HomeMy WebLinkAboutWPO201400087 Plan - As-built 2023-01-13Channel Report
Hydrallow Express Extension for AutadeeF4 AutoCAM Civil 3M by Autodeck. lm.
Thursday. Feb 19 2015
Downstream Section A -A
User -defined
Highlighted
Invert Elev (ft) = 412.24
Depth (ft)
= 0.79
Slope (%) = 11.08
Q (cfs)
= 5.350
N-Value = 0.050
Area (sqft)
= 1.14
Velocity (ft/s)
4.71
Calculations
Wetted Perim (ft)
= 3.30
Compute by: Known Q
Crit Depth, Yc (ft)
= 0.89
Known Q (cfs) = 5.35
Top Width (ft)
= 2.88
EGL (ft)
= 1.13
Elev (ft)
422.00
420.00
418.00
416.00
414.00
412.00
Section
Depth (ft)
9.76
7.76
5.76
3.76
1.76
-0.24
410.00 -2.24
-5 0 5 10 15 20 25 30 35 40 45
Sta (ft)
Channel Report
Hydmllow Express Extension far Au odesk& AutoC/
Downstream Section B-B
User -defined
Invert Elev (ft)
= 408.34
Slope (%)
= 6.40
N-Value
= 0.050
Calculations
Compute by:
Known Q
Known 0 (cfs)
= 5.35
3M by Attached, Inc. Thursday, Feb 19 MI5
Highlighted
Depth (ft)
= 0.50
Q (cfs)
= 5.350
Area (sgft)
= 1.76
Velocity (ft/s)
= 3.05
Wetted Perim (ft)
= 6.46
Crit Depth, Yc (ft)
= 0.51
Top Width (ft)
= 6.37
EGL (ft)
= 0.64
ra
.-
.�� Itl�
I, -T
a�
tt
t I r 1 1
0,050)
Channel Report
Hydrallow Express Extension for AUWdesF® AutoGAM Civil 3M by Aubdeck. lm.
Downstream Section
C-C
User -defined
Invert Elev (ft)
= 406.70
Slope (%)
= 3.30
N-Value
= 0.050
Calculations
Compute by:
Known Q
Known Q (cfs)
= 5.35
Thursday. Feb 19 2015
Highlighted
Depth (ft)
= 0.60
Q (cfs)
= 5.350
Area (sqft)
= 2.31
Velocity (ft1s)
= 2.31
Wetted Perim (ft)
= 7.85
Crit Depth, Yc (ft)
= 0.54
Top Width (ft)
= 7.75
EGL (ft)
= 0.68
Elev (ft) Section Depth (ft)
413.00
412.00
411.00
410.00
409.00
408.00
407.00
406.00
405.00
6.30
5.30
4.30
3.30
2.30
1.30
0.30
-0.70
-1 70
0 5 10 15 20 25 30 35 40 45
Sta (ft)
MS-19 Analyis Summary
Segment
ID
Q2 (cfs)
Slope
(ft/ft)
Liner Material
n
Allowable
Velocity
Q10 (cam)
10-Year
Depth (ft)
Maximum
Channel
Remarks
A -A
2.51
0.111
Existing Vegetation
0.050
5.00
5.35
0.79
1.50
Velocity OK
Depth OK
B-B
2.51
0.064
Existing Vegetation
0.050
5.00
fl24
5.35
0.50
1.50
Velocity OK
Depth OK
C-C
2.51
0.033
Existing Vegetation
0.050
5.00
5.35
0.60
1.50
Velocity OK
Depth OK
* COMPOSITE n NOT WARRANTED AS CHANNEL SIDE SLOPE MATERIAL HOMOGENEOUS
MS-19 CHANNEL ADEQUACY CALCULATIONS
BIORETENTION FILTER CONSTRUCTION SPECIFICATIONS
BIORETENTION BASIN SHOULD BE CONSTRUCTED AFTER ALL SITEWORK IS COMPLETE AND STABILIZATION
MEASURES HAVE BEEN IMPLEMENTED. BIORETENTION FILTERS MUST BE PROTECTED FROM ALL SEDIMENT
LOADS TO PREVENT MALFUNCTION. ALL BIORETENTION AREAS WILL REMAIN "OFF-LINE" FROM STORMWATER
INFLOW UNTIL THEIR RESPECTIVE DRAINAGE AREAS ARE FREE FROM LOOSE SEDIMENTS WHICH COULD
WASH INTO THE FACILITY. IN ADDITION, ALL CONSTRUCTION ACTIVITIES IN THESE AREAS MUST BE
MINIMIZED TO REDUCE COMPACTION OF IN -SITU SOILS, WHICH SHALL BE CORDONED OFF TO PREVENT
ACCIDENTAL COMPACTION BY EQUIPMENT DURING THE REMAINDER OF THE CONSTRUCTION PHASE IN THAT
AREA. EMBANKMENT, IMPERVIOUS CORE AND CUTOFF TRENCH TO BE IMPERVIOUS MATERIAL AVAILABLE
ON -SITE, EMBANKMENT FILL TO BE BENCHED 1:1 INTO EXISTING GROUND, EMBANKMENT TO BE
COMPACTED TO 95% DRY WEIGHT DENSITY t2% PER ASTM D-698, CONSTRUCTION OF EMBANKMENT TO
BE SUPERVISED BY A GEOTECHNICAL ENGINEER LICENSED TO PRACTICE IN THE COMMONWEALTH OF
VIRGINIA.
BIORETENTION FILTER SEQUENCE OF CONSTRUCTION
1. REMOVE ALL ACCUMULATED SEDIMENT AND EXCAVATE BIORETENTION FILTER AREA TO PROPOSED
DEPTH. USE RELATIVELY LIGHT, TRACKED EQUIPMENT TO AVOID COMPACTION OF THE BASIN FLOOR.
AFTER FINAL GRADING IS COMPLETED, DEEPLY TILL THE BASIN FLOOR WITH ROTARY TILLERS OR DISC
HARROWS.
2. INSTALL A 6 INCH LIFT OF UNDERDRAIN GRAVEL (VDOT NO. 57) AND LIGHTLY COMPACT WITH
LANDSCAPING ROLLER. INSTALL UNDERDRAIN PIPING, CLEANOUTS AND APPURTENANCES IN
ACCORDANCE WITH THE PIPE MANUFACTURER SPECIFICATIONS. INSTALL REMAINING UNDERDRAIN
GRAVEL. INSTALL PEA GRAVEL CHOKER STONE LAYER. FILL BIORETENTION FILTER AREA WITH
BIORETENTION SOIL MIXTURE IN ACCORDANCE TO VIRGINIA BMP CLEARING HOUSE SPECIFICATIONS AS
SHOWN IN THE PLANS.
3. INSTALL VEGETATION AND GROUND COVER SPECIFIED IN THE PLANTING PLAN FOR BIORETENTION AREA.
INSTALL MULCH LAYER IF CALLED FOR IN THE DESIGN.
4. HAND PLACE LANDSCAPING STONE AT THE BIORETENTION FILTER INLETS AND WEIRS AS SPECIFIED ON
THE PLANS AND DETAILS.
5. UPON AUTHORIZATION FROM DESIGNATED INSPECTOR, REMOVE ALL SEDIMENT CONTROLS AND STABILIZE
ALL DISTURBED AREAS.
BIORETENTION FILTER UNDERDRAIN SPECIFICATIONS
UNDERDRAIN MATERIAL TYPES
• UNDERDRAIN SYSTEMS SHALL BE COMPOSED OF 6-INCH PVC PIPE (SCHEDULE 40) OR APPROVED
EQUAL.
UNDERDRAIN CONNECTIONS
• PIPE SECTIONS SHALL BE COUPLED USING SUITABLE CONNECTION SOCKET -WELDED JOINTS. FIELD
CONNECTIONS TO STORMDRAIN STRUCTURES AND PIPES SHALL BE SEALED WITH POLYMER GROUT
MATERIAL THAT IS CAPABLE OF ADHERING TO SURFACES. UNDERDRAIN PIPE SHALL BE CAPPED (AT
STRUCTURE) UNTIL COMPLETION OF SITE.
• UNDERDRAINS CONNECTED DIRECTLY TO A STORM DRAINAGE STRUCTURE SHALL BE NON -PERFORATED
FOR A DISTANCE OF AT LEAST 5 FEET FROM THE STRUCTURE INTERFACE TO AVOID POSSIBLE PIPING
PROBLEMS.
UNDERDRAIN PERFORATIONS
• UNDERDRAIN PERFORATIONS SHALL BE X" PERFORATIONS, 6" CENTER TO CENTER, ALONG TWO OR
THREE EQUALLY SPACED LONGITUDINAL ROWS. PERFORATIONS SHALL BE PLACED CLOSEST TO THE
INVERT OF THE PIPE TO ACHIEVE MAXIMUM POTENTIAL FOR DRAINING THE FACILITY. NO PERFORATIONS
ARE TO BE WITHIN 5 FEET OF WHERE THE UNDERDRAIN SYSTEM CONNECTS TO A STORMDRAIN
STRUCTURE.
UNDERDRAIN INSPECTION
• THE CONTRACTOR SHALL CONTACT THE COUNTY WATER RESOURCES INSPECTOR 24-HOURS PRIOR TO
BACKFILLING THE BIOFILTER AND REQUEST AN INSPECTION AND APPROVAL OF THE UNDERDRAIN
INSTALLATION AND SOIL MIX.
1 ADDRESS 1st SUBMISSION COMMENTS DMJ 2/27/15
2 UPDATED BIORETENTION ELEVATIONS DMJ 5/01/15
z
CL OF
EMBANKMENT
f �4' MIN.
I
CUTOFF TRENCH DETAIL
NOT TO SCALE
8„1
oG�s, MIN.
T
^. ( A
- 4
°. .A
A
! A. ' CO • d a e
4000 PSI
VDOT CLASS A4
GENERAL CONCRETE
CONCRETE CRADLE DETAIL
NOT TO SCALE
1 4 1 SIGNATURE SET I DMJ 1 6/18/15 1 1 1 1 1
g
NO. I SHEET REVISION
SHEET REVISION
1L
3
STORMWATER NARRATIVE
A VSMP PERMIT WAS OBTAINED FOR THIS SITE PRIOR TO JULY 1, 2014. THEREFORE THIS
SITE IS GRANDFATHERED PER 9VAC25-870-48 AND MEETS THE WATER QUALITY REQUIREMENTS
OF PART II C SET FORTH IN 9VAC25-870-96.
STORMWATER QUALITY AND DETENTION FOR THE IMPROVEMENTS PROPOSED WITH THIS SITE PLAN
WILL BE PROVIDED BY THE PROPOSED BIORETENTION FILTER MINIMUM STANDARDS 3.11A. THE
REQUIRED TREATMENT VOLUME IS EQUAL TO 1/2" OF RUNOFF FROM THE IMPERVIOUS AREA.
THE PROJECT SITE LIES WITHIN THE DEVELOPMENT AREA AND THE REQUIRED OVERALL
POLLUTANT REMOVAL RATE IS 49%. BIOFILTER SIZING CALCULATIONS AND BMP COMPUTATIONS
ARE PROVIDED ON THIS DRAWING.
THE POINT OF ANALYSIS FOR THE PROJECT IS LOCATED AT THE DRAINAGE SWALE ON THE
EASTERN PROPERTY LINE AS SHOWN ON DWG. C-19. THE PRE -DEVELOPED DRAINAGE AREA
TO THE POINT OF ANALYSIS IS 2.36 ACRES. THE PRE -DEVELOPED FLOWS ARE 2.64 CFS AND
6.73 CFS FOR THE 2-YEAR AND 10-YEAR STORM EVENTS RESPECTIVELY.
IN THE POST -DEVELOPED CONDITION THERE ARE TWO SEPARATE DRAINAGE AREAS. 2.65
ACRES WILL BE CAPTURED AND ATTENUATED BY THE PROPOSED BIORETENTION FACILITY AND
THERE IS A 1.39 ACRE UNCONTAINED AREA THAT DRAINS TO THE POINT OF ANALYSIS. THE
POST DEVELOPED COMBINED FLOWS ARE 2.50 CFS AND 5.35 CFS FOR THE 2-YEAR AND
10-YEAR STORM EVENTS RESPECTIVELY.
THE COMBINED FLOWS FOR THE BIORETENTION FILTER ROUTING AND UNCONTAINED DRAINAGE
AREAS IN THE POST -DEVELOPED CONDITION ARE LESS THAN THE PRE -DEVELOPED FLOWS AT
THE POINT OF ANALYSIS THEREFORE THE SITE IS IN COMPLIANCE WITH MS-19. A ROUTING
SUMMARY IS PROVIDED BELOW AND THE ROUTING CALCULATIONS ARE SHOWN ON DWG. C-21.
ADEQUACY CALCULATIONS FOR THE EXISTING DOWNSTREAM CHANNEL ARE PROVIDED ON THIS
DRAWING. THE CHANNEL ADEQUACY CALCULATIONS INDICATE THAT THE EXISTING VEGETATION IN
THE DOWNSTREAM CHANNEL IS ADEQUATE TO PREVENT EROSION. THERE IS NO SIGN OF
EROSION IN THE EXISTING CHANNEL IN THE PRE -DEVELOPED CONDITION.
BIORETENTION FILTER SIZING CALCULATIONS
SURFACE AREA REQUIRED = 2.5% OF IMPERVIOUS AREA
IMPERVIOUS AREA = 50,772FT2
REQUIRED SURFACE AREA = 50,772 FT2 x .025 = 1,269 FT2
BIOFILTER SURFACE AREA PROVIDED = 1,290 F72
FOREBAY SIZING CALCULATIONS
MIN. SURFACE AREA REQUIRED = 10% OF BIOFILTER SURFACE AREA
MIN. SURFACE AREA REQUIRED = 0.10(1,290 FT2) = 129 F72
FOREBAY 1 SURFACE AREA PROVIDED = 207 FT2
FOREBAY 2 SURFACE AREA PROVIDED = 393 F72
POLLUTANT REMOVAL CALCULATIONS
THE BMP ANALYSIS AREA FOR THE PROJECT IS THE PROPERTY LIMITS OF THE PARCELS
DESIGNATED AS TMP 61A-15 AND 61A-17. THE BMP ANALYSIS AREA IS 2.75 ACRES.
CALCULATIONS ARE PROVIDED AS PART OF THIS PLAN.
CLASS A1J
RIP RAP T A T ITT T T T[r TTT A T TT TITT A TT
BIORETENTION SOIL
MIXTURE IN
ACCORDANCE TO
VIRGINIA BMP
CLEARINGHOUSE
SPECIFICATIONS,
LATEST EDITION
TOP OF
MULCH
.�.
GRAVEL
STONE
VDOT NO.
PROVIDEAGGREGATE
BELOW6" SUMP
UNDERDRAIN
TH OF "yti,
4 D 7f
DAVID M. -TENSE
Lic. No. 11484
��SArIDNAL Fr�O,
NOT TO SCALE
BIORETENTION
FACILITY=425.00
JTION FILTER I
NOT TO SCALE
3" MULCH
2'
_'
12"
6" DIA.
PERFORATED
UNDERDRAIN
ISSUED FOR CONSTRUCTION
9i 09-03-15
BIORETENTION
FILTER SURFACE
PERFORMANCE -BASED WATER QUALITY CALCULATIONS APPCNDIX5D
PERFORMANCE -BASED WATER QUALITY CALCULATIONS APPENDIX 5D
W.rlaha02 SitanNO2
W.clehoot 2, Moulins 2
N,I cf4
Page2af4
Summery ae Situation 2 criteria: torn calculation procedure h= I lhru STEP 3, Workaheet l:
STEP Determine the relative peal -development pollutant load(L,j.
Applicnblearea(A)-= lS etas
L,,o-[0.05+(0.MxI,o)]x Axd28 (Equadon5-21)
4,n =(total prstdevelrpmrnt impervious cover+A) x I W = 3l
wM1ere: Lp,,, = mlaEve post -development root phosphoovs load (poonde par
Ca.ew = % a I=16%
Icy = prsFdevelvpmrnt percent impervious cover (percmO mptessed is
I�,y=(total exislirg impervious cove+A") x I W =�%
whale numbers)
A - applicable urea (acres)
I-a.I <I",°y u. %; used
L„" = [om+play; x ;j 11] x 2 75 x 228
I,r S-Tsl..,.mw \L %
- a.40 pounda,co'cer
STEP Dearminc the relative pre -development pollu[an load(LJ.
STEP Determine Me relative pvllubnt removal requirementOUL.
RR = Ln"-L,.w ,
(Equation 5-16)
RR = its Q- t.1a
where: Lr,y-,. = relative pradevelopmeot btal pbospharoua load(pounds per year)
L.,"a„a avttaW landeaver condition for specific watershed or locality yr
pouMsperyou
the Chesapake Bay default value of 16%(pecent expressud in
whole cumbers)
A applicable arn(auca)
STEP Identify beat mamgement praetia(BMP) for then ute.
L„y„._o.- o.05+(0.009x Il_)]x. 2,16' x2.20
1. Constrains the required polludentreravel efficiency for the site:
pauvda per year
EFF-(RR+L_,)x 100 (Equafiaa 5-22)
when: EFF - coNtedpalitttaa removal eB"iicievcy(percent expressed it whole
tubers)
RR = palluavt removal re9uhemmt(prmds per year)
Ln„ = alodve postdevelopment rolal phosphorous load (ponds per
year)
EFF
5D-9
5C-Iv
PBCFORMANCERASCD WATER QUALITY CALCULATIONS APPBNDIX50
PERFORMM`CF`BASED WATER QUALITY CALCULATIONS APPENDIX51i
Worktheet2: Sifi 2
Page 4ON
Workshoet 2, Situation 2
N..3af4
4. Calculate the pollutant land removed by the proposed BMP(s):
2. Select BMP(s) from Table 5-35 and locate on the site:
L,,,„,,, - Effat., x Lam (Equation 5-24)
BMPL
where: L,,,_-Post-developmeotpollutsnt load reraoved by proposed BMP
(No. aperyear)
BMP 2:
Effawe= poBmmt removal efficiency ofBW(expeassedfit deduced f)
Lam = rdafivepastdeval.pment toad phosphorous load emeriag
BMP 3:
proposed BMP (pounds per,aq
3. Denemdnethe polhuant load entering Is proposed BMP(s):
L„m_an= 0.56 x a�4-=�f 5s pouMsperycar
Lt., - [0.05+(0.009 x I-) x A x 2.28 (Egnafion 5-Im
L,:,...amarer _ pounds per yea
wham: Le.,r'aletive past-developmrnttoal phosphomva load enmdug
L_,,,san x- pounds per year
proposed BMP (pounds par year)
lam =post-developmevr pwrmt impery ous cvverofa6lP dmtange area
(peremtexpreesedmwholeaumbers)
S. Celuelme the mml pollutant land removed by the 13141 :
A- drainage area of propose I RMP (acres)
L..... ....,
Last-[0.05+(0009x 44 1]x 26S_x2,2g
where L„m,,,,n,a,- totalprputad lead remoyv4beaced sad
= 1.49-pound�ptt Year
No I
L,,,,,„,ee,nn- pollutant load removed by proposed BMP No.2
L:.m.. pollutant load Incurred by proposed BMP No.3
Loan - [0.05+(0.009 • )]---2.28
_a
L„m..unwr=pollmmt load Incurred by proposed BMP No.3
= pouoaaperyem
L:..e,e,v- 1.5s + + +...
Laws - [0.05+(0.009 x x x 2.28
LST pounds"YOur
= pouM¢per yew
6. Verify compliance:
I,_- RR
5D11
5D- 2
BIORETENTION FACILITY ROUTING SUMMARY
DESIGN STORM
PRE -DEVELOPED FLOWS
(CFS)
POST -DEVELOPED
COMBINED FLOWS (CFS)
2yr
2.64
2.51
10yr
6.73
5.35
IF SOD CANNOT BE INSTALLED UPON
4e DIA.
RCP OUTLET PLACEMENT OF SOIL MIX, INSTALL
STRUCTURE W/TRASH RACK PERIMETER SILT FENCE AT TOP OF
TOP=433.30 UNSTABILIZED EMBANKMNET SLOPES (TYP)
4" ORIFICE WITH BMP
100YR WSE 434.38
CAGE INV=429.50
x
REFER TO LANDSCAPE C-20 C-20
1 OYR WSE 433.24
10, 12" MAX PLANS FOR BIORETENTION TOP OF
ICI
2YR WSE 431.11
POl D FILTER PLANTINGS MULCH
TOP OF
DEPTH x
EMBANKMENT
III=III I
1
=436.50
11 ELEV.=428.50 1
IMPERVIOUS
III1 1- � :::: :.. ......... ..:.. _: ,.;`:...... -.: ....:_:-:::'.:.•:,:.>:. �.-::.:..:.:...:.-:..,...._:.;:'.:
III=III ". `,':: ` BIORETENTION
CORE
.
IIIIII11 FILTER SOIL MIX
,._,�..; ........... �...:.-.,:,<:
=1 I I-III-III=1
IIIIIIIII=III
II 000000000000000 0000000000000000000 0
15" HDPE
6" DIA. DRAINAGE
OUTFALL
PERFORATED COURSE
PIPE
UNDERDRAIN
15e O.C.
CUTOFF
TRENCH
WATERTIGHT 81X2'
CONCRETE
CONNECTION CONCRETE
CRADLE
BASE
TEMPORARY EXCAVATED SUBGRADE SLOPES MAY BE INSTALLED
NEAR
VERTICALLY TO ENSURE A MINIMUM BOTTOM DEPTH OF
4e IS
MAINTAINED FOR THE DRAINAGE COURSE. ALL SLOPES
ABOVE
MULCH LAYER TO BE NO STEEPER THAN 3:1, UNLESS
OTHERWISE SHOWN ON PLANS
BIORETENTION FILTER FACILITY DETAIL
NOT TO SCALE
_
DESIGNED BY:
r:
PROJECT
SET REV. No.
LOFTS AT MEADOWCREEK
W5
- ENGINEERS
FINAL SITE PLAN
DRAWN BY:
ALBEMARLE COUNTY, VIRGINIA
DRAWING NUMBER:
rmSURVEYORS
II
TITLE:
STORMWATER MANAGEMENT NARRATIVE
PLANNERS
C-20
Dlh'R BY:
ASSOCIATES
a1DB
DETAILS AND CALCULATIONS
SHEET NUMBER:
POB..4119 3040 Avemore Square PI
Lynchbd,, VA 24502 clnrinndvdle, VA 22911
WWA NUMBER:
FILE NAME:
DISCIPLINE:
SCALE:
DATE:
Phone: 434.31&6080 Phone: 434.984.2700
WWW.NM1rOggnCiates.nM
213001.05
300105C_SWM-2.dwg
CIVIL
H: N/A
00 I Z0/14
24 of 30
V.-N/A
w
Q
O
J
D_