HomeMy WebLinkAboutWPO201400063 Review Comments 2014-07-07Review Comments
Project Name: New Hope Church Stormwater Management/BMP Plan
Date Completed: Friday, September 26, 2014
Reviewer: Ana Kilmer
Department /Division /Agency: CommDev- Central Ops
Reviews
9/16/2014 - SWA submitted to CDD
9/16/2014 - SWA forwarded to CAO for approval
9/16/2014 - approved by CAO
9/18/2014 - county executive executed the swa
9/26/2014 - SWA recorded in deed book 4539, page 436
Review Status: Approved
Review Comments
Project Name: New Hope Church Stormwater Management/BMP Plan
Date Completed: Wednesday, September 10, 2014
Reviewer: Max Greene
Department /Division /Agency: Engineering
Reviews
Review Status: No Objection
Review Comments
Project Name: New Hope Church Stormwater Management/BMP Plan
Date Completed: Wednesday, August 27, 2014
Reviewer: Max Greene
Department /Division /Agency: Engineering
Reviews
Contacted Consultant via e -mail with this note:
The plans appear to address the State Minimum Requirements for Approval. But we do not have a complete set of
plans. Also, do you have a copy of the 2014 VSMP permit from the State? I think if you send 2 complete sets of
the plans to me I can approve them once we have all the State permit information.
Review Status: Requested Changes
OF Al
vIRGINI�
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
Project: New Hope Church WP0201400063
Plan preparer: Blackwell Engineering
Owner or rep.: New Hope Community Church; Michael Henderson Trustee
[mike2848 @ gmail. com]
Plan received date: 24 July 2014
Date of comments: 24 July 2014
Reviewer: reviewer
The (New Hope Church) Plans (WP0201400063) submitted 30 June 2014 have received
Engineering Review and do not appear to meet Albemarle County minimum checklist items for
approval. The Following items will need to be adequately addressed prior to final approval:
A. VSMP: SWPPP and Pollution Prevention Plan
(The Virginia stormwater management program, stormwater pollution prevention plan application and
documents)
1. Please provide a VSMP application, a full copy of the SWPPP documents, and fees.
B. VSMP: SWPPP: Stormwater Management Plan
1. Please submit 2 complete copies of the VSMP plans for review and approval.
C. VSMP: SWPPP: Erosion and Sediment Control Plan
1. Please submit 2 complete copies of the VSMP plans for review and approval. (Same as above.)
Once these comments have been addressed, please submit 2 copies (add 1 more copy if VDOT needs to
review, and 1 more if mass - grading that Planning needs to review) of the revised plans, calculations, and
narratives to Current Development Engineering.
Current Development Engineering is available from 2:30 -4 PM on Thursdays to discuss these review
comments. Please contact Max Greene at 434 - 296 -5832 ext. 3283 or email m re�eneAalbemarle.org to
schedule an appointment.
File: CDDE L_rpfspfptvsmp_MRG_New Hope Church.doc
Review Comments
Project Name: New Hope Church Stormwater Management/BMP Plan
Date Completed: IThursday, July 10, 2014
Reviewer: Glenn Brooks
Department /Division /Agency: Engineering
Reviews
This application was incomplete and failed the 10day completeness check. The applicant was emailed.
Review Status: Denied