Loading...
HomeMy WebLinkAboutSDP202200047 Review Comments Final Site Plan and Comps. 2023-01-26c or nt 401 McIntire Road, North Wing Charlottesville,VA22902-4579 County of Albemarle Telephone:434-296-5832 COMMUNITY DEVELOPMENT DEPARTMENT WWW.ALBEMARLE.ORG Memorandum To: Scott Collins, PE; Collins Engineering (scottncollins-en ing eering com) From: Andy Reitelbach, Senior Planner II, Planning Division Date: January 26, 2023 Subject: SDP2022-00047 — Victorian Heights — Final Site Plan; 2"d Submittal The Planner for the Planning Services Division of the Albemarle County Department of Community Development will recommend approval of the plan referred to above when the following items have been satisfactorily addressed. (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.) Comments — First Review of Victorian Heights — Final Site Plan (SDP2022-00047): 1. [30.2.61 This development will require review by the Planning Commission to determine anticipated impacts of the cluster development and bonus density provisions and regulations on the Airport Impact Area overlay district. Provide a narrative justifying why this proposed development will not have a negative impact on the AIA requirements. Staff has no concerns with this request. Staff will work with the applicant to schedule this item for consideration by the Planning Commission. 2. [2.2] The calculations for open space and the bonus density appear to be incorrect. For more information, see comments from Zoning (near the end of this memo) regarding the calculation of the bonus density provisions and the open space requirements. The cover sheet states that 8 affordable units are required based on the provided calculations. However, the note on sheet 3 states that 11 affordable units are required. It appears that only eight units are marked as affordable. Clarify the calculations and the number of affordable units required and provided. Include the affordable housing standards listed under 18-2.4.5(b) of the Zoning Ordinance on the site plan. It appears that portions of the designated open space are instead occupied by the alleyway and access easements. These are not permitted uses within designated open space. Revise the calculations with the removal of those areas. 3. [4.19] The setback note will need to be updated if the Board of Supervisors approves the special exception request for modifying the setback regulations. Response noted. See also comment below under SE2022-00043. 4. [32.5.2(a)] Revise the building sites note on the cover sheet. There are more lots than what is stated in that note. The note states there is a residue parcel. Which lot is considered the residue? Also, see the comment below — buildings 2 and 3 cannot be on a separate lot from building 1. Review Comments Page 2 of 3 5. [32.5.2(a)] There should be at least 36 building lots, as opposed to the 35 identified in the table on the plan layout sheet. Building 1 will be on a different parcel from Buildings 2 and 3 because of the open space area separating them. Or is it intended that these buildings and the open space will all be on the same parcel? Lots 36 and 37 do not have road frontage now that they are located on separate lots from Building #1, as the central roadway is an access easement for an alley, not a private street. On the first submittal of the plat, the three multi -family buildings were all located on the same lot, with frontage along Berkmar, which gave those buildings frontage. Either the multi -family buildings all need to be on one parcel, or the alleyway through the center of the development will need to become a street to give those buildings frontage. It may be helpful to meet with staff to discuss options. 6. [4.16] Provide a substitution waiver request for the recreational facilities, as there is a note on the cover sheet indicating one would be provided. However, one was not submitted with this application. Staff cannot fully analyze the recreational facilities without knowing what is proposed to be provided. The facilities as currently proposed do not meet the requirements. Revise the request for substitution of recreational facififres. The area required for rec facilities is not to exceed 5% of the gross site area, which is 10,718 square feet (or approximately 0.246 acres). 7. [32.5.2(a)] An interconnection needs to be provided to TMP 45-68D1 on the north side of this project. The expanded easement does not appear to be identified on sheet 4 of the site plan. 8. [32.7.91 Landscaping Plan a. An easement will be required for any landscaping located on private lots. An easement plat must still be submitted for review and approval prior to approval of the final site plan. (See comment below also.) 9. [32.5.20), 32.5.2(k)] An easement plat will be required. This easement plat must be recorded prior to approval of the site plan. Provide a separate easement plat. This comment is still outstanding. An easement plat must be submitted and approved prior to approval of the final site plan. Comments — SE2022-00043 — Victorian Hei¢hts — Special Exception: 1. This application has been scheduled for consideration by the Board of Supervisors. Please contact Andy Reitelbach in the Department of Community Development at areitelbach@albemarle.org or 434-296-5832 ext. 3261 for further information. Comments from Other Reviewing Departments. Divisions, and Agencies Albemarle County Engineering Services (Engineer) Emily Cox, ecox2 a&albemarle.org — Requested changes; see the attached comment memo. Albemarle County Building Inspections Betty Slough, bslough@albemarle.org — Review pending; comments will be forwarded to applicant upon receipt by Planning staff. Review Comments Page 3 of 3 Albemarle County Department of Fire -Rescue Howard Lagomarsino, hlagomarsino@albemarle.org — No objections at this time. Albemarle County Service Authority (ACSA) Richard Nelson, melsongserviceauthority.org — Requested changes; see the attached comment memo. Virginia Department of Transportation (VDOT) Doug McAvoy, dou as.mcavoy a vdot.vir ig nia.gov —No objections at this time; see the attached comment memo. Rivanna Water and Sewer Authority (RWSA) Dyon Vega, dvegagrivanna.org — Review pending; comments will be forwarded to applicant upon receipt by Planning staff. �$ County of Albemarle m COMMUNITY DEVELOPMENT DEPARTMENT Memorandum To: Andy Reitelbach From: Emily Cox Date: 08/04/2022 Rev. 1: 12/29/22 Subject: Victorian Heights Final Site Plan (SDP202200047) 401 McIntire Road, North Wing Charlottesville, VA 22902-4579 Telephone: 434-296-5832 WWW.ALBEMARLE.ORG The Victorian Heights Final Site Plan has been reviewed by engineering. The following comments will need to be addressed before approval: 1. Easement plat must be recorded before final site plan can be approved. Rev. 1: Comment not addressed. 2. 3. The plan does not match the approved WPO. WPO amendment must be submitted and approved before final site plan can be approved. Rev. 1: Comment not addressed. WPO was submitted but is not approved yet. Please note that the WPO and the site plan should match. Differences were noted in the grading and storm along Woodburn Rd. Ensure the maximum proposed slope is 2:1. Please add a note showing the maximum 2:1 slope. Rev. 1: Per County Code 18-4.3.3-C-1, it appears the area between buildings 1 and 2 and Berkmar Dr. requires a reverse slope bench because it is a 2:1 slope over 20 ft. This should be adjusted on the WPO as well. See below: 4. Engineered signed and sealed retaining wall plans will be necessary before final site plan approval. Rev. 1: Comment not addressed. 5. Sheet 5 appears to show public drainage easements that are not shown on Sheet 3A.Rev. 1: Please make sure the public and private drainage labels match on these sheets. The outfall from the SWM facility should be public and is labeled as public on Sheet 5. It is not evident as public on Sheet 3A. 6. Please show all proposed easements on the landscaping sheet. Rev. 1: Ensure all trees are at least 5' from all storm pipes. Engineering Review Comments Page 2 of 2 7. Please ensure County Code 18-4.12.17.b is met. This code states that entrances should not exceed a 4% grade for a distance of 40 ft. from the intersected street. Rev. 1: Comment addressed. 8. [Sheet 6] Please show cross -slopes on typical road cross section details. Rev. 1: Comment addressed. Albemarle County Service Auth♦rity Serving6Con%Tving December 21, 2022 Collins Engineering Attn: Mr. Scott Collins, P.E. 200 Garrett Street, Suite K Charlottesville, Virginia 22902 Re: Victorian Heights - Final Site Plan Dear Mr. Collins: We have reviewed the plans entitled "Victorian Heights - Final Site Plan," dated December 9, 2022. The following comments need to be addressed. General 1. Provide water/sewer data sheets. 2. RWSA approval for water connection and proposed site development required prior to ACSA approval. 3. Recorded offsite sewer deed of easement and plat required prior to utility plan approval. 4. Update sewer easement widths to reflect updated ACSA specs for easement requirements. 5. Water pressures may be low. Sheet 2 1. Add a note to have the existing FHA along Berkmar adjusted to final grade. Sheet 4 1. Relocate meters out of driveway typ. 2. Relocate existing 2-inch service line and water meter outside of parallel parking along Woodburn. This service line serves the neighboring parcels. Care should be taken to ensure their service is not interrupted. 3. Have double tap meters shown in wider portions of strips between driveways. 4. Relocate proposed FHA to the corner of Lot 28. 5. Relocate Lot 28 water meter to portion of water main going to FHA. 6. Relocate blow -off assembly away from retaining wall. 7. Show separate water service and fire line connections for Buildings 1 and 2. 8. Lot 19 sewer lateral should enter at 90-degrees or greater. 9. Have Lot 18 lateral enter sewer main, after casing pipe. 10. Refer to red line drawing for manhole S9A location and water main alignment. 168 Spotnap Road - Charlottesville, VA 22911 - Phone (434) 977-4511 - Fax (434) 979-0698 www.serviceauthority.org Sheet 9 1. Manhole S12 invert elevations are flat. 2. Relocate manhole S8 between Lots 30 and 31, and shorten to 3-feet depth. 3. Shallow the downstream sewer segments based on new manhole S8 location and running the sewer main at 0.5 percent slope. If you have any questions concerning this review feel free to call at me (434) 977-4511, Ext. 113. Sincerely, Richard Nelson Civil Engineer RN/dbh 050601 Victoria nHeig htsComments 122122 COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION Stephen C. Brich, P.E. 1401 East Broad Street Commissioner Richmond, Virginia 23219 January 10, 2023 County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Attn: Andy Reitelbach Re: Victorian Heights — Final Site Plan SUB-2021-00047 Review #2 Dear Mr. Reitelbach: (804) 7862701 Fax: (804) 7862940 The Department of Transportation, Charlottesville Residency Transportation and Land Use Section, has reviewed the above referenced plan as submitted by Collins Engineering, dated 27 June 2022, revised 09 December 2022, and find it to be generally acceptable. If further information is desired, please contact Willis Bedsaul at 434-422-9866. A VDOT Land Use Permit will be required prior to any work within the right-of-way. The owner/developer must contact the Charlottesville Residency Transportation and Land Use Section at (434) 422-9399 for information pertaining to this process. Sincerely, John Wilson, P.E. Assistant Resident Engineer -Land Use Charlottesville Residency VirginiaDOT.org WE KEEP VIRGINIA MOVING