Loading...
HomeMy WebLinkAboutZMA197700012 Review Comments 1977-09-09 _ =r - -1. N Planning Department = - - 8o41286.5 23 414 EAST MARKET STREET CHARLOTTESVILLE.. VIRGINIA 22901 RCOERT W. TUCKER. JR. RONALD S. DIRECTOR OP PLANNING ASSISTANT OIR[ N CTO OF PLANNING VARY JOY SCALA September 9, 1977 [[NIOR PLANNER CARLOS M. MONTENEGRO ILANNIR Mr. Byron Coburn Assistant Resident Engineer Post Office Box 910 Charlottesville, Virginia ge-z4AhAlcx Res JARMAN GAP ESTATES - Decel/Pullover lanes Dear Bryon: • In response to your request concerning the above referenced matter, I offer the following comments. On July 20, 1977, the Board of Supervisors approved a rezoning for Jarman Gap Estates with several conditions. One condition required that the three proposed "entrances are each to have a 12-foot wide deceleration lane, 75 feet in length, with a 25-foot taper." The 12 foot wide deceleration lane or pull-over lane was added by the staff based on standards that had been followed in the past. It is my understanding that you feel that the width of the decel lane can be reduced to 9-10 feet, provided the length of the lane is increased. If my assumption is correct, please advise in writing for our files. If you have any further question, please do not hesitate to call. Sincerely, • Robert W. Tucker, Jr. :F 1s,. Director of Planning ;;__ -- RWTj,jg