HomeMy WebLinkAboutWPO201900039 Calculations 2022-01-134bKteverde
1/13/20"
Seth Roderick, PE
Monteverde Engineering & Design Studio
250 E Elizabeth St, Suite 114
Harrisonburg, VA 22801
Albemarle County Community Development Department
Attn: John Anderson
401 McIntire Road
North Wing
Charlottesville, VA 22902
RE: Hillcrest Vineyard Tasting & Venue WPO 2019-00039 — AS-BUILTS
Mr. Anderson,
This letter and accompanying calculations are being in order to properly certify that
discrepancies found between the referenced as -built survey and the original design file are
satisfactory in relation to the functionality of associated stormwater management practices.
Discrepancies noted and comparative testing results are described as follows:
A. POND 1 (top of hill, POA A)
Pond 1 was found to be graded bigger than originally prescribed on the plans, with a
drainage area that included more impervious area than assumed in the original design, but
less acreage overall. Portions of the original DA for Pond 1 were determined to drain
instead towards Pond 2 / POA B, with another portion draining offsite as uncontrolled sheet
flow to neither pond (retains overland sheet flow characteristics until landing at bottom of
hill in existing farm pond). To account for these discrepancies, the additional area draining
to POA B was added to the Pond 2 analysis (described below), while the POA A drainage
was broken into uncontrolled and controlled subgroups.
The 0.29 acres draining uncontrolled was determined to have a CN of 80 and a TC of 6 min.
As stormwater travel distance is minimal and evenly spread across the perimeter of the area,
it can be viewed as sheet flow. As such, no further efforts are needed in examination of
channel protection requirements, while the area's hydrograph will be added to the analysis
for total area's 10-Yr flood protection analysis. Note that due to differing times of
Hillcrest Vineyard Tasting & Venue WPO 2019-00039 — AS-BUILTS
January 13, 2022
concentration, the vast majority of the uncontrolled floes peak will have come and gone
well before the pond's peak, so the uncontrolled aspect has little impact on total conditions.
The remaining area draining to Pond 1, originally analyzed at 5.75 acres, was found to
include 5.21 acres with a CN of 87 and a TC of 25.1 min. As the primary orifice to Pond 1
was drilled as directed after further analysis (6" orifice added at elevation 1072.2), and the
riser top was cut to an elevation just above the 10-yr max elevation, the pond was found to
handle the contributing drainage exceedingly well.
Post -development runoff rates and pond analysis for as -built conditions are summarized
below, while supporting calculations / hyrdrographs are attached.
10-Yr Pre -Development: 4.39 CFS
10-Yr Post -Development, Uncontrolled 1.70 CFS
10-Yr Post -Development, Pond (Actual) 2.38 CFS
10-Yr Post -Development, Total Combined 3.06 CFS
100-yr Elev = 1078.70
Top of Embankment = 1081.00 (2.30' of freeboard)
B. LEVEL SPREADER
The level spreader was found to be constructed at an approximate length of 69 LF, which is
in excess of the originally prescribed 56 LF. As the extra length will provide a greater area to
distribute the contributing storm event, which is now reduced with the 6" orifice, this
discrepancy is deemed beneficial to the downstream conditions. No further analysis is
required.
C. POND 2 (bottom of hill, POA B)
Similarly to Pond 1, Pond 2 was found to be constructed larger than prescribed on the plans,
but also with a slightly larger contributing watershed (including some area originally
designed for Pond 1, with other assumed to drain offsite to the north; 0.64 ac total increase in
area toward Pond 2). Through analysis of the pond, it was found that the allowable
discharge rate per energy balance dropped slightly due to an increase in post -development
RV associated with the larger drainage area, but the additional volume in the pond slows the
analyzed release rate sufficiently to meet requirements. No further modifications to the
outlet riser or orifices are deemed necessary.
odowlh,
Page 2 of 3
FhHcrest Vineyard Tasting & Venue WPO 2019-00039 - AS-BUILTS
January 13, 2022
It was also noticed that the emergency spillway may not be properly functional, due to a low
point existing elsewhere on the embankment. As more than 2.0' of freeboard was calculated
to exist during the 100-yr event, however, this design still meets minimum standards for
such facilities (i.e., no emergency outlet is required). It is recommended, but not required,
that the embankment be modified to properly direct overflow directly to the spillway (note
that the Owner has agreed to remedy this, but no further as -built verification is deeined necessary due
to minimum standards already having been met).
Post -development runoff rates and pond analysis for as -built conditions are summarized
below, while supporting calculations / hyrdrographs are attached.
Qa = 0.8 (Q-pre.site x RV-pre.site)/ RV-post.site + Offsite bypass
Qa = 0.8 (0.515 x 4046) / 10,873 + (3.858 cfs)
Qa = 4.01 cfs
1-Yr Allowable, Pond 4.01 CFS
1-Yr Post -Development, Pond 3.79 CFS
10-Yr Pre -Development 32.01 CFS
10-Yr Post -Development, Pond 28.59 CFS
100-Yr Elev = 1002.13
Top of Embankment = 1004.30 (2.27' of freeboard)
In sum, while the facilities were not constructed to the original spec, they were analyzed to be
more than sufficient to accommodate the anticipated storm events as required by code. I am
comfortable certifying such with my seal, as stamped below, given the survey data presented.
Any questions to this matter, please feel free to let me know.
Si acerely,
Seth Roderick, PE
Managing Partner
Monteverde Engineering & Design Studio
�fr
v SETH . R DERICK 9
� Lic. o. 041454W
0;e� Jan 13, 2022 $�
�Ss'ONAL ECG~
Page 3 of 3
Pond Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020
Thursday, 01 / 13 / 2022
Pond No. 1 - Detention Basin (As -Built)
Pond Data
Contour; -User-defined contour areas. Conic method used for volume
calculation. Begining
Elevation = 1071.00 ft
Stage / Storage Table
Stage (ft) Elevation (ft) Contour area (sgft)
Incr. Storage (cult)
Total storage (cult)
0.00 1071.00 200
0
0
1.00 1072.00 4,204
1,773
1,773
2.00 1073.00 5,540
4,856
6,630
3.00 1074.00 6,226
5,879
12,509
4.00 1075.00 6,942
6,580
19,089
5.00 1076.00 7,710
7,322
26,411
6.00 1077.00 8,432
8,068
34,478
7.00 1078.00 9,179
8,802
43,280
8.00 1079.00 9,950
9,561
52,841
9.00 1080.00 10,765
10,354
63,195
10.00 11,607
11,182
74,377
Culvert / Orifice Structures Weir Structures
[A] [B] [C] [PrfRsr] [A] [B] [C] [D]
Rise (in)
= 18.00
2.00
6.00
0.00
Crest Len (ft)
= 9.42
Inactive
29.00
0.00
Span (in)
= 18.00
2.00
6.00
0.00
Crest El. (ft)
= 1077.70
0.00
0.00
No. Barrels
= 1
1
1
0
Weir Coeff.
= 2.60
3.33
3.33
3.33
Invert El. (ft)
= 1068.90
1071.00
4.072.20
0.00
Weir Type
= 1
Rect
Broad
-
Length (ft)
= 75.00
0.00
0.00
0.00
Multi -Stage
= Yes
Yes
No
No
Slope (%)
= 3.00
0.00
0.00
n/a
N-Value
= .012
.012
.013
n/a
Orifice Coeff.
= 0.60
0.60
0.60
0.60
Exfil.(in/hr)
= 0.000 (by
Contour)
Multi -Stage
= n/a
Yes
Yes
No
TW Elev. (ft)
= 0.00
Stage (ft)
10.00
8.00
6.00
4.00
2.00
000
Note:Culvert/Orifice outflows are analyzed under lnlet(Ic) and oudet(oc) wnirol. Weir users checked for orifice oonditions(ic) and submergence(a).
Stage / Discharge
Elev (ft)
1081.00
1079.00
1077.00
1075.00
1073.00
107100
0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 160.0
• Total 0 Discharge (cfs)
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 313® by Autodesk, Inc. v2020
Hyd. No. 7
Rc: -t Dev DA to Det Basin -"'I (As -Built)
Hydrograph type
= SCS Runoff
Storm frequency
= 10 yrs
Time interval
= 1 min
Drainage area
= 5.210 ac
Basin Slope
= 0.0 %
Tc method
= TR55
Total precip.
= 5.38 in
Storm duration
= 24 hrs
Composite (Area/CN) = [(3.630 x 98) + (1.580 x 61)1 / 5.210
Q (Cfs)
21.00
18.00
15.00
12.00
MR!
MM
3.00
M
Thursday, 01/13/2022
Peak discharge
= 20.52 cfs
Time to peak
= 12.13 hrs
Hyd. volume
= 74,258 cuft
Curve number
= ;W'
Hydraulic length
= 991 ft
Time of conc. (Tc)
= 25.1? i" 1in
Distribution
= Type 11
Shape factor
= 484
Post Dev DA to Det Basin #1
Hyd. No. 7 -- 10 Year
Q (cfs)
21.00
U,
15.00
12.00
o f,
3.00
tnn
u [ 4 6 8 10 12 14 16 18 20 22 24 26
Hyd No. 7 Time (hrs)
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020
Thursday, 01 f 13 12022
Hyd. No. 8
Pet Basin #1 Routed (As -Built)
Hydrograph type = Reservoir
Peak discharge
= 2.378 cis
Storm frequency = 10 yrs
Time to peak
= 12.83 hrs
Time interval = 1 min
Hyd. volume
= 74,246 cuft
Inflow hyd. No. = 7 - Post Dev DA to Det Basin Max. Elevation
= 1077.45 ft
Reservoir name = Detention Basin
Max. Storage
= 38,397 cuft
Storage Indication method used.
Det Basin #1 Routed
Q (cfs) Hyd. No. 8 -- 10 Year Q (cfs)
21.00 21.00
18.00 18.00
15.00 15.00
12.00 12.00
9.00 9.00
6.00 6.00
3.00 3.00
0.00 - 0.00
0 4 8 12 16 20 24 28 32 36
Time (hrs)
Hyd No. 8 — Hyd No. 7 Total storage used = 38,397 cult
Hydrograph Report
HydraBow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020
Hyd. No. 15
A5-Built Uncontrnlied
Hydrograph type
= SCS Runoff
Peak discharge
Storm frequency
= 10 yrs
Time to peak
Time interval
= 1 min
Hyd. volume
Drainage area
= 0.290 ac
Curve number
Basin Slope
= 0.0 %
Hydraulic length
Tc method
= User
Time of conc. (Tc)
Total precip.
= 5.38 in
Distribution
Storm duration
= 24 hrs
Shape factor
Composite (Area/CN) = ((0.150 x 98) + (0.140 x 61)] / 0.290
1.00
Thursday, 01 / 1312022
_ 1.702 cfs
= 11.95 hrs
= 3,503 cuft
= 80'
= 0 ft
= 6.00 min
= Type II
= 484
As -Built Uncontrolled
Hyd. No. 15 -- 10 Year
2 4 6 8 10 12 14 16 18 20 22
Hyd No. 15
Q (cfs)
2.00
1.00
0.00
24
Time (hrs)
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020
Hyd. No. 17
Uncontrolled + Pond 1
Hydrograph type
= Combine
Storm frequency
= ,IO—ga
Time interval
= 1 min
Inflow hyds.
= 8, 15
Thursday, 01/13/2022
Peak discharge
= 3.062 cfs
Time to peak
= 11.97 hrs
Hyd. volume
= 77,750 cult
Contrib. drain. area
= 0.290 ac
Uncontrolled + Pond 1
Q (Cfs) Hyd. No. 17 -- 10 Year Q (Cfs)
4.00 4.00
3.00 3.00
2.00 2.00
1.00 1.00
1
0.00 0.00
0 4 8 12 16 20 24 28 32 36
Time (hrs)
— Hyd No. 17 —Hyd No. 8 —Hyd No. 15
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020
Hyd. No. 8
Det Basin #1 Routed
Hydrograph type
= Reservoir
Peak discharge
Storm frequency
= .100 yrs
Time to peak
Time interval
= 1 min
Hyd. volume
Inflow hyd. No.
= 7 - Post Dev DA to Det Basin
Wax. Elevation
Reservoir name
= Detention Basin
Max. Storage
Storage Indication method used.
Q (cfs)
40.00
30.00
20.00
10.00
Det Basin #1 Routed
Hyd. No. 8 -- 100 Year
Thursday, 01 / 13 / 2022
= 24.45 cis
= 12.30 hrs
= 134,696 cuft
= E1078.70 ft
= 49,969 cuft
0.00 '
0 3 6 9 12 15 18 21 24
— Hyd No. 8 — Hyd No. 7 Total storage used = 49,969 cuft
Q (cfs)
40.00
30.00
20.00
10.00
0.00
27
Time (hrs)
Pond Report
a
Hydrallow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020
Friday, 12 13
/ 2021
Pond No. 5 - (Pond 2..s As.buNt
Pond Data
Contours -User-defined contour areas. Conic method
used for volume calculation. Begining Elevation = 990.00 ft
Stage / Storage Table
Stage (it) Elevation (ft)
Contour area (sqft)
Incr. Storage (tuft)
Total storage (cult)
0.00 990.00
25
0
0
1.00 991.00
86
52
52
2.00 992.00
310
186
239
3.00 993.00
1,526
841
1,080
4.00 994.00
3,711
2,539
3,619
5.00 995.00
5,671
4,656
8,275
6.00 996.00
7,550
6,587
14,862
7.00 997.00
9,349
8,433
23,295
8.00 998.00
11,230
10,274
33,569
9.00 999.00
12,990
12,098
45,667
10.00 1000.00
14,760
13,864
59,531
11.00 1001.00
16,628
15,683
75,214
12.00 1002.00
18,676
17,640
92,855
13.00 1003.00
20,918
19,784
112,639
14.00 1004.00
23,304
22,098
134,737
Culvert I Orifice Structures
Weir Structures
[A]
[B] [C]
[PrfRsr]
[A] [B]
[C] [D]
Rise (in) = 24.00
0.00
0.00
Crest Len (ft)
= 12.56 0.00
0.00 0.00
Span (in) = 24.00
i♦ 0.00
0.00
Crest El. (it)
= 4000,00 0.00
0.00 0.00
No. Barrels = 1
/ 0
0
Weir Coeff.
= 3.33 3.33
3.33 3.33
Invert El. (ft) = 990.00
0.00
0.00
Weir Type
= 1 --
- -
Length (ft) = 112.00
0.00 0.00
0.00
Multi -Stage
= Yes No
No No
Slope 1%) = 7.90
0.00 0.00
n/a
-
N-value = .012
.013 .013
n/a
Orifice Coeff. = 0.60
0.60 0.60
0.60
Ex01.(in/hr)
= 0.000 (by Wet area)
Multi -Stage = n/a
Yes No
No
TW Elev. (ft)
= 0.00
Note: CuNerlOdfice outflows are analyzed under inlet(ic) and outlet(oc) control. Weir risers checked for orifice contll6ons(ic) and subrnaWnce(a).
Stage / Storage / Discharge Table
Stage Storage Elevation
Clv A
Clv B Clv
C PrlRsr Wr A
Wr B Wr C
Wr D Ex01 User
Total
ft tuft ft
cis
cfs efs
cis cis
cis cfs
cis cfs eft
efs
0.00 0 990.00
0.00
0.00 --
-- 0.00
- -
-- -- --
0.000
1.00 52 991.00
0.60 is
0.57 is --
-- 0.00
- --
--- --- --
0.573
2.00 239 992.00
3.39 is
3.30 is -
- 0.00
-- -
- --- -
3.305
3.00 1,080 993.00
4.72 is
4.71 is --
- 0.00
-- --
- - --
4.713
4.00 3,619 994.00
5.78 is
5.78 is --
-- 0.00
-- --
- - --
5.782
5.00 8,275 995.00
6.69 is
6.62 is --
-- 0.00
-- -
- -- -
6.616
6.00 14,862 996.00
7.36 is
7.36 is -
-- 0.00
- --
-- -- -
7.363
7.00 23,295 997.00
8.12 is
8.05 is -
- 0.00
-- --
-- - -
8.050
8.00 33,569 998.00
8.76 is
8.68 is --
- 0.00
-- -
-- -- -•
8.684
9.00 45,667 999.00
9.38 is
9.28 is -
-- 0.00
-- -
-- -- -
9.276
10.00 59,531 1000.00
9.84 is
9.84 is --
- 0.00
--- --
-- -• -
9.842
11.00 75,214 1001.00
45.26 is
3.44 is -
- 41.82
-- --
-- -- -
45.26
12.00 92,855 1002.00
49.86 is
1.23 is -
-- 48.62
s -- -
- -- --
49.85
13.00 112,639 1003.00
52.29 is
0.73 is -
-- 51.52
s - --
- - --
52.25
14.00 134,737 1004.00
54.48 is
0.51 is -
-- 53.96
s - --
- - --
54.47
Hydrograph Report
Hydraflow Hydrogrephs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020
Friday, 12 / 3 / 2021
Hyd. No. 10
Post Dev Project Area
Hydrograph type
= SCS Runoff
Peak discharge
= 2.161 cfs
Storm frequency
= 1 yrs
Time to peak
= 736 min
Time interval
= 1 min
Hyd. volume
= 10,873 cuft
Drainage area
= (3,790 ag (prev 3.15)
Curve number
= 72*
Basin Slope
= 0.0 %
Hydraulic length
= 0 ft
Tc method
= TR55
Time of conc. (Tc)
= 35.50 min
Total precip.
= 2.97 in
Distribution
= Type II
Storm duration
= 24 hrs
Shape factor
= 484
Composite (Area/CN) = [(3.150 x 71) + (0.260 x 98) + (0.380 x 61)1 / 3.790
Q (cfs) Post Dev Project Area
Hyd. No. 10 -- 1 Year
3.00
2.00
1.00
WUMP
Q (Cfs)
3.00
2.00
1.00
IVW
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Hyd No. 10 Time (min)
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Aulodesk, Inc. v2020 Friday, 1213 12021
Hyd. No. 20
pond 2 as -built
Hydrograph type
= Reservoir
Peak discharge
= 3.791 cis (<4.06 CFS)
Storm frequency
= ,1 yrs
Time to peak
= 759 min
Time interval
= 1 min
Hyd. volume
= 38,689 cuft
Inflow hyd. No.
= 13 - Total Drainage to B
Max. Elevation
= 994.10 ft
Reservoir name
= Pond 2 - As -built
Max. Storage
= 3,539 cult
Storage Indication method used.
Q (cfs)
6.00
5.00
4.00
3.00
2.00
1.00
dW
pond 2 as -built
Hyd. No. 20 -- 1 Year
Q (cfs)
6.00
5.00
4.00
3.00
2.00
1.00
M
0 120 240 360
480 600 720
840 960 1080 1200 1320 1440
1560
Time (min)
— Hyd No. 20 --^
Hyd No. 13
Total storage used = 3,539 cult
Hydrograph Report
HydraOow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020
Hyd. No. 10
;pGicf I iPPw PrniPrf Area
Hydrograph type
= SCS Runoff
Storm frequency
= 10 yrs
Time interval
= 1 min
Drainage area
= ,3 79 0 a (prey 3.15)
Basin Slope
= 0.0 %
Tc method
= TR55
Total precip.
= 5.38 in
Storm duration
= 24 hrs
Composite (Area/CN) = [(3.150 x 71) + (0.260 x 98) + (0.380 x 61)] / 3.790
Io
4.00
DIO
r
Hyd No. 10
Peak discharge
Time to peak
Hyd. volume
Curve number
Hydraulic length
Time of conc. (Tc)
Distribution
Shape factor
Post Dev Project Area
Hyd. No. 10 -- 10 Year
Friday, 12 / 312021
= 7.665 cfs
= 735 min
= 34,318 cuft
= 72"
= Oft
= 35.50 min
= Type II
= 484
Q (Cfs)
8.00
. 11
4.00
em
.TiTin
360 480 600 720 840 960 1080 1200 1320 1440 1560
Time (min)
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 12 13 / 2021
Hyd. No. 20
pond 2 as -built
Hydrograph type
= Reservoir
Peak discharge
= 28.59 cfs (<32.01 CFS)
Storm frequency
= 10 yrs
Time to peak
= 746 min
Time interval
= 1 min
Hyd. volume
= 164,583 cult
Inflow hyd. No.
= 13 - Total Drainage to B
Max. Elevation
= 997.71 ft
Reservoir name
= Pond 2 - As -built
Max. Storage
= 30,012 cuft
Storage Indication method used
pond 2 as -built
Q (cfs) Hyd. No. 20 -- 10 Year Q (cfs)
35.00
30.00
25.00
20.00
15.00
10.00
5.00
000
35.00
30.00
25.00
20.00
15.00
10.00
5.00
0.00
0 120 240
360 480 600 720
840 960 1080 1200 1320 1440
1560
Time (min)
— Hyd No. 20
— Hyd No. 13
Total storage used = 30,012 cult
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020
Hyd. No. 10
,PGse nev Project Area
Hydrograph type
= SCS Runoff
Storm frequency
= 100 yrs
Time interval
= 1 min
Drainage area
= 3.790 ac (prev 3.15)
Basin Slope
= 0.0 %
Tc method
= TR55
Total precip.
= 8.69 in
Storm duration
= 24 hrs
Friday, 12/3/2021
Peak discharge
= 16.51 cfs
Time to peak
= 734 min
Hyd. volume
= 72,983 cuft
Curve number
= 72'
Hydraulic length
= 0 ft
Time of cone. (Tc)
= 35.50 min
Distribution
= Type II
Shape factor
= 484
. Composite (Area/I _ [(3.150 x 71) + (0.260 x 98) + (0.380 x 61)] / 3.790
Post Dev Project Area
Q (cfs) Hyd. No. 10 -- 100 Year Q (cfs)
18.00 18.00
15.00 15.00
12.00
12.00
9.00
i 9.00
6.00 6.00
3.00 3.00
0.00 000
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Hyd No. 10 Time (min)
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020
Friday, 12 / 3 / 2021
Hyd. No. 20
,pond 2 as -built
Hydrograph type
= Reservoir
Peak discharge
= 45.51 cfs
Storm frequency
= 100 yrs
Time to peak
= 757 min
Time interval
= 1 min
Hyd. volume
= 399,715 cuft
Inflow hyd. No.
= 13 - Total Drainage to B
Max. Elevation
= [1002.13 it
Reservoir name
= Pond 2 - As -built
Max. Storage
= 94,889 cult
Storage Indication method used.
pond 2 as -built
Q (cfs) Hyd. No. 20 -- 100 Year Q (cfs)
90.00
80.00
70.00
60.00
50.00
40.00
30.00
20.00
10.00
000
90.00
80.00
70.00
60.00
50.00
40.00
30.00
20.00
10.00
0.00
0 120 240
360 480 600 720
840 960 1080 1200 1320 1440
1560
Time (min)
— Hyd No. 20
-- Hyd No. 13
I Total storage used = 94,889 cult