HomeMy WebLinkAboutWPO202000049 Bond Release Erosion Control Plan 2023-01-05 ,OFA
(gar alit
'Z!l�GTt.V�j
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road,North Wing
Charlottesville,Virginia 22902-4596
Phone (434)296-5832 Fax (434)972-4126
EROSION CONTROL PERFORMANCE BOND RELEASE --nlp17Q,,, Fce l ,
❑ MITIGATION PERFORMANCE BOND RELEASE
❑ STORMWATER MANAGEMENT PERFORMANCE BOND RELEASE
PROJECT NAME: 312-"' 0AO RgAN iow/ ?D
PLAN/PERMIT NO.: 1PU ZDZO COO Li?
Date As-built plan was approved by Engineering Division: Q
DEQ Termination Date org
DEQ Permit No.: rN/i4%
If townhomes in a Common Plan,list Common Plan DEQ Permit No.: ti /4
This project has been satisfactorily completed and the performance bond may be released at this time if
all re-inspection and annual maintenance fees invoiced have been paid.
O J./ DATE: I J
5—2
rosion Contro inspector
Community Development Department
All fees invoiced on the above project have been collect"
/
Director of Community Development ounty Engineer
// //7
Date
Cc: Ana Kilmer
Revised:04/11/2022
VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY
GENERAL VPDES PERMIT FOR DISCHARGES OF STORMWATER FROM CONSTRUCTION ACTIVITIES(VAR10)
NOTICE OF TERMINATION 2019
Permit Coverage Number(VAR10####): WP0202000049
Section I. Operator/Permittee Information.The person or entity that has active permit coverage approval and operational control
over construction activities to ensure compliance with the general permit. A person with signatory authority for this operator must
sign the certification in Section VII(per Part III.K.of the VAR10 Permit).
Construction Activity
Operator Name: Sathish Anabathula
Contact Person: Sathish Anabathula
Address: 3125 Morgantown Rd
City,State,Zip Code: Charlottesville,VA 22903
Phone Number: 434-962-5205
Primary Email: anabathula@gmail.com
CC Email:
Section II. Construction Activity Location Information. Project site information.
Construction Activity Name: Grading
Address: 3125 Morgantown Rd
City and/or County and Zip Code: Charlottesville,VA 22903
Latitude and Longitude
(6 digit,decimal degrees format): 38 03'25"N,78 36'33"W 38057Z -78,C09Z)
Section III. Reason for Terminating Coverage under the General Permit. The operator shall submit a Notice of Termination within
30 days after meeting one or more of the following conditions(select one or more):
❑A.Necessary permanent control measures included in the SWPPP for the site are in place and functioning effectively and final
stabilization has been achieved on all portions of the site for which the operator is responsible.When applicable,long-term
responsibility and maintenance requirements for permanent control measures shall be recorded in the local land records
prior to the submission of a Notice of Termination;
❑ B.Another operator has assumed control over all areas of the site that have not been finally stabilized and obtained coverage for
the ongoing discharge;
❑ C.Coverage under an alternative VPDES or state permit has been obtained;or
® D.For residential construction only,temporary soil stabilization has been completed,the operator has provided written
notification to the homeowner about the importance of final stabilization and incorporating a copy of the notification and
signed certification statement into the SWPPP,and the residence has been transferred to the homeowner.
Rev 04/2019 PAGE 1 16
CONSTRUCTION GENERAL PERMIT(VAR10) NOTICE OF TERMINATION 2019
Section IV.Participation in a Regional Stormwater Management Plan. If your site discharges to a regional stormwater
management"' facility,provide information related to the regional stormwater management plan.Attach a separate list if discharging
to multiple regional facilities.
Regional Stormwater Management N/A
Facility Type:
Address:
City and/or County and Zip Code:
Latitude and Longitude
(6-digit,decimal degrees format):
Total Acres Treated by Regional Facility
(report to one-hundredth of an acre):
Impervious Acres Treated by Regional Facility
(report to one-hundredth of an acre):
Section V.Perpetual Nutrient Credits. If your site is utilizing nutrient credits,provide information related to the perpetual nutrient
creme dits that were acquired in accordance with§62.1-44.15:35 of the Code of Virginia.Attach a separate list if needed.
Nonpoint Nutrient Credit Generating Entity � )
(Bank Name): (U 1-
4)
Nutrient Credits Acquired
(pounds/acres/year):
Include the affidavit of sale for all nutrient credits acquired. Is the affidavit of sale of nutrient credits attached? OYES ONO
Section VI. Permanent Control Measures. If applicable,list the post-development stormwater management facilities or best
(
management practices(BMPs)that were constructed and installed as part of this activity to comply with the stormwater
management technical criteria(structural and nonstructural,on-site and off-site).Attach a separate list if needed.
} If you have permanent control measures,the following items are required to be included with this form in order to complete your
0 0 I Notice of Termination submittal:
❑A. Engineer's Certification Statement
9A- 0 B. As-built plahs(construction record drawings)—digital
i
❑ C. As-built plans(construction record drawings)—full-sized,paper
❑ D. Stormwater Management Plans—digital
❑ E. BMP Maintenance Agreement—notarized original,for public and private projects under DEQ's VSMP Authority
Stormwater Management Facility Types(please choose from the following bmp types):
Bioretention 1 Extended detention-enhanced Other IIC(manufactured Soil Amendments
Bioretention 2 Filtering Practice 1 treatment device,etc.) Urban Bioretention
Bioretention basin Filtering Practice 2 Permeable Pavement 1 Vegetated filter strip
Bioretention filter Grass Channel Permeable Pavement 2 Vegetated Roof 1
Constructed Wetland 1 Grassed swale Rainwater Harvesting Vegetated Roof 2
Constructed Wetland 2 Infiltration(1 x WQ Vol) Retention basin I(3 x WQ Vol) Wet Pond 1
Constructed wetlands Infiltration(2 x WQ Vol) Retention basin II(4 x WQ Vol) Wet Pond 2
Dry Swale 1 Infiltration 1 Retention basin III(4 x WQ Vol Wet Swale 1
Dry Swale 2 Infiltration 2 with aquatic bench) Wet Swale 2
Extended detention(2 x WQ Vol) Other IIB(manufactured Sand filter
Extended Detention Pond 1 treatment device,etc.) Sheetflow to Vegetated Filter or
Extended Detention Pond 2 Conserved Open Space 2
Rev 04/2019 PAGE 2 1 6
CONSTRUCTION GENERAL PERMIT(VAR10)NOTICE OF TERMINATION 2019
Stormwater Management Facility#1 N/A,no stormwater management facilities other than vegetation
BMP Type:
Date BMP Became Functional:
Address(if available):
City and/or County and Zip Code:
Latitude and Longitude
(6-digit,decimal degrees format):
Receiving Water(s)
(outfall discharge):
Total Acres Treated
(report to one-hundredth of an acre):
Impervious Acres Treated
(report to one-hundredth of an acre):
Stormwater Management Facility#2
BMP Type:
Date BMP Became Functional:
Address(if available):
City and/or County and Zip Code:
Latitude and Longitude
(6-digit,decimal degrees format):
Receiving Water(s)
(outfall discharge):
Total Acres Treated
(report to one-hundredth of an acre):
Impervious Acres Treated
(report to one-hundredth of an acre):
Stormwater Management Facility#3
BMP Type:
Date BMP Became Functional:
Address(if available):
City and/or County and Zip Code:
Latitude and Longitude
(6-digit,decimal degrees format):
Receiving Water(s)
(outfall discharge):
Total Acres Treated
(report to one-hundredth of an acre):
Impervious Acres Treated
(report to one-hundredth of an acre):
Rev 04/2019 PAGE 3 16
CONSTRUCTION GENERAL PERMIT(VAR10) NOTICE OF TERMINATION 2019
Section VII. Certification. This Certification must be signed by a person representing the operator identified in Section I.and
meeting the requirements of 9VAC25-880-70 Part Ill K.
Certification: "I certify under penalty of law that I have read and understand this Notice of Termination and that this document and
all attachments were prepared in accordance with a system designed to assure that qualified personnel properly gathered and
evaluated the information submitted.Based on my inquiry of the person or persons who manage the system or those persons
directly responsible for gathering the information,the information submitted is to the best of my knowledge and belief true,
accurate,and complete.I am aware that there are significant penalties for submitting false information including the possibility of
fine and imprisonment for knowing violations."
Printed Name: Sathish Anabathula �] ,y� a
Signature(signed in ink): t *)1.11 4 a`V .. hLA..-
Date: 1/4/2023
Section VIII.Submittal Instructions. Please submit this form to the Virginia Stormwater Management Program(VSMP)Authority
that has jurisdiction for your construction activity. If the locality is the VSMP Authority,please submit your form directly to the
locality;do NOT send this form to DEQ. A list of local VSMP Authorities is available here: VSMP Authorities.
If DEQ is the VSMP Authority,please send to: If the locality is the VSMP Authority,please send to:
Department of Environmental Quality The Local VSMP Authority(insert address below)
Office of Stormwater Management Suite 1400
PO Box 1105
Richmond VA 23218
constructiongp(adeq.virginia.gov
Permit terminations may be delayed if there are
outstanding annual permit maintenance fee balances due.
Rev 04/2019 PAGE 4 16