HomeMy WebLinkAboutWPO201300055 Plan - Approved 2013-08-12iiiii lit
�P►Ci
SITE PLmiN 6ET
a
l
1
r
AREA TOTALS UNIT QUANTITY
TOTAL DISTURBED AREA AC 5.93
TOTAL EXISTING IMPERVIOUS AREA SF 28,995
TOTAL DESIGN IMPERVIOUS AREA SF 21,911
OWN -amfill
KEY
ISSUED FOR INFORMATION AND
COORDINATION
m VOID
C'
V IC� I N' I Tv M A P
ISSUED FOR CONSTRUCTION
APPROVED
1bl !!:
1 L_
-its
W.M. Whitaker &Associates
landscape architects
Pa BOX 2153
Chattanooga, Tennessee 37409
ph:(434) 825 -0744 e:wmwhitaker@wmwhi taker Iamm
SUBMISSIONSI REVISIONS
8/06/13 SITE PLAN SET
9127/13 REVISED SITE PLAN SET
10117113 REVISED SITE PLAN SET
KEY MAP
t
WILL M. R�
Lie.
�SC�E AR�1�
SEAL
PROJECT NUMBER: 1 303
DATE: October 17, 2013
SCALE: N/A
DRAWING TITLE:
Cover
SHEET NUMBER:
SYMBOLS
DRAWING TITLE
TITLE LINE 1 • DRAWING DESCRIPTION
SCALE: 1/8" = 1
DRAWING No. /LETTER
DRAWING LOCATION
SECTION /ELEVATION
0 0 0 0
GRAPHIC BAR SCALE
DRAWING SCALE
1 SECTION NUMBER
L1.1 SECTION LOCATION
DETAIL KEY
- - - 1 DETAIL LETTER
L1.1 1 DETAIL LOCATION
ir AREA TO BE DETAILED
ELEVATION DATUM PLAN DATUM
� Tw 00.00,
NORTH ARROW REVISION MATCHLINE
N
00
MATERIALS
EARTH
CONCRETE MASONRY
STONE
SAN D /MORTAR
PLANTING SOIL
BRICK/PAVERS
III II ..
BLOCKING
RIGID INSULATION
CONCRETE
a
4 r
AGGREGATE
WHO -OD
V /
MULCH
GENERAL NOTES
1. PARKING, EQUIPMENT AND MATERIAL STORAGE IS PERMITTED ONLY IN THE
AREAS INDICATED. PARKING OR MATERIAL STORAGE OUTSIDE THESE AREAS,
EVEN TEMPORARILY WILL NOT BE PERMITTED.
2. SITE ACCESS IS PROVIDED AT THE EXISTING DRIVE ON THE SOUTH SIDE OF
THE PROPERTY. HEAVY EQUIPMENT ACCESS MAY USE THE TEMPORARY
CONSTRUCTION ENTRANCE WEST OF THE STUPAAND FOLLOWA
PREDETERMINED ROUTE TO THE CONSTRUCTION ZONE. NO OTHER ROUTE OF
ACCESS TO THE SITE IS PERMITTED.
3. ACCESS TO THE SITE IS LIMITED TO THE TWO ENTRANCES IN NOTE 2 AND THE
CONSTRUCTION ZONE. ACCESS TO AREAS OUTSIDE THESE WILL BE STAGED
AND LIMITED TO SPECIFIC WORK THAT MUST TAKE PLACE OUTSIDE THE
CONSTRUCTION ZONE, ONLY PERSONNEL, EQUIPMENT AND VEHICLES
ASSOCIATED WITH THIS WORK WILL BE PERMITTED IN THESE AREAS AND ONLY
WHEN THE WORK IN AN AREA IS BEING PERFORMED.
4. NO CONSTRUCTION ACTIVITY INCLUDING BUT NOT LIMITED TO GRADE
CHANGES, SURFACE TREATMENTS OR EXCAVATIONS OF ANY KIND IS PERMITTED
WITHIN THE AREA IDENTIFIED ON THESE DRAWINGS AS A TREE PROTECTION
ZONE (TPZ). IN ADDITION NO ROOT CUTTING, NO STORAGE OF MATERIALS OR
FILL, NO MOVEMENT OR STORAGE OF VEHICLES OR EQUIPMENT IS PERMITTED
WITHIN THESE AREAS. AREA(S) IDENTIFIED AS A TPZ MUST REMAIN
UNDISTURBED AT ALL TIMES.
5. ARBORICULTURAL WORK: ANY ROOTS OR BRANCHES WHICH EXTEND BEYOND
THE TREE PROTECTION ZONE(S) INDICATED ON THIS PLAN WHICH REQUIRE
PRUNING, MUST BE PRUNED BY A QUALIFIED ARBORIST OR OTHER TREE
PROFESSIONAL AS APPROVED BY THE LANDSCAPE ARCHITECT_ ALL PRUNING OF
TREE ROOTS AND BRANCHES MUST BE IN ACCORDANCE WITH APPROPRIATE
ARBORICULTURAL STANDARDS. THE ARBORIST/TREE PROFESSIONAL MUST
CONTACT THE LANDSCAPE ARCHITECT NO LESS THAN 48 HOURS PRIOR TO
CONDUCTING ANY SPECIFIED WORK,
6. IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO REVIEW THE
SITE CONDITIONS AND INFORM THE LANDSCAPE ARCHITECT OF ANY
DISCREPANCIES IN SITE CONDITIONS OR EXISTING GRADES THAT ARE NOT
DESCRIBED ON THE PLANS BEFORE COMMENCING WORK.
7. THE CONTRACTOR SHALL INSURE THAT ALL WORK MEETS ALL APPLICABLE
LOCAL AND NATIONAL BUILDING AND SAFETY CODES THAT PERTAIN TO THE
PROJECT WORK. IF THERE IS A DISCREPANCY BETWEEN A CODE AND THE
CONTENT OF THE PLANS, THE CONTRACTOR IS TO CONSULT LANDSCAPE
ARCHITECT BEFORE PROCEEDING.
8. SHOULD THERE BE ANY DISCREPANCIES BETWEEN LANDSCAPE
ARCHITECTURAL DRAWINGS AND THOSE OF OTHER DESIGN DISCIPLINES, THE
CONTRACTOR IS TO CONTACT LANDSCAPE ARCHITECT IMMEDIATELY TO REVIEW
AND COORDINATE BEFORE PROCEEDING.
9. IT IS THE CONTRACTOR'S RESPONSIBILITY TO GROUND AND BOND ALL
EXPOSED METAL OBJECTS IN LANDSCAPE,
10. PRIOR TO PROJECT COMPLETION, THE SITE IS TO BE THOROUGHLY CLEANED
OF ALL CONSTRUCTION DEBRIS INCLUDING BUT NOT LIMITED TO SIGNS, TRASH,
MATERIAL, AND ALL TEMPORARY CONSTRUCTION DEVICES.
11. SYMBOLS AND ABBREVIATIONS APPLY TO LANDSCAPE SHEETS ONLY
12, CONTRACTORS MUST CLEAN UP ALL TRASH AND DEBRIS ON THE
CONSTRUCTION SITE AT THE END OF EACH DAY. LIGHTWEIGHT MATERIAL,
PACKAGING, AND OTHER ITEMS MUST BE COVERED OR WEIGHTED DOWN TO
PREVENT WIND FROM BLOWING SUCH MATERIALS OFF OF THE CONSTRUCTION
SITE. CONTRACTORS ARE PROHIBITED FROM DUMPING, BURYING, OR BURNING
TRASH ANYWHERE ON THE SITE. DURING THE CONSTRUCTION PERIOD, THE
CONSTRUCTION SITE MUST BE KEPT NEAT AND TIDY TO PREVENT IT FROM
BECOMING AN EYESORE FOR SURROUNDING PROPERTY OWNERS. DIRT, MUD,
OR OTHER DEBRIS RESULTING FROM ACTIVITY ON SITE MUST BE PROMPTLY
REMOVED FROM SURROUNDING ROADS.
13. IN ORDER TO RESPOND TO AND MONITOR HAZARDOUS MATERIAL
(INCLUDING PETROLEUM PRODUCTS) USE AND /OR SPILLS THE CONTRACTOR
SHALL COMPLY WITH THE FOLLOWING CRITERIA:
- THE CONTRACTOR SHALL PROVIDE A CONTACT PERSON AND
TELEPHONE NUMBER FOR A COMPANY EXPERIENCED IN EMERGENCY
RESPONSE FOR CONTAINING HAZARDOUS MATERIAL SPILLS.
- ABSORBENT SHEETS WILL BE USED FOR SPILL PREVENTION AND CLEAN UP..
SEVERAL BOXES SHOULD BE LOCATED AT FUEL TRUCKS, STORAGE AREAS, AND
IN MAINTENANCE VEHICLES. INVENTORIES MUST BE MAINTAINED AS
NECESSARY.
- SPILLS IN EXCESS OF ONE (1) GALLON MUST BE REPORTED TO THE
LANDSCAPE ARCHITECT.
- SPILL IN EXCESS OF TEN GALLONS MUST BE REPORTED TO THE LANDSCAPE
ARCHITECT AND VIRGINIA DEPARTMENT OF THE ENVIRONMENT.
- THE CONTRACTOR SHALL MAINTAIN A LIST OF PRODUCT NAMES AND A
MATERIALS SAFETY DATA SHEET (MSDS) FOR ALL HAZARDOUS MATERIAL
PRODUCTS USED OR LOCATED ON SITE.
- BEFORE A HAZARDOUS MATERIAL IS STORED, THE CONTRACTOR SHALL
CHECK AND ENSURE THAT
1. THE MATERIAL IS STORED IN AN APPROVED CONTAINER.
2. THE CONTAINER IS TIGHTLY CLOSED.
3. THE CONTAINER HAS THE PROPER WARNING LABEL.
4. THE CONTAINER HAS BEEN INSPECTED FOR LEAKS.
ABBREVIATION LIST
A
ADJ
ADJACENT, ADJUSTABLE
DECK DRAIN
AFF
ABOVE FINISH FLOOR
DIAG
ALT
ALTERNATE
DIMENSION
ALUM
ALUMINUM
DS
APPROX
APPROXIMATE
DRAWING(S)
ARCH
ARCHITECTURAL)
B
BC
BOTTOM OF CURB
EXPANSION JOINT
BD
BOARD
ELEC
BLDG
BUILDING
EQUAL
BLKG
BLOCKING
EXP
BOT
BOTTOM
EXISTING
BRK
BRICK
F FAB
BS
BOTTOM OF STAIR
TOP OF STEEL
BW
BOTTOM OF WALL
C
CEM
CEMENT
S S
CIP
CAST IN PLACE
TW
CJ
CONTROL JOINT
SCHEDUL(E), (ED)
CMU
CONCRETE MASONRY UNIT
TELEVISION
COL
COLUMN
CONC
CONCRETE
CU FT
CUBIC FEET
D DD
DECK DRAIN
DIA
DIAMETER
DIAG
DIAGONAL
DIM
DIMENSION
DN
DOWN
DS
DOWN SPOUT
DWG(S)
DRAWING(S)
E E
EAST
EA
EACH
EJ
EXPANSION JOINT
EL
ELEVATION
ELEC
ELECTRIC(AL)
EQ
EQUAL
EQUIP
EQUIPMENT
EXP
EXPOSED
EXIST
EXISTING
EXT
EXTERIOR
F FAB
FABRIC
ALBEMARLE COUNTY GENERAL CONSTRUCTION NOTES
1. PRIOR TO ANY CONSTRUCTION WITHIN ANY EXISTING PUBLIC RIGHT-OF-WAY, INCLUDING CONNECTION
TO ANY EXISTING ROAD, A PERMIT SHALL BE OBTAINED FROM THE VIRGINIA DEPARTMENT OF
TRANSPORTATION (VDOT). THIS PLAN AS DRAWN MAY NOT ACCURATELY REFLECT THE REQUIREMENTS
OF THE PERMIT. WHERE ANY DISCREPANCIES OCCUR THE REQUIREMENTS OF THE PERMIT SHALL
GOVERN.
2. ALL MATERIALS AND CONSTRUCTION METHODS SHALL CONFORM TO CURRENT SPECIFICATIONS AND
STANDARDS OF VDOT UNLESS OTHERWISE NOTED.
3. EROSION AND SILTATION CONTROL MEASURES SHALL BE PROVIDED IN ACCORDANCE WITH THE
APPROVED EROSION CONTROL PLAN AND SHALL BE INSTALLED PRIOR TO ANY CLEARING, GRADING OR
OTHER CONSTRUCTION.
4. ALL SLOPES AND DISTURBED AREAS ARE TO BE FERTILIZED, SEEDED AND MULCHED.
5. THE MAXIMUM ALLOWABLE SLOPE IS 2:1 (HORIZONTAL:VERTICAL). WHERE REASONABLY OBTAINABLE,
LESSER SLOPES OF 3:1 OR BETTER ARE TO BE ACHIEVED.
6. PAVED, RIP-RAP OR STABILIZATION MAT LINED DITCH MAY BE REQUIRED WHEN IN THE OPINION OF THE
COUNTY ENGINEER, OR DESIGNEE, IT IS DEEMED NECESSARY IN ORDER TO STABILIZE A DRAINAGE
CHANNEL.
7. ALL TRAFFIC CONTROL SIGNS SHALL CONFORM WITH THE VIRGINIA MANUAL FOR UNIFORM TRAFFIC
CONTROL DEVICES.
8. UNLESS OTHERWISE NOTED ALL CONCRETE PIPE SHALL BE REINFORCED CONCRETE PIPE - CLASS III.
9. ALL EXCAVATION FOR UNDERGROUND PIPE INSTALLATION MUST COMPLY WITH OSHA STANDARDS FOR
THE CONSTRUCTION INDUSTRY (29 CFR PART 1926).
UTILITY NOTES
1. EXISTING UTILITY LOCATIONS SHOWN ARE APPROXIMATE.
2. NEIGHBORHOOD SUPPLY LINES IN THE RIGHTS -OF -WAY ALONG BROOMLEY
ROAD AND IVY CREEK DRIVE ARE NOT SHOWN AND MUST BE LOCATED AND
MARKED BY MISS UTILITY PRIOR TO CONSTRUCTION. MISS UTILITY CONTACT:
DIAL 811 in VA, or 1- 800 - 552 -7001.
SEE www.missutilityofvirginia.com/ FOR MORE INFORMATION.
3. VERIFY LOCATIONS AND DEPTHS OF ALL UTILITIES IN THE FIELD AND NOTIFY
LANDSCAPE ARCHITECT OF ANY CONFLICTS BETWEEN LAYOUT /GRADING
AND UTILITIES PRIOR TO CONSTRUCTION.
4. TRENCHING FOR UTILITIES WILL BE PERMITTED IN APPROVED LOCATIONS ONLY
CONTRACTOR MUST ALERT LANDSCAPE ARCHITECT PRIOR TO TRENCHING FOR
REVIEW AND APPROVAL.
LAYOUT NOTES
1. DO NOT SCALE DRAWINGS.
2. CONTRACTOR SHALL VERIFY ALL LAYOUT DIMENSIONS IN THE FIELD. REPORT
DISCREPANCIES TO THE LANDSCAPE ARCHITECT BEFORE PROCEEDING.
3. ALL ANGLES ARE ASSUMED TO BE 900 UNLESS OTHERWISE NOTED.
4. ALL DIMENSIONS FROM STRUCTURES ARE FROM FACE OF FINISH OF
EXTERIOR WALL.
5. ANY ALTERATIONS TO THESE DRAWINGS PROPOSED IN THE FIELD FOR
CONSTRUCTION SHALL BE PROMPTLY REPORTED TO THE LANDSCAPE
ARCHITECT BEFORE PROCEEDING.
GRADING NOTES
1. CONTRACTOR SHALL VERIFY ALL EXISTING GRADES IN THE FIELD AND REPORT ANY DISCREPANCIES
TO THE LANDSCAPE ARCHITECT. i
2. SLOPE AWAY FROM ALL BUILDINGS,
3. SLOPE TRANSITIONS BETWEEN SPOT GRADES EVENLY
4. PROVIDE VERTICAL CURVES OR ROUNDINGS AT ABRUPT CHANGES IN GRADE UNLESS OTHERWISE
NOTED.
5. ALL PAVED AREAS MUST PITCH TO DRAIN AT MINIMUM OF 1 %. NON -PAVED AREAS MUST PITCH TO
DRAIN AT A MINIMUM OF 2 %. ANY DISCREPANCIES NOT ALLOWING THIS TO OCCUR SHALL BE REPORTED
TO THE LANDSCAPE ARCHITECT PRIOR TO CONTINUING WORK.
6. ALL DENUDED AREAS WHICH WILL BE LEFT DORMANT FOR MORE THAN 30 DAYS SHALL BE SEEDED WITH
FAST GERMINATING TEMPORARY VEGETATION IMMEDIATELY FOLLOWING GRADING OF THOSE AREAS.
LANDSCAPE ARCHITECT SHALL SELECT ALL SEED MIXES PRIOR TO SEEDING.
7. CONTRACTOR MUST PROVIDE A MINIMUM OF 8" OF TOPSOIL IN ALL PLANTING AREAS. SEE TOPSOIL
SPECIFICATION.
8. BACKFILL AT RETAINING WALLS MUST BE FREE OF STONES AND BUILDING MATERIAL FOR A MINIMUM OF
24" BELOW FINISHED GRADE. COORDINATE WITH LANDSCAPE ARCHITECT.
MATERIAL NOTES
1. ALL WALL VENEERS TO CONTINUE A MINIMUM OF 6" BELOW GRADE.
FIN
FINISH
FT
FOOT, FEET
FTG
FOOTING
G GA
GUAGE
GALV
GALVANIZED
GC
GENERAL CONTRACTOR
H HDW
HARDWARE
HDWD
HARDWOOD
HM
HOLLOW METAL
HOR
HORIZONTAL
HT
HEIGHT
HVAC
HEATINGNENTILATING/
PSI
AIR CONDITIONING
ID
INSIDE DIAMETER
INCL
INCLUD(E), (ED), (ING)
INSUL
INSULAT(E), (ED), (ING), (ION)
INT
INTERIOR
J
JT
JOINT
K
KO
KNOCK OUT
L
L
LENGTH
OPENING
LT
LIGHT
M
MAS
MASONRY
PLATE
MATL
MATERIAL
PNL
MAX
MAXIMUM
PAINT(ED)
MECH
MECHANICAL
PSI
MED
MEDIUM
POINT
MFR
MANUFACTURER
R RAID
MIN
MINIMUM
RUBBER BASE
MISC
MISCELLANEOUS
MO
MASONRYOPENING
TOP OF STEEL
MTL
METAL
N
N
NORTH
S S
NIC
NOT IN CONTRACT
TW
No., #
NUMBER
NOM
NOMINAL
NTS
NOT TO SCALE
0 OC
ON CENTER
OD
OUTSIDE DIAMETER
OPNG
OPENING
OPP
OPPOSITE
P PERF
PERFORAT(E), (ED), (ION)
PL
PLATE
PLYWD
PLYWOOD
PNL
PANEL
PNT
PAINT(ED)
PSF
POUNDS PER SQUARE FOOT
PSI
POUNDS PER SQUARE INCH
PT
POINT
P.O.B.
POINT OF BEGINNING
R RAID
RADIUS
RB
RUBBER BASE
RD
ROOF DRAIN
CLOD -LOD �
- 200 -
572
+572.50
LIMIT OF DISTURBANCE
PROPERTY LINE
EASEMENT LINE
BENCH MARK
EXISTING CONTOUR
PROPOSED CONTOUR
PROPOSED SPOT ELEVATION
EXISTING POWER POLE
EXISTING CULVERT
MISC. SYMBOLS
CENTERLINE
II-
PROPERTYLINE
z
RE:
REFER TO
T
T &G
TONGUE & GROOVE
REINF
REINFORC(E), (ED), (ING)
E
TBD
TO BE DECIDED
REQD
REQUIRED
TC
TOP OF CURB
REV
REVISION
TEL
TELEPHONE
RL
RAIN LEADER
THK
THICK(NESS)
TOM
TOP OF MASONRY
TOS
TOP OF STEEL
TS
TOP OF STAIR
S S
SOUTH
TW
TOP OF WALL
SCHED
SCHEDUL(E), (ED)
TV
TELEVISION
SD
STORM DRAIN
TYP
TYPICAL
SFRM
SPRAYED FIRE - RESISTIVE MATERIAL
SHT
SHEET
U
UNO
UNLESS NOTED OTHERWISE
SIM
SIMILAR
SQ
SQUARE
V
VERT
VERTICAL
SS
STAINLESS STEEL, SOLID
VIF
VERIFY IN FIELD
SURFACE
STD
STANDARD
W
W
WEST, WIDE, WIDTH
STL
STEEL
W/
WITH
STN
STAINED)
W/O
WITHOUT
SUSP
SUSPEND(ED)
WD
WOOD
WT
WEIGHT
LIMIT OF DISTURBANCE
PROPERTY LINE
EASEMENT LINE
BENCH MARK
EXISTING CONTOUR
PROPOSED CONTOUR
PROPOSED SPOT ELEVATION
EXISTING POWER POLE
EXISTING CULVERT
MISC. SYMBOLS
LEGEND
No SAN -
CENTERLINE
II-
PROPERTYLINE
z
ANGLE
W
PERPENDICULAR
VALVE
DIAMETER
LEGEND
No SAN -
PROPOSED SANITARY PIPE
----- W- - - - - --
EXISTING WATERLINE
PROPOSED WATERLINE
W
VALVE
- 6 -RAIN -� 6 -RAIN
PROPOSED STORM PIPE
E
EXISTING BURIED ELECTRIC
E
PROPOSED BURIED ELECTRIC
01) EXISTING TREES
W.M. Whitaker &Associates
landscape architects
PO BOX 2153
Chattanooga, Tennessee 37409
ph:(434) 825 -0744 e:wmwhitaker @wmwhitakerla.com
NATIVE POND
Albemarle County, Virginia
SUBMISSIONS/ REVISIONS
8/06/13 SITE PLAN SET
9/27/13 REVISED SITE PLAN SET
I
10/17/131 REVISED SITE PLAN SET
KEY MAP
�O � L
O SVILL M. R
L 0 7
e-��5 10 't.1- (5
SEAL " V'vl
PROJECT NUMBER: 1303
DATE: October 17, 2013
SCALE: N/A
DRAWING,TITLE:
General Notes
SHEET NUMBER:
G1 e
I
❑
o
W.M. Whitaker & Associates
rr
>- landscape architects
w
0 PO BOX 2153
0 Chattanooga, Tennessee 37409
ph:(434) 825 -0744 e:wmwhitaker @wmwhitakerla.com
4 11
� ' -' _ ---- - 590 _ / i/ • \ - , / ` `���//,(
— -- -- - '' I' -`" - ' - 580 -'- / --" _— -- -_ � - /•'- - /' -�• ' / ' � � _ \ \ • / �� �, � �
— - / x--595— / _ / \ \ • / �r
/ — — — •� ` _ -- UNDERGROUND ELECTRIC
/ \ / � —
I . \� UNDERGROUND WATER
/ / / ' / • r r /5gg �� 05'r \\ I I -- I \ \•� _ \ \
\ \\ � : ! / �� / � \I \\ 0 • -_` \ • \ \- \ \ \ \ I'
PARKING PARKING
I/ / / / it -- — ^V`r. / / / 5ga i � I / I 11 1 _ � \ � • \ 4 � \�
/ 1
HOUSE �• 595�
' / ! SHEDS / PARTIAL DEMOLITION UNDERWAY
/ / , - - - -- - ° • -- / PARKING \ % • \
w / Ir
--- - - - - -- ° / PARKING
/ -- _ \ 1
�Lul / i / � LANDSCAPED AREA
\ \ • r /
—594--_ r �59, - ` /� / - - I r I i • m j
If
0 If
j ( \ \ Sod \ � i i \ i , / / �"�`-� / / , I , I • I � !.
590— \ r S 63
LU
I
/ \ \
If
l
t' � I � � V A � / ' --- --- A --__ ' \ � i %•\ / / � � ' /�� � ,/ / � �i / % l; 11
r
LAWN � --,. ' � • \ , _ — / ;' i i i/ � / � � / � � � / / / l / l
A,
587— \ \ \ \ v� / l • / / % / // / /� / / /�
DRIVE jA
J \ V X580- ----
r
// • �j \\ \ \ \ \ \ / r �\
EASEMENTS
IMF-
%XISTTNG GAZEBO
X/ /- —_ -- - -- -- — - -- - - __ _ � ` ` --- '/-
75 _ \ \ \ / / / 61 0
Bl/JDDHIST STOPA
Xz
om
I i
L
/
i
j/z / /
Q
' 2
NATIVE POND
Albemarle County, Virginia
SUBMISSIONS/ REVISIONS
8/06/13
SITE PLAN SET
9/27/13
REVISED SITE PLAN SET
10/17/13
REVISED SITE PLAN SET
KEY MAP
:,;�EALTR 0
L �
v WILLIAM TAKER
0
c�E AR
SEAL
PROJECT NUMBER: 1303
DATE: October 17, 2013
SCALE: 1" - 20' -0"
DRAWING TITLE:
Existing Conditions
SHEET NUMBER:
L 1 e
I
I
r
I
I
I
I
r
I
r
I
I
I
I
I
I
I
I
I
I
I
I
I
r
I
f
I
I
r
I
I
w,
z,
JI
LL
Wr
OIcc
r
I
I
r
I
I
I
I
r
r
r
W.M. Whitaker &Associates
NOTES: _ — -� _57�— / -- j ��� / / / \ ,O
�\ \ cC
/ __ — : - -- — —� \ �ti \ landscape architects
1. SEE 1-1.20 FOR EROSION AND SEDIMENT CONTROL AND PROTECTION _ _ / _ — - / - -' / ' / \ \ \ LU
MEASURES. DEMOLITION, E &SC, AND PROTECTION WORK SHALL OCCUR _ / _ — --- ' • / /' -- �/i ' j / j I / • • �� �. A
CONCURRENTLY.
--575- -- / — — — / • ;� _ / / — —565 -- \' ��>>! O PO BOX 2153
Chattanooga, Tennessee 37409
2. DEMOLISH ENTIRELY:
A. ALL LANDSCAPE LIGHTS, CONDUITS AND JUNCTION BOXES. -` - �' -- - ' / — — - � !__ _ ___ — • � �`'4� -! �� � m ph: (434) 825 -0744 e:wmwhltaker @wmwhltakerla.com
B. ALL VISIBLE IRRIGATION COMPONENTS AND ANY COMPONENTS ' -- ! o - -- — —580 _ ' / / / • •' • j �`F \ I \
UNEARTHED DURING CONSTRUCTION. - — __ / J — _ -- - -- — — -- _ • -
1
C. ALL VISIBLE AND UNEARTHED UTILITIES THAT HAVE BEEN OR WILL BE ' _ — — - / — i - - "" - - - ___ _ - -- / , • �� • / ( �
ABANDONED. — - _ -- j .560 _L D — — - ` �`— - _ / �• / / ,• \ / \\ \ \ 1`.
3. TO THE EXTENT POSSIBLE, SALVAGE ALL LANDSCAPE STONES INCLUDING
PAVING WALL STONES AND BOULDERS. -- _ - • - - - - __ - — \ 1
4. ALL TREES TO BE REMOVED SHALL BE FLAGGED IN THE FIELD. TREE REMOVAL
INDICATED IS CONTINGENT ON FIELD EVALUATION AND APPROVAL BY 0 \ , \ 00D
LANDSCAPE ARCHITECT.
SHOWN ON SURVEY HAVE BEEN PARTIALLY DEMOLISHED / S \ / r i N �,
5. SOME STRUCTURES / � - --- � -- - - � � \•� � \ \ ��� \ \ 1 l 1
OR HAVE DETERIORATED SINCE THE SURVEY. REMOVE ALL COMPONENTS / / / f — / / �' �� \ \ • \ 1\ I I , j j - • i -- \ -590 — `
INCLUDING ROTTING WOOD AND FOUNDATIONS.
ALL FIELD STONE WALLS AT FRONT ENTRANCE AND AROUND PERIMETER OF
s / / / / --- � — � — --- _- � . X59 \` \ \ •, � � \ • ) \ � 1 \ \
HOUSE TO REMAIN. PROTECT WALLS FROM DAMAGE, STAINING OR ANY / / - - / 1 j \ \ , 1 \ \ • \
ACTIVITY THAT MIGHT DIMINISH QUALITY OF WALLS DURING CONSTRUCTION. / / / / / / / �� /59Q ,} l yJ I ` \ \ _ ,-� t • \ \ i \ �� \ I�\
A 0
1z I STAGING AREA
LOD
HOUSE • i� A >. - - -�"� - 0p
/
z- / o� / \ PARTIAL DEMOLITION UNDERWAY
1- / /I
DEMOLISH EXPOSED AGGREGAT / V� /
/
' CONCRETE PAVING - _ / \ % • i f \ \
/ f / / / / ! it • _ i � � , . � � \ � -- / / ,�
DEMOLISH SHEDS I 1 • , I
v
C�
op
OP
♦ 1 �� ` �9y I / / I t l \ I
DEMOLISH LANDSCAPE TIMBERS �; % �• ? \ / I r
AND VEGETATION I �� / t' I �� \ I �► PLANTING CONTRACTOR TO CAREFULLY REMOVE ALL
. 1 / i7 ; / • _ _ �- \ , SHRUB AND GROUNDCOVER VEGETATION BELOW TREES I' r
� / 592 - --'` - I I I �� / �
/ /oo PLANTING CONTRACTOR TO CAREFULLY REMOVE ALL / / >I / p► / �, / i I I / 'if �. • � j fj
/ I SHRUB AND GROUNDCOVER VEGETATION BELOW TREES l / / I I ! j �'�� f 1I I ' �• / I / i I
r
590— I \ / %' \ \` �5s W
;
\ - 569 --
i
/
,
LAWN
i/ �' ' \ / \\ \ \ \ ` j \ \ \ \•\ \ \ / _ate ///
585-
i! O DRIVE • / i / / /, / j / ; / j
\
/ , \ -595- - f \ \ -- \ \� \ f �- 41 ; /' % j /,
CIO
00 7 � �� \ �—� � �_ '� "— �- ---- __- --'- --_— � l - -- --- --- -__ `\' ,, \ '�" - -- -- — �
_ 0
os5
� A oo - -- -- \, \ �_ -- / ,'�' EASEMENTS
O / _ XISTING GAZEBO- - -- -- - -- -- - -- \ - / //
\ \
xx
,EXIST)NG BUDDHIST`STUPA
\ \ \ \ \ \ — "�'•'"'` — - _ _ REMOVE ALL GRAVEL
\ -- — -- REMOVE HEADWALLS AND CULVERT
MAINTAIN SWALE HIGH POINT
NATIVE POND
Albemarle County, Virginia
SUBMISSIONS/ REVISIONS
8/06/13
SITE PLAN SET
9/27/13
REVISED SITE PLAN SET
10/17/13
REVISED SITE PLAN SET
KEY MAP
" W"71 LM M. W T >
Lic. N .40
SEAL
PROJECT NUMBER: 1303
DATE: October 17, 2013
SCALE: 1" - 20' -0"
DRAWING TITLE:
Demolition Plan
SHEET NUMBER:
Ll 015
EROSION & SEDIMENT CONTROL LEGEND — — = _ _ — _ / , _
_ -- °� _ �" _ �"_ � � �' � / � — _ � '� �� � � \ _ ` ', \o W.M. Whitaker .& Associates
r \
LIMIT OF DISTURBANCE — -- ' ' / � � / _— / \ \ , �
-- — _ f = = / / : - —�, �- Iandsca e arch i te cts
— — /
so--- LU
TP v TREE PROTECTION 3.38 — _
/ • • / \,oR�� '1 1 PO BOX 2153
'I _` ✓^ // / =_575- - - ' / / J- • i -/ / -585' Op
I
o _ _ — — _ / / / /� � Chattanooga, Tennessee 37409
r CE o CONSTRUCTION ENTRANCE 3.02 _ _ _ _ / / / _ �� ,� �� �j I� 1\ m ph:(434) 825 -0744 e:wmwhitaker @wmwhitakerla.com
i \ ' 1
580 - - / /, /j, . / / • _` • I •\ _, / / � ! � �r\ 1
r SF X SILT FENCE 3.05
0
r TO To TOPSOILING 3.30 _ TPZ
TPZ
TS Ts TEMPORARY SEEDING 3.31 — _ i / / g3 — ° �p� ` ' �/ x •` — ` - — / - -- \ I /
_ ' TS / / x\ r•\ — — , \ 1 \ / ' 1 ` 1 !,
' PS PS PERMANENT SEEDING 3.32 gg/ �' \ TP + --- __ z -- • S \ ��`` \ i �,� 1,/
R.O.W. DIVERSION 3.11 / -�' _ — — / •1 \ = \ \ 1�; Ts I DC ,' Pp �' — f \ —590 \ \ \
TEMPORARY DIVERSION DIKE 3.09
r / / / / / / /-T-
TEMPORARY _
SF
' TEMPORARY SEDIMENT TRAP 3.13 / L� / / , i ' i \ �- •-\ \ -- \ \} 1 I` 'i'``
ST x --L-�x x x x - / __--- - - - - -- - - --
/ x x P \ TPZ
i
TPZ' \•�, ;!
' DC DUST CONTROL 3.39 i -- — /, • _ x i ' i / J —1 , -�
DC <� / r r"
r
---------------------
- - - - -- -- TPZ — 1
-- - -- —
�' BEM BLANKETS AND MATTING 3.36 / / / / i' /`
aI i ac \ r \ STUDIO , -- 1 / 59 _ _ , SF TP / ; I !
a' TPZ TREE PROTECTION ZONE
TPZ T \ i •' .�
VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK SPECIFICATION NUMBER / ( PAVILION - i/_ ;`/ j • • \ f I ;
•
❑ ❑ TPZ .� , ,� • i !' ! ti , it y
r
t \ / V � + `
,TPZ i
TPZ
TPZ ,/ % � _ -- v �. - �� � � � _ I �, v • • ; „ ,J / ,.
TPZ
TP TP : �• , 1
{ TPZ
I Ss3 ' — i ' I't / ` / w
/ \ A
590—
\ \ / TP
TP / / / ! TP / 5
{ � , � { \ V � � \ \ \ � ' l V � �i / � i i ,•'/ ', ' i / � it 1 r l �
TPZ
jl II I ii
TPZ � ' � ,' •� ` 'ii; /;i %l ,
1 --
� \ \ \ \ � / -- � �� `'-- —_ \ � � --__ ,.r � \ • %•� ( / % / / /` ' _ l � j , / � / l/! l / l! 11
\ , v -TPZ v TP
_ --�- T TPZ
� � � _ _ —537 _-_- \ � � / � � � ` � \ \ • • __._. / / f � � / � / / / /
/ / r
DRIVE \ '� /
SF
SF
0000 \ \ \ -50 ' _�-- ,�� \/ v �/� `� g�/
TPZ SF _____ - ___ —__— - - -- -�\
O^ \x \ \ PS \ \ _x —x x --x —xg x / \
O • o OQ —��-'' -- -- -- x x '�— x —= 401 0
�5B3 / • � `` -- x ---- x GO T �- \ \ mesas / t � � '� ____ Z
x� =x x—ate\
x
EASEMENTS
,
\ \ � \ \� • � — �y /� - -- - -- _-___ --_ — _ _' ' \ \ \ --- --_._- -_ '/ /x'90 / / / � ' / , / � / // /
010 / EXISTING BUDDHIST STUPA - - -- -- — -- -- -- \ \ \ \ \ \ / !� / /� /
F } TPZ
\ \ \ \ EXISTING BUDDHIST STUPA
\ DD
TPZ —
F
PS
\ \ s»
DD 7
Tl
DC
DD / / j / DRY STORAGE 12X12', MUST BE FLAT
S- / WET STORAGE 14X14', MUST BE FLAT
_ —56
WET STORAGE 28X28', MUST BE FLAT
— -- DRY STORAGE 26X26', MUST BE FLAT
-- - - -_ - _ —__ —f RWD
_ f
/ Jv
BLANKETS AND MATTING TO BE INSTALLED IN
RESTORED SWALE AFTER CONSTRUCTION - / / / / / /
ENTRANCE, CULVERT AND SEDIMENT TRAP ARE
REMOVED. /
NATIVE POND
Albemarle County, Virginia
SUBMISSIONS/ REVISIONS
8/06/13
SITE PLAN SET
9/27/13
REVISED SITE PLAN SET
10/17/13
REVISED SITE PLAN SET
KEY MAP
0 y
U WILLIAM M. WHITAKER
Lic. N . 40 0 0
CAE AR�'
SEAL
PROJECT NUMBER: 1303
DATE: October 17, 2013
SCALE: 1 " - 20' -0"
DRAWING TITLE:
E&SC Plan
SHEET NUMBER:
Ll 020
a - -
I 11
MS -6: Surface runoff from disturbed areas that is comprised of flow from drainage ALBEMARLE CO GENERAL CONSTRUCTION NOTES
PROJECT DESCRIPTION areas greater than or equal to three acres shall be controlled to 1
i residence into amulti -use structure improve an existing accommodate the anticipated sediment loading from the land- disturbing FOR EROSION AND SEDIMENT CONTROL PLANS _ _ z W.M. Whitaker & Associates
The project purpose is p 9 TEMPORARY SEDIMENT TRAP ST 1 TEMPORARY SEDIMENT TRAP ST 2 :TEMPORARY RIGHT OF WAY DIVERSIONS
drive, add minimal parking spaces and garden areas. The project will consist of site grading, activity. The outfall device or system design shall take into account the l --_
drainage area flowing through the disturbed area to be served by the basin. 1. THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE r h t p t
remodeling of a multi story structure, site walls, rehabilitation of a driveway, removal of gravel PRE - CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF landscape. a I C I I I L e C l S
driveway and planting. The total square footage of the structure and paved areas will be LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPECTION.
reduced. The total square footage of lawn will be reduced and converted to native meadow MS -7: Cut and fill slopes shall be constructed in a manner that will minimize erosion. Slopes 1' T -6" * 1. 1;_s;;
grasses. Invasive species will be removed. The majority of native trees are being preserved. that are found to be eroding excessively within one year of permanent stabilization 2. ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CONSTRUCTED AND 1- - VDOT #1
shall be provided with additional slope stabilizing measures until the problem is MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE I COURSE AGREGATE
AREA TOTALS UNIT QUANTITY corrected. VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS ORIGINAL * „ PO BMX 21 53
GROUND 2 6 ORIGINAL 2'-6 " -Ig min•
VR 625 -02 -00 EROSION AND SEDIMENT CONTROL REGULATIONS. � ��_ GROUND Chattanooga, Tennessee 37409
TOTAL DISTURBED AREA AC 5.03 ELEV. � _ - -, , I
TOTAL EXISTING IMPERVIOUS AREA SF 28,995 MS -8: Concentrated runoff shall not flow down cut or fill slopes unless contained within an 10' ELEV. 10, ____ I 1��I ph:(434) 825 -0744 e:wmwhitaker @wmwhitakerla.com
TOTAL DESIGN IMPERVIOUS AREA SF 21,911 adequate temporary or permanent channel, flume or slope drain structure_ 3. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR I = �'� \� � `I - Ov I
AS THE FIRST STEP IN CLEARING.
54.1 CU. YD. * __ � � ' ---- I II ',��I I'i � Oi ! ! 1�
EXISTING CONDITIONS MS -9: Whenever water seeps from a slope face, adequate drainage or other protection shall 3' o" 9.4 CU. YD. V * 'i - III11'��`\�I��y- -\ .,I�gi�lii� ,� `�' - � " N � i " N �? 2' -5" -1 ! - -'! I I -� ' '---!1 II \ \! WI
be provided. 4. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE y 1 -6 � I l I \ \O�\ \I II \iii' `I
The site current) consists of a former residence and Buddhist Stu pa with slopes that vary MAINTAINED ON THE SITE AT ALL TIMES. 26' -0" " I i -!111
Y P P rY 12 -0 I! � �.Ii�l'
from 2 -33 %. Majority land cover is fescue lawn/field with areas of open tree cover. Two MS -10: All storm sewer inlets that are made operable during construction shall be I \� �. I I \�II,
driveways access the site, one asphalt at the house and one gravel at the stupa. protected so that sediment -laden water cannot enter the conveyance 5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES iN AREAS OTHER THAN I I �!�i UM
system without first being filtered or otherwise treated to remove sediment. INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO, OFF -SITE BORROW OR 74.5 CU. YD. 13.6 CU. YD. I-� \O'i'�'i 6 M'N'
WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION 3-61, 3 -0 �� '
CRITICAL AREAS CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING (EXCAVATED) (EXCAVATED)
MS -11: Before stormwater conveyance channels are made operational, adequate outlet FILTER CLOTH ORIGINAL
The site includes a minimal number of square feet of critical slopes. Disturbance in these protection and any required temporary or permanent channel lining shall be installed in AUTHORITY. GROUND FILTER CLOTH ORIGINAL
ELEV. GROUND
areas will be minimal with no significant grading taking place. Early establishment and proper both the conveyance channel and receiving channel. 6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OFANYADDITIONAL EROSION ELEV. TYPICAL GRAVEL STRUCTURE
maintenance of perimeter controls will provide sedimentation control. Stabilize and maintain CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS
fill slopes throughout project construction to control erosion. No wetland disturbance is MS -12: When work in a live watercourse is performed, precautions shall be taken to DETERMINED BY THE PLAN APPROVING AUTHORITY *SEE PLATE 3.13 1 COARSE AGGREGATE ** CLASS 181PRAP * SEE PLATE 3.13 -1 COARSE AGGREGATE ** CLASS I BIPRAP
proposed with this project. minimize encroachment, control sediment transport and stabilize the work -
area to the greatest extent possible during construction. Nonerodible material 7. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES
STRUCTURAL PRACTICES
shall be used for the construction of causeways and cofferdams. Earthen fill AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT CROSS SECTION OF OUTLET soli
may be used for these structures if armored b nonerodible cover materials. UNTIL FINAL STABILIZATION IS ACHIEVED. CROSS SECTION CTi O N O F OUTLET Compacted
1. Temporary Construction Entrance - 3.02 MS -13: When a live watercourse must be crossed by construction vehicles more 8. DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED
A temporary construction entrance shall be provided at the location indicated FILTERING DEVICE.
on the plan. than twice in any six -month period, a temporary stream crossing CLASS I BIPRAP , ' ; ` ' _ �jl' I"
constructed of nonerodible material shall be provided. 5' -6„ CLASS 161PRAP i .
9. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY 1' -s^ 18' min. • �! , ! t
2. Silt Fence Barrier - 3.05 ' �' 4`I` I' \`;1 �iI !I�O
MS -14: All applicable federal, state and local regulations pertaining to working AND AFTER EACH RUNOFFPRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR ' I = I4, j` "'--- I �i !O I- .. i \ 1 � III, \! \\
Silt fence sediment barriers with wire support shall be installed downslope of PP 9 P 9 9 ' `I ! I i \ li _ !i!
CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES �- L I 1 III 00 I i,'I, I - li �1 II li� Ii
areas with minimal grades to filter sediment -laden runoff from sheet flow as in or crossing live watercourses shall be met. L �� �_ I \O� I =I`'i t - _ l _ I I I J I
SHALL BE MADE IMMEDIATELY.O THE LANDSCAPE ARCHITECT FOR REVIEW AND DIVERSION ��- �- I I I ig 14 I1� - - ' ! I I � i I
indicated. Z �_ DIKE II �I!;1 `j IiI!,�O`
� - DIVERSION I _111 \11111 --I �11I !! 1' II �il!1'�
MS -15: The bed and banks of a watercourse shall be stabilized immediate) APPROVAL. �= �_ � �_ DIKE O,i; �_ - II \i�lll'�II',I�;O
y �� i �. I
�.�;\ � , ,\ I I ',`III \I , ..
3. Temporary Diversion Dike - 3.09 following after work in the watercourse is completed. �_ �_ \- �_ \ 11�ii '� 1 ililA
10. ALL FILL MATERIAL TO BE TAKEN FROM AN APPROVED, DESIGNATED BORROW AREA. �\ \ � - �_ _ _\ \\_ �� � mill 1N`MuM
Temporary diversion dikes shall be constructed in the locations indicated on L1.20. MS -16: Underground utility lines shall be installed in accordance with the standards in addition 11. ALL WASTE MATERIALS SHALL BE TAKEN TO AN APPROVED WASTE AREA. EARTH FILL �\ '� �_ \�\ - \� • �_ \ O- 6 M
4. R.O.W. Diversion - 3.11 to other applicable criteria. SHALL BE INERT MATERIALS ONLY FREE OF ROOTS, STUMPS, WOOD, RUBBISH, AND \ \ ���\- \ ��-��_ \\ ��\ O
A ridge of compacted soil or loose rock or gravel constructed across disturbed a. No more than 500 linear feet of trench shall be opened at one time. OTHER DEBRIS. 0-\ ��_ \ \ '- \ �_ \ ��� "Nwz%!�_ rights -of -way and similar sloping areas. \ \ \ \ �_ *��\\_ �\ \ \ \ \ _
b. Excavated material shall be placed on the uphill side of trenches. 12. BORROW OR WASTE AREAS ARE TO BE RECLAIMED WITHIN 7 DAYS OF COMPLETION // �_\ \ \ \ \ � // 0 \ \ \ \ TYPICAL EARTHEN STRUCTURE
5. Temporary Sediment Trap - 3.13 PER ZONING ORDINANCE SECTION 5.1.28.
ST-1 c. Effluent from dewatering operations shall be filtered or passed through xz_�' \ \ \ \ \ X// �\ // O \ \O -O- 0-- / -\- \_ Off- \-
A temporary, small ponding area shall be constructed at the location indicated on an approved sediment trapping device, or both, and discharged in a 13. ALL INERT MATERIALS SHALL BE TRANSPORTED INCOMPLIANCE WITH SECTION / / \\_ \ \ \\ / / �- \ \ \ \
the Ian. manner that does not adversely affect flowing streams or off site 13 -301 OF THE CODE OF ALBEMARLE. ( ** � \_ \\__ _
P I \ S I **
Calculations: property. COARSE AGGREGATE / % / - SOURCE: Va DSWC PLATE 3.11 -1
2 Acres 14. BORROW, FILL OR WASTE ACTIVITY INVOLVING INDUSTRIAL-TYPE POWER EQUIPMENT ( ( /, COARSE AGGREGATE /
Area Serving' 0 9 c es , ( ( \ /
Storage: at 134c /Acre = 123.3c d. Restabilization shall be accomplished in accordance with these regulations. SHALL BE LIMITED TO THE HOURS OF 7:OOAM TO 9:OOPM. EXCAVATED /
g Y Y � FILTER CLOTH EXCAVATED
\ FILTER CLOTH
Wet Storage: 26x26 - A of 676sf, D = 3.5 for V of 74.5cy ' AREA AREA /
Dry Storage: 28x28' = A of 784sf, D = 2.0' for V of 54.1 cy e. Applicable safety regulations shall be complied with. 15. BORROW, FILL OR WASTE ACTIVITY SHALL BE CONDUCTED IN A SAFE MANNER THAN
Weir Height = 3.0' MAINTAINS LATERAL SUPPORT, OR ORDER TO MINIMIZE ANY HAZARD TO PERSONS, -/
Weir Top Width = 2.5' MS -17: Where construction vehicle access routes intersect paved public roads, provisions PHYSICAL DAMAGE TO ADJACENT LAND AND IMPROVEMENTS, AND DAMAGE TO ANY
See L1.25 for construction details. shall be make to minimize the transport of sediment by vehicular tracking onto the PUBLIC STREET BECAUSE 0 SLIDES, SINKING, OR COLLAPSE. TEMPORARY DIVERSION DIKE
paved surface. Where sediment is transported onto a public road surface, the road ** COARSE AGGREGATE SHALL BE VDOT #3, #357 OR #5 ** COARSE AGGREGATE SHALL BE VDOT #3, #357 OR #5
ST-2 shall be cleaned thoroughly at the end of each day. Sediment shall be removed from 16. THE DEVELOPER SHALL RESERVE THE RIGHT TO INSTALL, MAINTAIN, REMOVE OR
A temporary, small ponding area shall be constructed at the location indicated on the roads by shoveling or sweeping and transported to a sediment control' disposal CONVERT TO PERMANENT STORMWATER MANAGEMENT FACILITIES WHERE APPLICABLE OUTLET (PERSPECTIVE VIEW) OUTLET (PERSPECTIVE VI EV1�
the plan. area. Street washing shall be allowed only after sediment is removed in this manner. ALL EROSION CONTROL MEASURES REQUIRED BY THIS PLAN REGARDLESS OF THE SALE
Calculations: OF ANY LOT, UNIT, BUILDING OR OTHER PORTION OF THE PROPERTY.
Area Serving: 0.15 Acres MS -18: All temporary erosion and sediment control measures shall be removed within 30 days 17. TEMPORARY STABILIZATION SHALL BE TEMPORARY SEEDING AND MULCHING. SOURCE: VA. DSWC PLATE. 3.13 -2 Compacted Soil
Storage: at 134cy /Acre = 20.1 cy after final site stabilization or after the temporary measures are no longer needed, SEEDING IS TO BE AT 75 LBS /ACRE, AND IN THE MONTHS OF SEPTEMBER TO FEBRUARY SOURCE: VA. DSWC PLATE. 3.13 -2
Wet Storage: 12x12' = A of 144sf, D = 3.0' for V of 13.6 cy unless otherwise authorized by the local authority having jurisdiction. Trapped TO CONSIST A 50/50 MIX OF ANNUAL RYEGRASS AND CEREAL WINTER RYE, OR IN MARCH
Dry Storage: 14x14' = A of 196sf, D = 1.5' for V of 9.4 cy sediment and the disturbed soil areas resulting from the disposition of temporary AND APRIL TO CONSIST OF ANNUAL RYE, OR MAY THROUGH AUGUST TO CONSIST OF 18" min.
Weir Height = 2.5' measures shall be permanently stabilized to prevent further erosion and sedimentation. GERMAN MILLET. STRAW MULCH IS TO BE APPLIED AT 80LBS /100SF. ALTERNATIVES ARE T YPI CAL T D A T l M E �' T - I �- -Flow
Weir Top Width = 2.5' SUBJECT TO APPROVED BY THE COUNTY EROSION CONTROL INSPECTOR. ® I ! �- i- ! ' I- ' ; I\ I ! -- I
See L1.25 for construction details.
TYPICAL OI�IENTA TI ®1� ®�' ! , I Ii I.\ ;! \=\ ! J 6il \ I Ii MS -19: Properties and waterways downstream from development sites shall be I ! 1 I -I -
protected from sediment deposition, erosion and damage due to increases in 18. PERMANENT STABILIZATION SHALL BE LIME AND FERTILIZER, PERMANENT SEEDING, %� _ ; �1 I _ I I I I I ! i I � I I i I I=
6. Soil Stabilization Blankets &Matting 3.36 v lume velocity nd peak flow rate of stormwater runoff for the stated AND MULCH. AGRICULTURAL GRADE LIMESTONE SHALL BE APPLIED AT 90LBS /1000SF, T l d EA �T, MENT , (SOIL S TA BILI ZA TI 1 D L� 1 �TI�E T�
Protective blankets shall be installed on steep areas and in the drainage Swale as ° P INCORPORATED INTO THE TOP 4 -6 INCHES OF SOIL. FERTILIZER SHALL BE APPLIED AT 4.5' min. - ---�I .
frequency storm of 24 -hour duration in accordance with the following (SOIL STABILIZATION INS TA L LA TI 1 !� CIS I TIC IA I I
noted on L -120.. 1000LBS /ACRE AND CONSIST OF A 10 -20 -10 NUTRIENT MIX. PERMANENT SEEDING SHALL
standards and criteria: BE APPLIED AT 180LBS /ACRE AND CONSIST OF 95% KENTUCKY 31 OR TALL FESCUE AND
0 -5% PERENNIAL RYEGRASS OR KENTUCKY BLUEGRASS. STRAW MULCH IS TO BE
VEGETATIVE PRACTICES a. Concentrated stormwater runoff leaving a development site shall be APPLIED AT80LBS /100SF. ALTERNATIVES ARE SUBJECT TO APPROVED BY THE COUNTY
discharged directly into an adequate natural or man -made receiving EROSION CONTROL SLOP OW �. ANCHOR SLOT
1. Topsoilin (Temporary Stockpile) - 3.30 channel, pipe or storm sewer system. For those sites where runoff is INSPECTOR. NOTES
Topsoil shall be stripped from areas to be graded and stockpiled for later discharged into a pipe or pipe system, downstream stability analyses at
spreading. Stockpile locations shall be located on site and shall be stabilized with the outfall of the pipe or pipe system shall be performed. 19. MAINTENANCE: ALL MEASURES ARE TO BE INSPECTED WEEKLY AND AFTER EACH - _ APPROXIMATELY 200 STAPLES REQUIRED
P P P p y p =i_ -!; ON SHALLOW SLOPES, STRIPS OF PER 100 SQ. YDS. OF MATERIAL ROLL.
temporary silt fence and vegetation. RAINFALL. ANY DAMAGE OR CLOGGING TO STRUCTURAL MEASURES IS TO BE REPAIR -i li -i I I, II- _I NETTING PROTECTIVE COVERINGS ANCHOR SLOTS, JUNCTION SLOTS &
_III= 1! CHECK SLOTS TO BE BURIED 6" TO 12 ".
2. Temporary Seeding - 3.31 b. Adequacy of all channels and pipes shall be verified in the IMMEDIATELY. SILT TRAPS ARE TO BE CLEANED WHEN 50% OF THE WET STORAGE !:I ,(_III_; f, MAY BE APPLIED ACROSS SOURCE: VA. DSWC PLATE 3.09 -1
following manner: VOLUME IS FILLED WITH SEDIMENT. ALL SEEDED AREAS ARE TO BE RESEEDED WHEN "-I I!, �;I II THE SLOPE.
All denuded areas which will be left dormant for more than 30 days shall be seeded , _I I i-
NECESSARY TO ACHIEVE A GOOD STAND OF GRASS. SILT FENCE AND DIVERSION DYKES = III -_! i i_ 12" MAX. 4:1 OR FLATTER
with fast germinating temporary vegetation immediately following grading of those WHICH ARE COLLECTING SEDIMENT TO HALF THEIR HEIGHT MUST BE CLEANED AND "' =1 ,I i 1 =_ 6" MAX. STEEPER THAN 4:1
areas. Selection of the seed mixture shall be selected by the landscape architect. (1) The applicant shall demonstrate that the total drainage areato the , I I - I
REPAIRED IMMEDIATELY. III -III III - -= I -II!= JUNCTION SLOT
point of analysis within the channel is one hundred times greater I---I , Ti =1I! -'
3. Permanent Seeding .32 than the contributing drainage area of the project in question. EDGE AND END JOINTS I I !
9- 9 g P l q
Immediately following finish grading, permanent vegetation shall be applied in 20. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE BERM CHECK SLOT * TO BE SNUGLY ABUTTED
REMOVED WITHIN 30 DAYS OF FINAL SITE STABILIZATION, WHEN MEASURES ARE NO ! =1 =tI!r
accordance with the planting plan for the site. (2) Natural channels shall be analyzed b the use of a two-year
1= I11 =!! I-!! -_ (JUTE MESH WILL HAVE I I Paved construction entrance for erosion control plans
Y Y Y LONGER NEEDED, SUBJECT TO APPROVAL BY THE COUNTY EROSION CONTROL WHERE THERE IS A BERM AT THE TOP OF THE SLOPE, _I11= III =111- III__!, TERMINAL FOLD STAPLED LAP JOINT IN I I
__ -- - - -- -- - -- - - -- -- - - -- -- - -
frequency storm to verify that stormwater will not overtop channel BRING THE MATERIAL OVER THE BERM AND ANCHOR IT I I =I I -li F=l I1 =I I I=! : - I' - - -- _ w_ _ - � . _ - ___ -I #(
4. Trees, Shrubs, Vines and Ground Covers - 3.37 INSPECTOR. BEHIND THE BERM. I =!I I- 111 =111=111 =1! ( =1 - LIEU OF EDGE JOINT) z, zl
banks nor cause erosion of channel bed or banks. = y1 „ -111 ; l i 11I FE1I I=z I- 111 =!'. t , LAP JOINT 2" MIN. ; I I I `' ' '
Immediate) following finish grading, vegetation shall be applied in accordance with
Y 9 9 9, 9 PP ! 1 -!; I -I1 I=1l1=1 1 =1;1=1! 1=111 -1! 1=1111_ 1 F it , ; . >� -., � .. I'
21. THIS PLAN SHALL BE VOID IF THE OWNER DOES NOT OBTAIN A PERMIT WITHIN 1 -1I I -li 1- 111=111= 111 -111=1 =1 I -!' (JUTE MESH ONLY) r -. I,i' i' `I
the planting plan for the site. (3) All previously constructed man -made channels shall be analyzed by the '!1.111= 111 =1! L= III -1i' TAMP FIRMLY "I , �" - ! � ' p 1 1,
YEAR OF THE DATE OF APPROVAL. (WATER PROTECTION ORDINANCE SECTION 17- 204G.) -,! _ 1 ,. i 13 7, €± � 1 ,� ��'f, ! . i1
III -1 I- ! i; a _,z .._.> �,._.., ..r_ I i
use of a ten -year frequency storm to verify that stormwater will not ANCHOR SLOT I I 1 O , `i
5' MAX. 4:1 OR FLATTER P ti; .4 m~ .> Imo.
4. Dust Control - 3.39 overtop its banks and by the use of a two -year storm to demonstrate that 22. PERMANENT VEGETATION SHALL BE INSTALLED ON ALL DENUDED AREAS WITHIN STEEP 1 ,; 111 ;
3' MAX. STEEPER THAN 4:1 I I �..�.. -.. d 311 i
_ _ o SLOPE
- - -H
f where on site and off site SIC -�il�! -u1 ! : -,A s� .- rt _. ,.v.:,
In areas subject to surface and air movement o dust e e stormwater will not cause erosion of channel bed or banks. NINE 9 MONTHS AFTER THE DATE THE LAND DISTURBING ACTIVITY COMMENCED. ! _ _ 1 1 ,. ��, �� "= � :� � t` 'i ?�
damage is likely to occur if preventative measures are not taken dust control O I°
=1 I� I �1I I-I I I- ' `
(WATER PROTECTION ORDNANCE SECTION 17 -2076) ice! I I R l ! `'
measures should be employed. (4) Pipes and storm sewer systems shall be analyzed by the use of a - - F - L2 . -
i- ,- i'�IiI IiCIIC- II�II�II -I!� 16" TO 12" � .�...,,,_ _ � -_. _. .w.� .�, Y�� ` -.,� °' � L., II
ten -year frequency storm to verify that stormwater will be contained ON STEEP SLOPES, APPLY li�ii� III II�Ii�1.. a1� I i I �F t � r i
within the pipe Or system. �iil -1 ! li I!- 1iCIIC1I -III I 1 i
PROTECTIVE COVERING PARALLEL -I!r =1!� II=II�II�I 11, . I I I I I , I II
PP Y I ! I! `iii =!I; !I -1� I i
MANAGEMENT STRATEGIES _,I __II __!I! -, TQ THE DIRECTION of FLOW - Y. , _ 01___, .1 , ,i
I!�iIL=1lI -!II -i AND ANCHOR SECURELY. i I I 1 la
C. If existing natural receiving channels or previously constructed man -made -Ili I I i I 1 ! I ; I ,l
1. Construction shall be sequenced so that grading operations can begin and channels or pipes are not adequate, the applicant shall: I' = =- - 'Ili -II- CHECK SLOT I I t,,: (" i _ Fr
II. I II St ! 4 iI
end as quickly as possible. The bulk of the area to be graded, north and west I
=II ! I s
(1) Improve the channels to a condition where a ten -year frequency storm will ' -III I -i -I -1 i =! i =1 I- - r1 1 1 7 . _ __ 1 I i, II I ;
of the studio down to Ivy Creek Drive shall be take place during a single _ ' =i l �'I! ! 11-II 111! =!I II TAMP CHECK SLOT I I I I I I I I I I� '+�. `: !
not overtop the banks and a two-year frequency storm will not cause I -1I! =! I t -I -I I I- 111 =n._ FIRMLY . I � :, i I ' { h
expedited period timed to provide for ideal seed germination in the fall or erosion to the channel bed or banks; or - -
following spring. I
! ro X11
7 VAR. VAR. .'�;
z'
II'` .L ��1� ' i' "i. ��� �I
Y - PLAN V f E W i S it a,
(2) Improve the pipe or pipe system to a condition where the ten-year 6" To 12 "''"� ' b ` "" 1 `'
4 �L i .mss 1 y � ° . a.
i in gravel rive. At the end of - - - - fi. ,I I I
2. The construction entrance shall utilize the ex st d fre uenc storm is contained within the a urtenances; or i ufi11tfI �_I, � ;I�i ll- s� 1 q Y PP BRING MATERIAL DOWN TO A LEVEL AREA BEFORE = ,� i _ 1 1 _ i, !I ,; L work in the area north and west of the studio the drive /entrace shall be STAPLING D I Q G R A
CONSTRUCTION O F A SILT FENCE TERMINATING THE INSTALLATION. TURN THE END - I��I II1i�11.1I I _ I!�I!h�1=y_I_ it 1. -11 1 -ICI : I; - 11Fa;1 I: a!k ��
-
r
removed including the culvert and graded to create a Swale adjacent to Ivy 3 Develo a site desi n that will not cause the pre - develo -development peak runoff UNDER 4" AND STAPLE AT 12" INTERVALS. . �� ' I'� I' I
O P 9 P P .. s" i1! ) : �I
n appropriate to th
e season.
-- _�._
r k Drive and seeded as I
CHECK SLOTS AT MIN. �-_ -- -- - _=-� � � - ;� `'
C ee r e rate from a two year Storm t0 Increase when runoff OutfallS into a natura � � �• ���� � � � � .�:: � . �`;` 1 Z" STAPLE FORMED FROM N0.1 1 STEEL WIRE. !` i °�• � •� � -�- �• •� '� - i; 1 '
(WITH WIRE SUPPORT :
.. � . . i I I ,
. ; :_� I. 50' C -C INTERVALS; I_
channel or will not cause the pre-development eak runoff rate from a 8 STAPLE MIN. LENGTH FOR SANDY SOIL. ;: '1!x� "" ° 3,1 it 1
P „ NOT REQ.'D WITH ALLv, ..
3. Sediment trapping measures shall be installed as a first step in land disturbing ten-year storm to increase when runoff outfalls into aman -made channel. .... _. _.,_ . -v .
activities and shall be seeded and mulched Immediate) following Installation. 1.sErPOSrsANDExcavaTEAa ^xa" 2.sTAPLEwIREFENCiNGTOTHEPOSrs. 6 STAPLE MIN. LENGTH FOR OTHER SOIL. NOT i ;I ��,�: s;
TRENCH UPSLOPE ALONG THE LINE DITCH FLOW I (i ?'
(4) Provide a combination of channel improvement, stormwater JUNCTION SLOT
OF POSTS. TAM P t 1 ii
4. Temporary seeding or other stabilization shall follow immediately after grading detention /retention or other measures which is satisfactory to the plan FIRMLY TERMINAL FOLD i . " iI
` IN DITCHES, APPLY PROTECTIVE COVERING � I '
to an areas to remain undisturbed for more than 7 days. approving authority to prevent downstream erosion. TAMP FIRMLY 11 ; it
Y Y PP 9 tY P
PARALLEL TO THE DIRECTION OF FLOW. !, ; s Is,
�I USE CHECK SLOTS AS REQUIRED. AVOID `'
I -- - -- Y,
5. Trenching or utilities and drainage shall be Isolated from downstream d. The a hcant shall rovide evidence of ermission to make the � r r JOINING MATERIAL IN THE CENTER OF ,I , I. i
9 PP P P J ' / 1} -_ _ THE DITCH IF AT ALL POSSIBLE. _ 1 ; t� - 1 i
conveyances In order to minimize perimeter controls. improvements. I I I -I -_ L= u. -1iI -III -- - x, .. . ,._,- _ .���� r �' ji
1 __
I / L`. ! 1- III -_. = _ = _ T - - _ =1I �=1I -I �I I c �?y w ; ;"w_ f
E: I -1;� 1-11 �.I J �y a x i' it
I ,� \ 1 -i ! 1 =! I 11 l ial i -11 -i' --1 i t =! (_ i! 0-1i I r I I I I =111 i:' . f
-!! -u.
I y' -II- - - _ f - -i -! h171 5
maintained until h are no _ _ • T _ . - - :,.. M . }
All erosion and sediment control practices shall be manta t they e tics I �; _ _ _� _II: _ _ II
6 p Y e. All h drolo is analyses shall be based on the existing watershed characteris j 1 _ __ . = IC ICI, 01 7!1 !1-, _; ,1-.,,ht - - _ „� _ -_- w.,;,.,.rc ;
hydrologic -� �( ( O � III -_ -li -! _ r-II O - ,F�!_I ! ±- 1�I�_I� I III -I�;_ �, , ti� ,d;.., ; ',
11i 1I l 11_1�II =11 - II,11; =1 =11!= Ili =11 r *" t r..
longer required to comply with the contract documents or state law. and the ultimate development condition of the subject project. - I I O "I � \ -- l i.I =111= =I I II_II!=1 I= \ _ _ _ _ - ii _ _ _ _ I „; R
q p P 1 \ l (� -I 11 =__ _I I i -1 1 -' 100FT -! 1 -14 -, : ��
;\ l I ` 11 i I I i �� \ �r 1 I' I' i -I i l- - -1 14- l 1- I
_�_II- ICI' -1- I -n -n I_ { i
\- 111 - \� i _ \l L I -I, i -1 I_i ! 1 -1 I_III =1 -III -I 1 =! I i -1 !' 1 M.
f. If the applicant chooses an option that includes stormwater detention/ retention, �' / �' - 1,1 -I I' -1 i 1- 111 -I f_1 l i -;,l i -,111 ' 1I L -
PERMANENT STABILIZATION PP p �' �� I \ '- 1I - I ,, Ii
he shall obtain approval from the locality of a plan for maintenance of the _/ f � \ \ !! T r_ £r.. Y:; n a _ r.
,: - ~= �;
detention facilities. The plan shall set forth the maintenance requirements of the I= ,'1'1 - I1 = SOURCE: ADAPTED FROM LUDLOW PRODUCTS BROCHURE PLATE: 3.36 -1 • V 0 BRIDGE STANDARDS PLATE: 3.36 -2 i : _ ,,
dwith permanent seeding, t !!1 ICI I II 5 SOURCE. DOT ROAD AND B E STAN ! .y,. ;,.- mu
All areas disturbed by construction shall be stabilize p g, _ , ^ , � ��y, ��w ���t "x ;.
facility and the person responsible for performing the maintenance. �� =I I 4P511111 1 \ i „v .,e3 , .. .,. , ti ,,
sodding, or planting and mulching as indicated by the site planting plan immediately I I I!,II !III !` ;�ti•. it
�'I NATIVE POND
Spec. 2 ` _ r: is
following finish grading. Seeding shall be In accordance with Std. & p 3 3 FLOW I `'� ' 1`' ''� '` _: ,�
d. The applicant shall provide evidence Of permission to make the _� ll I I �! ii l l ! _� I I + � .' � I I it
PERMANENT SEEDING. Seed type shall be as specified by the landscape architect. -�
improvements. a^ fi �• 11
Mulch (straw or fiber) shall be used on all seeded surfaces. In all seeding operations ;I , ". - � ? �: ri Albemarle County, Virginia
1- ° i
seed, fertilizer and lime shall be applied prior to mulching. e. All hydrologic analyses shall be based on the existing watershed characteristics )` �� '
3. ATTACH THE FILTER FABRIC TO THE WIRE 4. BACKFILL AND COMPACT THE I j��_ _ ,i
and the ultimate development condition of the subject project. I ; _ _ _�__ �r __�_ I li
FENCE AND EXTEND IT INTO THE TRENCH. EXCAVATED SOIL. I ,
MAINTENANCE _ __ ._ . M1 _ _ .._ -, • ....__ .... - __..._ ...� _ . _ _. � SUBMISSIONS/ REVISIONS
f. If the applicant chooses an option that includes stormwater detention/ retention, .�
1. All erosion and sediment control measures shall be checked daily and after each run -off he shall obtain approval from the locality of a plan for maintenance of the -
producing rainfall. Any necessary repairs or cleanup to maintain the effectiveness of the detention facilities. The plan shall set forth the maintenance requirements of the 8/06/13 SITE PLAN SET
erosion control devices shall be made immediately. facility and the person responsible for performing the maintenance.; i 9/27/13 REVISED SITE PLAN SET
The following items shall be checked in particular: --- ",
g. Increased volumes of sheet flows that may cause erosion or sedimentation on O/ _ 10/17/13 REVISED SITE PLAN SET
2. The silt fence barrier shall be checked for undermining or deterioration of the adjacent property shall be diverted to a stable outlet, adequate channel or detention i - - - -_ �O STONE CONSTRUCTION E N T RAN C E
fabric. Sediment shall be removed when the level of sediment deposition facility. ���`� �� I I I� -- I I I
reaches half way o the to of the barrier. = I i
Y P
h. In applying these stormwater management criteria, individual lots in a residential _ - % �\ �
0 70' MIN. EXISTING
3. The seeding areas shall be checked to ensure that a good stand is subdivision development shall not be considered to be separate development I III- FLOW /' \ III-
maintained. Areas shall be fertilized (organic only) and re- seeded as needed. projects. Instead, the residential subdivision development, as a whole, shall be - H , I - A 3 PAVEMENT
considered to be a single development project. Hydrologic parameters that reflect - I (1011 IO --1�! �\ !l _ v v 5.1 1
the ultimate subdivision development shall be used in all engineering calculations. \ I II - -
STORM WATER RUNOFF 21 �
I I -1 ! I' .. : -- 11! 11
- 111=111 ! I !-1 ' !- ill- v. ,
EXTENSION OF FABRIC AND WIRE INTO THE TRENCH.
i. Proposed commercial or industrial subdivisions shall apply these stormwater
Stormwater runoff for the site continues to drain onto the surround forest and grass areas. DRIP LINE FILTER CLOTH s" MIN. A MOUNTABLE BERM
management criteria to the development as a whole. Hydrologic parameters that �(� (OPTIONAL)
The overall square footage of impermeable surfaces will be reduced by removal of asphalt reflect the ultimate subdivision development shall be used in all engineering FILTER FABRIC t� EXISTING TREE SEE L1.20 FOR LAYOUT OF FENCE
paving and removal of portions of the residential structure. Runoff from the structure will be calculations. 1 ` /' 1 ' \� SIDE ELEVATI O N
diverted into rainwater cisterns. The surrounding forest and grass areas will be improved to \' /` \\/
allow for more infiltration through soil remediation and establishment of native meadow ; =,--`� - , \O O EXISTING GROUND
species. The proposed design does not significantly change the existing larger scale \IIII If WIRE 1Ii I I i /\ 2" POST
1 70' MIN
P P P � -1 i � -;�i Imo- � � �) �� \
drainage patterns. Overall result will be a net reduction in stormwater runoff and improved 0-_ )
GENERAL EROSION & SEDIMENT CONTROL NOTES - -I'"� �'I'I� - \
water quality. \,' 7
SOURCE: Adapted from Installation of Straw and Fabric Filter Barriers for Sediment Control, PLATE. 3.05 -1 \� / TREE PROTECTION FENCING B WASHRACK 10' MIN.
1. UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION Sherwood & Wyant '� 1
EROSION CONTROL QUANTITIES AND SEDIMENT CONTROL PRACTICES WILL BE CONSTRUCTED AND MAINTAINED J�O _O_ (OPTIONAL) ` \
_ --� -, !� Ili. -! ! �, `
ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA _\Jf'O =1 !=i , !,-
EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS VR \7\ - \\
ITEM UNIT QUANTITY 625 -02 -00 EROSION AND SEDIMENT CONTROL REGULATIONS. I ! Ii!- * \\ \O 10' Mw.
MINIMUM TOP WIDTH �� 1A\ 12' MIN. I' EXISTING
CONSTRUCTION ENTRANCE EA 1 I 4 NOTES:J PAVEMENT
2. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR ` �' ` I'll
SILT FENCE LF 2,110 TO OR AS THE FIRST STEP IN CLEARING. IF DURING CONSTRUCTION, ADDITIONAL REQUIRED FOR SEDIMENT �\O 1. FENCING TO REMAIN I N PLACE UNTIL I i r .Ll1� \\ 5 6` 6 5C KEY MAP
TREE PROTECTION LF 2,800 EROSION CONTROL DEVICES ARE FOUND NECESSARY THEY SHALL BE INSTALLED \\ -
l \O CONSTRUCTION HAS BEEN COMPLETED OR r � NTH
TEMPORARY SEDIMENT TRAP EA 2 AS DIRECTED BY THE LANDSCAPE ARCHITECT. TRAP EMBANKMENTS - , ;' 1, I\ VDOT #1 I �- � POSITIVE DRAINAGE 10' MIN. �!� of
/ AS DIRECTED BY LANDSCAPE ARCHITECT. COURSE AGGREGATE TO SEDIMENT I O� T't
3. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE B TRAPPING DEVICE W �tr
MAINTAINED ON THE SITE AT ALL TIMES. ACCORDING TO HEIGHT O F I ) O� r
* MUST EXTEND FULL WIDTH U WILLIAM M. WFIIT R
APPLICABLE VIRGINIA MINIMUM STANDARDS 4. NO DISTURBED AREA WILL BE DENUDED FOR MORE THAN 30 CALENDAR DAYS. EMBANKMENT 2. WITHIN TREE PROTECTION ZONE (TPZ) THERE OPERATI SS AND EGRESS PLAN VIEW Lic. o, 4 0 70
(FEET) MUST BE
OPERATION
MS -1: Permanent soil stabilization shall be applied to denuded areas within seven days after 5. ALL TEMPORARY EARTH BERMS, DIVERSIONS, AND SOIL STOCKPILES ARE TO BE -!--
final grade is reached on any portion of the site. Temporary soil stabilization shall be - NO ALTERATION OR DISTURBANCE TO 12' MIN. '9 (D -i ? , - --
MULCHED AND SEEDED FOR VEGETATIVE COVER IMMEDIATELY AFTER GRADING. 1SC
applied within seven days to denuded areas that may not be at final grade but will STRAW MULCH IS REQUIRED. 1 -') EXISTING GRADE OF ANY KIND; i �c-1; r..� I '�'P
remain dormant (undisturbed) for longer than 30 days. Permanent stabilization shall be ' ' , u` � ;\\� `� \o X �-�) r O r 3.. MIN. ( - NO CHANGES TO THE GRADE BY ADDING O o� O OHO 000 o0O o 00 - c0 00 � SEAL
applied to areas that are to be left dormant for more than one year. i i ! �� ,� . �
6. ANY DISTURBED AREA NOT PAVED, SODDED, OR BUILT UPON BY NOVEMBER 1ST, � W - l f ( I = !
IS TO BE SEEDED ON THAT DATE WITH OATS OR WINTER WHEAT AND MULCHED H O W \ ! I I ��
H O � I I _l I \I l' 1 !_ v � �? �� � v��: 0 O' v � `U � v � �, � 3" MIN.
/l FILL, EXCAVATING OR SCRAPING; - -' O 0 PROJECT NUMBER: 1303
WITH STRAW MULCH. MODIFY AS APPLICABLE DEPENDING ON PROPOSED TIME OF / r ' / - NO STORAGE OF CONSTRUCTION MATERIALS 77'"'�� -
MS -2: Temporary soil stockpiles shall be stabilized or protected with sediment trapping 1.5 0.5 2.0 --
CONSTRUCTION. \ I FILTER CLOTH DATE:
measures. Provide temporary protection and permanent stabilization of all soil 2.0 1.0 2.0 L\ OR EQUIPMENT; SECTION A -A October 17, 2013
stockpiles on site as well as soil transported from the project site. 2.5 1.5 2.5
7. ALL DISTURBED AREAS SHALL DRAIN TO APPROVED SEDIMENT CONTROL 3.0 2.0 2.5 1 `� 1 O EXISTING TREE
MEASURES AT ALL TIMES DURING LAND- DISTURBING ACTIVITIES AND DURING SITE " - NO STORAGE OF SOIL, CONSTRUCTION 6' -7^ I SCALE: N/A
MS -3: A permanent vegetative cover shall be established on denuded areas not otherwise DEVELOPMENT. C• 3.5 `2.5 3.0
permanently stabilized. Permanent vegetation shall not be considered established H 0 H 4.0 3.0 3.0 0 WASTE OR DEBRIS;
P Y g Off) O.` O DRAWING TITLE:
4.5 35 4.0
until a ground cover is achieved that in the opinion of the landscape architect, is 8. THE LANDSCAPE,ARCHITECT MUST ATTEND THE PRE - CONSTRUCTION f TREE PROTECTION - NO DISPOSAL OF ANY LIQUIDS E.G. %0 � \
F REVIEW AN APPROVE ALL MEASURE BEFORE CONSTRUCTION 5.0 4.0 4.5-
uniform, mature enough to survive and will inhibit erosion. CONFERENCE AND D - O 01 O 1 Off% obi 00-
\! Ifl_,II FENCING CONCRETE SLEUTH, GAS, OIL, PAINT, AND '3 - E&SC Notes & Details
BEGINS. THE LANDSCAPE ARCHITECT WILL MAKE A CONTINUING REVIEW AND I- =i I \' O 11, i1 I__ 0 _ _\ ( \O\O
o EXCAVATED AREAS ' O X01 O <, < _, _,T - - J 00 O '\.
MS -4: Sediment basins and traps, perimeter dikes, sediment barriers and other measures EVALUATION OF THE METHODS AND EFFECTIVENESS OF THE E.C. PLAN. I I I; - ' - NO MOVEMENT OF VEHICLES, EQUIPMENT \.\.\ \\\\�\\.,C1\ \\ � \���) O 1
intended to trap ediment shall be constructed as a first step in an land-disturbing AX. DEPTH = 4' 6 MAX. O O 0 O O O O O O�J a
P P y g ORIGINAL o ROTECTIO OR PEDESTRIANS. o) o 0 0 0 0 0 0 \\ O oO
activity and shall be made functional before upslope land disturbance or timbering 9. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN GROUND co ONE P r (N'��`'�(``" `
takes place. INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO, OFF -SITE BORROW ELEV. GRADE SHEET NUMBER:
OR WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION REINFORCED CONCRETE DRAIN SPACE
MS -5: Stabilization measures shall be applied to earthen structures such as dams, dikes and CONTROL PLAN TO THE LANDSCAPE ARCHITECT FOR REVIEW AND APPROVAL. 3. TREE PROTECTION ZONES MUST BE INDICATED SECTION B -B
diversions immediately after installation. A WITH SIGNS WHICH READ "TREE PROTECTION
I SOURCE: VA. DSWC PLATE. 3.13 -1 Ll ■
I ZONE. THIS FENCE SHALL NOT BE REMOVED."
SOURCE: ADAPTED from 1983 Maryland Standards for Soil erosion and Sediment Control, and Va.135WC3.02 -1 I
/ I
I
I
I
i
I
I
I
I
1
I
I
1
i
i
I
I
r
I
r
1
I
I
I
WI
zl
I
wl
al
�-r
r
1
I
i
1
I
1
I
I
i
I
1
1
1
1
1
I
1
% Q W.M Whitaker & Associates
_ >- landscape architects
/ / , LU
-/ --
—575— % '- �- / / -� // / / / - -585 �'I P— 60X`2153
IrChattanooga, Tennessee 37409
� ,-- _-____ ____ �_ _ — _y / • I R� � � m ph:(434) 825 -0744 e:wmwhitaker @wmwhitakerla.com
--'- 590 �- •
-. _.-- -- / 590 ._ -- _ • ------ --- / • / / \ / / \ ` �
D \ I 1 \
Ir -- -- ------ - - - - -- -- O___ \_ jai
/ / �_ - J �� / /55A • ------- - - - - - - - - - -ses - \ • �/ - __
/ / �5�0 / �_ _.--- --- _. I � � 0i / \ / f' \ 1 / I I I I / - ` � -i i \�i / \ - --' - r s � • �\ � ((, � / \
/ / -� / _-'� � -- -- �� 6 - � _� �� � I �--, I I I , ® / `� �- • � � ` D R t'KC � 00 -- \\ \\ { X jI / I I c
—590 - -- ` • \ • \ \ `� \ \ \\ \
PARK
/ / / /'— / / / �- / '' __ -' �_ -- --� � r �k/ h / /U / 5y3" -\ � \ 'I ' I � I I QI I QI \ \ \ ' \ •I \ / / \\ ` \\� 1\ \ \ � • � � \ C' \ / � \� \
/ / / / �- ' / / "� �' _-- /�� •■( / gam \ 1 � \ \ i I j �I I �I � \ , ' / \ \ -� _/ / \ `�\ \�� \ \ \ \ f •'- � • \
10 i�i II `I ' \ \ \ — •� `�\ ��� > • \ \ \ w I' \ \. \ \\
LOD ^ LIM � � / i / IL
i � j '� j \ � —� \ \ � \ `� �o � \- \ —i \ \ � / l Li • \ � �
OD 1 / if
\ Iwl I I \ . , - - - - -- ---- - - - - -- -- - - - - - - -- -------- !------ - - /- --
LAWN . L__J \ \ — / \ ` WATER LINE CORRIDO I f- r� - -- - - - -- -
/ \
STUDIO DRIVE _ + -- - \
I
/ V\
PARK • % •�
PAVILION °o
TERRACE
/ % c \• i / • i 1
MEADOW �, I ° — o ° ° o / mil PARK \ •
TERRACE'
PARK
� i d
FIRE PIT ! \ r DRIVE �\ / • ) // \ I / /'• I�
if /I
594-_ / \5-� I f I \ / l • \ I
i
MEADOW o / l' l if
•
1013
� / i r ! 1 � • 1 7 , ` l 11 /' tf l (.
LLJ
590 ----
OI \ \v // / Av �/ // • •/ l 11 l i� I `� /+i i % ��' f/r
MEADOW PARK
( / /
LAWN \ \ \ \• \\ / � � r � � ,% � ! / / /j % j l /l
i
\ MOWN PATH \ - — — _— \ \I / \ / ' /' +
+
_587—
x / / / / v MEADOW v — _ v \ \ v — • i V / \ ' / / / /% / j/ ;� // /�/
DRIVE ` 41h
\ x x
i
O /
�y � a0 a SOLAR ARRAY CIO
\ \ \ 5a • (
60�
\ \ \ — — / • —
G. T \ MEADOW\
MEADOW
\ q / NATIVE POND
Albemarle County, Virginia
MOWN PATH
� � \ �--- --- — s ' v • / \ `� -___ __-_ -- ` \ \ \ \ \ `� � MEADOW ; _ ,-- — � l l � r: % /
� / / EASEMENTS
/ SUBMISSIONS/ REVISIONS
/ / /' 8/06/13 SITE PLAN SET
—Z, / \ \ \ \ \ \ ` _— / / / / / / I /' / %/ 9/27/13 REVISED SITE PLAN SET
i / �� / . / l' j/ 10/17/13 REVISED SITE PLAN SET
,—t00 �/ j / �
EXISTING GAZEBO
\ \ \ \ \ EXISTING BUDDHIST.STUPA
o � \
\ MOWN PATH
oci
KEY MAP
OP
WILLIAM M.
—550— / Lic. NojJ 40600 77
SEAL
PROJECT NUMBER: 1303
55j i
DATE: October 17, 2013
SCALE: ill- 251 -011
DRAWING E:
Site Plan
SHEET NUMBER:
/
/ _ ■