Loading...
HomeMy WebLinkAboutSDP202300006 Application Major Amendment, Final Site Plan 2023-01-20J`p} dfgF Application for Major or Minor Site Plan Amendments T Existing Site Plan Name & Number: SDP82-29 DALYS RENTAL Taz map and parcel(s): 061 WO-02-OB-00200 Zoning: Cl-COMMERCIAL Contact (who should we contact about this project): Meridian Planning Group, LLC Street Address 440 Premier Circle, Ste 200 City Charlottesville State VA Zip Code 22901 Phone Number 434-882-0121 Email tmiller@meridianwbe.com Owner of Record Greenbrier East, LLC StreetAdareas 255 Ipswich PL C;ty Charlottesville State VA Zip Code 22901 Phone Number 434-973-6161 Email sue@designenvirons.com Applicant Same as Owner Street Address City State Zip Code Phone Number Email FEES la Major Amendment = $1846 ❑ Minor Amendment (alterations to parldng, circulation, building Application $1775 +Technology Surcharge $71.00 ® Major Amendment Fire Rescue Fee = $100 size, location) = $615.68 Application $592 +Technology Surcharge $23.68 This application may require additional review by the Fire Marshal. Fees in addition to those shown on this application may be required by the Fire Prevention Code Fee Schedule. A copy of the schedule is available from the Fire Marshal. A completed application and all supplemental documents should be subotiaed via the Community Development Apply for Paee. Ijpaper is the only option, then one copy of completed application and as supplemental documents may be provided Technology Surcharge 4% additional fee on each (does not apply to required notices fees) Notices required by Section 32.4.2.1 (f) Initial notice fee to be provided in conjunction with an application, for preparing and mailing notices and published notice = $448.00 County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Voice: (434) 296-5832 Fax: (434) 9724126 Major or Minor Site Plan Amendments 8/15/2022 Page 1 of 2 (Required for all non-residential site plans not serviced by public water) Was a Groundwater Assessment conducted for the existing site plan? ❑ YES ® NO If NO and the new plans show a use using less than 2,000 gallons/day (average) ❑ Tier 3 Groundwater Review = $627.12 Fee $603 +Technology Surcharge $24.12 If NO and the new plans show a use using greater than 2,000 gallons/day (average) ❑ Tier 4 Groundwater Review = $1,354.08 Fee $1302 + Technology Surcharge $52.08 If YES and the use goes from using less than to more than 2,000 gallons/day (average) ❑ Tier 4 minus Tier 3 = $72696 Fee $699 + Technology Surcharge $27.96 If YES and the use does not change from using less than to more than 2,000 gallons/day ❑ No fee Comments/Attachments: Owner/Applicant Must Read and Sign ® Manor Amendment This major amendment as submitted contains all of the information required by Section 32.5 (Initial Site Plan) and Section 32.6 (Final Site Plan) of the Albemarle County Zoning Ordinance. I understand that plans which lack information required by said sections shall be deemed incomplete and shall be denied by the agent within ten (10) days of submittal as provided in Section 32.4.2.1 or Section 32.4.3.1 as the case may be. ❑ Minor Amendment This minor amendment as submitted contains all of the information required by Section 32.5 (Initial Site Plan) and Section 32.6 (Final Site Plan) of the Albemarle County Zoning Ordinance. I hereby certify that the information provided on this application and accompanying information is accurate, true, and correct to the best of my knowledge. By signing this application, I am consenting to written comments, letters and or notifications regarding this application being provided to in or my de^ red contact via and or email. This consent does not preclude such written communication from also bein nt via fir •la eui . 1. /2a123 lure of caner, ontract Purchaser, Agent Date Print Name Daytime phone number of Signatory FOR OFFICE USE ONLY SDP # Fee Amount $ Date Paid By who? Receipt # Ck# By: Major or Minor Site Plan Amendments 8/152022 Page 2 of