Loading...
HomeMy WebLinkAboutSDP198800031 Assessment - Environmental Final Site Plan and Comps. 1988-04-20 ......„ Ai APR 20 1988 PLANNING DIVISION 401 McIntire Road Charlottesville , VA 22901 April 13 , 1988 TO: Amelia Patterson, John Pullen, and Bill Fritz - Planners FROM: J. Gordon Yager , District Conservationist RE: Site Plan CONTACT PERSON: AMELIA PATTERSON SP-88-23 Spring Hill Land Trust (Spring Hill Subdivision Amendment) - Soils in this area consist of Ashe Loam, Chester Loam, Chewacla Silt Loam, Cullen Clay Loam, Hayesville Loam and Toccoa Sandy Loam. The majority of the soils in this area consist of Chester , Cullen and Hayesville . These are deep and well drained soils . The dominate soil on the steeper slopes will be Ashe Loam. This is a very shallow soil with hard rock of 20 inches . Along the stream will be Chewacla and Toccoa. These are deep soils , however, they are wet and subject to flooding. .. Texaco Service Center , Minit Lube and Car Wash Preliminary Site Plan - No comment. Wray Brothers Construction Company Final Site Plan - Soils in this area consist of Rabun Clay Loam and Davidson Clay Loam. These are moderately deep to deep soils . Very hard rock may be found at 40-60 inches . CONTACT PERSON: BILL FRITZ J. W. Seig and Company, Inc. Home Facility Preliminary Site Plan - Soils in this area consist of Hayesville Loam and Cullen Loam. These are deep and well drained soils . Watts Station Preliminary Subdivision Plat - Soils in this area consist of Glenelg Loam and Elioak Loam. These are deep and well drained, however , they are very erosive. There also may be some very shallow soils on the steeper slopes .