HomeMy WebLinkAboutWPO202200009-77060-Full Inspection ReportWRITTEN WARNING Hand delivered COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 (434)296-5832 Project: WP0202200009 MOUNTAIN VIEW ELEMENTARY SCHOOL -VSMP - DIGITAL Operator/Contractor: Loughridge & Company, LLC COUNTY OF ALBEMARLE SCHOOL BOARD Issued Date:1/24/2023 This is your Written Warning in accordance with § 17-900 of the Water Protection Ordinance of Albemarle County and Section 62.1-44.15:37 of the Virginia Stormwater Management Act. This Written Warning is being issued because of the following deficiencies: Deficiency: swppp must identify the qualified person(s) performing inspections, and their qualifications. Corrective Action: Identify qualified person and qualifications. Deficiency: The swppp must contain an "approved" plan that has a county approval stamp. Corrective Action: the plan in the swppp must have an approval stamp. Deficiency: swppp contains an appropriate pollution prevention plan, but it is not being followed. Please comply with the pollution prevention plan so that field conditions match the plan. Corrective Action: follow the pollution prevention plan, or amend the plan. Deficiency: Swppp must be amended whenever field conditions deviate from the approved plan. The amendment process was reviewed during the pre -construction meeting, and again on site during this inspection with Wesley Teter and Alejandro Ovalle. Corrective Action: Follow e&sc plan, or amend it. Deficiency: the last inspection documented in the swppp is dated 1-13-23. Corrective Action: perform and document inspections at required frequency. Deficiency: stockpile(s) behind school in the staging area are not shown on plan. The E&SC plan must be amended to show the piles, and piles are to be stabilized if they ever remain dormant for more than 14 days. Corrective Action: follow the e&sc plan, or amend it. Deficiency: Numerous E&SC measures shown in Ph 1 of the plan are not installed. If these controls are not needed in "Ph I", amend the swppp to indicate when they will be installed. Corrective Action: install "all" a&sc measures shown on the approved plan, or amend it. Deficiency: a diversion along the south side of the sediment basin has not been installed pursuant to the approved plan. Corrective Action: install alle&sc measures shown on plan. Deficiency: copy of coverage letter must be posted near entrance. Corrective Action: post copy of coverage letter near entrance. Deficiency: pollution prevention measures on plan have either not been installed, or are in locations different from pollution prevention plan. Corrective Action: follow the pollution prevention plan. Deficiency: spill kit not visible. Corrective Action: site needs spill kit with visible sign. Deficiency: concrete washout not in place. Corrective Action: install all pollution prevention measures, or amend the plan. Deficiency: dumpster not visible on site. Corrective Action: same as above. Unless subsequently amended in writing by this office, it is expected all corrective measures will be completed by Failure to comply by the required date may subject the owner to penalties and remedies as listed under § 17-900 et -al of the Water Protection Ordinance of the Albemarle County Code. Should you have a legitimate reason you cannot complete your required corrections by the above given date, you must immediately contact your erosion control inspector. Unless you have contacted the inspector and agreed to alternative arrangements, all compliance work is expected to be completed by the above date. County Inspector Name: Dan Ratzlaff County Inspector Phone Number: (434) 296-5832 COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 VSMP/VESCP PERMIT SITE INSPECTION REPORT Project Name: MOUNTAIN VIEW ELEMENTARY Project/WPO Number: WP0202200009 SCHOOL -VSMP - DIGITAL Project Address: DEQ Permit Number (if VAR1 OR891 applicable): Project Operator: Loughridge & Company, LLC Operator Telephone #: (804) 237-1301 Project Contact: COUNTY OF ALBEMARLE SCHOOL Contact Telephone #: BOARD Contact E-Mail: gharris@kl2albemarle.org Qualified Personnel (QP): Aleandro Ovalle Moya Inspector: Dan Ratzlaff Qualified Personnel (QP) Email: Disturbed Acreage: Weather (Wet/Dry/Rain): Single -Family: Inspection Date & Time: 1/24/2023 12:00:00 PM Stage of Construction: Clearing Other Email: wtester@loughridgeconstruction.co m Re -Inspection: No Other Email: Bond Inspection: No Other Email: COVERAGE & POSTING REQUIREMENTS Compliant? Reviewed during re -inspection? Yes Comments/Description Construction site has permit coverage? (Va. Code §62.1- 44.15:34.A) Yes 1 (9VAC25-870-310)(Alb. Co. Code §17-300, 17-302) A copy of the notice of coverage letter is posted conspicuously near the No copy of coverage letter must be posted near entrance. 2 main entrance of the construction activity? (CGP Part II.C) Notice of the location of the SWPPP is posted near the site's entrance, if Yes 3 applicable, and information for public access is provided? (9VAC25-870- 54.G)(CGP Part II D.2 & 3) SWPPP AVAILABILITY AND CONTENTS Compliant? Reviewed during re -inspection? Yes Comments/Description 4 The SWPPP is on -site or made available during the inspection? (CGP Yes Part II D.1 & 2)(9VAC25-870-54.G) The SWPPP contains a signed copy of the registration statement? Yes 5 (CGP Part II A.1.a) 6 The SWPPP includes, upon receipt, a copy of the notice of coverage Yes letter and the CGP? (CGP Part II A.1.b & c) The SWPPP includes a narrative description of the nature of the Yes 7 construction activity, including the function of the project? (CGP Part II A.1.d) Page 1 of 6 The SWPPP includes a legible site plan identifying all appropriate Yes 8 measures and that includes the locations of support activities and the onsite rain gauge, when applicable? (CGP Part II A.1.e(1-7)) 9 The SWPPP contains the name, phone number and qualifications of No "Qualified Personnel" conducting inspections? (CGP Part II A.6) 10 The SWPPP contains an approved erosion and sediment control plan? No (9VAC25-870-54.B)(CGP Part II.A.2) The SWPPP contains an approved stormwater management plan or an 11 existing construction site has a stormwater management plan that Yes ensures compliance with the water quality and quantity requirements? (9VAC25-870-54.C)(CGP Part II.A.3) Technical Criteria 11.113 ❑ ILC ❑ 12 The SWPPP contains an adequate pollution prevention plan? (9VAC25- No 870-54.D)(CGP Part II.A.4) The SWPPP identifies impaired water(s), approved TMDL, pollutant(s) of Yes 13 concern, exceptional waters and the additional controls measures applicable? (9VAC 25-870-54.E)(CGP Part IIA.5 (a-b)) 14 Delegation of Authority is provided and signed in accordance with Part III Yes K? (CGP Part II A.7) 15 The SWPPP is signed and dated in accordance with Part III K? (CGP Part Yes II A.8) SWPPP AMENDMENTS, MODIFICATIONS AND UPDATES Compliant? Reviewed during inspection? Yes Comments/Description Is the SWPPP being amended whenever there is a change in the design, 16 construction, operation, or maintenance that has a significant effect on the No discharge of pollutants to surface waters? (CGP Part 11 B(1))(9VAC25-870- 54.G) Has the SWPPP been amended if inspections or investigations by the 17 operator's qualified personnel, or by local, state or federal officials find that No existing control measures are ineffective in minimizing pollutants in discharges? (CGP Part II B(2))(9VAC25-870-54.G) 18 Contractor(s) that will implement and maintain each control measure are No identified? (CGP Part II B(3))(9VAC25-870-54.G) Have there been updates to the SWPPP when any modifications to its implementation have occurred, including a record of dates when major No 19 grading activities occur, construction activities temporarily or permanently cease on a portion of the site or stabilization measures are initiated? (CGP Part II B.4(a))(9VAC25-870-54.G) 20 Is there documentation in the SWPPP of replaced or modified controls? No (CGP Part II B.4(b))(9VAC25-870-54.G) 21 Is the SWPPP updated to indicate areas that have reached final N/A stabilization? (CGP Part II B.4(c))(9VAC25-870-54.G) Is the SWPPP updated to indicate properties that are no longer under the 22 legal control of the operator and the dates on which the operator no longer N/A had legal control over each property? (CGP Part II B.4(d))(9VAC25-870- 54.G) Does the SWPPP identify the date of any prohibited discharges, the 23 volume released, actions taken to minimize the impact of the release and N/A measures taken to prevent the recurrence of any prohibited discharge? (CGP Part II B.4(e-f)) (9VAC25-870-54.G) 24 Amendments, modifications, or updates to the SWPPP are signed in No accordance with Part III K? (CGP Part 11 B(5))(9VAC25-870-54.G) INSPECTIONS AND CORRECTIVE ACTIONS Compliant? Reviewed during inspection? Yes Comments/Description Inspections required by the SWPPP are conducted at the required 25 frequency, including a modified frequency for impaired water(s), approved No TMDL(s), and exceptional waters when applicable? (CGP Part II F (2)) (CGP Part II A.5.b.3) Page 2 of 6 26 Inspection reports are completed and signed in accordance with CGP Yes Part II F (3-4)? (CGP Part II F (3-4)) 27 Corrective actions are taken consistent with the requirements of the Yes CGP? (CGP Part II G(1-2)) ESC AND SWM PLAN IMPLEMENTATION Compliant? Reviewed during inspection? Yes Comments/Description 28 Have stream buffers and steep slopes been protected as shown on the N/A plan? Sequencing of the project is implemented in accordance with the Yes 29 approved erosion and sediment control plan and stormwater management plans? (9VAC25-870-54.B and C) Have all denuded areas requiring temporary or permanent stabilization been stabilized, and have stabilization requirements for impaired waters, 30 approved TMDL(s), pollutants of concern and exceptional waters, when Yes applicable, been met? (9VAC 25-840-40.1) (9VAC25-870-54.B) (9VAC25- 880-60) (CGP Part I F.1(a)) (CGP Part II A.5.b(1)) (CGP Part II A.2.c (8)) (CGP II E(1-2)) stockpile(s) behind school in the staging area are not Are soil stockpiles adequately stabilized with seeding and/or protected NO shown on plan. The E&SC plan must be amended to 31 with sediment trapping measures? (9VAC 25-840-40.2) (CGP Part II show the piles, and piles are to be stabilized if they A.2(c)) (9VAC25-870-54.B) ever remain dormant for more than 14 days. A permanent vegetative cover has been established that is uniform, N/A 32 mature enough to survive and will inhibit erosion? (9VAC 25-840-40.3) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B) Numerous E&SC measures shown in Ph 1 of the plan Have sediment trapping facilities been constructed as the first step in land NO are not installed. If these controls are not needed in 33 disturbance activities? (9VAC 25-840-40.4) (CGP Part II A.2(c)) (CGP 11 "Ph 1 ", amend the swppp to indicate when they will be E(1-2)) (9VAC25-870-54.B) installed. Have earthen structures been stabilized immediately after installation? a diversion along the south side of the sediment basin 34 (9VAC 25-840-40.5) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870- No has not been installed pursuant to the approved plan. 54.13) Are sediment traps and basins installed in accordance with MS-6 and the Yes 35 approved plan? (9VAC 25-840-40.6) (CGP Part II A.2.c (9)) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B) Are finished cut and fill slopes adequately stabilized to prevent or correct N/A 36 excessive erosion? (9VAC 25-840-40.7) (CGP Part II A.2(c)) (CGP II E(1- 2)) (9VAC25-870-54.B) Is concentrated runoff down cut or fill slopes contained in an adequate N/A 37 permanent or temporary structure? (9VAC 25-840-40.8) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B) Is adequate drainage or other protection provided for water seeps? N/A 38 (9VAC 25-840-40.9) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870- 54.13) Do all operational storm sewer inlets have adequate inlet protection? install E&SC measures pursuant to the approved plan. 39 (9VAC 25-840-40.10) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870- No 54.13) Are stormwater conveyance channels adequately stabilized with channel N/A 40 lining and/or outlet protection? (9VAC 25-840-40.11) (CGP Part 11 A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B) Is in -stream construction conducted using measures to minimize channel N/A 41 damage? (9VAC 25-840-40.12) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54. B ) Are temporary stream crossings of non -erodible material installed where N/A 42 applicable? (9VAC 25-840-40.13) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54. B ) 43 Is necessary restabilization of in -stream construction complete? (9VAC N/A 25-840-40.15) (CGP II E(1-2)) (9VAC25-870-54.B) Are utility trench operations conducted and stabilized in accordance with N/A 44 MS-16? (9VAC 25-840-40.16) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54. B ) Page 3 of 6 Are soil and mud kept off paved or public roads to minimize the transport Yes 45 of sediment? (9VAC 25-840-40.17) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54. B ) Have all temporary control structures that are no longer needed been 46 removed and disturbed soil resulting from their removal permanently N/A stabilized? (9VAC 25-840-40.18) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54. B ) Are properties and waterways downstream from development adequately 47 protected from erosion, sediment and damage in accordance with the Yes standards and criteria specified by 9VAC25-840.19(a-n)? (9VAC 25-840- 40.19(a-n)) 48 Permanent control measures included in the SWPPP are in place? N/A (9VAC25-870-54.C) (9VAC25-880-60) (CGP Part II F.1(a)) POLLUTION PREVENTION PLAN IMPLEMENTATION Compliant? Reviewed during inspection? Yes Comments/Description Practices are in place to prevent and respond to leaks, spills, and other pollution prevention measures on plan have either not releases including (i) procedures for expeditiously stopping, containing, been installed, or are in locations different from 49 and cleaning up spills, leaks, and other releases; and (ii) procedures for No pollution prevention plan. reporting leaks, spills, and other releases in accordance with Part III G? (CGP Part II A.4.e(1))(9VAC25-870-56) Practices are in place to prevent the discharge of spilled and leaked fuels No spill kit not visible. 50 and chemicals from vehicle fueling and maintenance activities? (CGP Part II A.4.e(2))(9VAC25-870-56) Practices are in place to prevent the discharge of soaps, solvents, 51 detergents, and wash water from construction materials, including the N/A clean-up of stucco, paint, form release oils, and curing compounds? (CGP Part II A.4.e(3))(9VAC25-870-56) Practices are in place to minimize the discharge of pollutants from vehicle N/A 52 and equipment washing, wheel wash water, and other types of washing? (CGP Part II A.4.e(4))(9VAC25-870-56) 53 Concrete wash water is directed into a leak -proof container or leak -proof No concrete washout not in place. settling basin? (CGP Part II A.4.e(5))(9VAC25-870-56) Practices are in place to minimize the discharge of pollutants from No dumpster not visible on site. 54 storage, handling, and disposal of construction products, materials, and wastes? (CGP Part II A.4.e(6))(9VAC25-870-56) Practices are in place to prevent the discharge of fuels, oils, and other N/A 55 petroleum products, hazardous or toxic wastes, and sanitary wastes? (CGP Part II A.4.e(7)(9VAC25-870-56) Practices are in place to minimize any other discharge from the potential N/A 56 pollutant -generating activities not addressed above, when applicable? (CGP Part II A.4.e(8))(9VAC25-870-56) Page 4 of 6 Notes: CONSTRUCTION GENERAL PERMIT SITE INSPECTION REPORT REQUEST FOR CORRECTIVE ACTION Project Name: Permit Number (if applicable): Date: Regulatory Occurrence Observation/Recommended Corrective Action Checklist # Citation/Legal requirement' Observation: Recommended Corrective Action: Observation: Recommended Corrective Action: Observation: Recommended Corrective Action: Observation: Recommended Corrective Action: Observation: 1 Refers to applicable regulation found in the most recent publication of the State Water Control Law (Va. Code § 62.1-44.2 et seq.), Virginia Erosion and Sediment Control Regulations (9VAC25-840), the Virginia Stormwater Management Program (VSMP) Regulations (9VAC25-870), or the General Permit for Discharges of Stormwater from Construction Activities (9VAC25-880). Page 5 of 6 Recommended Corrective Action: Corrective Action Deadline: Re -Inspection Date: Comments: The recommended corrective action deadline date applies to all conditions noted on this report unless otherwise noted. If listed conditions) currently constitute non-compliance and/or corrective actions are not completed by the deadline, other enforcement actions may be issued to the entity responsible for ensuring compliance on the above project. Page 6 of 6 Construction General Permit Site Inspection Report Request for Correction Action Check Regulatory Citation/Legal Occur. Observation Recommended Corrective List # Requirement* Action 9 (CGP Part II A.6) swppp must identify the Identify qualified person and qualified person(s) performing qualifications. inspections, and their qualifications. 10 (9VAC25-870-54.B)(CGP The swppp must contain an the plan in the swppp must Part II.A.2) "approved" plan that has a have an approval stamp. county approval stamp. 12 (9VAC25-870-54.D) swppp contains an follow the pollution prevention (CGP Part II.A.4) appropriate pollution plan, or amend the plan. prevention plan, but it is not being followed. Please comply with the pollution prevention plan so that field conditions match the plan. 16 (CGP Part II B(1)) Swppp must be amended Follow e&sc plan, or amend it. (9VAC25-870-54.G) whenever field conditions deviate from the approved plan. The amendment process was reviewed during the pre -construction meeting, and again on site during this inspection with Wesley Teter and Alejandro Ovalle. 25 (CGP Part II F (2)) (CGP the last inspection perform and document Part II A.5.b.3) documented in the swppp is inspections at required dated 1-13-23. frequency. 31 (9VAC 25-840-40.2) stockpile(s) behind school in follow the a&sc plan, or (CGP Part II A.2(c)) the staging area are not amend it. (9VAC25-870-54.B) shown on plan. The E&SC plan must be amended to show the piles, and piles are to be stabilized if they ever remain dormant for more than 14 days. 33 (9VAC 25-840-40.4) Numerous E&SC measures install "all" a&sc measures (CGP Part II A.2(c)) shown in Ph 1 of the plan are shown on the approved plan, (CGP II E(1-2)) not installed. If these controls or amend it. (9VAC25-870-54.B) are not needed in "Ph 1", amend the swppp to indicate when they will be installed. 34 (9VAC 25-840-40.5) a diversion along the south install alle&sc measures (CGP Part II A.2(c)) side of the sediment basin shown on plan. (CGP II E(1-2)) has not been installed (9VAC25-870-54.B) pursuant to the approved plan. 2 (CGP Part II.C) copy of coverage letter must post copy of coverage letter be posted near entrance. near entrance. 49 (CGP Part II A.4.e(1)) pollution prevention measures follow the pollution prevention (9VAC25-870-56) on plan have either not been plan. installed, or are in locations different from pollution prevention plan. 50 (CGP Part II A.4.e(2)) spill kit not visible. site needs spill kit with visible (9VAC25-870-56) sign. 53 (CGP Part II A.4.e(5)) concrete washout not in install all pollution prevention (9VAC25-870-56) place. measures, or amend the plan. 54 (CGP Part II A.4.e(6)) dumpster not visible on site. same as above. (9VAC25-870-56) Recommended 1/31/2023 Corrective Action Deadline: Targeted Re- 1/31/2023 Inspection Date: Comments: *Refers to applicable regulation found in the most recent publication of the State Water Control Law (Va. Code § 62.1-44.2 et seq.), Virginia Erosion and Sediment Control Regulations (9VAC25-840), the Virginia Stormwater Management Program (VSMP) Regulations (9VAC25-870), or the General Permit for Discharges of Stormwater from Construction Activities (9VAC25-880). Construction General Permit Site Inspection Photo Log Photos for Item 2 Photo Description: General permit coverage letter must be posted near entrance and visible to the public. Photos for Item 4 Photo Description: Photos for Item 9 ............................................. Photo Description: please provide names and qualifications of qualified persons. ................... Photos for Item 10 ................................................................................................................................................................................... ....................................................................... Photo Description: Photos for Item 31 Photo Description: two stockpiles exist on east side of school that are not shown on the plan. Amend plan to include these or remove piles. Photos for Item 34 Photo Description: Diversion adjacent to sediment basin is not installed. Photos for Item 39 Photo Description: Inlet protection must be installed. Photo Description: same as above. Other Photos Photo Description: COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 434 296-5832 Inspection Date: 1/26/2023 County Inspector