Loading...
HomeMy WebLinkAboutWPO202200050 Review Comments WPO VSMP 2023-01-31a$ County of Albemarle m COMMUNITY DEVELOPMENT DEPARTMENT VSMP Permit Plan Review Project title: VSMP Plan for Forest Lakes Self -Storage Project file number: WPO2022-00050 Plan prepares Shimp Engineering, 912 E. High St., Charlottesville, VA 22902 Chris Marshall, EIT, chris(d�shimo-engineering.com Applicant: JA-ZAN Limited Partnership [ 250gto(&,,oeosicva.com ] P.O. Box 9035, Charlottesville, VA 22911 Plan received date: 9 Dec 2022 (Rev. 1) 11Jan 2023 Date of comments: 29 Dec 2022 (Rev. 1) 31Jan 2023 Reviewer: John Anderson, PE 401 McIntire Road, North Wing Charlottesville, VA 22902-4579 Telephone: 434-296-5832 WWW.ALBEMARLE.ORG County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is disapproved for reasons listed below. The VSMP application content requirements can be found in County Code section 17-401. A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary. 1. Revise title pg. of SWPPP to reference WP02022-00050. (Rev. 1) Addressed. 2. Once revisions complete, include I I" x 17plan inserts, Sec 4 /5 (ESC /SWM plans). (Rev. 1) Persists. 3. Sec. 1 /Registration Statement: a. Sec. II.F. — List `Albemarle County' since project located in Albemarle County MS4. (Rev. 1) Addressed. 4. Sec. 8: List /name qualified personnel responsible for SWPPP inspections. (Rev. 1) Persists. Required for Grading Permit, not plan approval. 5. Sec. 9: Signed Certification (is blank): Complete form with next submittal. (Rev. 1) Persists. 6. Sec. 11: Insert 26-p. 2019 VAR10 CGP. Available at this link. (Rev. 1) Partially addressed. Asfollow- up: Please relocate 26-p. VAR10 CGP to Sec. 11 of the SWPPP. Once the VAR10 CGP coverage letter is issued by DEQ, place the coverage letter at Sec. 2 of the SWPPP. 7. New: Sec. 6.E: List named individual responsible for PPP. See also PPP, below. Required for Grading Permit, not plan approval. B. Pollution Prevention Plan (PPP) — See above. The PPP content requirements can be found in County Code section 17-404. 1. Sec. E: List named individual responsible for PPP (required for Grading permit, not plan approval). (Rev. 1) Persists. C. Stormwater Management Plan (SWAP) VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWAP. This plan is disapproved for reasons listed below. The stormwater management plan content requirements can be found in County Code section 17-403. 1. C1 2. C2 3. C3 4. C4 Engineering Review Comments Page 2 of 6 a. Revise WPO plan title and Calc. packet title to include reference to WPO2022-00050. (Rev. 1) Addressed. b. Recommend also ref WPO2022-000491 Maplewood Development, TMP 461344 /adjacent parcel (Rev. 1) Apparently addressed. Applicant response (1/10/23 letter): "WPO202200049 is now referenced." County cannot locate reference. a. Show EOP, Worth Crossing. EOP label provided, but not linework matching EP. It is typical to show roads clearly w/ identifiable EP features (gray solid line). Only existing contours and Worth Crossing and EOP labels are provided, but not distinct EP linework, which is now requested. (Rev. 1) Addressed. b. Depict and label: (Rev. 1) Addressed. i. Existing buildings, parking, improvements, etc. on adjacent parcels that lie within 100' of TMP 46B4-3 parcel boundaries. Much detail is shown, but check image, below: ii. As example. show Private Road EOP alone west Darcel boundary on C2. as well as C3. a. Show /label CG-6, rolltop, and CG-2 curbing. Note item b., below, request to revise CG-2 to CG- 6 in specific locations. (Rev. 1) Addressed. b. Wherever runoff concentrates against curbing provide CG-6 curb and gutter, not CG-2 curb alone. (Rev. 1) Addressed. a. Label detention pond emergency spillway dimensions, L x W x D. Alternatively, label at C8. (Rev. 1) Addressed. b. Provide spot elevations that define earthen /grass emergency spillway cross-section. (Rev. 1) Addressed. c. Provide ( w/ C 10) emergency spillway cross-section, provide spillway geometry. (Rev. 1) Addressed. d. Label emergency spillway grass. (Rev. 1) Addressed. e. Label swale created by proposed contours. Also, ESC plan review item 3.b., below. (Rev.1) Addressed. 5. C5 Engineering Review Comments Page 3 of 6 f Label Str. at end of 15 LF 12" HDPE (Applies to C3, as well. Provide profile Str./15LF pipe, C5). (Rev. 1) Addressed. g. Provide spot elevations at Str. B 1 to ensure positive drainage. (Rev. 1) Addressed. h. Provide proposed contours as needed at grate inlet, Str. B1. Applies to 08, as well. (Rev. 1) Addressed. i. Items g.-h., above, apply to unlabeled structure at item f, above. (Rev. 1) Addressed. j. Provide SWM facility sign for pond that warns of risk of detained water and forbids trespass. Sample sign follows SWM review item 10., below. (Rev. 1) Addressed. a. Show /label detention pond principal riser base in storm profile AO-A5 (riser = Str. AI). (Rev. 1) Addressed. b. Label riser base, concrete/steel. Label base dimensions (Lx W x D). (Rev. 1) Addressed. c. Provide buoyancy calculations for riser /base. (Rev. 1) Addressed. d. Label detention pond floor elevation (513'). (Rev. 1) Addressed. e. Coordinate sediment basin dewatering device, elev. 514.5', with mid -flow 4" orifice, elev. 514'. Coordinate dewatering and 4" permanent orifice in separate vertical planes (offset locations). (Rev. 1) Addressed. f New (Rev. 1) Add profile label for pipe end section at Str. BO. 6. Sheet 12/ Calc. packet, p. 2 propose purchase of 3.37 lb. nutrient credits to meet 9VAC25-870-65 requirements. Incl. letter of nutrient credit availability for project from Ivy Creek Nutrient bank on the plan. Project discharges to Powell's Creek /S. Fork Rivanna River, impaired streams. Ivy Creek is the only nutrient bank that meets DEQ eligibility criteria for impaired streams in project FIUC. Please coordinate with Ana Kilmer, 434,296-5832 -x3246 ( akilmer(a),albemarle.ore) prior to purchase to ensure bill of sale /Affidavit include requisite project data. Nutrient purchase not required for plan approval but is required to receive a Grading Permit. (Rev. 1) Addressed. 7. Check LD-229 table, p. 61, Calcs: Provide design for `A' series storm line. Additional comments possible. (Rev. 1) Partially addressed. As %[loin -up: Please add profile label for pipe end section at Str. A2. 8. SWM /public drainage easement plat (and off -site temporary construction) easement plat recordation is required for WPO plan approval. (Rev. 1) Persists. Applicant: "Acknowledged, an easement plat will be submitted for review and recorded." Note: SUB202300011 (easement plat) is submitted; review pending. 9. A recorded Maintenance Agreement is required for WPO plan approval. (Rev. 1) Persists. Applicant: "Acknowledged, a maintenance agreement will be signed and recorded." Note: Engineering email to Applicant discusses need in this regard: Confirmation that side -by -side developments, Forest Lakes Self - Storage and Maplewood Development, will grant temporary construction /access easements to one another —these easements are required for development of either parcel. Email sent January 26, 2023 10:19 AM. 10. Proof of nutrient credit purchase, state VAR10 CGP (LOD =3.29 Ac.), SWPPP update (Sec. 6E/8), and WPO plan bond required prior to receiving a Grading Permit. (Rev. 1) Addressed. Credit Availability Letter from Ecosystem Services to Chris Marshall, Shimp Engineering, January 9, 2023, indicates 3.37 pounds of phosphorus available for this project. Engineering Review Comments Page 4 of 6 D. Erosion and Sediment Control Plan (ESCP) Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is disapproved for reasons listed, below. The erosion control plan content requirements can be found in County Code section 17-402. 1. C10 2. C9 3. C8 a. Provide Contech StonnRax or similar storm rack /riser cover detail for detention basin. (Rev. 1) Addressed. a. Include paved wash rack detail, see p. 8, ACDSM. (Rev. 1) Addressed. a. Although Maplewood Development (parcel to N) final site plan (SDP202200067) and WPO plan (WPO202200049) appear to suggest near -term development, should these plans fall through: i. Provide offsite grading easement on TMP 046134-00-00-00400, Maplewood Investments LLC. Grading easement are shown on C3, C4. Furnish copy of recorded off -site easement (required for WPO plan approval). (Rev. 1) Persists: Applicant: "An offsite grading easement will be shown on the easement plat which will be submitted prior to plan approval." Note: SUB202300011 Forest Lakes Self -Storage Easement Plat, is under review. Off -site grading easement on TMP 46B44 on SUB202300011 matches C3, C4. ii. Provide ROE (Right of Entry) Letter Agreement, between TMP 046134-00-00-00400 owner and Cunty of Albemarle that allows ESC inspector entry to TMP 461344. (Rev. 1) NA: Applicant: "Please provide template for ROE." Albemarle coordinating, internal email, January 20, 2023 5:38 PM. Update: Email to Applicant sent January 26, 2023 10:19 AM explains ROE is a last resort reserved for extenuating circumstance, that easement plat is the vehicle to show off -site easement. SUB202300011 can (and does) show easement to benefit Forest Lakes Self -Storage (TMP 46134-3) on TMP 46134-4. iii. Note: Once a WPO plan is approved, SWM Agreement is recorded, and Grading Permit issued for Maplewood Development (TMP 46134-4), Albemarle will have right to enter adjacent parcel, but development plans often change, so i./ii. are required, unless iii. (Rev. 1) Persists, see 3.a.i, ii, above: Applicant: "Acknowledged, access will be provided by way of easement/ROE agreement." iv. Regardless of status of Maplewood Development, if Forest Lakes Self -Storage receives plan approval, then, absent ROE ii. above), Maplewood (Owner, TMP 46B44) must be party to ESC plan bond, since ESC measures for TMP 46134-3 (Self -Storage) are located on 461344 (Maplewood). This requirement is inflexible until such time development of TMP 46134-4 advances to point that no self -storage ESC measures are located on TMP 4613-4. All of this (item. 3.a.i.-iv. may be avoided if Forest Lakes coordinates WPO plan design with Maplewood Development design (Collins Engineering) to show no grading and no ESC measures on TMP 46B44. Either option is acceptable: 3.a.i: iii, or 3.a.iv. (Rev. 1) Persists: Applicant: "The grading easement has been agreed to by both parties to make the connection easier so an ROE agreement will be provided." b. Label swale between contours 520' and 515' /grate inlet created by proposed contours east of detention pond. Also, SWMplan item 4.e., above. (Rev. 1) Addressed. c. Provide and label EC2 for swale, item b., above. (Rev. 1) Addressed. d. Relocate B2, B1 structure labels or 520', 524' contour labels so structure labels are readable. Comment applies to sheet 04as well. (Rev. 1) Addressed. e. Label ditch -lining for ditch between multi -use path and Worth Crossing (EC-3, or EC-2). (Rev. 1) Persists. Applicant: "Ditch lining is now specified for ditch between path and Worth Crossing." As ollow-uj27 Please direct reviewer to specification (labeVC8, table, note, sequence, etc.), since Engineering Review Comments Page 5 of 6 cannot locate. If ditch corresponds with detail, CIO please label ditch 'Ditch 1' on sheet C8 and ref. detail, CIO. f Provide cross -sections for swale /ditch, items b., e., above. (Rev. 1) Addressed. g. Relocate IP label at Sir. A3 since this label obscures A3 label. (Rev. 1) Addressed. h. Provide ESC Ph 1-A plan that depicts mass grade of site, perimeter controls, and diversions, incl. RWD at PCE at Worth Crossing. (Rev. 1) Addressed. Note: RWD may be required by ESC inspector. i. Ph 2 ESC plan Sequence of Construction references RWD; depict RWD at Worth Crossing on Ph 1-A plan. (Rev. 1) Not addressed. RWD (ESC measure) not shown /provided. j. Revise Ph 2 Sequence to require removal of all sediment and saturated material from sediment basin floor to at least detention pond floor elevation prior to converting SB to detention pond. Specify adequate disposal of saturated SB excavate. (Rev. 1) Addressed. k. Provide silt fence at Worth Crossing. (Rev. 1) Addressed. I. Provide and label safety fence between 10' multiuse path and construction site once multi -use path is constructed. Furnish notes /labels to guide installation of safety fence. (Rev. 1) Addressed. m. Provide /label SWM facility access (Rev. 1) Addressed. Note: SWM Access via Worth Crossing. i. At access, replace CG6 with roll-top curb. ii. Recommend SWM access be opposite 22.33' opening, south face of building. iii. Ref. design at ACDSM, p. 12 — adequate vehicle access, 10' width graded at < 20%. iv. SWM facility access must not conflict with DI A3. v. Comment applies to additional sheets. 4. CT Provide silt fence at Worth Crossing. (Rev. 1) Addressed. 5. C4: Label riprap outfall dimensions (BO x 2, A2). L x W x D. Alternatively, label dimensions at C8. Detail 6, C9, provides dimensions, but please label dimensions in plan view, as well. (Rev. 1) Persists: Applicant: "Rpprap outfall dimensions are now labeled in plan." As follow-up: Please direct reviewer to labels (and sheet), since cannot locate riprap outfall dimension labels in plan view. 'Next Steps' after WPO plan approval Purchase Nutrient Credits (3.371b. required) a. PLEASE coordinate with the County reviewer before working with (Ivy Creek) nutrient bank. The reviewer must confirm if your project must follow the DEQ hierarchy requirements (Ivy Creek is only eligible nutrient bank since project discharges to S. Fork Rivanna River, which is impaired). b. Letter of availability must be provided on the WPO approved plans. c. Applicant must contact/coordinate nutrient credit purchase with Ana Kilmer, akilmer(a albemarle.org. d. Affidavit of Purchase must be provided to Ana Kilmer before a grading permit can be issued. 2. Post WPO Bond a. Applicant must submit a 'Request to Establish a Bond' form and fee to CDD. i.Complete the form and email it to akilmer(a),albemarle.org, along with proof of payment (see below). b. Payment can be made either online or with a check. i.If paying online: 1. Go to the online payment portal. a. Select WPONSMP as the application 'type.' b. Type in the WPO number and project name in the Notes/Details section of the form. C. Type in the 'payment amount' as S294.34. d. Click "Proceed to Secure Checkout" link to make payment. 2. You will receive a receipt in an email. ii.Emad a copy of the receipt to akilmer(a),albemarle.org. Engineering Review Comments Page 6 of 6 c. Once the bond request and payment are received, the applicant can provide the bond estimate (completed on the County worksheet), or Engineering staff will complete the estimate. Once the estimate is approved, Ana Kilmer will contact and work with the applicant to post the bond. Obtain DEQ Permit (if required, required since LOD =4.09 Ac.) After nutrient credits have been purchased and the bond has been posted: a. County staff will register the project with DEQ. b. Applicant/operator listed on the Registration Statement will receive an email with instructions on how to pay the DEQ permit fee. c. Applicant must email a copy of the DEQ receipt of payment to charris(o)albemarle.org. d. DEQ typically will issue a permit within 2 weeks of receiving payment. 4. Request pre -construction meeting: a. Complete and email the Request for a Preconstruction Meeting and Grading Permit to charris(iWbemarle.org. b. Pay the fee via the online payment portal or a check at the pre -construction meeting. If paid online, email a copy of the receipt to charris(o)albemarle.org. All steps must be completed before the grading permit can be issued. County forms can be found on the county website forms center under Engineering Applications: htti)s: //www.albemarle. org/government/community-develol)ment/apply-for/engineering-applications Thank you. Please call if any questions — tel. 434.296-5832-x3069, or email 4anderson2(a)albemarle.org. WP0202200050 Forest Lakes self storage_ 013123revl.docx