Loading...
HomeMy WebLinkAboutSUB202200183 Correspondence 2023-01-1828Imperial Drive P 434.327.1689 T I M M O N S GROUP Staunton, VA 24401 www.timmons.com YOUR VISION ACHIEVED THROUGH OURS. January 18, 2023 County of Albemarle I Community Development Department Planning Services RE: COMMENT RESPONSE to 1st Review, SUB202200183 Woodbrook Station — Boundary Line Adjustment (BLA) TO: Ms. Mariah Gleason C: Lea Brumfield Please find below our responses to review of the plat referenced above (Ivy Proper Easement / BLA Plat); we appreciate your comments and review. Included (below) are comments provided by Albemarle County with responses (in red), accordingly: 1. [14-302(A)(7)] Departing lot lines. If TMP 45-94 shares a boundary edge with the subject property, identify the departing lot lines and provide the appropriate labels on the plat map. TMP-94 does not share a boundary with the subject, but it is depicted to more clearly define the adjoining public right-of-way, Berkmar Drive. 2. [14-302(A)(10)] Development rights. Remove Note 11. Due to the property's location within the Development Area this Rural Area -focused note is not needed on the plat and could cause confusion. Addressed. 3. [14-302(B)(5)] Zoning. In the zoning notes for each property, revise the rezoning line to state: "ZMA2003-00008 and associated proffers". Addressed. 4. [14-303(A)] Statement of consent. Revise the statement of consent to explicitly state: "The platting or dedication of the following described land [insert a correct description of the land subdivided] is with the free consent and in accordance with the desire of the undersigned owners, proprietors and trustees, if any." Addressed. 5. [Comment] Reminder that revised plats must include the original date of drawing and the revision dates) of each subsequent version of the plat. Addressed. Original (Oct. 24) and 2nd submittal (Jan 11) dates are shown. CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIs I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES OTHER SRC REVIEWERS Albemarle County Zoning Services (Zoner) Lea Brumfield, Brumfield@albemarle.org - See recommendation 1. Please note proffer #1 of ZMA2003-008 remains in effect for both parcels unless rezoned or developed in accordance with the Rio29 Form -Based Code Overlay District. This proffer requires the property owner to establish the sidewalks, pedestrian pathway, and stairway shown on the plan entitled "Wood brook Station Rezoning Application Site Concept,' dated October 24, 2005. The sidewalks, pedestrian pathway, and stairway must be completed prior to the issuance of any CO's for any business or residence in the development. The pedestrian pathway and stairway as shown on the plan entitled "Woodbrook Station Rezoning Application Site Concept" are located on parcels under separate ownership, but this does not recuse the owner from this proffer requirement. Acknowledged. Deemed not a survey / plat matter, understood incidental to site design. Additionally, proffer #2 of ZMA2003-008 will apply to any residential developments on either parcel unless rezoned or developed in accordance with the Rio29 Form -Based Code Overlay District. This proffer requires a cash contribution Albemarle County of $1,725 per dwelling unit for affordable housing. This contribution is due and payable with each application for a building permit. Acknowledged. Deemed not a survey / plat matter, understood incidental to site design. Thank you. Joe Medley l Timmons Group / 540.607.7500