HomeMy WebLinkAboutWPO201400035 Review Comments 2014-04-18Review Comments
Project Name: 5th Street Station (Early Grading) Erosion and Sediment Control Plan
Date Completed: Friday, June 13, 2014
Reviewer: Max Greene
Department /Division /Agency: Engineering
Reviews
Spoke with Daniel Hines to have traps #2 & #4 ghosted in on pages 6F & 6G with a note that the traps can not be
removed until the WPO Inspector has approved in writing.
Asked for Super Silt Fence be made continuous on page 6C.
Review Status: See Recommendations
'�
etzzi /A_ //ec
W.
Review Comments
Project Name: 5th Street Station (Early Grading) Erosion and Sediment Control Plan
Date Completed: 1wednesday, May 14, 2014
Reviewer: Max Greene
Department /Division /Agency: Engineering
Reviews
Met with designer, owner's rep. and contractor to discuss the changes to the proposed plan for approval. Plans
were red -lined for corrections.
Review Status: Requested Changes