE WITH CURRENT VDOT STANDARDS AND STORM PIPE & STRUCTURE N0, 7, IF PRE -CAST UNITS ARE TO BE USED, VDOT SHALL BE NOTIFIED AND THE ® MANUFACTURER SHALL SUBMIT DRAWING DETAILS FOR REVIEW. DROP INLET & STRUCTURE NO. CERTIFICATION AND VDOT STAMP WILL BE REQUIRED ON ALL UNITS. WATER 8, ALL CONCRETE SHALL BE A3 -AE (AIR ENTRAINED 3,000 PSI). CURB 9. DESIGN CHANGES, SPECIFIED MATERIALS CHANGES AND /OR FIELD w EXISTING WATER LINE CHANGES FROM THE APPROVED PLANS NEED TO BE RESUBMITTED TO CURB &GUTTER VDOT PRIOR TO PROCEEDING WITH THE WORK. A LETTER OF DRY CURB & GUTTER 8" W PROPOSED WATER LINE EXPLANATION SHALL A CC OMPANY THE REVISED PLANS AND OR THE DRAINAGE CALCULATIONS WHICH MUST BE SUBMITTED TO VDOT FOR �^^?�^^^^', •, •� ., , PROPOSED PAVEMENT �- 8` W PROPOSED VALVE REVIEW AND APPROVAL BY THE RESIDENT ENGINEER. Ti 8" W PROPOSED TAPPING SLEEVE 10. CONTRACTOR SHALL VERIFY LOCATION AND ELEVATION OF ALL PAVED DITCH UNDERGROUND UTILITIES SHOWN ON PLANS IN AREAS OF PROPOSED FIRE HYDRANT CONSTRUCTION PRIOR TO STARTING WORK, CONTACT ENGINEER - JUTE JUTE MESH DITCH IMMEDIATELY IF LOCATION OR ELEVATION IS DIFFERENT FROM THAT CENTERLINE OF DITCH SHOWN ON PLAN. IF THERE APPEARS TO BE A CONFLICT, AND /OR UPON GRADING DISCOVERY OF ANY UTILITY NOT SHOWN ON THIS PLAN, CALL MISS BENCH MARK UTILITY OF CENTRAL VIRGINIA AT 1- 800 - 552 -7001, THE DEVELOPER SHALL BE RESPONSIBLE FOR THE RELOCATION OF ANY UTILITY WITHIN . �. . CLEARING LIMITS TC =TOP OF CURB EXISTING AND /OR PROPOSED RIGHT OF WAY REQUIRED BY THE BC =BACK OF CURB DEVELOPMENT. 'at- R -1 VDOT STANDARD STOP SIGN EP = EDGE OF PAVEMENT 11. CASING SLEEVES SHALL BE PLACED AT ALL ROAD CROSSINGS FOR GAS, TW = TOP OF WALL - -200 - -- EXISTING CONTOUR BW = BOTTOM OF WALL POWER, TELEPHONE AND CABLE TV SERVICE TRUNK LINES, 12. THE INSTALLATION OF SEWER, WATER, AND GAS MAINS (INCLUDING 200 �- TS = TOP OF STAIRS PROPOSED CONTOUR SERVICE LATERALS AND SLEEVES) SHALL BE COMPLETED PRIOR TO THE BS = BOTTOM OF STAIRS PLACEMENT OF AGGREGATE BASE COURSE. +240.5 EXISTING SPOT ELEVATION N/A = NOT APPLICABLE TO THIS 13. ALBEMARLE COUNTY APPROVAL OF CONSTRUCTION PLANS DOES NOT TC PROJECT 240.5 PROPOSED SPOT ELEVATION PRECLUDE THE RIGHT TO REQUIRE ADDITIONAL FACILITIES AS DEEMED /- NECESSARY. 14, A GEOTECHNICAL ENGINEER IS TO ASCERTAIN CAUSE AND CERTIFY RECOMMENDED METHOD OF REPAIR FOR ALL PAVEMENT STRUCTURAL WATER QUALITY ANALYSIS FAILURES PRIOR TO STATE ACCEPTANCE. 15. ALL VEGETATION AND ORGANIC MATERIAL MATERIAL IS TO BE REMOVED TOTAL PRE POST FROM THE RIGHT OF WAY LIMITS PRIOR TO CONDITIONING OF THE AREA IMPERVIOUS IMPERVIOUS SUBGRADE 1- L5,41 ,- _, -w -I (OH) 5 6 0 varrsraRUBS 0 . -� h�1b Goy e. r<F� 00 \Gl Po�� 7.0' 1 �0- 5r G I 5a7 6 \ o' F ®� ���G `�Pog3 6`�� P 0�� Ql 71 5� �� �0 0• V, GO l w�. ,o�^ -. 561. / 587 Q0 ,\ �h h � m g \r1 FtP00�� 0�� � s7 NG�� G0J �� 10 � SAWCUT AND ` �0 \0\p0� h1� o j LI�J HARDSCAPE TO BE REMOVED �� \ \�5 COORDINATE ROOF REMOVE SIDEWALK, CURB AND +h X REMOVE TREE ��� �G� �\.5� WITH ARCHITECTURAL AT NEAREST JOINT 1 2 \,J\PP \5� 6 3L� PLAN RELOCATE 00 2p 00 2� O �`0 6 0 y8' 0 yy' REMOVE EXTERIOR �° V SCALE V =10' 0 10' 20' 6_9 CLEANOUT t, /V 52��,5 6 �'1 BALCONIES 7. 1 1. ! G� 34.a _ r I REMOVE LIGHT BOLLARD / \ (ROH) C��oS�'� (ROH) a '�G t \ \ �oP - - - - <I _ _ SAW UT AND I "" O J 1 �RELOCATE'11T14ITY _ \ - - _ LINE ? - \' h`� �^ I �V \ J� / REMOVE SIDEWALK Ion 2 - - - - - - - - - - �a� - _ / -Fh \ I-� \ ), / fYAT NEAR ST JOINT;' _- __ REMOVE WOOD -f- REMOVE WOOD `� \ C'p, �t LANDSCAPE ? "`� LANDSCAPE h�j /� \�G P�t��(P _ - _ - --/ -_ - Q 6 \ �G\`S` r' T TIMBERS h� TIMBERS ��� ,�� �`� 0� \P� �� / _ � \ mot. �� \\ - a ---\ ��IV qP C�S��. PAINTOVERWITH R�10P 5 � �1 -`0 �+ ` ��, �• �5� ( � � ?� - h o� C' I � ,q �� 1 � � j e - � � � // h�` i` _ _ c r-_ - __ h _ �- -�\� . �� �`�� _ �_`r h� h � ' . - � - '� ,r{ . \ � �I _ J \ - - , _- _ _ _ __ _ - � l ✓ _ _ _ _ - - _ -BLACK-PAINT R CP PO E= REMOVE LIG h� o I I 7 0 i / T MHD- CURB INLET - TOP = 590.69' 0 h . ` O EL C IGN INV OUT = 586.8' + -t 'INLET SET ON A 4- -- - REMOV �. ROUGH - POURED PIT, 0 �► cp _� _ _ _ _ - - _ - _ - _ �, r l _ \ \ \� \ I H�D 5'l OUTLET PIPE IS OFFSET NE " RCP _! �` uGP i- �`\ \ 'HC PAR-KING G' \ P� PAINT VER -WITH �,P ", \ OF BOX, 0.4' FROM CURB) uGP _SAWCUT AND / \ \ \ �` R MO E SIGN BLACK PAINT -- UGP --- REMOVE SIQ0WALK,� \ �s �G 0L CURB AND GUTTE5 , W TOP= QHD y..0 p;' `� AT NEAREST JOINT% sa ���a REL C TE`q GN W II r .IG h-16 V. IN= 576.03' 18 "RCP hJ1A_RKING F Z 5 \ i` MANAGED SLOPES THIS 0U,TDRC� CONNECT.) AREA MH - FRB I T \ ` ` IO SYC -� INV. BOT =582.70 � � I 18" RCP GG'o 'HC PARKING' \ \ I \ N \ � r 1 � TIE TO EXISTING NEAREST JOINT 1 1 I I 1 \ \ 1 SCALE V=10' MR 0 10' 20' /f EX. TC 487.85 I 00 000 / 00 � \ i tp r4 4 I s '� � d \ � � I s8& \ I 5.00 ` I - 4 488.05 k. , 1 \ 4 I W rl- rl �'L --- - - - - -- \ _ \� ��� 488.05 ->... ,w rr►�� w �, - TC X7..60 1 \ ` EX. 487.84 gyp. i 488.20 I ' - \ • 5' \r � ,� „` +� IFILTERRA I 488.02 �'' _ - - -- \ 4; 487,75 487. �, ,re °M0 AREA =0.06 AC \ \ ;4 IMP. AREA =005 AC EX. 7.77 48 ' k 487.45 y' . \\ \� 00�,� - - -- ---- 8'MIN- 18"RCP \� ^r/ f> 0 4 < R1 ' 487.61 487.30 \ ®_ _ _ -- I 7 / by MHD - CURB INLET 'IE TO EXISTING ` _ - ,; +�` _ _ _ _ / r TOP = 590.69' SIDEVYALKA�� _O{�CFZE'TE�,$IQ/VALK ' �'1 k 1' ` �'� „ 1k `'� -'_` ' 4-- � -TIE TO EXISTING /~10' MIN _ _ , - ~ r INV. OUT = 586.8'± NEAREST JOINT- t _ - - -- - _ CURB - / / / T -� � ..�► --_ _ _ _ _ _ - - - - - _-._ - _ � _ _ _ _ - - - ,� ROUGH-POURED UURED P ON A EX. TC 487,33 I / OUTLET PIPE IS OFFSET NE RCP - - -UGP r- r \ / \ \ \ 1 , / i°� OF BOX, 0.4' FROM CURB) -UGP _.\` ` Q1\ \ \ \ � /�00 uGP F1 � �� MHU c �� �•�`� REL C ED �� /i .®� A wo IN= 576.03P1S "RCP SLOPES \ 4X6 - %)7f �� � \ � � SIG 1 r � � �" MANAGED THIS BOX- \ � � �ii�' "'® wo T= 57/.54' 18" RCP AREA - \ �6�CONNECT) MH -CURB INLET -`"~- TOP= RELOCATED ` . `� �4* \1 INV BOT= 582.70' SIGN ` ,,,�� I 18" RCP AREA AREA Ipre Lpre Ipost Lpost RR ( Lpost - 0.91-pre) ALBEMARLE COUNTY ENGINEERING GENERAL 0.08 Ac 0.03 Ac 0.05 Ac 37.50 0.07 62,50 0.11 0.05 CONSTRUCTION NOTES TOTAL AREA IMPERVIOUS 1, PRIOR TO ANY CONSTRUCTION WITHIN ANY EXISTING PUBLIC RIGHT TO TREATMENT AREA REMOVAL POUNDS OF WAY, INCLUDING CONNECTION TO ANY EXISTING ROAD, A PERMIT SHALL BE OBTAINED FROM THE VIRGINIA DEPARTMENT OF TRANSPORTATION (VDOT). THIS PLAN AS DRAWN MAY NOT ACCURATELY REFLECT THE REQUIREMENTS OF THE PERMIT. WHERE ANY DISCREPANCIES OCCUR THE REQUIREMENTS OF THE PERMIT SHALL GOVERN. 2. ALL MATERIALS AND CONSTRUCTION METHODS SHALL CONFORM TO CURRENT SPECIFICATIONS AND STANDARDS OF VDOT. 3. EROSION AND SILTATION CONTROL MEASURES SHALL BE PROVIDED IN ACCORDANCE WITH THE APPROVED EROSION CONTROL PLAN AND MUST BE INSTALLED PRIOR TO ANY CLEARING, GRADING OR OTHER CONSTRUCTION, 4. ALL SLOPES AND DISTURBED AREAS ARE TO BE FERTILIZED, SEEDED AND MULCHED, 5. THE MAXIMUM ALLOWABLE SLOPE IS 2 :1 (HORIZONTAL: VERTICAL). WHERE REASONABLY OBTAINABLE, LESSER SLOPES OF 3:1 OR BETTER ARE TO BE ACHIEVED. 6. PAVED, RIP -RAP OR STABILIZATION MAT LINED DITCH MAY BE REQUIRED WHEN IN THE OPINION OF THE COUNTY ENGINEER, OR DESIGNEE, IT IS DEEMED NECESSARY IN ORDER TO STABILIZE A DRAINAGE CHANNEL. 7. ALL TRAFFIC CONTROL SIGNS SHALL CONFORM WITH THE VIRGINIA MANUAL FOR UNIFORM TRAFFIC CONTROL DEVICES. 8. UNLESS OTHERWISE NOTED ALL CONCRETE PIPE SHALL BE REINFORCED CONCRETE PIPE - CLASS III. 9. ALL EXCAVATION FOR UNDERGROUND PIPE INSTALLATION MUST COMPLY WITH OSHA STANDARDS FOR THE CONSTRUCTION INDUSTRY (29 CFR PART 1926). Itreat Ltreat RATE ** REMOVED 0.06 0.015 83,33 0,11 65% 0.07 * *TREATMENT SYSTEM IS A FILTERRA BOX TIED TO EX CURB INLET. TOTAL POUNDS REQUIRED TO BE REMOVED = 0.05 POUNDS TOTAL POUNDS REMOVED = 0.07 POUNDS '- Q =11 CONTROL JOINT SPACED AT WIDTH OF WALK F /�' EXPANSION JOINT AT MAX OF 100', / WITH PREMOLDED EXPANSION FILLER CONC. WALK `- COMPACTED SUBGRADE `- 4" 21 -B STONE CONCRETE SIDEWALK JOINT DETAIL No Scale . I■I Lit , $W - 00 0 FIDE $M - W FEE TOW P AWAY ENALTY ZOPE 1T0W1A1W1ALY11Z0W11 VAN 6' ABOVE ACCE88BLE V ABOVE FINISHED FINISHED GRADE GRADE SPACES SHALL BE IDENTIFIED BY ABOVE GRADE SIGNS AS RESERVED FOR PHYSICALLY DISABLED PERSONS. PROVIDE ONE (1) R -7 -8 SIGN AT EACH PARKING SPACE INDICATED ON SITE PLAN. SIGN SHALL BE ALUMINUM (PAINTED WHITE) WITH GREEN LETTERS AND INTERNATIONAL WHEELCHAIR SYMBOL. SIGN SHALL BE PLACED ON STEEL POST 1 -1/2" 0 PAINTED BLACK SET IN MIN, 2' OF CONCRETE. VA. SIGN FOR THE DISABLED ON 0.80 GAUGE ALUMINUM. COLORS: GREEN BORDER & LEGEND, BLUE SYMBOL FOR ACCESSIBILITY, WHITE BACKGROUND. PARKING SIGNS FOR THE DISABLED No Scale 4" MIN. 2" R CONC CURB AND GUTTER CLASS 3A, 1 (f'c =3,000 PSI) CONCRETE q4 61 13" d' ' ° 711 a° a ° 611 JIB -__ 6111 _ 2' -011 COMPACTED CONTINUE 21 B STONE SUBGRADE BASE FROM ADJACENT PAVEMENT SECTION UNDER CURB VDOT STANDARD CG -6 CURB & GUTTER No Scale VARIABLE WIDTH' MAX. CROSS SLOPE 2% KEYPLAN GENERAL NOTES PLAN NOTES TH OF t; y Lie. No. 31371 V"M SsIONAL PROJECT TITLE CATERED LIVING Westminster tCanterbury OF T H E B L U E R I D G E 250 PANTOPS MOUNTAIN ROAD CHARLOTTESVILLE, VA 22911 TIMMONS GROUP 919 2nd Street SE Charlottesville, VA 22902 TEL 434.295.5624 FAX 434,295.8317 www,tlmmons.com NON -SLIP BROOM FINISH T, Architecture T Engineering C S S Planning Interiors SECS Inc. 305 South Jefferson Street Roanoke, Virginia 24011.2003 540.344,6664 Fax 540.343.6925 www.sfcs.com 4" 3,000 PSI AIR - ENTRAINED CONCRETE `- 4" TYPE 21B STONE COVER COMPACTED SUBGRADE DENOTES CONCRETE SIDEWALK PAVEMENT ON PLANS NOTE: SIDEWALKS SHALL BE CONSTRUCTED IN ACCORDANCE WITH VDOT STANDARDS. CONCRETE SIDEWALK PAVEMENT SECTION No Scale PROJECT DESIGNER DHK PROJECT ARCHITECT DBF PROJECT ENGINEER SSG, TFR, GMF, PJM DRAWN BY GK CHECKED BY JH APPROVED BY JH NO. REVISION DESCRIPTION DATE RE\/15F[? PER GOMMENT5 04/22/14 DRAWING TITLE EXISTING CONDITIONS AND SITE PLAN COMM. NO. DATE 9112,00 February 24, 2014 DRAWING SHEET C2.0 4 °F 5 - II Filterra(g) Project Information Form Complete & send to Americast by email, fax or mail. Address: 11352 Virginia Precast Raod Ashland, VA 23005 Project Information Project Name/Number: CATERED LIVING Regulatory Municipality and State (City, County, etc.): ALBEMARLE COUNTY Target Treatment Rate: 65% PLEASE PRINT AND FAX OR EMAIL THIS FORM Toll Free: (866) 349 -3458 Fax: (804) 798 -8400 Email: design @filterra•com Engineering Contact Information Engineering Firm: TIMMONS GROUP Contact: CRAIG KOTARSKI Email: CRAIG.KOTARSKI TIMMONS.COM Current Date: 02/24/14 Phone: 434 - 327 -1688 Fax: 434 - 925 -8317 6 /07- v01- MldAtl. 0 fi It A G.,, mg Idea in Sumn. uo Ntra'.m Filterra® Details (Email, mail or fax plans to Americast - Acceptable formats are AutoCAD or pdf) Plans sheets should include (1) cover, (2) grading, (3) drainage areas, (4) stormwater schedules or profile, (5) landscaping & (6) Filterra® details. Filterra Structure # F1 CROWNED FLUME TREE GRATE QTY & SIZE TOWARDS FILTERRA THROAT PRECAST FILTERRA I � I TOP SLAB (TYP) PRECAST 6' -0" FILTERRA Filterra Size (ID ti) Throat L x W 6X4 OPENING (TYP) k i''r:t$t,: -• "•• '•'f3t «i" r wq �'tt ;i�:` SDR -35 4 -6" FILTERRA •- •� THROAT OPENING 'ft •�•�;:1 !( ,r+ . �:/ "+�1;::;} �i:ti.r c y:y� "'i. �• `i'v �: `n ia/ .•� . 8' -0" 4 —6" OPENING (1) 4 -6" OPENING Filterra Drainage Area Acres 0.06 PVC :t'..: •�' •:. �'�..,, I I I •,.,:�;..,.;,: II ' I I �: *� 4x4 CAST —IN —PLACE FLUME & GUTTER :J',3�':';� ;• Runoff Coefficient C Factor 0.81 x { CURB (BY OTHERS) (SLOPED TOWARD + "'�1 ' ' `' PRECAST w'i; PLAN VIEW ;' t DOWEL Filterra Spot Elevation TC 587.34 (OUTLET PIPE LOCATION VARIES) FILTERRA BOX WALL ' CAST —IN— PLACE''' FLUME & GUTTER TREE FRAME & GRATE (TYP) PRECAST ' DOWEL (TYP) (CROWNED AND SLOPED FL 586.84 (2) TOWARD FILTERRA THROATS) BOX WALL SDR -35 PVC STREET x Q 13' -0" 7' -0" INV OUT 583.84 ! + DOWEL BARS :r z PVC .• ® 12" O.C. •, Bypass Spot Elevation TC 587.33 BY AMERICAST r'. L: '• FL 586.64 UNDERDRAIN SYSTEM BY AMERICAST UNDERDRAIN STONE PROVIDED BY AMERICAST SECTION A —A Bypass or Effluent INV IN 583.64 Modified Structure Y /N? N Grate or Top Options Y /N'1 N TC = Top Curb, FL = Flow Line FLP Detail on plans (Y /N)0 CGT Detail on plans (Y /N) FT Plan Notes shown (Y /N)0 \AENL N/A FILTERRA STANDARD CURB AND GUTTER (TYP) CURB INLET 1111F_\►t�lf�i1 TRANSITION FROM STANDARD TO DEPRESSED GUTTER (TYP) is BE HIGHER THAN ELEV '113' ❖. ❖. ❖. ❖. GUTTER • THROAT DEPRESSED GUTTER AT OPENING GUTTER FLOW FILTERRA BYPASS CURB INLET FLOWLINE ELEV'A' FLOWLINE ELEV'B' ELEVATION VIEW INTERLOCKING FILTERRA UNIT t JOINT (TYP) w x ' OUTLET P11 04 H " : M (BY OTHER TO STORM Z PERFORATED EFFLUENT INVERT OUT (3' -6 ") STORMWATER STRUCTURE SECTIONS VIEWS OF FILTERRA IN TYPICAL FLUME APPLICATIONS SEE BELOW FOR DETAILS NOT SHOWN STANDARD 90' NOSING (OTHER NOSING AVAILABLE UPON REQUEST) � ` -- ' - ' 7 PRECAST 4 '' •: TOP SLAB .4 : • ' ,•f 4 -6" CLEAR < 9• a p' THROAT �' ' •. a a A ' ° ' q q OPENING .q.. 4, q" q °4 e ° • e 4 4 q• q °. 44 4 4,° CAST —IN —PLACE a" DEPRESSED GUTTER q' 4'• AND THROAT OPENING q q (BY CONTRACTOR) Ad + I THROAT PROTECTION DEVICE #4 DOWEL BARS 0 12" O.C. BY AMERICAST ,i DO NOT REMOVE —LEAVE 4. '; IN PLACE UNTIL SITE IS TO BE BENT AS NECESSARY BY CONTRACTOR STABILIZED AND FILTERRA PRIOR TO INSTALLATION OF FIELD POURED GUTTER i i,:''" IS ACTIVATED Y, u �;•f..f1t UNDERDRAIN SYSTEM bIKUWUnn K / ////111Z,1 // /I PRECAST BOX WALL BY AMERICAST EFFLUENT IN IMPORTANT (MUST BE LOWER) FILTERRA FLOWLINE MUST BE AT A HIGHER ELEVATION CROSS SECTION SECTION VIEW THAN BYPASS FLOWLINE v10DIFICATIONS OF DRAWINGS ARE ONLY PERMITTED BY WRITTEN AUTHORIZATION FROM FILTERRA Copyright O ?VU7 by Americast � 6 FLUME -- SLOPED CROWNED FLUME TREE GRATE QTY & SIZE TOWARDS FILTERRA THROAT PRECAST FILTERRA I � I TOP SLAB (TYP) PRECAST 6' -0" FILTERRA FILTERRA THROAT TOP SLAB CURB OPENING (TYP) k i''r:t$t,: -• "•• '•'f3t «i" r wq �'tt ;i�:` SDR -35 4 -6" FILTERRA •- •� THROAT OPENING 'ft •�•�;:1 !( ,r+ . �:/ "+�1;::;} �i:ti.r c y:y� "'i. �• `i'v �: `n ia/ .•� . 8' -0" 4 —6" OPENING (1) 4 -6" OPENING „ is ; •' i A PVC :t'..: •�' •:. �'�..,, I I I •,.,:�;..,.;,: II ' I I �: *� 4x4 CAST —IN —PLACE FLUME & GUTTER :J',3�':';� ;• I I I r------ � 10 x { CURB (BY OTHERS) (SLOPED TOWARD + "'�1 ' ' `' PRECAST w'i; PLAN VIEW ;' t DOWEL FILTERRA THROAT) ' (OUTLET PIPE LOCATION VARIES) FILTERRA BOX WALL ' CAST —IN— PLACE''' FLUME & GUTTER TREE FRAME & GRATE (TYP) PRECAST ' DOWEL (TYP) (CROWNED AND SLOPED FILTERRA w OTHERS) I (2) TOWARD FILTERRA THROATS) BOX WALL SECTIONS VIEWS OF FILTERRA IN TYPICAL FLUME APPLICATIONS SEE BELOW FOR DETAILS NOT SHOWN STANDARD 90' NOSING (OTHER NOSING AVAILABLE UPON REQUEST) � ` -- ' - ' 7 PRECAST 4 '' •: TOP SLAB .4 : • ' ,•f 4 -6" CLEAR < 9• a p' THROAT �' ' •. a a A ' ° ' q q OPENING .q.. 4, q" q °4 e ° • e 4 4 q• q °. 44 4 4,° CAST —IN —PLACE a" DEPRESSED GUTTER q' 4'• AND THROAT OPENING q q (BY CONTRACTOR) Ad + I THROAT PROTECTION DEVICE #4 DOWEL BARS 0 12" O.C. BY AMERICAST ,i DO NOT REMOVE —LEAVE 4. '; IN PLACE UNTIL SITE IS TO BE BENT AS NECESSARY BY CONTRACTOR STABILIZED AND FILTERRA PRIOR TO INSTALLATION OF FIELD POURED GUTTER i i,:''" IS ACTIVATED Y, u �;•f..f1t UNDERDRAIN SYSTEM bIKUWUnn K / ////111Z,1 // /I PRECAST BOX WALL BY AMERICAST EFFLUENT IN IMPORTANT (MUST BE LOWER) FILTERRA FLOWLINE MUST BE AT A HIGHER ELEVATION CROSS SECTION SECTION VIEW THAN BYPASS FLOWLINE v10DIFICATIONS OF DRAWINGS ARE ONLY PERMITTED BY WRITTEN AUTHORIZATION FROM FILTERRA Copyright O ?VU7 by Americast � 6 W --I --- 6 1-61' TREE GRATE QTY & SIZE OUTLET PIPE I � I x 4 6' -0" 4' -0" I I j INLET SHAPING 4" SDR -35 PVC 8 (BY OTHERS) A 8' -0" I (1) 3x3 i A PVC J I I I 6 II ' I I (1) 4x4 4" I I L ------ i— I I I r------ � 10 x 6 CURB (BY OTHERS) 6' -0" - 4x4 6" PLAN VIEW SDR-35 PVC COUPLING 12 CAST INTO PRECAST BOX WALL 4 (OUTLET PIPE LOCATION VARIES) CLEANOUT PLANT AS SUPPLIED (2) COVER BY AMERICAST TREE FRAME & GRATE CAST (NOT SHOWN GALVANIZED N (N CAST IN TOP SLAB TOP SLAB FOR CLARITY) ANGLE NOSING TOP SLAB CURB AND UTTER INTERLOCKING JOINT (TYP) - w OTHERS) I (2) 4x4 6" SDR -35 PVC STREET x Q 13' -0" 7' -0" N I 4x4 ! + DOWEL BARS :r z PVC .• ® 12" O.C. •, FILTER MEDIA PROVIDED BY AMERICAST r'. L: '• PERFORATED MULCH PROVIDED BY AMERICAST UNDERDRAIN SYSTEM BY AMERICAST UNDERDRAIN STONE PROVIDED BY AMERICAST SECTION A —A STANDARD FILTERRA THROAT OPENING (DROP INLET OR OTHER) MODIFICATIONS OF DRAWINGS ARE ONLY PERMITTED MODIFICATIONS OF DRAWINGS ARE ONLY PERMITTED BY WRITTEN AUTHORIZATION FROM FILTERRA DRAWING AVAILABLE IN TIFF FILE FORMAT. BY WRITTEN AUTHORIZATION FROM FILTERRA DATE: 07 -07 -06 DWG: FLP -2 DATE: 02 -26 -09 DWG: CGT -5 6) FILTERRAO TYPICAL FLOWLINE fifir��® Q lJ�%!lls���Lr, _J U® FILTERRAO THROAT OPENING fifif��® AND OULET PIPE RELATIONSHIP US PAT 6,277,274 AND GUTTER OR FLUME DETAIL us PAT 6,277,274 AND 6,569,321 Copyright r� 2007 by Americast AND 6,569,321 Copyright O 2007 by Americast DESIGNATION L W TREE GRATE QTY & SIZE OUTLET PIPE 6 x 4 6' -0" 4' -0" (1) 3x3 4" SDR -35 PVC 8 x 4 8' -0" 4' -0" (1) 3x3 4" SDR -35 PVC 8 x 6 8' -0" 6' -0" (1) 4x4 4" SDR -35 PVC 10 x 6 10' -0" 6' -0" (1) 4x4 6" SDR -35 PVC 12 x 4 12' -0" 4' -0" (2) 3x3 4" SDR -35 PVC 12 x 6 12' -0" 6' -0" (2) 4x4 6" SDR -35 PVC 13 x 7 13' -0" 7' -0" (2) 4x4 1 6" SDR -35 PVC fi err Bloretention Systems Filterra® Standard Plan Notes Construction & Installation A. Each unit shall be constructed at the locations and elevations according to the sizes shown on the approved drawings. Any modifications to the elevation or location shall be at the direction of and approved by the Engineer. B. If the Filterra® is stored before installation, the top slab must be placed on the box using the 2x4 wood provided, to prevent any contamination from the site. All internal fittings supplied (if any), must be left in place as per the delivery. C. The unit shall be placed on a compacted sub -grade with a minimum 6 -inch gravel base matching the final grade of the curb line in the area of the unit. The unit is to be placed such that the unit and top slab match the grade of the curb in the area of the unit. Compact undisturbed sub -grade materials to 95% of maximum density at +1- 2% of optimum moisture. Unsuitable material below sub -grade shall be replaced to the site engineer's approval. D. Outlet connections shall be aligned and sealed to meet the approved drawings with modifications necessary to meet site conditions and local regulations. E. Once the unit is set, the internal wooden forms and protective mesh cover must be left intact. Remove only the temporary wooden shipping blocks between the box and top slab, The top lid should be sealed onto the box section before backfilling, using a non - shrink grout, butyl rubber or similar waterproof seal, The boards on top of the lid and boards sealed in the unit's throat must NOT be removed. The Supplier (Americast or its authorized dealer) will remove these sections at the time of activation, Backfilling should be performed in a careful manner, bringing the appropriate fill material up in 6" lifts on all sides, Precast sections shall be set in a manner that will result in a watertight joint. In all instances, installation of Filterra® unit shall conform to ASTM specification C891 "Standard Practice for Installation of Underground Precast Utility Structures ", unless directed otherwise in contract documents. F. The contractor is responsible for inlet protection /sediment control and cleaning around each Filterra unit. G. Curb and gutter, construction (where present) shall ensure that the flow -line of the Filterra® units Is at a greater elevation than the flow -line of the bypass structure or relief (drop inlet, curb cut or similar). Failure to comply with this guideline may cause failure and /or damage to the Filterra® environmental device. H. Each Filterra® unit must receive adequate irrigation to ensure survival of the living system during periods of drier weather. This may be achieved through a piped system, gutter flow or through the tree grate. www.filterra.com A. Activation of the Filterra® unit is performed ONLY by the Supplier. Purchaser is responsible for Filterra® inlet protection and subsequent clean out cost. This process cannot commence until the project site is fully stabilized and cleaned (full landscaping, grass cover, final paving and street sweeping completed), negating the chance of construction materials contaminating the Filterra® system. Care shall be taken during construction not to damage the protective throat and top plates. B. Activation includes installation of plant(s) and mulch layers as necessary. • Irt =i• - A. Each correctly installed Filterra® unit is to be maintained by the Supplier, or a Supplier approved contractor for a minimum period of 1 year. The cost of this service is to be included in the price of each Filterra® unit. Extended maintenance contracts are available at extra cost upon request. B. Annual Included maintenance consists of a maximum of (2) scheduled visits. The visits are scheduled seasonally; the spring visit aims to clean up after winter loads that may include salts and sands. The fall visit helps the system by removing excessive leaf litter. C. Each Included Maintenance visit consists of the following tasks. 1. Filterra® unit inspection 2. Foreign debris, silt, mulch & trash removal 3. Filter media evaluation and recharge as necessary 4. Plant health evaluation and pruning or replacement as necessary 5. Replacement of mulch 6. Disposal of all l maintenance refuse items 7. Maintenance records updated and stored (reports available upon request) D. The beginning and ending date of Supplier's obligation to maintain the installed system shall be determined by the Supplier at the time the system is activated. Owners must promptly notify the Supplier of any damage to the plant(s), which constitute(s) an integral part of the bioretention technology, www.filterra.com DRAWING AVAILABLE IN TIF FILE FORMAT. DATE: 09 -04 -07 DWG: FTNW -3 PRECAST FILTERRAO UNIT efra® NARROW WIDTH CONFIGURATION US PAT 6,277,274 AND 6,569,321 KEYPLAN GENERAL NOTES PLAN NOTES 0� Uc. No, 31371 'SSIONALOti PROJECT TITLE CATERED LIVING Westminster tCanterbury OF T H E B L U E R I D G E 250 PANTOPS MOUNTAIN ROAD CHARLOTTESVILLE, VA 22911 x•00 •' 0 00 TIMMONS GROUP 919 2nd Street SE Charlottesville, VA 22902 TEL 434,295,5624 FAX 434,295,8317 www,timmons.com -1F .. Architecture T Engineering Planning Interiors SECS Inc. 305 South Jefferson Street Roanoke, Virginia 24011.2003 540.344.6664 Fax 540.343.6925 www.sfcs.com PROJECT DESIGNER DHK PROJECT ARCHITECT DBF PROJECT ENGINEER 585, TFR, CMF, PJM DRAWN BY CK CHECKED BY JH APPROVED BY JH NO. REVISION DESCRIPTION DATE REVISED PER COMMENTS 04/22/14 DRAWING TITLE STO RM WATE R DETAILS COMM. NO. DATE 9112.00 February 24, 2014 DRAWING SHEET C2.1