Loading...
HomeMy WebLinkAboutWPO201300027 Review Comments 2013-04-16 Mark Hopkins From: John Anderson Sent: Tuesday, January 27, 2015 8:31 AM To: Mark Hopkins Cc: Glenn Brooks Subject: WPO201300027, WP0201400004-OW, blocks 28, 29, 35, etc-SWM Mark, This morning,you helped me understand that a silt trap shown on ESCP under WP0201300027 is to be converted to a bio-filter(SWM facility), but if we compare with WP0201400004,this trap will not be converted to a SWM facility. Thanks for catching this. Under WP0201400004,the silt trap may eventually be removed,without conversion. Upper Ballard Pond will serve as SWM for blocks 28, 29, 35, and other areas approved for mass grading under WP0201400004. Excellent catch. Please let me know if you have any questions. Thanks, Mark. John E.Anderson,PE 1 Civil Engineer II Department of Community Development l County of Albemarle,Virginia 401 McIntire Road l Charlottesville,VA 22902 434.296.5832 ext.3069 1 Project Name: Date Completed: Reviewer: Department/Division/Agency: Reviews Comments: Review Status: Review Comments OLD TRAIL - BLOCKS 29A & 35A Thursday, July 25, 2013 Ana Kilmer CommDev-Central Ops Erosion and Sediment Control Plan 7/9/2013 - SWA was submitted. SWA needs corrections and no fee was submitted 7/10/2013 - e-mail sent to Bill Ledbetter 7/17/2013 - SWA was re-submitted 7/18/2013 - SWA forwarded to CAO for approval 7/18/2013- SWA approved by CAO 7/23/2013 - County Executive Signed SWA 7/23/2013 - SWA will be recorded this week 7/25/2013 - SWA recorded in deed book 4388 page 562 Approved COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 Project: Old Trail Village Block 35A & 29A WPO201300027, SUB201300054 Plan preparer: Bill Ledbetter Owner or rep.: March Mountain Properties LLC Plan received date: 16 April 2013 Date of comments: 8 May 2013 Reviewer: Max Greene The Water Protection and Road Plans (WPO201300027, SUB201300054) submitted 16 April 2013 have received Engineering Review and do not appear to meet Albemarle County minimum checklist items for approval. Please adequately address the following comments for final approval: A) Road and drainage plans (SDP200400042) 1) VDOT approval is required. Comments will be forwarded when received. [DM905] 2) Sheet 7 of 13 details for future public road with 61‘private right of way will require VDOT approval. 3) Street tree counts don’t appear to match up with the plans. Please revise. B) Stormwater Management and Mitigation Plan (WPO200500007) 1) The pond shown is not an approved Storm Water Management Structure at this time. Please Submit drainage area plans for the pond and calculations to verify previously approved plans for block 4 of the Old Trail Town Center #WPO201000041 were constructed as designed and add the proposed additional impervious area for this site. 2) SWM agreement is required for the pond to be utilized as a SWM basin. 3) Stormwater pipes with a diameter 15” to 42“will have access points spaced a maximum 300’ apart for maintenance and inspection. C) Erosion Control Plan (WPO200500007) 1) Please certify the topography is current and accurate as of the time of plan submittal. 2) Please update the general E&SC notes on the plan. The notes can be found in the Albemarle County Design Standards Manual. There appears to be several duplications of notes on the plan and need to match or removed from the plan. http://www.albemarle.org/upload/images/forms_center/departments/community_develop ment/forms/design_standards_manual/Albemarle_County_Design_Standards_Manual_22 Oct2012.pdf 3) Please place the Albemarle County Paved Wash Rack detail on the plan. 4) Drainage area to sediment trap appears to be 3+ acres and will require a sediment basin. Engineering Review Comments Page 2 of 2 The basin will need to be designed for the largest drainage area involved with development. I.e. Pre, during, or post development drainage areas. 5) Storm pipe system appears to be lower than the Sediment control structure. This plan appears to show the pipe inundated with stormwater up to the level of the E&SC outlet structure. Please clarify, and show the pipes not backing up with sediment laden stormwater. 6) Please show the existing tree lines as of time of submittal. 7) Limits of disturbance do not appear to encompass all work proposed with this plan. Please include all work proposed with this plan or gray it out so it is clear it will not be constructed with this permit. 8) Narrative states not stockpiles will be on site. Please add, “All excess material to be hauled to an approved site with adequate protection.” 9) Please show the location of the “Enhanced Ball Field” as stated in the E&SC Narrative. 10) Please show how MS-19 is adequately addressed from the end of Stormwater System to pond. D) Planner for Zoning and Current Development has the following comments: 1) On Sheet 5, please show required street trees along the sidewalk on Golf Drive. 2) On Sheet 5, please update the plant list to show the correct number of each type of tree. Currently, there appear to be 13 QP, 10 PA and 4 FP trees. E) Building Inspections department has “No Objection” to the approval of this submittal. F) Fire and Rescue department has ”No Objection” to the approval of this submittal. G) E-911 department has “no Objection” to the approval of this submittal. H) ACSA has forward comments directly to the consultant. Departmental and agency comments from RWSA and VDOT will be forwarded as received. Once these comments have been addressed, please submit 2 copies (add 1 more copy if VDOT needs to review, and 1 more if mass-grading that Planning needs to review) of the revised plans, calculations, and narratives to Current Development Engineering along with the required review fee and transmittal form. Current Development Engineering is available from 2:30-4 PM on Thursdays to discuss these review comments. Please contact Max Greene at 434-296-5832 ext. 3283 or email mgreene@albemarle.org to schedule an appointment. [17-204.f] An application for an erosion and sediment control plan that requires modifications, terms, or conditions to be included in order for it to be approved shall be deemed to be withdrawn if the owner fails to submit a revised plan addressing the omitted modifications, terms or conditions within six (6) months after the owner is informed of the omitted information as provided under paragraph (B). File: Document5 Albemarle County Service 'Auth4rity Serving ♦ Conserving April 24, 2013 Roudabush, Gale & Assoc., Inc. Attn: Mr. Bill Ledbetter, L.S. 914 Monticello Road Charlottesville, Virginia 22902 Re: Old Trail Village Block 29A & 35A Dear Bill: We have reviewed the plans entitled "Old Trail Village Block 35A & Block 29A Final Construction Plan" dated April 5, 2013. The following comments need to be addressed: Sheet 1 1. Provide water data sheet. 2. Flow Acceptance will be required from the Rivanna Water and Sewer Authority (RWSA). The ACSA will submit a request to the RWSA once a schedule for build -out and number of units have been provided by the developer. 3. Revised master plan showing water and sewer for Old Trail Village is required prior to plan approval. Sheet 2 1. Sewer elevations for manhole lids and inverts do not match as- builts submitted by Timmons Group for the Lickinghole Creek Sanitary Sewer Extension. Sheet 3 1. Label existing manholes as shown with the prefix Lickinghole -. 2. Show the 12 -inch gate valve that was cut in during the Block 23 project. 3. Contractor will be required to remove gate valve and stub -out directed at this site since it will not be utilized. 4. All water meters should be placed between the sidewalk and curbing. 5. Revise sewer lateral for Lot 2 so that the angle between the lateral and the downstream sewer main is at least 90 °. 6. Sewer lateral for Lot 4 should connect to manhole across the road. 7. Provide sewer lateral for Lot 5. 8. It is unclear what property the lateral shown at the end of Golf View Drive will serve. 9. Provide gate valve and blow -off at the end of Golf View Drive. 168 Spotnap Road • Charlottesville, VA 22911 • Tel (434) 977 -4511 • Fax (434) 979 -0698 www.serviceauthority.org 10. The fire hydrant along Golf View Drive should be relocated to the western side of the roadway. 11. Add a fire hydrant and future gate valve at the end of Golf View Drive. 12.Add a gate valve near Storm Structure 5 since this section will eventually be looped. Sheet 5 1. Keep trees a minimum of ten feet away from ACSA utilities. Sheet 6 1. Show water service and sewer lateral crossings on storm sewer profiles. 2. What is the 6" S/L label near Station 17 +00? 3. Should the 6" W/L be a water service near Station 5 +50? 4. Revise the reference to PVC W/L under Storm Structure 10. Sheet 7 1. Provide recently revised ACSA General Water and Sewer Notes. I can email this to you at your convenience. Sheet 8 1. There appears to be adequate fall beyond ST #1. Would it be possible to shift this down the hill and allow the water main to cross above the storm sewer? Sheets 9 -13 1. Eliminate these sheets from our submittal. If you have any questions concerning this review, feel free to contact me at (434) 977 -4511, Ext. 114. Sincerely, ;4— /1�r Jeremy M. Lynn, P.E. Senior Civil Engineer JML /dbh 050601 OldTrai IV i IlageBlks29A &35ACommentLtr042413