Loading...
HomeMy WebLinkAboutSDP202300003 Plan - Submittal (First) 2023-01-178 1 7 1 6 DOMINION ENERGY VIRGINIA SITE PREPARATION PERFORMANCE SPECIFICATIONS 5 4 1 2 RESPONSIBLE LAND DISTURBER DESIGNATION 2 1 PREFACE IT IS THE INTENT OF THESE SPECIFICATIONS TO HAVE A COMPLETELY PREPARED SITE FOR THE CONSTRUCTION OF AN ELECTRICAL FACILITY AT THE COMPLETION OF THE "WORK" AS INDICATED ON THE DRAWINGS, SPECIFICATIONS, OR OTHER DOCUMENTS PROVIDED. THE REGULATIONS OF ALL LOCAL, STATE, OR FEDERAL GOVERNMENTAL BODIES HAVING JURISDICTION OVER THE WORKING AREAS SHALL BE OBSERVED AT ALL TIMES. D ANY SPECIFICATIONS OR INSTRUCTIONS APPEARING ON THE DRAWINGS SHALL HAVE PRECEDENCE OVER THE WRITTEN SPECIFICATIONS WHICH APPEAR HEREIN. IN THE EVENT THAT A DISCREPANCY OR OMISSION HAS OCCURRED, DOMINION ENERGY VIRGINIA SHALL BE CONSULTED FOR RESOLUTIONS. ALL "WORK" SHALL BE PERFORMED IN A MANNER CONSISTENT WITH THE BEST PRACTICES OF THE TRADES INVOLVED. ALL "WORK" SHALL BE PERFORMED WITHIN THE LIMITS OF THE PROPERTY / RIGHTS -OF -WAY SHOWN ON THE DRAWINGS. THE CONTRACTOR WILL RECOGNIZE AND ABIDE BY ALL TERMS AND CONDITIONS OF PERMITS, EASEMENTS, AND AGREEMENTS RELATING TO THE PROJECT. CLEARING AND GRUBBING LIMITS FOR CLEARING AND/OR GRUBBING SHALL BE AS DEFINED ON THE DRAWINGS. CLEARING SHALL CONSIST OF REMOVAL AND DISPOSAL OF BRUSH, DOWNED TIMBER, LOGS, STANDING TREES AND SNAGS, OTHER GROWTH AND ANY ITEMS THAT WOULD INTERFERE WITH CONSTRUCTION OPERATIONS. GRUBBING SHALL CONSIST OF REMOVAL AND DISPOSAL OF STUMPS, BURIED LOGS, ROOTS GREATER THAN 1/2 " DIAMETER, AND ANY OTHER ORGANIC MATERIAL BELOW THE GROUND SURFACE. ALL CLEARED AREAS WILL BE GRUBBED UNLESS OTHERWISE NOTED. DISPOSAL OF CLEARED/GRUBBED MATERIAL BY BURNING SHALL ONLY BE USED WHEN WRITTEN APPROVAL IS OBTAINED FROM LOCAL AUTHORITIES AND DOMINION ENERGY VIRGINIA. OTHERWISE, DISPOSAL SHALL BE OUTSIDE THE LIMITS OF DOMINION ENERGY VIRGINIA CONTROLLED LAND. TOPSOIL ALL TOPSOIL AND SURFACE SOILS CONTAINING ORGANIC MATERIAL SHALL BE REMOVED FROM THE GRUBBED AREA. TOPSOIL SHALL BE STOCKPILED FOR FUTURE USE IN APPROVED LOCATIONS UNLESS OTHERWISE SHOWN ON THE DRAWINGS. TOPSOIL SHALL NOT BE USED AS, OR MIXED WITH, FILL MATERIAL IN THE CONSTRUCTION OF EARTH EMBANKMENTS UNLESS OTHERWISE SHOWN ON THE DRAWINGS. TOPSOIL MATERIAL USED AS A SURFACE DRESSING SHALL BE REASONABLY FREE OF CINDERS, DEBRIS, AND STONES. UNSUITABLE AND EXCESS TOPSOIL MATERIAL SHALL BE DISPOSED OFFSITE. C EARTHWORK EXCAVATION: EXCAVATION SHALL BE ACCOMPLISHED BY CUTTING ACCURATELY TO THE CROSS SECTIONS, GRADES, AND ELEVATIONS SHOWN ON THE DRAWINGS. SOFT, UNSTABLE, OR OTHERWISE UNSATISFACTORY MATERIALS ENCOUNTERED AT THE REQUIRED GRADES SHALL BE REMOVED AS DIRECTED AND REPLACED WITH APPROVED, PROPERLY COMPACTED MATERIAL. COMMON EXCAVATION SHALL INCLUDE ALL MATERIAL WHICH CAN BE REMOVED BY COMMON EARTH EXCAVATION EQUIPMENT, OTHER THAN SOLID ROCK OR BOULDERS AND DETACHED PIECES OF ROCK, EACH EXCEEDING 2 CUBIC YARDS IN VOLUME. ROCK EXCAVATION SHALL BE MATERIAL WHICH REQUIRES THE USE OF PNEUMATIC HAMMERS AND/OR EXPLOSIVES FOR REMOVAL. SITE PREPARATION: IF EARTHWORK OPERATIONS ARE PERFORMED DURING WET SEASONS, CONTRACTOR SHALL AVOID OPERATING EQUIPMENT ON SATURATED SOILS. ANY WET SUBGRADE AREAS WHICH RECEIVE COMPACTED FILL SHALL BE DRAINED AND ALLOWED TO DRY. THE EXPOSED SUBGRADES OF THE BUILDING PAD AND ROADBEDS SHALL BE PROOFROLLED TO DETECT UNSUITABLE SOIL CONDITIONS. PROOFROLLING SHALL BE DONE AFTER A SUITABLE PERIOD OF DRY WEATHER TO AVOID DEGRADING THE SUBGRADE. PROOFROLLING SHALL BE PERFORMED WITH A HEAVILY LOADED DUMP TRUCK OR WITH SIMILAR APPROVED CONSTRUCTION EQUIPMENT. SOFT MATERIALS ENCOUNTERED SHALL BE COMPLETELY EXCAVATED AND REPLACED WITH APPROVED FILL MATERIALS EMBANKMENT: EMBANKMENT WORK SHALL CONSIST OF THE PLACEMENT AND COMPACTION OF FILL MATERIAL ABOVE THE NATURAL GROUND OR OTHER SURFACE IN CONFORMANCE WITH THE DRAWINGS. MATERIALS: APPROVED SOILS USED IN COMPACTED FILLS SHALL BE FREE OF DEBRIS AND FIBROUS ORGANIC MATERIAL. FROZEN MATERIAL WILL NOT BE PERMITTED IN THE FILL. SATISFACTORY MATERIALS SHALL COMPRISE THOSE CLASSIFIED IN ACCORDANCE WITH THE UNIFIED SOIL SYSTEM, ASTM D-2487 AS GW, GP, SW, SP, SM, AND SC. THESE MATERIALS SHALL POSSESS A MAXIMUM DRY DENSITY OF 100 #/CU.FT. OR GREATER REFERENCED TO ASTM D-698 STANDARD PROCTOR. SOILS SHALL HAVE A LIQUID LIMIT LESS THAN 40 PERCENT AND A PLASTICITY INDEX LESS THAN 15. OTHER MATERIALS, WHEN APPROVED BY ENGINEERING, MAY BE PERMITTED IN FILL AREAS. UNSATISFACTORY SOILS INCLUDE THOSE CLASSIFIED AS PT, OH OR OL, CH, MH, CL AND ML, AS REFERENCED TO ASTM D-2487. COMPACTION: COMPACTION EQUIPMENT SHALL CONSIST OF VIBRATORY OR TAMPING ROLLERS, SHEEPSFOOT ROLLER, PNUEMATIC-TIRED ROLLERS, THREE -WHEEL POWER ROLLERS, WALK BEHIND VIBRATORY ROLLERS, VIBRATORY PLATE OR OTHER APPROVED EQUIPMENT WELL SUITED TO THE SOIL BEING COMPACTED. APPROVED FILL MATERIAL SHALL BE PLACED IN UNIFORM HORIZONTAL LIFTS OF APPROXIMATELY 8" DEPTH (LOOSE MEASUREMENT), EXCEPT FOR ROAD MATERIALS ABOVE SUBGRADE ELEVATION AND THE UPPER 12" OF BUILDING PADS WHICH REQUIRE 6" LIFTS. WHERE WALK BEHIND ROLLERS AND VIBRATORY PLATE COMPACTORS ARE USED, THE LIFT THICKNESS SHALL NOT EXCEED 4". GENERALLY, FILLS SHALL BE COMPACTED TO AT LEAST 95 PERCENT OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY (ASTM D-698), WITH MOISTURE CONTENT RANGING BETWEEN LESS THAN 3 PERCENT UP TO THE OPTIMUM AS DETERMINED BY THE PROCTOR DENSITY TEST. THE UPPER 121, OF ROADBEDS AND CONTROL ENCLOSURE BUILDING PADS REQUIRE 98 PERCENT COMPACTION REFERENCED TO ASTM D-698, WITH MOISTURE CONTENT MAINTAINED WITHIN 2 PERCENT OF THE OPTIMUM. EACH SUCCESSIVE LIFT WILL BE PLACED ON FIRM APPROVED SUBGRADE OR COMPACTED FILL. WHERE PREVIOUS LIFTS ARE FOUND TO BE UNACCEPTABLE, THE AREA WILL BE SCARIFIED, AERATED OR MOISTENED, RECOMPACTED OR REMOVED, AND REPLACED AS REQUIRED. DRAINAGE: THE FILL SURFACE SHALL BE ADEQUATELY MAINTAINED DURING CONSTRUCTION. THE SURFACE SHALL BE SLOPED TO ACHIEVE SUFFICIENT DRAINAGE, AND TO PREVENT WATER FROM PONDING ON THE FILL. IF PRECIPITATION IS EXPECTED WHILE FILL CONSTRUCTION IS TEMPORARILY HALTED, THE SURFACE SHALL BE ROLLED WITH RUBBER -TIRED OR STEEL -DRUMMED EQUIPMENT TO IMPROVE SURFACE RUNOFF. FOR PLACEMENT DURING OR AFTER DIFFICULT WEATHER CONDITIONS, WET OR FROZEN MATERIAL SHALL BE REMOVED. FINISHED GRADE TOLERANCES: THE TOP OF EARTHWORK FOR SUBSTATION PAD AND ROADWAY TRAVEL AREAS SHALL BE WITHIN 0.10 FT. ABOVE OR BELOW THE THEORETICAL GRADE. EARTH SLOPES: EXCAVATED SLOPES STEEPER THAN 3:1 SHALL BE ROUGH GRADED IN A MANNER TO PROVIDE HORIZONTAL RIDGES AND GROOVES HAVING AN AVERAGE DEVIATION NO GREATER THAN 0.75 FT. FROM THE THEORETICAL LINE OF THE TYPICAL CROSS SECTION. EXCAVATED SLOPES 3:1 OR FLATTER SHALL BE UNIFORMLY FINISHED AND SHALL NOT DEVIATE FROM THE THEORETICAL PLANE SURFACE BY MORE THAN 0.50 FT. EMBANKMENT SLOPES STEEPER THAN 3:1 SHALL BE ROUGH GRADED IN A MANNER TO PROVIDE HORIZONTAL RIDGES AND GROOVES NOT MORE THAN 0.50 FT. FROM THE THEORETICAL LINE OF THE TYPICAL CROSS SECTION. EMBANKMENT SLOPES 3:1 OR FLATTER SHALL BE UNIFORMLY FINISHED AND SHALL NOT DEVIATE FROM THE THEORETICAL PLANE SURFACE BY MORE THAN 0.50 FT. ROCK SLOPES: SHALL NOT DEVIATE FROM A PLANE SURFACE BY MORE THAN 2.0 FT. AND SHALL NOT DEVIATE FROM THEIR THEORETICAL LOCATION BY MORE THAN 2.0 FT. MEASURED ALONG ANY LINE PERPENDICULAR TO THE THEORETICAL SLOPE LINE. BENCHING: MATERIALS / INSTALLATION BENCHING SHALL CONSIST OF A SERIES OF HORIZONTAL CUTS BEGINNING AT THE TOE OF THE EXISTING VDOT: SLOPED SURFACE AND CONTINUING AT EACH VERTICAL INTERSECTION OF THE PREVIOUS CUT. ITEMS REFERENCED TO THE VIRGINIA DEPARTMENT OF TRANSPORTATION SHOWN ON THE DRAWINGS SHALL SATISFACTORY MATERIAL REMOVED DURING THIS OPERATION SHALL BE RECOMPACTED ALONG WITH THE CONFORM TO THE REQUIREMENTS OF THEIR LATEST STANDARDS AND SPECIFICATIONS. NEW EMBANKMENT MATERIAL AS GENERALLY SPECIFIED, EXCEPT MOISTURE CONTENT SHALL BE MANUFACTURERS' ITEMS: B MAINTAINED WITHIN 10 PERCENT OF THE OPTIMUM. BENCHING SHALL BE REQUIRED FOR ALL FILL EMBANKMENTS PLACED ON EXISTING SLOPES AS FOLLOWS: ITEMS REFERENCED TO SPECIFIC MANUFACTURERS OR BRAND NAMES SHALL BE SUBJECT TO ANY RECOMMENDATIONS OR LIMITATIONS PERTAINING TO THEIR INSTALLATION OR USE. SLOPES STEEPER THAN 4:1 BUT NOT STEEPER THAN 1 1/2:1, THE BENCH SHALL BE AT LEAST 6 FT. IN WIDTH. REQUESTS FOR SUBSTITUTIONS MUST BE APPROVED BY ENGINEERING. SUFFICIENT INFORMATION V ' 1 —_ Z' —1 ' — '!— ' �• —_ _ — —_ REGARDING REQUESTS MUST BE RECEIVED BY ENGINEERING 10 DAYS IN ADVANCE OF APPROVAL. PROJECT DESCRIPTION: THIS PROJECT PROVIDES FOR THE INSTALLATION OF AIR CORE SERIES REACTOR ON LINE 2054 AT HOLLYMEADE SUBSTATION. THE SUBSTATION WILL BE EXPANDED TO PROVIDE SPACE FOR NEW EQUIPMENT. NEW PERIMETER 1 ) FENCING WILL BE INSTALLED TO MATCH THE EXISTING STATION FENCE. AN INTERNAL SEPARATION FENCE MUST ALSO BE INSTALLED TO PROHIBIT PERSONNEL AND EQUIPMENT APPROACH TO REACTORS WHILE ENERGIZED. I \ SUBSTATION GENERAL SR. SITING AND PERMITTING SPECIALIST: CIVIL ENGINEER OF RECORD: EQUIPMENT LEGEND BLAIR PARKS R. CRAIG MURPHY \\ (804) 658-7316 (724) 579-3866 O SECURITY FENCE BLAIR.PARKS@DOMINIONENERGY.COM EMAIL: DOMINION ENERGY VIRGINIA R.MURPHY@GAICONSULTANTS.COM F\ O EQUIPMENT ACCESS ROAD 10900 NUCKOLS ROAD GAI CONSULTANTS INC. I * \ \ FOURTH FLOOR 4701 COX ROAD SUITE 125 E O AIR CORE SERIES REACTOR GLEN ALLEN, VIRGINIA 23060 GLEN ALLEN, VA 23060 I 2 BREAKER DOMINION CIVIL SITE DESIGN ENGINEER: TOM RICHESON JR w �N O BACKBONE STRUCTURE (804) 257-4714 o o ) DOMINION ENERGY TECHNICAL h OSWITCH SERVICES, INC c ( 2400 GRAYLAND AVENUE -�i RICHMOND, VIRGINIA 23220 5 L 3HO ALL EXISTING AND CALL MISS UTILITY r 6 PROPOSED GRADES BEFORE DIGGING 4 3 SHOWN ON THIS SITE 1-800-5552-7001 OR , 811 PLAN ARE DIRT GRADES. SUBSTATION EQUIPMENT LAYOUT SCALE 1 "=60' 8 1 7 6 5 THE PERSON IDENTIFIED BELOW IS DESIGNATED AS THE RESPONSIBLE LAND DISTURBER WHO WILL BE IN CHARGE OF AND RESPONSIBLE FOR CARRYING OUTTHE LAND DISTURBING ACTIVITY ASSOCIATED WITH THIS PROJECT. THIS PERSON MEETS THE APPLICABLE REQUIREMENTS OF VIRGINIA CODE SECTION 10.1-563 AND 10.1-566 BY VIRTUE OF THE FOLLOWING: ✓ RESPONSIBLE LAND DISTURBER CERTIFICATE DCR CERTIFICATION FOR COMBINED ADMINISTRATOR, ADMINISTRATOR, PLAN REVIEWER, INSPECTOR, OR CONTRACTOR. VIRGINIA PROFESSIONAL ENGINEER, LAND SURVEYOR, LANDSCAPE ARCHITECT, OR ARCHITECT. RESPONSIBLE LAND DISTURBER CONTACT INFORMATION: NAME (SIGNATURE) DATE NAME (PRINT) DAVID K. PERRY CERTIFICATION/REGISTRATION NUMBER RLD07424 COMPANY DOMINION ENERGY MAILINGADDRESS 10900 NUCKOLS ROAD GLEN ALLEN, VA 23060 TELEPHONE (804) 257-4631 FAX E-MAIL David.K.Perry@Dominionenergy.com THIS DESIGNATION MAY ONLY BE CHANGED BY A PLAN COVER SHEET REVISION THAT MUST BE SUBMITTED TO THE VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) FOR VERIFICATION AND APPROVAL. THE FOLLOWING INFORMATION MUST BE SUBMITTED TO DEQAT LEAST TWO (2) WEEKS IN ADVANCE OF THE COMMENCEMENT OF LAND DISTURBING ACTIVITIES. NOTIFICATIONS SHALL BE SENT BY EMAIL TO standardsandspecs@deq.virginia.gov is PROJECT NAME OR PROJECT NUMBER (INCLUDING ANY ASSOCIATED CGP PERMIT NUMBER); ii: PROJECT LOCATION (INCLUDING NEAREST INTERSECTION, LATITUDE & LONGITUDE, ACCESS POINT); iii: ON -SITE PROJECT MANAGER NAME AND CONTRACT INFORMATION; iv: RESPONSIBLE LAND DISTURBER (RLD) NAME AND CONTACT INFORMATION; v: PROJECT DESCRIPTION; vi: ACREAGE OF DISTURBANCE FOR PROJECT; vii: PROJECT START AND FINISH DATE; viii: ANY VARIANCES/EXEMPTIONS/WAIVERS ASSOCIATED WITH THIS PROJECT PLEASE CONTACT DOMINION PERMITTING (C.J. LINDEMANN) AT 804.771.6408 TO SET UP A PRE -CONSTRUCTION MEETING. DRAWING LIST 1 OF 29 COVER SHEET, SPECIFICATIONS/GENERAL NOTES 2 OF 29 OVERALL SITE PLAN 3 OF 29 EROSION & SEDIMENT CONTROL GENERAL NOTES & NARRATIVE 4 OF 29 EROSION & SEDIMENT CONTROL MINIMUM STANDARDS AND DETAILS 5 OF 29 EROSION & SEDIMENT CONTROL DETAILS 6 OF 29 EROSION & SEDIMENT CONTROL AND DEMOLITION PLAN (1 OF 3) 7 OF 29 EROSION & SEDIMENT CONTROL AND DEMOLITION PLAN (2 OF 3) 8 OF 29 EROSION & SEDIMENT CONTROL AND DEMOLITION PLAN (3 OF 3) 9 OF 29 SITE PLAN (1 OF 3) 10 OF 29 SITE PLAN (2 OF 3) 11 OF 29 SITE PLAN (3 OF 3) 12 OF 29 FENCE PLAN 13 OF 29 GRADING & DRAINAGE PLAN (1 OF 2) 14 OF 29 GRADING & DRAINAGE PLAN (2 OF 2) 15 OF 29 GRADING SECTIONS AND PROFILES (1 OF 3) 16 OF 29 GRADING SECTIONS AND PROFILES (2 OF 3) 17 OF 29 GRADING SECTIONS AND PROFILES (3 OF 3) 18 OF 29 CONSTRUCTION DETAILS 19 OF 29 STORMWATER NARRATIVE 20 OF 29 LANDSCAPE PLAN 21 OF 29 LANDSCAPE SPECIFICATIONS 22 OF 29 WATER QUALITY 23 OF 29 STORMWATER MANAGEMENT DRAINAGE AREA MAPS & ROUTING DIAGRAMS 24 OF 29 STORMWATER MANAGEMENT DRAINAGE AREA MAPS & ROUTING DIAGRAMS 25 OF 29 STORMWATER MANAGEMENT PRE -DEVELOPED 1-, 2- AND 10-YR ROUTING 26 OF 29 STORMWATER MANAGEMENT POST -DEVELOPED 1-, 2- AND 10-YR ROUTING 27 OF 29 CALCULATIONS 28 OF 29 CALCULATIONS 29 OF 29 CALCULATIONS SURVEY DRAWING LIST 1 OF 2 TOPOGRAPHIC SURVEY FOR PROPOSED HOLLYMEADE SUBSTATION EXPANSION 2 OF 2 TOPOGRAPHIC SURVEY FOR PROPOSED HOLLYMEADE SUBSTATION EXPANSION RETAINING WALL DRAWING LIST 1 OF 3 RETAINING WALL DETAILS 2 OF 3 RETAINING WALL DETAILS 3 OF 3 RETAINING WALL DETAILS 0 3 OWNER: ADDRESS: MAGISTERIAL DISTRICT: LAT. - LONG.: ZONING: PARCEL ID: USE: PARCEL ACREAGE: WATER AND SEWER: WETLANDS IMPACTS: LAND DISTURBANCE: EXISTING TREE CANOPY COVERAGE: PROPOSED TREE CANOPY COVERAGE: PARKING: PROPOSED BUILDINGS: OFFSITE LAND DISTURBANCE: LAND DISTURBANCE PERMIT: VIRGINIA STORMWATER MANAGEMENT PROGRAM PERMIT (VSMP): FLOODPLAIN: SITE LOCATION SCALE 1 "=500' GENERAL SITE INFORMATION VIRGINIA ELECTRIC & POWER COMPANY 3317 WORTH CROSSING, CHARLOTTESVILLE, VA 22911 RIVANNA LAT: 38' 07' 40.176" N LONG: 78' 269.232" W R-1 and R-15 03200-00-00-03700 ELECTRICAL SUBSTATION 6.72 ACRES NONE PROPOSED N/A 2.69 ACRES 3.44 ACRES 2.92 ACRES NONE PROPOSED OR EXISTING NONE PROPOSED (PRE-FAB ENCLOSURE) TEMPORARY FOR CONSTRUCTION ACCESS. ANY OFFSITE LAND DISTURBING ACTIVITY ASSOCIATED WITH THIS PROJECT MUST HAVE AN APPROVED EROSION AND SEDIMENT CONTROL PLAN. CONTACT DEQ TWO (2) WEEKS PRIOR TO ANY LAND DISTURBING ACTIVITY. SEE DETAILS IN THE RESPONSIBLE LAND DISTURBER DESIGNATION BLOCK ON THIS SHEET FOR DETAILS. REQUIRED PRIOR TO ANY LAND DISTURBANCE. AN APPROVED VSMP MUST BE ACCOMPANIED WITH A STORMWATER POLLUTION PREVENTION PLAN (SWPPP) PRIOR TO CONSTRUCTION. THIS PROPERTY IS LOCATED IN ZONE "X" (AREAS DETERMINED TO BE OUTSIDE THE 0.2%ANNUAL CHANCE FLOODPLAIN) AS SHOWN ON FEMA PANEL #51003CO145D EFFECTIVE DATE: FEBRUARY 4, 2005. NO FLOODPLAIN LINES SHOWN ON PROPERTY. REVISIONS y galconsultants REV DATE DESCRIPTION .00 Dominion Energy PRELIMINARY SITE AND GRADING PLAN HOLLYMEADE SUBSTATION EXPANSION ALBEMARLE COUNTY VIRGINIA OPERATIONAL REGION B/M No. SCALE NTS PROJECT F NAME DATE SHEET: OO1 DESIGNER PROJECT ENGINEER DRAWING: APPROVED BY R220236-00-000-00-C-001 2 1 17 C 3 0 Lc C 3 A 9 7 OVERALL SITE PLAN OHE UGE UGE UGT — UGT UFO UFO CTV CTV — El EXISTING MAJOR CONTOURS EXISTING MINOR CONTOURS PROPOSED MAJOR CONTOURS PROPOSED MINOR CONTOURS TOPOGRAPHIC SURVEY BOUNDARY EXISTING ADJACENT PROPERTY LINE EXISTING SITE PROPERTY LINE / EXISTING FENCE LINE / PROPOSED FENCE LINE / EXISTING OVERHEAD ELECTRIC I EXISTING UNDERGROUND ELECTRIC EXISTING UNDERGROUND TELEPHONE — EXISTING FIBER OPTIC J EXISTING TELECOMMUNICATION LINE / EDGE OF EXISTING GRAVEL PROPOSED SUBSTATION PAD EXISTING EDGE OF WATER 5 4 2 2 1 NOTES: 1. TOPOGRAPHIC INFORMATION SHOWN HERE IS BASED ON A TOPOGRAPHIC I I \\ \\ \\ / / \ \ FIELD SURVEY COMPLETED BY DRAPER ADEN ASSOCIATES DATED MARCH i i — 2022. 2. SOURCE OF MERIDIAN: NAD83 BASED UPON A TOPOGRAPHIC SURVEY OF \ \ -500 \ \ \ — \ \ \ \ \ \\\ HOLLYMEAD SUBSTATION BY RICHARD L. FRALIN, L.S. DATED 04/17/2013 \ PROVIDED BY DOMINION ENERGY. 3. VERTICAL DATUM: BASED UPON A TOPOGRAPHIC SURVEY OF HOLLYMEAD SUBSTATION BY RICHARD L. FRALIN, L.S. DATED 04/1712013 PROVIDED BY DOMINION ENERGY. NIF N/F \ PARCEL /D: N/F,, \ ` PARCEL 0-PARCEL /D. na vin>_nn_n>ann 032✓0-01-00-0,M00 �4340ECA TUR OR/VE TREELINE / I 1 PROPOSED ACCESS ROAD CENTERLINE / J \ \ I N:6729393.29 U E:11501952.25 — \ \ EXISTING RIP RAP / / y EXISTING INLET PROPOSED INLET /\\\ TV — � �_TV ' EXISTING CULVERT ` EDGE OF EXISTING DITCH \ \ I \° TBM C SET CHISELED SQUAREY / c90 M£eyo^ae \ \ N:6729329.67. / / oat LIMIT OF DISTURBANCE \ \ / \ \ E:11501800.27 ` / Say ` \ I / \ \ \ EL=494.58' PROPOSED STORM SEWER µer PROPOSED LEVEL SPREADER ( I I — //\\ 5 s ` \\\ EXISTING POWER POLE AND GUY WIRE ✓ � / I I / / / �✓ /� �/ N/F PARCEL /D- 0468• / / / FORESTLAKE.' BENCHMARK / / / PROPOSED RETAINING WALL AREA PH -I FORESTLAKES, .0000, ASSOC/A EXISTING IRON ROD FOUND I / / / / D.B. 1304, i PR/MARYZO RES/DEA 7 6 5 4 3 VIRGINIA ELECTRIC ROW FROM SURVEY /I SCALE: 1" = 50' 50 0 50 yREVISIONS gaiconsultants REV DATE DESCRIPTION Dominion Energy OVERALL SITE PLAN HOLLYMEADE SUBSTATION EXPANSION ALBEMARLE COUNTY VIRGINIA OPERATIONAL REGION B/M No. SCALE 1"=50' PROJECT F NAME DATE SHEET: OO2 DESIGNER PROJECT ENGINEER DRAWING: 1 OUJ APPROVED BY R220236-00-000-00-C-002 2 1 0 C 3 A 0 7 [. 5 4 1 2 2 1 10 x L•' A EROSION AND SEDIMENTATION CONTROL NOTES - DOMINION ENERGY VIRGINIA 1. CONTRACTOR SHALL HAVE AVAILABLE A COPY OF THE LATEST VERSION OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK. CONTRACTOR SHALL BE RESPONSIBLE FOR THE INSTALLATION, MAINTENANCE, AND REMOVAL OF ALL CONTROL DEVICES. THESE DEVICES SHALL MEET OR EXCEED THE HIGHER OF THE REQUIREMENTS COVERED IN THIS HANDBOOK OR THE CONTROLLING AUTHORITY. 2. EROSION AND SEDIMENT CONTROL DEVICES, AS SHOWN ON THE PLAN, SHALL BE INSTALLED AS THE FIRST STEP OF THE GRADING PROCESS. 3. TEMPORARY DEVICES SHALL BE REPAIRED OR REPLACED IMMEDIATELY IF THEY CEASE TO FUNCTION AS INTENDED. TEMPORARY CONTROLS SHALL BE REMOVED WHEN AREAS ABOVE THEN BECOME STABILIZED TO THE SATISFACTION OF THE PLAN APPROVING AUTHORITIES. 4. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO KEEP SURROUNDING DRAINAGE BEDS FREE OF SILT CAUSED BY EROSION DURING CONSTRUCTION. 5. NO DISTURBED AREA SHALL REMAIN DENUDED FOR LONGER THAN 7 DAYS, EXCEPT THOSE CONTINUOUSLY BEING WORKED OR BUILT UPON. 6. ELECTRIC POWER, TELEPHONE, AND GAS SUPPLY TRENCHES ARE TO BE COMPACTED, SEEDED, AND MULCHED WITHIN 7 DAYS AFTER BACKFILL. ALL EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES. 7. THE SITE STONE IS PART OF THE PERMANENT STABILIZATION OF THE SITE. IT SHALL BE APPLIED AS SOON AS PRACTICAL AFTER FOUNDATION INSTALLATIONS ARE COMPLETE. 8. TEMPORARY OR PERMANENT SEEDING SHALL BE ACCOMPLISHED WITHIN 7 DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SUBSTATION LOT. 9. TOPSOIL SHALL BE APPLIED IN 2-6 INCH LAYERS ON AREAS ROUGHENED USING STANDARD ROUGHENING PROCEDURES. ALL AREAS DESIGNATED TO BE SEEDED SHALL BE TOPSOILED WHEN SUFFICIENT MATERIAL IS AVAILABLE. 10. UNLESS OTHERWISE NOTED, ALL DITCHES AND OTHER GRASS LINED WATER WAYS SHALL BE LIMED, FERTILIZED, SEEDED, AND STABILIZED WITH EXCELSIOR BLANKET (CURLEX) IMMEDIATELY AFTER CONSTRUCTION. 11. TEMPORARY AND PERMANENT SEEDING SHALL CONFORM TO THE LATEST SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK. * GENERAL SPECIFICATIONS FOLLOW: 12. REFER TO SHEET 5 FOR TEMPORARY AND PERMANENT SEEDING SPECIFICATIONS. GENERAL EROSION AND SEDIMENTATION CONTROL NOTES - VESCH ES-1. UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATION OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS 9VAC25-840 EROSION AND SEDIMENT CONTROL REGULATIONS. ES-2. THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE -CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPECTION. ES-3. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP IN CLEARING. ES-4. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON SITE AT ALL TIMES. ES-5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO, OFF -SITE BORROW OR WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY. ES-6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN APPROVING AUTHORITY. ES-7. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED. ES-8. DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE. ES-9. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH RUNOFF -PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. PROJECT DESCRIPTION: THE PURPOSE OF THIS PROJECT IS FOR THE INSTALLATION OF AIR CORE SERIES REACTORS ON LINE 2054 AT HOLLYMEADE SUBSTATION AT 3317 WORTH CROSSING, CHARLOTTE, VA. THE PROPERTY IS ZONED R1 AND R15 RESIDENTIAL. THE SITE AREA IS 2.69 ACRES WITH 1.42 EXISTING IMPERVIOUS ACRES. THE PROPOSED INSTALLATION WILL COMPRISE OF 1.27 ACRES OF ADDITIONAL IMPERVIOUS SURFACE AND 2.69 ACRES OF LAND DISTURBANCE. THIS PROPERTY IS WITHIN THE SOUTH FORK RIVANNA RIVER WATERSHED. (HUC 020802040203, VA 6TH ORDER JR08). EXISTING CONDITIONS: THE EXISTING SITE AREA CONSISTS MAINLY OF GRAVEL SURFACE DUE TO THE EXISTING SUBSTATION AND THE GRAVEL ACCESS ROAD TO THE WEST. THE AREA SURROUNDING THE SUBSTATION CONSISTS MAINLY OF GRASSY AREAS AND PATCHES OF WOODED AREAS ENCOMPASSING THE SUBSTATION. THE TERRAIN IS RELATIVELY FLAT UNTIL IT DROPS OFF TO AN EXISTING POND SOUTH AND EAST OF THE SUBSTATION. ADJACENT PROPERTIES THIS SITE IS BOUND BY FOURTEEN (14) PROPERTIES, WHERE FOUR (4) ARE ZONED R-15 (RESIDENTIAL), ONE (1) IS ZONED R-4 (RESIDENTIAL), EIGHT (8) ARE PLANNED RESIDENTIAL DEVELOPMENTS, AND THE LAST IS A PLANNED RESIDENTIAL SHOPPING CENTER. OFF -SITE AREAS: THERE WILL BE NO OFF SITE DISTURBANCE. SOILS: I � \ Z SOILS MAP SCALE 1 "=200' THE FOLLOWING THREE (3) SOIL TYPES ARE IDENTIFIED WITHIN THE SITE DEVELOPMENT AREA: 1) 27B ELIOACK LOAM, 2 TO 7 PERCENT, HYDROLOGIC SOIL GROUP (HSG) B, k=1.98. 2) 28C3 ELIOACK CLAY LOAM, 7 TO 15 PERCENT, HYDROLOGIC SOIL GROUP (HSG) B, k=1.98; 3) 34C GLENELG LOAM, 7 TO 15 PERCENT, HYDROLOGIC SOIL GROUP (HSG) B, k=1.98. CRITICAL EROSION AREAS: THERE ARE NO ENVIRONMENTALLY SENSITIVE AREAS WITHIN THE LIMITS OF DISTURBANCE STRUCTURAL PRACTICES 1. SAFETY FENCE - 3.01 2. CONSTRUCTION ENTRANCE - 3.02 3. SILT FENCE - 3.05 4. STORM DRAIN INLET PROTECTION - 3.07 VEGETATIVE PRACTICES 1. TOPSOIL - 3.30 2. TEMPORARY SEEDING - 3.31 3. PERMANENT SEEDING - 3.32 4. MULCHING-3.35 5. SOIL STABILIZATION BLANKETS AND MATTING - 3.36 6. DUST CONTROL - 3.39 MANAGEMENT STRATEGIES 1. CONSTRUCTION WILL BE SEQUENCED SO THAT GRADING OPERATIONS CAN BEGIN AND END AS QUICKLY AS POSSIBLE. 2. TEMPORARY SEEDING OR OTHER STABILIZATION WILL FOLLOW SEVEN (7) DAYS AFTER GRADING. 3. AREAS WHICH ARE NOT TO BE DISTURBED WILL BE CLOSELY MARKED BY FLAGS, SIGNS, ETC. 4. THE JOB SUPERINTENDENT SHALL BE RESPONSIBLE FOR THE INSTALLATION AND MAINTENANCE OF ALL EROSION AND SEDIMENT CONTROL PRACTICES. 5. AFTER ACHIEVING ADEQUATE STABILIZATION, THE TEMPORARY EROSION AND SEDIMENT CONTROLS WILL BE CLEANED AND REMOVED. PERMANENT STABILIZATION ALL AREAS DISTURBED BY CONSTRUCTION SHALL BE STABILIZED WITH PERMANENT SEEDING IMMEDIATELY FOLLOWING FINISH GRADING. SEEDING SHALL BE APPLIED IN ACCORDANCE WITH STANDARD AND SPECIFICATION 3.32, PERMANENT SEEDING. MULCH WILL BE USED IN ALL SEEDED AREAS AFTER SEED, FERTILIZER, AND LIME HAVE BEEN APPLIED. STORMWATER MANAGMENT THE APPLICABLE SITE AREA IS CALCULATED TO BE 2.69 ACRES. IN ACCORDANCE WITH THE VIRGINIA RUNOFF REDUCTION METHOD (VRRM), PHOSPHOROUS REMOVAL MUST ACHIEVE 2.01 POUNDS PER YEAR. PHOSPHOROUS REMOVAL WILL BE MITIGATED VIA OFFSITE CREDITS THROUGH ECOSYSTEM SERVICES IVY CREEK NUTRIENT BANK FACILITY. THE SITE HAS FOUR (4) OUTFALLS THAT ARE ADEQUATE USING THE VRRM AND THE MS-19 REGULATIONS. FOR OUTFALL 1, THE PRE -DEVELOPED 1-YEAR, 2-YEAR, AND 10-YEAR PEAK DISCHARGES ARE 0.35 CFS, 0.63 CFS AND 1.63 CFS RESPECTIVELY. THE POST -DEVELOPED 1-YEAR, 2-YEAR, AND 10-YEAR PEAK DISCHARGES ARE 0.35 CFS, 0.63 CFS, AND 1.63 CFS RESPECTIVELY. FOR OUTFALL 2, THE PRE -DEVELOPED 1-YEAR, 2-YEAR, AND 10-YEAR PEAK DISCHARGES ARE 3.38 CFS, 5.70 CFS, AND 13.65 CFS RESPECTIVELY. THE POST -DEVELOPED 1-YEAR, 2-YEAR, AND 10-YEAR PEAK DISCHARGES ARE 5.31 CFS, 8.16 CFS, AND 17.52 CFS RESPECTIVELY. OUTFALL 1 IS IN COMPLIANCE WITH VIRGINIA ADMINISTRATIVE CODE 9VAC25-870-66.B.1.a., OUTFALL 2 IS IN COMPLIANCE WITH VIRGINIA ADMINISTRATIVE CODE 9VAC25-870-66.D AND 9VAC25-870-66.B.1.a. MAINTENANCE IN GENERAL, ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CHECKED DAILY AND AFTER EACH SIGNIFICANT RAINFALL. THE FOLLOWING MEASURES WILL BE CHECKED AND MITIGATED ACCORDINGLY. SAFETY FENCE - 3.01 SAFETY FENCE SHALL BE CHECKED REGULARLY FOR WEATHER -RELATED OR OTHER DAMAGE. ANY NECESSARY REPAIRS MUST BE MADE IMMEDIATELY. CARE SHOULD BE TAKEN TO SECURE ALL ACCESS POINTS (GATES) AT THE END OF EACH WORKING DAY. ALL LOCKING DEVICES MUST BE REPAIRED OR REPLACED AS NECESSARY. CONSTRUCTION ENTRANCE - 3.02 A CONSTRUCTION ENTRANCE WILL BE INSTALLED AT THE SITE FOR VEHICLE INGRESS AND EGRESS TO REDUCE THE AMOUNT OF SEDIMENT TRANSPORTED ONTO PAVED PUBLIC FACILITIES AND ROADS BY VEHICULAR TRAFFIC OR RUNOFF. THE CONSTRUCTION ENTRANCE SHALL BE INSTALLED FOLLOWING VESCH STANDARD 3.02. SILT FENCE - 3.05 SILT FENCE BARRIERS SHALL BE INSTALLED DOWNSLOPE OF AREAS WITH MINIMAL GRADES TO FILTER SEDIMENT -LADEN RUNOFF FROM SHEET FLOW AS INDICATED ON THE E&SC PLANS. ALL MAINTENANCE PRACTICES SHALL FOLLOW THE GUIDELINES SET IN VESCH STANDARD 3.05. STORM DRAIN INLET PROTECTION - 3.07 STORM DRAIN INLETS SHALL BE PROTECTED DURING CONSTRUCTION BY SILT FENCE, FILTERING, SEDIMENT -LADEN WATER BEFORE ENTERING STORM NETWORK. ALL MAINTENANCE PRACTICES SHALL FOLLOW THE GUIDELINES SET IN VESCH STANDARD 3.07. TOPSOILING - 3.30 AREAS OF THE SITE MAY REQUIRE TOPSOILING TO PROVIDE A SUITABLE GROWTH MEDIUM FOR VEGETATION STABILIZATION. A TEMPORARY TOPSOIL STOCKPILE SHALL BE INSTALLED AS SHOWN ON SHEET 7. TOPSOILING PLACEMENT AND INSTALLATION SHALL FOLLOW THE GUIDELINES SET IN VESCH STANDARD 3.30. TEMPORARY SEEDING - 3.31 CERTAIN AREAS OF THE SITE WILL BE ROUGH GRADED AS A FIRST STAGE OF CONSTRUCTION. FINISH GRADING WILL OCCUR NEAR PROJECT COMPLETION. THESE AREAS SHALL BE SEEDED TEMPORARILY WITH FAST GERMINATING GRASSES TO REDUCE EROSION POTENTIAL. DIVERSIONS, FILL DIVERSIONS, DIVERSION DIKES AND THE SEDIMENT BASIN EMBANKMENT SHALL ALSO RECEIVE TEMPORARY SEEDING. TEMPORARY SEEDING APPLICATIONS SHALL FOLLOW THE GUIDELINES SET IN VESCH STANDARD 3.31. PERMANENT SEEDING - 3.32 IMMEDIATELY FOLLOWING FINISH GRADING, PERMANENT VEGETATION SHALL BE APPLIED IN ACCORDANCE TO THE GUIDELINES IN THE VESCH STANDARD 3.32 (PIEDMONT AREA) AND PER THE E&SC DETAILS IN THIS PLAN. PERMANENT SEEDING APPLICATIONS SHALL FOLLOW THE GUIDELINES SET IN VESCH STANDARD 3.32. MULCHING - 3.35 IN AREAS THAT REQUIRE SUPPLEMENTAL EROSION CONTROL TO PROMOTE GROWTH OF VEGETATION OR TO REDUCE VELOCITIES FROM OVERLAND FLOW, MULCH MAY BE USED AS AN ALTERNATIVE. ANY MULCH APPLICATIONS SHALL FOLLOW THE GUIDELINES SET IN VESCH STANDARD 3.35. SOIL STABILIZATION BLANKETS AND MATTING - 3.36 SOIL STABILIZATION BLANKETS AND MATTING MAY BE USED AS AN ALTERNATIVE TO TEMPORARY AND PERMANENT SEEDING OR IN CRITICAL AREAS WITH STEEP CUT OR FILL SLOPES. BLANKET AND MATTING STABILIZATION MAY BE USED PER THE DIRECTION OF THE E&SC INSPECTOR. ANY BLANKET AND MATTING APPLICATION SHALL FOLLOW THE GUIDELINES SET IN VESCH STANDARD 3.36. DUST CONTROL - 3.39 DUST CONTROL APPLICATIONS MAY BE EMPLOYED WHEN SURFACE AND AIR MOVEMENT OF DUST RESULTING FROM CONSTRUCTION BECOMES AN ISSUE. DUST CONTROL APPLICATIONS SHALL FOLLOW THE GUIDELINES SET IN VESCH STANDARD 3.39. CONSTRUCTION SEQUENCE 1. FLAG THE LIMITS OF DISTURBANCE SHOWN ON THE EROSION AND SEDIMENT CONTROL PLAN PRIOR TO A PRE -CONSTRUCTION MEETING WITH CERTIFIED PERSONNEL AS IT PERTAINS TO THE VIRGINIA STORMWATER MANAGEMENT PROGRAM (VSMP) REGULATIONS AND IN ACCORDANCE WITH THE ANNUAL STANDARDS AND SPECIFICATIONS FOR EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT (TE VEP 8000). A PRE -CONSTRUCTION MEETING WITH THE CONTRACTOR, PROJECT MANAGER, AND CERTIFIED EROSION AND SEDIMENT CONTROL INSPECTOR WILL BE SCHEDULED BY DOMINION. 2. DURING THE PRE -CONSTRUCTION MEETING, THE CERTIFIED EROSION AND SEDIMENT CONTROL INSPECTOR SHALL CHECK THE FLAGGING DESIGNATING THE LIMITS OF DISTURBANCE. 3. INSTALL THE CONSTRUCTION ENTRANCE. 4. INSTALL ALL OTHER PERIMETER DEVICES SUCH AS SILT FENCE. 5. CLEAR, GRUB AND REMOVE VEGETATION AS INDICATED IN THE EROSION AND SEDIMENT CONTROL PLAN ONCE ALL EROSION CONTROL DEVICES ARE FUNCTIONING AND IN PLACE. 6. PLACE AS NEEDED TEMPORARY TOPSOIL STOCKPILE AND PROTECT WITH SILT FENCE AND TEMPORARY SEEDING. 7. DEMO EXISTING STORMWATER NETWORK AND RETAINING WALL AS SHOWN ON THE EROSION & SEDIMENT CONTROL AND DEMOLITION PLAN. 8. FILL THE SITE PER THE GRADING SHOWN IN THE GRADING AND DRAINAGE PLAN. ENSURE SURFACE ROUGHENING IS APPLIED TO 3:1 FILL SLOPES. 9. INSTALL LEVEL SPREADERS AND EXPAND UPON THE EXISTING STORM SEWER NETWORK AS DEPICTED IN THE GRADING & DRAINAGE PLANS. 10. APPLY TEMPORARY SEEDING TO ANY DISTURBED AREAS THAT REMAIN DORMANT FOR MORE THAN SEVEN (7) DAYS. 11. PERFORM FINAL SITE GRADING AS SHOWN ON PLANS. 12. INSTALL A FOUR (4) INCH THICK LAYER OF VDOT #57 STONE COURSE AGGREGATE SITE STONE, TWELVE (12) INCH THICK VDOT No. 21A COMPACTED BASE COURSE TO ACCESS ROADS AND SUBSTATION SECURITY FENCE PER SHEET 012 AND THE DETAILS SHOWN ON SHEET 018. APPLY PERMANENT SEEDING TO REMAINING GRADED AREAS NOT STABILIZED BY STONE COVER. 13. NO EROSION AND SEDIMENT CONTROL DEVICES SHALL BE REMOVED UNTIL THE SITE IS DEEMED STABILIZED AND PER THE APPROVAL OF THE CERTIFIED EROSION AND SEDIMENT CONTROL INSPECTOR. TOTAL DISTURBED AREA: 2.69 ACRES Ij;kvA REVISIONS DATE I DESCRIPTION Dominion Energy y galconsultan[s EROSION & SEDIMENT CONTROL GENERAL NOTES AND NARRATIVE HOLLYMEADE SUBSTATION EXPANSION ALBEMARLE COUNTY VIRGINIA OPERATIONAL REGION B/M No. SCALE NTS PROJECT NAME DATE SHEET: 003 DESIGNER PROJECT ENGINEER DRAWING: APPROVED BY R220236-00-000-00-C-001 10 Le L A 0 7 6 1 5 M 3 2 1 7 0 5 VIRGINIA EROSION AND SEDIMENT CONTROL MINIMUM STANDARDS 11 2 2 I 0 C 7 0 MINIMUM STANDARDS THIS SECTION IDENTIFIES THE MINIMUM EROSION AND SEDIMENT STANDARDS THAT THE PROJECT NEEDS TO MEET ACCORDING TO VIRGINIA'S EROSION AND SEDIMENT CONTROL LAW AND REGULATIONS (4VAC50-30-40). MINIMUM STANDARD 1. PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT FOR LONGER THAN 14 DAYS. PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE TO BE LEFT DORMANT FOR MORE THAN ONE YEAR AND PROVIDED AS THE SITE IS BROUGHT TO GRADE. M APPLICABLE ❑ NOT APPLICABLE PROJECT COMPLIANCE: TEMPORARY AND PERMANENT SEEDING SPECIFICATIONS HAVE BEEN INCLUDED AS A VEGETATIVE MEASURE. REFER TO E&SC PLANS AND DETAILS. MINIMUM STANDARD 2. DURING CONSTRUCTION OF THE PROJECT, SOIL STOCKPILES AND BORROW AREAS SHALL BE STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING MEASURES. THE APPLICANT IS RESPONSIBLE FOR THE TEMPORARY PROTECTION AND PERMANENT STABILIZATION OF ALL SOIL STOCKPILES ON SITE AS WELL AS BORROW AREAS AND SOIL INTENTIONALLY TRANSPORTED FROM THE PROJECT SITE. M APPLICABLE ❑ NOT APPLICABLE PROJECT COMPLIANCE: POTENTIAL STOCKPILE AREAS ARE TO BE KEPT ON -SITE AND WITHIN THE LIMITS OF DISTURBANCE UNDER THE CONTROL OF EROSION AND SEDIMENT CONTROL MEASURES. MINIMUM STANDARD 3. A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED. PERMANENT VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT, IS UNIFORM, MATURE ENOUGH TO SURVIVE AND WILL INHIBIT EROSION. M APPLICABLE ❑ NOT APPLICABLE PROJECT COMPLIANCE: PERMANENT SEEDING WILL BE PROVIDED ON ANY DENUDED AREA ONCE THE SITE HAS BEEN BROUGHT TO FINAL GRADE. MINIMUM STANDARD 4. SEDIMENT BASINS AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS AND OTHER MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP IN ANY LAND -DISTURBING ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE. M APPLICABLE ❑ NOT APPLICABLE PROJECT COMPLIANCE: IN ACCORDANCE WITH THE CONSTRUCTION SEQUENCE SILT FENCE SHALL BE INSTALLED PRIOR TO MASS GRADING OR UP GRADIENT LAND DISTURBANCES. MINIMUM STANDARD 5. STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES SUCH AS DAMS, DIKES AND DIVERSIONS IMMEDIATELY AFTER INSTALLATION. M APPLICABLE ❑ NOT APPLICABLE PROJECT COMPLIANCE: DAMS OR OTHER EARTHEN MEASURE SHALL BE STABILIZED IN ACCORDANCE WITH MINIMUM STANDARD 1. MINIMUM STANDARD 6. SEDIMENT TRAPS AND SEDIMENT BASINS SHALL BE DESIGNED AND CONSTRUCTED BASED UPON THE TOTAL DRAINAGE AREA TO BE SERVED BY THE TRAP OR BASIN. A.THE MINIMUM STORAGE CAPACITY OF A SEDIMENT TRAP SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA AND THE TRAP SHALL ONLY CONTROL DRAINAGE AREAS LESS THAN THREE ACRES. ❑ APPLICABLE M NOT APPLICABLE PROJECT COMPLIANCE: N/A B.SURFACE RUNOFF FROM DISTURBED AREAS THAT IS COMPRISED OF FLOW FROM DRAINAGE AREAS GREATER THAN OR EQUAL TO THREE ACRES SHALL BE CONTROLLED BY A SEDIMENT BASIN. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT BASIN SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA. THE OUTFALL SYSTEM SHALL, AT A MINIMUM, MAINTAIN THE STRUCTURAL INTEGRITY OF THE BASIN DURING A TWENTY-FIVE YEAR STORM OF 24-HOUR DURATION. RUNOFF COEFFICIENTS USED IN RUNOFF CALCULATIONS SHALL CORRESPOND TO A BARE EARTH CONDITION OR THOSE CONDITIONS EXPECTED TO EXIST WHILE THE SEDIMENT BASIN IS UTILIZED. ❑ APPLICABLE M NOTAPPLICABLE PROJECT COMPLIANCE: N/A MINIMUM STANDARD 7. CUT AND FILL SLOPES SHALL BE DESIGNED AND CONSTRUCTED IN A MANNER THAT WILL MINIMIZE EROSION. SLOPES THAT ARE FOUND TO BE ERODING EXCESSIVELY WITHIN ONE YEAR OF PERMANENT STABILIZATION SHALL BE PROVIDED WITH ADDITIONAL SLOPE STABILIZING MEASURES UNTIL THE PROBLEM IS CORRECTED. M APPLICABLE ❑ NOT APPLICABLE PROJECT COMPLIANCE: ANY FILL SLOPE THAT MAY ERODE WILL BE MONITORED AND ADDITIONAL STABILIZATION WILL BE ADDED IF NEEDED. MINIMUM STANDARD 8. CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL SLOPES UNLESS CONTAINED WITHIN AN ADEQUATE TEMPORARY OR PERMANENT CHANNEL, FLUME OR SLOPE DRAIN STRUCTURE. ❑ APPLICABLE M NOTAPPLICABLE PROJECT COMPLIANCE: N/A MINIMUM STANDARD 9. WHENEVER WATER SEEPS FROM A SLOPE FACE, ADEQUATE DRAINAGE OR OTHER PROTECTION SHALL BE PROVIDED. M APPLICABLE ❑ NOT APPLICABLE PROJECT COMPLIANCE: INADEQUATE DRAINAGE SHALL BE CORRECTED PRIOR TO STABILIZATION. MINIMUM STANDARD 10. ALL STORM SEWER INLETS THAT ARE MADE OPERABLE DURING CONSTRUCTION SHALL BE PROTECTED SO THAT SEDIMENT -LADEN WATER CANNOT ENTER THE CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED OR OTHERWISE TREATED TO REMOVE SEDIMENT. M APPLICABLE ❑ NOTAPPLICABLE PROJECT COMPLIANCE: CULVERT INLET AND INLET PROTECTION TO BE INSTALLED. REFER TO E&SC PLANS AND DETAILS. MINIMUM STANDARD 11. BEFORE NEWLY CONSTRUCTED STORMWATER CONVEYANCE CHANNELS OR PIPES ARE MADE OPERATIONAL, ADEQUATE OUTLET PROTECTION AND ANY REQUIRED TEMPORARY OR PERMANENT CHANNEL LINING SHALL BE INSTALLED IN BOTH THE CONVEYANCE CHANNEL AND RECEIVING CHANNEL. ❑ APPLICABLE M NOTAPPLICABLE PROJECT COMPLIANCE: N/A MINIMUM STANDARD 12. WHEN WORK IN A LIVE WATERCOURSE IS PERFORMED, PRECAUTIONS SHALL BE TAKEN TO MINIMIZE ENCROACHMENT, CONTROL SEDIMENT TRANSPORT AND STABILIZE THE WORK AREA TO THE GREATEST EXTENT POSSIBLE DURING CONSTRUCTION. NONERODIBLE MATERIAL SHALL BE USED FOR THE CONSTRUCTION OF CAUSEWAYS AND COFFERDAMS. EARTHEN FILL MAY BE USED FOR THESE STRUCTURES IF ARMORED BY NONERODIBLE COVER MATERIALS. ❑ APPLICABLE M NOTAPPLICABLE PROJECT COMPLIANCE: N/A MINIMUM STANDARD 13. WHEN A LIVE WATERCOURSE MUST BE CROSSED BY CONSTRUCTION VEHICLES MORE THAN TWICE IN ANY SIX-MONTH PERIOD, A TEMPORARY VEHICULAR STREAM CROSSING CONSTRUCTED OF NONERODIBLE MATERIAL SHALL BE PROVIDED. ❑ APPLICABLE M NOTAPPLICABLE PROJECT COMPLIANCE: N/A MINIMUM STANDARD 14. ALL APPLICABLE FEDERAL, STATE, AND LOCAL REGULATIONS PERTAINING TO WORKING IN OR CROSSING LIVE WATERCOURSES SHALL BE MET. ❑ APPLICABLE M NOTAPPLICABLE PROJECT COMPLIANCE: N/A MINIMUM STANDARD 15. THE BED AND BANKS OF A WATERCOURSE SHALL BE STABILIZED IMMEDIATELY AFTER WORK IN THE WATERCOURSE IS COMPLETED. ❑ APPLICABLE M NOTAPPLICABLE PROJECT COMPLIANCE: N/A MINIMUM STANDARD 16. UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING STANDARDS IN ADDITION TO OTHER APPLICABLE CRITERIA: A. NO MORE THAN 500 LINEAR FEET OF TRENCH MAY BE OPENED AT ONE TIME. B. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES. C. EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH, AND DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY AFFECT FLOWING STREAMS OR OFF -SITE PROPERTY. D. MATERIAL USED FOR BACKFILLING TRENCHES SHALL BE PROPERLY COMPACTED IN ORDER TO MINIMIZE EROSION AND PROMOTE STABILIZATION. E. RESTABILIZATION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THESE REGULATIONS. F. APPLICABLE SAFETY REGULATIONS SHALL BE COMPLIED WITH. M APPLICABLE ❑ NOT APPLICABLE PROJECT COMPLIANCE: ALL REGULATIONS PERTAINING TO TRENCHING WILL BE MET AND FOLLOWED ON THIS SITE. MINIMUM STANDARD 17. WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR PUBLIC ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY VEHICULAR TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT IS TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE, THE ROAD SURFACE SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. THIS PROVISION SHALL APPLY TO INDIVIDUAL DEVELOPMENT LOTS AS WELL AS TO LARGER LAND -DISTURBING ACTIVITIES. M APPLICABLE ❑ NOT APPLICABLE PROJECT COMPLIANCE: SEDIMENT TRANSPORTED ONTO PAVED PARKING FACILITIES AND PUBLIC ROADS WILL BE REMOVED AT THE END OF EACH WORK DAY. IN ADDITION, A CONSTRUCTION ENTRANCE WILL BE USED AS SHOWN ON THE APPROVED EROSION AND SEDIMENT CONTROL PLANS. MINIMUM STANDARD 18. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS OTHERWISE AUTHORIZED BY THE LOCAL PROGRAM AUTHORITY. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENTATION. ALL TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES WILL BE REMOVED AFTER 30 DAY OF FINAL SITE STABILIZATION OR AFTER THE TEMPORARY DEVICES ARE NO LONGER NEEDED. M APPLICABLE ❑ NOT APPLICABLE PROJECT COMPLIANCE: ALL TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES WILL BE REMOVED AFTER 30 DAY OF FINAL SITE STABILIZATION OR AFTER THE TEMPORARY DEVICES ARE NO LONGER NEEDED UPON THE APPROVAL OF THE CERTIFIED EROSION AND SEDIMENT CONTROL INSPECTOR. MINIMUM STANDARD 19. PROPERTIES AND WATERWAYS DOWNSTREAM FROM DEVELOPMENT SITES SHALL BE PROTECTED FROM SEDIMENT DEPOSITION, EROSION AND DAMAGE DUE TO INCREASE IN VOLUME, VELOCITY AND PEAK FLOW RATE OF STORMWATER RUNOFF FOR THE STATED FREQUENCY STORM OF 24-HOUR DURATION IN ACCORDANCE WITH THE FOLLOWING STANDARDS AND CRITERIA: A. CONCENTRATED STORMWATER RUNOFF LEAVING A DEVELOPMENT SITE SHALL BE DISCHARGED DIRECTLY INTO AN ADEQUATE NATURAL OR MAN-MADE RECEIVING CHANNEL, PIPE OR STORM SEWER SYSTEM. FOR THOSE SITES WHERE RUNOFF IS DISCHARGED INTO A PIPE OR PIPE SYSTEM, DOWNSTREAM STABILITY ANALYSES AT THE OUTFALL FOR THE PIPE OR PIPE SYSTEM SHALL BE PERFORMED. B. ADEQUACY OF ALL CHANNELS AND PIPES SHALL BE VERIFIED IN THE FOLLOWING MANNER: (1) THE APPLICANT SHALL DEMONSTRATE THAT THE TOTAL DRAINAGE AREA TO THE POINT OF ANALYSIS WITHIN THE CHANNEL IS ONE HUNDRED TIMES GREATER THAN THE CONTRIBUTING DRAINAGE AREA OF THE PROJECT IN QUESTION; OR (2)(A) NATURAL CHANNELS SHALL BE ANALYZED BY THE USE OF A TWO-YEAR STORM TO VERIFY THAT STORMWATER WILL NOT OVERTOP CHANNEL BANKS NOR CAUSE EROSION OF CHANNEL BED OR BANK, - AND (B) ALL PREVIOUSLY CONSTRUCTED MAN MADE CHANNELS SHALL BE ANALYZED BY THE USE OF A TEN-YEAR STORM TO VERIFY THAT STORMWATER WILL NOT OVERTOP ITS BANKS AND BY THE USE OF A TWO-YEAR STORM TO DEMONSTRATE THAT STORMWATER WILL NOT CAUSE EROSION OF CHANNEL BED OR BANKS AND (C) PIPES AND STORM SEWER SYSTEMS SHALL BE ANALYZED BY THE USE OF A TEN-YEAR STORM TO VERIFY THAT STORMWATER WILL BE CONTAINED WITHIN THE PIPE OR SYSTEM. C. IF EXISTING NATURAL RECEIVING CHANNELS OR PREVIOUSLY CONSTRUCTED MAN-MADE CHANNELS OR PIPES ARE NOT ADEQUATE THE APPLICANT SHALL: (1) IMPROVE THE CHANNEL TO A CONDITION WHERE A TEN-YEAR STORM WILL NOT OVERTOP THE BANKS AND A TWO YEAR STORM WILL NOT CAUSE EROSION TO THE CHANNEL BED OR BANKS; OR (2) IMPROVE THE PIPE SYSTEM TO A CONDITION WHERE THE TEN YEAR STORM IS CONTAINED WITHIN THE APPURTENANCES; OR (3) DEVELOP A SITE DESIGN THAT WILL NOT CAUSE THE PRE -DEVELOPMENT PEAK RUNOFF RATE FROM A TWO YEAR STORM TO INCREASE WHEN RUNOFF OUTFALLS INTO A NATURAL CHANNEL OR WILL NOT CAUSE THE PRE -DEVELOPMENT PEAK RUNOFF RATE FROM A TEN YEAR STORM TO INCREASE WHEN RUNOFF OUTFALLS INTO A MAN MADE CHANNEL; OR (4) PROVIDE A COMBINATION OF CHANNEL IMPROVEMENT, STORMWATER DETENTION OR OTHER MEASURES WHICH IS SATISFACTORY TO THE PLAN APPROVING AUTHORITY TO PREVENT DOWNSTREAM EROSION. D. THE APPLICANT SHALL PROVIDE EVIDENCE OF PERMISSION TO MAKE THE IMPROVEMENT. E. ALL HYDROLOGIC ANALYSES SHALL BE BASED ON EXISTING WATERSHED CHARACTERISTICS AND THE ULTIMATE DEVELOPMENT OF THE SUBJECT PROJECT. F. IF THE APPLICANT CHOOSES AN OPTION THAT INCLUDES STORMWATER DETENTION HE SHALL OBTAIN APPROVAL FROM THE LOCALITY OF A PLAN FOR MAINTENANCE OF THE DETENTION FACILITIES. THE PLAN SHALL SET FORTH THE MAINTENANCE REQUIREMENTS OF THE FACILITY AND THE PERSON RESPONSIBLE FOR PERFORMING THE MAINTENANCE. G. OUTFALL FROM A DETENTION FACILITY SHALL BE DISCHARGED TO A RECEIVING CHANNEL, AND ENERGY DISSIPATERS SHALL BE PLACED AT THE OUTFALL OF ALL DETENTION FACILITY AS NECESSARY TO PROVIDE A STABILIZED TRANSITION FROM THE FACILITY TO THE RECEIVING CHANNEL. H. ALL ONSITE CHANNELS MUST BE VERIFIED TO BE ADEQUATE. I. INCREASED VOLUMES OF SHEET FLOWS THAT MAY CAUSE EROSION OR SEDIMENTATION ON ADJACENT PROPERTY SHALL BE DIVERTED TO A STABLE OUTLET, ADEQUATE CHANNEL, PIPE OR PIPE SYSTEM, OR TO A DETENTION FACILITY. J. IN APPLYING THESE STORMWATER RUNOFF CRITERIA, INDIVIDUAL LOTS OR PARCELS IN A RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT SHALL NOT BE CONSIDERED TO BE SEPARATE DEVELOPMENT PROJECTS. INSTEAD, THE DEVELOPMENT, AS A WHOLE, SHALL BE CONSIDERED TO BE A SINGLE DEVELOPMENT PROJECT. HYDROLOGIC PARAMETERS THAT REFLECT THE ULTIMATE DEVELOPMENT CONDITION SHALL BE USED IN ALL ENGINEERING CALCULATIONS. K. ALL MEASURES USED TO PROTECT PROPERTIES AND WATERWAYS SHALL BE EMPLOYED IN A MANNER WHICH MINIMIZES IMPACTS ON THE PHYSICAL, CHEMICAL AND BIOLOGICAL INTEGRITY OF RIVERS, STREAMS, AND OTHER WATERS OF THE STATE. M APPLICABLE ❑ NOT APPLICABLE L. ANY PLAN APPROVED PRIOR TO JULY 1, 2014, THAT PROVIDES FOR STORMWATER MANAGEMENT THAT ADDRESSES ANY FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS SHALL SATISFY THE FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS IF THE PRACTICES ARE DESIGNED TO (1) DETAIN THE WATER QUALITY VOLUME AND TO RELEASE IT OVER 48 HOURS; (11) DETAIN AND RELEASE OVER A 24-HOUR PERIOD THE EXPECTED RAINFALL RESULTING FROM THE ONE YEAR, 24-HOUR STORM; AND (111) REDUCE THE ALLOWABLE PEAK FLOW RATE RESULTING FROM THE 1.5, 2, AND 10-YEAR, 24-HOUR STORMS TO A LEVEL THAT IS LESS THAN OR EQUAL TO THE PEAK FLOW RATE FROM THE SITE ASSUMING IT WAS IN A GOOD FORESTED CONDITION, ACHIEVED THROUGH MULTIPLICATION OF THE FORESTED PEAK FLOW RATE BY A REDUCTION FACTOR THAT IS EQUAL TO THE RUNOFF VOLUME FROM THE SITE WHEN IT WAS IN A GOOD FORESTED CONDITION DIVIDED BY THE RUNOFF VOLUME FROM THE SITE IN ITS PROPOSED CONDITION, AND SHALL BE EXEMPT FROM ANY FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS AS DEFINED IN ANY REGULATIONS PROMULGATED PURSUANT TO 62.1-44.15:54 OR 62.1-44.15:65 OF THE ACT. ❑ APPLICABLE M NOT APPLICABLE M. FOR PLANS APPROVED ON AND AFTER JULY 1, 2014, THE FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS OF 62.1-44.15:52 A OF THE ACT AND THIS SUBSECTION SHALL BE SATISFIED BY COMPLIANCE WITH WATER QUANTITY REQUIREMENTS IN THE STORMWATER MANAGEMENT ACT 62.1-44.15:24 ET SEQ. OF THE CODE OF VIRGINIA) AND ATTENDANT REGULATIONS, UNLESS SUCH LAND -DISTURBING ACTIVITIES ARE IN ACCORDANCE WITH 9VAC25-870-48 OF THE VIRGINIA STORMWATER MANAGEMENT PROGRAM (VSMP) REGULATIONS. ❑x APPLICABLE ❑ NOT APPLICABLE N. COMPLIANCE WITH THE WATER QUANTITY MINIMUM STANDARDS SET OUT IN 9VAC25-870-66 OF THE VIRGINIA STORMWATER MANAGEMENT PROGRAM (VSMP) REGULATIONS SHALL BE DEEMED TO SATISFY THE REQUIREMENTS OF SUBDIVISION 19 OF THIS SUBSECTION. M APPLICABLE ❑ NOT APPLICABLE PROJECT COMPLIANCE: SEE SWM NARRATIVE ON SHEET 15 FOR SWM CALCULATIONS. REVISIONS REV I DATE I DESCRIPTION .00 Dominion Energy y gaiconsultants EROSION & SEDIMENT CONTROL MINIMUM STANDARDS AND DETAILS HOLLYMEADE SUBSTATION EXPANSION ALBEMARLE COUNTY VIRGINIA OPERATIONAL REGION B/M No. SCALE NTS PROJECT NAME DATE SHEET: 004 DESIGNER PROJECT ENGINEER DRAWING: APPROVED BY R220236-00-000-00-C-OOZ IN C 3 0 8 1 7 6 1 5 4 1 3 2 I 8 1 7 Wi 4 2 2 1 0 C 3 A 1992 3.01 a ••••iiiiiii• �ii�•iiiiiiiil ••••i�•i i i i i i i i i i!�•i•�•i•��i ly••••••A.•••••••.h ••••• T•` yyegyb•••dP �••d� LL.-4•ddddd-•d •d.4a \ i•Sii•• ••iiiiii i i i •i ;*-:1 •�•i i i4 ••••••, ••••••4M4••••••••'s• . •4••b� dbb••h••4•••deP• .6•-•-•d .•.•.4•.•.•.•ddd.•- V ram, Mr. 4 �=- �z�GL� � • ` .. :� .'4 s A. Source: Adapted from Conwed Plastics and Plate 3.01-1 VDOT Road and Bridge Standards TE VEP 8000-17-00 3 TABLE 3.31-C TEMPORARY SEEDING PLANT MATRQIAT S, SEEDING PAM, AND DATES SEEDING RATE NORTH° Sourrip 3/1 5/1 sills V15 5/1 911 .SPHCIBS PLANT CHARACTERISTICS Anne 1D0o ns m m m m m le 4/30 Sf15 1111 4r30 911 11115 OATS 3 W. (up m 100 N., 2 @c X - - X - U. 4ing vAtiMMe (A It, Noble). (Av_e Ike AMI not lees Ih.0 501h.) RYE• 2 bu (up W 1101W., 2.5 On. X - X X X Um ran lass HO a uJi.,z, wiohr (zL tut lore @evSO lbs.) corer. Tolamw cold and low mibue. GERLId N Mllim so the. Approx. 1 @ - X - - X - Waem<amo annual. Dies M But (SNaia jI&I tmM. May W WdAd .. ANNUAL RYEGRA33• W Re. IK I. X - X X X MAy Wadded ie mils. Will oaa9m morn-mm�mi ®w cot nr � .taom. W88PI140 IS IW. Ss5 w. - X - - X - W� PerenoiM. May IAVEGRASS booth. TOImatee Wt, dry Mopm cunv14 and ardd, m(Mile soil¢. May be added m Adam. KOREAN 25 Its. app.. 1% X X - X X - warm Isom annual legnme. I.ESPSDr1ZA` lbs. TolmMea acid mils. May W aAM2kBenwlaw) added m mixes. A Nonhem Piedmont and Mountain region. Sea Plates 3.22-1 and 3.22-2. b Southern Piedmont and Coastal Plain. n May be used as a cover crop with spring seeding. d May be used as a cover crop with fall Seeding. X May be planted between these data. - May Do be planted between these dates. TABLE 3.39-A ADHESIVES USED FOR DUST CONTROL Water Application Dilution Type of Rate Adhesive (Adhesive: Water) Nozzle Gallons/Acre Anionic Asphalt Emulsion 7:1 Coarse Spray 1,200 Latex Emulsion 12.5:1 Fine Spray 235 Resin in Water 4:1 Fine Spray 300 Acrylic Emulsion (Non -Traffic) 7:1 Coarse Spray 450 Acrylic Emulsion (Traffic) 3.5:1 Coarse Spray 350 Source: Va. DSWC 3 7 1992 STONE CONSTRUCTION ENTRANCE 3.02 70' MIN. t0• B A IN. EXISTING GROUND EXISTING 12' 1B' MI MIN. PAVEMENT VDOT • 1 COARSE AGGREGATE B I MRSHRRCK a' MIN. POSITIVE DRAINAGE TO IF REQUIRED SEDIMENT TRAPPING DEVICE MUST EXTEND FILL MOTH OF INOIESS AND PLAN VIEW 1TiESS OPERATION EXISTING 70' MIN. EXISTING PAVEMENT GROUND 3' S.� FILTER CLOTH 6• MIN. MOUNTABLE BERM ELEVATION TE VEP 8000-17-00 4 TABLE 3-VD SITE SPECIFIC SEEDING MDnVRES FOR PIEDMONT AREA Total Lbs. Minimum Care Lawn Per Acre - Commercial or Residential 175-200 lbs. - Kentucky 31 or Tuff -Type Tall Fescue 95-100% - Improved Perennial Ryeglass 0-5%D - Kentucky Bluegrass 0-5% High -Maintenance Lawn 200 250 lbs. - Kentucky 31 or Turf -Type Talt Fescue 100% General Slope (3:1 or less) - Kentucky 31 Fescue 128 lbs. - Red Top Grass 2 lbs. - Seasonal Nurse Crop • 20 lbs. 150 lbs. Low -Maintenance lope { to ner than 3.1) - Kentucky 31 Fescue 108 lbs. - Red Top Grass 2 lbs. - Seasonal Nurse Crap A 20 lbs. - Crownvetch •" 20 lbs, 150 Tbs. Use seasonal nurse crop in accordance with seeding dates as stated below: February 16th through April ...................... Annual Rye May 1st through August 15th ..................... Foxtail Millet August 16th through October ...................... Amoral Rye November through February 15th................... Winter Rye `• Substitute Sericea lespedeza for Crownvetcb east of Farmville Va. (May through September use hulled Sericea, all other periods, use unhulled Sericea). If Flatpea is used in lieu of Crowllvetch, increase rate to 30lbs./acre. All legume seed must be properly inoculated. Weeping L.ovegrass Billy be added to any slope or low -maintenance mix during warmer seeding periods; add 10-20 lbs./acre in mixes. 111- 303 3 3.32 1992 3.05 1992 CONSTRUCTION OF A SILT FENCE (WITHOUT WIRE SUPPORT) 1. SET THE STAKES. 2. EXCAVATE A 4" X 4" TRENCH UPSLOPE ALONG THE LINE OF STAKES. FLOW 3. STAPLE FILTER MATERIAL TO STAKES AND EXTEND IT INTO THE TRENCH. 4. BACKFILL AND COMPACT THE EXCAVATED SOIL. SHEET FLOW INSTALLATION (PERSPECTIVE VIEW) POINTS A SHOULD BE HIGHER THAN POINT B. Source: Adapted from Installation of Straw and Fabric Filter Barriers for Sediment Control, Sherwood and Wyant III - 25 1992 SILT FENCE DROP INLET PROTECTION 2 X 41 VOOD FRAME DROP MET VITN GRATE FRANC a• lma ��y GATHER �^ EXCESS UAT CORNERS PERSPECTIVE VIEWS ELEVATION OF STAKE AND FABRIC ORIENTATION SPECIFIC APPLICATION DETAIL A THIS METHOD OF INLET PROTECTION IS APPLICABLE WHERE THE INLET DRAINS A RELATIVELY FLAT AREA (SLOPE NO GREATER THAN 5%) WHERE THE INLET SHEET OR OVERLAND FLOWS (NOT EXCEEDING 1 C.F.S.) ARE TYPICAL. THE METHOD SHALL NOT APPLY TO INLETS RECEIVING CONCENTRATED FLOWS, SUCH AS IN STREET OR HIGHWAY MEDIANS. Source: N.C. Erosion and Sediment Control Plate 3.05-2 Planning and Design Manual 1988 Ell -35 3.35 TABLE 3.35-A ORGANIC MULCH MATERIALS AND APPLICATION RATES RATES: MULCHES: Per Acre Per 1000 sq. ft.NOTES: Straw or Hay 1; - 2 tons 70 - 90 lbs. Free from weeds and coarse (Minimum 2 matter. Must be anchored. tons for Spread with mulch blower winter cover) or by hand. Fiber Mulch Minimum 35 lbs. Do not use as mulch for 1500 lbs. winter cover or during hot, dry periods.* Apply as slurry. Com Stalks 4 - 6 tons 185 - 275 11hs. Cut or shredded in 4-6" lengths. Air-dried. Do not use in fine turf areas. Apply with mulch blower or by hand. Wood Chips 4 - 6 tons 185 - 275 lbs. Free of coarse matter. Air- dried. Treat with 12 lbs nitrogen per ton. Do not use in fine turf areas. Apply with mulch blower, chip handler, or by hand. Bark Clips 50 - 70 cu. 1-2 cu. yds. Free of coarse matter. Air - or yds. dried. Do not use in fine Shredded turf areas. Apply with Bark mulch blower, chip handler, or by hand. a When fiber mulch is the only available mulch during periods when straw should be used, apply at a minimum rate of 2000 lbs./ac. or 45 lbs./1000 sq. ft. Source: Va. DSWC 5 III - 353 0 3.07 Plate 3.07-1 1992 3.36 TYPICAL ORIENTATION OF TREA TMENT - I (SOIL STABILIZATION BLANKET) SHALLOW ON SHALL OM SLOPES, STRIPS OF NETTING PROTECTIVE COVERINGS MAY BE APPLIED ACROSS THE SLOPE. BERM WHERE THERE IS A BERM AT THE TOP OF THE SLOPE, BRING THE MATERIAL OVER THE BERM AND ANCHOR IT BEHIND THE BEAM. ON = SLOPES, APPLY PROTECTIVE COVERING PARALLEL TO THE DIRECTION OF FLOW AND ANCHOR SECURELY. _ - BRING MATERIAL DOWN TO A LEVEL AREA BEFORE <- TERMINATING THE INSTALLATION. TURN THE END UNDER 4' AND STAPLE AT 1Y INTERVALS. � \ IN DITCHES, APPLY PROTECTIVE COVERING PARALLEL TO THE DIRECTION OF F-M. USE CHECK SLOTS /S REQUIRED. AVOID JOINING MATERIAL W THE CENTER OF THE DITCH IF AT ALL POSSIBLE. TE VEP 8000-17-00 20 3 TABLE 3.30-A CUBIC YARDS OF TOPSOIL REQUIRED FOR APPLICATION TO VARIOUS DEPTHS Depth Per 1,000 inches Square Feet Per Acre 1 3.1 134 2 6.2 268 3 9.3 403 4 12.4 537 5 15.5 672 6 18.6 806 Source: Va. DSWC REVISIONS y galconsultants REV DATE DESCRIPTION Dominion Energy EROSION & SEDIMENT CONTROL DETAILS HOLLYMEADE SUBSTATION EXPANSION ALBEMARLE COUNTY VIRGINIA OPERATIONAL REGION B/M No. SCALE NTS PROJECT NAME DATE SHEET: OO5 DESIGNER PROJECT ENGINEER DRAWING: APPROVED BY R220236-00-000-00-C-00%' 2 1 Le A 8 7 6 5 4 2 2 1 1 / I EROSION & SEDIMENT CONTROL AND DEMOLITION PLAN (1 OF 31 NO, KEY SYMBOL TITLE EXISTING MAJOR CONTOURS v I I I I 1 - — — — — — — - EXISTING MINOR CONTOURS N/F I I Z I I I I 142P PROPOSED MAJOR CONTOURS D PARCEL 0..' I 7 I I I I MA 032✓O-01-00-01400 cn I I Pk \ \ _ 1406DECATURDRIVE I = I p PROPOSED MINOR CONTOURS --------------- STEVENM.MALONE M I I / \ _ ORLAUR/EDALE I M I I I PR/MARYZON/NG' I TOPOGRAPHIC SURVEY BOUNDARY CD PLANNED RES/DENRAL O DEVELOPMENT v I ` \ C/) / / \ \ \\ \ \\ �` —, \ \ \ EXISTING ADJACENT PROPERTY LINE / / / _ / \\ \ \ \ \ `\ W \ ( N/F I EXISTING SITE PROPERTY LINE \ \ \------ G PARCEL/D. — — — — ' \ 1z 032✓0-01-004150Q \ \ �Cy 114160ECATUNSO 6 g EXISTING FENCE LINE \ CASEYROS/NSOA}'& REIKOIGAAAShT PR/MARYZONF" E I r. PROPOSED FENCE LINE J \IPLNNDRES/DN AL DEVELOPMENT�_J_ EXISTING OVERHEAD ELECTRIC EXISTING UNDERGROUND ELECTRIC EXISTING UNDERGROUND TELEPHONE // UFO EXISTING FIBER OPTIC __ — _ _ — — ^ — — — 1 \ \ \ \ \ \/ir II I i I `\ / / — — — N EXISTING TELECOMMUNICATION LINE j� - EDGE OF EXISTING GRAVEL PROPOSED SUBSTATION PAD EXISTING EDGE OF WATER TREELINE PROPOSED ACCESS ROAD CENTERLINE /—-----J/\4g \�\\ \ �`I11� / / / / —/— — — — — — — —— — —� / /�\ S. �\ ��\ �� \ \ \ IIII / / // / // EXISTING RIP RAP _ / _ _ \_� III1 / / // � El EXISTING INLET -------------------- — ✓ / \ \\ \\\� �\\\�_ \��rr l l/ I ❑ PROPOSED INLET EXISTING CULVERT EDGE OF EXISTING DITCH I�°44'09"W f09.36) o LIMIT OF DISTURBANCE I PROPOSED STORM SEWER V/R/AELECTR/c8 — — — — — -- — — — — — I // I �� EXISTING POWER POLE AND GUY WIRE PO ER COMPANY %`'s \ \ 03200-00-00-03700 / / I I ZONED: fANOR15 / —!----- J --- III I\ \ I \ BENCHMARK AREs72ACI / /� r--------- - + III\ F EXISTING IRON ROD FOUND 3.02 ce CONSTRUCTION ENTRANCE B 490, \ I I I ? l / I I I IIII / —1 _ / — d� I I • REVISIONS y 9atconsultants B o c / I UFO REV DATE DESCRIPTION _ Dominion Al /Energy / _ u< `----------- ---->' EROSION & SEDIMENT CONTROL AND NOTES: / \\ `\ �� �� �� /n /I / / — �► — I— — — — — — — DEMOLITION PLAN (1 OF 3) MATCHLINE SHEET008 1. TOPOGRAPHIC INFORMATION SHOWN HERE IS BASED ON A TOPOGRAPHIC / \ FIELD SURVEY COMPLETED BY DRAPER ADEN ASSOCIATES DATED / \ \ \ \ \ \ \ I MARCH2O22. / \ \ I \ / I / / c: I A 2. SOURCE OF MERIDIAN: NAD83 BASED UPON A TOPOGRAPHIC SURVEY OF HOLLYMEAD SUBSTATION BY RICHARD L. FRALIN, L.S. DATED 04/17/2013 / \ \\ \\ \ / I I /—r _ _ _ _ _ _ ///II I / / / \\ I �I HOLLYMEADE SUBSTATION EXPANSION \ PROVIDED BY DOMINION ENERGY. / / II \ 3. VERTICAL DATUM: BASED UPON A TOPOGRAPHIC SURVEY OF HOLLYMEAD y ALB EMARLE COUNTY V I RG I N IA SUBSTATION BY RICHARD L. FRALIN, L.S. DATED 04/17/2013 PROVIDED BY y \ \ \ \ \ \ 1 ` — — — // III /I' / / -` \ 3 O 2HO DOMINION ENERGY. � \\ \\ \ \ \ \\ I / / / III ✓ / / I OPERATIONAL REGION B/M No. SCALE 1"=20' 4. ELEVATION POINTS BASED ON TOP OF DIRT. s, / I I / / / \ PROJECT NAME DATE SHEET: / \ \ \ \ \ I I I I — _ SCALE: 1 — 20 006 5. CONTRACTOR SHALL MONITOR AND PROVIDE DUST CONTROL ON \ \ / / l I I I / / / \G�\ DESIGNER PROJECT SITE AND ALONG SITE ACCESS OFF WORTH CROSSING DURING /' \ \\ \ `\ \ \ \ `\ `\ _ �' ` J'�I / / / / / \ PROJECT ENGINEER DRAWING: CONSTRUCTION. / / \ \ \ \ \ _ / I _ II / / _ �— 20 0 20 40 APPROVED BY 20236-00-000-00-C-006-C 8 7 6 5 4 3 2 1 10 x I A 8 7 6 5 4 2 2 1 / \ \ \\\\\ NOTES: EROSION & SEDIMENT CONTROL AND I \ \\\ 1. TOPOGRAPHIC INFORMATION SHOWN HERE IS BASED ON ATOPOGRAPHIC DEMOLITION PLAN (2 OF 3) \\ \\\ \ /� \\�\ ` FIELD SURVEY COMPLETED BY DRAPER ADEN ASSOCIATES DATED NO. KEY SYMBOL TITLE MARCH2O22. _ I EXISTING MAJOR CONTOURS \ 2. SOURCE OF MERIDIAN: NAD83 BASED UPON A TOPOGRAPHIC SURVEY OF cfl I I I \ \ HOLLYMEAD SUBSTATION BY RICHARD L. FRALIN, L.S. DATED 04/17/2013 _ \ N/F \ \ \ \ \ / / / \ \ \ \ �\ \ EXISTING MINOR CONTOURS O I PAiP�EL/D: \ \ \ I \ \ \ \ \ \ ( ) / / / \ \ \ \ \ \ \ PROVIDED BY DOMINION ENERGY. NF I w I I I I 032✓O-'Of- -olsoo I \ \ \ \ \ N� \ \ \\ \ \\ \ \ / / // \ \� \\ \\ \\\ \ 3. VERTICAL DATUM: BASED UPON A TOPOGRAPHIC SURVEY OF HOLLYMEAD PROPOSED MAJOR CONTOURS I 14220ECATU R/VE SUBSTATION BY RICHARD L. FRALIN, L.S. DATED 04/17/2013 PROVIDED BY Lu I Q \ \PARCEL /D.' \ \ \ / / D PARCEL / I I MAR/SA GOOD \ I \ ) l / / \ \ \ \ \ \ \ 032✓aol-000 = I I l I \ o32✓t,01-oao>eo0 \ \ \ I / DOMINION ENERGY. 406DECATUROR/uE \ PR/MARYZON/NG. \ \ r 1434DE-qATURDRIVE\ \ \ I I I / / ' / \ \ \ \ 4. ELEVATION POINTS BASED ON TOP OF DIRT. PROPOSED MINOR CONTOURS W I P[ uNED RES/DENT/AL \ \ \ BR/AN OHNES & rEVENM MA[ONE Z dLFUELOPMENT \ \ \ ✓ENN/FR[OHNES I \ \ \ \ \ \ I 1 / / / \ \ \ 5. CONTRACTOR SHALL MONITOR AND PROVIDE DUST CONTROL ON OR LAUR/EDALE J I I I \ \ PR/MAR�CZON/NG \ \ \ I — — TOPOGRAPHIC SURVEY BOUNDARY \ PROJECT SITE AND ALONG SITE ACCESS OFF WORTH CROSSING DURING PR/MARYZON/NG.� NNED RES/DENT/AL = I I \ \ PLANNEDRkS/DENT/AL \ —\ \ \ \ \ \ / / / / ) ) \ \ \ CONSTRUCTION. EXISTING ADJACENT PROPERTY LINE U I \ \ \ \ DEVELOPMENT \ \ \ \ \ \ 1 \ DEVELOPMENT I I I \ I \ \ \ \ \ \ \ \ \ \ \ \ \ / N/F < I \ \ \ \ PARCEL /�7 \ \ \ \ \ \ I I I I I ` \ \ \ I \ \ \ \ \ \ \ \ \ \ \ \ \ \ I 0 2✓0.02-o0b00co / \ \ \ I I I I — — EXISTING SITE PROPERTY LINE I N/F \ I \ \ \ \ \ _ \ \ \ I\ \ \ \ \ \ \ ESIESPASRKpHEASSE2 NIF OPENITIKCE \ \ \\ \ \\ II II I I EXISTING FENCE LINE PARCEL FORET032Jo-01-00-OfWe \YIF PARCEL D' 11416DECATURDRIVE ` \ _ PARO° L /0' \ \ _ �?2JR01-00-01900 \ \ \ COMWAYTY \ I 1 \ \ GOD CASEYROB/NSO/�%& _ \ ` \ \ \ \ \\ PROPOSED FENCE LINE I_ \ — 03ia 01-00.01700 _ {� \ M4'' ATURDR/VE \ \ \ \ \ \ \ /�SSOC/A7�/ON/NC \ 1 \ \ \ \ — RE/KO /GARAS \ \ 1428 DECBj/�/RDR/VE \ \ \ CHR/STOPHEAN ,OC PR/MARYZONIN I — —\ _ R/6.(CBOBYMAz Dv� \ \ — _ _ \ ` HOANG \ \\ \ \ \ \ \ \ \ \ \ \ �' I \ \ \ �' , \ \ ` 0HE— EXISTING OVERHEAD ELECTRIC PLANNED RES/DEN ZAL —I _ NEEXhA EL/ZA H \ \ PR/MARYZON/NG \ MAK/L\ \ — — — \ — _ \ NNED RES/DENT/A?` — \ \ \ \ \ \ \ DEVELOPMENT�_J_ --- I \ �1 \ �� i---uce— _ /�(7/MARYZON/NG\ \ _ � _ \ ` `DEVELOPMENT , \ \ \ \ \ \ �\ � \ \ \ EXISTING UNDERGROUND ELECTRIC . �I. \\ — .PLANNEd77'OF�NiX�9L —I _ i—\� -- — _� _ �` _ DEVELOPMENT — --- _ _ r�—=y�yz� _\ _— — — \\ , j \\ \ \ i\ \'i \ \\ _� \\ 1 ) \I I Il (r /� \\\ —ocr— EXISTING UNDERGROUND TELEPHONE T— .1�1. �I I I / \\\ UFo EXISTING FIBER OPTIC — — — — — — — — — \ --\ -----/S73°A\F3 \94% 3`M 3�(l��-�nZ�-+- EXISTING TELECOMMUNICATION LINE rEDGE OF EXISTING GRAVEL oI\ I\\ \ \\ I\ II II I I\ 1\ II 1 i I f \ \/ l PROPOSED SUBSTATION PAD ! Y _ _ _ \ ' --- J __ I ✓ / / /\ \\ \ \ \\�� \\ \ \ \ \ I\ o \\ I\ \ EXISTING EDGE OF WATER 51p TREELINE Son —_— _ / \ \ \ \ 1 \ \ \ 1 I I I I _ ___ ------------ — --- I -- -- — -----= `39n_ % / / ( \ 1\ \\ \ \ 1 1 \\ \ \ \ 1 I I I I I --------------------- --- ---_-- ---—� // y \ \ \ \ \ \ 1 I I \\ / PROPOSED ACCESS ROAD CENTERLINE ----------------- — — ---� _ I r \ \\ \I 1 1\ \ \I II II 11 I i �� !I\ I C / / /��—__ —---------------------------------- �n I \ \ \ \ \ I I A I \\\\\\'L\\ / EXISTING RIP RAP —505— �_� J30n— I I 11 VIRGINIA s —---------------------- ---- -------- Son_ ° I \ \ \ \ 1 1 I I I I I g I \\ e ❑ EXISTING INLET / —__------ — —ion \ \ \ 1 I o to — — — ELECTRIC ROW _ _ _ _ _ _ _ _ _ 1 I \\ FROM SURVEY 6 _ —`� \ \ \ \\ \ \ \ \ \ \\ 1 1 1 I I I 1 I I I\ \ < / 18 PROPOSED INLET — — ------ --__ /— _ — —c \�' \� \ \ \ \. \, \ \. \ 1 1 1 1 1 1 1 1 I I \\\ �i a REMOVE EXISTING CULVERT \ \ \ I I ( I \�\ \� 18 ® PROPOSED LEVEL SPREADER J \ \ \ \ \ \ \ \ \ —�I�� / / I 0 I \ \ \ \ \CLEAR AND GRUB TREES \ ( I \ 1 \ \ � EDGE OF EXISTING DITCH LIMIT OF DISTURBANCE PROPOSED GATE EXISTING TO BE REMOVED X—X( \ \ \ \ \ \ \\ \\ \ \ \\ \\ \ EXISTING POWER POLE AND GUY WIRE X I \ \ \ \ \\ \\ \ \ \ \\ \I \ III I 1 1 I \ \\\\y \\1\ II \ BENCHMARK TBM B SET TBM B SET CHISELED SQUARE \ �\\ \ \ \ \ \ \ \ 1 1 1 \ \ I \ �( \ I \ \ \ \ \ I EXISTING IRON ROD FOUND Lu CHISELED SQUARE `� N:6729419.35 r Iof N:6729441.81 �— E 1 2L I \\ \ \\ \ \\ \\ \\ \ 11 11 11 1\ 1 \ \ \\ \ \ i \ I� \\A \\ ce I 3.02 CONSTRUCTION ENTRANCE CE \ E:11501958.74 EL0499.40' \ \ \ \ 1 1 \ \ \ I \II 3.05 X SILT FENCE sF EL=499.82' AIIII O I\ \\ \I \\\ \ \\ \ 1 TO PS M 1\ \\ \\ \\ I \\ \ II \ �I I \\\`�\ 3.07 P ® STORM DRAIN INLET PROTECTION \\; 3.30 ro ro TOPSOILING 3.32 vs rs PERMANENT SEEDING 3.35 Mu Mu MULCHING -r�- - - 1 REMOVE EXISTING FENCE \ I \ I I I I ° E \ \ \ w I I I I I I REVISIONS \\ I Ne I gal consultants �`\ \ �y \ , , , , ; I I N:6729393.29 I I I I I I 1 off E:11501952.25 EXISTING PROPOSED LEVEL SPREADER \\ — — _ — _ _ _ — I TELECOMMUNICATION LINE 4p, I — oHE + / TO BE RELOCATED I I 1 I 1 1 \+ I _ � I J ' W S73°0448F 8000' S73'00WT 79.83' / ( l p ' O El /S73°0448F 8000/ / / I \ I /Sl3°0448E 30.00% ' \� SUBSTANONBASEL/NE 0 II II I I I i I I I I I \ I II 11 I I II I I I ENO UFO 0 — UFOW- —mil €$ rn�J �J� ®e— \ �€ _— ��€ — \\ i I I I I °N� P I I I I II I I I I 11 I I III \ I I f REV DATE DESCRIPTION cc�� I \ I tiF I� aN II III I°NE� o�Ee yl Il I II \ I I 1 II I II I I I � Dominion' PF Energy I I° \\\ _ _U/0 UFO UFO U O 40—\F--UFO u=E /----U _--_ -EUG� UG — --IUGE— �\ _/ I I l II II II EROSION & SEDIMENT CONTROL AND --° ---'---11-- UGE ON DEMOLITION PLAN (2 OF 3) MATCHLINESHEET008 a 1 \ I 1 I I / I __��----------- t �— e, A Ii a / UGE 0 ° �� -- /' \ II II I I I 11 xll �IIII i I I II III III HOLLYMEADE SUBSTATION EXPANSION °yF r ALBEMARLE COUNTY VIRGINIA 3 0 �Ho-� ` DHHo > 3 - — 3Ho / II _ / / I I r I I 1 I I I I OPERATIONAL REGION B/M No. SCALE 1"=20' PROJECT NAME DATE SHEET: SCALE: 1"=20' DRAWING: DESIGNER 007 o , / / / / PROJECT ENGINEER 20 0 20 40 APPROVED BY 20236-00-000-00-C-006-0 8 7 6 5 4 3 2 1 0 e L A 8 7 6 5 4 2 2 1 �Np 1 j I I �� I 1 \ \ \ 1 1 i I I i I I I EROSION & SEDIMENT CONTROL AND k l \ l — -\\\o I/ I /I I / IIII/I IIII I I II II ljII ---n_®� w- -®�—D�----E wM`^O— L—IT.I ON PLAN (3 OF 3) FO—�/€$ OfUFO 6€— zz NO. KEY SYMBOL TITLE EXISTING MAJOR C ON TO UR S yF EXISTING MINOR CONTOURS I pee REMOVE EXISTING FENCE OE PROPOSED MAJOR CONTOUR S 00 DUFO UFO U O U UFO PROPOSED MINOR CONTOURS O 0UGE ?�uTOPOGRAPHIC SURVEY BOUND ARY MATCHLINE SHEET 007�uGE— 0 oE /c UGE EXISTING ADJACENT PROPERTY LINE � EXISTING SITE PROPERTY LINE EXISTING FENCE LINE u0ECUT AND REMOVE 48 LPROPOSED FENCE LINE �W OF EX. 36" STORM o DRAIN PIPE. EXISTING OVERHEAD ELECTRIC Z 3HO73H 3HO REMOVE EXISTING UGE— EXISTING UNDERGROUND ELECTRIC VDOT DI-7 INLET. UG*EXISTING UNDERGROUND TELEPHONE P /o EXISTING FIBER OPTIC EXISTING TELECOMMUNICATION LINE — -- /TPS MU EDGE OF EXISTING GRAVEL PROPOSED SUBSTATION PAD O CTv EXISTING EDGE OF WATER + CO TREELINE CHISELED SQUARE C SET PROPOSED ACCESS ROAD CENTERLINE N:6729329.67 \ IF EXISTING RIP RAP C E:11501800.27SIF — /+E4EXISTING INLET �PROPOSED INLET / PROPOSED LEVEL SPREADER x—x�_X_1 x REMOVE EXISTING RETAINING g WALL AND FENCE EXISTING CULVERT VIRGINIA EDGE OF EXISTING DITCH R�h ELECTRIC ROW FROM SURVEY PROPOSED LEVEL SPREADER LIMIT OF DISTURBANCE AdEXISTING TO BE REMOVED - - - - - - - - - _ — PROPOSED STORM SEWER EXISTING POWER POLE AND GUY WIRE BENCHMARK EXISTING IRON ROD FOUND 3.05 ) SILT FENCE 3.07 STORM DRAIN INLET PROTECTION6 EXISTING —TOPSOILING TELECOMMUNICATION LINE 3.32 PERMANENT SEEDING PROPOSED RETAINING WALL TO BE RELOCATED 3.35 MULCHING CLEAR AND GRUB TREES \� 100e REVISIONS /galconsultan[ s 100000 IVIF / l PO FORESTL�ESCOMMON AREA Ph-> PAR C FORESOOMUN/TYI / / ASSOCIATION D.E. 1304, PG. 346 PR/MARYMN/NG,R4 RESIDENTIAL DATE DESCRIPTION 0 Dominion � Energy EROSION & SEDIMENT CONTROL AND DEMOLITION PLAN (3 OF 3) HOLLYMEADE SUBSTATION EXPANSION ALBEMARLE COUNTY VIRGINIA OPERATIONAL REGION B/M No. SCALE 1"=20' PROJECT NAME DATE SHEET: SCALE: 1 " = 20' DESIGNER 008 PROJECT ENGINEER DRAWING: 20 0 20 40 APPROVED BY 20236-00-000-00-C-006-0 8 7 6 5 4 3 1 2 1 10 e 1.1 A 0 x L 121 8 7 6 5 4 2 > I l\ / �\ \ — / / /// 11 Il \\\ \\ \ ✓ / N/F I I m M03, A j I I I >a22 \ _ 032✓0-01-00-01400 PARCEL ID.'I CD I I I I \ 1406DECATURDRIVE I = I I PL�9PN - - - - - - - - - - - - - STEVENU.. MALONE M I D ORLAUR/EDALE I M \ \ \ PR/MARYZON/NG, PLANNED RESIDENT/AL I I \ DEVELOPMENT I CD\ \ \ I II co / N/F ZCSOL ID 11 —/\\ \_ / / \ ` \ \----_—\ �' 11416DECATURDR,IVE \\\— OCASEYRORINSO & I /--- ---- --— / // /_ \ \ \ \ \ \ o \ Il{ / \ \ \ \ \ \ -L RE/KO /GARAPR IMA SN PLANNED RESIDE rIAL DEVELOPMENT _ 1 _ �'-_- / — — — _ — I —_------ i----_—__-----� r\ \\ 14 \-- / —-----------'\ — — — — — — — — — — — — — — — — — — \ \ \ \ \ \ �\11 I / / / / / I — — — — (N13W'09"W 109.367 ° V/R/A ELECTR/C& --------- PO ER COMPANY P4q'?CEL /D.- r _ 03200-04-DO-03700/ ZONED'/MANOR/5 AR 672AC/ / // ---- -_---I /�3 F/ \ I I l l I I I I IIII I I I I 1 490, ----- / Ix \ UFO I \\ I 2 ° \ MATCHLINESHEET 011 } \` r - 310 0— \\\\\ \\\ \\ \\\ \\\ 11\ // IIIII II / / SCALE: 1"=20' \`� I I I I % / ✓'/ `\\ \\ \`� \. \\. \� \ ''/ // i—�llll r/ / / _��\— 20 0 20 _— 40 8 1 7 1 6 1 5 A\ 4 1 3 2 DETAIL NO 1Ti�TLcI SITE PLAN (1 OF 3) SYMBOL TITLE — UGE —UFO- - — — GN — 6El 18 6El 18 R REVISIONS 1 EXISTING MAJOR CONTOURS EXISTING MINOR CONTOURS PROPOSED MAJOR CONTOURS PROPOSED MINOR CONTOURS TOPOGRAPHIC SURVEY BOUNDARY EXISTING ADJACENT PROPERTY LINE EXISTING SITE PROPERTY LINE EXISTING FENCE LINE PROPOSED FENCE LINE EXISTING OVERHEAD ELECTRIC EXISTING UNDERGROUND ELECTRIC EXISTING UNDERGROUND TELEPHONE W76911kqLegg 1-1q.Kola 1I6 EXISTING TELECOMMUNICATION LINE EDGE OF EXISTING GRAVEL PROPOSED SUBSTATION PAD EXISTING EDGE OF WATER TREELINE PROPOSED ACCESS ROAD CENTERLINE EXISTING RIP RAP EXISTING INLET PROPOSED INLET EXISTING CULVERT EDGE OF EXISTING DITCH LIMIT OF DISTURBANCE EXISTING POWER POLE AND GUY WIRE BENCHMARK EXISTING IRON ROD FOUND DESCRIPTION Dominion WEnergy SITE PLAN (1 OF 3) galco�ltan[s HOLLYMEADE SUBSTATION EXPANSION ALBEMARLE COUNTY VIRGINIA OPERATIONAL REGION B/M No. SCALE PROJECT I NAME DATE SHEET: OO9 DESIGNER PROJECT ENGINEER DRAWING: APPROVED BY 20236-00-000-00-C-009-C 2 1 0 Le I A 1 8 1 7 1 6 1 5 \1/ 4 1 2 2 1 Le L Ll C) I I I \NIF O PARCEL /D: I I I 032✓0-01-ao-01600 PARC L / I LIJ I I I I f422DEC4TU1WR/VE I \ \ \ \ I \ —/0. 3/2✓/0._/0/ f-/M—\A_—R \/_SA—= /G OsO-D— _PYI—N C PR/MARYZON/NG� 01-03L`0—-\/0D18-- 0`0 434 \1TURDR/\V—E�o\ t060ECAw IP NNEDRES/DNT/AL BR/A OHNES&MEVENMLE ORLARLnF<ELOPEV JENNIF LOHNES :3PR/MARPR/MAR ZONING' ANNEDNT/AL PLANT/AL DEVELMT \\_��\= o�\_ n\��\ \ \ �\ / \ \_\ \ \ \ \ r\ \ \\ \ \— \ \ \\\I\\\ \\—\ \-- ` \\\ — _—\II I \\=—\/ \\ \\ \\\r\ \\1I 1 im/ L\ �( e\ \ d1\\\-/�\1 \\ \\\\\ \ _\\i�\ I \ \\ ) l/\\ \\I \ I ' \I \\\ + \\ \\/\� \\ \ �\ \\�\\\//\�\\\\ \\\� \•/ \ \�\ � \IN\\ \I / \FDEVELOPMENT I \ \ PARCEL ) \/\pQ OhZO-02- 0\C\\ O ESESPARKHN/F ASE\\ \2 \ OPENS ACE ID' N/F p 032✓Of--01507 PARCEL D' FOREST�AKES PA\���?2JR0f-00-0900 COMM(N/TY1416DECATURAVE LD 0301-OD->700CASEYROB/NS0144 4AdATURDR/VE ASSOC/ANCIVINC RE/KO/GARASII>428DECAPRDRIVE \\CHR/STOPMS9,VCOC u PRIMARYZON/N� R/6KBOSYMVhEW HOANG YZON/NG' \\ PLANNED RES/DENT/AL - NE�tH4 ELZAg�H PR/MAR MAK/LNED RES/DENT/ACDEVELOPMEN7ELOPMENTAR/MARYZON/NG DEVEL OPMELXT ----__�-- /S7T E3Z94% \\ \\ \ \ ` lmii — — ------ / \1\1 \— — — — — — — —�3on —_ _____----- --_3 _ ------------------ -------_-- —_ 505 on —I- -- — — — — — — — — — — — — — — — — — — ------ — — — — -- •/' `\\\I� \%\l 3`n_ — — — — — — — — — — — _��3_On =--------- I I \\I \ /I \ II\\ I \\ \\II .II I —\J E \1 3 10 1V\ 1\\ I I\ \R\ \\I I\ \ IGI\\\NIIN\ II \\I\\I0 AI\E\\\ \ L\\I\\IE\ I0 \\ \ C\II I I\ \ I TI\\\\R\1\I\ I\II \C \\\\\1 \\ I \\ h\III% — — — — — — ROW FROM SURVEYrl 4 5 PROPOSED \ I\I\I III I\ I \ EIIII\I1II,(1 \'• \I \I II i1 I III \ II\I\IIIII\ III 0 \SWIN\III\ G GATE \I .11 PROFEN 11 1p `5 PROPOSED 14'ACCESS ROAD (TYP.) I II Ii I\ IIIII I\ II /III I1% /I\/ \I\I /\I I\II I y TBMBSET CHISELED SQUARE N:6729441.81 E:11501958.74m,,ill EL=499.82'TBM B SET 0 CHISELED SQUARE N:6729419.35 o m = E:11502023.16 OEL=499.40' N N:6729393.29 off E:11501952.25 PROPOSED LEVEL 4 DER 63 FT S73448E 8000' \wOHE 8 9000E79.B3 IIIB 1 10 B(S73W48E8000) (S73048E80.00) SUBSTADON@SELLNE off10 y 00 o`Nl Ln FOy— UFO 6€°tiF UFUFO U O UhOo � UFO \ o`` 2 _2 UG U G E ° °E �o MATCHLINESHEET 011 E-032✓0 /I I , IO x J F I I — ' 3 PROPOSED 1 I I PROPOSED LEVEL 4 II I 0� 1 / — — ' W SWING GATE I \ 1 I I SPREADER 140 FT 18 I 707 \ 31 0 3H0 3H0 SCALE: 1 " = 20' \ / 20 0 20 40 8 1 7 1 6 1 5 /I\ 4 1 3 DETAIL NO. SITE PLAN (2 OF 3) SYMBOL TITLE 18 18 18 ——GNE— UGE - - UGT- -UFO- -—cw- REVISIONS EXISTING MAJOR CONTOURS EXISTING MINOR CONTOURS PROPOSED MAJOR CONTOURS PROPOSED MINOR CONTOURS TOPOGRAPHIC SURVEY BOUNDARY EXISTING ADJACENT PROPERTY LINE EXISTING SITE PROPERTY LINE EXISTING FENCE LINE PROPOSED FENCE LINE EXISTING OVERHEAD ELECTRIC EXISTING UNDERGROUND ELECTRIC EXISTING UNDERGROUND TELEPHONE EXISTING FIBER OPTIC EXISTING TELECOMMUNICATION LINE EDGE OF EXISTING GRAVEL PROPOSED SUBSTATION PAD EXISTING EDGE OF WATER TREELINE PROPOSED ACCESS ROAD CENTERLINE EXISTING RIP RAP EXISTING INLET PROPOSED INLET EXISTING CULVERT EDGE OF EXISTING DITCH LIMIT OF DISTURBANCE PROPOSED LEVEL SPREADER EXISTING POWER POLE AND GUY WIRE BENCHMARK EXISTING IRON ROD FOUND REV I DATE I DESCRIPTION Dominion Energy SITE PLAN (2 OF 3) galco�ltants HOLLYMEADE SUBSTATION EXPANSION ALBEMARLE COUNTY VIRGINIA OPERATIONAL REGION B/M No. SCALE 1"=20' PROJECT F NAME DATE SHEET: O1O DESIGNER PROJECT ENGINEER DRAWING: APPROVED BY 20236-00-000-00-C-009-0 2 1 0 Le L A 1 8 1 7 1 6 1 5 \I/ 4 1 2 2 1 \ I I 0I I II 1 PROPOSED LEVEL O FOO—�/€$ 0zz� k=J UFO SPREADER 63 FT l8 I II C ////////— //�/ //// ////'/ ///' //// /-/// /I ///�I� ~ / / / /I/ I ///\// /// / /� _�///' \/W/a0/ O/'//\ // / /II / \i/ce\� / / ///\/ "�// /// /\ _/ ///\/—\T✓-/ /,\ �/ � //////// /II //I /a // /E/sII — /c/// //// / k/ //,—// _a///// //Ir� / /_�/o (I//_//// / / /\// /-_/// ,IY�I/ /I G_/_°//cr /_ / I_'/� h0/�/G�'/ �_ /_I \// FIN•/ IS_tip/H//� ED//_ / I- iG/ / R/ /A/= // ce /// //_ /-/// / /�/- / '/ �//- I /_ //�N T/ /_I j I—/ //A/o-///=_ /J //__/ /6--%�— _/_`/—/µ/mo/_ �l/ —L //— o/- // / _ —/ ,-•--\ _ /�IiI \\-- t� _\ - \/ _I_ \ \\�.I_ C_\\'-\- _- }/\ -_-\- - - �\-\i/- \`l\ /-\/ / // / \\ /�-�_/� - \_ ■ / _ /_= - I _��I rIFI_ I I II I\ I �_ �II lI�'_\ ____T __ __•`_ S\m N / / 4 \��o/ �/ \ )� ��\ \�1\8\��/�_/� •\�\ �� /\\ _\�— /i /iI—I/\—\ II\�'/' I \ I \ \ I oo//N�/� D UFO UFO Uo O UOUFO v 2 UGE IS, NNNS'/ 2uGEMATCHLINE SHEET 010 / o II_uGE ww Go °� /PROPOSED oy / /SWING GATE Z 3HO>3Ho 3Ho 3 PROPOSED WALL TO TIE TO EXISTING WALL / If PROPOSED STORM ___ _ - - - SEWER PROPOSED ?- FENCE LINE / CTV N - - - - _ CT CTV PROPOSEDTOP WALL ELEVTION: 494.38 _ _--- It HEIGHT: 6.85 INLET(TYP. TBM�CSET 4� CHISELED SQUARE ~ N6729329.E - TOP WALL ELEVATIO:494.33 / ItE:11501800.27 WALL HEIGHT: 8.5 EL=494.58' TOP WALL ELEVATION: VIRGINIA ELECTRIC eo°gss) 490 ROW FROM SURVEYWALL HEIGHT:9.06 _PROPOSED RETAINING WALL PROPOSEDIt LEVEL SPREADER140FT TOP WALL ELEVATION493.72 vd - - - - - - WALL HEIGHT: 10.16 3 TOP WALL ELEVATION:493.62 WALL HEIGHT: 7.61 - 10000, REVISED TREELINE / TOP WALL ELEVATION: 493.55 rnALL SEE WALL EL SEWALLEL. / NOR — . — . — . _ .— N/F It P,gRCEL /D.- 046B4-00-00L000A0 FORESTLAKESCOMMON AREA Ph -I PAR®+ra¢ SEE TABLE FORESTLAKESCOMMUN/TYI FIHIBED/ BELOT/ ASSOC/AT/ON SEE D.B 1304, PG. 346 Ttj(7 CMLIX�MPIIEPAMTOPR/MARY. R4 PEIIGEOTECI,EP RESIDENTIAL It ro'a I,II ,I LI IF °N, II II�I/IT I I II i II II/ II " IiI / II II/II III I II II III I :I III I IIII / I III I'I ' > 6"ON. PERFORATED DRAIN PIPETROUGH ram' IM®tYO.C. / Nor O'C' WALL 10' O C. MA% J / N MITERED TO SLOPE CE®E•D.C.CCSIPAGT BTAND-D R 8U%iRAOE / RE.( PI. - PEROEOTECI, REPORT / rs rs ra" / IDS / L / A LAP SPLICE LENGTH BAR SIIE CND P& CORCHEIE IOPflNS OTHERflNi3 IN e RETAINING WALL SECTION -' SCALE: IYr•1•S l / DETAILS FOR SITE PLAN —/ SCALE: 1" = 20' INFORMATION PURPOSES ONLY NOT— FORCONSTRUCTION 20 0 20 40 8 7 6 5 4 3 SITE PLAN (3 OF 3) DETAIL NO. SYMBOL TITLE EXISTING MAJOR CONTOURS - - - - - - - - EXISTING MINOR CONTOURS PROPOSED MAJOR CONTOURS PROPOSED MINOR CONTOURS — TOPOGRAPHIC SURVEY BOUNDARY - EXISTING ADJACENT PROPERTY LINE - - EXISTING SITE PROPERTY LINE EXISTING FENCE LINE e 1 2 3 PROPOSED FENCE LINE 1818 18 - — — GHE— EXISTING OVERHEAD ELECTRIC — - - UGE— EXISTING UNDERGROUND ELECTRIC — - - GGT— EXISTING UNDERGROUND TELEPHONE UFO EXISTING FIBER OPTIC EXISTING TELECOMMUNICATION LINE EDGE OF EXISTING GRAVEL PROPOSED SUBSTATION PAD EXISTING EDGE OF WATER �. TREELINE - PROPOSED ACCESS ROAD CENTERLINE EXISTING RIP RAP 6 18 u EXISTING INLET 6 18 PROPOSED INLET EXISTING CULVERT EDGE OF EXISTING DITCH - LIMIT OF DISTURBANCE 18 PROPOSED STORM SEWER 4 18 PROPOSED LEVEL SPREADER EXISTING POWER POLE AND GUY WIRE BENCHMARK EXISTING IRON ROD FOUND y REVISIONS galconsultan[s REV DATE DESCRIPTION Dominion Energy SITE PLAN (3 OF 3) HOLLYMEADE SUBSTATION EXPANSION ALBEMARLE COUNTY VIRGINIA OPERATIONAL REGION B/M No. I SCALE PROJECTJ NAME DATE SHEET: 011 DESIGNER PROJECT ENGINEER DRAWING: APPROVED BY 20236-00-000-00-C-009-C 2 1 10 Le L A 1 8 7 6 5 4 2 2 1 GRADING AND DRAINAGE PLAN (1 OF 2) I I I \\ N/F I I I I AI)p P---€-_'L—\/-----\\1--60- 0 _`- /-\ - \_�U-/ ti- F-F\,\�--_ 0\-L-,IIIf- --\`_ /_� \= \\ - _ \- _\// mi_- \= - \ _\- -l\ €, $-\ / \ ,\_ \\ \_ g \ _I\\1 ma I\_-omJ \ III _ 3- \o—n-__—_ _-— \JI�\ -_ \I 7 I—\-\ � - _`���-_O/ �_y�✓ - `\N\uE�\ - S /-/ `~&.\ � '�o I /i\ -�_n�I'/� -II \-\\\-\-\ \ —/\\- _\\ ) _`\ \ `_ \ \-_3\o\`_-`n\_ \ \ �\\ -_\' /\-\ \\ / � \\ — � \ \ \=�\ _/\\\ \ yam \\ \ \\ \�\\ �—\/ y\ /\/\_�\ \ \-\\ \�\\\ _\—\ \ \ \ - �\ `\\ \ \ � \\\-' _\\- \�-J \\_- \/\ \\\ --\-/ /\ \\\\/\� \:\ .\ —\ .\:\-�\ -.�� \\—\_z N\\ I: \\; I \I o— : \ \ �'\• °`\ /� 0\—\—N; \ \E\ \—\ \ -\\Il 1\ .- /i\\\ \ _I1//T\ \\ \/ /\1X I\ /\ / I \ -\\\-\\\° J`/I \\ / -�\ \\.\ r( \•E/\�' ,Ii II I-1\I\�II,-Oi I�`cI\ \II Ij \\II \ '-\ I\�II \ III'.tI\II-.I-�I \l I \II I\/ \) II .I\I \I I.I � I I -•-.�\I \ . ,\\ \ /I\.1`\ I_\Ll\ II II\:1 \--� I\`\\ 1\-I �\.� \ I(��\I\\\ / \\��o \ �°\\\\ - - \:\ '\I� \\�\� II \_';I�I-l- \ --.�\\:- \ \ \ •\\ �\ \.\`_\ -\--\ :\\ ( . I I \ : .\\\ _\ \�\ .\1�\`�:/ \\ \\ !-\/If- \ \ \\r\ \.oyI I \'\\ ./ I:�\/\...\\ \�/'\-\ \ :\ \ /. \\\- / - i\ \I 1\ \\/ \ /\ \\//\ \\ �`I.- \ \\I\ \�\. / \ \ \\.\\/\\ -\v\ \\ \\ \ \\\\/ \\� \\-I\\ \/\/ \I\ \\ \\ 0 /\ - \\: I \/- \ I (\I.(I�II\ : �\-l2\\ I L\ N\ \ \✓-/ I \--\I\ ° 1'/E 1.:/\\ > \\\ 1\ / .\-:1 S1 %1/ . ' \ \1 10V\ . / \\�\\\jI\-I j\II \\/r\I/ II \\:\\ \% /\1.,I\ \ \- \ \1:i \ \- • \/ \E1\ /�\ I\\ \:\ -I sI \• \/. I o : I \\ II\1:�`� '\ \\• \: I/ \•- \T. \\I:1 \/\--\I \\•/ \I \ I. \ \1 1 \'\--\ /\\\\°1,I- 1\ \\ 1 \�\°\ \ \ \\' jl- 1\`I�\\ \E.'\ \\ \/ om\ I\L .--`I\\1\_ - ,\ 1 ` \.I'\\ j 1\.\- \\\ \ i1 -`\1 : \\ �\\\ \ 1 \\•-I\ \ ---`\ 1 \ \Ikp \ ��\\\ \'I/\ \I \\\- \\ i\ \\\\ \11..\•I 1 I 1� o 1\\ \\11�/1 '\ I�1\ / 1 1 1.\:\ \(:\ If1\`\• I\�\\ 1- .:\ I \ I 'I i` / \-\9- 1 -I \ \3-\\\I \1 �I1\ .1II I I3I/•\�`— � .) /, 8\1 `\ 1\ \\\ \1\\\/I1 \I I I\I1jI II \ /I \am1 I\\\II�I _\I \\\ \ I\ \\1 \\H1 \ \I I\°\\—`\\I� \\ \ \ 1I\I I\ \ i\ E\ � \ \ (IIN\ -I \II \\IEI\aI1. I \I1\ I,` \ \ I—o \I:g �\ U\ 1I \ III /° \\�I ` `II/I \ I`l \I��I\ /I ` I I/\I\I�I \\I `\` I\ \`-\I��i\ I \ 1♦�/�\o1\ l/I\I �l —>�\ r\�1w�/ 1 Ij I • I\/1 I�\' \\ /\IEj ✓�I\�, II \ 4I'I\\ ��i1 I \/ '\I\I�/)\\I\1� \ \f/ 'II/ � I - \ l I\I II\ III \ I\I• I\ III/\\I iII\I\ IIII � I/\ \II `I 8 188 - --❑--O EXISTING MAJOR A JO R C ONTO UR S 0320.01E0 1422DECA /R/VN/F I N/F \PARCEL ID.'DPMAR/SA GOOD 032✓?01-00.01800 - - - - - - - - EXISTING MINOR CONTOURS 0320.01-00-0 PR/MARYZON/NG14340EATUROR//E\06DECATURDR/VE PLN TEVENM MALONE VDELRES/EDET T/AL BRAN OPMN✓E/ ORLAUR/EDALE 1VN3RLHOHNFS PROPOSED MAJOR CONTOUR S PR/MARYZON/NG' PR/MARkZON/NG NNED RESIDENTIAL PANNEDRkS/DENTAL PROPOSED MINOR CONTOURS DEVELOPMENT DEVELO\MENr PARCELLo� TOPOGRAPHIC SURVEY BOUND ARY pH2N/F \ ES ESPARK N/F OPENIT1KCEPARCEL D' \✓/F PARCEL D' FORET032JO-01-0050VE EXISTING ADJACENT PROPERTY LINE 1416DECAURDRO0O14Y 03i01-0001700 M4'ATURDR/VE\ CASEYN& 1428DEBjRDR/VASSOC/A7YON/NC RE/KO/GARAENEXISTING SITE PROPERTY LINE RIWSOSYMA /EDV EX4L/H NGYZON HOA N /AL ZON/NGPLNNED RES/D/EXISTING FENCE LINEDEVELOPMENT� S/DENT/A?MAK/L\ NNEDRE\ AT1UARYZON/NGDEVELOPMENT OVED ——. _ PROPOSED FENCE LINEDEVELPMEN� _aHE— EXISTING OVERHEAD ELECTRIC\ a /s73oE3 94/ 4 3EXISTING UNDERGROUND ELECTRIC UGr—EXISTING UNDERGROUND TELEPHONE y UFO EXISTING FIBER OPTIC 510\EEXISTING TELECOMMUNICATION LINE - - - - - -----= EDGE OF EXISTING GRAVEL -------------------------------- - - - - --_- - --- - - - - - PROPOSED —505- n°nSUBSTATION PAD C _ VIRGINIA ELECTRIC - - - - - - _ - - - - ROW FROM SURVEY EXISTING EDGE OF WATER - - - - - - - - - - - - -------- --_ --- - - - - - - - - - - - -------- TREELINE PROPOSED ACCESS ROAD CENTERLINE rI\V\\\EXISTING RIP RAP 8 EXISTING INLET 8 El PROPOSED INLET 1EXISTING CULVERT \\\vIEDGE OF EXISTING DITCH #21A COMPACTED GRAVEL 499.29 _ TBM B SET ° J CHISELED SQUARE CHISELED SQUARE . . . . . . #57 STONE UNCOMPACTED GRAVEL S\A N:6729441.81 E:11501958.74 E:11502023.16 LIMIT OF DISTURBANCE EL=499.82' EL=499.40' PROPO4 SED LEVEL SPREADER BENCHMARK EXISTING POWER POLE AND GUY WIRE EXISTING IRON ROD FOUND N:6729393.29 E11501952.25 REVISIONS galcons (ants .orROPOSED LEVEL SPREADER 63 FT S73048F 8000' ° wl S73OOOF 79.E3' _ O /S73048F 8000/ 0SUBSTANONBSEL/NE OH o� l�0 UFO oHtREV DATE DESCRIPTION %/°yloNE Dominion' Energy LO co UFO o UFO U O : UF4p u=E u UGEucE° GRADING AND DRAINAGE PLAN 1 of 2 Hi uc UGP� 1���� 1-7 �E MATCHLINE SHEET 014 I GEE - A o m PROPOSED LEVEL°SPREDER 140 FT HOLLYMEADE SUBSTATION EXPANSION ° i 1 I i I ALBEMARLE COUNTY VIRGINIA 31 Ho-- 3H0 ENO OPERATIONAL REGION SCALE "=20' T:SCALE. 1 PROJECTNAME DATE SHEEUzQ DESIGNER 013 494.91 / —e e 9 495..00° / - / PROJECT ENGINEER DRAWING: / I 20 0 20 40 APPROVED BY 20236-00-000-00-C-013-0 8 7 6 5 4 1 3 1 2 1 0 Le A n 8 1 7 1 6 1 5 \1/ 4 1 2 2 1 oNE493.38 1 \ h I I I I I II uFo o _ UFO-�€� g �€o= �5€=�� ®e- / I. I I pH� p . - I . �• I I I I I d 6€- ��- -•-`�-\�/ -�'--\l�_- n- / _ --\ ---�--�/ �---./ \ _-- - - -I-_I _iyI Ii- - -- j_�l� � --?- _-_\\ �-__ - -_` �� ,/�--_-�, - /-._ .5 -\ _a-11-8\_\ .- \ \_\U""_ -�\�- \- _ \-\\6 -\ \ _\_ -_\_--- _� \- - _ -�` \-- \_. _\-�\-_ \� -\-�_ \! �\\-\ \�/\ -\� \ \ �C� \.-\ �\_\- / \\ '�- \.\��'\:�� /.a.�'- \N\/\/•:- f\\ ./--`\ /\\ N\ \�\.� � .\N: \\ \ \ / \ /\\\/ \/\�//.\-�\\ \l-/ _-",\ ��- \PE.. \- III I�\\I, -\\'-_I�I/I'1'1 I I \\ /- _I\I\I % . I \ I I \- \I_ -r\ \l 7I /o I \\ D I LO _ O _�i • .// `\_' �_\\\\I `� / I I\ 'j-_ j -I �_I II ' -_/ I/I_ � :II i•-_I , // . f// "/.--//./ _�: / "I//1//-1' '1/•I/ I . / .l /. -/ /%/JI IIIlf il /I'1I, I/1 / . /' // / ��/ �I/��/I '/ " / / // /_/ / '•I/I / �I1 / 1/MI �//�e/• /�Iz.I/I s' III/eI 1 /oN / %/ / 1//:1/ I v= UFO U U�OUFO UFO p PROPOSED RI O� PI I IO S\// I/ EI/I1V� I a D8, 1 LEVEL UGE UGE SPREADER 63 FT MATCHLINE SHEET 013 UGF UGE / O UGE/ EX. MANHOLE TOP=494.29' o GE 36" INV IN=488.69'(N /J m 36" INV IN=488.59(SE) p 12" INV OUT=484.62'(SW) DI-1 GRATE INLET oy zTOP=493.00' 3HO . 3HO 0 24" INV IN=489.22' (SE) 3Ho TOP=)4lE3)' 36" INV OUT=488.73'(V) INV OUT=488.3'36(SU 494.91 49500 DI-1 GRATE INLET 492.59 TOP=493.00' 2 3 - -24"INVIN=489.31'(SE)r- - - - 24" INV OUT=489.31' (NW) DI-1 GRATE INLET _18 . 24" INV IN-489.45' (E) / a" INV OUT=489.45' (NW) G CTTr 2DI-1 GRATE INLET CTV/� �� 494.01 r=CTl 6 TOP=493.00' o - OT=a89.76'(W) 10 TBMBSET 493.42\-_49.81 CHISELED SQUARE 493.05C N:6729329.67 CULVERT E:1150180027 12" INV OUT=483.85'(NE)` 494.26 EL=494..58',Emir VIRGINI ELECTRIC .493'. ROW FROM SURVEY PROPOSED RETAINING WALL PROPOSED 4 SPREADER140FT 96 �� EX. 10'DRAINAGE PROPOSED EASEMENT - - - -- -_-_ STORM SEWER O/\ EX. DUAL 8" DIP CULVERT 8" INV IN=475.16' 8" INV IN=475.30',/ 8" INV OUT=474.07 8" INV OUT=474.00' 666L04 �� / REVISED TREELINE / / / / / / IVIF / l PO / FORESTL�ESCOMMON AREA Ph-> PAR C FORESOMUN/TYI / / ASSOCIATION -\/ I I I II II1 I //I III I I I/ 1II �I I \ \ / D.E. 1304, PG. 346 PR/MARYZON/NG.,R4 / RESIDENTIAL I A STRUCTURE NUMBER DESCRIPTION LENGTH TOP INVERT IN INVERT OUT SLOPE REMARKS 1 12" RCP 15.07' N/A 484.62 483.85 5.11% 2 36" RCP 35.17' N/A 488.73 488.59 0.40% 3 24" RCP 37.88' N/A 489.31 489.22 0.25% 4 24" RCP 52.60' N/A 489.45 489.31 0.25% 5 24" RCP 124.4 N/A 489.76 489.45 0.25% 6 36" RCP 38.26' N/A 488.69 488.93 0.63% 7 DI-5(42") N/A 493.13 N/A 488.93 N/A 8 MH-1 N/A 494.29 488.59 484.62 N/A 9 DI-5(42") N/A 493.00 489.22 488.73 N/A 10 DI-5 (42") N/A 493.00 489.31 489.31 N/A 11 DI-5(42") N/A 493.00 489.45 489.45 N/A 12 DI-5(42") N/A 493.00 N/A 489.76 N/A i SCALE: 1 " = 20' \ \ - - - 20 0 20 40 8 7 6 5 4 3 GRADING AND DRAINAGE PLAN (2 OF mmm - - - ONE- - - - UGE- - - - UGT - UFO - - M 6 Fn 18 6 18 LEI 7 18 4 18 �� N REVISIONS EXISTING MAJOR CONTOURS EXISTING MINOR CONTOURS PROPOSED MAJOR CONTOURS PROPOSED MINOR CONTOURS TOPOGRAPHIC SURVEY BOUNDARY EXISTING ADJACENT PROPERTY LINE EXISTING SITE PROPERTY LINE EXISTING FENCE LINE PROPOSED FENCE LINE EXISTING OVERHEAD ELECTRIC EXISTING UNDERGROUND ELECTRIC EXISTING UNDERGROUND TELEPHONE EXISTING FIBER OPTIC EXISTING TELECOMMUNICATION LINE EDGE OF EXISTING GRAVEL PROPOSED SUBSTATION PAD EXISTING EDGE OF WATER TREELINE PROPOSED ACCESS ROAD CENTERLINE EXISTING RIP RAP EXISTING INLET PROPOSED INLET EXISTING CULVERT EDGE OF EXISTING DITCH #21A COMPACTED GRAVEL #57 STONE UNCOMPACTED GRAVEL LIMIT OF DISTURBANCE PROPOSED STORM SEWER PROPOSED LEVEL SPREADER EXISTING POWER POLE AND GUY WIRE BENCHMARK EXISTING IRON ROD FOUND y galconsultan[s DATE I DESCRIPTION Dominion Energy GRADING & DRAINAGE PLAN (2 OF 2) HOLLYMEADE SUBSTATION EXPANSION ALBEMARLE COUNTY VIRGINIA OPERATIONAL REGION B/M No. SCALE 1"=20' PROJECTF NAME DATE SHEET: 0 4 DESIGNER PROJECT ENGINEER DRAWING: 20236-00-000-00-C-013-a APPROVED BY 2 1 10 I A 0 7 6 5 \I/ 4 2 2 1 L' 4 IN. I HIGI NO.57 C AGGREGA- PROPOSED GRADE A 0 W N_ Z �U �ED O Q < V LL Z J J W Z_W QU) 2 U W O z W W 0 I SEE NOTE 1 STEEL POST (TYP. LINE POST) PER SE VEP-2020-19-01 DESIGN WIND SPEED: 90mph SOIL TYPE: POOR FOUNDATION PER SE VEP-2020-19-01 SUBSTATION FENCE DETAIL NOT TO SCALE LU W N z J E[ o Qa .e LL N ZL J U. Z F Q V. 2 U 1992 3.21 LEVEL SPREADER CROSS SECTION JUTE OR EXCELSIOR OR EQUIVALENT VARIABLE MN. T STAPLED IN PLACE ( ) BURIED R" MIN. F fill MIN. _--_ NIN. - 111111� I � I LEVEL UP OF - I - SPREADER I = = = 2:1 OR FLATTER MW. 6. LEVEL SPREADER WITH VEGETATED LIP 4 LEVEL SPREADER 1 8 NOT TO SCALE COMPACTED BASE COARSE (41N LIFTS) DETAIL EQUIPMENT ACCESS ROAD NOT TO SCALE SEE NU I E 1 I I SEE NU I E 1 I 2 SUBSTATION FENCE ELEVATION 18 FOR ILLUSTRATIVE PURPOSES ONLY NOT TO SCALE L [.-j PLAN m (COVER REMOVED) MV-4" (12" - 36" PIPE) B•J'-0" (M" - 36" PIPE) A-4'-ID" (42" PIPE) B-3'-S" (42" PPE) C( IF r % ACC WEEP SEE NN STEPS SECTION A -A CAST IN PLACE FOR USE WITH 12" TO 42" PIPES 241 503 2016 ROAD & BRIDGE STANDARDS PLAN (COVER REMOVED) SEE NOTE SEE NOTE 5. SECTION B-B PRECAST NOTES (CONT.) 15. DI_7-------- NO GUTTER DI-7A------- SINGLE GUTTER WHEN DROP INLET S ON A GRADE. DI-7B------ DOABLE GUTTER WHEN DROP INLET S N A SAC BETWEEN TWO GRADES. 16. FOR DETAILS OF PRECAST DI-7 NOT SHOWN HEREON SEE PRECAST UNIT ASSEMBLY DIAGRAM PAGE 103. FOR PRECAST GENERAL NOTES PARE 7113.02 AND F R APPLICABLE PRECAST BASE, RASHER AO TOP DETAILS, PAGES 103.07 THRU 103.12. 17. GRATE BARS TO BE PARALLEL TO DITCH FLOW. PIPE 12" 1 15" 1 IS- 1 24" 1 W. 35" 42" MINIMUM DEPTH 2'-0" '-Y/f' 2'-&/y" 3'-1' 3'-T/t' 4'-2" 4' IT CONCRETE MBIC YARDS.947 1.045 1143 1A3B 1.535 1.731 1.82] - PUST (TYP. )OST) PER SE 020-19-01 RATION PER P-2020-19-01 NOTES DI-7, 7A 7B 1. DEPTH OF INLET (H) TO BE SHOWN ON PLANS. 2. THE "H" DIMENSK)N SHOWN ON THE STANDARDS AND SPECIFIED ON THE PLANS WILL BE MEASURED FROM THE INVERT OF THE OUTFALL PIPE TO THE TOP OF THE STRUCTURE. PLAN "H" DIMENSIONS ARE APPROXIMATE ONLY FOR ESTIMATING PURPOSES AND THE ACTUAL DIMENSIONS SHALL BE DETERMINED BY THE CONTRACTOR FROM FELD CONOTTENS. MAXIMUM DEPTH (H) TO BE 12'-B. 3. WHEN SPECIFIED ON THE PLANS THE INVERT IS TO BE SHAPED IN ACCORDANCE WITH STANDARD IS-1. THE COST OF FURNISHING AND PLACING ALL MATERIALS INCIDENTAL TO THE SHAPING IS TO BE INCLUDED IN THE BID PRICER FOR THE STRUCTURE. 4. IN THE EVENT THE INVERT OF THE OUTFALL PIPE IS HIGHER THAN THE BOTTOM OF THE STRUCTURE,THE INVERT OF THE STRUCTURE SHALL BE SHAPED WITH CEMENT MORTAR TO PREVENT STANDING OR PONDING OF WATER IN THE STRUCTURE. THE COST OF FURNISHING AND PLACING ALL MATERIALS INCIDENTAL TO THE SHAPING IS TO BE INCLUDED IN THE BE PRICE FOR THE STRUCTURE. 5. STEPS ME TO BE PROVIDED WHEN H IS 4'-0" OR GREATER. FOR DETAILS SEE STANDARD ST-1. B. REINFORCED CONCRETE FOOTING MAY BE PRECAST OR CAST -IN -PLACE. TWO LIFTING HOOKS OF FABRICATORS DESIGN TO BE PROVIDED N PRECAST FOOTING 7. 4" DEPTH AGGREGATE 46 wa. OR EB X 6" WIDTH. 6. 3" DIAMETER WEEP HOLE WITH 12"XI2" PLASTIC HARDWARE CLOTH /4' MESH OR GALVMZEO STEEL WIRE, MINIMUM WIRE DIAMETER 0.03", NUMBER 4 MESH HARDWARE CLOTH ANCHORED FIRMLY TO THE OUTSIDE OF THE STRUCTURE. 9. DELEDEERENET(PBECSRCD IN PLACE). HOOUWIL B AT THE OPTION OF THE CONTRACTOR. V. FOR DETAILS OF CONCRETE COVER.COLLAR AND CRATE AND THE METHOD OF PLACING APPROACH GUTTER SEE SHEET 2 OF 3. R. CAST -IN PLACE CONCRETE IS TO BE CLASS A3 (3000 PSI). PRECAST CONCRETE IS TO BE 4000 PSI. 12. CONCRETE OUANTITIES SHOWN ARE FOR INDICATED DEPTH IN) WITHOUT PIPES. THE MOUNT DISPLACED BY PIPES MUST BE DEDUCTED TO OBTAIN TRUE OUAiTITIES. FOR INLETS OF DIFFERENT DEPTHS ADD OR SUBTRACT THE APPROPIATE CUBIC YARDS OF CONCRETE FOR EACH FOOT OF DEPTH. 13. PAVED DITCHES ME TO BE TRANSITIONED TO MEET INLET GUTTER AS SHOWN IN STANDARD PG-2A 14. PROVIDE SAFETY SLABS WHEN SPECIFIED ON THE PLANS. INCREMENT PER FOOT OF ADDITIONAL DEPTH ... £ - 0.352 CU. YES' (12" - 36" PPE) 0.410 CU. YDS. (42" PIPE) STANDARD MEDIAN DROP INLET ROAD AM BBRIDGETSTANDARDS 12" TO 42" PIPE REVISION DATE SHEET 1 OF 3 VIRGINIA DEPARTMENT OF TRANSPORTATION 10422 2016 ROAD & BRIDGE STANDARDS 6 DETAIL VDOT 0I-7 1 8 NOT TO SCALE w T. i TF n T SEE NOTE 1 4" DIAMETER O.D. 3ALVANIZED STEEL PIPE SEE DETAIL HEAVY DUTY STEEL BEARING HINGES I. mr-rr-m I V UVIVIIINIVIN rCINI+C Jr CI+Ir IlAF11 IVIVJ rum DIMENSIONS 1'-6" TYPICAL SWING GATE FOR ILLUSTRATIVE PURPOSES ONLY NOT TO SCALE NOTES: 1. REFER TO SUBSTATION PLANS FOR GROUNDING GRID PLACEMENT. gniA RTTAF) R RRInrP FTANIIARF)R Pal NO PROJECTION OF PIPE ABOVE GROUND LINE TOP OF FILL TOP OF FILL TOP OF FILL GROUND LINE x = GROUND LINE x GROUND LINE x ' //rri rrrr - rrrrrr /iii - -II FEAR TH ROCK OR EARTH N m r ? aLIELDING I. 0 o BEDDING MATERIAL 3 y MIN. 1/10 0 V10 D MIN. 1/10 D D % BE X DDING BEDDIN % D X G MATERIAL MATERIAL PER TOF H IT., MAX. 24• FOUNDATION SOFT, YIELDING, OR NORMAL EARTH FOUNDATION ROCK FOUNDATION I OTHERWISE UNSUITABLE MATERIAL PIPE PROJECTION ABOVE GROUND LINE MIN. 1.5 x D MIN. 1.5 x D MIN. 1.5 x D MIN. 1.5 x D MIN. 1.5 x D MIN. 1.5 x D TOP OF FILL iOP OF FIL STOP OF FILL I }'• rrrr// /r//r/r I;:iiii i�� - { }: - _ - "" rr/rrr r/iirr = rrrrrrr/rrr// rrrrrrrrrrrrrr = /// f ////r ...... rrr •rrr ••}: +:+{{:•:}y rrr/r r//r - ti-}}}}:tiv NrrrX//rrr/ rr/rirrrrrrrr = }ij+.4• N - rr rr + •�• - =_ �: :• r/ r}.vk-. iv - • • • rrr/ rii �+, _ �•:::{a1 rr rr :,+'+'+• '/ 7 � =_ rrrrirrr/r rrrrrrrirrr rrriirrrr rrrrrriirr- - • GROUND o v / :vvvvxv GROUND - Jrrrrrrrr d rrrrrr/rr_ GROUND =:;•• it •ry LINE ryry v•- LINE m= i :iiiiiiti - o - LINE r- cI III IL -III II II II S EARTH 11 CK c ROOR MIN. 1/10 D - UNYIELDING I MIN. 1/10 D X D X BEDDING MATERIAL - SO PER IL T''NOF H % D X D BEDDING MIN. 1/10 - EARTH MIN BEDDING MATERIAL MAX. 24" MATERIAL FOUNDATION SOFT, YIELDING, OR NORMAL EARTH FOUNDATION ROCK FOUNDATION OTHERWISE UNSUITABLE MATERIAL ®BEDDING MATERIAL IN ACCORDANCE WITH EMBANKMENT SECTION 302 OF THE ROAD MO BRIDGE ® NOTES: SPECIFICATIONS. REGULAR BACKFILL MATERIAL IN ACCORDANCE FOR GENERA. NOTES ON PIPE BEDDING, CLASS I BACKFILL MATERIAL IN ACCORDANCE SEE INSTALLATION OF PIPE CULVERTS WITH SECTION 302 OF THE ROAD AND BRIDGE WITH SECTION 302 OF THE ROAD AND BRIDGE SPECIFICATIONS. AND STORM SEWERS GENERAL NOTES SPECIFICATIONS. ON SHEET 107.00. FOR AL OTHER PIPE REGULAR BACKFILL MATERIAL FOR PLASTIC PIPE ' IN ACCORDANCE WITH SECTION 302 OF THE ROAD CRUSHED GLASS CONFORMING TO THE 6" MINIMUM CLASS I BACKFILL MATERIAL PLACED DIRECTLY AND BRIDGE SPECIFICATIONS. SIZE REQUIREMENTS FOR CRUSHER RUN OVER PIPE AND 6" REGULAR BACKFILL MATERIAL, AGGREGATE SIZE 25 AND 28 MAY BE OR 12" OF CLASS I BACK FILL MATERIAL, USED IN PLACE OF CLASS I BACKFILL. IN ACCORDANCE WITH SECTION 302 OF THE ROAD AND BRIDGE SPECIFICATIONS. `VD❑T H I I IL H INSTALL. OF PIPE CULVERTS AND STORM SEWERS SPECIFICATION REFERENCE ROAD AND BRIDGE STANDARDS CIRC. PIPE BEDDING AND BACKFILL -METHOD "A" 302 SHEET 1 OF 4 REVISION DATE 07/19 VIRGINIA DEPARTMENT OF TRANSPORTATION 303 107.01 2U16 KOAU & BRIUGE S I ANUAHUS 7 DETAIL VDOT PB-1 1 8 NOT TO SCALE REVISIONS REV DATE DESCRIPTION ism Dominion Energy CONSTRUCTION DETAILS y galconsultan[s HOLLYMEADE SUBSTATION EXPANSION ALBEMARLE COUNTY VIRGINIA OPERATIONAL REGION B/M No. SCALE NTS PROJECTF NAME DATE SHEET: O1 H DESIGNER PROJECT ENGINEER DRAWING: APPROVED BY 220236-00-000-00-C-01 F A !3 7 5 4 3 2 1 E1 7 5 M 2 t SUBJECT Hollymeade Substation Expansion SUBJECT Hollymeade Substation Expansion SUBJECT Hollymeade Substation Expansion SUBJECT Hollymeade Substation Expansion DESIGNED BY: ELLISJR DATE 01/13/2023 PROJ. NO. R210961.01 DESIGNED BY: ELLISJR DATE 01/13/2023 PROJ. NO. R210961.01 DESIGNED BY: ELLISJR DATE 01/13/2023 PROJ. NO. R210961.01 DESIGNED BY: ELLISJR DATE 01/13/2023 PROJ. NO. R210961.01 L� CHECKED BY: BARBESJ DATE 01/13/2023 SHEET NO._J__OF 6 ��lf CHECKED BY: BARBESJ DATE 01/13/2023 SHEET NO.__2__OF 6 CHECKED BY: BARBESJ DATE 01/13/2023 SHEET NO. 3 OF 6 N CHECKED BY: BARBESJ DATE 01/13/2023 SHEET NO.__4__OF 6 ��lf gai consultants lgai€onsultants gai consultants gai consultants INTRODUCTION: D The Dominion Hollymeade Substation Expansion project, located in Mbermarle County, Virginia will be constructed within the limits of Parcel 03200-00-00-03700 located at 3317 Worth Crossing Road, Charlottesville, Virginia 22911. The switching station property is zoned R-1 & R-15 Residential and is composed of approximately 6.72 acres owned by Virginia Electric & Power Company. The Dominion Hollymeade Substation Expansion project consists of the renovation and expansion of the existing switching substation to improve electrical service and reliability to Albermarle County. This includes the expansion of the existing pad area with installation of new equipment, foundations, retaining wall, and fence. Removal of existing equipment and identified sections of fence will occur within the existing substation area. The project will result in the land disturbance of approximately 2.69 acres and will include approximately 2.19 acres of impervious gravel area. The Dominion Hollymead Substation Expansion project will have a standard construction schedule and is anticipated to begin in Spring 2023, and the project duration is anticipated to last 12 months. The proposed project must follow the Virginia Code §9VAC25-870 pertaining to Virginia Stormwater Management Program (VSMP) Permit regulations, and the Virginia Erosion and Sediment Control Regulations under §9VAC25-840. Under the technical criteria, the switching station site design will have to meet requirements for water quality (§9VAC25-870-65), channel protection (§9VAC25-870-66. B), and flood protection (§9VAC25-870-66.C) as it relates to post - construction stormwater runoff. EXISTING SITE CHARACTERISTICS: The project will only impact parcel number 03200-00-00-03700, which is owned by Virginia Electric & Power Company and is approximately 6.72 acres. Existing improvements on the project site include an existing substation switching facility and gravel access; the remainder of the site consists of forested and vegetated space. EXISTING SOIL CHARACTERISTICS Based on the Soil Survey report for Albemarle County, Virginia the soils consist primarily of 28C3 C Elioack Clay Loam, 7 to 15 percent slops, hydraulic soil group (HSG) B. The soils to the north of the substation consist of 27B Elioack Loam, 2 to 7 percent slops, hydraulic soil group (HSG) B. The soils northeast of the substation consist of 34C Glenleg Loam, 7 to 15 percent slopes, Hydraulic soil group (HSG) B. A The USDA Soils Survey map has been included on Site Plan Sheet 3 for reference. \\gaiconsultants.imal\BUPmjAEnergy\Dominion\R220236.00 - Dominion Hollymeade Sub\Working Docs\Engineering\E&SC SWM Narra6ve\E&SC - SWM Narrative 01-13-2023 SUBJECT Hollvmeade Substation Exoansion DESIGNED BY: ELLISJR DATE 01/13/2023 PROJ. NO. R210961.01 L� CHECKED BY: BARBESJ DATE 01/13/2023 SHEET NO._5.__OF 6 ��lf gai consultants POI 4 Runoff from this drainage area leaves the project site via a level spreader as sheet flow that ultimately conveys to an existing stormwater management pond to the southeast of the site. Channel and Flood Protection Runoff from this drainage area leaves the project site via a level spreader as sheet flow. Per 9VAC25-870-66, the runoff from this drainage area is not concentrated stormwater flow and therefore channel and flood protection requirements are met. As a result, Channel and Flood Protection criteria laid out in 9VAC25-870-66.13 and 9VAC25-870-66.C, respectively, were not evaluated. Erosivity The analysis below demonstrates that the sheet flow volumes from this drainage area are non - erosive and compliant with 9VAC25-870-66 Section D. Level S oreader Level Spreader Storm Event Max Flow Rate cfs Level Spreader Length ft Max Velocity (ft/s) Allowable Velocity (ft/s) 1 2-Year 1.398 140 0.71 4.00 2 2-Year 0.508 63 0.71 4.00 STORMWATER CONVEYANCE: Stormwater management for the Dominion Hollymeade Substation Expansion project will consist of the construction of two (2) level spreaders and the expansion of one (1) existing storm network. The level spreaders are proposed to be located within the southeastern side of the substation. The level spreaders are proposed to be 133 and 126 feet long respectively and constructed as depicted on Sheet 018. The level spreader will dissipate the sheet flow coming from the substation to the forested and grassland areas to the southeast. The existing storm network located on the southern side of the substation will be expanded 120 feet southwest. The storm network will convey the water from the existing substation pad and a portion of the proposed to a drainage ditch to the south of the substation, which ultimately flows to a pond. Stormwater Analysis was utilized to calculate the peak flow from the drainage areas to the level spreader and the storm sewer network. Hydraflow hydrograph Extension for Autodesk Civil 3D 2019 (Hydraflow) which utilizes the Manning Formula, was utilized to analyze the conveyances for the 2-year 24-hour and 10-year 24-hour peak discharge. The discharges were then used to determine whether the stormwater network could convey the proposed drainage area and whether the velocity exiting both conveyances were acceptable given the soil type. Please see Sheet 024 for drainage maps and calculations pertaining to the Stormwater Conveyances. MAINTENANCE PROGRAM: \\gaiconsultants.imal\BUPmjAEnergy\Dominion\R220236.00 - Dominion Hollymeade Sub\Working Docs\Engineering\E&SC SWM Narrative\E&SC - SWM Narrative 01-13-2023 DRAINAGE AREA CONDITIONS The proposed project site has been split into four (4) distinct drainage areas. Drainage area 1 (POI 1) sheet flows and ultimately concentrates to an existing grass swale to the northwest of the site. Drainage area 2 (POI 2) sheet flows mainly across the existing gravel substation pad to where the flow is channelized into an existing storm drain system that outfalls off site to an existing stormwater management pond to the southern portion of the site. Drainage area 3 (POI 3) sheet flows and ultimately concentrates and conveys runoff to an existing stormwater management pond to the southern portion of the site. Drainage area 4 (POI 4) sheet flows and ultimately concentrates and conveys runoff to an existing stormwater management pond to the eastern portion of the site. Drainage area maps have been included on Sheet 021 for reference. ADJACENT AREAS The project site is located within the 6.72 acre parcel 03200-00-00-03700. The project site is located to the east of Worth Crossing. Due to the location selected, areas outside the property boundary are not anticipated to be impacted by the project. BMPs, as depicted on the plans and described herein, shall be utilized as perimeter controls for the site to prevent sediment laden stormwater from entering downstream channels or properties. METHODOLOGY AND SYSTEM DESCRIPTION The Dominion Hollymeade Substation Expansion project was designed in accordance with the Virginia Stormwater Management Act and Regulations. The Dominion Hollymeade Substation Expansion project shall be considered a re -development project due to the work consisting of improvements to the existing site. The limits of disturbance (2.69 acres) was selected as the water quality limits of analysis and the Virginia Runoff Reduction Method was utilized to analyze the pollutant load produced by the site. Water Quality Land Cover maps can be seen on Sheet 020. WATER QUALITY: The Dominion Hollymeade Substation Expansion project shall be considered a redevelopment as part of the property is developed (buildings and substation equipment) with impervious cover, manage turf and open space (existing wooded area). In accordance with 9VAC25-870-63 and 9VAC25-870-65, the required pollutant load removal requirements were calculated utilizing Virginia Runoff Reduction Method (VRRM) and associated spreadsheets for a redevelopment. Table 1.1 illustrates the pre -development land cover conditions while Table 1.2 illustrates the post -redevelopment land cover conditions. Please see Sheet 020 for calculations pertaining to water quality and drainage maps which illustrate pre and post redevelopment cover conditions. Table 1. 1 Pre -Development Land Cover acres A Soils B Soils C Soils 1 D Soils Totals Forest/Open Space acres 0.00 0.52 0.00 0.00 0.52 Managed Turf acres 0.00 0.75 0.00 10.00 0.75 Impervious Cover acres 0.00 1.42 0.00 1000 1.42 Total 2.69 \\gaiconsultants.imal\BUPmjlEnergy\Dominion\R220236.00 - Dominion Hollymeade Sub\Working Dots\Engineering\E&SC SWM Narrative\E&SC - SWM Narrative 01-13-2023 SUBJECT Hollvmeade Substation Exoansion DESIGNED BY: ELLISJR DATE 01/13/2023 PROJ. NO. R210961.01 L� CHECKED BY: BARBESJ DATE 01/13/2023 SHEET NO._&__OF 6Nl gaiconsultants Upon the completion and acceptance of the construction of the Dominion Hollymeade Substation Expansion project, long-term routine maintenance of all stormwater management facilities will be the responsibility of the Owner. This maintenance includes inspection of all drainage facilities on a regular basis and after each significant precipitation event. At a minimum, the drainage facilities should be inspected twice yearly. The drainage structures will be cleaned, as necessary, to prevent clogging and to maintain structure capacities. The grass/landscaped areas will be checked on a regular basis and will be mowed/trimmed periodically to ensure that a good stand of vegetation is maintained. Any area deficient in vegetation will be fertilized, reseeded and mulched, as needed. General lawn areas will be checked on a regular basis for settled areas that allow water to collect and stand. Any settled area will be backfilled, dressed to conform to existing grades and reseeded. Any area deficient in positive flow will be repaired as necessary to ensure proper drainage. Individual maintenance programs for specific drainage structures and miscellaneous facilities are as follows: Level Spreader- Level Spreaders should be checked on a regular basis to make sure the lip remains at 0% slope to ensure proper function. Piping - Pipes should be checked on a regular basis and after significant precipitation events for obstructions that restrict flow. \\gaiconsultants.imal\BUPmjAEnergy\Dominion\R220236.00 - Dominion Hollymeade Sub\Working Docs\Engineering\E&SC SWM Namfive\E&SC-SWM Narrative 01-13-2023 Forest/Open Space acres 0.00 10.00 10.00 10.00 0.00 Managed Turf acres 0.00 10.50 10.00 10.00 0.50 Impervious Cover acres 0.00 12.19 10.00 10.00 2.19 Total 2.69 As aforementioned and as illustrated in the Table 1.1 & 1.2, the soils within the property boundary are considered Hydrologic Soil Group B. Grading and new improvements for the Dominion Hollymeade Substation Expansion project will alter the drainage areas from pre- to post - development and the project will result in a total impervious area of 2.19 acres. The VRRM spreadsheet indicates the post -development total phosphorous load reduction required for the project is 2.01 Ibs/yr. A summary of the VRRM spreadsheets has been provided on Sheet 020. The Dominion Hollymeade Substation Expansion project will satisfy water quality requirements by being in compliance with 9VAC25-870-69.B.2 and by purchasing offsite nutrient credits. Nutrient credit letters of availability have been provided on Sheet 020 from the Ivy Creek Nutrient Bank located within the Chesapeake Bay Watershed. All nutrient banks are located within the South Fork Rivanna Basin, which is the basin the project site is located within, and all nutrient banks have approval from VDEQ to sell nutrient credits. Upon approval of the proposed water quality management solution selected, the Dominion Energy Virginia will purchase the nutrient credits and the bank will retire 2.01 Ibs/yr of phosphorous credit in accordance with the Nutrient Offset Certification regulations. CHANNEL PROTECTION AND FLOOD PROTECTION: Channel protection and flood protection calculations were completed for each drainage area to ensure compliance with 9VAC25-870-66 Section B and Section C. Poll Runoff from this drainage area leaves the project site via sheet flow that ultimately concentrates to an existing grass swale to the northwest of the site. Channel and Flood Protection 9VAC25-870-66. B, Subsection 1.a requires a manmade stormwater conveyance system to convey the post development peak flow rate from the 2-year 24-hour storm event without causing erosion. The allowable velocity for the grass legume mixture is 4 ff/sec. The peak discharge during the 2- year 24-hour storm event is 0.628 CFS. The peak velocity of the water leaving POI 1 was evaluated to be 3.8 ft/s which is non -erosive and compliant with 9VAC25-870-66.B.1.a. Following evaluation of the 1, 2, and 10-year 24-hour storm events, GAI noted no increase in stormwater runoff. The discharge from POI 1 has not been altered and the post -development peak flow rate is no greater than pre -development rates. With this information, 9VAC25-870- 66.C.2.b has been satisfied. \\gaiconsultants.local\BUPmjAEnergy\Dominion\R220236.00 - Dominion Hollymeade Sub\Working Doos\Engineering\E&SC SWM Narrative\E&SC - SWM Narrative 01-13-2023 3 STORM EVENT PRE -DEVELOPMENT POST -DEVELOPMENT 1-YEAR 0.345 0.345 2-YEAR 0.628 0.628 10-YEAR 1.625 1.625 POI 2 Runoff from this area sheet flows across a gavel pad and ultimately concentrates and conveys runoff to an existing stormwater management system that will be extended to capture pad runoff. The stormwater management systems will control runoff and discharge through an existing outfall and existing conveyance channel to an existing stormwater management pond to the southern portion of the site. Channel and Flood Protection 9VAC25-870-66. B, Subsection 1.a requires a manmade stormwater conveyance system to convey the post development peak flow rate from the 2-year 24-hour storm event without causing erosion. The allowable velocity for a rip -rap line channel is 5 f tsec. The peak discharge during the 2-year 24-hour storm event is 2.64 CFS. The peak velocity of the water leaving POI 1 was evaluated to be 4.5 ft/s which is non -erosive and compliant with 9VAC25-870-66.B.1.a. STORM PRE- PRE- POST- POST - EVENT DEVELOPMENT DEVELOPMENT DEVELOPMENT DEVELOPMENT (NO DETENTION) (WITH (NO DETENTION) (WITH DETENTION) DETENTION 2-YEAR 5.16 4.16 5.82 2.64 10-YEAR 10.52 5.76 11.34 4.14 P01 3 Runoff from this drainage area leaves the project site via sheet flow that ultimately conveys to an existing stormwater management pond to the south of the site. Channel and Flood Protection Runoff from this drainage area leaves the project site by maintaining sheet flow. Per 9VAC25- 870-66, the runoff from this drainage area is not concentrated stormwater flow and therefore channel and flood protection requirements are met. As a result, Channel and Flood Protection criteria laid out in 9VAC25-870-66.13 and 9VAC25-870-66.C, respectively, were not evaluated. Following evaluation of the 1, 2, and 10-year 24-hour storm events, there is a decrease in stormwater runoff for post -development conditions. The discharge from POI 3 has not been altered and the post -development peak flow rate is less than pre -development rates. With this information, 9VAC25-870-66.C.2.b has been satisfied STORM EVENT PRE -DEVELOPMENT POST -DEVELOPMENT 1-YEAR 0.179 0.117 2-YEAR 0.417 0.273 10-YEAR 1.333 0.873 \\gaiconsultants.imal\BUPmjAEnergy\Dominion\R220236.00 - Dominion Hollymeade Sub\Working Docs\Engineering\E&SC SWM Narra6ve\E&SC - SWM Narrative 01-13-2023 REVISIONS REV DATE DESCRIPTION ism Dominion PW Energy y galconsultants STORMWATER NARRATIVE HOLLYMEADE SUBSTATION EXPANSION ALBEMARLE COUNTY VIRGINIA OPERATIONAL REGION B/M No. SCALE NTS PROJECT F NAME DATE SHEET: 01 DESIGNER PROJECT ENGINEER DRAWING: APPROVED BY 220236-00-000-00-C-01 2 1 0 e A 8 1 7 1 \ / \ PANIF RCEL /D' 032✓O-01-00-01400 \ 1406DECA7URDR/VE \ \ STEVENM MALONE \-------_ ORLAUR/EDALE \ — — — PR/MARYZON/NG. \ PLANNED RESIDENTIAL D — \ \ DEVELOPMENT \ I I 6 I 5 _ 4 NIF bbARCEL /D: \ \ \\ \ 32YQ O1-OQO>600 \III\ \ \\ PARCEL / : \ \ \ / / / \ -500-1 I ¢ \ \ \ \ \ I > 220EL)4 TUR DRY \ \ 03 ✓QO1-OQO 00 \� AR/SAG'mODW/N \ \ \ \ \ \ EXISTINGASPHALT \1 14B EVL /✓E / \ I I I \ \ BR/A�'LOHNE & \ \ \ \ ( ) l / / TRAIL \ P N�✓ED RES/D r/AL \ \ I / \ \ I I \ \ I\ ✓ENN/F�RLOHN \ \ ` I ( � / / \ \ OEI�LOPMENT \I \ \ PR/MA ZON/NN� \ \ \ Is / / / N111 \ \ I \ \ \ I INNED RfS/DENT/ \ \ \ \� \ \ ` I \ AARCE'd/D' \ \ \ \ \ N/F \ \ \ DEVEL MENT \ N/F \ \ \ \ \ \� l / 032✓*02-00-))OOCO LL \ \ \ \ PARCEL /DI \ \ NNE I \ \ \ \ \ \ \ I l ESTE PARK�HASE� \ \ 032✓0-01-OQO1f5001 — \PARCEL /D. \ \ \ \\ \ \ 032QOT-OlEQ1900 \ \ \ \ \ \ \ \ I �EN SP.9CE \ \ \ b 032.><0-01-00-01700 \\ \ \ 14160ECATUR R/ \ — 1N40DECATURARM/ \ \ \ \ \ \ \ 1 F RESTf.9KES \ \ CASEYROS/NS'ON& \ \ 505 ATURDRIVE \ \ \ \ CHMSTOPHERN C \ \ \ \ \ OMM(YN/TY / \ \ \ \ 1 \ AS OC/A /ON/A/C \ \ RE/KO /GARA H/ I — \ Rim.. .,,7B)�4fATHEWB ` � \ � \\ \ � y \ \ 1 PR/MARYZC G. — \ _ r fEETH /N,� ETH \ \ _ \ ��NG \ ` � \ \ \ \ \ � PLANNED RES/D NT/,4k — \ — \ M�L \ \\ I \ \ — — ` \PR/MARYZO%vY�VG. OEVELOPMENT ` PR/MARY2U7A�/A(O \ \ NNED RES/DEN/AL PLANr�/CQ/S<DENT/�fL— _ \ — �\ _1FYELOp" E _—� 510 11 /\ \) \\ \ \ \\ \ \ \ \ \ \ \\ \ \ \ \ \ III I If \\ 11 1 1 I /----___-_--------_---_----_--_—_-----_—_----_----- I / \� \ \ \ \ \ \ \ 1 \ \ \ 1 I 1 1 \\ \ \ �/ _ _ —=505 =_ — — — _ / /i%i/�—_— — __---- _ _--_---' __—_—_—_ /�500;II II I 11 zz , \ _ & I/ /\ \ \\ \ \\\ \ \\ \\ 1 \\ 11 11 \\ el \ \ \ \ \ 1 1 1 Canary of .Albemarle ('onsrn alien Plan Checklist —'1'a be placed on Landscape Plans Illandbomk• pp 111-294-111-297 for complete specifications) I: I I I I� I I II I I II I I� I I II I II I I I I� I I II I I I II I I� I II I I. I I�I I I EXISTING RETAINING WALL —(ed ' 6s' — \ PROPOSED RETAININGWALL \ \ \ 405 hvz, Ii A I. The fullowlne hems shall he shown on the olan: b Tice. ut the saved'. 0 Limits of clearing loutside dripline of mcce to be saved): 0 Location andlype ofprorcetive fencing: NrA❑ Gradc changes requiring tree wells or walls; NA U Propo ed marching or tunneling beyond the limits ofclearing 1. alaf6tm°W 0 All Itecs to be saved shall be marked with print "ribbon at a hcight dearly visible to equipment operators. 0 No grading shall begin until the tree marking has been inspected and approved by a County Inspector. 1, rm-Constructlnn Canf raw.: 0 Tn•c prc.cr.;nion anJ pnnectior measures shall be reviewed with the contractor onsite. 4. Equipment Operator mod Mutant: 0 IIca%y equipment, vehicular trallic and storage ofcam ruwaim materials including and shall not be permitted within the driplines afirees to be saved. S. Sal F.roaIon and My, mwalce Ikavntnn Ik• lces: 0 Such dcvics5 shall not adversely affect Inc, to be saved. 6. Eim%: 0 F1res are not permitted widda 1 W fm of the dripline of mess n be saved. 7. Team Materials: 0 ],,sic malcrials shall not be stored within 100 foes ofthe dripline ofirces to be saved. S. pmlecsive Eeechre: 0 'rma to be retained within 4t feet of a proposed building "grading activity shall be protected by fencing. 0 Fencing shall In in place and shall be inspected and approved by a County Inspector prior to grading or construction. 9. Tree Wells: N/A U When the ground level most be missal within the dripline of a trey to be saved, a tree well shall be provided and a construction detail submitted ma approval. U. Tree W'alh: WA ❑ When the ground level most be lowered within the dripline a tree to be saved, a tree wall shall be provided; and a comtruction detail whmitted for approval. 11, Treeehim and'faenettaw: WAU When trenching is regmted within the limits of clearing. it shall be done as far awav from the bunks of bea as possible. Tunneling under a large uce shall be considecod an an alternative when it is anticipated that necessary uenching will datroy feeder roots. 12. Cloonan: 0 Protecsive fencing shall be the last items removed during the final cleanup. 13. 0 Damaged trees shall be treated immediately by ptunm& fertilization or other methods mcommooded bys tree specialist NOTE: IT ISTHE DEVELOPER'S RESPONSIBILITY TO CONFER WTrH THE CONTRACTOR ON TREE CONSERVATION REQUIREMENTS EL — — — — — — — -00-0.77Q— — r— — _ I l \ \ \ 11 1\ \ \ \ \\ 1 \ \\ \ \ 1 OWNER SIGNATURE (DATE) 23 IIANDR15 03/0 — — — _ 6.72,cjC // III'\ � \ 1 1 1 �\ \ \ \ \ W' CONTRACT PURCHASER SIGNATURE (DATE) 5/IM6 page 1 M I I vv —500— / \ A / / / S7304<8E 80. 00' S73000SE 798J I I I A I /S73 0443E 8000% (S73°0448"E 80.% -- SUBSTAT/ONF 1 1 I I I I I I I 1 I 1 \ \\\ \\ \ / t I .• I I ----- —��' I / \ I I I I I I I I I I I I \\\\ \\\ �— \`f / // ' �Ito — — — — — — \ \ \\ —-1` / / /�� \\ / —_•� IIIII // /I I 1 I I I I I � I I � � I i �495— -- — ---r B II /I I I I // / \ _ � 4s5_ PLANTING SCHEDULE SPECIES INDICATOR MATURE PLANT HEIGHT SIZE TYPE SPACING QUANTITY COMMON NAME SCIENTIFIC NAME STATUS (FEET) (FEET O.C.) Giant Arborvitae Thuja plicata & cvs. GA 50 4.5' ht. Container 15 38 Tree Viburnum x pragense Prague Viburnum PV 10.0 3.0' ht. Container 10 14 Shrub Myrica pensylvanica Northern Bayberry NB 6.0 3.0' ht. Container 15 Shrub Shrub 8 7 I 6 EXISTING ASPHALT TRAIL I / / PARCEE 046B4-0000LO, 0 FORE, REA PH-1 PAR C / I I FOROSTLAKES COMMUry/TY I / ASSOC/AT/ON 5 4 I I\ II\ 1\\ I\ l\ / / / / / / / / / / / / / \ \ \ \ \ \ \ \ \7 / SCA/E: 1" = 30' 30 sY 30 60 3 2 L NOTE: LEGEND 1 REMOVED TREELINE EXISTING GRAVEL PROPOSED GRAVEL EXISTING ADJACENT PROPERTY LINE EXISTING SITE PROPERTY LINE EXISTING FENCE LINE PROPOSED FENCE LINE EDGE OF EXISTING GRAVEL TREELINE LIMIT OF DISTURBANCE EXISTING INLET EXISTING CULVERT PROPOSED STORM SEWER PROPOSED INLET EXISTING VEGETATION PROPOSED GIANT ARBORVITAE PROPOSED PRAGUE VIBURNUM PROPOSED NORTHERN BAYBERRY 1. ALL TREES TO REMAIN SHALL BE PROTECTED. CONTRACTOR SHALL INSTALL PROTECTIVE FENCING ALONG LIMITS OF DISTURBANCE TO PROTECT TREES. REVISIONS REV DATE DESCRIPTION ism Dominion PO Energy LANDSCAPE PLAN galcolnsultants HOLLYMEADE SUBSTATION EXPANSION ALBEMARLE COUNTY VIRGINIA OPERATIONAL REGION B/M No. SCALE 1 1"=20' PROJECT NAME DATE SHEET: OZO DESIGNER PROJECT ENGINEER DRAWING: 220236-00-000-00-C-02( APPROVED BY 2 1 0 A 0 C 7 A 8 1 7 LANDSCAPE PLANTING FOR TREES, SH MATERIALS PLANT MATERIALS 0 RUBS AND GROUNDCOVER (2018 1. PLANT LIST - A LIST OF PLANTS IS SHOWN ON THE PLANTING PLAN AND/OR THE REQUEST FOR BID. IN THE EVENT THAT QUANTITY DISCREPANCIES OR MATERIAL OMISSIONS OCCUR ON THE PLAN FOR THE PURCHASE ORDER REQUEST SHALL GOVERN. 2. QUALITY AND SIZE - PLANS SHALL BE WELL GROWN AND HAVE A HABIT OF GROWTH THAT IS NORMAL FOR THE SPECIES ND SHALL BE SOUND, WELL FORMED, HEALTHY, VIGOROUS, AND FREE FROM INSECT PESTS, PLANT DISEASES AND INJURIES. ALL PLANTS SHALL BE EQUAL TO OR EXCEED THE MEASUREMENTS SPECIFIED IN THE PLANT LIST, WHICH ARE MINIMUM ACCEPTABLE SIZES THEY SHALL BE MEASURED BEFORE PRUNING, WITH BRANCHES IN NORMAL POSITION. ANY NECESSARY PRUNING SHALL BE DONE AT THE TIME OF PLANTING, REQUIREMENTS FOR THE MEASUREMENTS, BRANCHING, GRADING, QUALITY, BALLING AND BURLAPPING OF PLANTS IN THE PLANT LIST GENERALLY FOLLOW THE CODE OF STANDARDS CURRENTLY RECOMMENDED BY THE AMERICAN ASSOCIATION OF NURSERYMEN, INC. IN THE AMERICAN STANDARD FOR NURSERY STOCK. 3. SUBSTITUTIONS - CONTRACTOR SHOULD BE CERTAIN HE CAN FURNISH ALL PLANTS AS REQUIRED BEFORE HE SUBMITS A PROPOSAL, SO THERE WILL BE NO DELAY IN COMPLETING THE PROJECT. MATERIAL FOR STAKING 1. STAKES FOR SUPPORTING TREES SHALL BE EITHER TWO TYPES: 2"X2"X6' SOUND WOOD OR 2"X2"X18" STAKE. 2. BLACK PLASTIC ADJ-A-TYE. 1" WIDE (OR SIMILAR MATERIAL OF OTHER MANUFACTURE) AND OR IF APPROVED BY SYSTEM ARBORIST OR DESIGNEE, GALVANIZED WIRE AND HOSE. MATERIALS FOR PLANTING 1. FERTILIZER - A SLOW RELEASE GRANULAR FERTILIZER SHOULD BE INCORPORATED INTO THE BACKFILL SOIL TO PROVIDE NITROGEN, PHOSPHORUS, AND POTASSIUM. USE NO MORE THAN 1 POUND ACTUAL NITROGEN PER 1,000 SQ. FT. OF PLANTING HOLE SURFACE. SYSTEM ARBORIST OR DESIGNEE MAY WAVE FERTILIZER REQUIREMENT DEPENDING ON THE SITE AND SOIL CONDITIONS. 2. MULCH - ALL PLANT MATERIAL WILL BE MULCHED WITH PINE BARK, SHREDDED HARDWOOD OR WELL ROTTED WOOD CHIPS AS DIRECTED. A TWO TO THREE INCH LAYER OF MULCH SHALL ENTIRELY COVER THE AREA OF THE PLANTING PIT, BED OR SAUCER AROUND EACH PLANT. CARE SHOULD BE TAKEN TO PREVENT MULCH RIGHT AT THE TRUNK OF THE TREE. PREPARATION A. TIME OF PLANTING 1. EVERGREEN MATERIAL: PLANT EVERGREEN MATERIALS BETWEEN SEPTEMBER 1 AND DECEMBER 1 OR IN SPRING BEFORE NEW GROWTH BEGINS. IF SYSTEM ARBORIST OR DESIGNEE REQUIRES PLANTING AT OTHER TIMES, PLANTS SHALL BE SPRAYED WITH ANTI -DESICCANT PRIOR TO THE DIGGING OPERATIONS. 2. DECIDUOUS MATERIAL: PLANT DECIDUOUS MATERIALS IN A DORMANT CONDITION WHEN POSSIBLE. IF DECIDUOUS TREES ARE PLANTED IN -LEAF, THE SHALL BE SPRAYED WITH AN ANTI -DESICCANT PRIOR TO THE DIGGING OPERATIONS. B. PLANTING SHALL BE PERFORMED ONLY BY EXPERIENCED WORKMEN FAMILIAR WITH PLANTING PROCEDURES UNDER THE SUPERVISION OF A QUALIFIED SUPERVISOR. B. LOCATE PLANTS AS INDICATED ON DRAWINGS. IF OBSTRUCTIONS ARE ENCOUNTERED THAT ARE NOT SHOWN ON THE DRAWINGS, DO NOT PROCEED WITH PLANTING OPERATIONS UNTIL ALTERNATE PLANT LOCATIONS HAVE BEEN SELECTED BY THE SYSTEM ARBORIST OR DESIGNEE. C. EXCAVATE CIRCULAR PLANT PITS WITH VERTICAL SIDES, EXCEPT FOR PLANTS SPECIFICALLY INDICATED TO BE PLANTED IN BEDS. PROVIDE SHRUB PITS AT LEAST 12" GREATER THAN THE DIAMETER OF THE ROOT SYSTEM AND 24" GREATER FOR TREES. DEPTH OF PIT SHALL ACCOMMODATE THE ROOT SYSTEM. LEAVE SOLID SOIL PEDESTAL IN THE BOTTOM OF THE PIT, DO NOT DIG DEEPER THAN THE BALL DEPTH. E. PROVIDE PRE -MIXED GROUND COVER BED PLANTING MIXTURE FOR USE AROUND THE BALLS AND ROOTS OF THE PLANTS CONSISTING OF FIVE (5) PARTS EXISTING SOIL TO ONE (1) PART DEHYDRATED COW MANURE. F. PROVIDE PRE -MIXED GROUND COVER BED PLANTING MIXTURE CONSISTING OF THREE (3) PARTS EXISTING SOIL TO ONE (1) PART DEHYDRATED COW MANURE. INCORPORATE THE MIX WELL BY TILLING OR HAND WORK. 5 SHRUB PLANTING DETAIL 3" Mulch ' Soil Well Soil Pedestal -Irl _ dl - `"L - do Remove container and cut circling;A�-r1z,..T, � 1 U �- r_ et=l hl_ rh roots if container -grown, or as - much burlap as possible if field — grown BALLED & BURLAPPED/CONTAINER PLANTS EVERGREEN TREE PLANTING DETAIL -STAKING TREE GUY SYSTEM - All posts shall be ;. ,.,•, 2"s2"hardvtvxxlequal length and sel pttunb at die ,ame height alwcc grade. Install (2) stakes per •.'.' } ;, .•{�':'• trotddireclh opposite Ilse I Inch Adi-A-T,,e guy tleiOht `�': •;•��' :••f:�;�ti•�''•:•:• ;•v,_, to secure the tree ul'l'roe ...': �4�ef D f�'{r,•rr,, � , ,;'rr,'I oT�l Y"00. Cut a„a, all ballot@ rolxs '! ��3�� I , I Renuna1„ to I ne txi. ket )jijj Widau :tnd score hole %call -- �— Rance container and cut circluig roots if container -groan, or as much burlap as possible if field -gro%m �j 2' 3' Mulch kLpI aN\aa from tnuik I - I I Soil ,wll to Backlill soil Lace solid soil pedestal -do not dig deeper than Fall depth SPECIMEN TREE PLANTING DETAIL o _7 Cut a%%av all balling Remove top of %\ire Widen and score hole %tall-:�-" Remove container and cut circling roots if container- grovm, or as much burlap as possible if field-gro%\Ti 2'--3" Mulch kept at\ai Irom trunk Soil welt to contain %cater r.: •" Backfill soil Lease solid soil pedestal -do not dig deeper than ball 4 1 2 I NSTALLATI O N A. SET PLANT MATERIAL IN THE PLANTING PIT TO PROPER GRADE AND ALIGNMENT. IF FABRIC IN -GROUND CONTAINER MATERIAL IS USED, REMOVE THE FABRIC BAG FIRST. SET PLANTS UPRIGHT, PLUMB AND FACED TO GIVE THE BEST APPEARANCE OR RELATIONSHIPS TO EACH OTHER OR ADJACENT STRUCTURE. SET PLANT MATERIAL NOW LOWER THAN THE FINISH GRADE OR 2-3" ABOVE FINISHING GRADE. NO FILLING WILL B PERMITTED AROUND TRUNKS OR STEMS. BACKFILL THE PIT WITH PLANTING MIXTURE. DO NOT USE FROZEN MIXTURES FOR BACKFILLING. FORM A RING OF SOIL AROUND THE EDGE OF EACH PLANTING PIT TO RETAIN WATER. B. AFTER PLANTS ARE SET, MUDDLE PLANTING SOIL MIXTURE AROUND BASES OF BALLS AND FILL ALL VOIDS. 1. REMOVE ALL BURLAP, ROPES AND WIRES FROM THE TOP 1/3 OF ROOT BALL. C. SPACE GROUND COVER PLANTS IN ACCORDANCE WITH INDICATED DIMENSIONS. D. MULCHING 1. MULCH TREE AND SHRUB PLANTING PITS AND SHRUB BEDS WITH REQUIRED MULCING MATERIAL 2-3" DEEP IMMEDIATELY AFTER PLANTING. AFTER WATERING, RAKE MULCH TO PROVIDE A UNIFORM FINISHED SURFACE. 2. MULCH GROUND COVER BEDS WITH MULCH 2" DEEP BEFORE PLANTING. E. STAKING AND GUYING STAKE TREES ONLY IF ONE OR MORE OF THE FOLLOWING CONDITIONS ARE PRESENT: LARGE CROWNS, SLOPED AREAS, WINDY AREAS OR TREE SPECIES REQUIRES INITIAL SUPPORT. IN THE EVENT THAT QUESTIONS ARISE CONCERNING THE ABOVE, THE SYSTEM ARBORIST OR DESIGNEE WILL MAKE THE FINAL DETERMINATION. 1. STAKING/GUYING A. STAKE/GUY ALL REQUIRED TREES IMMEDIATELY AFTER PLANTING OR WITHIN 48 HOURS. B. STAKING DETAILS ARE SHOWN ON ATTACHMENT A. F. PRUNING 1. UNLESS OTHERWISE DIRECTED, PRUNING WILL BE RESTRICTED TO REMOVING BROKEN, DAMAGED AND ASYMMETRICAL GROWTH OF NEW WOOD. 2. UNLESS OTHERWISE DIRECTED, PRUNE EVERGREENS ONLY TO REMOVE BROKEN OR DAMAGED BRANCHES. G. EXISTING PLANT RELOCATION 1. TRANSPLANT TREES AND SHRUBS DESIGNATED FOR RELOCATION TO LOCATION SHOWN ON THE DRAWINGS. PRUNE DIG BALL AND BURLAP MOVE AND PLANT IN ACCORDANCE WITH SPECIFIED TREE PLANTING REQUIREMENTS. 2. PRUNE DIG, BALL AND BURLAP, AND MOVE DESIGNATED TREES FOR RELOCATION TO THE DESIGNATED PLANT STORAGE AREA FOR HEELING -IN OF MATERIAL UNTIL FINAL PLANTING AREAS ARE PREPARED, IF REQUIRED. A. MAINTAIN PLANTS IN STORAGE AREAS BY BRACING PLANTS IN VERTICAL POSITION AND SETTING BALLS IN AN ENCLOSED BERM OF TOPSOIL OR BARK. WATER AS REQUIRED TO MAINTAIN ADEQUATE ROOT MOISTURE. B. RE -BURLAP PLANT BALLS IF REQUIRED BEFORE FINAL TRANSPLANTING OPERATIONS. C. MOVE TO FINAL LOCATIONS SHOWN ON THE DRAWINGS AND PLANT IN ACCORDANCE WITH SPECIFIED TREE PLANTING REQUIREMENTS. 3. TRANSPLANTS ARE NOT UNDER WARRANTY. MAINTENANCE A. MAINTENANCE OF INSTALLED AND ACCEPTED PLANTINGS WILL BE PERFORMED BY THE OWNER. B. CONTRACTOR'S MAINTENANCE SHALL INCLUDE PRUNING, CULTIVATING, WEEDING, WATERING AND APPLICATION OF APPROPRIATE INSECTICIDES AND FUNGICIDES NECESSARY TO MAINTAIN PLANTS FREE OF INSECTS AND DISEASE UNTIL ACCEPTANCE. 1. RE -SET SETTLED PLANTS TO PROPER GRADE AND POSITION. RESTORE PLANTING SAUCER AND ADJACENT MATERIAL AND REMOVE DEAD MATERIAL. 2. TIGHTEN AND REPAIR GUY WIRES AND STAKES AS REQUIRED. 3. CORRECT DEFECTIVE WORK AS SOON AS POSSIBLE AFTER DEFICIENCIES BECOME APPARENT AND WEATHER AND SEASON PERMIT. 4. WATER TREES, PLANTS AND GROUND COVER BEDS. CLEANING A. PERFORM CLEANING DURING INSTALLATION AND UPON COMPLETION OF THE WORK. REMOVE FROM SITE ALL EXCESS MATERIALS, SOIL, DEBRIS, AND EQUIPMENT. REPAIR DAMAGE RESULTING FROM PLANTING OPERATIONS. 2 1 1 ACCEPTANCE A. PLANTED AREAS WILL BE INSPECTED AT COMPLETION OF INSTALLATION AND ACCEPTED SUBJECT TO COMPLIANCE WITH SPECIFIED MATERIAL AND INSTALLATION REQUIREMENTS. B. INSPECTION TO DETERMINE ACCEPTANCE OF PLANTED AREAS WILL BE MADE BY THE OWNER'S REPRESENTATIVE, UPON CONTRACTOR'S REQUEST. PROVIDE NOTIFICATION BEFORE REQUESTED INSPECTION DATE. 1. PLANTED AREAS WILL BE ACCEPTED PROVIDED ALL REQUIREMENTS HAVE BEEN MET AND PLANT MATERIALS ARE ALIVE AND IN A HEALTHY, VIGOROUS CONDITION. C. SECTIONS OF THE WORK MAY BE ACCEPTED WHEN COMPLETE UPON AGREEMENT OF THE OWNER'S REPRESENTATIVE AND THE CONTRACTOR. D. UPON ACCEPTANCE, THE OWNER WILL ASSUME PLANT MAINTENANCE. WARRANTY A. WARRANT PLANT MATERIAL TO REMAIN ALIVE AND BE IN HEALTHY, VIGOROUS CONDITION FOR A PERIOD OF ONE (1) YEAR AFTER COMPLETION, PROVIDED PLANTS ARE GIVEN PROPER CARE DURING THIS PERIOD. 1. INSPECTION OF PLANTS WILL BE MADE BYTHE SYSTEM ARBORIST OR DOMINION ENERGY DESIGNEE AT COMPLETION OF PLANTING. B. REPLACE ONCE, IN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS, ALL PLANTS THAT ARE DEAD OR, AS DETERMINED BY THE SYSTEM ARBORIST OR DESIGNEE INSPECTION, ARE IN A SEVERELY UNHEALTHY CONDITION. REPLACEMENTS TO BE INSTALLED AT NEXT BEST PLANTING SEASON. C. WARRANTY SHALL NT INCLUDE DAMAGE OR LOSS OF TREES, PLANTS OR GROUND COVERS CAUSED BY FIRES, FLOODS, DROUGHT, FREEZING RAINS, LIGHTNING STORMS, OR WIND OVER 75 MILES PER HOUR, WINTER KILL CAUSED BY EXTREME COLD AND SEVERE WINTER CONDITIONS NOT TYPICAL OF PLANTING AREAS: ACTS OF VANDALISM OR NEGLIGENCE ON THE PART OF THE OWNER. ANY REPLACEMENT ATTRIBUTED TO THIS MUST BE IN ADDITION TO THE CONTRACT AMOUNT. D. REMOVE AND IMMEDIATELY REPLACE ALL PLANTS AS DETERMINED BY THE SYSTEM ARBORIST OR DESIGNEE, TO BE UNSATISFACTORY DURING THE INITIAL PLANTING INSTALLATION. PROJECT CONDITIONS A. WORK NOTIFICATION: NOTIFY SYSTEM ARBORIST OR DESIGNEE AT LEAST FIVE (5) DAYS PRIOR TO INSTALLATION OF PLANT MATERIAL. B. PROTECT EXISTING UTILITIES, PAVING AND OTHER FACILITIES FROM DAMAGE CAUSED BY LANDSCAPING OPERATIONS. CALL MISS UTILITYTO MARK UNDERGROUND UTILITIES MINIMUM OF 48 HOURS BEFORE DIGGING. SAFETY UNDERSCORING OUR COMMITMENT TO SAFETY DOMINION ENERGY CORPORATE SAFETY ADVOCATES COMPANY AND CONTRACTOR SAFETY AS ONGOING INITIATIVES. ALL LANDSCAPE VENDORS WILL ADHERE TO THE APPLICABLE SECTIONS OF THE DOMINION ENERGY ELECTRIC TRANSMISSION CONTRACTOR SAFETY PROGRAM FOR THEIR ANTICIPATED WORK. (A) DOMINION EXPECTS SITE SAFETY REVIEW WITH CONTRACTOR PRIOR TO THE COMMENCEMENT OF WORK. THIS REVIEW WILL INCLUDE SITE WORK OR WORK RELATED HAZARDS AND MISS UTILITY MARKINGS IDENTIFIED AND DISCUSSED. NEW PERSONNEL TO THE SITE WILL BE UPDATED ACCORDINGLY. (B) ALL SAFETY RELATED ISSUES MUST BE REPORTED TO THE DOMINION CONTACT WORKING THE PROJECT IMMEDIATELY. (C) ALL PERSONAL PROTECTIVE EQUIPMENT ASSOCIATED WITH THE SAFE PERFORMANCE OF WORK SHALL BE ADHERED TO BYTHE CONTRACTOR WHILE WORKING FOR DOMINION. THIS SHALL INCLUDE BUT NOT BE LIMITED TO HARD HATS (WHEN MEN OR EQUIPMENTARE WORKING ALOFT), SAFETY GLASSES (AS NECESSARY), WORK GLOVES, AND REFLECTIVE VESTS. REVISIONS y gaiconsultants REV I DATE I DESCRIPTION .00 Dominion Energy LANDSCAPE SPECIFICATIONS HOLLYMEADE SUBSTATION EXPANSION ALBEMARLE COUNTY VIRGINIA OPERATIONAL REGION B/M No. SCALE NTS PROJECT NAME DATE SHEET: 021 DESIGNER PROJECT ENGINEER DRAWING: APPROVED BY R220236-00-000-00-C-02 IN C 3 Id 8 1 7 3 5 IB 3 2 1 8 7 6 / , I I `` /' � III III ` 1, \ \ \ \\' �- //'%%� / I \1 ►11 � - / 1 1 1 1 \ v / � I I I I I I I \ \ \ \ \ \ // ,///• '/ � \ � l �) /ill I \I \\ II \\ III f \\� I 1,� it \\ ; 1 r I \ \ �►/ll �l I l r I �/ / I ��lli ( \I \\\ I ► , I, , I � \ _ IIII \��1 PROJECT NO. PRE -DEVELOPED WATER QUALITY LAND COVER MAP DRAWN BY: ELLISJR HOLLYMEADE SUBSTATION DATE: 08/22/22 PROJECT NO. SCALE: 1a=80' ALBEMARLE COUNTY, VIRGINA j 1 111 11 \`�/� ) I jI1I�11� \ ,I\ \ \\\/ /%-�'�\\ ,/''���/ ► 1\\I ►%I r 1 �I /// ram\ \\ /I /- .l I ► % / /<\AN / //lIl►I //// l�l ► V \,!� II \\1 / / lie \\\\� IIII ►1,� \mac_\- /_7 0 IL, it I I I► r/ I I\�\\ V l ir t\\ 1 \ 11 I I II II \ _ ����II►j1 li(L: //// / ir/ / I r I//// \�`�/// \%��%j//�i.• " s A V / 6 //o' ELLISJR PROJECT NO. POST -DEVELOPED WATER QUALITY LAND COVER MAP DRAWN BY: DATE: 08/26/22 PROJECT NO. HOLLYMEADE SUBSTATION scALE: In=80' ALBEMARLE COUNTY, VIRGINA 8 7 1 6 5 LEGEND HSG B; IMPERVIOUS (1.42 AC) HSG B; MANAGED TURF (0.75 AC) HSG B; FOREST/OPEN SPACE (0.52 AC) SCALE: 1" = 80' 80 0 80 160 FIGURE NO. Dominion Energy LEGEND HSG B; IMPERVIOUS (2.19 AC) HSG B; MANAGED TURF (0.50 AC) SCALE: 1" = 80' 80 0 80 160 FIGURE NO. Dominion Energy 5 0 2 2 Legend « Project -Location *`� �� •li ECOSYSTEM SERVICES, LLC wE4T IF GI NIA 1739 Allied Street, Suite A Charlottesville, VA 22903 LynnhavenHUC n' / 540.578.4296 f www.ecosystemservices.us ion(riecosystemservices.us d� ` Primary_HUCs May 26, 2022 / is-� rJames Secondary HUCs Kirsten M. Lipsky, EIT GAI Consultants 385 E. Waterfront Drive Homestead, PA 15120-5005 RE: Nutrient Offset Credit - Cost Quote Project: Hollymeade Substation Expansion Project Project Address: 2428 Decatur Drive, Charlottesville, VA 22911 Project HUC: 02080204 Bank Hi 02090204 +Ili Bank Address:1705 Lambs Road, Charlottesville, VA 22901 Il i Dear Ms. Lipsky, S We appreciate the opportunity to provide a cost quote for 222 pounds of phosphorus for the above �jQ)II referenced project. This letter is to certify that as of today, May 26, 2022, Ivy Creek Nutrient Bank has 171.08 pounds of phosphorus (TP), 263.26 pounds of nitrogen (TN), and 53,946.89pounds of TSS available r for transfer to those entities requiring offsets in accordance with the Chesapeake Bay Watershed Nutrient Credit Exchange Program (VA Code § 62.1-J4.19:14 et seq.). Those offsets are also transferable in accordance with the Virginia stormwater offset program (VA Code § 62.1-44.15:35) and the Virginia Soil 9 and Water Conservation Board's Guidance Document on Stormwater Nonpoint Nutrient Offsets approved on July 23, 2009, to those regulated entities q lifying for nutrient credits. We can certainly accommodate your need � and could offer to fulfil the order of 2.22 pounds of phosphorus for $44,400.00 ($20,000/pound)'a The Bank Sponsor will guarantee this price for the above referenced pounds for thirty (30) days from ti�ie date of this letter. The Bank Sponsor reserves the right to requote the price if the nutrient credits requested changes. Please feel free to contact us with any questions. I hope we have the opportunity to work together on this project. 9' zf ii uii d a Ir,. y ( �Ji Ali Id Sincerely; ` SI m7 Ji Ij f+ rl i J ) I'�u1�1 �' ,�• ° � �J�/4 �i /) A Ecosystem Services, LLC v- B �(r 5�"e�� �I rr � Ih �:i ��r I �, �� • � � f � � I i g 'li � bL ` I{ ,i ��m ,r !if �l �%°. ll�ry1, 11 Jonathan R. Roller, AOSE PSS CNMP I8 N Manager - Authorized Representatmi'1� �I II �j rill �ll� �(�,^ I : PPP . � i g d DEQ Virginia Runoff Reduction Method Re -Development Compliance Spreadsheet -version 3.0 BMP Design Specifications List. 2013 Dreg Stds & Specs Site Summary Project Title: Hollymeade Substation Expansion Project Date: 44799 Total Rainfall (in), 43 Total Disturbed Acreage: 2.69 Site Land Cover Summary Pre-ReDevelopment Land Cover (acres) Asolls BSolls CSolls DSoils Totals %of Total Forest/Open(a<res) 1 0.00 0.52 0.00 0.00 0.52 19 Managed Turf (acres) 0.00 0.75 0.00 0.00 0.75 28 Impervious Cover(acres) 0.00 1.42 NEC 0.00 1.42 53 2.69 00 Post-ReDevelopment Land Cover (acres) Asoils esoils CSoils DSolls Totals %of Total Forest/Open (acres) 0.00 0.00 0.00 0.00 0.00 0 Managed Turf (acres) 0.00 0.50 0.00 0.00 0.50 19 Impervious Cover (acres) 0.00 2.19 0.00 0.00 2.19 1 81 2.69 1 100 Site Tv and Land Cover Nutrient Loads Final Post -Development Port- Post- Adjusted Pre- (Post-ReDevelopment ReDevelopment Development ReDevelopment &New Impervious) p (New Impervious) Site Rv 0.81 0.75 0.95 0.75 TreatmentVolume (1 7,915 5,260 2,655 5,260 TP Load (Ib/yr) 4,97 3.30 1.67 3.30 Total TP Load Reduction Required (Ib/yr) 2.01 0.66 1.35 Final Post -Development Load (Post-ReDevelopment & New Impervious) Fir e- ReDevelopment TN Load (lb/yr) 35.58 24.71 Site Compliance Summary Maximum% Reduction Required Below 20% Pre-ReDevelopment Load Total Runoff Volume Reduction (1 0 Total TP Load Reduction Achieved (lb/yr) 0.00 Total TN Load Reduction Achieved (lb/yr) 0.00 Remaining Post Development TP Load 497 (lb/yr) Remaining TP Load Reduction (Ib/yr) Required 2.01 i 3 1 ��' �1Nashington i ,. Ki D.] Cdy sbNM: MarrroMurg Pew H u Fredericksblrgi California A- Fnd A.P / Rivanna,il trevae to+c Hil - 1 CnesapeaFe 8ai Middle James -Buffalo An,, a61 n James -Willis a. Appomattox FI,F.I nxl F��.imaa 1 le^ bar"111, - - - -,o0 n H Ke DRAWN BY: ELLISJR CHECKED BY: KUZMKWM pre ReDevelopment Final Post -Development Post-ReDevelopment TP TP Load per acre Tp Load per acre Load per acre (Ib/acre/yr) (lb/acre/yr) (lb/acre/yr) 1.72 2.85 2.72 REVISIONS DATE I DESCRIPTION P ism .00 Dominion RWO Energy Loweriames Lynnhaven-Poquoson /Hampton Norfolk 1 `V ugi rim Beach WATER QUALITY gaico�ltants HOLLYMEADE SUBSTATION EXPANSION ALBEMARLE COUNTY VIRGINIA OPERATIONAL REGION B/M No. SCALE 1" = 200' PROJECT F NAME DATE SHEET: 022 DESIGNER PROJECT ENGINEER DRAWING: APPROVED BY 220236-00-000-00-C-02'e 2 1 0 M no A r:? 7 5 4 I 2 2 1 L A �RCEL Al ' I yD \ PAR �' \ /��\ / /i �/ ► )11 /I 1 1 1 1 1 1 \ \ 032"st601400/ 0' \ ' 1 \ `r40QBECAruRDR/ hqr D 434 z cA e/ / rI ! l I EL �•/�// // t I 1 1 iy c o iAN YD \ / _ �// J1III 1/ 11 //l \\-\SOTEl7ENR1E 117 Y L o / ��S/ U�i/�/ III I/1� �ll lrr-% G I .p(RY M NTY /NARY //�i G.\ \ R ti PLA NEDREN \\ /• i� \ i / / / -- \\ _�_- \ _ _•,__ -y1 �\ � a �•�r�����_= -v\ \ \\\\ i-r''I F - _ r _ Jj \\ \\ \ IIII 1 \I\ \ fz \ I ►1'l 1 I I I o _ �\�� �/ 111< h \\ \ � \ \\�--- l / � \\ - U � / �I I 1► I I III III IIII � . \ \ o I v I I I I IIII I \\_ PA oe p PO 174 J/ P01 2 / I FORESAS /01W rY / l I PR/MA/1rYZONING.•R4 / l I /S/DEN�JAL [POI3 rxe��n. DRAINAGE AREA TIME OF CONCENTRATION PATH (SHEET FLOW) TIME OF CONCENTRATION PATH (SHALLOW CONCENTRATED FLOW) TIME OF CONCENTRATION PATH (CHANNEL FLOW) TIME OF CONCENTRATION PATH (PIPE FLOW) PRE -DEVELOPED DRAINAGE AREA 1 (0.51 AC) CN=64 TIME OF CONCENTRATION: 6 MIN PRE -DEVELOPED DRAINAGE AREA 2 (2.36 AC) CN=75 TIME OF CONCENTRATION: 8 MIN PRE -DEVELOPED DRAINAGE AREA 3 (0.55 AC) CN=60 TIME OF CONCENTRATION: 7 MIN PRE -DEVELOPED DRAINAGE AREA 4 (1.44 AC) CN=60 TIME OF CONCENTRATION: 6 MIN SCALE: 1" = 80' PROJECT NO. FIGURE NO. PRE -DEVELOPED DRAINAGE AREA MAP 00 Dominion Ener DRAWN BY: ELLISJR HOLLYMEADE SUBSTATION / DATE: 09/06/22 PROJECT NO. 9Y 2 SCALE: is=80' ALBEMARLE COUNTY, VIRGINA Check ■ Present ❑ Under Development ❑ Developed Sheet Flaw Segment ID AB Surface Description .......................................... P Meadow Manni 's Roughness Coefficient n.............. 0.15 TR Table 1 b5 3 Flow Length. L................................................ 100 ft Two-year 24hour Rainfall, P2............................. 3.61 In Land Slope. s................................................. 0,147 ft/ft Travel Time, Tt=(0.007'(n•L)08)/(Pz 4•s°'1)........ 0.0692 has Shallow Concentrated Flow Segment ID SC Surface Description (Paved / Unpaved) ................ Paved 20.33 Surface Description Coefficient, C....................... (TR-55 APPENDIX F) 137 Flow Length. L................................................ ft 0.023 Watercourse Slope,a....................................... ft/ft AverageVelocity, - 9A V-Ce ........................... fusee 3.10 0.012 Travel Time, Tt = (L) /(3600•V).......................... has Channel Flow NO CHANNEL FLOW Time of Concentration Sheet Flow T.................................................. e 0.069 2 h rs Shallow Concentrated Flow T ........................... t- 0.0123 hrs Time of Concentration, T. .................................. 0.0815 hrs 5 mins Project: By,: D 1 Dominion -Noll -Hollymeade Substation JRE a/31/2022 Location: Checked: Date: PRE P011 MWK 9/4/2022 8 I 7 Chad: as Preaebt D Under Development ❑ Davelopetl Sheet Flow Segment ID 3urrece Olac ipEOn........................................ Manninga Roughness Caelfiderv, n .............. FlowLeigin. L.............................................. Two-year2 Ihaar Ralneell, P Leekslopes................................................ Travel Time, T,=(O.00T(n•Lf )/(P�° s")....... Shallow Concermatl Flow AB Be CD Woods Gres Grant 0.4 0.15 0.011 22.19 30.64 47.17 3.61 3.61 3.61 0.076 0.194 0.018 CIRRI 0.0241 0.0109 nmR ,Table 31) ft In ft/ft has Se9 meM ID DE EF Surface Deem s Pavetl / Un wtl .............. pli ( PB ) Pavad Unpaved! Pe Surface Deealptlm CSMtlem, C...................... 20.33 18.13 (TRSS APPENDIX F) Flow Langbl, L.............................................. 10.47 57.4998 ft Watercourse Sk,P.. e...................................... 0.029 0.06 RM Avara9a Velocity,V=C•s66............................. 3.48 1.25 Na x Travel T.,T,=(L)/(35ODV)......................... 0.016 0.013 has Segment lD Diameter d MPa. do ...................................... Water&* in pipe, d.................................... meta. B...................................................... Waded Pedmstan O.SG'EO.... ........................ Hydraulic Radius, r= G.2V(1-(sin9y0k10........... Chssl Slope, s..... ........... ......... -............... Manningk Roughness Coeffiplem, n.................. Aveupe Velocity, V=11.49'(V3's12)/ (n)........ Volume0ic Flow Rate. cfa ............................... FlowLengN, L............................................. Travel Time. Tt= (L) /(3800'V)........................ Segment ID Sacibn B., b...................................... saclbn DWM, d.................................... sactbn Side slope,. .............................. C. Seal R. Anse, a=bd. Trf... Waded Perimeter, P.=b. (2'drtZ. 1)°b.. Hydraulic Radiu, r= e/ q......................... Channel Slope. s.................................... Wnning's Roughnes Coe) chin, n.........., Average Velocity, V=(1.49•rz°416)/(n).... . Flow Length. L....................................... Travel Time. T,= (L) / (3600^n................. rme of Canostreticn FG GH Id. 3 1 1.333 3 1 1.333 6.2831853 62011153 5.2831853 9.424778 3.1415927 4.18T743 0.75 0.26 0.33325 0.004 0.051 0.0612 0013 0.013 0013 S9781108 1U.224635 13.579214 42.256775 8.0304095 19.950681 Seel 15.07 18.95 0.0041 0.0004094 0.0003876 1.50 ft 0.0 ft 3 0.56 N A Toe ft Fla R FN 0 ft 0.01 3.58 ft/eac )7.81 R Me has Sheet Flaw T, ................................................ oesaut h l Shallow Comertmal Flow Ti.......................... 0.0283 he Pipe Flow Tl........................................ Metals he Channel Flow TL........................................... 0.01178 In Tine of Conmandficn,T•................................ 0.1349 M 8 ali s L•� ft ft ft ft ftIR Msc hre Proect: Y Date: Dominion- Hollymeade Substation Expansion ELLISJR 9/1/2022 Cheduad: Dale: r?g�i cgnsplt`.antis Location: KUZMKMW 9/4/2022 PRE POI 1 84 Post-0evelopment Area Runoff Acres Proact: Y Date: Dominion- Hollymeade Substation Expansion ELLISJR 9/1/2022 Chedu d: KUZMKMW Date: 9/4/2022 Location: PRE POI 3 Post4Development Area Ru Product ■Acres Cover Description ON of D milesa CN z Area o% Meadow (B) 58 0.13 8 Woods (B) 60 0.40 24 Greve) (B) 85 0.02 2 TOTALS 0.55 33 Project: Date: Dominion -Noll meade Substation JRE 8/31/2022 Location: Checked: Date: PRE P013 MWK 9/4/2022 Check ■ Present D Under Development O Developed Sheet Flow Segment ID Surface Description ...................................... 9 Mannin9 's Roughness Coefficientn .............. Flow Length, L............................................ Two-year 24-hour Rainfall, P2......................... LandSlope, s.............................................. Travel Time, T, _ (0.007'(n•L)°'0) / (pz .s•a0°) Shallow Concentrated Flow Segment ID Surface Description (Paved / Unpaved) ............... Surface Description Coefficient, C....................... Flow Length, L................................................ Watercourse Slope. s....................................... Average Velocity, V = C s .............................. Travel Time, T, = (L) /(3600'1n.......................... Channel Flow Time of Concentration N R- TaMe -1 55 3ftin 0.049 fuft 0.1074 hrs BC CD DE EF Unpaved Unpaved Paved Unpaved 16.13 16.13 20.33 16.13 100 89.73 4 8.41 0.088 0.128 0.108 0.212 4.79 5.77 6.68 7.43 0.006 0.004 0.000 0.000 Sheet Flow Tt.................................................. 0.1074 Kra Shallow Concentrated Flow Tt ............................ 0.0105 hrs Time of Concentration, T................................... 0.1180 hnc 7 mine 5 (TR-55 APPENDIX F) ft ft/ft fusee has CN (WEIGHTED) 60 y gai consultants Hallymeade Substation Expansion POI Post -Development Area Runoff Product • Acres Cover Description CN of D mils' CN xArea o% Meadow (B) 58 0.65 32 Woods (B) 60 0.37 22 Gravel(B) 85 1.44 122 TOTALS 2.36 177 ON (WEIGHTED) 75 gai consultants Proect: Date: Dominion - Hollymeade Substation Expansion ELLISJR 9/1/2022 Checked: KUZMKMW Date: 9/4/2022 Location: PRE POI 4 Post -Development Area Runoff • Acres Product Cover Description CN of ❑ miles, CN x Area ❑% Meadow(B) 58 0.85 49 Woods (B) 60 0.54 32 Gravel(B) 85 0.05 4 TOTALS 1.1 86 Project: D :. Dominion -Hollymeade Substation JRE 8/3l/2022 Location: Checked: Date: PRE P014 MWK 9/4/2022 Check 0 Present D Under Development O Developed Sheet Flow Segment ID Surface Descriptionss .......................................... Mannin9 's Roughness Coefficient n .............. 9 Flow Length, L................................................ Two-year 24hour Rainfall, P2............................. Land Slope, s.................................................. Travel Time, Tt = (0.007'(n•L)°'0) / (Pz'°•s°'°)..... .... Shallow Concentrated Flow AS TR-5 ft in ft/ft hrs Grew 0.15 100 3.61 0.072 0.0921 Segment ID Surface Description (Paved / Unpaved) ............... Surface Description Coefficient, C....................... Flow Length, L............................................... Watercourse Slope. s....................................... Average Velocity. V = C•sp.°.............................. Travel Time, Tj = (L) /(3600'V).......................... Channel Flow Time of Concentration Table 3-1 BC CD DE EF Unpaved Unpaved Paved Unpaved 16.13 16.13 20.33 16.13 100 64.31 6.39 11.01 0.076 0.158 0.111 0.119 4.45 6.41 6.77 5.57 0.006 0.003 0.000 0.001 Sheet Flow Tt.................................................. 0.0921 hrs Shallow Concentrated Flow Tt ............................ 0.0098 hrs Time of Concentration T. .................................. 0.1019 hrs 8 mins 3 (TR-55 APPENDIX F) ft fvt fusee has CN (WEIGHTED) 60 REVISIONS y gaiconsultants REV DATE DESCRIPTION Dominion Energy STORMWATER MANAGEMENT DRAINAGE AREA MAPS & ROUTING DIAGRAMS HOLLYMEADE SUBSTATION EXPANSION ALBEMARLE COUNTY VIRGINIA OPERATIONAL REGION B/M No. SCALE 1" = 200' PROJECT NAME DATE SHEET: O23 DESIGNER PROJECT ENGINEER DRAWING: APPROVED BY 220236-00-000-00-C-02; 2 1 A r:? 7 s 2 1 I\\/ �_ /1j►p r - 1 1 1 1 1 \ \ 032olt6 0>400/ j 0 `440§RECAMRDR/ 1 1 ny _ 111 \ \ - SDTEl7EN R/6�AL/ Yo / S U�i/ III I �/1 /rr - / 1 1 \ \\ Rr1 c�cB E/ \AW // IIII I/// � /// NEDRE �Q I E \\\ I I IIC 1/ l/ / / / r I P /a�ARrA vac.\ \ \ rr\� \\ IIII 1 \ see" see" / / // �/ / 1 - J �\ \ M N 1 I \\\ // / / / \ \\\ �• - `& PLA NED RE,'/ D �• _ NE A /\ \\\ „ 1(\� \\� / / / Poi i / ci �rRiC� /\ I1TA1tN �{ i \I \\ 0A 0-03700 J \.-� D \\\ I\'111\\\\ . Ash jlwv It It it 0 \ \\ � ► I l I l I � � /i '-��---e --�-�� I I )I I ri, I IIII, \I \\\�, \ ) I ► ► I l ( I\\\ r I \ II lll�j I \ \\- \ ► 1 11 �\�\� \\_- � �i /t l �, I I' ,1 .1. III III \ \ \ \ L\\ \ \�/ \ \\�\\ \� 1\1 / /\\\ \ - �// ►III III \ If is FOREST AREA PH-coMNun �f POI4 J FORESTIA AS /AT/ If j /// j ` / // % / \\ ,�/. • • If I D.B. PR/MA/tYZON�NG.•R4 � \ IfI /S/DEN�JAL [POI i If LEGEND DRAINAGE AREA TIME OF CONCENTRATION PATH (SHEET FLOW) TIME OF CONCENTRATION PATH (SHALLOW CONCENTRATED FLOW) TIME OF CONCENTRATION PATH (CHANNEL FLOW) TIME OF CONCENTRATION PATH (PIPE FLOW) POST -DEVELOPED DRAINAGE AREA 1 (0.51 AC) CN = 64 TIME OF CONCENTRATION: 6 MIN POST -DEVELOPED DRAINAGE AREA 2 (2.32 AC) CN=78 TIME OF CONCENTRATION: 9 MIN POST -DEVELOPED DRAINAGE AREA 3 (0.36 AC) CN = 60 TIME OF CONCENTRATION: 9 MIN POST -DEVELOPED DRAINAGE AREA 4 (1.67 AC) CN = 68 TIME OF CONCENTRATION: 10 MIN SCALE: 1" = 80' IIII PROJECT No. POST -DEVELOPED DRAINAGE AREA MAP FIGURE NO. DRAWN BY: ELLISJR HOLLYMEADE SUBSTATION � Dominion DATE: 09/01/22 PROJECT NO. / Energy® 2 SCALE: in=80' ALBEMARLE COUNTY, VIRGINA Project: eY Dill Dominion -Sinai Substation Ex nsion JRE 8/31/2022 Location: Checked: Date: POST POI MWK 9/412022 Check: D Present D Under Development ■ Developed Sheet Flow Segment ID Surface Description .......................................... Manning's Roughness Coefficient, n .............. Flow Length•L................................................ Two-year 24-hour Rainfall, P2............................. Land Slope, a .................................................. Travel Time, Tt=(0.007'(nlB)/(P2 s`s°A)......... Shallow Concentrated Flow AS (TR-55, Table 3-1) It in Nft him Meadow 0.15 100 3.61 0.147 0.0692 Segment ID BC Surface Description (Paved /Unpaved) ................ Paved Surface Description Coefficient, C....................... 20.33 (TR-55 APPENDIX F) Flow Length, L................................................ 137 It Watercourse Slope, s........................................ 0.023 flflt Average Velocity, V = C'ss's ............................... 3.10 fil Travel Time, Tt = (L) /(361 .......................... 0.012 bra Channel Flow NO CHANNEL FLOW Time of Concentration Sheet Flow T................................................... Shallow Concentrated Flow Tt ............................ Time of Concentration, Ta.................................. 0.0692 his hrs him mine 0.0123 0.0815 5 7 PrateG ar Odx Dpninion -Sinai Substation Expansion IRE a31TN22 Lacetipn: 00adea9: QOb: POST P012 Matrix 9M2W2 chak: DPment OthWer Doak~ al Obligation Shell Flew Sagna m Surfers Dawlptlon Manning'% Roughness Daellklent, n .............. Flow LengO,. L.. Teoyear2M0 ur RelMell, P............................. LandSbpa.e................................................. Trees nine, 1:= Ia.O (n•Lf') I(P,2e ll y......... Shallow Coi,crmded Flax AB BC m Wood. Great Gravel OA 0.15 0.011 M.19 ages 3.01 3.61 3.81 0.078 0.10 0.010 0.0586 0.0241 0.0109 71155, Table 3-1) 0 In rim hr. SanxMID of Sudae DesMption 014: unpaved) ................. Paved Sudece DeeaipOa CaM6cia4 C ........................ 20.33 (rR55 APPENDM F) Flow Length.L................................................. 276.747 0 Walercaars,swe.a........................................ 0.025 Ml0 AvereWVNo.itY.V=Chos................................ 3.21 Nee. Treatnme,>;=0-)I(3110 l........................... a.gu hr. Pipe Flay Segment ID Diameter of Pps. d0.......................................... Wdesdapm In pipe.0....................................... mom. Wetletl PorimMe.ingrsex,ll............................................. 0.5'1'0 ................................ Hydreulk Raal r= o.2T(1Hs1n0yhdD............... (preval Stec. 9.............................................. Manning's Pa hnw Co Mdwt, n..................... Average velocity, V x (IA8 iWir112) I (n)....... ..... Volumetric Flax Ram. cfe................................... Flow Length. L., .... Travel Time, n=(L)1(3407l........................... EF FG OH HI IJ N. 2 2 2 3 1 LK13 2 2 2 3 1 1.= 628918531 6.28316531 6.28318631 8283185307 62831853 6.20185 (28318531 UM18531 6.20318531 9.424777881 3.141M7 4.107743 0.5 0.5 0.6 0.75 0.25 0.33325 0.0025 0.0025 0.0025 9.001 0.0511 0.0812 0.013 0.013 0.013 0.013 0.013 0.013 3.80182878 3.601828)B 3.60182678 5.978110774 10.23M54 13.5mll 11.315sM 11.3154M 11.315l 42.256775 8.008UN legal 1VA Us 37.89 35.17 15.09 18.95 0.0096939 0.00405456 0.00292213 0.0p1634203 O.000W98 O.00a180 Channel Flax SegmatlD Section Base, b........................... Section Ratan, d.............................................. Section Sitle Sbpa, a ........................................ Cross Bauman RonA e a= ed a edi............. Waetl Pedmde.,0.=6e(2tlP(zi'ii............ Hydraulic RaeluS.r=a/0.................................. Channel Sbpe, a .............................................. Manning: Raehna.. C.epn'ml n..................... Average VNo.6Y.V=(1 A9'F%An/(n)............... Flow Length. L................................................. Traval Time, T,=L)I(xoM........................... Tyne of Concentre0m 0 6 ah fl 6 Mt Naec 0 has JK 1.60 0.25 3 0.56 3.0 0.1818 am 0.114 3.58 91.61 j s.sms shad FlaaT, Bill Cptxenbded Flax It ............................. Pipe Flow It .......................................... Overva Flow R.............................................. Tmeof Concentrefil................................... 0.0935 has las his his M, miro 0a239 0.019B 0a07B &IM1 B Proact: BY Date: Dominion- Hollymeade Substation Expansion ELLISJR 9/1/2022 Checked: KUZMKMW Data: 9/4/2022 Location: POST POI 1 Post -Development Area Runalf ■Acres Product Cover Description Chl of ❑ miles' CN x Area ❑% Meadow (B) 58 0.30 17 Wootls (B) 60 0.11 7 Gravel (B) 85 0.10 9 TOTALS 0.51 33 CN (WEIGHTED) 69 Pri Date: Dominion - Hollymeade Substation Expansion ELLISJR 9/1/2022 Checked: KUZMKMW Data: 9/4/2022 Location: POST POI 3 Post -Development Area Runaff ■Acres Product Cover Description Chl [3 miles' miles' CN x Area ❑% Meadow (B) 58 0.14 8 Woods (B) 60 0.21 13 Gravel (B) 85 0.01 1 TOTALS 0.36 22 Project: Dy D Dominion - Sinai Substation Ex anion JRE 8/3V2022 Location: Checked: Data. POST POI MWK 9/4/2022 Check 13 Present D Under Development ■ Devebpetl Sheet Flow Segment ID Surface Description .......................................... Manning's Roughness Coefficient n .............. Flow Length. L................................................ Two-year 24-hour Rainfall, P2............................ LandSlope, s................................................. Travel Time, Tt = (0.007e(neL)s's) / (P2 aeS9A)__...... Shallow Concentrated Flow Segment ID Surface Description (Paved / Unpaved) ................ Surface Description Coefficient, C....................... Flow Length. L................................................ Watecouree Slope. s....................................... Average Velocity. V = CeseG ............................... Travel Time, Tt = (L) /(38g0'1/).......................... AS BC CD Meadow Woods Meadow 0.15 0.4 0.15 28.72 82.87 9 3.61 3.61 3.61 0.195 0.116 0.316 0.0228 0.1151 0.0074 (TR-55, Table 3-1) It In fl/fl him (TRb5 APPENDIX F) It Wit fl/sec hire Channel Flow NO CHANNEL FLOW Time of Concentration DE EF Paved Unpaved 20.33 16.13 4.01 6.41 0.813 0.273 18.33 8.43 0.000 0.000 Sheet Flow Tk.................................................. Shallow Concentrated Flow Tt............................ Time of Concentration, T................................... 0.1453 him hrs him mine 0.0003 0.1456 9 5 CN (WEIGHTED) BO raa'Itant. Hollymeade Substation Expansion P012 Cover Description (B) Hollymeade Substation Expansion POI Post -Development Area Runoff Product • Acres Chl o ❑ miles' CN xArea o% 58 0.40 23 60 0,23 14 85 1.69 144 TOTALS 2.32 181 CN (WEIGHTED) 78 Post -Development Area Runoffof Product ■ Apes Cover Description Chl D miles' Chl x Area D% Meadow (B) 58 0.76 44 Woods (B) 60 0.34 20 Gravel (B) 85 0.67 48 TOTALS 1.67 113 Pill py Dam: Dominion- Sinai Substation Expansion JRE &3112022 LocaOon: Checked: Date: POSTPOI4 MWK 9I4/20 22 Chac 0 Present 0 Under Development • Developed Sheet Flay ......Sg Surfem Description ............ Menninb RouBhimas CoelAden...6nM ..D ..... Flow Length. L................................................ Tani 2A4tour Reintal, P2............................ LandSlope. s................................................ Travel Time, T, = (0.007'(n'L)os) / (P2ad'seA)........ Shallow Concentrated! Flow Segment ID Surface DpCIiDGOn (Pia ed / Unpaved) ................ Surface Description Coefficient, C....................... Flow Length. L................................................ Wamr-n gaSIOps.s....................................... Average Velocity. V=C'sos ............................... Travel Time, T, = (L) /(3600^0.......................... AB EF FG GH HI Uad Gravel Meow Woods Meadow Gravel Meadow 0.011 0.16 0.4 0.15 0.011 0.15 100 15.14 67.14 1 2.59 1 6.39 11.01 3.61 3.61 3.61 3.61 1 3.61 3.61 0.02E 0.100 0.145 1 0282 0.111 0.108 0.ata o.01Te 0.11Da g.og29 0,0011 0.0135 (TR55 APPENDIX F) ft Ole O/sec hre Channel Flow BC CD DE Paved Unpaved Unpaved 20.33 16.13 16.13 84.15 12.2 13.05 0.024 0.320 0.077 3.15 9.13 4.48 OAOT 0.000 1 0.001 Sheet Flow Tt novidConcentration,Te................................ 0.1828 hra him mine 'a 0.1712 10 3 TR55, Table 3-1) It in Ole has CN (WEIGHTED) 88 REVISIONS REV DATE DESCRIPTION Dominion Energy gai consultants y gaiconsultants STORMWATER MANAGEMENT DRAINAGE AREA MAPS & ROUTING DIAGRAMS HOLLYMEADE SUBSTATION EXPANSION ALBEMARLE COUNTY VIRGINIA OPERATIONAL REGION B/M No. SCALE 1" = 200' PROJECT F NAME DATE SHEET: O24 DESIGNER PROJECT ENGINEER DRAWING: APPROVED BY 220236-00-000-00-C-024 2 1 A r:? 7 5 4 2 2 1 Ll i -a F _ / w � \ 35 le -� ---- r \- LEGEND j/ate% I 1 ses' ass' IIIII I/ //l /�i/i I DRAINAGE AREA IIII Ill �/� - - /Z/ �/ OVERALL DRAINAGE AREA PRE -DEVELOPED DRAINAGE AREA 1 (0.70 AC) TIME OF CONCENTRATION: 6 MIN IIII I I 1 PRE -DEVELOPED DRAINAGE AREA 2 (1.02AC) TIME OF CONCENTRATION: 6 MIN 1\\ 11 11111\ \\\ A NOTES: I 1 I III I \\\ ( 1. REFER TO SHEETS 021 THROUGH 024 FOR OVERALL FLOW RATE CALCULATIONS FOR INDIVIDUAL POI-S. IIII \\\ 2. A TIME OF CONCENTRATION OF 6 MIN WAS USED DUE TO THE CALCULATED VALUE BEING UNDER 6 MIN. /�1'�/iiilii►lliiilliii�pl� � \\ \\ i_ ,/IIII 1 1 � 1 11 1 IIIIIII I \ - �//I11II`1 IIII � POI 4 / /,'/ \` ji/ / `'''� ��j/ice' \�����% '� /• i r`J// // \\�\4PO/2 / I // l P013 PROJECT NO. PRE -DEVELOPED STORMWATER DRAINAGE AREA MAP DATE: 08/04/2022 PROJECT NO. DRAWN BY: R HOLLYMEADE SUBSTATION /04/2 SCALE: ill =60' ALBEMARLE COUNTY, VIRGINA PRE -DEVELOPED 2-YEAR ROUTING swrm .7ewers =ension Tor AMOUesx191 Aorol:AU l:wrr Jr Man MVReaort o .n w Imnl 1.•.� I.u�O mal m y l. am am am lla MVReaort """I MVReaort o. . -" ..o Wul. up a. W ow aw m m m w w o.q mu w wl m w w w w w w a- iL L .Wa -L W. W.,. I MVReoort • is .F • fin.. An M do ll- m..,.,m Dominion WOO Energy® 1-1 0.Y 0.A W w w I.N w w w w w w w w w Iffl Ll]iL- W. �.�.-,.. . I MVReaort m- -s wW W W N W PRE -DEVELOPED DRAINAGE AREA: Inlet 1 A, area acres C, Runoff Coefficient Ax C Land Cover Description Impervious 0.68 0.70 0.476 Managed Turf 0.02 0.17 0.0034 Forest/Open Space 0.24 0 Sum: 0.70 Sum: 0.4794 Weighted C Factor, FAxC/Total Area 0.68 PRE -DEVELOPED DRAINAGE AREA: Inlet 2 A, area acres C, Runoff Coefficient A x C Land Cover Description Impervious 0.70 0.70 0.49 Managed Turf 0.30 0.17 0.051 Forest/Open Space 0.02 0.24 0.0048 Sum: 1.02 Sum: 0.5458 Weighted C Factor, FAxC/Total Area 0.54 PRE -DEVELOPED 10-YEAR ROUTING Hydraflow Storm Sewers Extension for Autodesk® AutoCAUO Civil 304D Plan 2 3 gtlel ,�.. - lw� I MVReoort 0 4 up .Jum capon w w u ip w W Pn.l OrvM M w w w IN .0 w m a M.M.M1,W4....II�Od, _wb.mF.Mvs: -CbiMM MVReaort •" `-•al .. - - o.n o� w- om. w . uw w V.9 MR m m alIW w 0.V 0.V A W R Mqauwau1 am mal am I MVReaort u.W a is �+M 4 Tn .w ad M1. .si On 4 dry - Iml mu1. .1 a. ■ IT I MVReaort 1-1 . 0.A W w w w w I.N w w w w w w w R m am amD am am --LLL-11 W. �.�.-,.... I MVReaort m- -s " v uW W w q W 0 _ REVISIONS I REV I DATE I DESCRIPTION ism Dominion Energy CALCULATIONS y galconsultants HOLLYMEADE SUBSTATION EXPANSION ALBEMARLE COUNTY VIRGINIA OPERATIONAL REGION B/M No. SCALE NTS PROJECT I NAME DATE SHEET: 027 DESIGNER PROJECT ENGINEER DRAWING: APPROVED BY 220236-00-000-00-C-02 / 3 2 1 A r:? 7 5 4 2 1 1 Ilk \ \` \\ Ui 1111 �r - - \/ �/ N% \\ // I // I�l // / III 1/ /l IIIII 11\� aI \\\I ✓ice\\\1111\11 It I 1, 1 3H6 R-[ _ NOTES: / 711le Ill mammal ammamma or - If 1 PROJECT NO. POST -DEVELOPED STORMWATER DRAINAGE AREA MAP DATE: 08/04/2022 PROJECT NO. DRAWN BY: R HOLLYMEADE SUBSTATION /04/2 SCALE: ill 80' ALBEMARLE COUNTY, VIRGINA POST -DEVELOPED 2-YEAR ROUTING MvReoort ma Im ,ma mat 14aa I -al w In.l wwl la"ll w w w w w w IM n m111. 1. MM AIO ipA _Im1. ,.M IR opm 0. ma m ■ MvReoort mm,I MvReoort mamm am cm ma m.. R. m7 .w -w R am . .. R am mR R m m ma m ma am w .1 w m. mm .. Im w w .mw<�w�m ,.mmmm.«m. MvReoort LEGEND DRAINAGE AREA OVERALL DRAINAGE AREA POST -DEVELOPED DRAINAGE AREA 1 (0.70 AC) TIME OF CONCENTRATION: 6 MIN POST -DEVELOPED DRAINAGE AREA 2 (0.18 AC) TIME OF CONCENTRATION: 6 MIN POST -DEVELOPED DRAINAGE AREA 3 (0.27 AC) TIME OF CONCENTRATION: 6 MIN POST -DEVELOPED DRAINAGE AREA 4 (0.47 AC) TIME OF CONCENTRATION: 6 MIN POST -DEVELOPED DRAINAGE AREA 5 (0,16 AC) TIME OF CONCENTRATION: 6 MIN 1. REFER TO SHEETS 021 THROUGH 024 FOR OVERALL FLOW RATE CALCULATIONS FOR INDIVIDUAL POI'S. 2. A TIME OF CONCENTRATION OF 6 MIN WAS USED DUE TO THE CALCULATED VALUE BEING UNDER 6 MIN. SCALE: 1" = 80' 80 0 80 160 FIGURE NO. Dominion WOO Energy® mw mw R. o-R all w w w w wro w w w w w w w ma w R ,.m in - ono ¢m omi av - I. _. .wx nm .ww uu uu .n °n wn xan xan .. o.w m u.m mm.m..m.ww.mn...m m I MvReoort m ■ ml ma am ma m.l w al R w al w RV Im a. R w w M W n sal � mllaal ■ MvReoort POST -DEVELOPED DRAINAGE AREA: Inlet 1 A, area acres C, Runoff Coefficient A x C Land Cover Description Impervious 0.68 0.70 0.476 Managed Turf 0.02 0.17 0.0034 Forest/Open Space 1 0.00 0.24 0 Sum: 0.70 Sum: 0.4794 Weighted C Factor, fAxC/Total Area 0.68 POST -DEVELOPED DRAINAGE AREA: Inlet 2 A, area acres C, Runoff Coefficient A x C Land Cover Description Impervious 0.14 0.70 0.098 Managed Turf 0.04 0.17 0.0068 Forest/Open Space 1 0.00 1 0.24 0 Sum: 0.18 Sum: 0.1048 Weighted C Factor, fAxC/Total Area 0.58 POST -DEVELOPED DRAINAGE AREA: Inlet 3 A, area acres C, Runoff Coefficient A x C Land Cover Description Impervious 0.23 0.70 0.161 Managed Turf 0.03 0.17 0.0051 Forest/Open Space 0.01 0.24 0.0024 Sum, 0.27 Sum: 0.1685 Weighted C Factor, fAxC/Total Area 0.62 POST -DEVELOPED DRAINAGE AREA: Inlet 4 A, area acres C, Runoff Coefficient A x C Land Cover Description Impervious 0.42 0.70 0.294 Managed Turf 0.04 0.17 0.0068 Forest/Open Space 0.01 0.24 0.0024 Sum: 0.47 Sum: 0.3032 Weighted C Factor, fAxC/Total Area 0.65 POST -DEVELOPED DRAINAGE AREA: Inlet 5 A, area acres C, Runoff Coefficient A x C Land Cover Description Impervious 0.16 0.70 0.112 Managed Turf 0.17 0 Forest/Open Space 0.24 0 Sum: 0.16 Sum: 0.112 Weighted C Factor, JAK/Total Area 0.70 POST -DEVELOPED 10-YEAR ROUTING - am amalw . r. w R `m w MI wwl I-, w w w w w w ma RaW a. .. ,R . 1. - Ram. I. 4mla I- mall 0 pOn y mam-mmal mw.ww m m .orem...m-mmla.mn�..wR•w,-n.°....�,�om.:-c�..mm ■ C� MvReoort '°m°' I MvReoort all Cat mam Calm IbIll m. mm, w^ a. ... ym. In at Im ° N - wm rw m m m am w aw 1. w lal w w an w ml w w m.,.m m.ww mn m1. -mm MvReoort -a Imal �l m mam m w. m... n•. mw mmm m.. m m m...n w M M M R w Ma W IW am M R M V4 ma am 4ma nm ml wmm ,mm emlammall ■ .a.= ^w mw mam w :a ma.am. a ma mW ma ISp w w w A w lam w w w w w A w am w mll m,m MyReport 1. ml am ma am am w w al W w a w .. M 1. -_ u m,m 3 I REV DATE REVISIONS DESCRIPTION ism Dominion RWO Energy CALCULATIONS y galconsultants HOLLYMEADE SUBSTATION EXPANSION ALBEMARLE COUNTY VIRGINIA OPERATIONAL REGION B/M No. SCALE NTS PROJECT NAME DATE SHEET: DESIGNER 028 PROJECT ENGINEER DRAWING: APPROVED BY 220236-00-000-00-C-02F 2 1 A 8 7 6 5 4 2 2 1 It�1 1II% 1 LEGEND 5 6 3 4 Hydrograph Report Pond Report Hydrograph Report Pond Report 1 1 1 1 \ / I I \ \ \ \ \ \ / ( / // / 1 (/ /' // 1 xprelar rvproaeaga Emmlan mrnulmneaewllJwxtegsrmux.live® iwW,w/elaxx Mryremxnpamagan Enemm� mrwlo.+vP.ocrvlxosxtegsrmux.lxve® iwW,wlelaxx PT Pond ///� //! I y NpIW.rNprtpWOavemaMbH1IDCM90DS1epNYOEak lmvNW' TumEq.[e/alAfl Pontl No.,. Level Spreadert NWINr.'NprtpWEbemaMbH1IDCM90DS1epNYOEak lmvNW' TumEq.[e/al'At] Pond No. 2. level Spreatler2 I r/ j / Hytl. No. 4 Pene Data Hyd. No. 9 Pone DNa taro.. ua.r.a.n.ae m.w.r-..a. Mna.Mm.wra..l.a.avlaae.a eml.aa e.ml..=aeTan Pondcawxxa+erranvdxwNr-. treemeumawmrrel.m.vle,l.em ewlm.o e.alla.=art nn / Route to LS1 Route to LS2 / // ��\\\\ v/� I I // // /( r/added DRAINAGE AREA sage/anageTNN. in.l.w 3mo•/anawT.u. in.l.w 1 \ \ ` l \ \ 1 % \\ III f (/ �/ / �• Hydmgreph ype = Raservolr Peak tlischarge = 1.398 cfr sonal own..gp wm rwym ..r sm .mq ,ee HydmgrePh ype = Rmervolr Peak discharge = 9.SOB fs anal own..gp rw mmwymg .."weveashern in, kare \ ` - - - C I \\ 1 I / // \\\ I 11\, �! // / / / Slam frequency = 2 yls Time to peak = 11.97 hall Slam frequency = 2 yls Time to peak = 11.97 hall ) Time Interval = 2 mIn H d. volume = 2,666 tuft °00 an an i 40 ° Time Interval = 2 min H d. volume = 945 cuff oa sum a o / \ \ 1 \ \ \ \\ \ III 1 ( / Y ozs Z. as .� Inflow N Y ole wars ui re D ` - \ \ \ I \ \ \ \ \ \ \\\\ / ! ) \ I \\\ // /// / Inflow hyd. No. = 1 -Level Spreader 1 Max Elevation = 487.92R oa wm as +a hyd. °. = 2-Level Spreader 2 Max. Elevation = 486.92R oa bum or D Reservoir name =Level Spreetlerl Max. Storage = 183 cuff Reservoir name =Level Spreatler2 Max. Storage = ]2 tuft o-sl cuNed/IXmm sedum weaaurm cuNed/IXmm sedum weo-slaaurm OVERALL DRAINAGE AREA w laf [DI 1Prmen w igi iD) Nf amcrlmwm.wmlma w laf [DI Ill w isi on Nf aten.ni 1.-al. a.Lw 1.a. InxOn ;MIN =,W.W Irectiw IretlM aware Mlrrpni Iretln InxLw IreNw InxOn ;MIN =p.W Irectiw IretlM asaw Y so.. nN =aa as as ow .e.ge =au.a as as am axi =aa boo as ow .e., on. To as as am - •rT ' \\ l �/ erreY =o ° o o Weir C.M. =A]a AAl Aaa flea .rreY =o ° o o Weir C.M. =Asa . Aaa a. \ \ \\\�`\�/ \ Z _ _ / / _ \ \ \\ 1 \ \ \ -_ LEVEL SPREADER 1 DRAINAGE AREA o1111seN -oleo oleo am aw llia,abae -N, x. No N. o�s�mliN -ow ow am aw M�`,reione sMa. -N, x. No N. _ \\\ \ \ \\ \ I / I I I / / =. 1 -•- \ \ \ \ \ \ \\\\; 1 1111\ 1 I I L /(! ` / / / / (0.46A1/) Pe IXI .0.a are 0.a lea Pe IXI .0.a 0.w 0.a lea \\ / 1 ede are 0.� M1°NN� �rota,cetwo e0.e are 0.� M1PNa4 =Owafteradnn) oW to L31 .,l It`.ma' a ROW t-2 Year 1 / \\ . m x. x. ml - as mwut`.ama . m No x. . e..In - ow = - _ 1111 // CN=81 0le) Hp.Nw4-zrev of el -we a` m a-rIm.a...a-..-- ofe) HW.Nw3-zrev of el nv.we �� TIME OF CONCENTRATION: 6 MIN 2.00 2.00 age/Storege/DlmlargeTebk TI. dm W. W, W. W. M am Tdd re re age/3tnreg./mml,.rgaTidalle .ba.lsl _- - . m -pr POl / \�\ \ \� \\\ / / \ ` •e 11\ \I f ` fl oMarea� Efl vfiever fl tea vfi` Na d. d. vfi d. dal ter G. fl oM� Never N •n vfifl tea vfi` d. d.fl d. vfino ` d. da ce r. M o 41 - - - _ om - - - _ _ solo 000 o au.w - _ oao - - - LEVEL SPREADER 2 DRAINAGE AREA - - - o.m o.go - - - am asys 14 solo oss ae been oao solo 01110 on \ \, \ (� / �• _' \ \ \1111 \\ \ CN = 79 am xr wm am 0.70 om ea bum esa ems \\\\ A \ I\\ \`\l\\\ \ \\. NOTES: TIME OF CONCENTRATION: 6 MIN am O > \\ ,.00 ,.qo am ON .w It \\\� D0 0.0 I I I I (\ \\\ ( 1. REFER TO SHEETS 021 THROUGH 024 FOR OVERALL p.m FLOW RATE CALCULATIONS FOR INDIVIDUAL POPS. 2. A TIME OF CONCENTRATION OF 6 MIN WAS USED DUE TO am o.m THE CALCULATED VALUE BEING UNDER 6 MIN. 0.10 +0 o.m D°° oam°.o° Tipsters)\ I I I \ o z a s s +o +z u a ,s m zz u ze a z a s e to +z u a ,s m zz u m \ \Tipsters)Triennia))Triennia)) -xae No .4 -Hae w.+ ®Tend Planetesimal =t83 wR -rye No.3 -Hae w.z ®TumlNwega ueetl=]z wR ° Pond Report 6 3 Pond Report " Hydrograph Report Hydrograph Report 1 rvryrarow rvMraxraqu Emmlan rare OnmoWteggmma.licvmw Ta..voinilwall H',w-H',.qurmmun mr wmtaACMl..taq/rbmlr, lac v® iwW,w/elaxz / / / I I I NandoWater n DYeYna�r anda0Dntunw pEak lmvNW' Tabodson"aranx P tl 1 Naaaem'eaNlap ..rhb cadi0eet8WMmM°c Woe TvlW. annomix I.au.O Pond No., . Level Spreader Pond No. 2. Level Spreader 2 Pontl Data Pond Data \ Hyd. No. 4 Hyd. No. 9 coaal.a., u.--rar-sass..-. ixe-ma..1 era-..l.an.mmdo-sidIel ..un•asrms ovislm-n--eraseameal....... .xvi-lvd-reml... relaovov ewl,nole,do-4eawn Route to LS1 Route To LS2 .L stage / Storage Table stage / Storage Table \`//// I Hydmgreph type=Reserrolr Peak discharge =2.584 she "am awes. Pe cana.arnade -swaWlltl TNamvewlale Hydmgreph type =Reservoir Peak tliscM1arge =0.958 efs sane PM oe..an Carol e.. real 1.... srame¢.N Tmld.rainkare ! / / /// Slam frequency = 10 yes Time m peak = 11.93 hrs Slam frequency = 10 ym Time to peak = 11.93 hrs Time Interval = 2 min H d. volume = 5,138 cuff ow berm a a+ o Time interval = 2 min H d volume = 1,883 oult 60° mb0 40 ° POI Y o.xa bu.x uo Y ozs au.rs ui re m Inflow hyd. No. = 1 -Level Spreader 1 Max. Elevation = 487.93ft om wm den to Inibw, hyd. No. = 2-Level Spreader Max. Elevation = 464.93fl om beam a as Reseepi name = Level Spreader 1 Max. Storage = 171 CYO RBer evoir name Level Spreader Max. Storage = 76 cuff CYNerI/IXMm BhuNuwa WNrBMwNm Dulwe/IXMm BbuNurea Web BlrvNum )CPon w D[C1Pn _ [A] [A] iD) (D) / lover, l Sown IrsaM rmM -sown theater, fapw 1. YeGe 1. p.'e, =0.°° ae 1. W w 1. 0.W ons per =aB1.W 0.WaW 1. 0.m QW W C -0 0 0 o ever. anal an am am .rrel. =0 0 0 o war. =xu 3A sea au apen0.i -aa oa om as c...m mra as as om „Ia wal ne do to naventrand No see 'b m P91XI •0.a 0.w 0.a Ne n aleryor 0.e 0.a am 0.w ana and r.In11N 0.a 0.W 0.a 0.m a.W9aaa •an ma me rdAre d ne / / ...aCM. •r0.wa N. No Na rea •0.a]l%W-.1 Maasto. •0.a 0.a 0.a 0.a nor -0.aa (Iy Welrrn) o(oft) Rouge - 0If along M w e wa x wam. q • as o io) III Po.b L82ova client) W x x w m u age • as / I // / HN. No. 4-,DYen .m a w w rl ro m rr m-r ma -non HM N°9-,DYK w . m w ww r wmw a bw--brae aaa..a . .r JJ / // / // / /• / I 3.e am Stage/Storege/Dlecharga TabM 0 Stage/Storage/DinkraMe Table / / sews. eve aN.u.. malnA da mac an mA me me ®° +I w w gaae stores an ea `re pill m emrA a ° arc ol meal \\�/.• / I / / / ow ° an's a. _ _ _ _ _ a. o.m o.m oa o aura - _ - _ 0as •n .n •nr ao00 r\ J///////\\�\I� PO/2 / I // ( POl3 // i om al «d - - - - - - - - - ^� o.m o.e° o e - - - m - - - as On On ( / / \� / - SCALE: 1" = 80' °m °m paw ON 80 0 80 160 00 re am D.m am PROJECT NO. LEVEL SPREADER DRAINAGE AREA MAP FIGURE NO. am o.m DRAWN BY: ELLISJR HOLLYMEADE SUBSTATION IIW Dominion DATE: 09/06/2022 PROJECT NO. /Energy® 0.00 am am f SCALE: 1"=80' ALBEMARLE COUNTY VIRGINA 0.7 2.0 4.o 8.0 ao +o10.0+z.o ueo maz.o .o +ao ,o ° z s e e m ,z a ,s ,e m m m -lye No.4 -Hatl M., ®Toblabxapv need =,]1M Timelllm) -rr/tl No.a -N.N No.2 ®TolelNmpe wed=mwfl Tlme(Iln) B B REVISIONS y gaiconsultants WEIR COEFFICIENT TAKEN FROM THE HYDRAFLOW HYDROGRAPH EXTENSION FOR AUTODESK CIVIL 3D 2019. Table 7-1 Allowable Velocity and Shear Stress Values for Lined Ditches WEIR EQUATION Q=C W L<H2/3 • Q= FLOW RATE • Cw= WEIR COEFFICIENT • H= DRIVING HEAD CONTINUITY EQUATION Q=V'A • V=VELOCITY • A= CROSS SECTIONAL AREA OF FLOW = (L-3-H) VELOCITY EQUATION V=1.5-Cw`H112 A Level Spreader Allowable Level Spreader Storm Event Max Flow Rat (Cu. Level Spreader Length Driving Head (ft) Weir Coefficient Max Velocity Velocity Grass Ft/s) (ft) (ft/s) ( ft/s) Lining 1 2-Yr 1.398 140 0.02 3.33 0.71 4.00 VDOT EC-2 1 10-Yr 2.564 140 0.03 3.33 0.87 4.00 VDOT EC-2 2 2-Yr 0.508 63 0.02 3.33 0.71 4.00 VDOT EC-2 2 10-Yr 0.958 63 0.03 3.33 0.87 4.00 VDOT EC-2 REV j DATE DESCRIPTION .00 Dominion RWO Energy CALCULATIONS A HOLLYMEADE SUBSTATION EXPANSION ALBEMARLE COUNTY VIRGINIA OPERATIONAL REGION B/M No. I SCALE NTS PROJECT NAME DATE SHEET: 029 DESIGNER PROJECT ENGINEER DRAWING: APPROVED BY 220236-00-000-00-C-02 8 7 6 5 4 3 2 1 Type of Maximum Maximum Lining Allowable Velocity Allowable (fps) Shear Stress (Ib/fe) Bare Earth (See Appx Varies Varies 7D-2) VDOT EC-2 Type-1 4.0 1.5 VDOT EC-2 1.75 Type-2 VDOT EC-2 Type-3 4.0 2.0 VDOT EC-2 Type-4 4.0 2.25 VDOT EC-3 Type 1 7.0 6.0 VDOT EC-3 Type 2 10.0 8.0 VDOT EC-3 Type-3 N/A 10.0 Concrete NA NA VDOT Riprap Based on Shear Varies Stress