Loading...
HomeMy WebLinkAboutWPO201100042 Review Comments 2011-07-06 (3) Philip Custer From: Ankita Kot[amodi @fk-inc.com] Sent: Thursday, July 28, 2011 3:20 PM To: Philip Custer Subject: RE: Crown Automotive (WPO-2011-00042) Attachments: CONTECH Review Letter 7-27-2011.pdf Philip Attached is the revised approval letter from Contech. Below is updated estimate for Contech and Filterra structures. This does not include installation. (3)6x4 Filterra Units-$8,100 (1) 12x4 Filterra Unit-$12,900 (1) 8x6 Filterra Unit-$11,700 (1) Stormfilter catch basin with 2 cartridges-$9,020 (2) Stormfilter catch basin with 3 cartridges-$11,550 Detention System -$68,000 From: Philip Custer [mailto:pcusterOalbemarle.orgl Sent: Saturday, July 23, 2011 5:54 PM To: Ankita Kot Subject: Crown Automotive (WPO-2011-00042) Good evening, Attached is the engineering memo from the review of the WPO application for Crown Automotive (WPO-2011-00042), received 3 July 2011. Other than comment 131,the plans require no engineering changes and the ESC and SWM plans are hereby approved. Please note there are several administrative steps before a grading permit can be provided (see attached letter). Please provide 2 additional copies of the full set(with the changes required by comment 131- I'll make the change on the existing sets) and one copy of the stormwater set(sheet C1, C10, C17, C19, and C21-C20)to me. Please note that a site plan submission is still necessary to add a carwash into the site plan. We only received the WPO submittal (ESC and SWM) Please let me know if you have any questions. Thanks, Phil (434) 296-5832 x3072 1 Mir Mg i :;:nt CONSTRUCTION PRODUCTS INC. July 27th, 2011 Ankita Kot Freeland & Kaufman, Inc. 209 West Stone Avenue Greenville, SC 29609 RE: Review of StormFilter Design for Crown BMW. The purpose of this letter is to document for Albemarle County our review of the plans and the proposed application of the Catchbasin StormFilters at this site as you have requested. CONTECH Construction Products has reviewed the StormFilter design for Crown BMW. We believe the Catchbasin StormFilter is an appropriate water quality solution for this site. The StormFilter system has received a certification from VDCR for 50% Phosphorous removal. The engineer of record reports the following information: Site ID Drainage Area(acres) Impervious Area(acres) C-factor Peak Flow Rate(cfs) CBSF#1 0.18 0.16 0.84 1.10 MHSF#2 0.32 0.32 0.90 2.09 CBSF#3 0.37 .32 0.85 2.08 The Catchbasin StormFilter is designed as a flow based system and is sized by calculating a peak water quality treatment flow rate using the rational method and assuming an intensity of 0.35"/hr. The StormFilter is designed to remove 80% TSS and 50% Total Phosphorous. To adequately treat the areas, CONTECH recommends two 3-cartridge Catchbasin StormFilters and one 2-cartridge Catchbasin StormFilter. As with all BMPs, the StormFilter will require periodic maintenance to operate properly. These systems appear to be constructible and are located in order to facilitate maintenance activities. Given typical street pollutant loading rates, CONTECH Construction Products recommends maintenance on an annual basis. In summary, these systems are expected to operate in accordance with CONTECH Construction Products'design intent. Please feel free to contact me if you have any questions or concerns. Sincerely, Aaron M. Lowell Design Engineer—Stormwater Products CONTECH Construction Products, Inc. www. contechstormwater. com Th,,Stormwaicr MAna gelt YOB Sn CON SPAN' CMP DETENTION SYSTEMS d � S SjtormFliter• Trani SYSTEMS Philip Custer From: Philip Custer Sent: Saturday, July 23, 2011 5:54 PM To: 'Ankita Kot Subject: Crown Automotive (WPO-2011-00042) Attachments: E1 esc swm mia PBC Crown Automotive.doc Good evening, Attached is the engineering memo from the review of the WPO application for Crown Automotive(WPO-2011-00042), received 3 July 2011. Other than comment 131,the plans require no engineering changes and the ESC and SWM plans are herebv annroved. Please note there are several administrative steps before a grading permit can be provided (see attached letter). Please provide 2 additional copies of the full set(with the changes required by comment B1- I'll make the change on the existing sets)and one copy of the stormwater set(sheet C1, C10,C17, C19, and C21-C20)to me. Please note that a site plan submission is still necessary to add a carwash into the site plan. We only received the WPO submittal (ESC and SWM) Please let me know if you have any questions. Thanks, Phil (434)296-5832 x3072 1 *ow' �alt 4,0e%tit COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville,Virginia 22902-4596 Phone(434)296-5832 Fax(434)972-4126 Project: Crown Automotive ESC and SWM Plans(WPO-2011-00042) Crown Automotive Minor Amendment(not yet submitted) Owner: Rickey Lee and Donna G. Baumgardner Applicant: Ms. Ankita Kot;Freeland and Kaufman Plan received date: 3 July 2011 Date of comments: 23 July 2011 Reviewer: Phil Custer A.Minor Site Plan Amendment(not yet submitted) 1. No runoff from the carwash process must enter the storm drainage system. It appears that the current design of the site plan accomplishes this. To confirm,please provide send me pdfs of the architectural drawings for the carwash so that I can see that there are internal drains and a roof over the wash area(which isn't clear on the site plan). 2. The easement plat reviewed under application SUB-2008-00286 must be recorded prior to approval of any site plan and a grading permit. Please provide the receipt of recordation for this plat once it is recorded. B. Erosion and Sediment Control Plan(WPO-2011-00042) 1. Since the original plan approval,the county has added two more notes to its General Notes for ESC plans. Please add these two notes to the plan. Please find the new note set in the current edition of the design manual, available online. 2. The previously computed ESC and SWM bonds must be updated. To receive revised bond estimates, please provide a completed Bond Estimate Request Form to the County Engineer. C. Stormwater Management Plan(WPO-2011-00042) 1. The addition of the washing area has revised the design of one of the stormfilter chambers. Please provide a new approval letter of Contech. 2. A stormwater maintenance agreement for original Crown parcel, TMP 78-15, is still needed. After reading the instructions for this form,please submit a completed agreement to Ana Kilmer's attention in the Albemarle County Community Development Department as soon as possible. 3. The previously computed ESC and SWM bonds must be updated. To receive revised bond estimates, please provide a completed Bond Estimate Request Form to the County Engineer. Please also provide updated cost estimates of the manufactured systems(detention and Stormfilters)so that they can be used in the bond. Please specify whether these cost estimates include labor/installation.