Loading...
HomeMy WebLinkAboutWPO201400024 Review Comments 2014-10-16Review Comments Project Name: Out of Bounds Erosion and Sediment Control Plan Date Completed: Thursday, October 16, 2014 Reviewer: Ana Kilmer Department /Division /Agency: CommDev- Central Ops Reviews 10/8/2014 - SWA submitted to County 10/9/2014 - SWA forwarded to CAO 10/9/2014 - SWA approved by CAO 10/10/2014 - SWA signed by County Executive 10/16/2014 - SWA recorded in DEED BOOK 4546, PAGE 264 Review Status: Approved Review Comments Project Name: Out of Bounds Erosion and Sediment Control Plan Date Completed: Friday, September 19, 2014 Reviewer: Glenn Brooks Department /Division /Agency: Engineering Reviews Review Status: Pending 4r IA COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road,Room 227 Charlottesville,Virginia 22902-4596 Phone(434)296-5832 Fax(434)972-4126 Project: Out of Bounds Plan preparer: Shimp Engineering [Justin Shimp [Justin @shimp-engineering.com]] Owner or rep.: Vito Cetta [vitocetta @me.com] Plan received date: road plan 11 Sep 2014 Date of comments: 17 Sep 2014 Reviewer: Glenn Brooks,P.E. A. Final Site Plan(SDP201400036) 1. This is recommended for approval. B. Road and drainage plans(SUB2014-) 1. The road plan is approved with the following additions,marked on the plan; 9ft parking lane on cross- section 2 for Georgetown Road,a VDOT standard CG-9D entrance to lot 52 on Out of Bounds Court, with parking prohibited in front of the entrance by paint striping,paint striping at the entrance of Out of Bounds Court to set off the parking lane,a 4' median dimension on Barracks Road, and lane work with 7"21-A,3"BM-25, 2" SM-9.5A or as required by VDOT to match existing,with paint striping and median sign. C.VSMP: SWPPP: PPP The VSMP plans are approved. When the project is bonded,the county will apply to DEQ for permit coverage. At that time,DEQ will request their portion of the state fees, and issue a coverage letter. This will enable the county to issue a joint permit for VSMP and grading after a preconstruction meeting. D.VSMP: SWPPP: Stormwater Management Plan(WPO201400024) 1. The stormwater plan is approved. E.VSMP: SWPPP: Erosion Control Plan (WPO201400024) 1. The erosion control plan is approved. Review Comments Project Name: Out of Bounds Erosion and Sediment Control Plan Date Completed: 1wednesday, September 10, 2014 Reviewer: Glenn Brooks Department /Division /Agency: Engineering Reviews received vdot approval confirmation on 9 Sep 2014 Review Status: Approved OF Al vIRG1, COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Out of Bounds Plan preparer: Shimp Engineering [Justin Shimp [Justin @chimp- engineering.com]] Owner or rep.: Vito Cetta [vitocetta @me.com] Plan received date: (Vdot approval letter received 9 Sep 2014) Date of comments: 10 Sep 2014 Reviewer: Glenn Brooks, P.E. A. Final Site Plan (SDP201400036) This is recommended for approval contingent on the road plans. B. Road and drainage plans (SDP200400042) 1. AS the last couple of revisions have been with VDOT or with WPO, it is not clear if the plans from Aug 7h are the latest. Please clarify or provide updates so the site plan can be approved. C. VSMP: SWPPP: PPP The VSMP plans are approved. When the project is bonded, the county will apply to DEQ for permit coverage. At that time, DEQ will request their portion of the state fees, and issue a coverage letter. This will enable the county to issue a joint permit for VSMP and grading after a preconstruction meeting. D. VSMP: SWPPP: Stormwater Management Plan (WP0201400024) 1. The stormwater plan is approved. E. VSMP: SWPPP: Erosion Control Plan (WP0201400024) 1. The erosion control plan is approved. OF Al vIRG1, COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Out of Bounds Plan preparer: Shimp Engineering [Justin Shimp [Justin @shimp - engineering.com]] Owner or rep.: Vito Cetta [vitocetta @me.com] Plan received date: 2 July 2014, and 11 July 2014 Date of comments: 24 July 2014 Reviewer: Glenn Brooks, P.E. A. Final Site Plan (SDP201400036) 1. Provide evidence of VDOT approval, especially for the inadequate pipe at the entrance on Barracks Rd. 2. The ribbon curb is confusing. It is not clear exactly what it is. Perhaps it is the gutter, without curb. A detail was not found. If CG -91) is provided, it would appear to connect most everywhere, leaving no room for curbing. In addition, the CG -91) is built to connect at standard curb height where the radius terminates (section B -B). This would ideally be a detail of your road plans. B. Road and drainage plans (SDP200400042) 1. A road plan has not been provided separate from the site plan. In order for bonds to be processed for these roads, a separate road plan will be required. This will be needed before final plat approvals. C. VSMP: SWPPP: PPP A stormwater pollution prevention plan has not been provided. A pollution prevention plan has not been provided. A copy of the registration statement or a letter of permit coverage have not been provided. No VSMP fees have been provided. If these have been submitted to the state, and permit coverage has been obtained, please submit the approval letter, and a copy of the full SWPPP documents. D. VSMP: SWPPP: Stormwater Management Plan (WP0201400024) 1. Please clarify the berm at the rear of the site above the lots on Smithfield Road. Show this clearly on the plan behind all townhouse units to ensure that no runoff is directed or overflows into the existing neighborhood. On the cross - section detail of the pipe system, draw and label the berm on the proposed ground elevation. E. VSMP: SWPPP: Erosion Control Plan (WP0201400024) 1. This plan is satisfactory. File: E10 _vsmp,fsp_GEB_OutofBounds.doc Review Comments Project Name: Out of Bounds Erosion and Sediment Control Plan Date Completed: Wednesday, July 02, 2014 Reviewer: Max Greene Department /Division /Agency: Engineering Reviews No Approved Plan at this time. See Michelle's last review comment letter. Review Status: See Recommendations Phone (434) 296 -5832 Project: Plan preparer: Owner or rep.: Plan received date Date of comments: Reviewer: COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Out of Bounds Shimp Engineering, P.C. Barracks Heights, LLC 2 Jun 2014 20 Jun 2014 Michelle Roberge Engineering has completed the review of application WP02014 -24. A. E &S and SWM (WP0201400024) Sincerely, Fax (434) 972 -4126 6) [Comment] Missing inlet protection and CIP near the main entrance. [Revision] Provide IP for grate inlet before ST -30. See sheet C -21. 10) [Comment] There appears to be two sump inlets on the southern side (in front of lots). Please place a berm in between the Out of Bounds Property as an added runoff protection measure for the Smithfield Road residents. Also, the STR -20 top of rim elevation does not work with the grades. Please revise. Please note, any steep slopes greater than 3:1 should spec a low maintenance ground cover. [Revision] Partially addressed. Provide a berm to pick up all lots along the southern property line. The berm shown is only near ST 20 and ST 34. 11) [Comment] The removal rate computation is over 50% for the north and south side. This will require 2 *WQv to treat first flush, .5" runoff. [Revision] Partially addressed. The southern underground detention basin should be increased to 190 ft from 180 ft. 18) [Comment] Please provide manufacturer's approval of plan for underground detention basins. [Revision] Please provide prior to approval of plans. 19) The bottom width of the drainfield is 28 ft for BMP #1 and 27 ft for BMP #2. Please make this clear on detail I on sheet C18. The 3 ft spacing dimension is correct for the southern BMP, but 4ft for the northern BMP. =111 Michelle Roberge Phone (434) 296 -5832 Project: Plan preparer: Owner or rep.: Plan received date Date of comments: Reviewer: COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Out of Bounds Shimp Engineering, P.C. Barracks Heights, LLC 20 Mar 2014 2 May 2014 Michelle Roberge Engineering has completed the review of application WP02014 -24. A. E &S and SWM (WP0201400024) Fax (434) 972 -4126 1) The project title should include E &S and SWM plan. The "Final Site Development Plan" should be removed since this is not a site plan. 2) Remove the road plans since that should be included in a subdivision application. 3) Label the managed slopes at the existing basin. 4) How will you control runoff off site from Bennington, as road is being built? Also CE should drain to trap. 5) Show staging area. 6) Missing inlet protection and CIP near the main entrance. 7) The 66 contour on SB -1 is on 568 contour. Please revise. 8) Extend DD near lot 44 to include runoff as 90 contour line is graded. 9) 574 contour near lot 38 does not work. Please revise. 10) There appears to be two sump inlets on the southern side (in front of lots). Please place a berm in between the Out of Bounds Property as an added runoff protection measure for the Smithfield Road residents. Also, the STR -20 top of rim elevation does not work with the grades. Please revise. Please note, any steep slopes greater than 3:1 should spec a low maintenance ground cover. 11) The removal rate computation is over 50% for the north and south side. This will require 2 *WQv to treat first flush, .5" runoff. 12) Provide a profile of underground detention basins. 13) The cross sections and details of the underground detention basin on C 18 should be to scale. 14) The geotech report show the boring test 1 -2 does not meet the permissible .52 inches/ hour. The pipes will need to be longer to compensate for this area. 15) BMP 1 will not handle the 100 year storm. 16) On computations /report, the post development BMP numbers do not match plans. Please re- label. 17) It appear that the underground pipe systems are short- circuited. Please show on plan details to avoid- short circuited flow to maximize detention time. 18) Please provide manufacturer's approval of plan for underground detention basins. Sincerely, MIAMI 11,, f Michelle Roberge