Loading...
HomeMy WebLinkAboutWPO201300074 Review Comments 2013-12-04Review Comment Project Name: Fifth Street Station Erosion and Sediment Control RIrF] Date Completed: Monday. March 31, 2014 Reviewer: Glenn Brooks D e p a rtm e nt'D ivi s i o WAg e n cy: Engineering Reviews Comments: Alan Glenn is saying that he cannot calculate a bond estimate_ Please contact your engineer. Thanks Ana D_ Kilmer Management Analyst County of Albemarle Community Development Department 401 McIntire Road Charlottesville, VA22902 434 -296 -5832 akilmer a albemarle_org From: Alan Taylor [mailto :clanriverbenddev_com] Sent: Monday, March 31, 2014 2:19 PM To: Glenn Brooks Cc: Ana Kilmer Subject: Re: 5th Street Station I sent the estimate request to Ana last week? < mobile > On Mar 31, 2014, at 2:17 PM, "Glenn Brooks" <GBROOKSalbemarle . org> wrote: Alan, I have received a bond estimate request for the initial erosion and sediment control plan for the 5th Street Station project (t+VP0201300074)_ I cannot issue a permit for this plan, as it shows buffer disturbances, and a mitigation plan has not been approved for those disturbances_ I will not be able to give a bond estimate for this plan until the mitigation component can be included_ This has been discussed with your engineer, Daniel Hines_ When we last met, his intention seemed to be to provide the mitigation plan and perhaps amend this plan to match this and other changes with the road and site plans. Glenn Brooks, P_E_ County Engineer Albemarle County Review Status: Denied F-1 Rage: 1 County of Albemarle On: '12J'I OJ20'14 Project Name: Gate Completed: Reviewer: DepartmentIDIVlsionlAgency: Reviews Comments: Review r Comment Fifth Street Station Wednesday, February 12. 2014 Michael Koslow Engineering Erasion and Sediment Control PIr Review Status: Approved E Page: 1 County of Albemarle On: 1121012014 OF1 w `•'' COUNTY OF ALBEMARLE ° ��' D Department of Community Development 2 " 1 401 McIntire Road �' Charlottesville,Virginia 22902 WPO Plan Review Project: F1 P k'\ ` e e e tcl,ek vl Submittal date: 12 /12 0(3 Number: WPO20 i 3- O 7 &4 Date: Reviewer: Michael Koslow Phone: (434) 296-5832 ext 3297 This is an abbreviated review comment notice. County engineering staff is available every Thursday afternoon to discuss details of review. To schedule,please call your reviewer for an appointment. Erosion & Sediment Control: Adequate (Code Chapter 17,Article II) Not Adequate Y N k'tcAso ��„d►e e �2{ Itc,1 UIUet. atr) 1Ca-\ €X:54v9 {spec U.ti t►� � �`'�' ° State standards followed, and Design Standards Manual notes and details Adequate limits and perimeter measures out of work areas All stages protected adequately Adequate channels Stormwater Management: Adequate (Code Chapter 17,Article III) Not Adequate Y N Enough capture and treatment for on-site areas Enough detention storage for on-site areas Sealed hydrologic and hydraulic computations provided Mitigation: (Code Chapter 17,Article III) Adequate Not Adequate Y N Buffers and disturbed areas adequately shown Adequate plantings at 2:1, or other mitigation provided This review attempts to encompass the larger compliance questions. County staff does not assume responsibility for any calculation or plan details, and cannot cover the intricacies of every plan submitted. Each plan and calculation must have a professional seal and signature to assume these responsibilities. This plan is Approved (please see attached Approval Fact Sheet) Not Approved