HomeMy WebLinkAboutWPO201900068 Checklist WPO VSMP 2019-11-26 COUNTY OF ALBEMARLf
t * :,. Department of Community Developmeni
401 McIntire Road
Charlottesville,Virginia 22902
VSMP Application Completeness Check
Ted -t .1 5
Project Title: a —
File Number: 1,JTh7302Drg VSM1�
Date: l l-- 24-t't
Reviewer:
Your application has been checked for completeness per section 17-409 of the County Code. All
items must be received and correct for the application to be deemed complete.
❑ This application is complete and plan review has begun
❑ This application is not complete. Please provide the missing items
checked below.
Received
Y N Correct
Y N N/A
.13' 0 Completed application ❑ ❑ ❑
0 Signatures of the Property Owners for each parcel affected ❑ ❑ ❑
iil74 Correct Fees Paid ❑ ❑ ❑
❑ Registration Statement on the official DEQ form, with correct LDA ❑ ❑ ❑
0 ' Erosion and Sediment Control Plan satisfying the requirements
of code section 17-402. ❑ ❑ ❑
9 ❑ Stormwater Management Plan satisfying the requirements of code
section 17-403. ❑ ❑ o
❑ Pollution Prevention Plan satisfying the requirements of code
section 17-404. The EPA template should be used. ❑ ❑ ❑
0 ❑ Stonnwater Pollution Prevention Plan satisfying the requirements
of code section 17-405. The EPA template should be used. ❑ ❑ ❑
01 Mitigation Plan satisfying the requirements of code section
17-406 for any proposed disturbance of stream buffers. ❑ ❑ ❑
❑ A Requested Variations or Exceptions as provided in code sections
17-407 and 408, if applicable. (SSF,MMT,etc) o ❑ ❑
❑ A Construction Record Drawings(as-builts)for any existing facilities
in the proposal satisfying the requirements of code section 17-422. ❑ o
Comments:
■