Loading...
HomeMy WebLinkAboutWPO201400063 Review Comments 2014-07-07Review Comments Project Name: New Hope Church Stormwater Management/BMP Plan Date Completed: Friday, September 26, 2014 Reviewer: Ana Kilmer Department /Division /Agency: CommDev- Central Ops Reviews 9/16/2014 - SWA submitted to CDD 9/16/2014 - SWA forwarded to CAO for approval 9/16/2014 - approved by CAO 9/18/2014 - county executive executed the swa 9/26/2014 - SWA recorded in deed book 4539, page 436 Review Status: Approved Review Comments Project Name: New Hope Church Stormwater Management/BMP Plan Date Completed: Wednesday, September 10, 2014 Reviewer: Max Greene Department /Division /Agency: Engineering Reviews Review Status: No Objection Review Comments Project Name: New Hope Church Stormwater Management/BMP Plan Date Completed: Wednesday, August 27, 2014 Reviewer: Max Greene Department /Division /Agency: Engineering Reviews Contacted Consultant via e -mail with this note: The plans appear to address the State Minimum Requirements for Approval. But we do not have a complete set of plans. Also, do you have a copy of the 2014 VSMP permit from the State? I think if you send 2 complete sets of the plans to me I can approve them once we have all the State permit information. Review Status: Requested Changes OF Al vIRGINI� COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: New Hope Church WP0201400063 Plan preparer: Blackwell Engineering Owner or rep.: New Hope Community Church; Michael Henderson Trustee [mike2848 @ gmail. com] Plan received date: 24 July 2014 Date of comments: 24 July 2014 Reviewer: reviewer The (New Hope Church) Plans (WP0201400063) submitted 30 June 2014 have received Engineering Review and do not appear to meet Albemarle County minimum checklist items for approval. The Following items will need to be adequately addressed prior to final approval: A. VSMP: SWPPP and Pollution Prevention Plan (The Virginia stormwater management program, stormwater pollution prevention plan application and documents) 1. Please provide a VSMP application, a full copy of the SWPPP documents, and fees. B. VSMP: SWPPP: Stormwater Management Plan 1. Please submit 2 complete copies of the VSMP plans for review and approval. C. VSMP: SWPPP: Erosion and Sediment Control Plan 1. Please submit 2 complete copies of the VSMP plans for review and approval. (Same as above.) Once these comments have been addressed, please submit 2 copies (add 1 more copy if VDOT needs to review, and 1 more if mass - grading that Planning needs to review) of the revised plans, calculations, and narratives to Current Development Engineering. Current Development Engineering is available from 2:30 -4 PM on Thursdays to discuss these review comments. Please contact Max Greene at 434 - 296 -5832 ext. 3283 or email m re�eneAalbemarle.org to schedule an appointment. File: CDDE L_rpfspfptvsmp_MRG_New Hope Church.doc Review Comments Project Name: New Hope Church Stormwater Management/BMP Plan Date Completed: IThursday, July 10, 2014 Reviewer: Glenn Brooks Department /Division /Agency: Engineering Reviews This application was incomplete and failed the 10day completeness check. The applicant was emailed. Review Status: Denied