HomeMy WebLinkAboutWPO202300004 Plan - VSMP 2023-01-19LEGEND
EXISTING NEW
311.5 x
311.5 TC x
311.5 TW x
311.5 BW x
X X
-0-
-0-
m
m
OHU
OHU
UGu
JGU
q q
S S
W
W
O
O
GAS
DESCRIPTION
BOUNDARIES
BENCHMARK
SITE PROPERTY LINE
ADJACENT PROPERTY LINE
BUILDING SETBACK
PARKING SETBACK
SITE TEXT
PARKING COUNT
TOPOGRAPHY
INDEX CONTOUR
INTERVAL CONTOUR
SPOT ELEVATION
TOP OF CURB ELEVATION
TOP OF WALL ELEVATION
BOTTOM OF WALL ELEVATION
STREAM
STREAM BUFFER
100 YEAR FLOODPLAIN
BUILDING
BUILDING
RETAINING WALL
STAIRS
EDGE OF PAVEMENT
ROAD CENTERLINE
FRONT OF CURB
BACK OF CURB
CG-12 TRUNCATED DOME
SIDEWALK
BIKE PARKING
HANDICAP ACCESSIBLE AISLE
HANDICAP PARKING
MATERIAL
CONCRETE
RIPRAP
ASPHALT
EC-2 MATTING
EC-3 MATTING
WETLAND
TREELINE
FENCE
UTILITY
UTILITY POLE
GUY WIRE
OVERHEAD UTILITY
UNDERGROUND UTILITY
STORM
STORM MANHOLE
DROP INLET
STORM SEWER
ROOF DRAIN
SANITARY
SANITARY MANHOLE
SANITARY SEWER MAIN
SANITARY SEWER LATERAL
WATER
WATER LINE
WATER METER
WATER METER VAULT
FIRE HYDRANT
FIRE DEPARTMENT CONNECTION
GAS
GAS LINE
EASEMENTS
CONSTRUCTION
GRADING
ACCESS
SIGHT DISTANCE
UTILITY
STORMWATER FACILITY MAINTENANCE
STORMWATER ACCESS
DRAINAGE
SANITARY
WATERLINE
GASLINE
NOTE:
1. THE SIZE OF THE SYMBOLS MAY VARY FROM WHAT IS SHOWN.
GLENWOOD
OWNER BENCHMARK
Creekside LC Datum for topography is NAVD 88
400 Locust Avenue STE 3 FLOODZON E
Charlottesville VA, 22902
(434) 825-1560 According to FEMA Flood Insurance Rate Map, effective date April 4, 2005 (Community Panel
reid@bmcholdingsgroup.com 51003CO255D), this property is not located within a Zone AE 100-year floodplain.
OPERATOR RESERVOIR WATERSHED
This site is within the Mechums River -Beaver Creek
Owner of property HUC12: 020802040102
PLAN PREPARATION
Shimp Engineering, P.C.
912 East High Street
Charlottesville, VA 22902
(434) 227-5140
ZONING
R-A
MAGISTERIAL DISTRICT
Samuel Miller
SOURCE OF TITLE
TAX MAP 5713-42 (3.50+/- ACRES)
D.B. 4613-406
D.B. 1044-343
Property Area: 3.27 Acres
SOURCE OF BOUNDARY AND TOPOGRAPHY
Plats of record and LIDAR DATA
GENERAL CONSTRUCTION NOTES FOR
EROSION AND SEDIMENT CONTROL PLANS
1. The plan approving authority must be notified one week prior to the pre -construction conference, one week prior to the commencement of land
disturbing activity, and one week prior to the final inspection.
2. All erosion and sediment control measures will be constructed and maintained according to minimum standards and specifications of the Virginia
Erosion and Sediment Control Handbook and Virginia Regulations VR 625-02-00 Erosion and Sediment Control Regulations.
3. All erosion and sediment control measures are to be placed prior to or as the first step in clearing.
4. A copy of the approved erosion and sediment control plan shall be maintained on the site at all times.
5. Prior to commencing land disturbing activities in areas other than indicated on these plans (including, but not limited to, off -site borrow or waste
areas), the contractor shall submit a supplementary erosion control plan to the owner for review and approval by the plan approving authority.
6. The contractor is responsible for installation of any additional erosion control measures necessary to prevent erosion and sedimentation as determined
by the plan approving authority.
7. All disturbed areas are to drain to approved sediment control measures at all times during land disturbing activities and during site development until
final stabilization is achieved.
8. During dewatering operations, water will be pumped into an approved filtering device.
9. The contractor shall inspect all erosion control measures periodically and after each runoff producing rainfall event. Any necessary repairs or cleanup
to maintain the effectiveness of the erosion control devices shall be made immediately.
10. All fill material to be taken from an approved, designated borrow area.
11. All waste materials shall be taken to an approved waste area. Earth fill shall be inert materials only, free of roots, stumps, wood, rubbish, and other
debris.
12. Borrow or waste areas are to be reclaimed within 7 days of completion per Zoning Ordinance section 5.1.28.
13. All inert materials shall be transported in compliance with section 13-301 of the Code of Albemarle.
14. Borrow, fill or waste activity involving industrial -type power equipment shall be limited to the hours of 7:00am to 9:00pm.
15. Borrow, fill or waste activity shall be conducted in a safe manner that maintains lateral support, or order to minimize any hazard to persons,
physical damage to adjacent land and improvements, and damage to any public street because o slides, sinking, or collapse.
16. The developer shall reserve the right to install, maintain, remove or convert to permanent stormwater management facilities where applicable all
erosion control measures required by this plan regardless of the sale of any lot, unit, building or other portion of the property.
17. Temporary stabilization shall be temporary seeding and mulching. Seeding is to be at 75 Ibs/acre, and in the months of September to February to
consist a 50/50 mix of Annual Ryegrass and Cereal Winter Rye, or in March and April to consist of Annual Rye, or May through August to consist of
German Millet. Straw mulch is to be applied at 80lbs/100sf. Alternatives are subject to approved by the County erosion control inspector.
18. Permanent stabilization shall be lime and fertilizer, permanent seeding, and mulch. Agricultural grade limestone shall be applied at 90lbs/1000sf,
incorporated into the top 4-6 inches of soil. Fertilizer shall be applied at 1000lbs/acre and consist of a 10-20-10 nutrient mix. Permanent seeding
shall be applied at 180lbs/acre and consist of 95% Kentucky 31 or Tall Fescue and 0-5% Perennial Ryegrass or Kentucky Bluegrass. Straw mulch is to
be applied at 80lbs/100sf. Alternatives are subject to approved by the County erosion control inspector.
19. Maintenance: All measures are to be inspected weekly and after each rainfall. Any damage or clogging to structural measures is to be repaired
immediately. Silt traps are to be cleaned when 50% of the wet storage volume is filled with sediment. All seeded areas are to be reseeded when
necessary to achieve a good stand of grass. Silt fence and diversion dykes which are collecting sediment to half their height must be cleaned and
repaired immediately.
20. All temporary erosion and sediment control measures are to be removed within 30 days of final site stabilization, when measures are no longer
needed, subject to approval by the County erosion control inspector.
21. This plan shall be void if the owner does not obtain a permit within 1 year of the date of approval. (Water Protection Ordinance section 17-204G.)
22. Permanent vegetation shall be installed on all denuded areas within nine (9) months after the date the land disturbing activity commenced. (Water
Protection Ordinance section 17-207B)
GENERAL CONSTRUCTION NOTES
1. Prior to any construction within any existing public right-of-way, including connection to any existing road, a permit shall
be obtained from the Virginia Department of Transportation (VDOT). This plan as drawn may not accurately reflect the
requirements of the permit. Where any discrepancies occur the requirements of the permit shall govern.
2. All materials and construction methods shall conform to current specifications and standards of VDOT unless otherwise
noted.
3. Erosion and siltation control measures shall be provided in accordance with the approved erosion control plan and shall be
installed prior to any clearing, grading or other construction.
4. All slopes and disturbed areas are to be fertilized, seeded and mulched.
5. The maximum allowable slope is 2: 1 (horizontal: vertical). Where reasonably obtainable, lesser slopes of 3: 1 or better are to
be achieved.
6. Paved, rip -rap or stabilization mat lined ditch may be required when in the opinion of the County Engineer, or designee, it
is deemed necessary in order to stabilize a drainage channel.
7. All traffic control signs shall conform with the Virginia Manual for Uniform Traffic Control Devices.
8. Unless otherwise noted all concrete pipe shall be reinforced concrete pipe - Class III.
9. All excavation for underground pipe installation must comply with OSHA Standards for the Construction Industry (29 CFR
VSMP PLAN FOR
ROAD POND
TAX MAP 57B, PARCEL 42
ALBEMARLE COUNTY, VIRGINIA
WPO: TBD
VICINITY MAPSCALE : 1°=1000'
o LANE
-ffethe Giraffe SeriesQ
WESTRIDGE
r
3
p 6Jfi
SITE
e, rs1'�^�0ear ad
�O- QHi-Tech Services
' � fiJfi
® GLENAIRE
WHISPERING '
r PINES
s
`k c
. - -
-xso _-- -- 'r'Y.Rd-_--
SHEETINDEX
C1 COVER SHEET
C2 EXISTING CONDITIONS
C3 GRADING PLAN
C4 EROSION CONTROL NARRATIVE
C5 EROSION CONTROL PLAN
C6 EROSION CONTROL DETAILS
C7 MITIGATION PLAN
IMAGE PROVIDED BY GOGGLE MAPS
SHIMP
ENGINEERIN G12.
LAND PLANNING - PROJECT MANAGEMENT
912 E. HIGH ST. 434.227.5140
CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM
U JU M. IMP Y
ic. .45183
I (? I23w�
�Ox
`rS70NAL
VSMP PLAN FOR
Glenwood Road
Pond
ALBEMARLE COUNTY, VIRGINIA
SUBMISSION:
2023.01.17
REVISION:
1.
FILE NO.
COVER SHEET
21.073
SHEET C1 of C8
C1
LEGEND
_ ' 'J ' / / / �A '":i::::: . -1 , 1 1.. 1 / / 1
-----' =- / / / / , / / .r.iifEr' / ; ` `\ 1 I I i I i' I I\ / / / I I
IS IRON SET
o_�---'''
I 1 ,) 1 1 ; 1 I 1 t1L�l iiiiiE:ii: ; I II ;\\ \ >11 / \ / - _ __''% ' �.t=." ''. -'t / / / / /, / i\:::::: / / / •r-' ' 1 'iF \S: I 11 I
y \\ \\ 11 I \\ `--�_- I _ -'.-- \ ,X; ' /, / % /� \� / 1 I III li 'iEir::k.\I\1 + I I I 1\ \, TP TELEPHONE PEDESTAL
ti\ \ � .:::: II \ \ PT POWER TRANSFORMER
s �`-� lGt"\i '
1 I I \I \ 1 \ r r\ I I I I LP LIGHT POLE
,`--- ` - - �` - - --- / \
I / / , Y / / / //i' ..... I \ 1 1 \I\ 1t1 1 \ \\` .......
I \ .� } s- r' / � \ / / / / ::z:'::a::' / / / / 1 I I � 1 I � CO CLEAN OUT
If
:•\ I\
I \ 1 \ \ \ \
I GRAVEL
PAVEMENT
N.\ ( \ \ 1 1 \ 1 I i i -{ \\ 1\ i \ �\ \\ \\ OVERHEAD UTILITY LINE
\__ \ \ ` -_' / �/ ,/ \ / .. .. / , _--ram\ 1 \ 1 I I I \ 1 \ / ,..... �) \ \ V \ \ 1 \ \ A
`\ �\ \ \` ------------\ � I \ ` . � ,_ J _'' `\ �' -' - / / h/ / / / /:::::::::::� / / _I \ 1 \ 1 \I ( 1 1 \ \ \ I 1 \\ 1-STORY FRAME #3550 (20.2'X 40.1')
1\\\�0`\ill
1` ORY FRAME #3553 (20.2'X 40.2')
------ �\ G 1-STORY FRAME- #3557 (20.1'X 40.1')
\\\' --- 1-STORY FRAME 3561 20.2'X 40.2'
rr \\ \ \ \ \ \ \ \\ i..,., \ \J�' \ \ \ \ \ `\ \ `� \ \ \\ _t�� i' i , r / / / I I 1 1 I l 111 \ 1 \
1 1 / / I s r \ \ \ \ \ 1 \ \ \ \ \ �_ _ z--� i� -�i' _�'' / / / / '.:ii'r:-::iir / / / - 1 1 �., \ \ ` ` \ it ( )
\ \ I \ \ \\ \ \ \ , , / / / / / I 1 I 1 1 \ \ \ E 1-STORY FRAME 3564 20.2'X 40.1'
\ / - /, , / / / 7/': '-\ 1 l I I 1 I I I I 1 I \ \ \\
\ \ \\ \ I I � ---- �- -------- �_----- /// ' / � > , / / / ' r r 1 1 I I I I I U \ \ P 1-STORY FRAME #3565 (20.1'X 40.2')
\ \ \ 1 I�/ / `, ` \\ \ \ \ i\ ` \ \ ` \ \ \ \ \ \\ \\ �-_ �- _ `-� 1 I \\ \\ \ \ SOIL TOTYPE BOUNDARY
RY FRAME 69 (20.2 X 40.2')
\ \ l l / r \ \1 \ \ \ \ \ ` \ _ _ �` /_ _�--------1_� \\\ \
\ \ 1 \ \ i • \ \ \ \ \ \ \ \ \ ` / \ �_ TMP�S✓1 �5 �` ��' / / / / / I I \ \_ NOTE: ALL SOILS HSG 8
V�
11\\ \\ \ _ �' / / / / / 1 r \ 1 I I I I I I I \ \ \ \ \ ( )
\ \ \ \ \ 1 \ \ ` \ \ \ \ \ \ \ \ \ MI>AE GERARD iERR� _ - /
\ 1 \ 1 \ \ \ \ MICAELA 5354R FERRE _ 1 SCARE I/'\.\..
\\ __�B 05354 �254-_ \ `�--__--__F___________________ / / / I 1 I I I I I 1 \ \ ♦ \ \ "..� 2!:iiii:ii'siisiii�i.:%�i::iY'�:::i
\ AFTER 2s0 AC _ _ // / - I I 1 \ \ .....:::::::::: ...:::: ::.::::::::
`\ \ _ \ _ '---_ -- D.B 2551-620 ' /' / / / / / I I I \ ... ....... .....
` \� _ `\ �\ _ _ � __ � /' i / / / `� _IL I ( I `\ ..::.i iiiii:%:Y::Eiiiiiiiiii`ir.iiri
` \ \` \\\\ r--- i/,- _ - \-_ \\\ - // // / / / /i'�,• // 8 // %/ / / / ii / / �\ i I 1 1 I I \ \ \ i'
\ \` \\\`\ `�\`\ \ �\\\\\\\ \ j l \ \\ \ \ \\ \` \ ` \' \�� \ ` �\ \ _ ------ \
\ \ \\ \ \\ \_� — \\ \ \ \ \` \ \ ` \ \ ``\ , > �` \ _i 1 _ _ \ \
\\ \\ \\ \\ \ ��\ `\\ \`\\ \ `\ \ \ \ \ \ \ \ ` \ \ ; \ \ �. ` . \ \ \
\ \ \ \\ \ \ \ \ \ \ \ ♦ �\ \` \ \ \_ �`_ �_ - 1\ /" -� -�= \ \
`\ \ \ \ ` `\ \ 1 \ \ \ \ \ \ \ \ \\ `` \_ ��� - _` 1 ' / �� ' / % i I it I � I \ \ \
\\\ \ -'\ \\ \ N.
\\ \ \\ \ \\ \ \ \ \ \ \ \ \ \ \\ \ �` .�- Y!---K•c`"°- yam^ �x /' I:::::' 4 WA R� ANC / / / % / / / /' /' `\ \ ++I I 1 I I _ 1 11 I '�,-'/� `-_-
\ \ \ \ \ \ \ ` \ / _ _ � - _NN
BOXES �4,,,
\ __\ 11 \\ \ \ \ \ \ \ \ \ \ \ \ \ __ -_ - / 1 II I
1 \ \ \ \ \ \ \ \ \ / / , 1 / / / \
\ \ \ \ \ \ `\ `\ `\ \\ \ \\ `\ `\I \ \\ \\ ` ` \ \\ \ ` \ . _ �\ _ - - IN \ \\ 'j / / ./ /' 3� �/ ' /' / r: 1 I
NN
MEE
\
\ _ \ \ \ \ \ \ _ � \ %.SIN 3L / J � �• �- \ / / i __ / / / I / I I 1 I I /
\
PT EX.SINGLE r 1 i•/ / _�' /' / / ,/ / �! V I I \ \ \ / / —
_
\_ `` _-_ - p _ - \_\ `\ • \ ` Eta \ _ _ _ _ - - - - /' _ `\` ..\ \ \ _ \-GCL `.; -•� /' ' ' / / /'� ' // I I I I I I \ \
\40
____—'___—.�_
a - _
�_' _---_---____' ' / / /' / TMP Sib— 7 I l 1 ( /I \ i ' I _—_— —
\ I /
N.
__ PAM -A HANIANSI
\ \ \ \ 630 -� . \\ \ _ _ _ - ,tkl- - - \ `\ `\ \!•�C \\\ t; HOME tr;"Y' ___________---D.B\19C9-�11
IDEA\I .65 bCI I I I I I\ I I I 1 `'/ '' -690\\ \
It
7 ------ SHIMP
-- - - \ \\ ` � � \,\ \ � \ \ � _ ` ♦ \\ \ \ \\ � �� \\ =>'\` _ __/-__--'
_ _ --�___ /��" , \:XI1 �J 1 1 1\\ \, \ ENGINEERING
/\\\\ \ \ —� \\ — \\ \ l\ TMP\57B-4R\ I _ __ �__—__ �� ,� \ r\ I i PT FjAM 1— �— \ \ \ \ \ — // / , 1\ \ 11 \ \ \ LAND PLANNING - PROJECT MANAGEMENT
N.
\\ \ `__ ____ \ \ \CREEKSIeE LC \ \ _ __ — \ /'' _ ' \ - I / I 1 1 I \ \ \ ��� ,' /
1 \ - �` \ _`\ _\ _� \ \ `\ DB, 4613A406 \ \\ — _ ----- __� A'' --" `—\ I 1 I I 1 \1 \ ` `\ — / _ _vt \ \ \ \ \
l \ \ \ — _ / \ _ / / \ \
\AREA \3.50 %G _ _ _—__ I \
\ \ \ \ \ \ ��\ \ \ ;_ --.�' \ ,� I I 1 \ 1\ \ \ ___—__—__ i\ \ \ \ \ 912 E. HIGH ST. 434.227.6140
IN \ \ \ —_l \ \\\ \ \ / / \ , \ \ \ \ \ \ \\ \ \\ \ \ / ^f \ + \ \ \ \ `\ \ \I` —__—_ 1 ,' /� `\ \ \ \\ `\ \\ \\ Imo— CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM
\\ \.. \ .' ^s�A\- STR ANl\ \\ \ \ \ \ \ °8\ 6S \ \ CRi IAA S ❑PE B=SiIS _ \ / J `" ,. \ `\ \\ \\ \ \ \ \\\ \`` ` \\ \\ ` \\ \` ` \ `
sic
IN
-----------------
i
_
-` , WATER \\ \\ �� �\ \ � I \ \ \ \ _t- UO� � 9
--------- N 5183
EX. POND I•\ ._..._.. / `I " �\ ``\\ \\\ % .� \` \ \\ /
CRITICAL\SLDPE AREA- GIS_\-
\ VSMP PLAN FOR
\ \ \ \ \ ,' • \ \ \ \ \.`. \ \` ` ` — — _ --__ — — '. _� _\ ; _ _ _ _ _ ---- \ — -- — — — -- — — — — — — _ -- _ — — --FF - _ - - '--_ ,\ \ _ _ - - `\ - ��� - Glenwood Road
---- - _ - \ \ _ - Pond
N \ \\ ALBEMARLE COUNTY, VIRGINIA
SUBMISSION:
2023.01.17
SOILD LEGEND '' - _--_-- __---_=_ \\\ `\`%' `\`\`\\"`:��'/",' __ -'--_ '\ \`_-'` -_--_-_--_-
REVISION:
4E — ASHE LOAM, 25 TO 45% SLOPE, HSG B, . \ —
i
36C - HAYESVILE LOAM - 7 TO 15% SLOPE, HSG B-
\
36D -HAYESVILLE LOAM - 15 TO 25% SLOPES, HSG B \ \ \ \ ` \. ; _ G= _ ____ _ _, \ \ .\ _ _ _ `\\ � \ \ \ \ \ _ ____ __ _ _ — _ — \\ \ \ \ ` — • _ -
37D3 - HAYESVILLE CLAY LOAM - 15 TO 25% SLOPES, HSG B, SEVERELY ERODED
56B - MEADOWVILLE LOAM, 2 TO 7% SLOPES, HSG: B - %' ' - - - ' ? - - --- -- _ \\ \ 1 it 1 — \ 1 \\ - _ _ - _ _ _- , ' \ `\ `\ \ _ _ ` ' FILE NO.
21.073
66E — PARKER VERY STONY LOAM, 25 TO 45% SLOPES HSG: A
W — WATER _ - _ - - - ---- - - - - - - ; _-: _' _= r - _ _ , - - \ - _ _ - - EXISTING CONDITIONS
IN I
40 0 40 ao 120 SHEET C2 of C7
C2
Scale: 1 `40'
\ \ r.................
.............. OHU� OHU
W6
ELL/
iu
\ \ \ \ \ \ \ \ \ \ — E r _ �\ `\ \♦ \ \ SI No Pol[E70
\ \ \ \ S DP\AR GIB\\ \ \ \ \ - - - - /- \ _ / \ o
'� / \ -
\ \ \ \ \ \ \ \ / 0 \
\\ \ \ ---___ - _ — SE QI� \ \ ��
\ \ \\ \ \ \ VI T� `E\ \\ \ \ �� \ --- — — _ — —
Nil
\ \\ /
� — POND SURFACE
♦` \ \\� \\ \ \ \ \\\ \\\_ \ _ — ELEV: 643.00
30 \ \ \\ \� \ �\ AREA: 10,900 Sq.FtLOD
/
I----- A�
\\ \ \ ` ♦ //� \v j J \1 \\ \ i \\\ \ \_ \ \ CO ` \�_ \\\ `� \ \\CREEK�QE LC ��� \ —
\ \ REA\3.50�co: �\ A
\ 4b \
\ 0. \ \\ \\\ �♦ \� NEW RIP —RAP \ �// \\ \T d/ \— \\ �� 44 \ �� \\ \ 60- \ --
OUTLET PROTECTION CIO/�6\ (V a- �/ \\ m!
\ \ D P, \ Q NEW 60 CM \\ c46 \\4��� CFI IAA S ❑PE B=�iLS —C /
Cb
STANDPIPE—�� /----
\\\ RIM ELEV: 643.40
10010
40
655 o w o 0 655 J — \646
/ / 1
OP
650 650 \ \ 4 \ — \ — �- _
/ — ro _ _ _ — — — — \ \ \ I I I / / ( `= WATER
645 sas _ \ 6 <qD LOD \ _ \46\
640 640 -� lop — _ — — \ ✓ / / _
EX GRAU
\ \ LIMITS OF DISTURBANCE AREA
635 635 — _ 31000 SQ.FT — _ — ! — �—
' \ / \ _ / 0.71 ACRES
\ — — —
Loo
-
630 630 —RIP-RAP POND-636.0 \/ /r �/� 6 0- — _ — — — — 52
69+50 10+00 10+50 11+0J5
1 POND PROFILE--
C3 Horiz: 1" 30' Vertical: 1': 10'
SHIMP
ENGINEERING2
LAND PLANNING - PROJECT MANAGEMENT
912 E. HIGH ST. 434.227.5140
CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM
VSMP PLAN FOR
Glenwood Road
Pond
ALBEMARLE COUNTY, VIRGINIA
SUBMISSION:
2023.01.17
REVISION:
1.
FILE NO.
GRADING PLAN
21.073
•0
SHEET C3 of C7
C3 II
PROJECT DESCRIPTION, GENERAL NOTES, EROSION & SEDIMENT CONTROL NOTES, AND SEQUENCE OF CONSTRUCTION
PROJECT DESCRIPTION
THIS PURPOSE OF THIS PROJECT IS TO CONSTRUCT A NEW WET POND FOR
RECREATIONAL PURPOSES.
THE TOTAL AREA OF DISTURBANCE IS 0.71 ACRES.
THE PROJECT INVOLVES THE FOLLOWING WORK ACTIVITIES:
1. THE CONTRACTOR SHALL OBTAIN ALL LOCAL AND STATE EROSION AND
SEDIMENT PERMITTING REQUIREMENTS AND MAINTAIN ALL EROSION AND
SEDIMENT CONTROLS IN ACCORDANCE WITH THE PERMIT REQUIREMENTS.
2. INSTALLATION OF PERMANENT EROSION AND SEDIMENT CONTROL MEASURES
AS SHOWN ON THE PLAN AND DETAILS.
3. GRADING AND PLACEMENT OF FILL SHALL BE IN GENERAL ACCORDANCE WITH
THE PLAN.
4. ESTABLISHMENT OF PERMANENT STABILIZATION OF ALL DISTURBED AREAS.
EXISTING SITE CONDITIONS
THE EXISTING SITE IS A WOODED LOT BESIDE A DEVELOPED RESIDENTIAL
SUBDIVISION. ZONED R-A.
ADJACENT PROPERTIES
THIS PROPERTY IS BORDERED FROM THE NORTH AND EAST BY SINGLE-FAMILY
HOUSES AND TILMAN ROAD, TO THE SOUTH BY A NATURAL POND AND WOODED
(TREES), AND THE WEST IS BORDERED BY WOODED (TREES ) AND RESIDENTIAL.
OFFSITE AREAS:
SOIL MAY NEED TO BE IMPORTED TO THE SITE FROM SITES WHICH SHALL HAVE
EROSION CONTROL PERMITS.
SOILS
THE SITE CONTAINS THE FOLLOWING SOIL TYPES:
4E - ASHE LOAM, 25 TO 45% SLOPE, HSG B,
36C - HAYESVILE LOAM - 7 TO 15% SLOPE, HSG B
36D - HAYESVILLE LOAM - 15 TO 25% SLOPES, HSG B
37D3 - HAYESVILLE CLAY LOAM - 15 TO 25% SLOPES, HSG B, SEVERELY
ERODED
56B - MEADOWVILLE LOAM, 2 TO 7% SLOPES, HSG: B
66E - PARKER VERY STONY LOAM, 25 TO 45% SLOPES, HSG: A
W - WATER
CRITICAL AREAS
THE CRITICAL AREA WITHIN THIS SITE IS WITHIN THE 100 FOOT STREAM BUFFER.
CONTRACTOR SHALL ENSURE PROPER INSTALLATION AND MAINTENANCE OF
PERIMETER CONTROLS ACCORDING TO THE PLANS TO PREVENT POLLUTANTS AND
SEDIMENT FROM ENTERING THE STREAM.
EROSION & SEDIMENT CONTROLS
SAFETY FENCE (SFE) - 3.01
A PROTECTIVE BARRIER INSTALLED TO PROHIBIT UNDESIRABLE USE OF AN
EROSION CONTROL MEASURE. STD. AND SPEC. 3.01.
TEMPORARY CONSTRUCTION ENTRANCE CE - 3.02
A STONE PAD WILL BE CONSTRUCTED AT THE ENTRANCE THE SITE TO
PROVIDE A MEANS OF REMOVING SEDIMENT FROM THE TIRES OF
CONSTRUCTION VEHICLES LEAVING THE WORK SITE. THE CONTRACTOR SHALL
REMOVE ANY MUD FROM THE EXISTING ROAD SURFACE BY MEANS OF
SWEEPING AND SHOVELING.
SILT FENCE (SF) - 3.05
SILT FENCING WILL BE INSTALLED AS A FIRST STEP IN CONSTRUCTION
ACTIVITIES. LOCATION AND DETAILS ARE SHOWN ON THE PLANS.
TEMPORARY CONSTRUCTION ENTRANCE (CE) - 3.02
A STONE PAD WILL BE CONSTRUCTED AT THE ENTRANCE THE SITE TO
PROVIDE A MEANS OF REMOVING SEDIMENT FROM THE TIRES OF
CONSTRUCTION VEHICLES LEAVING THE WORK SITE. THE CONTRACTOR SHALL
REMOVE ANY MUD FROM THE EXISTING ROAD SURFACE BY MEANS OF
SWEEPING AND SHOVELING.
OUTLET PROTECTION (OP) - 3.18
THE INSTALLATION OF RIP -RAP CHANNEL SECTION AND/OR STILLING BASINS
BELOW STORM DRAIN OUTLETS TO REDUCE EROSION AND UNDER -CUTTING
FROM SCOURING AT OUTLETS AND TO REDUCE FLOW VELOCITIES STORMWATER
ENTERS RECEIVING CHANNELS BELOW THESE OUTLETS
PERMANENT STABILIZATION
TEMPORARY SEEDING (TS) - 3.31
TEMPORARY SEEDING SHALL BE APPLIED TO ALL DENUDED AREAS WITHIN
SEVEN (7) DAYS TO DENUDED AREAS THAT MAY OR MAY NOT BE AT FINAL
GRADE BUT WILL REMAIN DORMANT (UNDISTURBED) FOR LONGER THAN 14
DAYS. TEMPORARY SEEDING SHALL BE APPLIED IN CONFORMANCE WITH STD.
AND SPEC. 3.31.
PERMANENT SEEDING (PS) - 3.32
ALL DITCHES AND ADJACENT AREAS WITHIN
15 FT
OF
THE EDGE OF THE
DITCHES SHALL BE SEEDED IN
CONFORMANCE
WITH
STD.
AND SPEC. 3.32.
PERMANENT SEEDING SHALL BE
APPLIED TO
AREAS
DELINEATED
ON THESE
PLANS WITHIN SEVEN (7) DAYS
AFTER FINAL
GRADE
IS
REACHED ON ANY
PORTION OF THE SITE. PERMANENT SEEDING
STABILIZES
DISTURBED AREAS
AND ENHANCES THE BEAUTY OF
THE SITE.
MULCHING (MU) - 3.35
APPLICATION OF PLANT RESIDUES OR OTHER SUITABLE MATERIALS TO THE
SOIL SURFACE TO PREVENT EROSION AND FOSTER THE GROWTH OF
VEGETATION. ORGANIC MULCHES (STRAW) HAVE BEEN FOUND TO BE THE
MOST EFFECTIVE.
DUST CONTROL (DC) - 3.39
CONDUCT DUST CONTROL OPERATIONS NECESSARY TO MET THE
REQUIREMENTS OF STD. & SPEC. 3.39 AS REQUIRED TO CONTROL SURFACE
AND AIRBORNE MOVEMENT OF DUST.
CONSTRUCTION MAINTENANCE
THE FOLLOWING CONSTRUCTION MAINTENANCE PRACTICES SHALL BE FOLLOWED AT THE SITE.
1. ALL E&S CONTROL MEASURES WILL BE CHECKED DAILY AND AFTER EACH SIGNIFICANT RAIN
EVENT. ALL DEFICIENCIES IDENTIFIED DURING THESE INSPECTIONS SHALL BE CORRECTED AS
SOON AS PRACTICABLE.
2. THE SILT FENCE BARRIER SHALL BE REGULARLY CHECKED FOR UNDERMINING, DETERIORATION OR
SIGNIFICANT EROSION. SEDIMENT SHALL BE REMOVED AFTER EACH STORM EVENT AND WHEN THE
LEVEL OF SEDIMENT DEPOSITION REACHES HALF THE HEIGHT OF THE CONTROL.
3. THE CONTRACTOR IS RESPONSIBLE FOR ADHERING TO ALL MAINTENANCE REQUIREMENTS SET
FORTH IN THE CURRENT EDITION OF THE VIRGINIA SEDIMENT AND EROSION CONTROL MANUAL,
OTHER APPLICABLE COMMONWEALTH OF VIRGINIA REGULATIONS AND THE PROJECT
SPECIFICATIONS.
4. ALL SEEDED AREAS WILL BE REGULARLY CHECKED TO ENSURE THAT A GOOD STAND OF GRASS
IS MAINTAINED.
5. AREAS WITH RIP -RAP SHOULD BE REGULARLY INSPECTED TO DETERMINE IF HIGH FLOWS HAVE
DAMAGED THESE CONTROLS OR CAUSED EXCESSIVE SEDIMENT DEPOSITION. ALL AREAS SHALL
BE MAINTAINED IN ACCORDANCE WITH THE REQUIREMENTS OF THIS E&S CONTROL PLAN.
ENVIRONMENTAL CONTROLS
1. CONTRACTOR SHALL PROVIDE AND MAINTAIN ALL ENVIRONMENTAL CONTROL MEASURES SO AS
TO COMPLY WITH LOCAL ORDINANCES, STATE AND FEDERAL LAWS AND REGULATIONS APPLICABLE
TO WATER POLLUTION IN WATERS OF THE STATE AND IN INTERSTATE WATERS.
2. CONTRACTOR SHALL MINIMIZE THE POTENTIAL FOR AIR POLLUTION BY THE USE OF EMISSION
CONTROL EQUIPMENT ON CONTRACTOR OPERATED EQUIPMENT, SHUT -DOWN OF MOTORIZED
EQUIPMENT WHEN NOT IN USE, AND ACTIVELY CONTROLLING DUST EMISSIONS THROUGHOUT THE
PROJECT.
EROSION & SEDIMENT CONTROL PERMITTING
CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL LOCAL AND STATE EROSION AND
SEDIMENT CONTROL PERMITS AND MAINTAINING ALL EROSION AND SEDIMENT CONTROLS IN
ACCORDANCE WITH THE PERMIT REQUIREMENTS.
GENERAL NOTES
1. THE INFORMATION AND DATA SHOWN OR INDICATED WITH RESPECT TO THE EXISTING
UNDERGROUND UTILITIES AT OR CONTIGUOUS TO THE SITE ARE BASED ON INFORMATION AND
DATA FURNISHED TO THE OWNER AND ENGINEER BY THE OWNERS OF SUCH UNDERGROUND
FACILITIES OR OTHERS. THE OWNER OR ENGINEER SHALL NOT BE RESPONSIBLE FOR THE
ACCURACY OR COMPLETENESS OF SUCH INFORMATION OR DATA. THE CONTRACTOR SHALL HAVE
FULL RESPONSIBILITY FOR CONFIRMING THE ACCURACY OF THE DATA, FOR LOCATING ALL
UNDERGROUND UTILITIES, FOR COORDINATION OF THE WORK WITH OWNERS OF SUCH
UNDERGROUND UTILITIES DURING CONSTRUCTION, FOR THE SAFETY AND PROTECTION
THEREOF AND REPAIRING ANY DAMAGE THERETO RESULTING FROM THE WORK. ALL OF THESE
CONDITIONS SHALL BE MET AT NO ADDITIONAL COST TO THE OWNER. THE CONTRACTOR SHALL
CONTACT "MISS UTILITIES" OF VIRGINIA AT 1-800-552-7001 PRIOR TO THE START OF WORK.
2. WHEN WORKING ADJACENT TO EXISTING STRUCTURES, POLES, UTILITIES, ETC., THE CONTRACTOR
SHALL USE WHATEVER METHODS THAT ARE NECESSARY TO PROTECT STRUCTURES FROM
DAMAGE. ANY DAMAGE CAUSED BY THE CONTRACTOR OR ITS SUBCONTRACTORS SHALL BE THE
CONTRACTOR'S SOLE RESPONSIBILITY TO REPAIR OR REPLACE. THIS EXPENSE IS THE
CONTRACTOR'S RESPONSIBILITY.
3. REPLACEMENT OR REPAIR OF DAMAGED STRUCTURES SHALL BE AT THE CONTRACTOR'S EXPENSE.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL EXISTING SITE STRUCTURES
FROM DAMAGE AND COORDINATING WORK SO THAT THE OWNER CAN MAKE NECESSARY
ARRANGEMENTS TO MODIFY PROTECT EXISTING STRUCTURES FROM DAMAGES.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING ALL UTILITY OWNERS ADJACENT LAND
OWNERS WHOSE PROPERTY MAY BE IMPACTED AND THE VIRGINIA DEPARTMENT OF
TRANSPORTATION PRIOR TO COMPLETING ANY OFF -SITE WORK.
6. CONTRACTOR SHALL NOTIFY AND COORDINATE ALL WORK INVOLVING EXISTING UTILITIES WITH
UTILITY OWNERS, AT LEAST 72 HOURS PRIOR TO THE START OF CONSTRUCTION.
7. ALL EXCAVATION FOR UNDERGROUND PIPE INSTALLATION MUST COMPLY WITH OSHA STANDARDS
FOR THE CONSTRUCTION INDUSTRY (29 CFR PART 1926).
8. THE CONTRACTOR SHALL VERIFY THE LOCATIONS OF ALL BOUNDARIES, BUILDINGS, VEGETATION,
AND OTHER PERTINENT SITE ELEMENTS. CONTRACTOR SHALL IMMEDIATELY REPORT ANY
DISCREPANCIES BETWEEN EXISTING CONDITIONS AND CONTRACT DOCUMENTS TO THE OWNER AND
ENGINEER.
9. CONTRACTOR SHALL SUBMIT FOR THE APPROVAL OF THE OWNER SUBMITTALS OF ALL SPECIFIED
MATERIALS LISTED IN THE PLANS, TO INCLUDE SHOP DRAWINGS, MANUFACTURER'S
SPECIFICATIONS AND LABORATORY REPORTS. THE OWNER'S APPROVAL OF SUBMITTALS WILL BE
GENERAL AND WILL NOT RELIEVE THE CONTRACTOR FROM THE RESPONSIBILITY OF ADHERENCE
TO THE CONTRACT AND FOR ANY ERROR THAT MAY EXIST.
10. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS, INSPECTIONS,
BONDS, AND OTHER RELATED ITEMS IN ACCORDANCE WITH LOCAL AND STATE POLICY.
STORMWATER MANAGEMENT
SWM QUALITY:
THE CONDITIONS OF SUBSECTION F OF 9VAC25-870-65 WATER QUALITY HAVE
BEEN MET FOR THIS SITE. THE VRRM CONSIDERS THE TOTAL LIMITS OF
DISTURBANCE FOR THE PROJECT WHEN CALCULATING THE REQUIRED LOAD
REDUCTIONS FOR THE DEVELOPMENT. USING THE DEQ VRRM NEW
DEVELOPMENT COMPLIANCE SPREADSHEET, THE TP LOAD REDUCTION REQUIRED
FOR THIS PLAN IS 0.46 LB/YR. THIS REQUIREMENT SHALL BE SATISFIED
THROUGH THE PURCHASE OF 0.46 NUTRIENT CREDITS.
SWM QUANTITY:
THE PROPOSED STORMWATER DESIGN MEETS THE WATER QUANTITY CHANNEL
PROTECTION REQUIREMENTS SET FORTH IN 9VAC25-870-66-B(3) FOR
DISCHARGE TO A NATURAL STORMWATER CONVEYANCE SYSTEM. THE NEWLY
CONSTRUCTED DAM WILL PROVIDE PERMANENT STORAGE OF RUNOFF AND
ALLOW FOR RUNOFF TO BE RELEASED AT THE NORMAL WATER SURFACE
ELEVATION AT RATES COMPLIANT WITH THE ENERGY BALANCE EQUATION.
THE PROPOSED STORMWATER DESIGN MEETS THE WATER QUANTITY FLOOD
PROTECTION REQUIREMENTS SET FORTH IN 9VAC25-870-66-C(2.b). THE
10-YR STORM WILL BE RELEASED FROM THE POND AT A RATE BELOW THE
PRE -DEVELOPMENT 10-YR FLOWRATE.
Table 1 : Energy Balance Equation Sunnualy
QI Pos[(Maa All..d)
Ql Post (Maa Achieved)
4.12
3.79
Q10 Pre-Dev
Q10 Pod-Dev
47.82
47.01
MANAGEMENT STRATEGY AND SEQUENCE OF CONSTRUCTION
THE FOLLOWING ARE THE PROPOSED MANAGEMENT STRATEGIES AND DETAILED
SEQUENCE OF CONSTRUCTION. REQUIRED PERMITS MUST BE IN -HAND BEFORE
WORK BEGINS:
PHASE 1
1. INSTALL CONSTRUCTION ENTRANCE OFF TILMAN ROAD (PUBLIC). TRUCKS
SHALL BE CLEANED PRIOR TO LEAVING THE SITE.
2. INSTALL SILT FENCE.
PHASE 2
1. CONTACT THE ENGINEER AND ALBEMARLE COUNTY FOR INSPECTION AND
APPROVAL OF ALL E&S CONTROL MEASURES.
PHASE 3
1. INSTALL THE NEW CULVERT IN THE POND. USE A PUMP -AROUND DIVERSION
TO INSTALL STANDPIPE AND CULVERT. SEE DETAIL ON SHEET 1/C6.
2. UPON APPROVAL OF E&S CONTROL MEASURES, BEGIN WHOLESALE CLEARING,
AND GRADING
3. MAINTAIN PERIMETER CONTROLS UNTIL AREA HAS ACHIEVED TEMPORARY
STABILIZATION.
4. AS AREAS ARE BROUGHT TO GRADE, APPLY DUST CONTROL, MULCHING,
TEMPORARY SEEDING AND PERMANENT SEEDING.
PHASE 4
1. ESTABLISH AND MAINTAIN PERMANENT STABILIZATION, INCLUDING VEGETATION
OF ALL SLOPES AND GRASSED AREAS.
2. CLEAN UP ALL SEDIMENT BUILD UP FROM ANY STORM STRUCTURES
3. ONCE ENTIRE SITE IS PERMANENTLY STABILIZED, REMOVE PERIMETER
CONTROLS.
NOTES
1. INSPECT EVERY 6 MONTHS DURING THE FIRST YEAR OF OPERATION.
ADJUST THE INSPECTION INTERVAL BASED ON PREVIOUS OBSERVATIONS OF
SEDIMENT ACCUMULATION AND HIGH WATER ELEVATIONS.
CONSTRUCTION MAINTENANCE
THE FOLLOWING CONSTRUCTION MAINTENANCE PRACTICES SHALL BE FOLLOWED
AT THE SITE.
1. ALL E&S CONTROL MEASURES WILL BE CHECKED DAILY AND AFTER EACH
SIGNIFICANT RAIN EVENT. ALL DEFICIENCIES IDENTIFIED DURING THESE
INSPECTIONS SHALL BE CORRECTED AS SOON AS PRACTICABLE.
2. THE SILT FENCE BARRIER SHALL BE REGULARLY CHECKED FOR UNDERMINING,
DETERIORATION OR SIGNIFICANT EROSION. SEDIMENT SHALL BE REMOVED
AFTER EACH STORM EVENT AND WHEN THE LEVEL OF SEDIMENT DEPOSITION
REACHES HALF THE HEIGHT OF THE CONTROL.
3. THE CONTRACTOR IS RESPONSIBLE FOR ADHERING TO ALL MAINTENANCE
REQUIREMENTS SET FORTH IN THE CURRENT EDITION OF THE VIRGINIA
SEDIMENT AND EROSION CONTROL MANUAL, OTHER APPLICABLE
COMMONWEALTH OF VIRGINIA REGULATIONS AND THE PROJECT
SPECIFICATIONS.
4. ALL SEEDED AREAS WILL BE REGULARLY CHECKED TO ENSURE THAT A GOOD
STAND OF GRASS IS MAINTAINED.
5. ALL AREAS SHALL BE MAINTAINED IN ACCORDANCE WITH THE REQUIREMENTS
OF THIS E&S CONTROL PLAN.
ENVIRONMENTAL CONTROLS
1. CONTRACTOR SHALL PROVIDE AND MAINTAIN ALL ENVIRONMENTAL CONTROL
MEASURES SO AS TO COMPLY WITH LOCAL ORDINANCES, STATE AND FEDERAL
LAWS AND REGULATIONS APPLICABLE TO WATER POLLUTION IN WATERS OF
THE STATE AND IN INTERSTATE WATERS.
2. CONTRACTOR SHALL MINIMIZE THE POTENTIAL FOR AIR POLLUTION BY THE
USE OF EMISSION CONTROL EQUIPMENT ON CONTRACTOR OPERATED
EQUIPMENT, SHUT -DOWN OF MOTORIZED EQUIPMENT WHEN NOT IN USE, AND
ACTIVELY CONTROLLING DUST EMISSIONS THROUGHOUT THE PROJECT.
3. ANY WASTE DISCOVERED DURING THE PROJECT SHALL NOT BE MOVED WITH
OUT PRIOR AUTHORIZATION OF THE OWNER AND BE DIRECT -LOADED INTO
COVERED ROLL -OFF CONTAINERS FOR TEMPORARY STORAGE PRIOR TO
DISPOSAL IN A PERMITTED LANDFILL.
MINIMUM STANDARDS (MS):
ALL APPLICABLE VIRGINIA EROSION AND SEDIMENT CONTROL REGULATIONS AND
MINIMUM STANDARDS SHALL BE ADHERED TO DURING ALL PHASES OF
CONSTRUCTION. THESE INCLUDE, BUT ARE NOT LIMITED TO THE FOLLOWING:
1. STABILIZATION OF DENUDED AREAS:
PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO
DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON ANY
PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION SHALL BE APPLIED
WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE
BUT WILL REMAIN DORMANT FOR LONGER THAN 14 DAYS. PERMANENT
STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE TO BE LEFT DORMANT
FOR MORE THAN ONE YEAR.
2. STABILIZATION OF SOIL STOCKPILES:
DURING CONSTRUCTION OF THE PROJECT, SOIL STOCK PILES AND BORROW
AREAS SHALL BE STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING
MEASURES. THE APPLICANT IS RESPONSIBLE FOR THE TEMPORARY PROTECTION
AND PERMANENT STABILIZATION OF ALL SOIL STOCKPILES ON SITE AS WELL AS
BORROW AREAS AND SOIL INTENTIONALLY TRANSPORTED FROM THE PROJECT
SITE.
3. PERMANENT VEGETATIVE COVER
A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED
AREAS NOT OTHERWISE PERMANENTLY STABILIZED. PERMANENT VEGETATION
SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED
THAT IS UNIFORM, MATURE ENOUGH TO SURVIVE AND WILL INHIBIT EROSION.
4. TIMING & STABILIZATION OF SILT TRAPPING MEASURES:
SEDIMENT BASINS AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS AND
OTHER MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A
FIRST STEP IN ANY LAND -DISTURBING ACTIVITY AND SHALL BE MADE
FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE.
5. STABILIZATION OF EARTHEN STRUCTURES:
STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES
SUCH AS DAMS, DIKES AND DIVERSIONS IMMEDIATELY AFTER INSTALLATION.
6. SEDIMENT TRAPS AND BASINS:
SEDIMENT TRAPS AND SEDIMENT BASINS SHALL BE DESIGNED AND
CONSTRUCTED BASED UPON THE TOTAL DRAINAGE AREA TO BE SERVED BY THE
TRAP OR BASIN.
a. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT TRAP SHALL BE 134
CUBIC YARDS PER ACRE OF DRAINAGE AREA AND THE TRAP SHALL ONLY
CONTROL DRAINAGE AREAS LESS THAN THREE ACRES.
b. SURFACE RUNOFF FROM DISTURBED AREAS THAT IS COMPRISED OF FLOW
FROM DRAINAGE AREAS GREATER THAN OR EQUAL TO THREE ACRES SHALL BE
CONTROLLED BY A SEDIMENT BASIN. THE MINIMUM STORAGE CAPACITY OF A
SEDIMENT BASIN SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA.
THE OUTFALL SYSTEM SHALL, AT A MINIMUM, MAINTAIN THE STRUCTURAL
INTEGRITY OF THE BASIN DURING A 25-YEAR STORM OF 24-HOUR DURATION.
RUNOFF COEFFICIENTS USED IN RUNOFF CALCULATIONS SHALL CORRESPOND TO
A BARE EARTH CONDITION OR THOSE CONDITIONS EXPECTED TO EXIST WHILE
THE SEDIMENT BASIN IS UTILIZED.
MINIMUM STANDARDS (,MS)
All applicable Virginia Erosion and Sediment Control Regulations and Minimum
Standards shall be adhered to during all phases of construction. These
include, but are not limited to the following:
1. STABILIZATION OF DENUDED AREAS:
Permanent or temporary soil stabilization shall be applied to bare areas
within seven days after final grade is reached on any portion of the site.
Temporary soil stabilization shall be applied within seven days to denuded
areas that may not be at final grade, but will remain dormant or
undisturbed for longer than 14 days. Permanent stabilization shall be
applied at areas that are to be left dormant for more than 1 year.
2. STABILIZATION OF SOIL STOCKPILES:
During construction of the project, soil stockpiles shall be stabilized or
protected with sediment trapping measures. The applicant is responsible for
temporary protection and permanent stabilization of all soil stockpiles on
site as well as soil intentionally transported from the project site.
3.PERMANENT VEGETATIVE COVER
A permanent vegetative cover shall be established on denuded areas not
otherwise permanently stabilized. Permanent vegetation shall not be
considered established until a ground cover is achieve that, in the opinion
of the county Inspector, is uniform and mature enough to survive to inhibit
erosion.
4. TIMING & STABILIZATION OF SILT TRAPPING MEASURES:
Sediment basins and traps, perimeter dikes, sediment barriers and other
measures intended to trap sediment shall be constructed as a first step in
any land disturbing activity and shall be made functional before upslope
land disturbance takes place.
5.STABILIZATION OF EARTHEN STRUCTURES:
Stabilization measures shall be applied to earthen structures such as
dams, dikes and diversions immediately after installation.
6.SEDIMENT TRAPS AND BASINS:
A sediment basin shall control surface runoff from disturbed areas that is
comprised of flow from drainage areas greater than or equal to three acres.
The sediment basin shall be designed and constructed to accommodate the
anticipated sediment loading for the land disturbing activity. The outfall
device or system device shall take into account the total drainage area
flowing through the disturbed area to be served by the basin.
7. CUT AND FILL SLOPES:
Cut and fill slopes shall be designed and constructed in a manner that
will minimize erosion. Slopes that are found to be eroding excessively
within one year of permanent stabilization shall be provided with additional
slope stabilizing measures until the problem is corrected.
& CONCENTRATED RUN-OFF DOWN CUT OR FILL SLOPES:
Concentrated runoff shall not flow down cut or fill slopes unless contained
within an adequate temporary or permanent channel, flume, or slope drain
structure.
9.WATER SEEPS FROM A SLOPE FACE:
Whenever water seeps from a slope face, adequate drainage or other
protection shall be provided.
10. STORM SEWER INLET PROTECTION:
All storm sewer inlets that are made operable during construction shall
P 9
be protected so that sediment -laden water cannot enter the conveyance
system without first being filtered or otherwise treated to remove sediment.
11. STABILIZATION OF OUTLETS:
Before newly constructed stormwater conveyance channels are made
operational, adequate outlet protection and any required temporary or
permanent channel lining shall be installed in both the conveyance channel
and receiving channel.
12. WORK IN LIVE WATERCOURSES:
When work in a live watercourse is performed, precautions shall be taken
to minimize encroachment, control sediment transport and stabilize the work
area to the greatest extent possible during construction. Nonerodible
material shall be used for the construction of causeways and cofferdams.
Earthen fill may be used for these structures if armored by nonerodible
cover materials.
13.CROSSING A LIVE WATERCOURSE:
When a live watercourse must be crossed by construction vehicles more
than twice in any six month period, a temporary stream crossing
constructed of nonerodible materials shall be provided.
14. APPLICABLE REGULATIONS:
All applicable federal, state and local regulations pertaining to working in
or crossing live watercourses shall be met.
15. STABILIZATION OF BED AND BANKS
The bed and banks of a watercourse shall be stabilized immediately after
work in the watercourse is completed.
16. UNDERGROUND UTILITIES:
Underground utilities shall be installed in accordance with the following
standards in addition to other criteria:
a.No more than 500 linear feet of trench may be opened at one time.
b.Excavated material shall be placed on the uphill side of trenches
c. Effluent for dewatering operations shall be filtered or passed through
approved sediment trapping device, or both, and discharged in a manner
that does not adversely affect flowing streams or offsite property.
d.Material used for backfilling trenches shall be properly compacted in order
to minimize erosion and promote stabilization.
e.Restabilization shall be accomplished in accordance with these regulations.
L Applicable safety regulations shall be complied with.
17.CONSTRUCTION ACCESS ROUTES:
Where construction vehicle access routes intersect paved public roads,
provisions shall be made to minimize the transport of sediment by vehicular
tracking onto paved surfaces. Where sediment is transported on to a
public road surface, the road shall be cleaned thoroughly at the end of
each day. Sediment shall be removed by shoveling or sweeping and
transported to a sediment control disposal area. Street washing shall be
allowed only after sediment is removed in this manner. This provision shall
apply to individual lots as well as to larger land disturbing activities.
18.TEMPORARY E&S CONTROL MEASURE REMOVAL:
All temporary erosion and sediment control measures shall be removed
within 30 days after final site stabilization or after temporary measures are
no longer needed, unless otherwise authorized by the local program
authority. Trapped sediment and the disturbed soil areas resulting from the
disposition of temporary measures shall be permanently stabilized to prevent
further erosion and sediment.
19.ADEQUACY OF RECEIVING CHANNELS:
Properties and waterways downstream from the development site shall be
protected from sediment deposition, erosion and damage, due to increases
in volume, velocity and peak flow rates of stormwater runoff for the stated
frequency storm of 24-hour duration.
I
SHP M
ENGINEERING2.
LAND PLANNING - PROJECT MANAGEMENT
912 E. HIGH ST. 434.227.5140
CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM
VSMP PLAN FOR
Glenwood Road
Pond
ALBEMARLE COUNTY, VIRGINIA
SUBMISSION:
2023.01.17
REVISION:
1.
FILE NO.
EROSION CONTROL
NARRATIVE
SHEET C4 of C7
21.073
C4
The Virginia Stream Restoration &
Stabilization Best Management Practices Guide
r)51TAII R t- 01111D_ADnIIAir1 D D A r T I r
Dewatering Device
IVA US Standard and Spec. 3.16
or dirt/sediment 6agF
Discharge Pump
Into Velocity
Dissipater
Discharge pump into
culverts rip —rap Outlet
Protection, which shall
function as velocity
dissipater
TEMPORARX INSTREIM
CONSTRUCTION MEASURES
\ \ \ \ v ...........::::::.:::::..: 7-
..
............
elNr
QHU
aRa
..u OR
;..W wry 10
\ V A bttu OHU �Hu —
\ \ 0
o T-70®_ 0
E .SINGE
�►�� \-� \� 9n ' 1 :,, OME EX.�
SOIL EROSION & SEDIMENT CONTROL SYMBOLS
N ATLE KEY
CONSTRUCTION ENTRANCE
3.05 SILT FENCE
3.31 TEMPORARY SEEDING
3.32 PERMANENT SEEDING
3.35 MULCH
3.39 DUST CONTROL
3.18 OUTLET PROTECTION
LIMITS OF DISTURBANCE
HOME
PUMP -AROUND DIVERSION DETAIL T
\_____\ �C5 Not To Scale\ \ J
\XJHE/
___-__-
630. \\ \ \ \\ \\ \\ \ _ — 4b1- _ _ \ \\ \\ \ \ \x, x HOME
\ \ � EX.SINGLE
4CO — POND SURFACE \ \ \ — ----\ / —
♦� ELEV: 643.00'
AREA: 10,900 Sq.Ft—
\ \ ♦ \ter �J \\♦�/ \ \ \ \ �� \\ OS�F
TNIP 57B-42i I \ _--_ --- ��_
CREEK
SAND BAG \ `�\ —(- \ �c \ \ \ —
\\ \ \ ♦ /�—/ --�/ \ ` l \ �/ O \\ `�� \ D-� 4613-\406 \ \ �\ — --- --�
\' \ COFFER DAM \ sA \ / �� N _ \ \ tcb \ \ I _
\ \ ♦ r'C • 1 I� / /� �, '` \ AREA 3.50 'A�
\`tea\\ \\ \I
Al
\ \ O /� \\ \\ \\`\ \\ \\�b ` CkI I -CA S ❑PE B=-5LS \ l
\\ \ \ \\ \\ �
PUMP AROUND DIVERSION.- 640 \ ram\ i \y�
\ \ \\ SET UP SANDBAGS & _ / L \ \\� -�
\PUMPS TO DIVERT STREAM _ - , \\ \ �2 /���'\///\•\v \ �� \\\ \\ �4� �♦ _ _ //
\ WATER DURING CULVERT o \ }- / ♦' I\,SYREAM�\
\ \\\\ \\ \ \\ \ \\\ INSTALLATION. SEE DETAIL. \ r "'�. C6,3B \
�/ Z_ \� \\ \��
I /
\ \ \ / _ - _ \♦ 0- \\ SAND BAG ' I
\ \ \ \ \ \ \ �� 1 _ _ 6 A-\ \ 44, COFFER DAM
SOILD LEGEND 6 - - - - - 6 4 \ - - - /� �/ �''� \ \� I / 1 \► I/
4E — ASHE LOAM, 25 TO 45% SLOPE, HSG B, / \ \ \ \ — cb 44\
1
36C — HAYESVILE LOAM — 7 TO 15% SLOPE, HSG B — / / � — _ _ _ _Lon _ `�— — � \ \ \\ � I �0 � CO
L _ DISCHARGE PIPE V00
36D — HAYESVILLE LOAM — 15 TO 25% SLOPES, HSG B \ \ LIMITS OF DISTURBANCE AREA
/ — \ — 31000 SQ.FT _ _ _ — >za— wo f / / /
37D3 — HAYESVILLE CLAY LOAM — 15 TO 25% SLOPES, HSG B, SEVERELY ERODED \ / / \ \ 0.71 ACRES
56B — MEADOWVILLE LOAM, 2 TO 7% SLOPES, HSG: B / 000 \ ` 6 0_ 52
66E — PARKER VERY STONY LOAM, 25 TO 45% SLOPES, HSG: A \ 10
W —WATER < /
0 20
SHIMP
ENGINEERING
LAND PLANNING - PROJECT MANAGEMENT
912 E. HIGH ST. 434.227.5140
CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM
VSMP PLAN FOR
Glenwood Road
Pond
ALBEMARLE COUNTY, VIRGINIA
SUBMISSION:
2023.01.17
REVISION:
1.
FILE NO.
21.073
EROSION CONTROL PLAN
SHEET C5 of C7
40 60
C5
PERMANENT SEEDING SPECIFICATIONS
CONSTRUCTION OF A SILT FENCE
February 16 through April 30
Kentucky 31 Fescue - 128
lbs/acre;
Red Top
Grass
- 2 lbs/acre;
Annual Rye - 20 lbs/acre.
Add 20
lbs/acre
Indian
grass when slopes
are greater than 3:1.
May 1 through August 15:
Kentucky 31 Fescue - 128
Ibs/acre;
Red Top
Grass
- 2 lbs/acre;
Foxtail Millet - 20 lbs/acre.
Add 20 lbs/acre
Indian
grass when slopes
are greater than 3:1.
August 16 through October
31:
Kentucky 31 Fescue - 128
Ibs/acre;
Red Top
Grass
- 2 lbs/acre;
Annual Rye - 20 lbs/acre.
Add 20
lbs/acre
Indian
grass on slopes
greater than 3:1.
November 1 through February
15:
Kentucky 31 Fescue - 128
lbs/acre;
Red Top
Grass
- 2 lbs/acre; Winter
Rye - 20 lbs/acre. Add 20 lbs/acre
Indian grass
on
slopes greater
than 3:1.
MULCHING SPECIFICATIONS
Straw or hay at a rate of 2 tons/acre. Must be anchored. Spread with
mulch blower or by hand.
LIME AND FERTILIZER SPECIFICATIONS:
Lime and fertilizer needs should be determined by soil tests. Soil tests
may be preformed by the Cooperative Extension Service Soil Testing
Laboratory at VPI&SU, or by a reputable commercial laboratory.
Information concerning the State Soil Testing Laboratory is available from
CITY Extension Agents. Under unusual conditions where it is not possible
to obtain a soil test, the following soil amendments will be applied:
For Permanent Seeding: Seeded areas shall be limed at a rate of 2 tons
per acre, and fertilized at a rate of 1,000 lbs. per acre of 10-20-10 (10
lbs. per 1,000 square feet) or equivalent.
For Temporary Seeding: Seeded areas shall be limed at a rate of 2 tons
per acre, and fertilized at a rate of 600 lbs. per acre of 10-20-10 (10
lbs. per 1,000 square feet) or equivalent.
1 ) PERMANENT SEEDING (PS
C6 Not To Scale
PIPE OUTLET CONDITIONS
A A
3do (MIN.)
'IPE OUTLET TO WELL
IEFINED CHANNEL
AKLA YVIIH NU ULI-INLI)
CHANNEL
IL
0 % 7
III d
SECTION A -A FILTER CLOTH KEY IN 6'-9°; RECOMMENDED FOR ENTIRE PERIMETER
NOTES: 1. APRON LINING MAY BE RIPRAP, GROUTED RIPRAP, GABION
BASKET, OR CONCRETE.
2. La IS THE LENGTH OF THE RIPRAP APRON AS CALCULATED
USING PLATES 3.18-3 AND 3.18-4.
3. d = 1.5 TIMES THE MAXIMUM STONE DIAMETER, BUT NOT
LESS THAN 6 INCHES.
Q10
La
Do
3Do
d50
Depth
W-Do
Outlet
(cfs)
(ft)
(ft)
(ft)
(in)
(in)
+La
Condition
OUTLET 1
46.97
20.0
3.00
9.00
7.0
10.5
23.0
Channel
Class Al)
4 OUTLET PROTECTION OP)
C6 Not to Scale
TABLE 3.31-C
TEMPORARY SEEDING PLANT MATERIALS, SEEDING RATES, AND DATES
SEEDING RATE
NORTM
SOUTIN
PLANT
W
Sn
sn
ens
vls
sn
9/1
CHARACTERISTICS
SPECIES
Acre
TOY. or
to
Inm
I.
w
m
aw
ens
un
anp
vn
uns
OATS
3 bu. (up w LEE IN..
2 M.
%
-
It
-
-
Us.P.w6 wigin (e.8.. Ncbk).
J (gg
,ct k.s nun mlbc)
RYE'
1 bu. (up w ILO IN..
1.S flu.
%
-
%
X
-
X
use fm We hll rMin®, xio2r
tsxele .10
ens w. �aev sp ro..)
coven. uM mtl Ew
rdwa
moi.w..
GERMAN MII.LEI
SO lbs.
116.
(SW,iW'nv)
e
�. Mry � 4Mt to simor
ANNUAL RYEGRA55°
6a Ws.
IN IK
%
X
%
MnY h WN'^ onaa. WJl
Il nlium nm lu=-lym�
maf mNelmS.
WEEPING
IS W.
5'h ov.
-
X
-
-
X
-
Wvm-sumo pmmisL MSY
LOVEGRA55
bwrL. Tolmmm not, ary dapro
E+ +I amuses
.m mla. �nreme mu.. M.r b.
.dea m �.
XORsaN
ss n».
lu
x
Itx
x
wmm mw.l lm�
LiSPEDEZA°
Ibs.
TakMa vdE ®ils. bLY toftiwlva)
(
tlard w misu.
• Nonhem Piedmont and Mountain region. Si Platers 3.22-t end 3.22-2.
n Soudlem Piedmont and Coastal Plain.
` May be used as a cover crop with spring siding.
d May be used as a cover crop with fall seeding.
% May be pMnled between thew dales.
- May � be pbmled betwcen these dares.
2 )TEMPORARY SEEDING
C6 Not To Scale
TABLE 3.39-A
ADHESIVES USED FOR DUST CONTROL
Water
Application
Dilution
Type of Rate
Adhesive
(Adhesive: Water)
Nozzle Gallons/Acre
Anionic
Asphalt Emulsion
7:1
Coarse Spray 1,200
Latex Emulsion
12.5:1
Fine Spray 235
Resin in Water
4:1
Fine Spray 300
Acrylic Emulsion
(Non -Traffic)
7:1
Coarse Spray 450
Acrylic Emulsion
(Traffic)
3.5:1
Coarse Spray 350
5 DUST CONTROL DC
C6 Not To Scale
1992 3.35
Source: Va. DSWC
TABLE 3.35-A
ORGANIC MULCH MATERIALS AND APPLICATION RATES
RATES:
MUI.CI-IES:
NOTES:
per Acre
Per 1000 sq. ft.
Straw or Hay
1 k - 2 tons
70 - 90 lbs.
Free from weeds and coarse
(Minimum 2
matter. Must be anchored.
tons for
Spread with mulch blower
winter cover)
or by hand
Fiber Mulch
Minimum
35 lbs.
Do not use as mulch for
1500 lbs.
winter cover or during hot,
dry periods.' Apply as
slurry.
Corn Stalks
4 - 6 tons
185 - 275 lbs.
Cut or shredded in 4-6"
lengths. Air-dried. Do not
use in fine turf areas. Apply
with mulch blower or by
hand.
Wood Chips
4 - 6 tons
185 - 275 this.
Free of coarse matter. Air-
dried. Treat with 121bs
nitrogen per ton. Do not
use in fine turf areas. Apply
with mulch blower, chip
handler, or by hand.
Bark Chips
50 - 70 cu.
1-2 cu. yds.
Free of coarse matter. Air -
or
yds.
dried. Do not use in fine
Shredded
turf areas. Apply with
Bark
mulch blower, chip handler,
or by hand.
" When fiber mulch is the only available mulch during periods when straw
should be used, apply at a minimum rate of 2000 lbs./ac. or 45 lbs./1000 sq. ft.
C6 Not To Scale 6 MULCHING MU
1. SET THE STAKES.
AI1.
3. STAPLE FILTER MATERIAL
TO STAKES AND EXTEND
IT INTO THE TRENCH.
FLOW
2. EXCAVATE A 4"X 4" TRENCH
UPSLOPE ALONG THE LINE OF
STAKES.
4. BACKFILL AND COMPACT
THE EXCAVATED SOIL.
SHEET FLOW INSTALLATION
(PERSPECTIVE VIEW)
POINTS A SHOULD BE HIGHER THAN POINT B.
DRAINAGEWAY INSTALLATION
(FRONT ELEVATION)
SOURCE: Adapted from Installation of Straw and Fabric Filter Barriers for Sediment Control,VA. DSWC
Sherwood and Wyant
3 SILT FENCE SF
C6 Not To Scale
GROUND
70' MIN.
A
FILTER CLOTH 6" MIN. I Al
SIDE ELEVATION
*
12' MIN.
L VDOT #1
COURSE AGGREGATE
* MUST EXTEND FULL WIDTH
OF INGRESS AND EGRESS
OPERATION
F.M.ro....Naaweo...w....aa
70' MIN.
P WASHRACK
I (OPTIONAL.
POSITIVE DRAINAGE
B TO SEDIMENT
TRAPPING DEVICE
PLAN VIEW
v v SECTION A -A
CONSTI
Not To Scale
ENTRANCE (CE
EXISTING
PAVEMENT
5:1
PLATE. 3.05-2
MOUNTABLE BERM
(OPTIONAL)
10' MIN.
EXISTING
PAVEMENT
10' MIN.
urtr{iry arrai,�
SHIMP
ENGINEERING2.
LAND PLANNING - PROJECT MANAGEMENT
912 E. HIGH ST. 434.227.5140
CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM
VSMP PLAN FOR
Glenwood Road
Pond
ALBEMARLE COUNTY, VIRGINIA
SUBMISSION:
2023.01.17
REVISION:
1.
FILE NO.
EROSION CONTROL
DETAILS
SHEET C6 of C7
21.073
C6
O 1 Q
6.0' SEEDLING)
(- 6.0' 6.0'
SEEDLING 6.0'
O
PLANTING PATTERN: 6' O.C.
C7 Scale: 1"=6'
LEGEND
100' BUFFER DISTURBANCE
MITIGATION REPLANTING (INSIDE BUFFER)
STREAM BUFFER
BUFFER AREA DISTURBED:
28,000 SF = 0.64 ACRES DISTURBED WITHIN 100' BUFFER
MITIGATION PLANTING CALCULATIONS:
•0.64 AC AREA DISTURBED WITHIN STREAM BUFFER
•0.46 AC REQUIRED 2:1 RATIO REPLANTING AREA (2x0.64=1.28 AC)
•1.28 AC AVAILABLE BUFFER REPLANTING AREA
MITIGATION SOLUTION REQUIREMENTS:
SEEDLING PLANTING FROM DCR RIPARIAN BUFFERS GUIDANCE MANUAL P.95 OPTION C, TABLE B:
PLANT 1210 BARE ROOT SEEDLINGS/ACRE OF AVAILABLE REPLANTING AREA AT 6'x6' ON CENTER.
PLANT 774 SEEDLINGS IN 0.64 AC REPLANTING AREA.
MITIGATION STRATEGY:
PLANT 1210x0.64= 774 BARE ROOT SEEDLINGS IN THE MITIGATION REPLANTING AREA. SEEDLINGS
CAN BE PURCHASED IN BULK FROM THE VA. DEPT. OF FORESTRY. (ESTIMATED $80/100 SEEDLINGS)
SEEDLING PLANTING INSTRUCTIONS:
PLANT 774 BARE ROOT SEEDLINGS AT 6'X'6 ON CENTER. MITIGATION SPECIES LOCATED IN LIST ON
THE LEFT OF THESE NOTES. SPECIES WERE SELECTED FROM ALBEMARLE COUNTY APPROVED
PLANTING LIST. CONTRACTOR CAN SUBSTITUTE SPECIES ONLY AFTER CONSULTING AN ARBORIST.
CONTRACTOR SHALL BEGIN PLANTING AFTER EARTHWORK IS FINISHED AND SHALL COMPLETE
PLANTINGS WITHIN 6 MONTHS OF THE FIRST BRIDGE CONSTRUCTION. SEEDLINGS SHALL BE PLANTED
ACCORDING TO BEST PRACTICES AS SPECIFIED BY THE USDA
MAINTENANCE INSTRUCTIONS:
DEVELOPER SHALL ENTER INTO A 5—YEAR MAINTENANCE AND PERFORMANCE GUARANTEE, WHICH
SHALL STIPULATE A MINIMUM SURVIVAL OF 600 PLANTS PER ACRE AFTER TWO (2) GROWING
SEASONS. REQUIRED SURVIVAL FOR THIS PROJECT: 600X0.64 = 384 PLANTS
MITIGATION PLANTING LIST
Planting Type
Botanical Name
Common Name
Quantity
Large
Shade
Tree
Quercus bicolor
Swamp White Oak
130
Large
Shade
Tree
Quercus phellos
Willow Oak
130
Large
Shade
Tree
Acer rubra
Red Maple
130
Large
Shade
Tree
Betula nigra
Riverbirch
130
Medium
Shade
Tree
Amelanchier laevis
Smooth
Serviceberry
130
Medium
Shade
Tree
Carpinus caroliniona
American
Hornbeam
130
BULK PURCHASE TOTAL
780
* ALL PLANTING SHALL BE BARE ROOT SEEDLING
MITIGATION PLAN
SOIL EROSION & SEDIMENT CONTROL SYMBOLS
N0. TITLE KEY
CE
3.02
CONSTRUCTION ENTRANCE
x —x —x —x
3.05
SILT FENCE
SF
TS
3.31
TEMPORARY SEEDING
TS
PS
3.32
PERMANENT SEEDING
MU
3.35
MULCH
DC
3.39
DUST CONTROL
3.18
OUTLET PROTECTION
OP
-LOD-LOD-LODtLOD
LIMITS
OF DISTURBANCE
/r _ ,/
Ou
WA AN
S,
�1�
:� ....
IGNo
O HOVE m�
J / /
man\`
X
GLE
ME A
DLE
/-- -- I�o/
r
-- PT
EX.SINGLE
\ J HOME
\\--- - - -
— TMP SIB-17 /
GERALp HANIJINS /
?`,z-+p.PAMLKA HANKIINS I I
AE EA\4.65 }C / I
x i
— x x x X
x�x " 1x x x x i // j��' —�/ /!
x -x—x x— x x fix— �— /�/'— / \\ :� I I 1 /
x x x x\
x_ — x x �,,------- --'reAG
, \\ \\ \ \\ \
DAM
\ \
o / 1 s
POND \
✓�// % % / \ i 1 \\
f /
0.64 Acres
SHIMP
ENGINEERING2
LAND PLANNING - PROJECT MANAGEMENT
912 E. HIGH ST. 434.227.5140
CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM
VSMP PLAN FOR
Glenwood Road
Pond
ALBEMARLE COUNTY, VIRGINIA
SUBMISSION:
2023.01.17
REVISION:
1.
FILE NO.
MITIGATION PLAN
21.073
SHEET C7 of C7
C7