HomeMy WebLinkAboutSDP201400003 Review Comments 2014-01-14Review Comments
Project Name: Agnor Hurt Elementary School - Major Major Amendment
Date Completed: Friday, June 06, 2014
Reviewer: Ellie Ray
Department /Division /Agency: Planning
Reviews
Review Status: Approved
Review Comments
Project Name: Agnor Hurt Elementary School - Major Major Amendment
Date Completed: IThursday, May 22, 2014
Reviewer: Troy Austin
Department /Division /Agency: VDOT
Reviews
Troy said he can review for these small revisions on the signature copy.
Review Status: See Recommendations
COMMONWEALTH of VIRGINIA
DEPARTMENT OF TRANSPORTATION
1601 Orange Road
Culpeper, Virginia 22701
Charles A. Kilpatrick, P.E.
Commissioner
May 21, 2014
Ms. Ellie Carter Ray
Senior Planner
County of Albemarle
Department of Community Development
401 McIntire Road
Charlottesville, VA 22902
Re: SDP - 2014 -00003 Agnor -Hurt Elementary School Major Amendment
Dear Ms. Ray:
We have reviewed the major site plan amendment for Agnor -Hurt Elementary School dated
1113114 with revisions dated 3127/14 and 4130114 as submitted by Timmons Group and offer the
following comments:
1. Based on the sight lines provided on the site plan, it appears that some of the vegetation
along Woodburn Road on both sides of the entrance will need to be cut back to allow for
the required sight distance.
2. Based on a conversation with the design engineer, the 35' radius on the south side of the
Woodburn Road entrance is going to be changed to a 50' radius to better accommodate
the school bus traffic that will utilize this new entrance. The entrance culvert will need to
be adjusted accordingly.
3. Subject to the above comments, VDOT has no objection to the proposed site plan.
If you need additional information concerning this project, please feel free to contact me.
Sincerely,
Troy Austin, P.E.
Area Land Use Engineer
Culpeper District
WE KEEP VIRGINIA MOVING
Review Comments
Project Name: Agnor Hurt Elementary School - Major Major Amendment
Date Completed: Thursday, May 15, 2014
Reviewer: Ellie Ray
Department /Division /Agency: Planning
Reviews
Still needs ACSA, VDOT and WPO approval.
Review Status: No Objection
Review Comments
Project Name: Agnor Hurt Elementary School - Major Major Amendment
Date Completed: IThursday, April 17, 2014
Reviewer: Max Greene
Department /Division /Agency: Engineering
Reviews
Review Status: No Objection
10111R
111!Z! 'Z7111111111
COMMONWEALTH of VIRGINIA
DEPARTMENT OF TRANSPORTATION
160 1 Orange Road
Culpeper, Vrg,n a 22701
Charles A. Kilpatrick, P.E.
Commissioner
April 15, 2014
Ms. Ellie Carter Ray
Senior Planner
County of Albemarle
Department of Community Development
401 McIntire Road
Charlottesville, VA 22902
Re: SDP - 2014 -0003 Agnor -Hurt Elementary School
Dear Ms. Ray:
We have reviewed the site plan for Agnor -Hurt Elementary School dated 3/27114 as submitted
by SHW Group and offer the following comments:
1. The sight line and sight distance to the right should be shown on the plan view.
2. The entrance detail provided is for a Private Subdivision Road Entrance. The entrance
should be designed based on the Commercial Entrance Design Along Highways with
Shoulders standard as found in Appendix F of the Road Design Manual.
If you need additional information concerning this project, please feel free to contact me.
Sincerely,
Troy Austin, P.E.
Area Land Use Engineer
Culpeper District
WE KEEP VIRGINIA MOVING
Review Comments
Project Name: Agnor Hurt Elementary School - Major Major Amendment
Date Completed: ISunday, April 13, 2014
Reviewer: Robbie Gilmer
Department /Division /Agency: Fire Rescue
Reviews
Based on plans dated 3/27/14
No comments or objections
Review Status: No Objection
O
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
March 4, 2014
Revl: April 9, 2014
Craig Kotarski
Timmons Group.
9192 nd Street SE
Charlottesville, VA 22902
RE: SDP201400003 Agnor -Hurt Elementary School — Major Amendment
Dear Sir:
Your Major Amendment application has been reviewed. In order for the amended site plan to be
approved the following revisions are required:
1. [32.5.2(a)] This property is zoned R -6 and, therefore, technically doesn't have parking setbacks;
please remove this information from the "site data ". Additionally, this property has two fronts; one on
Berkmar and one on Woodburn. Because there are two fronts, all of the other property lines are
sides (fronts and backs don't intersect). Please show the setbacks on the layout plan and label them
correctly.
Revl : Comment addressed.
2. [32.5.2(a)] Provide the names of the owners, zoning district, tax map and parcel number, and
present uses of all abutting parcels.
Revl : Comment addressed.
3. [32.5.2(b)] List the number of parking spaces removed and the number proposed. Verify the total
number of spaces provided; "site data" indicates 118, but the landscape plan states 128.
Revl : Comment addressed.
4. [32.5.2(d)] A critical slope waiver was requested to disturb 0.55 acres of man -made slopes in excess
of 25 %. However, a Zoning Text Amendment (ZTA) is currently underway that, if approved, would
designate the slopes on this property as "managed ". The ZTA, as proposed, would allow for the
disturbance of "managed" critical slopes for many permitted uses as long as certain design standards
are met, and would make this waiver unnecessary. The ZTA will be heard by the Board of
Supervisors on Wednesday March 5th. If the ZTA is not approved, the waiver request will be
processed while revisions to the site plan are underway.
Revl : Comment addressed.
5. [32.5.2(1)] Provide the pavement width for Woodburn Road.
Revl : Comment addressed.
6. [32.5.2(1)] Provide the pavement width for both entrances and their associated accessways.
Revl : Comment addressed.
7. [32.5.26,k,l)] Verify that the location(s) of all existing or proposed utilities and utility easements
including water, sewer, drainage, telephone, cable, electric and gas are shown on the plan.
Revl : Comment addressed.
8. [32.5.2(m)] Show the distance to the centerline of the nearest existing street intersection from the
proposed ingress and egress locations.
Rev1: Comment addressed.
9. [32.6.2(e)5] Provide a legend showing all symbols and abbreviations used on the plan.
Rev1: Comment addressed.
10. [32.6.2(g)] All water and sewer facilities to be dedicated to public use and the easements for those
facilities and shall be identified by a statement that the facilities are to be dedicated to the Albemarle
County Service Authority.
Rev1: Comment addressed.
11. [32.6.2(i)] Dimension all travelways.
Rev1: Comment addressed.
12. [32.6.2(1)] Show the location of any loading space(s) and provide dimensions.
Rev1: Comment addressed.
13. [32.6.2(i)] Provide the location of any signs.
Rev1: Comment addressed.
14. [32.6.2(i)] Indicate the type of surfacing for all paved or gravel areas.
Rev1: Comment addressed. However, the hatching patterns used to designate different
surfacing types are very hard to distinguish on the copies submitted for review.
15. [32.6.2(i)] Label the angle of any non - perpendicular parking spaces.
Rev1: Comment addressed.
16. [32.6.2(i) & 4.12.15 (f)] Each end of the 10 parking space row on the eastern side of the parking lot
should be protected by raised traffic islands instead of painted stripes.
Rev1: Comment addressed.
17. [32.6.20) & 32.7.9.4(b)] Existing trees may be preserved in lieu of planting new plant materials in
order to satisfy the landscaping and screening requirements of section 32.7.9 or to meet conditions of
approval, subject to the agent's approval. It appears that some of the Landscape Plan requirements
are proposed to be met with existing vegetation. The landscape plan should show the trees to be
preserved, the limits of clearing, the location and type of protective fencing, grade changes requiring
tree wells or walls, and trenching or tunneling proposed beyond the limits of clearing. In addition, the
applicant shall sign a conservation checklist approved by the agent to insure that the specified trees
will be protected during construction. Except as otherwise expressly approved by the agent in a
particular case, such checklist shall conform to specifications contained in the Virginia Erosion and
Sediment Control Handbook, pp III -284 through III -297, and as hereafter amended. This checklist
must be signed, dated, and added to the landscape plan sheet.
Rev1: Comment not fully addressed. The majority of the required tree canopy is provided
through preservation of existing trees along the perimeter of the property. The tree protection
measures for these trees are only shown on the Sheet C3.1, not the landscape plan.
Frequently E &S plans are pulled from the site plan set at the request of Engineering; make
sure Sheet C3.1 remains with the site plan set or add an additional landscape sheet showing
tree protection for all trees remaining on the site. Additionally, the conservation checklist
must be completed, signed and dated.
18. [32.6.20) & 32.7.9.6(b)] The 5% landscaped area required shall be planted with a mixture of shade
trees and shrubs and shall include one (1) large or medium shade tree per ten (10) parking spaces or
portion thereof, if five (5) spaces or more. As noted above, clarify how many total parking spaces are
proposed. Additionally, it appears that one Betula nigra is proposed within a striped paved area;
please revise.
Rev1: Comment not fully addressed. The parking lot tree note indicates that 11.8 (12) trees
are required, and only 10 are provided. However, the Landscape Plan shows many more trees
than 10 are proposed. Revise the note to indicate that at least the minimum required number
is provided. Please also revise the size of the proposed trees to indicate the minimum caliper
instead of height. The minimum requirement for parking lot trees is 1 1/2" — 1 %" caliper.
19. [32.6.20) & 32.7.9.8] The tree canopy requirement for this site is 10 %; please provide information to
verify that this requirement is being met. If existing trees are to be used to satisfy this requirement,
provide the information requested above regarding preserving existing trees in lieu of planting new
plant material. Please also provide the tree canopy information for all proposed plantings.
Rev1: Comment not fully addressed. See comment #17 above. Additionally, use numbers
from the County's "Approved Plant Canopy Calculations" to indicate the canopy provided by
the proposed plantings.
(http: / /www.albemarle.org /upload /images /forms center /departments /Community Developmen
t /forms /appli cation s /Approved Plant Canopy Calculations 02- 05- 03.pdf)
20. [32.6.2(k) & 4.17] Is any outdoor lighting proposed? If so, all lighting (including building mounted
fixtures) must be shown on a lighting plan that includes a photometric plan, luminaire schedule and
cut sheets for each proposed fixture.
Rev1: Comment not fully addressed; a lighting plan has now been added to the application,
see lighting comments below.
21. [Comment] This amendment cannot be approved until VDOT completes their review and grants
their approval; comments will be forwarded upon receipt. Engineering, Fire /Rescue, ACSA,
inspections, and E911 comments have been provided.
Rev1: Comment addressed. This amendment cannot be approved until VDOT, Engineering,
Fire /Rescue, and ACSA complete their review and grant their approval; comments will be
forwarded upon receipt.
22. [32.6.2(k) & 4.17] Show the proposed lighting locations on the layout and landscape sheets to verify
that no site conflicts exist.
23. [32.6.2(k) & 4.17] Lighting spillover exceeds 0.5 footcandle along the Woodburn Road right -of -way,
and possibly along the northern property line in one small area; revise the lighting to reduce the
spillover to 0.5 footcandle or less (4.17.4(b)l ).
24. [32.6.2(k) & 4.17] Albemarle County requires that the LLF (maintenance factor) be 1.0; revise the
photometric plan to use the proper LLF.
25. [32.6.2(k) & 4.17] Provide the following standard lighting note on the lighting plan: Each outdoor
luminaire equipped with a lamp that emits 3, 000 or more initial lumens shall be a full cutoff luminaire
and shall be arranged or shielded to reflect light away from adjoining residential districts and away
from adjacent roads. The spillover of lighting from luminaires onto public roads and property in
residential or rural areas zoning districts shall not exceed one -half footcandle.
Staff has provided references to provisions of Chapter 18 of the Code of the County of Albemarle. The
Code is kept up to date by the County Attorney's office. The Code may found on the County Attorney's
website which may be found under "Departments and Services" at Albemarle.org.
In accord with the provisions of Section 32.4.3.5 of Chapter 18 of the Code if the developer fails to submit
a revised final site plan to address all of the requirements within six (6) months after the date of this letter
the application shall be deemed to have been voluntarily withdrawn by the developer.
If you have any questions about the comments please feel free to contact me.
Sincerely,
&-U 6, 2
Ellie Carter Ray, CLA
Senior Planner
Planning Division
Nu", Nose
Ellie Ray
From: Austin, Nathran. (VDOT) [Nathran.Austin @vdot.virginia.gov]
Sent: Tuesday, March 04, 2014 1:50 PM
To: Ellie Ray
Cc: Joel DeNunzio, P.E.
Subject: SDP-2014-0003 Agnor-Hurt Elementary School
Attachments: SDP-2014-0003 Agnor-Hurt Elementary School Review Comments-3-4-14.pdf
Ellie,
Couple of things about this site...I received some comments in early February from one of our project managers
indicating that there would need to be some minor changes made to Woodburn at the proposed entrance to match the
improvements in shown in the plans for the 29 Bypass project. I didn't include that in my review letter because I don't
really know where we stand with bypass. It appears to be dead based on the Board of Supervisors' action, but who
knows. Secondly,they have issues with the sight distance they have shown. I'm going to verify prior to the SRC, but I
think that the road is unposted, making the speed limit 55 mph. For that speed,they need 610 feet of sight distance and
they are showing 240 to the left and 280 to the right...BIG problem. An option available to them is for them to get the
Board of Supervisors to make a request to Joel for a speed study and ultimately a posted speed limit on Woodburn. Let
me know if you have any questions. If I don't hear from you, I will see you on Thursday.
Troy Austin, P.E.
Area Land Use Engineer
Virginia Department of Transportation
Land Development—South
Culpeper District
P.O. Box 1017
Troy,VA 22974
Phone: (434) 589-5871
Fax: (434)589-3967
1
p`` �i51Y C �q1
COMMONWEALTH H of VIRGINIA
DEPARTMENT OF TRANSPORTATION
1601 Orange Road
Culpeper, Virginia 22701
Charles A. Kilpatrick, P.E.
Commissioner
March 4, 2014
Ms. Ellie Carter Ray
Senior Planner
County of Albemarle
Department of Community Development
401 McIntire Road
Charlottesville, VA 22902
Re: SDP - 2014 -0003 Agnor -Hurt Elementary School
Dear Ms. Ray:
We have reviewed the major site plan amendment for Agnor -Hurt Elementary School dated
1113/14 as submitted by Timmons Group and offer the following comments:
1. The proposed entrance onto Woodburn Road will need to be designed and constructed in
accordance with VDOT commercial entrance standards. The appropriate detail should be
added to the plans and the entrance should be dimensioned accordingly.
2. The sight distance shown on the plans for the proposed entrance onto Woodburn Road
does not meet the minimum sight distance requirements. This entrance cannot be
approved unless it meets the minimum requirements.
If you need additional information concerning this project, please feel free to contact me.
Sincerely,
Troy Austin, P.E.
Area Land Use Engineer
Culpeper District
WE KEEP VIRGINIA MOVING
O
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
March 4, 2014
Craig Kotarski
Timmons Group.
9192 nd Street SE
Charlottesville, VA 22902
RE: SDP201400003 Agnor -Hurt Elementary School — Major Amendment
Dear Sir:
Your Major Amendment application has been reviewed. In order for the amended site plan to be
approved the following revisions are required:
1. [32.5.2(a)] This property is zoned R -6 and, therefore, technically doesn't have parking setbacks;
please remove this information from the "site data ". Additionally, this property has two fronts; one on
Berkmar and one on Woodburn. Because there are two fronts, all of the other property lines are
sides (fronts and backs don't intersect). Please show the setbacks on the layout plan and label them
correctly.
2. [32.5.2(a)] Provide the names of the owners, zoning district, tax map and parcel number, and
present uses of all abutting parcels.
3. [32.5.2(b)] List the number of parking spaces removed and the number proposed. Verify the total
number of spaces provided; "site data" indicates 118, but the landscape plan states 128.
4. [32.5.2(d)] A critical slope waiver was requested to disturb 0.55 acres of man -made slopes in excess
of 25 %. However, a Zoning Text Amendment (ZTA) is currently underway that, if approved, would
designate the slopes on this property as "managed ". The ZTA, as proposed, would allow for the
disturbance of "managed" critical slopes for many permitted uses as long as certain design standards
are met, and would make this waiver unnecessary. The ZTA will be heard by the Board of
Supervisors on Wednesday March 5t ". If the ZTA is not approved, the waiver request will be
processed while revisions to the site plan are underway.
5. [32.5.2(1)] Provide the pavement width for Woodburn Road.
6. [32.5.2(1)] Provide the pavement width for both entrances and their associated accessways.
7. [32.5.2(j,k,l)] Verify that the location(s) of all existing or proposed utilities and utility easements
including water, sewer, drainage, telephone, cable, electric and gas are shown on the plan.
8. [32.5.2(m)] Show the distance to the centerline of the nearest existing street intersection from the
proposed ingress and egress locations.
9. [32.6.2(e)5] Provide a legend showing all symbols and abbreviations used on the plan.
10. [32.6.2(g)] All water and sewer facilities to be dedicated to public use and the easements for those
facilities and shall be identified by a statement that the facilities are to be dedicated to the Albemarle
County Service Authority.
11. [32.6.2(i)] Dimension all travelways.
12. [32.6.2(i)] Show the location of any loading space(s) and provide dimensions.
13. [32.6.2(i)] Provide the location of any signs.
14. [32.6.2(i)] Indicate the type of surfacing for all paved or gravel areas.
15. [32.6.2(i)] Label the angle of any non - perpendicular parking spaces.
16. [32.6.2(i) & 4.12.15 (f)] Each end of the 10 parking space row on the eastern side of the parking lot
should be protected by raised traffic islands instead of painted stripes.
17. [32.6.20) & 32.7.9.4(b)] Existing trees may be preserved in lieu of planting new plant materials in
order to satisfy the landscaping and screening requirements of section 32.7.9 or to meet conditions of
approval, subject to the agent's approval. It appears that some of the Landscape Plan requirements
are proposed to be met with existing vegetation. The landscape plan should show the trees to be
preserved, the limits of clearing, the location and type of protective fencing, grade changes requiring
tree wells or walls, and trenching or tunneling proposed beyond the limits of clearing. In addition, the
applicant shall sign a conservation checklist approved by the agent to insure that the specified trees
will be protected during construction. Except as otherwise expressly approved by the agent in a
particular case, such checklist shall conform to specifications contained in the Virginia Erosion and
Sediment Control Handbook, pp III -284 through III -297, and as hereafter amended. This checklist
must be signed, dated, and added to the landscape plan sheet.
18. [32.6.20) & 32.7.9.6(b)] The 5% landscaped area required shall be planted with a mixture of shade
trees and shrubs and shall include one (1) large or medium shade tree per ten (10) parking spaces or
portion thereof, if five (5) spaces or more. As noted above, clarify how many total parking spaces are
proposed. Additionally, it appears that one Betula nigra is proposed within a striped paved area;
please revise.
19. [32.6.20) & 32.7.9.8] The tree canopy requirement for this site is 10 %; please provide information to
verify that this requirement is being met. If existing trees are to be used to satisfy this requirement,
provide the information requested above regarding preserving existing trees in lieu of planting new
plant material. Please also provide the tree canopy information for all proposed plantings.
20. [32.6.2(k) & 4.17] Is any outdoor lighting proposed? If so, all lighting (including building mounted
fixtures) must be shown on a lighting plan that includes a photometric plan, luminaire schedule and
cut sheets for each proposed fixture.
21. [Comment] This amendment cannot be approved until VDOT completes their review and grants
their approval; comments will be forwarded upon receipt. Engineering, Fire /Rescue, ACSA,
inspections, and E911 comments have been provided.
Staff has provided references to provisions of Chapter 18 of the Code of the County of Albemarle. The
Code is kept up to date by the County Attorney's office. The Code may found on the County Attorney's
website which may be found under "Departments and Services" at Albemarle.org.
In accord with the provisions of Section 32.4.3.5 of Chapter 18 of the Code if the developer fails to submit
a revised final site plan to address all of the requirements within six (6) months after the date of this letter
the application shall be deemed to have been voluntarily withdrawn by the developer.
If you have any questions about the comments please feel free to contact me.
Sincerely,
LL 0. 2b
Ellie Carter Ray, CLA
Senior Planner
Planning Division
Ellie Ray
From: Alex Morrison [amorrison @serviceauthority.org]
Sent: Saturday, March 01, 2014 9:13 AM
To: Ellie Ray
Subject: SDP20140003: Agnor -Hurt Elementary School- Major Amendment (Rio Magesterial District)
Ellie,
The above referenced plan requires ACSA construction review and approval. Please have the applicant submit the
following documents to the ACSA (Attn: Jeremy Lynn, PE) to begin the construction review process:
• 3 copies of the construction plan.
• Water data sheet.
• Existing building fixture counts.
• Proposed additional fixture counts.
Let me know if you have any questions. Thank you.
Alexander J. Morrison, EIT
Civil Engineer
Albemarle County Service Authority
168 Spotnap Road
Charlottesville, Virginia 22911
(0) 434 - 977 -4511 Ext. 116
(F) 434 - 979 -0698
Review Comments
Project Name: Agnor Hurt Elementary School - Major Major Amendment
Date Completed: Monday, February 24, 2014
Reviewer: Max Greene
Department /Division /Agency: Engineering
Reviews
'Curb and gutter should be added to the parking area that drains across the proposed fill over the existing swale on
the North side of the site.
'Sight distance details (C7.0) should be clearly labeled as new entrance onto Woodburn Road.
'VDOT approval is required for new entrance onto Woodburn Road.
Review Status: See Recommendations
Review Comments
Project Name: Agnor Hurt Elementary School - Major Major Amendment
Date Completed: ITuesday, February 18, 2014
Reviewer: Ellie Ray
Department /Division /Agency: Soil && Water Conservation
Reviews
2/14/2014 - Soils Report Received form TJ Soil and Water Conservation District
Review Status: See Recommendations
Review Comments
Project Name: Agnor Hurt Elementary School - Major Major Amendment
Date Completed: Imonday, February 10, 2014
Reviewer: Robbie Gilmer
Department /Division /Agency: Fire Rescue
Reviews
Based on plans dated 1/13/14
1. 20 foot drive lane designed for student drop -off and pick -up needs to have signs "No Parking /Student Drop -off
and Pickup - only"
2. The inside Radii on the drive lane designed for student drop -off and pick -up needs to be no less then 25ft.
3. Bus Parking lot needs to have the area near the building marked as "Fire Lane No Parking"
Review Status: Requested Changes
Review Comments
Project Name: Agnor Hurt Elementary School - Major Major Amendment
Date Completed: IThursday, January 30, 2014
Reviewer: Andrew Slack
Department /Division /Agency: E911
Reviews
Approved
Review Status: Approved
Review Comments
Project Name: Agnor Hurt Elementary School - Major Major Amendment
Date Completed: Tuesday, January 28, 2014
Reviewer: Jay Schlothauer
Department /Division /Agency: Inspections
Reviews
Based on plans dated January 13, 2014.
No comments or conditions.
Review Status: No Objection