Loading...
HomeMy WebLinkAboutWPO201400087 Certified Engineer's Report 2023-01-13Engineering • Surveying • Planning January 12, 2023 Frank Pohl Albemarle County RE: LOFTS AT MEADOWCREEK RETAINING WALL ENGINEERING REPORT Dear Frank: MERIDIAN PLANNING GROUP, LLC 440 Premier Circle, Suite 200 Charlottesville, VA 22901 Phone: 434-882-0121 www.mendmwbexom This is in reference to the as -built conditions at the base of the retaining wall at the northwest corner of the Bio-retention basin. The as -built conditions at this location are as follow: 1. The side slope of the Bio-retention basin at the retaining wall is approximately 1.7:1. 2. The top of the side slope is 3' from the bottom face of the retaining wall. A review of the retaining wall design plans show that the wall was designed to have a 2:1 slope that begins at the bottom face of wall. The as -built conditions as the bottom face of wall provide a more stable condition than the conditions used for the design of the wall. I have visited the site to inspection the as -built conditions. There is no visual evidence that the wall has settled, or any movement has occurred. Construction has been completed for over a year. I can confirm that the as -built conditions at the northwest corner of the Bio-retention basin have no detrimental effect on the stability of the retaining wall. If you have any questions regarding this proposal, please feel free to contact me at your convenience. Sincerely, Timothy Miller, P.E., L.S. Principal Page 1