Loading...
HomeMy WebLinkAboutWPO201900068 Checklist - Project Closeout (Administrative) WPO VSMP 2022-12-19 WATER PROTECTION (CONSTRUCTION) FILE CLOSEOUT AT TIME OF COMPLETION (BOND AGING CENTER INSTRUCTIONS RELEASE) CRECICLIST The Inspector/Management Analyst is to complete this form ,{ ,,�;,a ;:.;;;�; release;place the completed form in thet �� `P� of project completion and/or bond Laease;pla. hee completed have been lace WPO folder and Imaging to the Imaging 1pwi Center ford Centralizedt closeout into WPO#�; Center staff will forward to Filing PROJECT TITLE FULL NAME INSPECTOR: FINAL ACTION DATE: 1-�--'-�" 2---- ` ��CountyView— ------------------------ 0 Status/Status Date - ~--_ -- ---- updated Hardcopy—File Folder Closeout: All __`----------_t__=chronological order(latest on top), items listed should beplaced inproject folder,in reverse _~ ; Please check each item included in this folder. To indicate that an item is not P the checkt box. The Inspector/Management Analyst has the discretion to inc plieidbe anyitem to this file,place necessaryan provide clarity to the file,please indicate that item on the"Other"lines provided . 11 deemed to Digital Closeout Instructions: i ,if the document is alreadyin • Below each item please indicate if Ima digital format,v den be saved to Lasei'Fiche. Please rovide the digital location Center is to scan the �cent, or,if of document in the digital e pro cad. Preconstruction Meeting Form ❑ Scan ❑Saved location ❑ Grading Permit ❑ Scan 0 Saved location ❑ Inspection Requests ❑ Scan ❑ Saved location a.ki L ❑ Inspection Results(Include an ❑ Scan Y inspection tickets,memos,photos,etc,) ❑ Saved location ❑ Bond Reduction/Bond Release Notices from Inspector to Mans ❑ Scan Bement Analyst ❑�Saved location ❑ Conservation Checklist ❑ Scan ❑ Saved location ❑ As-built/Construction Plans i 0 Scan ' ❑ Saved location ❑ Other(Please explain) ❑ Scan ❑Saved location 0 Other Plans - lend to At Inspector's discretion, copies of una pprr plans/plats may be placed in the ar if they an unapproved and contain a note clarifying such plans are included, they should be clearly marked as ❑ Scan Ymg why it was included. Saved location i NOTES: WPO project folders will be accepted by the Imaging 1) Checklist Is completed and included in folder; g Center when the folio _ �-^-�'^ 2) Documents are Acco-fastened(except plats/plans),and in chronological orde g items are complete: __._-^ 3) Documents are sufficiently identified as to which need to be scanned or saved to L If the above items are not complete, (latest documents on top); Engineerh items are comp ,Imaging Center staff will circle the incomplete item a d return turn folder to the County tion. 1 Draft 12-5-2013 WPO FILE CLOSEOUT CHECKLIST WPO#- 07019 00 66 fteD " u- C''" -Ri BIR Inspections ✓ BIESC performed with approved plan. ✓ BISWM performed with As-Built plan. Required Docs (either in CV or paper copy) CGP VAR10 for this project: 1/4R /0 02Y7 r/ CGP VAR10 that treats SWM for this project: $,4M E Albemarle County Application ✓ General VPDES Permit Registration Statement Approved E&SC and SWM Plans - Atit_.•,ltt'l A ' 3-1(1-2t ✓ SWPPP APPPeve-0 40-2S'-2o /UM Approved Bond Estimate Nutrient Credit Purchase Affidavit b /8 Z0(eS044s)) ( ,og usi) i1J/4 Recorded Documents:SWM Maintenance Agreement, Easements As-Built Construction Record Drawings/Certification - 4,pepwcr� 11 q-22 Manufacturing and Installation records Pipe video Current survey ✓ General VPDES Permit N.O.T. Verify all fields;verify still active; reference other VAR10"comments"for swm ✓ Inspections: 2 minimum with photos. Photos of all swm bmps BIR release/reduction form Erosion Control,or SWM Performance Bond Release: ✓For releases: �Jpdate CV�yiew status to 'approved/com lei to". For reductions: Update CV review status to"denied/complete", and enter reasons for denial in the comments box.