HomeMy WebLinkAboutWPO201300074 Review Comments 2013-12-04Review Comment
Project Name: Fifth Street Station Erosion and Sediment Control RIrF]
Date Completed: Monday. March 31, 2014
Reviewer: Glenn Brooks
D e p a rtm e nt'D ivi s i o WAg e n cy: Engineering
Reviews Comments:
Alan
Glenn is saying that he cannot calculate a bond estimate_ Please contact your engineer.
Thanks
Ana D_ Kilmer
Management Analyst
County of Albemarle
Community Development Department
401 McIntire Road
Charlottesville, VA22902
434 -296 -5832
akilmer a albemarle_org
From: Alan Taylor [mailto :clanriverbenddev_com]
Sent: Monday, March 31, 2014 2:19 PM
To: Glenn Brooks
Cc: Ana Kilmer
Subject: Re: 5th Street Station
I sent the estimate request to Ana last week?
< mobile >
On Mar 31, 2014, at 2:17 PM, "Glenn Brooks" <GBROOKSalbemarle . org> wrote:
Alan,
I have received a bond estimate request for the initial erosion and sediment control plan for the 5th Street Station project
(t+VP0201300074)_ I cannot issue a permit for this plan, as it shows buffer disturbances, and a mitigation plan has not
been approved for those disturbances_ I will not be able to give a bond estimate for this plan until the mitigation
component can be included_ This has been discussed with your engineer, Daniel Hines_ When we last met, his intention
seemed to be to provide the mitigation plan and perhaps amend this plan to match this and other changes with the road
and site plans.
Glenn Brooks, P_E_
County Engineer
Albemarle County
Review Status:
Denied
F-1
Rage: 1 County of Albemarle On: '12J'I OJ20'14
Project Name:
Gate Completed:
Reviewer:
DepartmentIDIVlsionlAgency:
Reviews Comments:
Review r Comment
Fifth Street Station
Wednesday, February 12. 2014
Michael Koslow
Engineering
Erasion and Sediment Control PIr
Review Status: Approved E
Page: 1 County of Albemarle On: 1121012014
OF1
w `•'' COUNTY OF ALBEMARLE
° ��' D Department of Community Development
2 " 1 401 McIntire Road
�' Charlottesville,Virginia 22902
WPO Plan Review
Project: F1 P k'\ ` e e e tcl,ek vl Submittal date: 12 /12 0(3
Number: WPO20 i 3- O 7 &4
Date:
Reviewer: Michael Koslow Phone: (434) 296-5832 ext 3297
This is an abbreviated review comment notice. County engineering staff is available every Thursday
afternoon to discuss details of review. To schedule,please call your reviewer for an appointment.
Erosion & Sediment Control: Adequate
(Code Chapter 17,Article II) Not Adequate
Y N k'tcAso ��„d►e e �2{ Itc,1 UIUet. atr) 1Ca-\ €X:54v9 {spec U.ti t►� � �`'�' °
State standards followed, and Design Standards Manual notes and details
Adequate limits and perimeter measures out of work areas
All stages protected adequately
Adequate channels
Stormwater Management: Adequate
(Code Chapter 17,Article III)
Not Adequate
Y N
Enough capture and treatment for on-site areas
Enough detention storage for on-site areas
Sealed hydrologic and hydraulic computations provided
Mitigation:
(Code Chapter 17,Article III) Adequate
Not Adequate
Y N
Buffers and disturbed areas adequately shown
Adequate plantings at 2:1, or other mitigation provided
This review attempts to encompass the larger compliance questions. County staff does not assume
responsibility for any calculation or plan details, and cannot cover the intricacies of every plan submitted.
Each plan and calculation must have a professional seal and signature to assume these responsibilities.
This plan is Approved (please see attached Approval Fact Sheet)
Not Approved