Loading...
HomeMy WebLinkAboutWPO201400035 Review Comments 2014-04-18Review Comments Project Name: 5th Street Station (Early Grading) Erosion and Sediment Control Plan Date Completed: Friday, June 13, 2014 Reviewer: Max Greene Department /Division /Agency: Engineering Reviews Spoke with Daniel Hines to have traps #2 & #4 ghosted in on pages 6F & 6G with a note that the traps can not be removed until the WPO Inspector has approved in writing. Asked for Super Silt Fence be made continuous on page 6C. Review Status: See Recommendations '� etzzi /A_ //ec W. Review Comments Project Name: 5th Street Station (Early Grading) Erosion and Sediment Control Plan Date Completed: 1wednesday, May 14, 2014 Reviewer: Max Greene Department /Division /Agency: Engineering Reviews Met with designer, owner's rep. and contractor to discuss the changes to the proposed plan for approval. Plans were red -lined for corrections. Review Status: Requested Changes