HomeMy WebLinkAboutWPO202100034 Approval - County 2023-01-13�q oe nt 401 McIntire Road, North Wing Charlottesville,VA22902-4579 County of Albemarle Telephone:434-296-5832 COMMUNITY DEVELOPMENT DEPARTMENT WWW.ALBEMARLE.ORG VSMP Permit Plan Review Project title: Victorian Heights Project file number: WPO202100034 amendment 1 Plan preparer: Collins Engineering [scoff@collins-engineering.com] Owner or rep.: Riverbend Development [alan@riverbenddev.com] Plan received date: 11/22/22 Rev.1 received: 1/10/23 Date of comments: 12/20/22 Approval 01/13/23 Reviewer: Emily Cox County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is approved. The rationale is given in the comments below. The VSMP application content requirements can be found in County Code section 17-401. A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary. 1. Approved amendment plans will need to be inserted into the SWPPP on site. Rev. 1: .omment acknowledged. B. Pollution Prevention Plan (PPP) The PPP content requirements can be found in County Code section 17-404. PPP for amendment was not provided. Rev. 1: Comment addressed. C. Stormwater Management Plan (SWMP) VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan is approved, and the reasons are provided in the comments below. The stormwater management plan content requirements can be found in County Code section 17- 403. 1. Please label the title as WPO202100034 amendment 1 on the title sheet. Rev. 1: Comment addressed. 2. Please provide more spot shots to show how drainage will flow into proposed inlets behind building #2 and not flow over the retaining walls. Rev. 1: Comment addressed. 3. Please show the managed slopes on the grading plan so grading can be confirmed to comply with County Code 18- 30.7.5 - Design standards. Rev. 1: Comment addressed. 4. Have engineered retaining wall plans been submitted? They will be required before final site plan approval. Rev. 1: Comment acknowledged. 5. Do you have VDOT approval for structure 1 to be installed in ROW and in the sidewalk? Rev. 1: Comment addressed. 6. Do you have RWSA approval? Their approval is necessary for final site plan approval, but Engineering Review Comments Page 2 of 3 it was understood that part of this amendment was because of their pipes. If so, please provide their approval. Rev. 1: Comment addressed. 7. Revised calculations packet was not received. Please provide and ensure all applicable calculations are provided. Rev. 1: Comment addressed. D. Erosion and Sediment Control Plan (ESCP) Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is disapproved, and the reasons are provided in the comments below. The erosion control plan content requirements can be found in County Code section 17-402. 1. Please update the narrative for the sequence of construction. Specify when all traps/basins are to be installed and removed. Please note that storm pipes behind building 3 will need to be installed with inlet protection before ST 3 is removed. Rev. 1: Comment addressed. 2. Ensure the outlets of all diversion dikes and pipes have outlet protection. Ensure the outlet protection type and sizing is specified. Rev. 1: Comment addressed. The VSMP permit application and all plans may be resubmitted for approval when all comments have been satisfactorily addressed. For re -submittals please provide 2 copies of the complete permit package with a completed application form. Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to discuss this review. Process: After approval, erosion and sediment control and stormwater management improvements must be bonded. The bonding process begins when the plan is approved, and the applicant submits a bond estimate request form and fee to the Department of Community Development. A plan reviewer will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted to the County, who will record the agreement. Engineering Review Comments Page 3 of 3 After bonding and agreements are complete, county staff enters project information in a DEQ database for state application processing, if a DEQ permit is required. DEQ reviews the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter, which must be posted at the construction site. After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference. Applicants must complete the request for a pre -construction conference form and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction conference will be scheduled with the County inspector. At the pre - construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; https://www.al bemarle.org/government/commu nity-development/apply-for/engineeri ng-applications