WPO201400033 Plan - Approved 2014-04-17
PIP- WA rER PRO rE,.0 riON IDA) "wo-k P, )1 11 U ISSUED FOR CONSTRUCTION SIGNATURE DATE SIGNATURE DATE SIGNATURE DATE THIS DOCUMENT IS NOT ISSUED BY BOHLER ENGINEERING FOR CONSTRUCTION WITHOUT THREE (3) SIGNATURES BEPC PROJECT # REVISION DATE: GENERAL NOTE: IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALL OF THE DRAWINGS AND SPECIFICATIONS ASSOCIATED WITH THIS PROJECT NORK SCOPE PRIOR TO THE INITIATION OF CONSTRUCTION. SHOULD THE CONTRACTOR FIND A CONFLICT WITH THE DOCUMENTS RELATIVE T( THE SPECIFICATIONS OR APPLICABLE CODES, IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE PROJECT ENGINEER OF RECORD IN WRITING PRIOR TO THE START OF CONSTRUCTION. FAILURE BY THE CONTRACTOR TO NOTIFY THE PROJECT ENGINEER SHALL CONSTITUTE 4CCEPTANCE OF FULL RESPONSIBILITY BY THE CONTRACTOR TO COMPLETE THE SCOPE OF THE WORK AS DEFINED BY THE DRAWINGS AND IP FULL CONFORMANCE WITH LOCAL REGULATIONS AND CODES. H:\13\V132D42\WMJGS\KM SETS\WATER PROTECTION DR KVU PUN "=I42MP0.W MM BE MUM 4.16.14 0 936 AM LAST SA II . 116T \ l l � ii \ ��� 1 I l l ROLKIN ROAD &ABBEY ROAD TAX MAP 78 -75A CHARLOTTESVILLE, VA 22911 ■ _, S E ALBEMARLE COUNTY LOCATION MAP COPYRIGHT ADC THE MAP PEOPLE PERMIT USE NO. 20602153 -5 SCALE: 1"=2000' CONTRACT PURCHASER/ ER/ DEVELOPER RIVERBEND MANAGEMENT 321 E. MAIN STREET, SUITE 200 CHARLOTTESVILLE, VA 22902 CONTACT: ALAN TAYLOR PHONE: 434- 245 -4970 Fax: (540) 349 -0321 www.BohlerEngineering.com CONTACT: DANIEL R. HINES, RE. CONTACT INFORMATION REFERENCES • BOUNDARY & TOPOGRAPHIC /ALTA SURVEY: TITLED "TOPOGRAPHIC SURVEY, PANTOPS SHOPPING CENTER, TMP 78 -75A, HICKMAN ROAD AND ROLKIN ROAD" PREPARED BY ROUDABUSH, GALE & ASSOCIATES, INC. 914 MONTICELLO ROAD CHARLOTTESVILLE, VA 22902 PHONE: 434- 977 -0205 DATED: 08 /21/13 GEOTECHNICAL REPORT: TITLED "REPORT OF GEOTECHNICAL STUDY, ROLKIN ROAD RETAIL BUILDING, ALBEMARLE COUNTY, VIRGINIA, F &R PROJECT NO. 71R- 0129" PREPARED BY FROEHLING & ROBERTSON, INC. 6181 ROCKFISH GAP TURNPIKE . CROZET, VA 23932 -3330 PHONE: 434- 823 -5154 DATED: 09/25/13 GOVERNING AGENCIES • COUNTY OF ALBEMARLE DEPARTMENT OF COMMUNITY DEVELOPMENT 401 WINTIRE ROAD CHARLOTTESVILLE, VA 22902 PHONE: 434 -296 -5832 FAX: 434 - 972 -4126 SHEET INDEX SHEET TITLE SHEET NUMBER COVER SHEET z EROSION &SEDIMENT CONTROL PLAN PHASE I T AppI�DDT C q LU '� Oq� 0 ',€' ua 9 E Fy /E 4L e G R - 2� M p9 ! F ONTAhq WE THE UNDERSIGNED DEVELOPER(S) UNDERSTAND THAT APPROVAL OF THIS PLAN BY THE COUNTY OF ALBEMARLE DOES NOT NECESSARILY INDICATE VIRGINIA DEPARTMENT OF TRANSPORTATION (VDOT) APPROVAL OF THE PLAN. APPROVAL OF THE PLAN BY THE COUNTY DOES NOT IN ANY WAY RELIEVE ME OF MY RESPONSIBILITY IN OBTAINING FINAL VDOT APPROVAL PRIOR TO THE ISSUANCE OF BUILDING PERMITS AND /OR CERTIFICATES OF OCCUPANCY. C °,ylq A9��G9F' =mss QOV4, ° o 00 � 000 DP 4QQ g PP r e�e$I fat qg � � s� >2 aA QO 1200 - BUS t rF o �4¢a0 - �q°p .,...,. NSOP ti SASSAF 0 20 S r� S¢ e� Q 5 ~�Q yS'- 1 ?�h 3Ga' M API RO F r G ayl °ps a ¢ °Pull IAG ��Q O PA P 0 I w 0 L GLEN o0sy09Fer T�4 a verview Q`' �Pe �� ax'000 9O SONOP ° ygGF y# J �1 ark VEP s r' VIE 2 OVE, LOOK Oq�KAY PETER PE ER ST eti Qy SEFFE SON CARLTO! ,� PL. CE J Exit -12 R #' /°a .`S i4 �����d }}�`# .,�, 4� �,bd't,4d• s a ' ✓r. 060 Y c�PSi �� y� fP� .t `t 3A +viay�kj��'�. 1� "New LOCATION MAP COPYRIGHT ADC THE MAP PEOPLE PERMIT USE NO. 20602153 -5 SCALE: 1"=2000' CONTRACT PURCHASER/ ER/ DEVELOPER RIVERBEND MANAGEMENT 321 E. MAIN STREET, SUITE 200 CHARLOTTESVILLE, VA 22902 CONTACT: ALAN TAYLOR PHONE: 434- 245 -4970 Fax: (540) 349 -0321 www.BohlerEngineering.com CONTACT: DANIEL R. HINES, RE. CONTACT INFORMATION REFERENCES • BOUNDARY & TOPOGRAPHIC /ALTA SURVEY: TITLED "TOPOGRAPHIC SURVEY, PANTOPS SHOPPING CENTER, TMP 78 -75A, HICKMAN ROAD AND ROLKIN ROAD" PREPARED BY ROUDABUSH, GALE & ASSOCIATES, INC. 914 MONTICELLO ROAD CHARLOTTESVILLE, VA 22902 PHONE: 434- 977 -0205 DATED: 08 /21/13 GEOTECHNICAL REPORT: TITLED "REPORT OF GEOTECHNICAL STUDY, ROLKIN ROAD RETAIL BUILDING, ALBEMARLE COUNTY, VIRGINIA, F &R PROJECT NO. 71R- 0129" PREPARED BY FROEHLING & ROBERTSON, INC. 6181 ROCKFISH GAP TURNPIKE . CROZET, VA 23932 -3330 PHONE: 434- 823 -5154 DATED: 09/25/13 GOVERNING AGENCIES • COUNTY OF ALBEMARLE DEPARTMENT OF COMMUNITY DEVELOPMENT 401 WINTIRE ROAD CHARLOTTESVILLE, VA 22902 PHONE: 434 -296 -5832 FAX: 434 - 972 -4126 SHEET INDEX SHEET TITLE SHEET NUMBER COVER SHEET 1 EROSION &SEDIMENT CONTROL PLAN PHASE I 2 EROSION & SEDIMENT CONTROL NARRATIVE 3 EROSION & SEDIMENT CONTROL DETAILS 4 EROSION AND SEDIMENT CONTROL PLAN - PHASE II 5 GRADING PLAN 6 FILE COPY This copy of the approved plan Is reserved for the official files of Albemarle County, Please do not remove this plan frorn the f lo, INSPECTIONS DEPARTMENT: DATE: ALBEMARLE COUNTY SERVICE AUTHORITY DATE: PLANNING DEPARTMENT DATE: ENGINEERING DEPARTMENT DATE: VIRGINIA DEPARTMENT OF TRANSPORTATION DATE: VIRGINIA DEPARTMENT OF HEALTH DATE: ARCHITECTURAL REVIEW BOARD DATE: FIRE AND RESCUE DEPARTMENT DATE: WE THE UNDERSIGNED DEVELOPER(S) UNDERSTAND THAT APPROVAL OF THIS PLAN BY THE COUNTY OF ALBEMARLE DOES NOT NECESSARILY INDICATE VIRGINIA DEPARTMENT OF TRANSPORTATION (VDOT) APPROVAL OF THE PLAN. APPROVAL OF THE PLAN BY THE COUNTY DOES NOT IN ANY WAY RELIEVE ME OF MY RESPONSIBILITY IN OBTAINING FINAL VDOT APPROVAL PRIOR TO THE ISSUANCE OF BUILDING PERMITS AND /OR CERTIFICATES OF OCCUPANCY. APPROVED by the Albemarle Crrun* Community Development Depadment Gate ;5-- 13 - z t I=lls v z OW 660 3- -3- ----__ U_ z >DaU az rraz pjzw=� Imo-! v Wo?�gow 0 (i OE 1w o W OOt -¢Ox2 �© O 'z W m F- tq �i lL 0_ U 3 ,L W iii v► ...... ° � g� F U ja zo w a02 Q R', Cx7 z a o � w N� W O ♦ p U oz�z >� °w Z " fj =ZO -,WQ m r a 1 ' F- n �mz<z2 ow QuUUH o� F-1 W H a W Fy W W (n C7 z E- -w ° P4 z ° o f4 zk' zd Cn Z Cn W W U �z O O `n w ,23 Pb O o o a m > oLL U W - ]REVISIONS REV DATE COMMENT BY APPROVED FOR CONSTRUCTION PROJECT No.: V132042 DRAWN BY: CBC CHECKED BY: DRH DATE: 04/09/14 SCALE: AS NOTED CAD 1. D.: WPO PROJECT: WATER PROTECTION ORDINANCE l "1.AN - PHASE II FOR- ROLKIN RETAIL CENTER LOCATION OF SITE ROLKIN ROAD & ABBEY ROAD TAX MAP 78 -75A CHARLOTTESVILLE, VA 22911 ALBEMARLE COUNTY 28 BLACKWELL PARK LANE, SUITE 201 WARRENTON, VIRGINIA 20186 Phone: (540) 349 -4500 Fax: (540) 349 -0321 www_Rah1PrEnnineerina_rnm SHEET TITLE: 1 SHEET NUMBER: r GENERAL NOTE: IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALL OF THE DRAWINGS AND SPECIFICATIONS ASSOCIATED WITH THIS PROJECT JORK SCOPE PRIOR TO THE INITIATION OF CONSTRUCTION. SHOULD THE CONTRACTOR FIND A CONFLICT WITH THE DOCUMENTS RELATIVE T( THE SPECIFICATIONS OR APPLICABLE CODES, IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE PROJECT ENGINEER OF RECORD IN WRITING PRIOR TO THE START OF CONSTRUCTION. FAILURE BY THE CONTRACTOR TO NOTIFY THE PROJECT ENGINEER SHALL CONSTITUTE 4CEPTANCE OF FULL RESPONSIBILITY BY THE CONTRACTOR TO COMPLETE THE SCOPE OF THE WORK AS DEFINED BY THE DRAWINGS AND II FULL CONFORMANCE WITH LOCAL REGULATIONS AND CODES. H: \13 \V132042\ DRAWINGS \PLAN SEES \WATER PROXCU ORDINANCE PUN II \V132O42WPO.DWG PRINTED BY: CCOLUNS 4.16.14 0 10:26 AM LAST S VIRGINIA UNIFORM CODING SYSTEM FOR EROSION AND SEDIMENT CONTROL PRACTICES 1V ®. TITLE ICY SYMBOL - SUPER SILT FENCE 3.01 SAFETY FENCE. 3.02 TEMPORARY STONE CONSTRUCTION ENTRANCE 3.05 SILT FENCE 3.09 TEMPORARY DIVERSION DIKE 3.13 TEMPORARY SEDIMENT TRAP 3.20 ROCK CHECK DAMS 3.31 TEMPORARY SEEDING NOTES: SSF SAF CE SF DD ST CD TS 1. REFER TO GEOTECHNICAL REPORT FOR SITE RECOMMENDATIONS AND CONSTRUCTION CRITERIA. 2. PER THE GEOTECHNICAL REPORT, THIS BUILDING AREA SHOULD BE UNDERCUT 6' BELOW FOUNDATION ELEVATION. FOUNDATION ELEVATION IS ESTIMATED TO BE 543. 3. SEE SHEET 4 FOR SEDIMENT TRAP COMPUTATIONS AND DETAILS. JC ITtm V, 4 1 20' ACSA WATERLINE I S51 °46'00 "E ( 35.06' ESYT DB 2035 P. 512 I i BId -5E7 - 54803 NE FACE D.l. DI -39, L= 6'--', ITOP - 54788 WHOPELOUT - 54J25 I (TBR) i E.Y. STOP BAR f A I I� A ME II i1 i I + 540 j � t / / EX 5X5' WATER VAUL T r / I Esu'T 0��2913��? 16J' i 7, OXE( 11.. � �.l Nf -,'1.) � ' 11P lXT,,D CC 7WIT�7�G1'4L r J ' i i J J jSAN MH RG(l1 526.00 INV IN - 519.49 --INV OUT - 518320'ACS4 A,LjA B ,5E ACE OF D D.I. Dl -329 L =8 "~-- -- TOP - 525.79 15WDPE IN - 518.2 18 HDPE IN - 519.15 24 WDP£ OUT - 519.0 Dl -3C, L =8' TOP - 522 07 1570PE OUT - 519.3 HICKMAN ROAD 60' PUBLIC RIGHT -OF -WAY REVISIONS REV DATE COMMENT BY 1 000, THE FOLLOWING STATES REQUIRE NOTIFICATION BY EXCAVATORS, DESIGNERS, OR ANY PERSON PREPARING TO DISTURB THE EARTH'S SURFACE ANYWHERE IN THE STATE. IN VIRGINIA, MARYLAND, THE DISTRICT OF COLUMBIA, AND DELAWARE CALL -811 (WV 1- 800 - 245- 4848) (PA 1- 800 - 242- 1776) (DC 1- 800 - 257 -7777) (VA 1-800-552-7001) (MID 1-800- 257- 7777) (DE 1 -800- 282 -8555) APPROVED FOR CONSTRUCTION PROJECT No.: V132042 DRAWN BY: CBC CHECKED BY: DRH DATE: 04/09/14 SCALE: 1 " =20' CAD I. D.: WPO PROJECT: WATEIR PROTECTION 0 I' 9t) I J AJ I "I.AJ - PHASE II f I' LOCATION OF SITE ROLKIN ROAD & ABBEY ROAD TAX MAP 78 -75A CHARLOTTESVILLE, VA 22911 ALBEMARLE COUNTY BOHLER ENGINEERING 28 BLACKWELL PARK LANE, SUITE 201 WARRENTON, VIRGINIA 20186 Phone: (540) 349 -4500 Fax: (540) 349 -0321 www.BohlerEngineering.com Op V DANIEL R. HINES .p Lic. No. 043176 � 4/16/14 4 7 SHEET TITLE: ]EROSION & SEDIMENT CONTROL PLAN PHASE I SHEET NUMBER: 2 OF 6 I F J LL a Ld c ¢¢,a > z >OOaul ZU o2 0 7j LU 0 ui a Lu I..II w O Z M LLxx " u.. I- 3av u wzGi.......c U n p�O2 y a 2 o Z } W O �a� oz °z >� `s Z xZO _3wQ �mZQz2 0<WOO Th o a C" tn a U W w o z OU U z z � Z 0 z A 4d a 0 c s U W 2 REVISIONS REV DATE COMMENT BY 1 000, THE FOLLOWING STATES REQUIRE NOTIFICATION BY EXCAVATORS, DESIGNERS, OR ANY PERSON PREPARING TO DISTURB THE EARTH'S SURFACE ANYWHERE IN THE STATE. IN VIRGINIA, MARYLAND, THE DISTRICT OF COLUMBIA, AND DELAWARE CALL -811 (WV 1- 800 - 245- 4848) (PA 1- 800 - 242- 1776) (DC 1- 800 - 257 -7777) (VA 1-800-552-7001) (MID 1-800- 257- 7777) (DE 1 -800- 282 -8555) APPROVED FOR CONSTRUCTION PROJECT No.: V132042 DRAWN BY: CBC CHECKED BY: DRH DATE: 04/09/14 SCALE: 1 " =20' CAD I. D.: WPO PROJECT: WATEIR PROTECTION 0 I' 9t) I J AJ I "I.AJ - PHASE II f I' LOCATION OF SITE ROLKIN ROAD & ABBEY ROAD TAX MAP 78 -75A CHARLOTTESVILLE, VA 22911 ALBEMARLE COUNTY BOHLER ENGINEERING 28 BLACKWELL PARK LANE, SUITE 201 WARRENTON, VIRGINIA 20186 Phone: (540) 349 -4500 Fax: (540) 349 -0321 www.BohlerEngineering.com Op V DANIEL R. HINES .p Lic. No. 043176 � 4/16/14 4 7 SHEET TITLE: ]EROSION & SEDIMENT CONTROL PLAN PHASE I SHEET NUMBER: 2 OF 6 ALBEMARLE COUNTY GENERAL CONSTRUCTION NOTES FOR EROSION AND SEDIMENT CONTROL PLANS: 1. THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE - CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPECTION. 2. ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS VR 625 -02 -00 EROSION AND SEDIMENT CONTROL REGULATIONS. 3. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP IN CLEARING. 4. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON THE SITE AT ALL TIMES. 5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO, OFF -SITE BORROW OR WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY. 6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN APPROVING AUTHORITY. 7. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED. 8. DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE. 9. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH RUNOFF - PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. 10. ALL FILL MATERIAL TO BE TAKEN FROM AN APPROVE,D DESIGNATED BORROW AREA. 11. ALL WASTE MATERIALS SHALL BE TAKEN TO AN APPROVED WASTE AREA. EARTH FILL SHALL BE INERT MATERIALS ONLY, FREE OF ROOTS, STUMPS, WOOD, RUBBISH, AND OTHER DEBRIS. 12. BORROW OR WASTE AREAS ARE TO BE RECLAIMED WITHIN 7 DAYS OF COMPLETION PER ZONING ORDINANCE SECTION 5.1.28. 13. ALL INERT MATERIALS SHALL BE TRANSPORTED IN COMPLIANCE WITH SECTION 13 -301 OF THE CODE OF ALBEMARLE. 14. BORROW, FILL OR WASTE ACTIVITY INVOLVING INDUSTRIAL -TYPE POWER EQUIPMENT SHALL BE LIMITED TO THE HOURS OF 7:OOAM TO 9:OOPM. 15. BORROW, FILL OR WASTE ACTIVITY SHALL BE CONDUCTED IN A SAFE MANNER THAN MAINTAINS LATERAL SUPPORT, OR ORDER TO MINIMIZE ANY HAZARD TO PERSONS, PHYSICAL DAMAGE TO ADJACENT LAND AND IMPROVEMENTS, AND DAMAGE TO ANY PUBLIC STREET BECAUSE OF SLIDES, SINKING, OR COLLAPSE. 16. THE DEVELOPER SHALL RESERVE THE RIGHT TO INSTALL, MAINTAIN, REMOVE OR CONVERT TO PERMANENT STORMWATER MANAGEMENT FACILITIES WHERE APPLICABLE ALL EROSION CONTROL MEASURES REQUIRED BY THIS PLAN REGARDLESS OF THE SALE OF ANY LOT, UNIT, BUILDING OR OTHER PORTION OF THE PROPERTY. 17. TEMPORARY STABILIZATION SHALL BE TEMPORARY SEEDING AND MULCHING. SEEDING IS TO BE AT 75 LBS /ACRE, AND IN THE MONTHS OF SEPTEMBER TO FEBRUARY TO CONSIST A 50/50 MIX OF ANNUAL RYEGRASS AND CEREAL WINTER RYE, OR IN MARCH AND APRIL TO CONSIST OF ANNUAL RYE, OR MAY THROUGH AUGUST TO CONSIST OF GERMAN MILLET. STRAW MULCH IS TO BE APPLIED AT 801_BS /100SF. ALTERNATIVES ARE SUBJECT TO APPROVAL BY THE COUNTY EROSION CONTROL INSPECTOR. 18. PERMANENT STABILIZATION SHALL BE LIME AND FERTILIZER, PERMANENT SEEDING, AND MULCH. AGRICULTURAL GRADE LIMESTONE SHALL BE APPLIED AT 1000LBS /ACRE AND CONSIST OF 10 -20 -10 NUTRIENT MIX. PERMANENT SEEDING SHALL BE APPLIED AT 180LBS /ACRE AND CONSIST OF 95% KENTUCKY 31 OR TALL FESCUE AND 0 -5% PERENNIAL RYEGRASS OR KENTUCKY BLUEGRASS. STRAW MULCH IS TO BE APPLIED AT 80LBS /100SF. ALTERNATIVES ARE SUBJECT TO APPROVAL BY THE COUNTY EROSION CONTROL INSPECTOR. 19. MAINTENANCE: ALL MEASURES ARE TO BE INSPECTED WEEKLY AND AFTER EACH RAINFALL. ANY DAMAGE OR CLOGGING TO STRUCTURAL MEASURES IS TO BE REPAIRED IMMEDIATELY. SILT TRAPS ARE TO BE CLEANED WHEN 50% OF THE WET STORAGE VOLUME IS FILLED WITH SEDIMENT. ALL SEEDED AREAS ARE TO BE RESEEDED WHEN NECESSARY TO ACHIEVE A GOOD STAND OF GRASS. SILT FENCE AND DIVERSION DYKES WHICH ARE COLLECTING SEDIMENT TO HALF THEIR HEIGHT MUST BE CLEANED AND REPAIRED IMMEDIATELY. 20. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE REMOVED WITHIN 30 DAYS OF FINAL SITE STABILIZATION, WHEN MEASURES ARE NO LONGER NEEDED, SUBJECT TO APPROVAL BY THE COUNTY EROSION CONTROL INSPECTOR. 21. THIS PLAN SHALL BE VOID IF THE OWNER DOES NOT OBTAIN A PERMIT WITHIN 1 YEAR OF THE DATE OF APPROVAL. (WATER PROTECTION ORDINANCE SECTION 17- 204G.) 22. PERMANENT VEGETATION SHALL BE INSTALLED ON ALL DENUDED AREAS WITHIN NINE (9) MONTHS AFTER THE DATE THE LAND DISTURBING ACTIVITY COMMENCED. (WATER PROTECTION ORDINANCE SECTION 17- 207B.) GENERAL NOTE: IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALL OF THE DRAWINGS AND SPECIFICATIONS ASSOCIATED WITH THIS PROJECT NORK SCOPE PRIOR TO THE INITIATION OF CONSTRUCTION. SHOULD THE CONTRACTOR FIND A CONFLICT WITH THE DOCUMENTS RELATIVE TC THE SPECIFICATIONS OR APPLICABLE CODES, IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE PROJECT ENGINEER OF RECORD IN WRITING PRIOR TO THE START OF CONSTRUCTION. FAILURE BY THE CONTRACTOR TO NOTIFY THE PROJECT ENGINEER SHALL CONSTITUTE 4CCEPTANCE OF FULL RESPONSIBILITY BY THE CONTRACTOR TO COMPLETE THE SCOPE OF THE WORK AS DEFINED BY THE DRAWINGS AND IN FULL CONFORMANCE WITH LOCAL REGULATIONS AND CODES. H: \13 \V132042 \DRAWINGS \PLAN SETS \WATER PROTECWN 0RDIMKE\V132D42WPO.DWG PPoNTED B. OCOWNS 4.16.14 0 9:56 AM UST SAVED Bf: MS -1: PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN SEVEN (7) DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. DENUDED AREAS THAT MAY NOT BE T FINAL GRADE BUT WILL REMAIN DORMANT (UNDISTURBED) FOR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN SEVEN (7) DAYS TO DENU A ( N ) LONGER THAN 30 DAYS. PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE TO BE LEFT DORMANT FOR N40RE THAN ONE (1) YEAR. ACTION: SEE EROSION AND SEDIMENT CONTROL NARRATIVE, SECTION X. PERMANENT STABILIZATION. MS -2: DURING CONSTRUCTION OF THE PROJECT, SOIL STOCKPILES AND BORROW AREAS SHALL BE STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING MEASURES. THE APPLICANT RESPONSIBLE FOR THE TEMPORARY PROTECTION AND PERMANENT STABILIZATION OF ALL SOIL STOCKPILES ON SITE AS WELL AS BORROW AREAS AND SOIL INTENTIONALLY TRANSPORTED FROM THE PROJECT SITE. ACTION: SEE EROSION AND SEDIMENT CONTROL PLAN, FOR LOCATION OF SOIL STOCKPILE AND ASSOCIATED SEDIMENT TRAPPING MEASURES. MS -3: A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE STABILIZED. PERMANENT VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT, IS UNIFORM, MATURE ENOUGH TO SURVIVE AND WILL INHIBIT EROSION. ACTION: SEE EROSION AND SEDIMENT CONTROL NARRATIVE, SECTION X. PERMANENT STABILIZATION. MS -4: SEDIMENT BASINS AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS AND OTHER MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP IN ANY LAND- DISTURBING ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE. ACTION: AN EXISTING SEDIMENT TRAPS LOCATED I A ED ON SITE AND WILL BE UTILIZED FOR THIS PROJECT. MS -5: STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES SUCH AS DAMS, DIKES, AND DIVERSIONS IMMEDIATELY AFTER INSTALLATION. ACTION: NOT APPLICABLE. MS -6: SEDIMENT TRAPS AND SEDIMENT BASINS SHALL BE DESIGNED AND CONSTRUCTED BASED UPON THE TOTAL DRAINAGE AREA TO BE SERVED BY THE TRAP OR BASIN. a. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT TRAP SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA AND THE TRAP SHALL ONLY CONTROL DRAINAGE AREAS LESS THAN THREE ACRES. D DRAINAGE AREAS GREATER THAN R UAL TO THREE ACRES SHALL BE CONTROLLED BY A SEDIMENT FROM DISTURBED AREAS THAT IS COMPRISE OF FLOW FROM N O EQUAL b. SURFACE RUNOFF O BASIN. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT BASIN SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA. THE OUTFALL SYSTEM SHALL, AT A MINIMUM, MAINTAIN THE STRUCTURAL INTEGRITY OF THE BASIN DURING A TWENTY -FIVE YEAR STORM OF 24 -HOUR DURATION. RUNOFF COEFFICIENTS USED IN RUNOFF CALCULATIONS SHALL CORRESPOND TO A BARE EARTH CONDITION OR THOSE CONDITIONS EXPECTED TO EXIST WHILE THE SEDIMENT BASIN IS UTILIZED. ACTION: DISTURBED AREA IS APPROXIMATELY 1.34± ACRES AND SERVED BY THE EXISTING SEDIMENT TRAP. MS -7: CUT AND FILL SLOPES SHALL BE ASSIGNED AND CONSTRUCTED IN A MANNER THAT WILL MINIMIZE EROSION. SLOPES THAT ARE FOUND TO BE ERODING EXCESSIVELY WITHIN ONE (1) YEAR OF PERMANENT STABILIZATION SHALL BE PROVIDED WITH ADDITIONAL SLOPE STABILIZING MEASURES UNTIL THE PROBLEM IS CORRECTED. ACTION: ALL CUT /FILL SLOPES SHALL BE DESIGNED WITH 3:1 GRADES. MS -8: CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL SLOPES UNLESS CONTAINED WITHIN AN ADEQUATE TEMPORARY OR PERMANENT CHANNEL, FLUME OR SLOPE DRAIN STRUCTURE. ACTION: CONCENTRATED RUNOFF SHALL BE CONTAINED WITH AN ADEQUATE TEMPORARY OR PERMANENT CHANNEL. MS -9: WHENEVER WATER SEEPS FROM A SLOPE FACE, ADEQUATE DRAINAGE OR OTHER PROTECTION SHALL BE PROVIDED. ACTION: ADEQUATE DRAINAGE AND PROTECTION WILL BE PROVIDED. MS -10: ALL STORM SEWER INLETS THAT ARE MADE OPERABLE DURING CONSTRUCTION SHALL BE PROTECTED SO THAT SEDIMENT -LADEN WATER CANNOT ENTER THE CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED OR OTHERWISE TREATED TO REMOVE SEDIMENT. ACTION: ANY STORM SEWER INLETS PROPOSED WITH THIS DEVELOPMENT WILL BE PROTECTED DURING CONSTRUCTION. MS -11: BEFORE NEWLY CONSTRUCTED STORMWATER CONVEYANCE CHANNELS OR PIPES ARE MADE OPERATIONAL, ADEQUATE OUTLET PROTECTION AND ANY REQUIRED TEMPORARY OR PERMANENT CHANNEL LINING SHALL BE INSTALLED IN BOTH THE CONVEYANCE CHANNEL AND RECEIVING CHANNEL. ACTION: NOT APPLICABLE. MS -12: WHEN WORK IN A LIVE WATERCOURSE IS PERFORMED, PRECAUTIONS SHALL BE TAKEN TO MINIMIZE ENCROACHMENT, CONTROL SEDIMENT TRANSPORT AND STABILIZE THE WORK AREA TO THE GREATEST EXTENT POSSIBLE DURING CONSTRUCTION. NON - ERODIBLE MATERIAL SHALL BE USED FOR THE CONSTRUCTION OF CAUSEWAYS AND COFFERDAMS. EARTHEN FILL MAY BE USED FOR THESE STRUCTURES IF ARMORED BY NON - ERODIBLE COVER MATERIALS. ACTION: NOT APPLICABLE. MS -13: WHEN A LIVE WATERCOURSE MUST BE CROSSED BY CONSTRUCTION VEHICLES MORE THAN TWICE IN ANY SIX (6) MONTH PERIOD, A TEMPORARY VEHICULAR STREAM CROSSING CONSTRUCTED OF NON - ERODIBLE MATERIALS SHALL BE PROVIDED. ACTION: NOT APPLICABLE. MS -14: ALL APPLICABLE FEDERAL, STATE, AND LOCAL REGULATIONS PERTAINING TO WORKING IN OR CROSSING LIVE WATERCOURSES SHALL BE MET. ACTION: NOT APPLICABLE. MS -15: THE BED AND BANKS OF A WATERCOURSE SHALL BE STABILIZED IMMEDIATELY AFTER WORK IN THE WATERCOURSE IS COMPLETED. ACTION: NOT APPLICABLE. MS -16: UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING STANDARDS IN ADDITION TO OTHER APPLICABLE CRITERIA: a. NO MORE THAN 500 LINEAR FEET OF TRENCH SHALL BE OPENED AT ONE TIME. b. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES. c. EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH, AND DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY AFFECT FLOWING STREAMS OR OFFSITE PROPERTY. d. MATERIAL USED FOR BACKFILLING TRENCHES SHALL BE PROPERLY COMPACTED IN ORDER TO MINIMIZE EROSION AIND PROMOTE STABILIZATION. e. RE- STABILIZATION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THESE REGULATIONS. f. APPLICABLE SAFETY REGULATIONS SHALL BE COMPLIED WITH. ACTION: INSTALLATION OF UNDERGROUND UTILITY LINES SHALL COMPLY WITH MS -16. MS -17: WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR PUBLIC ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY VEHICULAR TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT IS TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE, THE ROAD SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. THIS PROVISION SHALL APPLY TO INDIVIDUAL DEVELOPMENT LOTS AS WELL AS TO LARGER LAND- DISTURBING ACTIVITIES. ACTION: A CONSTRUCTION ENTRANCE WITH WASHRACK HAS BEEN PROVIDED. MS -18: ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS OTHERWISE AUTHORIZED BY THE LOCAL PROGRAM AUTHORITY. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENTATION. ACTION: SEE EROSION AND SEDIMENT CONTROL NARRATIVE, SECTION VIII. SEQUENCE OF CONSTRUCTION, PHASE II. MS -19: PROPERTIES AND WATERWAYS DOWNSTREAM FROM DEVELOPMENT SITES SHALL BE PROTECTED FROM SEDIMENT DEPOSITION, EROSION AND DAMAGE DUE TO INCREASES IN VOLUME, VELOCITY AND PEAK FLOW RATE OF STORMWATER RUNOFF FOR THE STATED FREQUENCY STORM OF 24 -HOUR DURATION IN ACCORDANCE WITH THE FOLLOWING STANDARDS AND CRITERIA: a. CONCENTRATED STORMWATER RUNOFF LEAVING A DEVELOPMENT SITE SHALL BE DISCHARGED DIRECTLY INTO AN ADEQUATE NATURAL OR MAN -MADE RECEIVING CHANNEL, PIPE OR STORM SEWER SYSTEM. FOR THOSE SITES WHERE RUNOFF IS DISCHARGED INTO A PIPE OR PIPE SYSTEM, DOWNSTREAM STABILITY ANALYSES AT THE OUTFALL OF THE PIPE OR PIPE SYSTEM SHALL BE PERFORMED. b. ADEQUACY OF ALL CHANNELS AND PIPES SHALL BE VERIFIED IN THE FOLLOWING MANNER: (1)THE APPLICANT SHALL DEMONSTRATE THAT THE TOTAL DRAINAGE AREA TO THE POINT OF ANALYSIS WITHIN THE CHANNEL IS ONE HUNDRED TIMES GREATER THAN THE CONTRIBUTING DRAINAGE AREA OF THE PROJECT IN QUESTION; OR (2) (a)NATURAL CHANNELS SHALL BE ANALYZED BY THE USE OF A TWO (2) YEAR STORM TO VERIFY THAT STORMWATER WILL NOT OVERTOP CHANNEL BANKS NOR CAUSE EROSION OF CHANNEL BED OR BANKS; AND (b)ALL PREVIOUSLY CONSTRUCTED MAN -MADE CHANNELS SHALL BE ANALYZED BY THE USE OF A TEN (10) YEAR STORM TO VERIFY THAT STORMWATER WILL NOT OVERTOP ITS BANKS BY THE USE OF A TWO (2) YEAR STORM TO DEMONSTRATE THAT STORMWATER WILL NOT CAUSE EROSION OF CHANNEL BED OR BANKS; AND (c)PIPES AND STORM SEWER SYSTEMS SHALL BE ANALYZED BY THE USE OF A TEN (10) YEAR STORM TO VERIFY THAT STORMWATER WILL BE CONTAINED WITHIN THE PIPE OR SYSTEM. c. IF EXISTING NATURAL RECEIVING CHANNELS OR PREVIOUSLY CONSTRUCTED MAN -MADE CHANNELS OR PIPES ARE NOT ADEQUATE, THE APPLICANT SHALL: (1)IMPROVE THE CHANNEL TO A CONDITION WHERE A TEN (10) YEAR STORM WILL NOT OVERTOP THE BANKS AND A TWO (2) YEAR STORM WILL NOT CAUSE EROSION TO THE CHANNEL BED OR BANKS; OR (2)IMPROVE THE PIPE OR PIPE SYSTEM TO A CONDITION WHERE THE TEN (10) YEAR STORM IS CONTAINED WITHIN THE APPURTENANCES; OR (3)DEVELOP A SITE DESIGN THAT WILL NOT CAUSE THE PRE - DEVELOPMENT PEAK RUNOFF RATE FROM A TWO (2) YEAR STORM TO INCREASE WHEN RUNOFF OUTFALLS INTO A NATURAL CHANNEL OR WILL NOT CAUSE THE PRE - DEVELOPMENT PEAK RUNOFF RATE FROM A TEN (10) YEAR STORM TO INCREASE WHEN RUNOFF OUTFALLS INTO A MAN -MADE CHANNEL; OR (4)PROVIDE A COMBINATION OF CHANNEL IMPROVEMENT, STORMWATER DETENTION OR OTHER MEASURE WHICH IS SATISFACTORY TO THE PLAN- APPROVING AUTHORITY TO PREVENT DOWNSTREAM EROSION. d. THE APPLICANT SHALL PROVIDE EVIDENCE OF PERMISSION TO MAKE THE IMPROVEMENTS. e. ALL HYDROLOGIC ANALYSES SHALL BE CASED ON THE EXISTING WATERSHED CHARACTERISTICS AND THE ULTIMATE DEVELOPMENT OF THE SUBJECT PROJECT. f. IF THE APPLICANT CHOOSES AN OPTION THAT INCLUDES STORMWATER DETENTION HE SHALL OBTAIN APPROVAL FROM THE LOCALITY OF A PLAN FOR MAINTENANCE OF THE DETENTION FACILITIES. THE PLAN SHALL SET FORTH THE MAINTENANCE REQUIREMENTS OF THE FACILITY AND THE PERSON RESPONSIBLE FOR PERFORMING THE MAINTENANCE. g. OUTFALL FROM A DETENTION FACILITY SHALL BE DISCHARGED TO A RECEIVING CHANNEL, AND ENERGY DISSIPATERS SHALL BE PLACED AT THE OUTFALL OF ALL DETENTION FACILITIES AS NECESSARY TO PROVIDE A STABILIZED TRANSITION FROM THE FACILITY TO THE RECEIVING CHANNEL. h. ALL ON -SITE CHANNELS MUST BE VERIFIED TO BE ADEQUATE. L INCREASED VOLUMES OF SHEET FLOWS THAT MAY CAUSE EROSION OR SEDIMENTATION ON ADJACENT PROPERTY SHALL BE DIVERTED TO A STABLE OUTLET, ADEQUATE CHANNEL, PIPE OR PIPE SYSTEM, OR TO A DETENTION FACILITY. j. IN APPLYING THESE STORMWATER RUNOFF CRITERIA, INDIVIDUAL LOTS OR PARCELS IN A RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT SHALL NOT BE CONSIDERED TO BE SEPARATE DEVELOPMENT PROJECTS. INSTEAD, THE DEVELOPMENT, AS A WHOLE, SHALL BE CONSIDERED TO BE A SINGLE DEVELOPMENT PROJECT. HYDROLOGIC PARAMETERS THAT REFLECT THE ULTIMATE DEVELOPMENT CONDITION SHALL BE USED IN ALL ENGINEERING CALCULATIONS. k. ALL MEASURES USED TO PROTECT PROPERTIES AND WATERWAYS SHALL BE EMPLOYED IN A MANNER WHICH MINIMIZES IMPACTS ON THE PHYSICAL, CHEMICAL AND BIOLOGICAL INTEGRITY OF RIVERS, STREAMS AND OTHER WATERS OF THE STATE. ACTION: IT IS THE OPINION OF THE ENGINEER THAT THE EXISTING STORM SEWER SYSTEM IS ADEQUATE TO CONVEY STORMWATER FOR THIS SITE. 1V 1110 11 4I. I. PROJECT DESCRIPTION: THE SUBJECT SITE IS LOCATED IN ALBEMARLE COUNTY, VIRGINIA. THE TOTAL AREA OF THE SITE IS 1.67 ACRES. THE SITE IS LOCATED IN THE SOUTHERN QUADRANT OF THE INTERSECTION OF ABBEY ROAD AND ROLKIN ROAD. THE PURPOSE OF THIS PROJECT IS TO CONSTRUCT A SINGLE STORY STRIP OF RETAIL SPACE AND RESTAURANTS. SITE CONSTRUCTION WILL ENTAIL GRADING; INSTALLING CURB AND GUTTER; ASPHALT PAVING; LIGHTING; LANDSCAPING; UNDERGROUND UTILITIES SUCH AS PUBLIC WATER AND SANITARY SEWER; AND STORMSEWER FACILITIES. THE PROJECT IS ANTICIPATED TO TAKE TWELVE (12) MONTHS (APPROXIMATELY FROM APRIL 2014 TO APRIL 2015) AND WILL DISTURB APPROXIMATELY 1.34 ACRES. II. EXISTING SITE CONDITIONS: 0 0 0 E I CURRENTLY A GRASSED LOT' 100 COVERED WITH GRASS. APPROXIMATELY 20% OF THE SITE CONSISTS OF CRITICAL SLOPES ABOVE 25/0. THE SLOPE OF THE TOPOGRAPHY VARIES FROM THE EXISTING SITE S C R G /o C 2% TO 40 %, TOWARDS THE HICKMAN ROAD CUL -DE -SAC. THE EXISTING RUN -OFF DRAINS TO STORM DRAIN INLETS WITHIN THE HICKMAN ROAD CUL -DE -SAC. WITH THE DEVELOPMENT OF THIS PAD, THE PROPOSED IMPROVEMENTS WILL DRAIN TO PROPOSED STORM INLETS WITHIN THE SITE. THE PROPOSED STORM INLETS WILL CONNECT TO THE EXISTING STORM DRAIN SYSTEM SOUTH OF THE SITE. THE ONLY ON -SITE ENVIRONMENTALLY SENSITIVE AREAS ARE AREAS WITH MAN -MADE CRITICAL SLOPES. III. ADJACENT PROPERTY: THE SUBJECT PAD SITE IS BORDERED AS FOLLOWS: • TO THE NORTH -EAST BY EXISTING ABBEY ROAD AND AN EXISTING GAS STATION • TO THE NORTH -WEST BY ROLKIN ROAD AND AN EXISTING SHOPPING CENTER • TO THE SOUTH -WEST BY HICKMAN ROAD AND AN EXISTING OFFICE BUILDING • TO THE SOUTH -EAST BY HICKMAN ROAD AND AN EXISTING OFFICE BUILDING NO POTENTIAL FOR OFF -SITE DAMAGE IS EXPECTED. PERIMETER CONTROLS ARE PROPOSED TO CONTROL ON -SITE SEDIMENT AS WELL AS PREVENT OFF -SITE PEDESTRIAN TRAFFIC ENTERING SITE. IV. OFF -SITE AREAS: THERE ARE NO PROPOSED OFF -SITE IMPROVEMENTS WITH THIS PROJECT. OFFSITE BORROW WILL BE NECESSARY TO GRADE THE SITE, THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY REQUIRED PERMITS. V. SOILS: THE SITE CONSISTS OF EXISTING FILL SOILS RANGING FROM 6' TO 25 DEEP. A GEOTECHNICAL ANALYSIS HAS BEEN PREPARED FOR REFERENCE. SINCE THE PAD SITE IS BEING REDEVELOPED, THE EXISTING SOILS ARE ANTICIPATED TO CONSIST OF SELECT IMPORT MATERIALS ADEQUATE FOR BUILDING CONSTRUCTION. VI. CRITICAL AREAS: APPROXIMATELY 20% OF THE LOT HAS ENVIRONMENTALLY SENSITIVE AREAS WITH CRITICAL SLOPES. VII. EROSION AND SEDIMENT CONTROL MEASURES: UNLESS OTHERWISE NOTED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK ( VESCH). THE MINIMUM STANDARDS OF VESCH SHALL BE ADHERED TO UNLESS OTHERWISE WAIVED OR APPROVED BY A VARIANCE. SPECIFIC EROSION AND SEDIMENT CONTROL MEASURES UTILIZED IN THIS PROJECT INCLUDE THE FOLLOWING: 1. SUPER SILT FENCE - N/A • REINFORCED SILT FENCE TO INTERCEPT AND DETAIN SMALL AMOUNTS OF SEDIMENT FROM DISTURBED AREAS DURING CONSTRUCTION OPERATIONS IN ORDER TO PRESENT SEDIMENT FROM LEAVING THE SITE. 2. SAFETY FENCE - 3.01 • A PROTECTIVE BARRIER INSTALLED TO PREVENT ACCESS TO AN EROSION CONTROL MEASURE. SAFETY FENCE SHALL BE INSTALLED AROUND THE LIMITS OF DISTURBANCE TO PREVENT PEDESTRIAN TRAFFIC ON SITE. 3. TEMPORARY STONE CONSTRUCTION ENTRANCE - 3.02 • A STABILIZED STONE PAN WITH A FILER FABRIC UNDERLINER LOCATED AT POINTS OF VEHICULAR INGRESS AND EGRESS ON A CONSTRUCTION SITE. 4. SILT FENCE - 3.05 • A PROTECTIVE BARRIER TO INTERCEPT AND DETAIN SMALL AMOUNTS OF SEDIMENT FROM DISTURBED AREAS DURING CONSTRUCTION OPERATIONS IN ORDER TO PRESENT SEDIMENT FROM LEAVING THE SITE. 5. TEMPORARY DIVERSION DIKE - 3.09 • A TEMPORARY RIDGE OF COMPACTED SOIL CONSTRUCTED AT THE TOP OR BASE OF A SLOPING DISTURBED AREA. 6. TEMPORARY SEDIMENT TRAP - 3.13 • A TEMPORARY PONDING AREA FORMED BY CONSTRUCTING AN EARTHEN EMBANKMENT WITH A STONE OUTLET. 7. ROCK CHECK DAMS - 3.20 • SMALL TEMPORARY STONE DAMS CONSTRUCTED ACROSS A SWALE OR DRAINAGE DITCH. 8. TEMPORARY SEEDING - 3.31 • THE ESTABLISHMENT OF A TEMPORARY VEGETATIVE COVER ON DISTURBED AREAS BY SEEDING WITH APPROPRIATE RAPIDLY GROWING ANNUAL PLANTS. VIII. SEQUENCE OF CONSTRUCTION: PHASE IA 1. OBTAIN ALL REQUIRED PERMITS. 2. THE CONTRACTOR SHALL CONTACT JURISDICTION AT LEAST 48 HOURS PRIOR TO COMMENCING CONSTRUCTION. 3. INSTALL CONSTRUCTION ENTRANCE. 4. INSTALL PERIMETER CONTROLS. NOTE: THE INSPECTOR SHALL APPROVE PHASE I PRIOR TO PHASE II COMMENCING. PHASE 1B 1. BEGIN STOCKPILING IMPORT FOR ONSITE FILL. 2. STABILIZE STOCKPILE AND TEMPORARILY SEED AND STABILIZE ALL DISTURBED AREAS PHASE II 1. BEGIN SITE WORK. 2. COMMENCE EARTHWORK OPERATIONS AND BEGIN CONSTRUCTION OF THE RETAINING WALL. 3. INSTALL ALL UNDERGROUND UTILITIES. 4. INSTALL CURB AND INLET PROTECTION. 5. LAY BASE AGGREGATE FOR DRIVE AND PARKING AREAS. 6. CONSTRUCT FOUNDATION FOR THE BUILDING. 7. TEMPORARILY SEED AND STABILIZE ALL DISTURBED LANDSCAPE AREAS. 8. PAVE SITE AND INSTALL CONCRETE SIDEWALKS. 9. PERMANENTLY SEED AND /OR SOD /MULCH ALL PROPOSED LANDSCAPE ISLANDS /GRASS AREAS PER LANDSCAPE SPECIFICATIONS. 10. INSTALL LANDSCAPE PLANTING IN ACCORDANCE WITH THE LANDSCAPE PLAN. 11. FOLLOWING COMPLETE SITE STABILIZATION AND WITH THE AGREEMENT OF INSPECTOR, REMOVE EROSION AND SEDIMENT CONTROL MEASURES. IX. MAINTENANCE PROGRAM: 1. ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE MAINTAINED DURING CONSTRUCTION BY THE CONTRACTOR. CONTRACTOR SHALL REFER TO THE MAINTENANCE SPECIFICATIONS WITHIN THE VESCH FOR EACH PROPOSED MEASURE. 2. SILT FENCE SHALL BE INSPECTED AT THE END OF EACH DAY AND AFTER EACH RAINFALL. ANY REQUIRED REPAIRS OR REPLACEMENTS SHALL BE DONE IMMEDIATELY. SEDIMENT DEPOSITS SHALL BE REMOVED BY HAND AFTER EACH RAINFALL AND AT ANY TIME DEPOSITS REACH HALF THE HEIGHT OF THE BARRIER. 3. INLET PROTECTIONS SHALL BE INSPECTED AT THE END OF EACH DAY AND AFTER EACH RAINFALL; ANY REQUIRED REPAIRS SHALL BE DONE IMMEDIATELY. 4. ALL SEEDED AREAS SHALL BE CHECKED REGULARLY TO ENSURE THAT A GOOD STAND IS MAINTAINED. AREAS SHOULD BE FERTILIZED AND RESEEDED AS NEEDED. 5. NO AREA SHALL BE LEFT DENUDED FOR ANY PERIOD LONGER THAN SEVEN (7) DAYS. 6. NO UNPROTECTED, UNDISTURBED AREA SHALL DRAIN TO ROADWAY PAVEMENTS SUCH THAT THE SUBBASE, BASE, OR WEARING SURFACE ARE CONTAMINATED BY SILT TRAPPED AT LOW POINTS OR INLETS. 7. ADJACENT ROADWAYS AND ENTRANCES WILL BE KEPT CLEAN FROM' ACCUMULATED DEBRIS AT ALL TIMES. X. PERMANENT STABILIZATION: TEMPORARY SEEDING WILL BE PROVIDED IN ACCORDANCE TO VESCH REQUIREMENTS THROUGHOUT CONSTRUCTION AS STATED ABOVE. FINAL SEEDING AND SODDING INSTALLATION PER THE SPECIFICATIONS OF THE LANDSCAPE PLAN WILL OCCUR ONCE THE SITE HAS BEEN FINAL GRADED AND THE BUILDING HAS BEEN CONSTRUCTED. A. STORM WATER RUNOFF CONSIDERATIONS: DOWNSTREAM PROPERTIES ARE PROTECTED VIA SILT FENCE AND SEDIMENT TRAP FACILITIES. THE MAJORITY OF STORMWATER RUNOFF SHALL BE CAPTURED VIA CURB DROP INLETS AND GRATE INLETS. THE CAPTURED STORMWATER WILL BE CHANNELED THROUGH AN EXISTING STORM SEWER SYSTEM ON HICKMAN ROAD. EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH, AND DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY AFFECT FLOWING STREAMS OR OFFSITE PROPERTY. XII. CALCULATIONS: DETAILED STORM AND BMP COMPUTATIONS SHALL BE PROVIDED WITH THE FINAL SITE PLAN FOR THIS PROJECT. XIII. OTHER IMPORTANT NOTES: 1. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLANS SHALL BE MAINTAINED ON THE SITE AT ALL TIMES. 2. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING BUT NOT LIMITED TO, OFF -SITE BORROW OR WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY. 3. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES AS NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN APPROVING AUTHORITY. 4. ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE PLACED PRIOR TO OR AS THE FIRST STEP IN CLEARING AND GRADING. 5. ALL AREAS TO BE PAVED MAY BE STABILIZED BY INSTALLATION OF BASE AND SUBBASE MATERIALS INSTEAD OF TEMPORARY VEGETATION COVER. 6. THE CONTRACTOR SHALL PROVIDE ADEQUATE MEANS OF CLEANING MUD FROM TRUCKS AND /OR OTHER EQUIPMENT PRIOR TO ENTERING THE PUBLIC RIGHT -OF -WAY. WATER TRUCKS SHALL BE UTILIZED IN THE EVENT THAT A PUBLIC WATER SOURCE IS NOT AVAILABLE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CLEAR THE STREETS AND TAKE WHATEVER MEASURES NECESSARY TO ENSURE THAT THE STREETS ARE MAINTAINED IN A CLEAN AND DUST -FREE CONDITION AT ALL TIMES. 7. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PERFORM THE WORK IN SUCH A MANNER AS TO PREVENT THE WASHING OF ANY TOPSOIL OR DEBRIS ONTO ADJACENT PROPERTIES. 8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY REPAIR OF ANY DAMAGED ITEMS DUE TO CONSTRUCTION TRAFFIC ACCESSING THE SITE. THIS SHALL INCLUDE, BUT IS NOT LIMITED TO PAVEMENT, CURB, CURB & GUTTER, SIDEWALK, LANDSCAPING, AND UTILITIES. i REV DATE Z 0 BY 1 12/13/13 L DRH DATE: 9/27/13 o= 5w N/A CAD I. D.: WPO ¢Qa a U w ❑¢z�Qz R� 'g V :�Cg F-OQIlW iu�7 W o?w�W'b (7 am 3- ww��Q og p z 0: OH-¢Oxx© ml- cn3:LL aU W wN W������♦ o& W O U � z - z LL °o LL ¢ G PO= ZZ U cc Q ¢ K= a - >> o. z C) ♦ U w _ <aJ ?0 ozlZ >L o0 m >-zpw a xZOLLW¢ coi,- �mz¢z2 �m NQ�UUF o� �h ¢a C4 H 0 O OU U €E �+ o g f+ 12o W U o 0 0a Z Z W U� p U p vJ S P4 q wo ow a p 00 d > a o oEE U W - REVISIONS REV DATE COMMENT BY 1 12/13/13 PER COUNTY COMMENTS DRH DATE: 9/27/13 SCALE: N/A CAD I. D.: WPO THE FOLLOWING STATES REQUIRE NOTIFICATION BY EXCAVATORS, DESIGNERS, OR ANY PERSON PREPARING TO DISTURB THE EARTH'S SURFACE ANYWHERE IN THE STATE. IN VIRGINIA, MARYLAND, THE DISTRICT OF COLUMBIA, AND DELAWARE CALL - 811 (WV 1- 800 - 245- 4848) (PA 1-800- 242- 1776) (DC 1-800- 257 -7777) (VA 1- 800 - 552- 7001) (MD 1- 800 - 257- 7777) (DE 1- 800 - 282 -8555) APPROVED FOR CONSTRUCTION PROJECT No.: V132042 DRAWN BY: MJS CHECKED BY.: DRH DATE: 9/27/13 SCALE: N/A CAD I. D.: WPO PROJECT: WATEIR I "I!'O I ECl 1O 0]RDI N.' \NCI'. I"I.A\ • i' ID LOCATION OF SITE ROLKIN ROAD & ABBEY ROAD TAX MAP 78 -75A CHARLOTTESVILLE, VA 22911 ALBEMARLE COUNTY 28 BLACKWELL PARK LANE, SUITE 201 WARRENTON, VIRGINIA 20186 Phone: (540) 349 -4500 Fax: (540) 349 -0321 www.BohlerEngineering.com .Tj v DANIEL R. HINES 7 .p . Lic. No. 043176 �O 4/16/14 SHEET TITLE: & SEDIMENT CONTIJDLXOL SHEET NUMBER: 3 >< OF 6 Z OO6 �n� LL N STONE CONSTRUCTION ENTRANCE 3 02TE1 CONSTRUCTION OF A SILT FENCE 3 5-2 ACCCOIRDANCEPWI HR NOTEBILIZATION IN MINIMUM TOP WIDTH 11 3.13TE1 ULF TEMPORARY D VERSION D KE ( ) ° >zWa? (WITHOUT WIRE SUPPORT) REQUIRED FOR SEDIMENT TRAP z °R ° °° ww 75' MIN. EXISTING U 'd 0 F J $ PAVEMENT k, 3 w 1E g ¢ 3 F�1 w ti ooI -¢Ox70: �o 5:1 1. SET THE STAKES. 2 UPSLOPEEALONG THE LINE p Z m F 1W Z_ w a N EMBANKMENTS. TO A STAKES• 2 p HEIGHT OF EMBANKMENT (FEET) o FILTER CLOTH 6" MIN. (OPTIONAL) BERM �� s'wx. 1 Com acied Soil w ¢ zF INSTALL SILT FENCE y p O ¢ �_ %- / �� �� (MAX. SIDE SLOPE (TYP.) AROUND PERIMETER OF ) T ( L ( 3 = z a o SIDE ELEVATION 1 �_� I STOCKPILE (TYP) 18" min. ( ( ( ( p EXISTI G GROUND - - I �/� a IIII t i t i t l 1 1 i 1 F= Flov�r w U ozY >� oR I I I 1 1111 IN 75' MIN. �i / r w *TO ® / r, I I m Z p s / �,� 11 _<1 1z d W 10' MIN. FLOW `� 0�02W" Will -411111 - - M-4111 - tq¢IYUU* 3. STAPLE FILTER MATERIAL 4. BACKFILL AND COMPACT 12' MIN. 1 'MIN. EXISTING 4.5' min. m PAVEMENT TO STAKES AND EXTEND THE EXCAVATED SDIL. TEMP 0 R A R Y S TO C K P I �E D E TA f �-- W --� F IT INTO THE TRENCH. H HO W W W VDOT 1 COURSE NOT TO SCALE 1.5 0.5 ZO W 1 AGE 10' MIN. 20 10 20 W AGGREGATE B SDIME j ''n:, j TRAPPING DEVICE F,. . 3.0 20 25 p �" O U * MUST EXTEND FULL WIDTH I - III - '.,_a HO H 3.5 2.5 3.0 Z p U a o OF INGRESS AND EGRESS Jill , 4.0 3.0 3.0 H o PLAN VIEW %_~ �, � . OPERATION / 4.5 3.5 4.0 a U z o E 5:. a. 12' MIN. FLOW 5,0 4.0 4.5 Z p W 3" MIN. III =III �- EXCAVATED AREA ZO � w MAX. DEPTH = 4' U o w SOURCE: VA. DSWC ORIGINAL ,43 � p � __ PLATE 3.09 -1 3" MIN. SHEET FLOW INSTALLATION GROUND ao (PERSPECTIVE VIEW) I U FILTER CLOTH SECTION A -A I ELEV. o FLOW 3 A REVISIONS REV DATE COMMENT BY POINTS A SHOULD BE PER COUNTY 1 12/13/13 DRH COMMENTS HIGHER THAN POINT B. REINFORCED CONCRETE AKRAJJ�NE DRAINAGEWAY INSTALLATION SECTION B -B (FRONT ELEVATION) SOURCE: ADAPTED FROM INSTALLATION OF STRAW AND FABRIC FILTER BARRIERS FOR SOURCE: ADAPTED FROM 1983 MARYLAND STANDARDS FOR SOIL EROSION AND SEDIMENT CONTROL, AND VA. DSWC SEDIMENT CONTROL,VA. DSWC, SHERWOOD AND WYANT SOURCE: VA DSWC CONSTRUCTION OF A SILT FENCE PLATE. 3.05 -1 1992 3.13 (WITH WIRE SUPPORT) 1. SET POSTS AND EXCAVATE A 4 "X4" 2. STAPLE WIRE FENCING TO THE POSTS. '��i�. �- - .� *` t�(�(.,� ��� TEMPORARY SEDIMENT WRAP TRENCH UPSLOPE ALONG THE LINE OF POSTS. QNSTR� -��I iq� A S' ° 51 .. A. AN N °AL`s' TAP 1' VARIABLEr" i rtFa ESiIINC' i /_ .. 4U Ll:� / ) ` � �` � '..:thy. "..... .:., 5 rt.,.4.`..'F�`.+ .,,.' ..s: ..: _...,. .,',�,��r-' +r.-�'�r m'-• r. GROUND >. o .r a �4 ELEV. VARIAB 67 CU. YD. /ACRE * TABLE 3.31-- N VARIABLE �% ACCI�PTABL1� '�'ENIl?`+( RUVP $ EDi.NG: PLANT M'K1rER][ALS ,. Y FI L THE FOLLOWING STATES REQUIRE NOTIFICATION BY x EXCAVATORS, DESIGNERS, OR ANY PERSON PREPARING TO FLOW III I 4 III I" 67 CU, YD. /ACRE "QiJICK ItEFEKEtCF F(aili AI L I�EGt1Dlr� DISTURB THE EARTH'S SURFACE ANYWHERE IN THE STATE. IN VIRGINIA, MARYLAND, THE DISTRICT OF COLUMBIA, AND DELAWARE CALL - 811 EXCAVATED 4' MAX. (WV 1- 800 - 245 -4848) (PA 1- 800 - 242 -1776) (DC 1- 800 - 257 -7777) Rats: �' } (VA 1-800-552-7001) (MID 1-800-257-7777) (DE 1- 800 - 282 -8555) 3. ATTACH THE FILTER FABRIC TO THE WIRE 4. DACKFILL AND COMPACT THE 1� „� �"( M , FILTER CLOTH ORIGINAL Plantttig ate5 FENCE AND EXTEND IT INTO THE TRENCH. EXCAVATED SOIL.t GROUND ly, ii A Pf {�hl� A\ ELEV. APPROVED FOR ? Sept. `I F'eb. '1S SOfU Iviix of SEE PLATE 3.13 -1 COARSE AGGREGATE CLASS I RIPRAP CONSTRUCTION A n>a t Rypgra I _ '� PROJECT No.: ' V132042 II r�'P lu it CROSS SECTION OF OUTLET � or al 4 in r) R ",5 6, -. ao DRAWN BY: DRH � . � - } DATE • /27/13 rte- I_ Gam✓ - J P Seale cI SCALE: N/A r FLOW / I- CAD LD.: WPO C ] CLASS I RIPRAP LENGTH (IN AREA Feb., 16 - Apt. 30 Annual Ry /egrass - 'fi0..- - tf)(l. III =III I AC.) itatTl t -i1 i "urii� PROJECT: EXTENSION OF FABRIC AND WIRE INTO THE TRENCH. L( L { ( F �1;I {=, WATER DIVERSION PROTECTION 1 T LII'i CAF �iJ`FS Ah10 "; I �.. FILTER FABRIC T [1 TI !! �F PP[N � v l DIKE Nia '1 -Au >3T _ ORDINANCE _ _ WIRE I �- �III I :. -�••. � - � LAN I' I �� source: .,VA. b8 FOR SOURCE: ADAPTED FROM INSTALLATION OF STRAW AND FABRIC FILTER BARRIERS FOR ` /� ��-- ROLKIN ROAD SEDIMENT _CONTROL, SHERWOOD & WYANT F T€OIE1T ���� --- . RETAIL CENTER _ COARSE AGGREGATE LOCATION OF SITE EXCAVATED / `FILTER CLOTH / ROLKIN ROAD &ABBEY ROAD AREA - - �"`��� TAX MAP 78 -75A TIN A CHARLOTTESVILLE, VA 22911 a *i ALBEMARLE COUNTY COARSE AGGREGATE SHALL BE VDOT #3, #357 OR #5 ilvurnu� ti�T�ati t�11':f l inll� txt><:, iltlt;1111t1 ���Ithimi��ln`l ulIx l�allcyl aix� OUTLET (PERSPECTIVE VIE W L cz'arlt ��Y e5ttta; 11 � ate$ iiillt lae�1�Yet�'aYi O�I� t1>4i><h 81I f cIII H L E R O i11�'j?l�`C.`��+�G�1i11g ii �� (tl I �L11U�'� �`���1111�11�,'I � ' � •� ���1I11�1,��• �hr1ll 1?�,��I � � ;�11�CC� �.��11�: E N G I N E E R I N G 111111 '�'kC�li11lilJll''Ixtcll1`> yv�1�c+�11� Source: Va. DSWC '? . , .......: ,. Plate 3.13 -2 28 BLACKWELL PARK LANE, SUITE 201 i WARRENTON, VIRGINIA 20186 1 Phone: (540) 349 -4500 ''PAYED'' ... Fax: (540) 349 -0321 111-76 www.BohlerEngineering.com ,��pLTH �pp V DANIEL R. HINES SEDIMENT TRAP DESIGN Lic. No. 043176 Trap Dtrainage Storage Volume Dimensions Elevation Embankment Outlet Top Spillway ��� 4/16/14 ID Area Total Wet Dry Wet Dry Storage Trap Clean Elev. Height Height Width Dimensions ., Req. Prov. Req. Prov. Req. Prov. L x W x D L x W x D Wet Dry Bottom Out H Ho W L x W �oilia►�.F' H: \13 \V132o42 \DRAWINGS \PLAN SETS \WATER PROTECTION ORDINANCE\VI32042WPO.DWG PRINTED BY. CLOWNS 4.16.14 0 9:57 AM LAST SAVED Bt°. (ac) (Cy) (Cy) (Cy) (Cy) (Cy) (Cy) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) SHEET TITLE: ST -1 0.80 108 128 54 60 54 68 135 x 8 x 1.75 155 x 12 x 1.25 535.75 537.00 534.00 534.88 538.00 2.3 1.3 4.0 5'x 13.0' EROSION SEDIMENT CON`S ROL NOTES DETAILS * WET DIMENSIONS: LENGTH AND WIDTH ARE AT BASE OF STONE OUTLET. DEPTH IS MEASURED FROM BASE OF STONE OUTLET DOWN TO BOTTOM OF TRAP. SHEET NUMBER: ** DRY DIMENSIONS: LENGTH AND WIDTH ARE AT CREST OF STONE OUTLET. DEPTH IS MEASURED FROM BASE OF STONE OUTLET UP TO CREST OF STONE OUTLET. * ** THE CLEAN OUT ELEVATION SHALL BE MARKED USING STAKE OR SPRAY PAINT ON THE RISER 4 GENERAL NOTE: IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALL OF THE DRAWINGS AND SPECIFICATIONS ASSOCIATED WITH THIS PROJECT OF 6 WORK SCOPE PRIOR TO THE INITIATION OF CONSTRUCTION. SHOULD THE CONTRACTOR FIND A CONFLICT WITH THE DOCUMENTS RELATIVE TO THE SPECIFICATIONS OR APPLICABLE CODES, IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE PROJECT ENGINEER OF RECORD IN WRITING PRIOR TO THE START OF CONSTRUCTION. FAILURE BY THE CONTRACTOR TO NOTIFY THE PROJECT ENGINEER SHALL CONSTITUTE ACCEPTANCE OF FULL RESPONSIBILITY BY THE CONTRACTOR TO COMPLETE THE SCOPE OF THE WORK AS DEFINED BY THE DRAWINGS AND IN FULL CONFORMANCE WITH LOCAL REGULATIONS AND CODES. H: \13 \V132o42 \DRAWINGS \PLAN SETS \WATER PROTECTION ORDINANCE\VI32042WPO.DWG PRINTED BY. CLOWNS 4.16.14 0 9:57 AM LAST SAVED Bt°. rl t t By SET - 55217 SE 81M OF MH IN MEDIA I I l 20' ACSA WATER LINE ESM'T DB 2035 P. 512 GENERAL NOTE: IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALL OF THE DRAWINGS AND SPECIFICATIONS ASSOCIATED WITH THIS PROJECT WORK SCOPE PRIOR TO THE INITIATION OF CONSTRUCTION. SHOULD THE CONTRACTOR FIND A CONFLICT WITH THE DOCUMENTS RELATIVE TO THE SPECIFICATIONS OR APPLICABLE CODES, IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE PROJECT ENGINEER OF RECORD IN WRITING PRIOR TO THE START OF CONSTRUCTION. FAILURE BY THE CONTRACTOR TO NOTIFY THE PROJECT ENGINEER SHALL CONSTITUTE ACCEPTANCE OF FULL RESPONSIBILITY BY THE CONTRACTOR TO COMPLETE THE SCOPE OF THE WORK AS DEFINED BY THE DRAWINGS AND IN FILL CONFORMANCE WITH LOCAL REGULATIONS AND CODES. H: \13 \V132D42 \DNAMNGS \PLW SETS \FINAL WE PLW \V132042EPO.DWG PRNIID BY: CCOWNS 4.16.14 0 1P.00 AM LAST SAVED Bf: CCOWNS SO 6901 540 r , rr CSq K's17E-RL /Ne r 2035 I , , , , , w \J SAN M// RIM 526.00 lNV IN - 519.49 rV OUT - 5>8.32cS�� �4N /TARYSEI4fR _.. - -.`-. 291 p 163 r3M � 5E FAGS OF D w� HICK MAN ]E3kOAD 60' PUBLIC RIGHT OF -WAY . G - 0- •--- -. 20 10 5 0 20 1 " =20' VIRGINIA UNIFORM CODING SYSTEM FOR EROSION AND SEDIMENT CONTROL PRACTICES N ®. TITLE ]KEY SYMBOL - LIMITS OF DISTURBANCE �Qp gm�� 5 SSF - SUPER SILT FENCE SSF SAF 3.01 SAFETY FENCE SAF 3.05 SILT FENCE SF X X X- 3.32 PERMANENT SEEDING PS PS DD 3.09 TEMPORARY DIVERSION DIKE DD RETAINING OVAL., CONSTRUCTION NARRATIVE: DURING CONSTRUCTION OF THE RETAINING WALL, THE RUNOFF FROM THE SITE SHALL BE DIRECTED TO STORM STRUCTURE A -1 USING A DIVERSION DIKE OR SWALE BEHIND THE WALL. THE SWALE /DIVERSION DIKE SHALL RISE INCREMENTALLY WITH THE CONSTRUCTION OF THE WALL TO KEEP THE DRAINAGE DIRECTED TO STRUCTURE A -1. STORM STRUCTURE A -1 SHALL ALSO BE CONSTRUCTED INCREMENTALLY SUCH THAT THE LIP OF THE STRUCTURE REMAINS APPROXIMATELY 18" ABOVE THE BOTTOM OF THE PONDING AREA AND ALSO 18" BELOW THE TOP OF THE DIVERSION DIKE/EDGE OF SWALE. THE CONTRACTOR SHALL COORDINATE WITH THE SITE INSPECTOR AND MAKE ADJUSTMENTS IN THE FIELD AS AGREED UPON WITH THE INSPECTOR. mp—.0 w a �W W W z �z w L s _j <w >�QZ _�. LLj oazW 2 gzciZ »r W O?wgo0 LLF k 001 a ° Z ON.- �LE Oax O x 2 Lu w Z U �a 'ate lei a i o ° O a a� Z o (Z' > O ♦ 0 �a� �Q U O Z� z >J oW Z LL ' aN m w00 2 U) H zm o� lil � w W 8'd F aw Uw 15 Z W m F w W U U U °w Z can W U y a o 0 U W REVISIONS REV DATE COMMENT BY 1 3/31114 PER COUNTY COMMENTS DRH DATE: 4/16/14 SCALE: 1 " =20' CAD I. D.: EPO THE FOLLOWING STATES REQUIRE NOTIFICATION BY EXCAVATORS, DESIGNERS, ORANY PERSON PREPARING TO DISTURB THE EARTH'S SURFACE ANYWHERE IN THE STATE. IN VIRGINIA, MARYLAND, THE DISTRICT OF COLUMBIA, AND DELAWARE CALL - 811 (WV 1- 800 - 245- 4848) (PA 1-800- 242- 1776) (DC 1- 800 - 257 -7777) (VA 1-800-552-7001) (MID 1- 800 - 257- 7777) (DE 1 -800- 282 -8555) APPROVED FOR CONSTRUCTION PROJECT No.: V132042 DRAWN BY: RTY CHECKED BY: DRH DATE: 4/16/14 SCALE: 1 " =20' CAD I. D.: EPO PROJECT: ]FINAL SITE ]PLAN IRN(I)ILKIN ROAD ID IZETAIL CENTER' LOCATION OF SITE ROLKIN ROAD & ABBEY ROAD TAX MAP 78 -75A CHARLOTTESVILLE, VA 22911 RIVANNA MAGISTERIAL DISTRICT ALBEMARLE COUNTY BOH LER E N G I N E E R I N G 28 BLACKWELL PARK LANE, SUITE 201 WARRENTON, VIRGINIA 20186 Phone: (540) 349 -4500 Fax: (540) 349 -0321 www.BohlerEngineering.com TH pF v DANIEL R. HINES Y .p Lie. No. 043176 k 0 4/16/14 144� SHEET TITLE: EIRUOSION AND SEDIMENT CONTROL PLAN a ]CHASE 11 SHEET NUMBER: 1® 5 >-95 OF 6 ICI t t 1 i i t BM SET - 552.27 5E 81M OF MH IN MEDIAi i 'If i t I 20' ACSA WATERLINE ESM'T DB 2035 P. 512 t 41 I - r r I , 1 i r rr \ �Q/ EX. DRAINAGE X51 °46'00 "E \ FL 306' UME \ `\ t 35. _. —. ABBEY ROA 'SE FACE D.L GENERAL NOTE: f IS THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALL OF THE DRAWINGS AND SPECIFICATIONS ASSOCIATED WITH THIS PROJECI JRK SCOPE PRIOR TO THE INITIATION OF CONSTRUCTION. SHOULD THE CONTRACTOR FIND ACONFLICT WITH THE DOCUMENTS RELATIVE' HE SPECIFICATIONS OR APPLICABLE CODES, IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE PROJECT ENGINEER OF RECORD II NRITING PRIOR TO THE START OF CONSTRUCTION. FAILURE BY THE CONTRACTOR TO NOTIFY THE PROJECT ENGINEER SHALL CONSTITUTE :CEPTANCE OF FULL RESPONSIBILITY BY THE CONTRACTOR TO COMPLETE THE SCOPE OF THE WORK AS DEFINED BY THE DRAWINGS AND FULL CONFORMANCE WITH LOCAL REGULATIONS AND CODES. H: \13 \V132042 \DRAWINGS \RUN SEES \RNAL SITE PUN \V132D42SSO.DWG PRNIID BY: CCDWNS 4.16.14 0 10:09 AM LAST SAVED BY: JESSN'APO 1 i i I 1 i 1 , 1 , I , I , I , I , I , - -- f I I , I , l'/ T f 1 1 1 i I 1 r r r r r r � ESMACSq 1ygTERf /NE' 2035 YO .572 ! ! i ! i ! , I ! i w.v 7Wr�� J SAN MN RIM 526.00 INV IN - 519.49 -• _ //VV OUT - 5>8.3ES 7 SqN /TARP �ER Z9/ j p >63 l J BM SET - 525 85 -- w SE FACE Of D.L - 91 -38, L =8'� -" _ -- f TOP - 525.79 - 15 'HOPE IN - 518.2 18 HDPE IN - 519. 1 24'fIDPE OUT - 519. ' TOP - 522.07 15'HDPE OUT - 519.3 - HICKMAN ROAD 60' PUBLIC RIGHT -OF -WAY --k-AX, GAS LINE 0_ 0 -- c I 20 10 5 0 20 1 " =20' NOTES 1. REFER TO SHEET 2 FOR GENERAL GRADING AND UTILITY NOTES. 2. REFER TO GEOTECHNICAL REPORT TITLED "REPORT OF GEOTECHNICAL STUDY, ROLKIN ROAD RETAIL BUILDING, ALBEMARLE COUNTY, VIRGINIA, F &R PROJECT NO. 71 R- 0129 ", PREPARED BY FROEHLING & ROBERTSON, INC., DATED 09/25/13. REV DATE 0 u- BY T 1�1 v 3/31/14 Ld oz Q Q , w z V ¢ w r , DRAWN BY: RTY o z�a k� >oijaW CHECKED BY: DRH Zw DATE: 4/16/14 ❑� E � 0z LZLI = � _ r , `u , W Z 3© ,I r7C/ y o W F0 o 'v- , , O ♦ w O �(L �o w>- O Q ow 1 i i I 1 i 1 , 1 , I , I , I , I , I , - -- f I I , I , l'/ T f 1 1 1 i I 1 r r r r r r � ESMACSq 1ygTERf /NE' 2035 YO .572 ! ! i ! i ! , I ! i w.v 7Wr�� J SAN MN RIM 526.00 INV IN - 519.49 -• _ //VV OUT - 5>8.3ES 7 SqN /TARP �ER Z9/ j p >63 l J BM SET - 525 85 -- w SE FACE Of D.L - 91 -38, L =8'� -" _ -- f TOP - 525.79 - 15 'HOPE IN - 518.2 18 HDPE IN - 519. 1 24'fIDPE OUT - 519. ' TOP - 522.07 15'HDPE OUT - 519.3 - HICKMAN ROAD 60' PUBLIC RIGHT -OF -WAY --k-AX, GAS LINE 0_ 0 -- c I 20 10 5 0 20 1 " =20' NOTES 1. REFER TO SHEET 2 FOR GENERAL GRADING AND UTILITY NOTES. 2. REFER TO GEOTECHNICAL REPORT TITLED "REPORT OF GEOTECHNICAL STUDY, ROLKIN ROAD RETAIL BUILDING, ALBEMARLE COUNTY, VIRGINIA, F &R PROJECT NO. 71 R- 0129 ", PREPARED BY FROEHLING & ROBERTSON, INC., DATED 09/25/13. REVISIONS REV DATE 0 u- BY T 1�1 v 3/31/14 Ld oz Q Q , w z V ¢ w DRH DRAWN BY: RTY o z�a k� >oijaW CHECKED BY: DRH Zw DATE: 4/16/14 ❑� E � 0z LZLI = � _ SCALE: 1.1=20' `u Wt�O'�I--�O' a$ m�v�W)�LLa0 W Z 3© No r7C/ y o W F0 o o� o = Z >' = W O ♦ w O �(L �o w>- O Q ow OZZZ >LL LN Z -W a w�m = ttz-mZ� 00 0wXLu QFQ Z v Uj <o U] a w W o Z H a �sm W w z> cq x o U €� z U o- M > a+ U p� � a Z W U �_ a z Nw A Lq Old C! �4 W o U W - REVISIONS REV DATE COMMENT BY 1 3/31/14 PER COUNTY COMMENTS DRH DRAWN BY: RTY CHECKED BY: DRH DATE: 4/16/14 SCALE: 1.1=20' CAD I. D.: SSO THE FOLLOWING STATES REQUIRE NOTIFICATION BY EXCAVATORS, DESIGNERS, OR ANY PERSON PREPARING TO DISTURB THE EARTH'S SURFACE ANYWHERE IN THE STATE. IN VIRGINIA, MARYLAND, THE DISTRICT OF COLUMBIA, AND DELAWARE CALL - 811 (WV 1- 800 - 245- 4848) (PA 1- 800 - 242- 1776) (DC 1 -800- 257 -7777) (VA 1 -800- 552- 7001)(MD 1-800- 257- 7777)(DE 1- 800 - 282 -8555) PROJECT: FINAL SITE PLAN FOR ROLKINIRXOAD RETAIL CENTER LOCATION OF SITE ROLKIN ROAD & ABBEY ROAD TAX MAP 78 -75A CHARLOTTESVILLE, VA 22911 RIVANNA MAGISTERIAL DISTRICT ALBEMARLE COUNTY 28 BLACKWELL PARK LANE, SUITE 201 WARRENTON, VIRGINIA 20186 Phone: (540) 349 -4500 Fax: (540) 349 -0321 www.BohlerEngineering.com T V DANIEL R. HINES .Q Lic. No. 043176 4r 4/16/14 , SHEET TITLE: GRADING PLAN SHEET NUMBER: 76 OF 6 APPROVED FOR CONSTRUCTION PROJECT No.: V132042 DRAWN BY: RTY CHECKED BY: DRH DATE: 4/16/14 SCALE: 1.1=20' CAD I. D.: SSO PROJECT: FINAL SITE PLAN FOR ROLKINIRXOAD RETAIL CENTER LOCATION OF SITE ROLKIN ROAD & ABBEY ROAD TAX MAP 78 -75A CHARLOTTESVILLE, VA 22911 RIVANNA MAGISTERIAL DISTRICT ALBEMARLE COUNTY 28 BLACKWELL PARK LANE, SUITE 201 WARRENTON, VIRGINIA 20186 Phone: (540) 349 -4500 Fax: (540) 349 -0321 www.BohlerEngineering.com T V DANIEL R. HINES .Q Lic. No. 043176 4r 4/16/14 , SHEET TITLE: GRADING PLAN SHEET NUMBER: 76 OF 6