HomeMy WebLinkAboutSUB201300136 Review Comments 2013-09-17Review Comments
Project Name: Lochlyn Hill, Phase 1A & 1 B - Final Final Plat
Date Completed: JFriday, April 04, 2014
Reviewer: Christopher Perez
Department /Division /Agency: CD
Reviews
All platting items have been addressed, the legal docs have all been revised with last revised date and re approved
by County Attorney. The WPO plan was approved by the City and staff has obtained copies of their approval from
city Engineers. All bonds have been posted. The plat has since been approved 4 -4 -14.
Review Status: Approved
Christopher Perez
From: Christopher Perez
Sent: Wednesday, April 02, 2014 9:59 AM
To: 'L.J. Lopez'
Subject: Lochyln Hill -- Drainage Easement
LJ,
As discussed in the phone call: prior to sending the Drainage Easement to the County Attorney I have reviewed
it. It appears that page one references the plat's last revised date of Jan 8, 2014. However we've had a couple
revisions since then. Thus this page in the document shall be revised to utilize the true last revised date of
March 26, 2014. Once you correct this error, I'll slip sheet it in the document and send it to Greg today,thus
avoiding resigning by the owner.
It appears that the Declaration of Covenants and Restrictions (pg 1,pg 5, and pg 46) also reference the Jan 8th
revision date. However these legal docs must be revised to reference the correct last revised date of the plat
March 26, 2014. Please revise.
Christopher P.Perez Senior Planner
Department of Community Development(County of Albemarle,Virginia
401 McIntire Road Charlottesville,VA 22902
434.296.5832 ext.3443
1
*IMO
Christopher Perez
From: Christopher Perez
Sent: Friday, March 14, 2014 11:11 AM
To: 'Rob Cummings'
Subject: Lochyln Hill Lot 21 -landscape easement depicted on final plat
Rob,
To speak directly about your question as to whether Lot 21 needs the 10' landscape easement to screen their
property from the alley. I would say, no they would not need to have that 10' landscape strip on lot 21 because
they are accessing their garage from the alley. Similar to how Lots 22—26 does not have screening from a use
(the alley)they use. Thus on the final plat when you resubmit to show all the changes for Y,Z, A, and X go
ahead and remove the 10' landscape easement from Lot 21.
Please note that I'm a little concerned about Lot 21's garage location to the alley turn around as they may feel
they can use this turn around as their private parking space, or prohibit others from using it to turn around their
vehicle. Thus when the final site plan comes in we will require they provide a"no parking" sign in this location.
Christopher P.Pere<=.!Senior Planner
Department of Community Development 1County of Albemarle,Virginia
401 McIntire Road!Charlottesville.VA 22902
434.296.5832 ext.3443
6-(1)
0 tM
1
Review Comments
Project Name: Lochlyn Hill, Phase 1A & 1 B - Final Final Plat
Date Completed: Monday, February 24, 2014
Reviewer: Robbie Gilmer
Department /Division /Agency: Fire Rescue
Reviews
Based on Plat dated 1/8/14
No comments or objections
Review Status: No Objection
Christopher Perez
From: Christopher Perez
Sent: Friday, February 21, 2014 11:45 AM
To: 'Rob Cummings'; Mary Zylowski; Pete Caramanis; Jeremy Lynn
Cc: L.J. Lopez; Scott Collins; Graham Murray; Kirk Hughes
Subject: RE: Parcels Y and Z Sheets 1-2 REV 02-20-2014.PDF
Rob,
Per my records this plat was on its way to City Council earlier in the week, what was the
results of the city council meeting?
The latest submittal has some changes which need to be reviewed by ACSA (additional 10'
Waterline easement) anditmignring. I'll forward the revised plat to them today.
At 1st glance one thing that jumps out to me is that the plat does not specify the terminology
of what exactly is a "DW/E-1, DW/E-2, DW/E-3", I deduce it's Driveway Easement 1, 2,
and 3 but it's not actually spelled out anywhere on the plat, is it? It should be. Also will there
be a deed associated with the new access easements being shown on this plat?
Also it appears you are adding area to Lochlyn's Common Area Open Space 2 in the form of
"Common Open Space 2A "...to assure that this doesn't create some type of spike strip you
will need to provide the same note that was provided on the final plat for lochyln hill
"Common Area Open Space 2A is Hereby Reserved for future right of way and shall be
dedicated upon demand of the county. " Also, once this Parcel Y and Z plat is set to record,
the final plat for Lochyln Hill (SUB2013-136) should be revised to add the land to the
subdivision assuring to update the acreage of the property and add the acreage to the
Common Open Space 2 acreage to assure that it's covered in the Covenants and Restrictions
etc...
Any questions or comments?
Christopher P. Perez Senior Planner
Department of Community Development 1County of Albemarle.Virginia
401 McIntire Road Charlottesville.VA 22902
434.296.5832 ext.3443
From: Rob Cummings [mailto:rob@ khals.net]
Sent: Friday, February 21, 2014 10:18 AM
To: Christopher Perez; Mary Zylowski; Pete Caramanis; Jeremy Lynn
Cc: L.J. Lopez; Scott Collins; Graham Murray; Kirk Hughes
Subject: Parcels Y and Z Sheets 1-2 REV 02-20-2014.PDF
Chris,
I hope all is well.
1
In`preparation to the upcoming quit claim for that 20'parcel of land currently belonging to the city, I have
attached the latest revisions to the Parcel Y and Z plat for review and comments.
A few of things to draw attention to.
1.)Driveway Easements across the Common Area Open Space 2A.
I think through all our reviews we almost overlooked that. Please keep in mind that the properties to the north
and adjacent to the 10' strip have access by deed to the area where the driveway easements are shown. Just want
to all to be assured that is not a spite strip.
2.) ( Mary Z.) The Gas Easement is still proposed across Parcel "Z". There is no change in the intent to plat that
easement.
3.) (Jeremy Lynn) The New 10' Waterline Easement along the southerly portion of Common Area Open Space
2A along with the 10' water line easement shown on the Lochlyn Hills plat will comprise to make a 20'
Easement being the initial goal of the ACSA comment to plat a 20' Water Line Easement along the existing
waterline within Pen Park Lane.
Graham,
I have attached the ACAD version for your records as well.
Chris,
Once the quit claim is recorded we will revise the deed references on this plat and prepare for signatures
pending any comments as we look forward to your approval.
Please let me know if there are any questions or comments.
Thanks to all and have a great weekend.
Rob Cummings
Project Manager
Kirk Hughes&Associates
Land Surveyors&Planners
220 East High Street
Charlottesville,VA 22902
(434)296-6942.Ext. 109
(434)295-7540 Fax
rob @khals.net
This e-mail and any attachments may be confidential or legally
privileged. If you received this message in error or are not the
intended recipient,you should destroy the e-mail message and any
attachments or copies,and you are prohibited from retaining,
distributing,disclosing or using any information contained herein.
Please inform us of the erroneous delivery by return e-mail. Thank you
for your cooperation.
2
Christopher Perez
From: Christopher Perez
Sent: Thursday, February 20, 2014 1:17 PM
To: 'L.J. Lopez'; Rob Cummings
Cc: 'Scott Collins'; Kirk Hughes
Subject: RE: SUB2013-136 Lochyln Hill -final sub phase IA and IB
Attachments: CD3 SUB201300136 2-19-14.pdf
LJ,
I have received word from Greg Kamptner about the need for a Deed to go with the drainage easements. He has
confirmed my original request for the deed(comment#18). Once developed please submit the draft deed to me
and I'll forward it to him for County Attorney review/approval.
His response is below in yellow. Hope that helps.
From: Greg Kamptner
Sent:Thursday, February 20, 2014 12:23 PM
To: Christopher Perez
Subject: Lochlyn Hill drainage easements
Even though recording a subdivision plat conveys to the County any drainage easement dedicated to public use,the County began requiring deeds
of drainage easements about 10 or so years ago to delineate the rights and responsibilities of the County and the landowner,e.g.,the right of the
landowner to maintain certain vegetation within the easement;the obligation of the landowner to not obstruct the drainage;the obligation of the
County to replace certain plantings after work within the drainage easement,and removing any trash related to the repair or maintenance work.
Greg Kamptner
Deputy County Attorney
County of Albemarle
gkamotnerPalbemarle.org
Christopher P. Perez I Senior Planner
Department of Community Development(County of Albemarle,Virginia
401 McIntire Road I Charlottesville,VA 22902
434.296.5832 ext.3443
From: L.J. Lopez [mailto:IlopezOmilestonepartners.co]
Sent: Wednesday, February 19, 2014 4:38 PM
To: Christopher Perez; Rob Cummings
Cc: 'Scott Collins'; Kirk Hughes
Subject: Re: SUB2013-136 Lochyln Hill - final sub phase IA and IB
The builder has confirmed that Lot 20 is to be designated as affordable.
-LJ
Louis J. Lopez III
I 1 1,.'stone
1
milestone partners
300 2nd Street NE
Charlottesville VA 22902
434.245.5803 T
434.409.1005 C
866.948.7684 F
ki„11 F'lec<se cor',icier the enviruiitnent 6 foie printing this e-in,it
From:Christopher Perez<cperez @albemarle.org>
Date:Wednesday, February 19, 2014 at 4:30 PM
To: Rob Cummings<rob @khals.net>
Cc: "L.J. Lopez III"<Ilopez@milestonepartners.co>, Scott Collins<scott@collins-engineering.com>, Kirk Hughes
<kirk@khals.net>
Subject:SUB2013-136 Lochyln Hill-final sub phase IA and IB
Rob,
Attached are my comments...all fairly minor. If you have any questions,please give me a call. I have a feeling
LJ will want to discuss comment #17 with me, and I'm glad to have that conversation, but please be advised
that comment came from the Subdivision Agent in consultation with Zoning. So there is not much further I can
take this one. Let me know.
Aside from required bonds being posted,the County Attorney's review of the maintenance doc/covenants and
restrictions that LJ provided me is all that I see being a large item that's pending. Once I hear from Greg I'll
forward you his findings.
Christopher P. Perez Senior Planner
Department of Community Development 1County of Albemarle,Virginia
401 McIntire Road l Charlottesville,VA 22902
434.296.5832 ext.3443
2
County of Albemarle
Department of Community Development
Memorandum
To: Kirk Hughes
From: Christopher P. Perez- Senior Planner
Division: Planning Services
Date: February 19, 2014
Subject: SUB2013000136 Lochlyn Hill — Final Subdivision Plat for Phase IA and IB
The Planner for the Planning Services Division of the Albemarle County Department Community
Development will recommend approval of the plat referred above when the following items have been
satisfactorily addressed. (The following comments are those that have been identified at this time.
Additional comments or conditions may be added or eliminated based on further review.) [Each
comment is preceded by the applicable reference to the Albemarle County Code.]
1. [Comment Revised and Reworded]
The applicant seeks to subdivide Phase IA and Phase IB on a single final plat; however, this is
not permissible due to how Phase IB originated and its dependence on the Cluster Development
provisions of the ordinance... Rev 2. Comment no longer relevant as previously written per
1 -15 -14 meeting. Comment addressed.
2. [Comment] Phase IB of this development straddles County and City boarders; as such the
City as well as the County will be required to sign the final subdivision plat for Phase IB of the
development including road plan review and bonding of the road.
Rev 1. Off -site easements reviewed and approved by the City of Charlottesville and or the
County of Albemarle recorded in the Clerk's Office will be adequate to assert the City's
approval. Thus note #14 should be revised to include all recorded deed book page
numbers of recorded plats /deeds. Also, revise the final plat to provide details /cutsheets for
each item subject of note #14, similar to those details provided on sheet 4 for the water line
easement detail and the storm drainage easement detail. Rev 2. Comment addressed
with the exception of note #13, which should be revised to include all recorded deed book
page numbers of recorded plats /deeds.
3.114-302(A4) and (A5), 14 -305, 14 -3111 Water protection plans are required to be approved
prior to final plat approval. Please coordinate this effort with Engineering, notably it appears the
Stormwater Management Facility for this site is offsite and within the City of Charlottesville,
thus I believe the City will be required to approve that aspect of the plan. Will this issue require
offsite Access and Maintenance Easement for the SWM pond? If so, they will be required prior
to approval of the final plat. Please address this issue.
Rev 1. Once the City of Charlottesville has approved the WPO provide Engineering with a
copy of the approval letter. Rev 2. Comment addressed.
4.[Comment] On the approved preliminary platfor Phase IA_ Lot 19 and Lot 20 were
approved as attached single family lots; however, on the final plat they are depicted as separate
detached single family lots. Please address this inconsistency.
Also, on the approved preliminary plat for Phase IA, Lot 20 was designated /approved to as an
affordable unit which was provided to meet the phases ' density requirements. Please address
the inconstancy with the approved preliminary plat. Revise appropriately to include a note on
sheet 1 which lists the Lot 20 as an affordable unit. Rev 1. Comment no longer relevant.
5.[14- 302B(8), 14 -302A (9) and 4.11.3] Side yard setbacks for R4 zoning are 15',- however, if
the applicant aims to reduce the setback to 10' as depicted on the plat the applicant will need
approval from the Fire Official that the development has adequate fire flows for such a
reduction. Prior to final subdivision plat approval please coordinate this effort with the Fire
and Rescue Dept to assure compliance with Section 4.11.3 (A1). Notably, Robbie Gilmer and
Alex Morrison have requested a fire flow test for Lochlyn Hills. Results are pending. Rev 1.
Comment addressed.
6. [Condition of Approval for Preliminary Plat] As proposed the realignment of Pen Park
Lane will require alterations in existing access for TMP 61A -19, 20, 21, 22, and 23A. As such
this may require access easements to be provided to those owners across Lochlyn Hills
property OR boundary line adjustments to transfer the excess land to those owners.
Depending on the solution to the above this may also require offsite construction easements to
construct the modified driveways on the above properties. Per the applicant, they are
working with VDOT and individual lot owners on this issue and the final plat will reflect
additional r/w or transfer of the property to the lot owners. Prior to Final Plat approval
this issue shall be resolved and approved by VDOT and the County.
Rev 1. Comment being addressed through Parcel Y and Z, and off site temp
grading /construction easement. Off -site easements reviewed and approved by the City
of Charlottesville and or the County of Albemarle recorded in the Clerk's Office will be
adequate to assert the City's approval. Note #14 should be revised to include all
recorded deed book page numbers of recorded plats /deeds. Also, revise the final plat to
provide details /cutsheets for each item subject of note #14, similar to those details
provided on sheet 4 for the water line easement detail and the storm drainage easement
detail. Rev 2. Comment addressed with the exception of note #13 which should be
revised to include all recorded deed book page numbers of recorded plats /deeds.
7.[14- 302(A)9 and 4.6.4] The rear setbacks for Lots 19 and 21 should be revised to account for
the approved L- turnaround of the 20' Private Alley Easement. The rear setback shall be
measured from the easement. The approved preliminary subdivision plat for Phase IA
(SUB201300028) did not contain a turn around on these lots, thus it was not relevant on that
plat. Only during the review and approval of the Initial Site Plan for Phase IB did this item
come into play. This will need to be corrected on the final subdivision plat prior to approval.
Also, the required /approved L- turnaround will affect the rear setback for "Para ' '
rear setback shall be measured from the easement. Revise appropriately. Rev 1. Comment
addressed.
8.114-303(G)] Ownership of Common Area. On the final plat provide the intended ownership
for all the easements, specifically for the Pocket Park, 20' shared driveway easements, 20'
Private Alley Access Easement, 30' Private Alley Easement (Points B to C), and 30'
Emergency Fire Access Easement and pedestrian and bike connection (Points A to B). Rev 1.
Comment addressed.
9.[Comment] The preliminary plat denotes the Pocket Park as being maintained by the HOA;
however, the final plat labels it as "Public " and is not include on Sheet 1 under General
Notes #6 along with the other items to be maintained by the HOA. On the plat clam who
2
shall maintain this space. Is it to be maintained by the HOA, individual property owners of
Lots 7 -9 or some otherparty? Please clarify. Also, staff recommends that a note be added to
sheet I of the plat to denote the Pocket Park Access Easement traverses Lots 7 -9. Rev 1.
Comment addressed.
10. [4.6.3(a)] The side yard setbacks abutting the "20' shared driveway easements " are not
accurately shown. Pursuant to Section 4.6.3(a) "I fa shared driveway is concurrent with the
shared lot line of the lots served by the shared driveway, each primary structure also shall be
located at least six (6) feet from the edge of the shared driveway easement. " Thus on the plat
there should be an additional 6' side yard setback from each side of the easement per Section
4.6.3(a). If the shared easements are to remain as depicted this will need to be corrected
prior to final subdivision plat approval. Rev 1. Comment addressed.
11. [14 -303E] Shared Driveway Easements. The easement holder(s) of the shared driveway
easements shall be identified on the plat. Revise plat. Also, a note shall be added to the plat
stating that maintenance shall be by the owners of the lots affected by the shared driveway
easement, not by the Virginia Department of Transportation or the county. Revise. Rev 2.
Comment addressed.
12. [14 -317] Instrument evidencing maintenance of certain improvements. Prior to Final Plat
approval, an instrument evidencing maintenance of the Pocket Park, Common Area Open
Space, 20' shared driveway easements, 20' Private Alley Access Easement, 30' Private Alley
Easement (Points B to C), and 30' Emergency Fire Access Easement and pedestrian and bike
connection (Points A to B) will need to be submitted for County review and approval. The
County Attorney will be required to review/ approve the maintenance documents prior to
final plat approval. Submit the draft documents to Planning staff for cursory review and then
we'll forward them to the County Attorney for review/ approval.
Rev 2. Maintenance document have been submitted by applicant and have been sent to
County Attorney for review/ approval. These must be approved prior to the signing of
the final plat.
13. [14 -435] Roads must be built or bonded prior to the signing of the final plat. Rev 2.
Comment still applicable.
14. [Comment] The note for Open space #2 should be revised to read: "Reserved for dedication
upon demand of the County." Rev] s Rev 2. Comment addressed.
15. [Comment] Note #6, "The 20' access easement across lots 19, 20, 21 and Block A " should
be revised to also include Lot 14 as the easement also traverses this lot. Rev 2. Comment
addressed.
16. [14- 303(A)] Statement of consent to division. Changes to the State Code and to the County of
Albemarle Subdivision Ordinance require changes to the consent to division statement.
Please revise the statement to read: "The platting or dedication of the following described
land [insert correct description of the land subdivided] is with free consent and in
accordance with the &- 7dersigned owners, proprietors and trustees, if any. "
Revise. Rev 2. Comment addressed.
New Comments
17. [Comment] General note #10 shall be revised to specify which lot will be the affordable unit.
Per recent discussions with the Zoning Department the note in its current form will pose an
enforcement issue to track the affordable unit. Revise the note to specific which single lot will
contain the affordable unit. If later the developer decides the affordable unit shall be moved to
an alternative lot in this phase they need only apply and staff will review it administratively.
18. [14 -303L] The project has Variable Width Drainage Easements running throughout the lots.
It is staffs' understanding that because of this the project requires a Deed of Easement for the
Drainage Easements which shall be approved by the County Attorney? Currently the
developer does not have these deeds developed and questions whether they are truly needed
as note #5 on the plat states: `Drainage Easements shown hereon are hereby dedicated to
public use, unless otherwise noted". Staff has posed the question to the County Attorney and
is awaiting a response.
19. [14, 30294), 303(L)] Easements. On the plat please label and provide the deed book page
number for the temporary construction and grading easement over the 3,680SF portion of
land owned by Charlottesville.
20. [14- 302(B)(1)] General Information. When the plat is revised, please provide the date of the
last revision on the plat.
21. [Comment/Recommendation] The approved road plan depicts the required 2nd set of
bollards at the beginning of the 30' private alley easement at Point "C ", this prohibit Lots 22
— 26 from accessing the rear of their properties where their required parking is located. The
road plan shall be revised to relocate the above mentioned bollards to Point "B" (as
previously approved) to allow lots 22 -26 to access their required parking. It is advisable that
the applicant correct this error on the road plans prior to final subdivision plat approval;
however, the applicant can wait till the final site plan stage for the townhouse lots. Regardless
this item must be completed before the final site plan for the townhomes is approved.
Engineering — Max Greene
1) Road bond will need to be posted and approved prior to final plat approval.
2) Deed book reference numbers will need to be filled in prior to final plat approval.
VDOT — Troy Austin
Comments pending
ACSA — Alex Morrison
Comments pending
Fire and Rescue — Robbie Gilmer
Comments pending
Please contact Christopher P. Perez at the Department of Community Development 296 -5832 ext.
3443 for further information.
4
Review Comments
Project Name: Lochlyn Hill, Phase 1A & 1 B - Final Final Plat
Date Completed: Wednesday, February 12, 2014
Reviewer: Max Greene
Department /Division /Agency: Engineering
Reviews
Road bond willl need to be posted and approved prior to final plat approval.
Deed book reference numbers will need to be filled in prior to final plat approval.
Review Status: See Recommendations
vow Nov
Wednesday,Jan 15`h from Ipm—2pm
Attendees: Bill, Chris, Francis,Kirk,LJ, Megan,Rob
The applicant of Lochlyn Hill has requested a meeting with staff to discuss the final plat SUB2013-
136. They would like to discuss the possibility of get the townhomes and the single family lots on
one plat vs two plats(the subject of comment#1,provided below).
During the discussions staff and the applicants brainstormed on how to remedy the situation within
the confines of the ordinance. The end result was being phase IA has an approved preliminary plat,
and being phase IB has an approved initial site plan and being we have an approved road plan
which depicts the entire road through both phases then the applicant could subdivide both phases
(phase IA and IB)on a single final plat. On this plat it should be clear which portion of open space
is for phase IB to qualify the townhomes to be min lot size of NA.
During this meeting it was discussed that the Final Site Plan for the townhomes does not have to be
approved prior to the final plat; rather, the final plat can divide the townhome lots prior to a final
site plan being approved. (l.ui still unsure;fthis is/00%true being most planning staff have ahrays interpreted the ordinance
the latter:however this portion of the discussion is an ongoing issue that will have to he remedied through staff discussion of the
ordinance).74-nit ti.', ar:/✓, f:lt p v.,r„ M,'k ...rP „
Regardless, as such the townhome lots will have to be divided on this plat, and when the fig site
plan is approved and the townhomes built the lot lines in the townhome section will nee o be
rearranged to match the fire walls...through a BLA.
1. [Original Comment Not Addressed,Comment Revised and Reworded]
The applicant seeks to subdivide Phase IA and Phase IB on a single final plat; however,this is not
permissible due to how Phase IB originated and its dependence on the Cluster Development
provisions of the ordinance.
The preliminary subdivision plat for Phase IA which was approved on 5-17-13 depicted Phase IB as
"future development",which was essentially a 22"d lot with an area of 1.27 acres. Subsequently
Phase IB went to SRC as an Initial Site Plan for the townhomes.
Notably the townhouse lots in Phase IB utilize the Cluster Development provision of the ordinance
based on providing a minimum of 25%open space. Thus what is depicted as Common Area Open
Space 1 and 3 on this plat is the area which qualified Phase IB of the development to have
townhome units at a min lot size below the minimum lot size of 10,890SF or 7,260 SF. This was all
contingent on Phase IB being its own lot to be developed at a future date.
In order to move forward with subdividing both Phase IA and IB on a single final plat 25%open
space would be required for the entire 6.3989 acres.At this time there is not enough open space for
this to be qualified.
It is advisable that the applicant removes Phase IB from this final subdivision plat and moves
forward with the review/approval of the Phase IA,to include the 22"d lot at 1.27 acres as shown on
the preliminary plat.
Once the road plan and the final plat for Phase IA are approved and recorded then submit a Final
Site Plan for Phase IB, once that's approved then submit a Final Plat for Phase IB. Revise
appropriately.
Christopher Perez
From: Alex Morrison [amorrison @serviceauthority.org]
Sent: Thursday, January 09, 2014 12:32 PM
To: Christopher Perez
Subject: RE: SUB2013 -136 Lochyln Hill - final plat
Chris,
The project manager for Lochyln Hills has reviewed the plat and has 1 comment that needs to be addressed:
• Provide a 20' easement on the existing ACSA waterline near the intersection of Pen Park Lane and Lochyln Hill
Lane. The VDOT right of way has been changed in this area and our waterline no longer is within the ROW.
Once this comment is addressed I will review the updated plat for approval. Thank you.
Alexander J. Morrison, EIT
Civil Engineer
Albemarle County Service Authority
168 Spotnap Road
Charlottesville, VA 22911
[434] 977 -4511 Ext. 116 (0)
[434] 979 -0698 (F)
Albemarle County
Service Auth4rity
Su-% ny 6 C r.!,aRoinq
f,. Please consider the environment before printing this email.
From: Christopher Perez [mailto:cperez @albemarle.org]
Sent: Tuesday, January 07, 2014 12:33 PM
To: Alex Morrison
Subject: SUB2013 -136 Lochyln Hill — final plat
Alex,
I am checking on the status of SUB2013 -136 Lochyln Hill — final plat. I have your latest review pending
(distributed on 12- 16 -13) and wanted to see when you think you'd have the revised plan reviewed. Let me
know. I plan to send my comments out today before COB.
Thanks
Christopher P. Perez I Senior Planner
Department of Community Development ICounty of Albemarle, Virginia
401 McIntire Road I Charlottesville, VA 22902
434.296.5832 ext. 3443
From: Alex Morrison [ma i Ito: amorrison (Dserviceauthority.org]
Sent: Thursday, November 07, 2013 2:39 PM
To: Christopher Perez
Subject: Lochlyn Hill- Phase 1A & 1B, Road and Utility Plan
Chris,
Be advised that the ACSA has granted construction approval for the above referenced project. Please advise if the
applicant would like to resubmit SUB201300136 with updated changes based on the approved construction plans for
ACSA review and approval. If not, I will comment on the existing copy I have from late September.
Alexander J. Morrison, EIT
Civil Engineer
Service Auth6rlitr
168 Spotnap Road
Charlottesville, VA 22911
Office: (434)977-4511 EXT: 116
This email may contain confidential information that should not be shared with anyone other than its intended
recipient(s).
From: Alex Morrison [ amorrison @serviceauthority.org]
Sent: Monday, October 07, 2013 3:18 PM
To: Christopher Perez
Subject: SUB201300136: Lochlyn Hill - Phase 1 - Final Plat
Chris,
The construction documents related to the above referenced plat are currently under review by ACSA staff. The ACSA
will comment on the plat once construction approval is granted.
Alexander J. Morrison, EIT
Civil Engineer
168 Spotnap Road
Charlottesville, VA 22911
Office: (434) 977 - 4511 EXT: 116
This email may
County of Albemarle
Department of Community Development
Memorandum
To: Kirk Hughes
From: Christopher P. Perez- Senior Planner
Division: Planning Services
Date: January 8, 2014
Subject: SUB2013000136 Lochlyn Hill — Final Subdivision Plat for Phase 1
The Planner for the Planning Services Division of the Albemarle County Department Community
Development will recommend approval of the plat referred above when the following items have
been satisfactorily addressed. (The following comments are those that have been identified at this
time. Additional comments or conditions maybe added or eliminated based on further review.)
[Each comment is preceded by the applicable reference to the Albemarle County Code.]
1. [Original Comment Not Addressed, Comment Revised and Reworded]
The applicant seeks to subdivide Phase IA and Phase E3 on a single final plat; however, this
is not permissible due to how Phase IB originated and its dependence on the Cluster
Development provisions of the ordinance.
The preliminary subdivision plat for Phase IA which was approved on 5 -17 -13 depicted
Phase IB as "future development ", which was essentially a 22nd lot with an area of. 1.27
acres. Subsequently Phase IB went to SRC as an Initial Site Plan for the townhomes.
Notably the townhouse lots in Phase IB utilize the Cluster Development provision of the
ordinance based on providing a minimum of 25% open space. Thus what is depicted as
Common Area Open Space 1 and 3 on this plat is the area which qualified Phase IB of the
development to have townhome units at a min lot size below the minimum lot size of
10,890SF or 7,260 SF. This was all contingent on Phase IB being its own lot to be
developed at a future date.
In order to move forward with subdividing both Phase IA and IB on a single final plat 25%
open space would be required for the entire 6.3989 acres. At this time there is not enough
open space for this to be qualified.
It is advisable that the applicant removes Phase IB from this final subdivision plat and
moves forward with the review /approval of the Phase IA, to include the 22nd lot at 1.27
acres as shown on the preliminary plat.
Once the road plan and the final plat for Phase IA are approved and recorded then submit a
Final Site Plan for Phase IB, once that's approved then submit a Final Plat for Phase 113.
Revise appropriately.
2. [Comment] Phase IB of this development straddles County and City boarders; as such
the City as well as the County will be required to sign the final subdivision plat for Phase
IB of the development including road plan review and bonding of the road.
Rev 1. Off-site easements reviewed and approved by the City of Charlottesville and or
the County of Albemarle recorded in the Clerk's Office will be adequate to assert the
City's approval. Thus note #14 should be revised to include all recorded deed book
page numbers of recorded plats /deeds. Also, revise the final plat to provide
details /cutsheets for each item subject of note #14, similar to those details provided on
sheet 4 for the water line easement detail and the storm drainage easement detail.
3.[14-302(A4) and (A5),14- 305,14 -311] Water protection plans are required to be
approved prior to final plat approval. Please coordinate this effort with Engineering,
notably it appears the Stormwater Management Facility for this site is offsite and within the
City of Charlottesville, thus I believe the City will be required to approve that aspect of the
plan. Will this issue require offsite Access and Maintenance Easement for the SWM pond?
If so, they will be required prior to approval of the final plat. Please address this issue.
Rev 1. Once the City of Charlottesville has approved the WPO provide Engineering
with a copy of the approval letter.
4. j�Lgrcaac�nea�tf On the appravec..11rr elirrrirrcar °y plat for° Phase L I Lot 14 taro./ Lot 20 vMere
approved as alluched single famdV lots; holwver, on the final plat thev are depicted cis
separate lots. Please address this inconsistency.
A /so, on the appr °ovecl prelinrirrary plat, for° Phase L4, Lot 20 iwus to as
an affordahle ctnit iwhich evas provided to niece the phases' density recp. ireurents. Please
address the inconslancv frith the aplrr °ovecl pr�elimiriary plot. Revise approprialely to
include ca note on sheet 1 lvhich lists the Lot 20 as an uffordahle unit.
Rev 1. Comment no longer relevant.
5.114 - 3022(8), 14- 302A(9) and 4.11.31 Side yard setbacks for R4 zoning are 15',- hoi�vcwer.
if fhe applicant aims to reduce the setback to 10' as depicted on the plat the applicant
ia:ill need apprn val. rotu the hire (>fficicd Thal the developtent has adequate fire flola�s fin°
such a reduc lion. Prior to final subdivision plat approval please coordinate this effor °t
tivith the 17ire and Rescue Dept to assure compliance wwith Section 4.11.3 (41). Notably,
Robbie Gihner° and Alex Morrison have requested a fire floiv test, for Lochlvrr hills.
Results are pending.
Rev 1. Comment addressed.
6. [Condition of Approval for Preliminary Plat] As proposed the realignment of Pen Park
Lane will require alterations in existing access for TNT 61A -19, 20, 21, 22, and 23A. As
such this may require access easements to be provided to those owners across Lochlyn
Hills property OR boundary line adjustments to transfer the excess land to those owners.
Depending on the solution to the above this may also require offsite construction
easements to construct the modified driveways on the above properties. Per the
applicant, they are working with VDOT and individual lot owners on this issue and
the final plat will reflect additional r/w or transfer of the property to the lot owners.
Prior to Final Plat approval this issue shall be resolved and approved by VDOT and the
County.
Rev 1. Comment being addressed through Parcel Y and Z, and off site temp
grading /construction easement. Off -site easements reviewed and approved by the
City of Charlottesville and or the County of Albemarle recorded in the Clerk's
Office will be adequate to assert the City's approval. Thus note #14 should be
revised to include all recorded deed book page numbers of recorded plats /deeds.
Also, revise the final plat to provide details /cutsheets for each item subject of note
#14, similar to those details provided on sheet 4 for the water line easement detail
and the storm drainage easement detail.
7.114 - 3112(,1)9 and 4.6.41 The rear setbacks for Lets 19 and 21 should be revised to
account , for the approved L - turnaround Of the 20' Private .r HeY Easellient. The rear
setback Shall he lneasured.froin the caseinew. The approved pre:?linunarV Subdivision plat
for Phase L"i (SUB201300028) did not contain a turn around on these /ots, thus it bNas not
releva771 on that plat. Only during the review and approval of the Initial Site Plan for
Phase II3 did this itein cotne into plc' {y. This will need to be corrected on the , final
sribdivision plat prior to approval.
A /so, the reCluired&approvcd L-turnaround will affect the rear sethack for "Parcel A .
The rear Setback shall be ineasured fi'ow the easeinent. Revise appropriately.
Rev 1. Comment addressed.
8.6 M- 303(C)J Obl'nersh7p of Cotninon Area. On the linal plat provide the intended
ownership for all the easements, specifically 6or the Pocket Park, 20' shared driveway
easements, 20' Private Alley Access Easement, 30' Private Alley Easement (Points B to
Q.. and 30' Emergency Fire Access Easement and pedestrian and bike connection (Points
A to i3).
Rev 1. Comment addressed.
9.10munentl The preliniimay plat denotes the Pocket _Park (xs being Inaintailled by the
110A.- however, the,final plat labels it as "Public "and is not include (gin Sheet I under
General Notes 116 along with the other iteins to he inaintained by the HOA. On the plat
clarifi) who !shall maintain this space. Is it to he inaintained by the I-10A, individual
property olPners of Lots 7-9 or soine other party? Please Clurih.'. A /so. Staff recon7i'nendy
that a note be added to Sheet 1 of the plat to denote the Pocicel Park Access Basement
traverses Lots 7 -9.
Rev 1. Comment addressed.
10. 14.6.3(q)] The side yard setbacks abutting the "20' shared driveway ecisetnents" are not
accuralely shoivn. Pursuant to Section 4.63(x) "If a shared driveway is concurrent with
the shared lot line of'lhe lots served by the shared driveiway, each primary siructtire also
shall he located at least six (6), feet, f •oin the edge of the shared driveway easenient. "
Thus on the plat there should be an additional G' side vay,d setbackfroin each side of'the
easement per Section 4.6.3(a). f the shared easements are to remain as depicted this ivill
need to be corrected prior to final subdivision plat approval.
Rev 1. Comment addressed.
11. [14 -303E] Shared Driveway Easements. The easement holder(s) of the shared driveway
easements shall be identified on the plat. Revise plat. Also, a note shall be added to the
plat stating that maintenance shall be by the owners of the lots affected by the shared
driveway easement, not by the Virginia Department of Transportation or the county.
Revise.
Rev 1. Comment not adequately addressed. Revise plat to address this comment.
12. [14 -317] Instrument evidencing maintenance of certain improvements. Prior to Final Plat
approval, an instrument evidencing maintenance of the Pocket Park, Common Area Open
Space, 20' shared driveway easements, 20' Private Alley Access Easement, 30' Private
Alley Easement (Points B to C), and 30' Emergency Fire Access Easement and
pedestrian and bike connection (Points A to B)'will need to be submitted for County
review and approval. The County Attorney will be required to review/ approve the
maintenance documents prior to final plat approval. Submit the draft documents to
Planning staff for cursory review and then we'll forward them to the County Attorney for
review/ approval.
Rev 1. Comment still applicable. Pending submittal of documentation by the
applicant.
13. [14 -435] Road plans must be approved and the roads must be built or bonded prior to the
signing of the final plat.
Rev 1. Comment still applicable.
New Comment
14. [Comment] The note for Open space #2 should be revised to read: "Reserved for
dedication upon demand of the County. " Revise.
15. [Comment] Note #6, "The 20' access easement across lots 19, 20, 21 and Block A"
should be revised to also include Lot 14 as the easement also traverses this lot.
16. [14- 303(A)] Statement of consent to division. Changes to the State Code and to the
County of Albemarle Subdivision Ordinance require changes to the consent to division
statement. Please revise the statement to read: "The platting or dedication of the
following described land [insert correct description of the land subdivided] is with free
consent and in accordance with the desire of the undersigned owners, proprietors and
trustees, if any. " Revise.
17. [14- 302(B)(1)] General Information. When the plat is revised, please provide the date of
the last revision on the plat.
4
Fire and Rescue — Robbie Gilmer
1) No objection
Building Inspections - Jay Schlothauer
No objection
E911- Andrew Slack
Approved
Engineering — Max Greene
1) Easements will need to be recorded for the portions in the City of Charlottesville prior to final
plat approval.
VDOT — Troy Austin
See attached comments
ACSA — Alex Morrison
Comments pending
RWSA - Victoria Fort
Comments pending
Please contact Christopher P. Perez at the Department of Community Development 296 -5832 ext.
3443 for further information.
E
COMMONWEALTH of 'VIRGINIA
DEPARTMENT OF TRANSPORTATION
1601 Orange Road
Culpeper, Virginia 22701 -3819
Gregory A. Whirley
Commissioner of Highways
January 6, 2014
Mr. Christopher Perez
Senior Planner
County of Albemarle
Department of Community Development
401 McIntire Road
Charlottesville, VA 22902
Re: SUB - 2013 -00136 Lochlyn Hill — Phase 1— Final Plat
SUB - 2013 -00185 Lochlyn Hill — Parcel Y and Z — BLA Plat
Dear Mr. Perez:
We have reviewed the final plat for Parcels "Y" and "Z" dated December 5, 2013 and the final
plat for Lochlyn Hill, Phase 1 dated September 4, 2013, both being submitted by Kirk Hughes &
Associates, and offer the following comments:
1. It appears that the final plat for parcels "Y" and "Z" should be completed and recorded
first.
2. The final plat for Lochlyn Hill, Phase 1 should reflect the newly created parcels including
the Deed Book and Page designation of the recorded plat.
3. It may actually be "cleaner" if the parcels were combined with tax map parcel 61A -2
prior to the final plat for Lochlyn Hill, Phase 1.
If you need additional information concerning this project, please feel free to contact me.
Sincerely,
Troy ustin, P.E.
Area Land Use Engineer
Culpeper District
VirginiaDOT.org
WE KEEP VIRGINIA MOVING
Review Comments
Project Name: Lochlyn Hill, Phase 1A & 1 B - Final Final Plat
Date Completed: IThursday, January 02, 2014
Reviewer: Robbie Gilmer
Department /Division /Agency: Fire Rescue
Reviews
Based on plat dated 8/4/13
No Comments or Objections
Review Status: No Objection
Review Comments
Project Name: Lochlyn Hill, Phase 1A & 1 B - Final Final Plat
Date Completed: Thursday, December 19, 2013
Reviewer: Jay Schlothauer
Department /Division /Agency: Inspections
Reviews
Based on plat dated September 4, 2013.
No comments or conditions.
Review Status: No Objection
Review Comments
Project Name: Lochlyn Hill, Phase 1A & 1 B - Final Final Plat
Date Completed: Monday, December 16, 2013
Reviewer: Max Greene
Department /Division /Agency: Engineering
Reviews
'Alley on Plat does not appear to match as shown on road plan.
'Easements will need to be recorded for the portions in the City of Charlottesville prior to final plat approval.
Review Status: See Recommendations
Review Comments
Project Name: Lochlyn Hill, Phase 1A & 1 B - Final Final Plat
Date Completed: Monday, December 16, 2013
Reviewer: Andrew Slack
Department /Division /Agency: E911
Reviews
Approved
Review Status: Approved
Review Comments
Project Name: Lochlyn Hill, Phase 1A & 1 B - Final Final Plat
Date Completed: Monday, December 16, 2013
Reviewer: Victoria Fort
Department /Division /Agency: RWSA
Reviews
no comments recieved
Review Status: Pending
Christopher Perez
From: Ron Higgins
Sent: Monday, December 16, 2013 2:58 PM
To: Christopher Perez
Cc: Amelia McCulle
Subject: RE: Setback q
Chris:
I agree with your conclusion. It would be a side y. : from the"alley easement"or the "30' Pedestrian, Bicycle,
and Emergency Access Easement". ;;but all function more as"alley"
easements.
Ron H.
From: Christopher Perez
Sent: Monday, December 16, 2013 12:18 PM
To: Ron Higgins
Cc: Amelia McCulley; Stewart Wright
Subject: Setback questions for Lochlyn Hill Lot 20 and Townhome Lot E
Ron,
I'd like to followup with the Zoning Administrator or their designee about determining a setback for Lochyln
Hill townhomes lots (see attached scanned plat).
The applicant would like to maintain the lot's side setback against the emergency connection. This road is to be
bollarded off and only emergency vehicles can access it through a key, the rest of the time it will remain a
pedestrian connection. The applicant has been asking me how to assure that this remains a side rather than
becoming a front per section 4.6.3(d). Below I had advised him how to proceed, but before I move forward with
approval of the plat would like to get the Zoning official to weigh in on this, be if it needs to change now is the
time to change it.
They currently are labeling it as a"30' Pedestrian, Bicycle, and Emergency Access Easement" , I do not
believe this would be a true Vehicle Access Easement as noted in 4.6.3(d) as it is only for Emergency vehicles
and is to be bollarded. Please weigh in on the above.
Christopher P.Perez'Senior Planner
Department of Community Development'County of Albemarle,Virginia
401 McIntire Road I Charlottesville,VA 22902
434.296.5832 ext.3443
From: Christopher Perez
Sent: Tuesday, November 26, 2013 12:38 PM
To: 'rob @khals.net'
Subject: Setback questions for Lochlyn Hill Lot 20 and Townhome Lot E
Rob,
After reading through the ordinance with regard to Section 4.6.3(d)ill. I feel fairly confident guiding you with
the following. But if you want an official determination from the Zoning Administrator it'll have to wait till
1
Monday when Amelia gets back into the office. Below is my guidance which stems from my reading of Section
4.6.3(d)1.
1) The initial site plan which was approved for Phase B/townhomes, depicts Lot E with a side setback to the
"30' Alley Easement". This appears to truly be a side per 4.6.3(d)1, as a front yard cannot come off an alley
easement.
2) Upon reviewing your question about Lot 20 and it's setbacks from the "30' Access Easement". I see your
concerns as to whether this would remain a side setback or if it would truly be a front. Upon reviewing Section
4.6.3d1 of the ordinance, if it's a"30' Access Easement", then it'd be a front. If you revise it to be a"30' Alley
Easement"the whole way through then it'd be a side setback. That's the cleaner preferred method. Or you could
revise it to be a"30' Emergency Access Easement", at which point staff feels comfortable with it as a side.
Hope the above helps guide you. Let me know if you need anything else.
1114.6.3d.-A front yard shall be measured from the right-of-way of public streets,private roads and vehicular access easements except alley easements and shared
driveway easements.
Christopher P.Perez Senior Planner
Department of Community Development(County of Albemarle,Virginia
401 Mclntire Road l Charlottesville,VA 22902
434.296.5832 ext.3443
ill 4.6.3d.-A front yard shall be measured from the right-of-way of public streets,private roads and vehicular access easements
except alley easements and shared driveway easements."
2
'k'.ti'X6 1--:••• ".-\ic'Nc.; - 4"‘
• ''‘,. -N, / • ,,, '.,, ■ , -_.
. -,- -...,..
N.< i
14.r9.' \-:, ?.'';'- ..„..■''°-.''' Cv-4. 7-, -,-1,-.
(-; -:,,:.: ,() , i\ .- *ere • ,. IvoK
..-)
, . ' ...
:_, Q--)' f+-7-• \,-":"---- ______,,s,--`,.; '-'--' \ \ i '-'" -
N'1,0 . ---•--- --
.7 e.1 ' i. - ■-• :.,,..i
...-1. _----
‘. / P ID/ )
..)
1 ..., , 1
•1 . • '•.s =
.1 \
,■ .-
--4-r-
\ N '
CP
,n 1
—
--
(5, — . 0,1 .6",
GI LOT 14 LOT 21 4k 1,, es,_e.'; i__*.. _
IL:3
1 1S'
—44 '
t
%
BLOCK "A"
(----____
/ P-•• .._
C11 .1 ;3
._ S 7T34'40" E 8.14' ------ -
6.85 / i ir 7
, I c\, , I Z::,
TO SAN. SEWER MAIN i d I/..-)' / ct?
' sx
I 1
- w i
it m
, 0,
4231:ic\ ■ ',i, , ill- 10
c1.4
c-Ci Ct P'/`' \ ,s? ---32.0-77, ---- _ I
" ..._•
. -- ' 16,n---- ----
- ) / N 2Z20'30" E
_
LOT 19 4t) -
44/0osc-------_____ -----,-, .,.
-, --/- 44
'`41/1/Ce4Peiliyo
_OT 18 „..
LOT 0 ..,01/7. ---: \-`'..------ /...---- p-,
:.. (76.1, Vtek. Z 8
,, <,c, -0• eLQ>,--', .°./)\- ',/'
y
PO k\ ..„.• ...... .”.
,
.('3D '\.N' '' ,'
../..CD ../ o•
./.. • / •
-
....../.. /."'. ,
— —
___--- - . *
- " -.; ••• - -2'
COMMON AREA
- ,
,
■■ OPEN SPACE 3
234.33 "
14414 .47' '
ARM 0 . A 7,229 S.F. '
.7, CENTERLINE-OF-60
PEDESTRIAN, BICTOLE,A,EMERGENCY
GAS COURI ACCESS,'EASDAEK-4,- - I
50' 01 FROtt POINTS' "A' TO ir LOT 34
IMP 61A-01-35
SEE DETAIL 1 AND 2— '— , — — — —
_ _ SHEET 4 OF 4
I. , r(ii2- SAad5ee)1
(0,4 ■S
,
- _
1 SHEET 3 OF 4
vat
Christopher Perez
From: Christopher Perez
Sent: Tuesday, November 26, 2013 12:38 PM
To: 'rob @khals.net'
Subject: Setback questions for Lochlyn Hill Lot 20 and Townhome Lot E
Rob,
After reading through the ordinance with regard to Section 4.6.3(d)[1l. I feel fairly confident guiding you with
the following. But if you want an official determination from the Zoning Administrator it'll have to wait till
Monday when Amelia gets back into the office. Below is my guidance which stems from my reading of Section
4.6.3(d)1.
1) The initial site plan which was approved for Phase B/townhomes, depicts Lot E with a side setback to the
"30' Alley Easement". This appears to truly be a side per 4.6.3(d)1, as a front yard cannot come off an alley
easement.
pon reviewing your question about Lot 20 and it's setbacks from the "30' Access Easement". I see your
ncerns as to whether this would remain a side setback or if it would truly be a front. Upon reviewing Section
4.6.3d1 of the ordinance, if it's a"30' Access Easement", then it'd be a front. If you revise it to be a"30' Alley
Easement"the whole way through then it'd be a side setback. That's the cleaner preferred method. Or you could
revise it to be a"30' Emergency Access Easement", at which point staff feels comfortable with it as a side.
Hope the above helps guide you. Let me know if you need anything else.
f'f 4.6.3d.-A front yard shall be measured from the right-of-way of public streets,private roads and vehicular access easements except alley easements and shared
driveway easements.
.,,. qv;,.. c`. e't- . Senior Planner
Department of Community Development !County of Albemarle,Virginia
401 McIntire Road 1 Charlottesville.VA 22902
434 296.5832 ext.3443
Ell 4.6.3d.-A front yard shall be measured from the right-of-way of public streets, private roads and vehicular access easements
except alley easements and shared driveway easements."
Christopher Perez
From:
Robbie Gilmer
Sent:
Monday, December 02, 2013 5:17 PM
To:
Graham Murray
Cc:
Alex Morrison; mvieira @serviceauthority.org; Christopher Perez
Subject:
RE: SUB201300136 Lochyln Hill Phase I —final subdivision plat
Chris,
Based on the fire flow's from ACSA Fire Rescue is willing to sign off on the 5' reduction in side yard setbacks.
Thanks,
Robbie
From: Graham Murray [mailto: graham @collins- engineering.com]
Sent: Monday, December 02, 2013 10:51 AM
To: Robbie Gilmer
Cc: Alex Morrison; mvieira @serviceauthority.org; Christopher Perez
Subject: RE: SUB201300136 Lochyln Hill Phase I — final subdivision plat
Good morning Robbie,
Adequate fire flows are present for this development. I've attached the approved water model for this project, which shows a flow
test performed by ACSA with close to 1100 gpm of flow and only a 3 psi pressure drop. If you have any questions please feel free to
call me. Also, please note this water model was simulated with an extremely high need fire flow of 3,000 gpm and still maintained
minimum pipe pressures.
Thanks,
Graham
From: Christopher Perez [mailto:cperezCai)albemarle.org]
Sent: Monday, December 02, 2013 10:35 AM
To: Robbie Gilmer
Cc: Alex Morrison; mvieira(aOserviceauthority.org; Graham Murray
Subject: SUB201300136 Lochyln Hill Phase I — final subdivision plat
Robbie,
The developers of Lochyln Hill are requesting confirmation from the County that they have received approval
for a 5' reduction in side yard setbacks based on fire flows. Your October 10th email (see below) suggests you
were awaiting the results of the fire flows from ACSA. Have you received this information... if so, please
provide a status update on this aspect of the plan. Is it approved for a 5' side yard setback reduction based on
available fire flows? In the attached PDF the developer sites ACSA's approval of reduced setback based on fire
flows; however, the ordinance required the Fire Official's approval. Let me know where this stands.
Thanks
Christopher P. Perez I Senior Planner
Department of Community Development ICounty of Albemarle, Virginia
401 McIntire Road I Charlottesville, VA 22902
434.296.5832 ext. 3443
From: Robbie Gilmer
Sent: Thursday, October 10, 2013 12:46 PM
To: Christopher Perez
Subject: RE: SUB201300136 Lochyln Hill Phase I — final subdivision plat
Chris,
Alex has requested a fire flow test for Lochyln Hills. We should know something by middle of next week.
Thanks,
Robbie
From: Christopher Perez
Sent: Wednesday, October 09, 2013 3:23 PM
To: Robbie Gilmer
Cc: Shawn Maddox
Subject: SUB201300136 Lochyln Hill Phase I — final subdivision plat
Robbie,
SUB201300136 Lochyln Hill Phase I — final subdivision plat
I received your comments "no objections" from 9 -29 -13 to the final subdivision plat for Lochyln Hill. However
I was reviewing the file and wanted to get final clarification from Fire and Rescue that this project has adequate
fire flows for a reduction in side yard setbacks per 4.11.3. 1 sent Shawn Maddox the email below seeking
clarification on this item during the review of SDP201300026 Lochlyn Hill - initial site plan but cannot find
any record that he responded/ or confirmed it is adequate. This is about the same time you took over his projects
once you came back.
As noted on the plan the applicant is seeking to reduce the side yard setbacks from 15' to 10'. This is permitted
in the R -4 zoning district; however, it requires Fire Official approval with special regard to Fire Flows (see the
section of the Ordinance which allows this reduction Section 4.11.3 (see below)).
Has Fire Flow tests been done to confirm that they have the required flow for the reduction in side yard
setbacks?
If so, please confirm, if not, the applicant shall have these done prior to the final plat approval.
Christopher P. Perez I Senior Planner
Department of Community Development I County of Albemarle, Virginia
401 McIntire Road I Charlottesville, VA 22902
434.296.5832 ext. 3443
From: Christopher Perez
Sent: Tuesday, June 18, 2013 9:06 AM
To: Shawn Maddox
Subject: SDP201300026 _ Lochlyn Hill - initial site plan
Shawn,
I have reviewed your comments for SDP201300026 - Lochlyn Hill - Initial site plan. I have a quick question
which I want to get clarification from you. As noted on the plan the applicant is seeking to reduce the side yard
setbacks from 15' to 10'. This is permitted in the R -4 zoning district; however, it requires Fire Official
approval with special regard to Fire Flows (see the section of the Ordinance which allows this reduction Section
4.11.3 (see below)).
Has Fire Flow tests been done to confirm that they have the required flow for the reduction in side yard
setbacks?
If so, please confirm, if not, I can always make that a condition of Final Site Plan approval and they will have to
get that done prior to the final site plan approval.
4.11.3 REDUCTION OF BUILDING SEPARATION AND SIDE YARDS (Added 1 -1 -83, Amended 6 -11-
08) The minimum building separation and side yards for primary structures may be reduced in accordance with
the applicable district regulations as follows:
A. Reductions for structures not within zero lot line developments; with adequate fire flows or which are
constructed in accordance with the building code. The minimum building_ separation or side yards for primary
structures may be reduced if the structure is not located within a zero lot line development, but is located in an
area where available fire flows are adequate under Insurance Service Offices standards to allow the reduction.
Each primary structure for which the minimum building separation or side yard has been reduced as provided in
this subsection shall be subject to the following:
1. In the case of a side yard reduction, the Albemarle County fire official may require a guarantee as deemed
necessary to insure compliance with the provisions of this section, and this guarantee may include, but not be
limited to, appropriate deed restrictions, disclosure, and other such instruments, which shall be of a substance
and be in a form approved by the fire official and the county attorney, and shall be recorded in the records of the
circuit court of the county;
2. No structure shall encroach within any emergency accessway required by the Albemarle County fire official;
3. Unless constructed to a common wall, no structure shall be located closer than six (6) feet to any lot line; and
4. No structure shall encroach on any utility, drainage or other easement, nor on any feature required by this
chapter or other applicable law.
Thanks
Christopher P. Perez I Senior Planner
Department of Community Development I County of Albemarle, Virginia
401 McIntire Road I Charlottesville, VA 22902
434.296.5832 ext. 3443
�I.11111���
County of Albemarle
Department of Community Development
Memorandum
To: Kirk Hughes
From: Christopher P. Perez- Senior Planner
Division: Planning Services
Date: October 10, 2013
Subject: SUB2013000136 Lochlyn Hill — Final Subdivision Plat for Phase 1
The Planner for the Planning Services Division of the Albemarle County Department Community
Development will recommend approval of the plat referred above when the following items have
been satisfactorily addressed. (The following comments are those that have been identified at this
time. Additional comments or conditions may be added or eliminated based on further review.)
[Each comment is preceded by the applicable reference to the Albemarle County Code.]
1. [Comment] The final plat which was submitted attempts to subdivide Phase IA and
Phase IB on the same final plat; however, this is not permissible at this time because Phase
IB was not depicted/reviewed on the preliminary subdivision plat for Phase IA which was
approved on 5- 17 -13, rather on the plat it was depicted as "future development."
Subsequently Phase IB has not went to SRC as a Subdivision Plat on its own accord, rather
it only went to SRC as an Initial Site Plan for the townhomes. It is advisable that the
applicant removes Phase IB from this final subdivision plat and move forward with the
review /approval of the Phase IA.
Once the road plan and the final plat for Phase IA are approved then submit a Final Site
Plan for Phase IB and then a Preliminary Plat or a Final Plat Prior to and without a
preliminary (to SRC) for Phase IB.
Also another reason why it is not permissible to include both phases on one plat is because
Phase IB utilized the standard level cluster development provision of the ordinance in R4
zoning district based on providing a minimum of 25% open space. Thus what is depicted as
Common Area Open Space 1 and 3 on this plat is the area which qualified Phase IB of the
development to have townhome units at a min lot size below the standard 10,890SF min lot
size. This was all contingent on Phase IB being its own lot to be developed at a future date.
Revise appropriately. If you have any questions please give me a call, for your convenience
below I am providing a history of the submittals for this project.
History of submittals:
* SUB201300028_Phase IA (Lots 1 -21) — Preliminary subdivision plat (went to SRC)
approved w/ conditions on 5- 17 -13.
* SDP201300026 —Phase IB (Townhomes) — Initial site plan (went to SRC) approved w/
conditions on July 29, 2013.
* SUB201300092_Road Plans (for both Phase IA and IB) - currently under review.
* SUB201300136_Final Plat (for both Phase IA and IB) — this plat, currently under review.
2. [Comment] Phase IB of this development straddles County and City boarders; as such
the City as well as the County will be required to sign the final subdivision plat for Phase
IB of the development including road plan review and bonding of the road.
[14- 302(A4) and (A5), 14 -305, 14 -3111 Water protection plans are required to be
approved prior to final plat approval. Please coordinate this effort with Engineering,
notably it appears the Stormwater Management Facility for this site is offsite and within
the City of Charlottesville, thus I believe the City will be required to approve that aspect
of the plan. Will this issue require offsite Access and Maintenance Easement for the
SWM pond? If so, they will be required prior to approval of the final plat. Please address
this issue.
4. [Comment] On the approved preliminary plat for Phase IA_ Lot 19 and Lot 20 were
approved as attached single family lots; however, on the final plat they are depicted as
separate detached single family lots. Please address this inconsistency.
Also, on the approved preliminary plat for Phase IA, Lot 20 was designated/approved to as
an affordable unit which was provided to meet the phases' density requirements. Please
address the inconstancy with the approved preliminary plat. Revise appropriately to include
a note on sheet 1 which lists the Lot 20 as an affordable unit.
5.[14-302B(8), 14- 302A(9) and 4.11.31 Side yard setbacks for R4 zoning are 15% however,
if the applicant aims to reduce the setback to 10' as depicted on the plat the applicant will
need approval from the Fire Official that the development has adequate fire flows for
such a reduction. Prior to final subdivision plat approval please coordinate this effort with
the Fire and Rescue Dept to assure compliance with Section 4.11.3 (Al). Notably,
Robbie Gilmer and Alex Morrison have requested a fire flow test for Lochlyn Hills.
Results are pending. In the case of a side yard reduction, the Albemarle County fire
official may require a guarantee as deemed necessary to insure compliance with the
provisions of this section, and this guarantee may include, but not be limited to,
appropriate deed restrictions, disclosure, and other such instruments, which shall be of a
substance and be in a form approved by the fire official and the county attorney, and
shall be recorded in the records of the circuit court of the county; "
Also, if approved for the reduction revise the side yard setback note on sheet 1 to state:
"Minimum side yard setbacks for this development are 10' per Section 4.11.3 ".
6. [Condition of Approval for Preliminary Plat] As proposed the realignment of Pen
Park Lane will require alterations in existing access for TMP 61A -19, 20, 21, 22, and
23A. As such this may require access easements to be provided to those owners across
Lochlyn Hills property OR boundary line adjustments to transfer the excess land to those
owners. Depending on the solution to the above this may also require offsite construction
easements to construct the modified driveways on the above properties. Per the
applicant, they are working with VDOT and individual lot owners on this issue and the
final plat will reflect additional r/w or transfer of the property to the lot owners. Prior
to Final Plat approval this issue shall be resolved and approved by VDOT and the
County.
2
As proposed it does not appear that the above mentioned issue has been addressed, rather
there is a portion of land being dedicated as "Common Area Open Space 2" which
appears to create an island in the middle of Pen Park Lane. Please clarify.
7.[14-302(A)9 and 4.6.41 The rear setbacks for Lots 19 and 21 should be revised to
account for the approved L- turnaround of the 20' Private Alley Easement. The rear
setback shall be measured from the easement. The approved preliminary subdivision plat
for Phase IA (SUB201300028) did not contain a turn around on these lots, thus it was not
relevant on that plat. Only during the review and approval of the Initial Site Plan for
Phase IB did this item come into play. This will need to be corrected on the final
subdivision plat prior to approval.
Also, the required/approved L- turnaround will affect the rear setback for "Parcel A ". The
rear setback shall be measured from the easement. Revise appropriately.
8. [14- 303(G)] Ownership of Common Area. On the final plat provide the intended
ownership for all the easements, specifically for the Pocket Park, 20' shared driveway
easements, 20' Private Alley Access Easement, 30' Private Alley Easement (Points B to
C), and 30' Emergency Fire Access Easement and pedestrian and bike connection (Points
A to B).
9. [Comment] The preliminary plat denotes the Pocket Park as being maintained by the
HOA; however, the final plat labels it as "Public" and is not include on Sheet 1 under
General Notes #6 along with the other items to be maintained by the HOA. On the plat
clarify who shall maintain this space. Is it to be maintained by the HOA, individual
property owners of Lots 7 -9 or some other party? Please clarify.
Also, staff recommends that a note be added to sheet 1 of the plat to denote the Pocket
Park Access Easement traverses Lots 7 -9.
10. [4.6.3(a)] The side yard setbacks abutting the "20' shared driveway easements " are not
accurately shown. Pursuant to Section 4.6.3(a) "If a shared driveway is concurrent with
the shared lot line of the lots served by the shared driveway, each primary structure also
shall be located at least six (6) feet from the edge of the shared driveway easement. "
Thus on the plat there should be an additional 6' side yard setback from each side of the
easement per Section 4.6.3(a). If the shared easements are to remain as depicted this will
need to be corrected prior to final subdivision plat approval.
It. [14 -303E] Shared Driveway Easements. The easement holder(s) of the shared driveway
easements shall be identified on the plat. Also, a note shall be added to the plat stating
that maintenance shall be by the owners of the lots affected by the shared driveway
easement, not by the Virginia Department of Transportation or the county. Revise.
12. [14 -317] Instrument evidencing maintenance of certain improvements. Prior to Final Plat
approval, an instrument evidencing maintenance of the Pocket Park, Common Area Open
Space, 20' shared driveway easements, 20' Private Alley Access Easement, 30' Private
Alley Easement (Points B to C), and 30' Emergency Fire Access Easement and
pedestrian and bike connection (Points A to B) will need to be submitted for County
review and approval. The County Attorney will be required to review/ approve the
maintenance documents prior to final plat approval. Submit the draft documents to
Planning staff for cursory review and then we'll forward them to the County Attorney for
review/ approval.
13. [14 -435] Road plans must be approved and the roads must be built or bonded prior to the
signing of the final plat.
Fire and Rescue — Robbie Gilmer
1) No objection*
*Notably, Robbie Gilmer and Alex Morrison have requested a fire flow test for Lochlyn Hills to
qualify the side yard reduction. Results are pending.
E911 - Andrew Slack
Approved
Engineering — Max Greene
1) Plat does not appear to match the initial site plans alley access and requires a turn around that
matches the site plan.
2) Road plans will need to be approved and bonded prior to final plat approval.
3) Water protection plans need to be approved prior to final plat approval.
4) Common Open Space # 2 appears to be blocking existing lot access or is creating an island in
the middle of the existing road. Please clarify road alignment.
5) Private drainage easements do not appear to match Initial site and subdivision plans.
6) Emergency Fire Access Easement is not labeled on plat.
VDOT — Troy Austin
1) The road and utility plans for this project are currently in the review process. There are a few
sanitary sewer and storm sewer alignment changes that we are working with the engineer on
which could impact the easements shown on the final plat. As such, the road plans need to be
approved before we can recommend approval on the final plat.
ACSA — Alex Morrison
1) The construction documents related to the above referenced plat are currently under review by
ACSA staff. The ACSA will comment on the plat once construction approval is granted.
Building Inspections - Jay Schlothauer
No objection
RWSA - Victoria Fort
Comments pending
Please contact Christopher P. Perez at the Department of Community Development 296 -5832 ext.
3443 for further information.
4
•t3 . ,
COMMONWEALTH of VIRGINIA
DEPARTMENT OF TRANSPORTATION
1601 Orange Road
Culpeper, Virginia 22701 -3819
Gregory A. Whirley
Commissioner of Highways
October 8, 2013
Mr. Christopher Perez.
Senior Planner
County of Albemarle
Department of Community Development
401 McIntire Road
Charlottesville, VA 22902
Re: SUB - 2013 -00136 Lochlyn Hill — Phase 1 Final Plat
Dear Mr. Perez:
We have reviewed the final subdivision plat for Lochlyn Hill, Phase 1 dated September 4, 2013
as submitted by Kirk Hughes & Associates and offer the following comments:
The road and utility plans for this project are currently in the review process. There are a
few sanitary sewer and storm sewer alignment changes that we are working with the
engineer on which could impact the easements shown on the final plat. As such, the road
plans need to be approved before we can recommend approval on the final plat.
If you need additional information concerning this project, please feel free to contact me.
Sincerely,
Troy Austin, P.E.
Area Land Use Engineer
Culpeper District
VirginiaDOT.org
WE KEEP VIRGINIA MOVING
Christopher Perez
From: Alex Morrison [amorrison @serviceauthority.org]
Sent: Monday, October 07, 2013 3:18 PM
To: Christopher Perez
Subject: SUB201300136: Lochlyn Hill - Phase 1 - Final Plat
Chris,
The construction documents related to the above referenced plat are currently under review by ACSA staff. The ACSA
will comment on the plat once construction approval is granted.
Alexander J. Morrison, EIT
Civil Engineer
Mcwk Cc'ni -I
Service Authkity
•
168 Spotnap Road
Charlottesville, VA 22911
Office: (434)977-4511 EXT: 116
This email may contain confidential information that should not be shared with anyone other than its intended
recipient(s).
Review Comments
Project Name: Lochlyn Hill, Phase 1A & 1 B - Final Final Plat
Date Completed: Isunday, September 29, 2013
Reviewer: Robbie Gilmer
Department /Division /Agency: Fire Rescue
Reviews
Based on plans dated 9/4/13
No comments or objections
Review Status: No Objection
Review Comments
Project Name: Lochlyn Hill, Phase 1A & 1 B - Final Final Plat
Date Completed: Thursday, September 26, 2013
Reviewer: Max Greene
Department /Division /Agency: Engineering
Reviews
'Plat does not appear to match the initial site plans alley access and requires a turn around that matches the site
plan.
'Road plans will need to be approved and bonded prior to final plat approval.
'Water protection plans need to be approved prior to final plat approval.
'Common Open Space # 2 appears to be blocking existing lot access or is creating an island in the middle of the
existing road. Please clarify road alignment.
'Private drainage easements do not appear to match Initial site and subdivision plans.
'Emergency Fire Access Easement is not labled on plat.
Review Status: Requested Changes
Review Comments
Project Name: Lochlyn Hill, Phase 1A & 1 B - Final Final Plat
Date Completed: 1wednesday, September 25, 2013
Reviewer: Andrew Slack
Department /Division /Agency: E911
Reviews
Approved
Review Status: Approved
Review Comments
Project Name: Lochlyn Hill, Phase 1A & 1 B - Final Final Plat
Date Completed: Monday, September 23, 2013
Reviewer: Jay Schlothauer
Department /Division /Agency: Building Code Zoning
Reviews
Based on plat dated September 4, 2013.
No comments or conditions.
Review Status: No Objection
�C �9 4
COMMONWEALTH:of VIRGINIA
_
DEPARTMENT OFE.NT17RONItIENTAL QUALITY'
VALLEY REGIONAL OFFICE
DOUglas, W. Domenech _ 44.11. Early Road, P.O. Boa 3000, Harrisonburg, Virginia 2280:1 David K..Paylor
Secretary of.Natural:Resources (540):574 -7800 Fax.(540) 574 -7878 Director
www.deq,.viTgini'a.gov AmvThatcher':0wens
Regional 'Director
September 13,2013
1 &. Scott .Collins
Collins Engineering
200 Garrett Street, Suite 'K
Charlottesville, VA 22902
RE; Lochlyn Hill
Scott,.
Regional and Central Office DEQ staff have been reviewing options for the oversight of the E &S
and Stormwater activities associated with this project. Based on this review,, wehave made the
following observations:
•
'l lie law provides that DEQ may review multijurisdictional plans; however, DEQ ip
declining to review this plan because the City of Charlottesville and the County of
Albemarle_ have. demonstrated the technical expertise to handle projects of this type.
• Both the City of Charlottesville and.Albemarle County are MS4s and are required to
operate stormwater. and erosion & sediment control programs.
• Based on '§ 62.1- 44.15:55.B and the review of the information we have been provided, by
operation of law the project is approved -and can proceed.
• DEQ recommends that the project engineer respond to the comments provided by the
:City of Charlottesville and transmitted to DEQ on.August 23, 201.1. (attached)
o In addition to the requirement -to develop and implement an approved erosion and
ediment control. plan for the site, you should also begin the process of applying:for
.coverage under the Virginia Stormwater.Management General Permit.
In orderto better serve the, development community and :our local partners, DEQ will be
developing procedures .for the.review and approval of future projects where complex
multijurisdictional issues require. agency expertise.